KR20060079489A - Inner wall panel and the wall construction method using there of - Google Patents

Inner wall panel and the wall construction method using there of Download PDF

Info

Publication number
KR20060079489A
KR20060079489A KR1020040117699A KR20040117699A KR20060079489A KR 20060079489 A KR20060079489 A KR 20060079489A KR 1020040117699 A KR1020040117699 A KR 1020040117699A KR 20040117699 A KR20040117699 A KR 20040117699A KR 20060079489 A KR20060079489 A KR 20060079489A
Authority
KR
South Korea
Prior art keywords
wall
finishing material
construction
heat insulating
concrete
Prior art date
Application number
KR1020040117699A
Other languages
Korean (ko)
Inventor
장찬희
박상수
황광범
Original Assignee
주식회사 본판넬
대한주택공사
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 주식회사 본판넬, 대한주택공사 filed Critical 주식회사 본판넬
Priority to KR1020040117699A priority Critical patent/KR20060079489A/en
Publication of KR20060079489A publication Critical patent/KR20060079489A/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • E04B2/84Walls made by casting, pouring, or tamping in situ
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/62Insulation or other protection; Elements or use of specified material therefor
    • E04B1/74Heat, sound or noise insulation, absorption, or reflection; Other building methods affording favourable thermal or acoustical conditions, e.g. accumulating of heat within walls
    • E04B1/76Heat, sound or noise insulation, absorption, or reflection; Other building methods affording favourable thermal or acoustical conditions, e.g. accumulating of heat within walls specifically with respect to heat only
    • E04B1/762Exterior insulation of exterior walls

Abstract

본 발명은 단열벽체의 시공방법을 개선하여 벽체의 시공을 보다 편리하게 하고, 벽체의 시공이 완료된 후에는 별도의 마감재설치 공정이 필요 없게 하여 전체 공기를 단축시키며 공사비용을 대폭적으로 절감시킬 수 있게 하는 공동주택의 단열벽체 시공방법 및 단열벽체용 마감재에 관한 것이다.The present invention improves the construction method of the insulation wall to make the construction of the wall more convenient, and after the construction of the wall is completed, there is no need for a separate finishing installation process to shorten the overall air and significantly reduce the construction cost The present invention relates to a method for constructing an insulated wall of a multi-family house and a finishing material for the insulated wall.

종래에 있어서의 단열벽체 시공방법은 공정수가 많고 복잡하여 시공에 어려움이 있고, 많은 공사 기간을 요하여 공기가 연장됨은 물론 콘크리트벽체의 양생완료 후에 마감재 설치공사와 도배공사를 하여야 되어 공사비용이 높아지는 문제점이 있었던 바, 본 발명은 단열벽체가 설치될 부위를 실측하고, 실측된 칫수로 벽체마감재의 배열도면을 작성하는 도면 작성공정(100)과; 작성된 도면에 따라 단열재(30)를 절단하고, 상기 단열재(30)의 내외측면에 부착되는 마그네슘보드(31)를 절단하는 재단공정(200)과; 재단된 각각의 반제품을 적층시켜 벽체마감재(3)를 형성시키되, 상기 벽체마감재(3)를 온장과, 반절, 및 기타 형상으로 제작하는 벽체마감재 제작공정(300)과; 단열벽체의 외부면을 성형하는 갱폼(40)을 설치하는 갱폼설치공정(400)과, 설치된 갱폼(40)으로부터 이격되어 벽체마감재(3)를 설치시키는 벽체마감재 설치공정(500)과, 설치된 벽체마감재(3)와 갱폼(40)의 사이에 콘크리트를 타설하는 콘크리트 타설공정(600)과; 타설된 콘크리트의 양생완료 후 갱폼(40)을 분리 제거하는 갱폼해체공정(700)으로 단열벽체를 시공함으로써, 적어도 단열재 부착공정과 마감재설치공정을 제외시킬 수 있고, 다수의 조각으로 구성되는 별도의 유로품을 사용하지 않아도 되어 단열벽체의 시공을 용이하게 하며 공기와 공사비용을 절감시킬 수 있는 효과가 있는 것임.
In the conventional method of constructing a thermal insulation wall, the construction process has many processes and is complicated, which makes it difficult to construct, which requires a lot of construction periods, as well as prolonging air, and finishing the installation of concrete and finishing work after curing of concrete walls, resulting in high construction costs. There is a problem, the present invention is a drawing creation process (100) for measuring the site where the heat insulating wall is to be installed, and to create an arrangement drawing of the wall finishing material with the measured dimensions; A cutting process (200) for cutting the heat insulating material (30) according to the drawings and cutting the magnesium board (31) attached to the inner and outer sides of the heat insulating material (30); Stacking each semi-finished product to form a wall finishing material (3), wherein the wall finishing material manufacturing process (300) of manufacturing the wall finishing material (3) in warm, half, and other shapes; Gang-form installation process (400) for installing the gangform 40 for molding the outer surface of the heat insulating wall, wall finish material installation process (500) for installing the wall finishing material (3) spaced apart from the installed gangform (40), and the installed wall A concrete placing process 600 for placing concrete between the finishing material 3 and the gang form 40; After completion of curing of the poured concrete, the construction of the insulation wall by the gang foam dismantling process 700 that separates and removes the gangform 40, at least the insulation material attachment process and the finishing material installation process can be excluded, and composed of a plurality of pieces It does not require the use of flow path products, which facilitates the construction of insulation walls and reduces the air and construction costs.

Description

공동주택의 단열벽체 시공방법 및 단열벽체용 마감재{Inner wall panel and the wall construction method using there of} Inner wall panel and the wall construction method using there of}             

도 1 은 종래의 단열벽체 시공과정을 도시한 단면도 1 is a cross-sectional view showing a conventional insulating wall construction process

도 2 는 종래의 단열벽체에 마감재가 설치된 상태를 도시한 단면도Figure 2 is a cross-sectional view showing a state in which the finishing material is installed on a conventional heat insulation wall

도 3 은 본 발명의 단열벽체 시공과정을 도시한 공정도Figure 3 is a process diagram showing the construction process of the insulating wall of the present invention

도 4 는 본 발명에 의해 단열벽체가 시공되는 상태를 도시한 단면도4 is a cross-sectional view showing a state in which the heat insulation wall is constructed by the present invention.

도 5 는 본 발명에 의해 시공이 완료된 단열벽체를 도시한 단면도Figure 5 is a cross-sectional view showing a heat insulation wall completed by the present invention construction

도 6 은 본 발명에 따른 단열벽체 마감재를 도시한 단면도
6 is a cross-sectional view showing a heat insulating wall finishing material according to the present invention.

<도면의 주요 부분에 대한 부호의 설명><Explanation of symbols for the main parts of the drawings>

3. 벽체마감재 30. 단열재3. Wall finishing material 30. Insulation material

31. 마그네슘보드 32. 보강재31. Magnesium Board 32. Reinforcement

33. 방수층 40. 갱폼
33. Waterproof layer 40. Gang foam

본 발명은 공동주택의 단열벽체 시공방법 및 단열벽체용 마감재에 관한 것으로, 더욱 상세하게는 단열벽체의 시공방법을 개선하여 벽체의 시공을 보다 편리하게 하고, 벽체의 시공이 완료된 후에는 별도의 마감재설치 공정이 필요 없게 하여 전체 공기를 단축시키며 공사비용을 대폭적으로 절감시킬 수 있게 하는 공동주택의 단열벽체 시공방법 및 단열벽체용 마감재에 관한 것이다.The present invention relates to a method for constructing insulation walls and finishing materials for insulation walls of a multi-family house, and more particularly, to improve the construction method of insulation walls to make the construction of walls more convenient, and after finishing the construction of walls, separate finishing materials. The present invention relates to a method of constructing an insulation wall of a multi-family house and a finishing material for insulation wall, which can shorten the entire air and significantly reduce the construction cost by eliminating the installation process.

일반적으로 아파트와 같은 공동주택의 경우 계단과 엘리베이터 통로와 접하는 벽체와, 외기 또는 옆집과 접하는 벽체는 단열 및 소음을 차단하기 위하여 벽체의 내부에 단열 흡음층을 설치시켜 시공하여야 한다.In general, in the case of a multi-family house such as an apartment, a wall contacting a staircase and an elevator passage and a wall contacting an outdoor air or a next door should be constructed by installing an insulation sound absorbing layer inside the wall to block insulation and noise.

종래에 공동주택의 단열벽체 시공방법은 첨부된 도면 도 1 및 도 2 에 도시되는 바와 같이, 시공하고자하는 벽체의 외측에 갱폼(gang form)(40)을 설치시키고, 내측에는 유로폼(euro form)(45)을 설치시키며, 갱폼과 유로폼의 사이에 콘크리트를 타설시켜 콘크리트벽체(80)를 형성시킨다.Conventionally, a method of constructing a thermal insulation wall of a multi-family house is shown in FIGS. 1 and 2, where a gang form 40 is installed on an outer side of a wall to be constructed, and an euro form is formed on an inner side thereof. 45 is installed, and concrete is poured between the gangform and the euroform to form the concrete wall 80.

이어 콘크리트의 양생이 완료되면 유로폼(45)과 갱폼(40)을 해체시키고, 콘크리트벽체(80)의 내측면에 단열재(30)를 부착 설치시키고, 단열재(30)의 부착이 완료되면 단열재 표면에 석고보드(50)를 설시키고, 석고보드(50)의 표면에 도배지(55)를 부착시켜 최종 마감하게 되는 것이다. Subsequently, when curing of concrete is completed, the euro foam 45 and the gang foam 40 are dismantled, and the heat insulating material 30 is attached to the inner surface of the concrete wall 80. When the heat insulating material 30 is attached, the surface of the heat insulating material is completed. The gypsum board 50 is installed, and the dopant 55 is attached to the surface of the gypsum board 50 to be finally finished.

이와 같이 종래의 단열벽체는 콘크리트벽체(80) 형성공정과, 단열재(30) 설 치공정 및 석고보드(50)설치공정 모두 3단계의 공정을 거쳐 단열벽체를 형성시키게 되는 것이다.As described above, the conventional heat insulating wall forms a concrete wall 80, a heat insulating material 30 installation process, and a gypsum board 50 installation process through three steps.

이상에서와 같이 종래에 있어서의 단열벽체 시공방법은 공정수가 많고 복잡하여 시공에 어려움이 있고, 많은 공사 기간을 요하여 공기가 연장됨은 물론 콘크리트벽체의 양생완료 후에 마감재 설치공사와 도배공사를 하여야 되어 공사비용이 높아지는 문제점이 있는 것이다.As mentioned above, the insulation wall construction method in the prior art has a large number of processes and is difficult to construct, and requires a lot of construction periods to extend the air, as well as to finish and install the finishing materials after the curing of the concrete wall. There is a problem that the construction cost increases.

또한 종래의 석고보드(50) 마감재는 습기에 매우 취약한 특성을 가지고 있어 콘크리트로부터 배출되는 습기에 의해 쉽게 손상되고, 이와 같은 손상은 도배지(55)를 통하여 외부로 노출되어 미관을 저해하는 요인이 되는 문제점이 있는 것이다. In addition, the conventional gypsum board 50 finish material is very vulnerable to moisture and is easily damaged by the moisture discharged from the concrete, such damage is exposed to the outside through the paper medium 55 is a factor that inhibits aesthetics There is a problem.

본 발명자는 천정마감재를 이용한 천정면의 시공방법에 대하여 선 출원 한 바 있다.(특허출원 제 2002-64395호)The inventor has filed a preliminary application for the construction method of the ceiling surface using the ceiling finish material. (Patent application 2002-64395)

상기 선 출원 발명은 거푸집을 대신하는 천정마감재의 내부에 자동소화설치를 설치시킬 수 있게 함으로써, 다수의 전문 인력과 자재의 낭비를 억제시켜 공사비용을 절감시킬 수 있는 효과와 아울러 천정마감재의 내부에 자동소화설비를 설치시킬 수 있어 고층의 건물에 적용실시가 가능한 효과를 가지는 것이다
The pre-applied invention enables to install automatic fire extinguishing in the interior of the ceiling finishing material in place of the formwork, thereby reducing the cost of construction by reducing the waste of a large number of skilled workers and materials, and also in the interior of the ceiling finishing material It is possible to install automatic fire extinguishing equipment so that it can be applied to high-rise buildings.

본 발명은 상기와 같은 종래의 문제점을 해결하기 위한 것으로, 본 발명은 단열벽체의 시공방법을 개선하여 적어도 단열재 부착공정과 마감재설치공정을 제외 시킬 수 있게 하고, 다수의 조각으로 구성되는 별도의 유로품을 사용하지 않도록 하여 시공을 용이하게 하며 공기와 공사비용을 절감시킬 수 있게 하는 공동주택의 단열벽체 시공방법을 제공함에 그 목적이 있다.The present invention is to solve the conventional problems as described above, the present invention improves the construction method of the insulating wall to be able to exclude at least the insulating material attaching process and the finishing material installation process, a separate flow path consisting of a plurality of pieces The purpose is to provide a method of constructing the insulation wall of a multi-family house that facilitates the construction by reducing the use of the product and reduces the air and construction costs.

본 발명의 또 다른 목적은 마감재의 구조를 개선하여 마감재가 유로폼의 역할을 대신할 수 있게 하는 동시에 콘크리트벽체로부터 배출되는 습기에 의해 손상되는 것을 방지할 수 있게 하는 단열벽체용 마감재를 제공함에 있다.Another object of the present invention to improve the structure of the finishing material to provide a finishing material for the insulating wall to prevent the damage to the moisture discharged from the concrete wall while at the same time can replace the role of the euro foam.

본 발명은 상기와 같은 목적을 달성하기 위하여 다음과 같이 구성된다. 즉, 본 발명은 단열벽체가 설치될 부위를 실측하고, 실측된 칫수로 벽체마감재의 배열도면을 작성하는 도면 작성공정과; 작성된 도면에 따라 단열재를 절단하고, 상기 단열재의 내외측면에 부착되는 마그네슘보드를 절단하는 재단공정과; 재단된 각각의 반제품을 적층시켜 벽체마감재를 형성시키되, 상기 벽체마감재를 온장과, 반절, 및 기타 형상으로 제작하는 벽체마감재 제작공정과; 단열벽체의 외부면을 성형하는 갱폼설치공정과, 설치된 갱폼으로부터 이격되어 벽체마감재를 설치시키는 벽체마감재 설치공정과, 설치된 벽체마감재와 갱폼의 사이에 콘크리트를 타설하는 콘크리트 타설공정과; 타설된 콘크리트의 양생완료 후 갱폼을 분리 제거하는 갱폼해체공정으로 되는 것에 특징을 둔 것이다.
The present invention is configured as follows to achieve the above object. That is, the present invention is a drawing creation step of measuring the site where the heat insulation wall is to be installed, and creating an arrangement drawing of the wall finishing material with the measured dimensions; A cutting step of cutting the heat insulating material according to the drawings, and cutting the magnesium board attached to the inner and outer sides of the heat insulating material; Stacking each semi-finished product to form a wall finishing material, the wall finishing material manufacturing process of manufacturing the wall finishing material in warm, half and other shapes; A gang form installation step of forming an outer surface of the insulating wall, a wall finishing material installation step of installing a wall finishing material spaced from the installed gangform, and a concrete pouring step of placing concrete between the installed wall finishing material and the gangform; Characterized in that the gang foam dismantling process to separate and remove the gang foam after curing of the poured concrete.

이하에서는 첨부된 도면을 참조하여 본 발명의 바람직한 실시 예를 상세히 설명하기로 한다. Hereinafter, with reference to the accompanying drawings will be described a preferred embodiment of the present invention;                     

첨부된 도면 도 3 은 본 발명의 단열벽체 시공과정을 도시한 공정도이고, 도 4 는 본 발명에 의해 단열벽체가 시공되는 상태를 도시한 단면도이고, 도 5 는 본 발명에 의해 시공이 완료된 단열벽체를 도시한 단면도이다.Figure 3 is a process diagram showing the construction of the heat insulating wall of the present invention, Figure 4 is a cross-sectional view showing a state in which the heat insulating wall is constructed by the present invention, Figure 5 is a heat insulating wall completed the construction by the present invention It is a cross-sectional view.

도 3 및 도 5 에 도시되는 바와 같이, 본 발명은 단열벽체가 설치될 부위를 실측하고, 실측된 칫수로 벽체마감재의 배열도면을 작성하는 도면 작성공정(100)과; As shown in Fig. 3 and Fig. 5, the present invention is a drawing creation process (100) for measuring the site where the heat insulating wall is to be installed, and for creating an arrangement drawing of the wall finishing material with the measured dimensions;

작성된 도면에 따라 단열재(30)를 절단하고, 상기 단열재(30)의 내외측면에 부착되는 마그네슘보드(31)를 절단하는 재단공정(200)과; 재단된 각각의 반제품을 적층시켜 벽체마감재(3)를 형성시키되, 상기 벽체마감재(3)를 온장과, 반절, 및 기타 형상으로 제작하는 벽체마감재 제작공정(300)과; 단열벽체의 외부면을 성형하는 갱폼(40)을 설치하는 갱폼설치공정(400)과, 설치된 갱폼(40)으로부터 이격되어 벽체마감재(3)를 설치시키는 벽체마감재 설치공정(500)과, 설치된 벽체마감재(3)와 갱폼(40)의 사이에 콘크리트를 타설하는 콘크리트 타설공정(600)과; 타설된 콘크리트의 양생완료 후 갱폼(40)을 분리 제거하는 갱폼해체공정(700)으로 단열벽체를 시공하는 것이다. A cutting process (200) for cutting the heat insulating material (30) according to the drawings and cutting the magnesium board (31) attached to the inner and outer sides of the heat insulating material (30); Stacking each semi-finished product to form a wall finishing material (3), wherein the wall finishing material manufacturing process (300) of manufacturing the wall finishing material (3) in warm, half, and other shapes; Gang-form installation process (400) for installing the gangform 40 for molding the outer surface of the heat insulating wall, wall finish material installation process (500) for installing the wall finishing material (3) spaced apart from the installed gangform (40), and the installed wall A concrete placing process 600 for placing concrete between the finishing material 3 and the gang form 40; After completion of curing of the poured concrete is to construct a heat insulation wall by the gang foam dismantling process 700 to separate and remove the gang foam (40).

또한 본 발명의 벽체마감재(3)는 첨부된 도면 도 6 에 도시되는 바와 같이, 단열재(30)의 외주면에 보강재(32)를 설치시키고, 단열재(30)의 상하면에 마그네슘보드(31)를 설치시키고, 보강재(32)의 외면에 방수층(33)을 형성시켜 구성되는 것이다.In addition, the wall finishing material 3 of the present invention, as shown in the accompanying drawings, Figure 6, to install the reinforcing material 32 on the outer peripheral surface of the heat insulating material 30, the magnesium board 31 is installed on the upper and lower surfaces of the heat insulating material (30) And the waterproof layer 33 is formed on the outer surface of the reinforcing material 32.

이와 같은 벽체마감재(3)는 마감재가 설치되는 건설 현장이 아닌 벽체마감재 (3) 생산 공장에서 제작하고, 이를 현장으로 운반하여 시공되는 것으로 건설현장에서는 시공만을 하게 되는 것이다.Such a wall finishing material (3) is manufactured at the wall finishing material (3) production plant, not the construction site where the finishing material is installed, and transported to the site is to be constructed only in the construction site.

이를 위하여는 먼저 건설 현장을 답사하여 각각의 평형별로 벽체마감재(3)가 설치되는 부위를 실측하고, 실측된 칫수로 벽체마감재의 배열 도면을 작성한 다음 온장과 반절 및 기타 조각의 벽체마감재(3)를 제조하게 된다.To this end, first survey the construction site, measure the area where the wall finishing material (3) is installed for each equilibrium, and make an arrangement drawing of the wall finishing material with the measured dimensions, and then the wall finishing material for the warming, half and other pieces (3). It will be prepared.

이때 제조되는 벽체마감재(3)에 번호를 부여하고 배열 도면에 마감재의 설치 위치에 따른 번호를 표시하면 시공 작업을 보다 편리하고 신속하게 이룰 수 있게 된다. At this time, by giving a number to the wall finishing material (3) to be manufactured and displaying the number according to the installation position of the finishing material in the arrangement drawing it is possible to achieve the construction work more conveniently and quickly.

이와 같은 벽체마감재(3)를 이용한 단열벽체 시공 방법을 설명하면 다음과 같다.Referring to the heat insulation wall construction method using the wall finishing material (3) as follows.

먼저 단열벽체의 내부에 매립되는 철근을 배근하고, 이의 외측 즉, 단열벽체의 외면을 형성시키는 갱폼(40)을 설치시킨다. 이어 갱폼(40)으로부터 일정거리로 이격되는 위치에 본 발명의 벽체마감재(3)를 배열 도면에 따라 배열 설치시키고, 벽체마감재(3)와 갱폼(40)의 사이에 콘크리트를 타설시킨다.First, the reinforcing bar embedded in the inside of the heat insulation wall is disposed, and the gangform 40 is formed to form an outer surface thereof, that is, the outer surface of the heat insulation wall. Subsequently, the wall finishing material 3 of the present invention is arranged in a position spaced apart from the gang form 40 by a predetermined distance, and concrete is poured between the wall finishing material 3 and the gang form 40.

이때 콘크리트의 수분과 직접적으로 접하여지는 벽체마감재(3)의 외장판은 습기에 강하고 향균성능이 우수한 마그네슘보드로 형성됨에 따라 수분에 의해 벽체마감재(3)가 변형되는 문제점은 발생되지 않으면서 콘크리트와 벽체마감재(3)가 견고한 결합을 이루게 되는 것이다.At this time, the exterior plate of the wall finishing material (3) which is in direct contact with the moisture of the concrete is formed of magnesium board which is resistant to moisture and has excellent antibacterial performance, so that the wall finishing material (3) is not deformed by moisture, Wall finish material (3) is to form a solid coupling.

이어 콘크리트의 양생이 완료후 갱폼(40)을 제거하게 되면 단열벽체의 내측면에 벽체마감재(3)가 부착 설치되어 마감 작업이 완료된다. Subsequently, after curing of the concrete is completed, if the gang foam 40 is removed, the wall finishing material 3 is attached to the inner side surface of the insulation wall to complete the finishing work.                     

이와 같은 단열벽체에 부착된 벽체마감재(3)의 내측면은 깨끗하고 평활한 면을 이룸에 따라 다른 별도의 작업 없이 곧바로 도배지(55)를 부착할 수 있게 되는 것이다.The inner surface of the wall finishing material (3) attached to the heat insulating wall is to be able to attach the paper 55 immediately without any other work according to the clean and smooth surface.

본 발명은 전술한 실시 예에 한정되지 않고 본 발명의 기술사상이 허용하는 범위 내에서 다양하게 변형하여 실시할 수가 있다.
The present invention is not limited to the above embodiments, and various modifications can be made within the scope allowed by the technical idea of the present invention.

이상에서와 같이, 본 발명에 따르면 적어도 단열재 부착공정과 마감재설치공정을 제외시킬 수 있고, 다수의 조각으로 구성되는 별도의 유로품을 사용하지 않아도 되어 단열벽체의 시공을 용이하게 하며 공기와 공사비용을 절감시킬 수 있는 효과가 있으며, 콘크리트벽체로부터 배출되는 습기에 의해 단열재와 도배지가 손상되는 것을 방지할 수 있는 효과가 있는 것이다.






As described above, according to the present invention can at least exclude the insulating material attaching process and the finishing material installation process, it is not necessary to use a separate flow path product composed of a plurality of pieces to facilitate the construction of the insulation wall, air and construction costs There is an effect to reduce the, it is effective to prevent damage to the insulation and the dossier by the moisture discharged from the concrete wall.






Claims (2)

단열벽체가 설치될 부위를 실측하고, 실측된 칫수로 벽체마감재의 배열도면을 작성하는 도면 작성공정(100)과; 작성된 도면에 따라 단열재(30)를 절단하고, 상기 단열재(30)의 내외측면에 부착되는 마그네슘보드(31)를 절단하는 재단공정(200)과; 재단된 각각의 반제품을 적층시켜 벽체마감재(3)를 형성시키되, 상기 벽체마감재(3)를 온장과, 반절, 및 기타 형상으로 제작하는 벽체마감재 제작공정(300)과; 단열벽체의 외부면을 성형하는 갱폼(40)을 설치하는 갱폼설치공정(400)과, 설치된 갱폼(40)으로부터 이격되어 벽체마감재(3)를 설치시키는 벽체마감재 설치공정(500)과, 설치된 벽체마감재(3)와 갱폼(40)의 사이에 콘크리트를 타설하는 콘크리트 타설공정(600)과; 타설된 콘크리트의 양생완료 후 갱폼(40)을 분리 제거하는 갱폼해체공정(700)으로 되는 것을 특징으로 하는 공동주택의 단열벽체 시공방법. A drawing creation step (100) of measuring a portion where the insulating wall is to be installed and creating an arrangement drawing of the wall finishing material using the measured dimension; A cutting process (200) for cutting the heat insulating material (30) according to the drawings and cutting the magnesium board (31) attached to the inner and outer sides of the heat insulating material (30); Stacking each semi-finished product to form a wall finishing material (3), wherein the wall finishing material manufacturing process (300) of manufacturing the wall finishing material (3) in warm, half, and other shapes; Gang-form installation process (400) for installing the gangform 40 for molding the outer surface of the heat insulating wall, wall finish material installation process (500) for installing the wall finishing material (3) spaced apart from the installed gangform (40), and the installed wall A concrete placing process 600 for placing concrete between the finishing material 3 and the gang form 40; After the curing of the poured concrete is completed, the gang foam dismantling process (700) to separate and remove the gang foam (40). 단열재(30)의 외주면에 설치되는 보강재(32)와; 단열재(30)의 상하면에 설치되는 마그네슘보드(31)와; 보강재(32)의 외면에 둘레에 설치되는 방수층(33)으로 구성되는 것을 특징을 하는 단열벽체용 마감재.A reinforcing material 32 installed on an outer circumferential surface of the heat insulating material 30; Magnesium board 31 is installed on the upper and lower surfaces of the heat insulating material 30; Finishing material for the insulating wall, characterized in that consisting of a waterproof layer 33 is installed around the outer surface of the reinforcement (32).
KR1020040117699A 2004-12-31 2004-12-31 Inner wall panel and the wall construction method using there of KR20060079489A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020040117699A KR20060079489A (en) 2004-12-31 2004-12-31 Inner wall panel and the wall construction method using there of

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020040117699A KR20060079489A (en) 2004-12-31 2004-12-31 Inner wall panel and the wall construction method using there of

Related Child Applications (1)

Application Number Title Priority Date Filing Date
KR20-2005-0000036U Division KR200379152Y1 (en) 2005-01-03 2005-01-03 Inner wall panel

Publications (1)

Publication Number Publication Date
KR20060079489A true KR20060079489A (en) 2006-07-06

Family

ID=37171117

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020040117699A KR20060079489A (en) 2004-12-31 2004-12-31 Inner wall panel and the wall construction method using there of

Country Status (1)

Country Link
KR (1) KR20060079489A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101374807B1 (en) * 2011-04-11 2014-03-17 박은태 Constructing method of nonflammable and heat-insulating wall
CN107009499A (en) * 2017-03-14 2017-08-04 孟锦 A kind of preparation method of the pre-cast concrete walling with heat-insulation layer
CN108149839A (en) * 2018-03-01 2018-06-12 饶淳 A kind of hollow finished concrete heat-insulation and heat-preservation wallboard and its manufacturing method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101374807B1 (en) * 2011-04-11 2014-03-17 박은태 Constructing method of nonflammable and heat-insulating wall
CN107009499A (en) * 2017-03-14 2017-08-04 孟锦 A kind of preparation method of the pre-cast concrete walling with heat-insulation layer
CN108149839A (en) * 2018-03-01 2018-06-12 饶淳 A kind of hollow finished concrete heat-insulation and heat-preservation wallboard and its manufacturing method

Similar Documents

Publication Publication Date Title
US8607523B2 (en) Building that uses composite light-weight panels for structure and a construction method therefor
EP2483488B1 (en) Building structure with prefabricated ribbed panels
JP2009035998A (en) External heat insulation-adjacent space-less rc construction method
RU97147U1 (en) MULTI-LAYERED EXTERIOR WALL
US20170292265A1 (en) Insulated Concrete Masonry System
KR101928041B1 (en) Construction method of building structure using exterior insulation material wall module
CN209817737U (en) Assembly type bay window and structure system thereof
KR20120002908U (en) Tile finishes for entrance packing adapter
RU2440472C1 (en) Method to erect monolithic construction structure of building or facility &#34;bliss house&#34;
KR20060079489A (en) Inner wall panel and the wall construction method using there of
JP2010112090A (en) Connection member and connection method without requiring temporary member
JP2007009427A (en) Construction method of reinforced concrete building
KR200379152Y1 (en) Inner wall panel
JP5612630B2 (en) Concrete container house
IE86668B1 (en) Structural panel and a building structure formed therefrom
CN209817736U (en) Assembly type bay window and structure system thereof
EA019257B1 (en) Isolation sandwich block and method for producing same
KR100693244B1 (en) the finishing-insulation-board using construction for slab of ceiling And the slab structure of ceiling usig it And the construction method thereof
JP2010059630A (en) Connection method avoiding use of placing form and temporary material
RU49051U1 (en) BUILDING BLOCK
US20210230868A1 (en) Improvements in or relating to building structures
CN201649385U (en) Energy-saving external wall board compounded with close-opening thin-wall sectional steel-insulation core material-thin panel
KR20190037549A (en) Double wall house
CN210767198U (en) Inner wall heat-bridge-free design for light steel passive house
KR100711021B1 (en) Construction Method of Concrete Slab Form combined with Ceiling Finish

Legal Events

Date Code Title Description
WITN Withdrawal due to no request for examination