KR20060056008A - Construction method for p.s.c. girder bridges and bridges production it - Google Patents

Construction method for p.s.c. girder bridges and bridges production it Download PDF

Info

Publication number
KR20060056008A
KR20060056008A KR1020040095222A KR20040095222A KR20060056008A KR 20060056008 A KR20060056008 A KR 20060056008A KR 1020040095222 A KR1020040095222 A KR 1020040095222A KR 20040095222 A KR20040095222 A KR 20040095222A KR 20060056008 A KR20060056008 A KR 20060056008A
Authority
KR
South Korea
Prior art keywords
girder
bottom plate
bridge
notch
constructing
Prior art date
Application number
KR1020040095222A
Other languages
Korean (ko)
Other versions
KR100616533B1 (en
Inventor
김근택
Original Assignee
한국시설안전기술공단
(주)대우건설
주식회사 비엔지컨설턴트
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 한국시설안전기술공단, (주)대우건설, 주식회사 비엔지컨설턴트 filed Critical 한국시설안전기술공단
Priority to KR1020040095222A priority Critical patent/KR100616533B1/en
Publication of KR20060056008A publication Critical patent/KR20060056008A/en
Application granted granted Critical
Publication of KR100616533B1 publication Critical patent/KR100616533B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D2/00Bridges characterised by the cross-section of their bearing spanning structure
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D2101/00Material constitution of bridges
    • E01D2101/20Concrete, stone or stone-like material
    • E01D2101/24Concrete
    • E01D2101/26Concrete reinforced
    • E01D2101/28Concrete reinforced prestressed

Abstract

본 발명은 피에스씨 거더교 시공방법 및 이 방법으로 제작된 교량에 관한 것으로, 그 목적은 2차 긴장재가 고정되는 정착구가 수용되는 노치부를 거더 상단부에 형성하여 단속교 또는 연속교을 용이하게 2차 긴장할 수 있도록 하는 는 피에스씨 거더교 시공방법 및 이 방법으로 제작된 교량을 제공함에 있다. 이는 복수의 1차 긴장재가 삽입되었거나 삽입할 수 있도록 이루어지고, 양단부 상측에 2차 긴장재가 고정되는 정착구가 수용되는 노치부가 형성되어진 거더를 제작하는 단계와, 상기 거더를 교각위에 거치하는 단계와, 상기 거더를 횡방향으로 연결하기 위한 크로스빔을 거더에 설치하는 단계와, 상기 정착구에 2차 긴장재를 삽입하여 고정하는 단계와, 상기 노치부를 제외한 상기 거더 위에 바닥판을 시공하는 단계와, 상기 노치부의 정착구를 통하여 설치된 2차 긴장재를 긴장하는 단계와, 상기 노치부를 포함한 바닥판을 콘크리트 등으로 매립하여 마무리 하는 단계를 포함한 것이다.

또한, 복수의 1차 긴장재가 삽입되었거나 삽입할 수 있도록 이루어지고, 2경간 이상으로 배치되며, 상기 경간의 최외측 단부 상측에 2차 긴장재가 고정되는 정착구가 수용되는 노치부가 형성되어진 거더를 제작하는 단계와, 상기 거더를 복수개 교각위에 거치하는 단계와, 상기 거더를 횡방향으로 연결하기 위한 크로스빔을 각 거더에 설치하는 단계와, 상기 정착구에 2차 긴장재를 전경간에 걸쳐 연속적으로 삽입 배치하는 단계와, 상기 거더 사이를 각각 연결하는 단계와, 상기 노치부를 제외한 상기 거더 위에 바닥판을 시공하는 단계와, 상기 노치부의 정착구를 통하여 설치된 2차 긴장재를 긴장하는 단계와, 상기 노치부를 포함한 바닥판을 콘크리트 등으로 마무리 하는 단계를 포함한 것이다.

또한, 상기의 시공방법으로 제작된 것을 특징으로 하는 피에스씨 연속 거더교인 것이다.

Figure 112004054043453-PAT00001

피에스씨, 거더교, 노치부

The present invention relates to a method for constructing a PS girder bridge and a bridge manufactured by the method, and an object thereof is to form a notch portion at an upper end of a girder to accommodate a fixing device to which a secondary tension member is fixed, so that the secondary bridge or the continuous bridge can be easily secondary tensioned. In order to provide a method of constructing the PSC girder bridge, and to provide a bridge manufactured by the method This is made of a plurality of primary tension material can be inserted or inserted, the step of manufacturing a girder is formed in the notch portion is accommodated in the fixing fixture for fixing the secondary tension material on both ends, and mounting the girder on the pier; Installing a crossbeam for connecting the girders in the lateral direction, inserting and fixing a secondary tension member in the fixing unit, constructing a bottom plate on the girders except for the notches, and And tensioning the secondary tension member installed through the negative anchorage, and finishing the bottom plate including the notch by filling the bottom plate with concrete or the like.

In addition, a plurality of primary tension members are inserted or inserted, and are arranged in more than two spans, the girder for manufacturing a girder formed in the notch portion is accommodated in the upper part of the outermost end of the span fixed to the secondary tension member is fixed. Mounting the girder on a plurality of piers, installing a crossbeam for connecting the girders in the transverse direction to each girder, and continuously inserting a secondary tension member in the anchorage over the foreground; And connecting each of the girders, constructing a bottom plate on the girder except for the notch part, tensioning a secondary tension member installed through the fixing part of the notch part, and a bottom plate including the notch part. This includes finishing the concrete.

In addition, it is a PS C continuous girder bridge, characterized in that produced by the above construction method.

Figure 112004054043453-PAT00001

CS, girder bridge, notch

Description

피에스씨 거더교 시공방법 및 이 방법으로 제작된 교량{CONSTRUCTION METHOD FOR P.S.C. GIRDER BRIDGES AND BRIDGES PRODUCTION IT}Construction method of PS girder bridge and bridge made by this method {CONSTRUCTION METHOD FOR P.S.C. GIRDER BRIDGES AND BRIDGES PRODUCTION IT}

도 1은 본 발명에 따른 피에스씨 단순 거더교의 시공방법을 설명하기 위한 도면으로서, 본 발명에 따른 피에스씨 거더를 나타낸 정면도.1 is a view for explaining the construction method of the PS simple girder bridge according to the present invention, a front view showing a PS girder according to the present invention.

도 2는 도 1의 A - A선 단면도.2 is a cross-sectional view taken along the line AA of FIG.

도 3은 본 발명에 따른 피에스씨 거더의 요부 사시도.Figure 3 is a perspective view of the main portion of the PS girder according to the present invention.

도 4는 도 1의 피에스씨 거더를 교각에 거치시키는 것을 나타낸 도면.FIG. 4 is a view showing the PS girder of FIG. 1 mounted on a pier; FIG.

도 5는 도 4의 상태에서 거더에 크로스 빔을 설치하는 단계를 설명하기 위한 도면.5 is a view for explaining a step of installing a cross beam in the girder in the state of FIG.

도 6는 도 5의 상태에서 2차 긴장재를 삽입하여 고정하는 단계를 설명하기 위한 도면.6 is a view for explaining the step of fixing by inserting the secondary tension material in the state of FIG.

도 7은 도 6의 상태에서 노치부를 제외한 바닥판을 시공하는 단계의 일예를 설명하기 위한 도면.7 is a view for explaining an example of the step of constructing the bottom plate except the notch in the state of FIG.

도 8은 도 6의 상태에서 노치부를 제외한 바닥판을 시공하는 단계의 다른예를 설명하기 위한 도면.8 is a view for explaining another example of the step of constructing the bottom plate except the notch in the state of FIG.

도 9는 도 8의 횡단면도.9 is a cross-sectional view of FIG. 8.

도 10은 도 6의 상태에서 노치부를 제외한 바닥판을 시공하는 단계의 또 다 른예를 설명하기 위한 도면.10 is a view for explaining another example of the step of constructing the bottom plate except the notch in the state of FIG.

도 11은 도 10의 횡단면도.11 is a cross-sectional view of FIG. 10.

도 12는 도 7 내지 도 11 상태에서 노치부의 정착구를 통해 2차 긴장재를 긴장하는 단계를 설명하기 위한 도면.12 is a view for explaining the step of tensioning the secondary tension material through the fixing unit of the notch in the state of FIGS.

도 13은 도 8 상태에서 노치부를 포함한 바닥판을 콘크리트 등으로 매립하여 마무리 하는 단계를 설명하기 위한 도면.FIG. 13 is a view for explaining a step of finishing by embedding a bottom plate including notches in concrete in FIG. 8; FIG.

도 14는 본 발명에 따른 거더의 지점부에 형성된 크로스 빔에 장착구를 설치한 상태를 나타낸 요부사시도.14 is a perspective view showing a state in which a mounting hole is installed in a cross beam formed at a point portion of a girder according to the present invention;

도 15는 본 발명에 따른 거더의 중앙부에 형성된 크로스 빔에 홀을 형성한 상태를 나타낸 단면도.Figure 15 is a cross-sectional view showing a state in which a hole is formed in the cross beam formed in the center portion of the girder according to the present invention.

도 16은 본 발명에 따른 피에스씨 연속 거더교의 시공방법을 설명하기 위한 도면.16 is a view for explaining the construction method of the CS continuous girder bridge according to the present invention.

(도면중 주요 부분에 대한 부호의 설명)(Explanation of symbols for the main parts of the drawing)

10: 거더 11: 1차 긴장재10: Girder 11: Primary Tension

12: 2차 긴장재 13: 정착구12: secondary tension material 13: anchorage

14: 노치부 15: 크로스 빔14: notch 15: cross beam

20: 교각 30: 교좌장치20: bridge 30: bridge device

40: 바닥판40: bottom plate

본 발명은 피에스씨 거더교 시공방법 및 이 방법으로 제작된 교량에 관한 것으로, 더욱 상세하게는 2차 긴장재가 고정되는 정착구가 수용되는 노치부를 거더 상단부에 형성하여 단속교 또는 연속교을 용이하게 2차 긴장할 수 있고, 장시간 경과하여 노후화된 교량을 보강하도록 크로스 빔에 사후 유지 보수용 정착구 설치와와 강선재가 통과하는 홀을 형성하도록 하는 피에스씨 거더교 시공방법 및 이 방법으로 제작된 교량에 관한 것이다.The present invention relates to a method for constructing a PS girder bridge and a bridge manufactured by the method, and more particularly, to form a notch portion in which an anchorage to which a secondary tension member is fixed is formed at an upper end of a girder to easily tension the severed bridge or a continuous bridge. The present invention relates to a PSC girder bridge construction method and a bridge fabricated by the method for installing post-maintenance anchorages in a cross beam and forming a hole through which steel wires pass to reinforce an aging bridge after a long time.

일반적으로 교량은 여러종류가 있으며, 그 중에서 거더교는 교각 교각 사이에 거더를 길이방향으로 설치하고, 상기 거더의 상면에 바닥판(슬래브 이라고도 함)을 설치하고, 상기 바닥판에 콘크리트 등을 타설하게 된다.In general, there are several types of bridges, among which girder bridges are installed in the longitudinal direction between the bridge piers, a bottom plate (also called slab) is installed on the upper surface of the girder, and concrete is placed on the bottom plate. do.

또한, 교각과 교각 사이를 경간 또는 지간(span)이라고 하는데 각 경간의 주형이 분리된 교량을 단순교라 하고, 경간의 주형이 연속된 것을 연속교라 하며, 연속된 경간수에 따라 3경간, 4경간, 5경간 연속교라 부른다.In addition, bridges and bridges are called spans or spans. Bridges in which the molds of each span are separated are called simple bridges, and continuous bridges are called continuous bridges. Three spans and four spans depending on the number of continuous spans. It is called 5 span continuous bridge.

상기와 같은 거더교를 시공하기 위한 다양한 방법이 알려져 있으며, 이에 대한 종래의 예로서는, 공개특허 2001-0000430의 "노출된 정착장치 및 이를 갖는 프리스트레스트 콘크리트거더를 이용한 연속교의 건설방법"에서 찾아 볼수 있다.Various methods for constructing the girder bridge as described above are known, and as a conventional example thereof, it can be found in the "Construction method of a continuous bridge using an exposed fixing device and a prestressed concrete girder having the same" of Patent Publication No. 2001-0000430.

상기에서 개시된 내용을 살펴보면, "거더마다 설치되는 적어도 한 조의 단순강선과, 다수개의 거더를 통과하는 적어도 한 조의 연속강선 및/또는 거더와 거더를 연결하는 한 조 이상의 연결강선을 포함하고 노출된 정착장치를 갖는 프리스트레스트 콘크리트 거더를 이용한 연속교의 건설방법에 있어서, 거더 제작후 단순 강 선을 긴장시키고, 거더를 교각에 거치시킨 후, 연결부의 쉬스 연결 및/또는 연속, 연결 강선을 배치하고, 연결부와 슬래브를 동시 타설하고, 연속 및/또는 연결강선을 긴장하여 거더에 긴장력을 가하는 단계; 및 상기 거더에 활하중이 작용하고, 사용중 거더 노후화에 따라 과도한 처짐 및 균열 발생시 연속, 연결 강선을 재긴장하여 처짐이나 균열을 보완하고, 거더의 내하력을 증대시켜 주는 단계; 를 포함하여 이루어지는 것을 특징으로 하는 노출된 정착 장치를 갖는 프리스트레스트 콘크리트 거더를 이용한 연속교의 건설방법"이 공개되어 있다.Looking at the above disclosure, "an exposed settling comprising at least one pair of simple steel wires installed per girder, at least one continuous steel wire passing through a plurality of girders and / or one or more connecting steel wires connecting girder and girder In the method of constructing a continuous bridge using a prestressed concrete girder with a device, after the girder is fabricated, the simple steel wire is tensioned, the girders are mounted on the piers, and the sheath connection and / or the continuous, connecting steel wire are arranged, Placing and slab simultaneously, and applying tension to the girder by tensioning the continuous and / or connecting wires; and the live load acting on the girder, and re-tensioning the continuous, connecting wires when excessive sagging and cracking occur due to aging of the girder during use. Compensating for sag and cracks, and increasing the load capacity of the girder; Continuous tenets construction method using prestressed concrete girder with exposed fixing device "may be made public.

상기에서 노출된 정착장치는 1차 긴장된 다수의 거더를 교각에 거치시키고, 2차 긴장용 연속, 연결강선을 배치한 후 연결부콘크리트와 바닥판을 동시에 타설하고 양생된 후에 2차 긴장을 할 수 있도록 한 구성으로서, 연결부와 바닥판을 동시에 타설하여 공사기간을 줄일수 있고, 교량의 장시간에 걸쳐 노후화되거나 설계하중을 초과하는 대형 차량에 의한 과도한 처짐, 균열 발생시 및 설계 내하력의 증대가 필요한 경우에도 대대적인 보수 보강 공정 없이도 거더에 내장된 비부착 강선을 노출된 정착장치에서 유압 긴장기를 이용하여 재긴장, 또는 추가긴장을 함으로써 매우 작은 비용으로 보수 보강을 할 수 있다.The exposed fixing device mounts a plurality of first-tensioned girders on the piers, arranges the secondary tension continuous and connecting wires, and then casts the connecting concrete and the bottom plate at the same time, so that the secondary tension can be made after curing. As one configuration, it is possible to reduce the construction period by placing the joints and the bottom plate at the same time, and even in case of excessive deflection, crack occurrence and increase in the design load capacity by the large vehicles that are aged over the bridge or exceeding the design load. Even without the repair and reinforcement process, the unattached steel wire built into the girder can be repaired and reinforced at a very low cost by retensioning or additional tensioning using a hydraulic tensioner in the exposed fixing device.

그러나, 상기와 같은 2차 긴장용 연속, 연결강선을 긴장하는 정착구가 외부에 노출되어 긴장이 용이할 수 있으나, 상기의 2차 긴장용 연속, 연결강선은 교량의 시공 보다는 노후화된 교량의 보수용으로 많이 사용되고, 거더의 단부에서 긴장하는 것이 아닌 거더의 양측면에서 긴장하기 때문에 이미 실시된 바다판으로 인하여 시공성이 떨어지고 풀질관리가 쉽지 않은 문제점이 있다.However, the secondary tension continuous, the anchorage tensioning the connecting wire is exposed to the outside can be easily tensioned, but the secondary tension continuous, the connecting wire is for the repair of the aging bridge rather than the construction of the bridge As it is used a lot, the tension on both sides of the girder rather than tension at the end of the girder due to the already carried out the sea plate has a problem of poor workability and easy to manage.

본 발명은 이러한 종래의 문제점을 해결하기 위하여 이루어진 것으로, 그 목적은 2차 긴장재가 고정되는 정착구가 수용되는 노치부를 거더 상단부에 형성하여 단속교 또는 연속교을 용이하게 2차 긴장할 수 있도록 하는 는 피에스씨 거더교 시공방법 및 이 방법으로 제작된 교량을 제공함에 있다.The present invention has been made to solve such a conventional problem, its purpose is to form a notch portion in the upper part of the girder to accommodate the anchorage to which the secondary tension member is fixed to facilitate the secondary tension of the intermittent bridge or continuous bridge easily It is to provide the construction method of the girder bridge and the bridge manufactured by this method.

또한, 본 발명의 다른 목적은 장시간 경과하여 노후화된 교량을 보강하도록 크로스빔에 사후 유지 보수용 정착구 설치와 강선재가 통과하는 홀을 형성하도록 하는 피에스씨 거더교 시공방법 및 이 방법으로 제작된 교량을 제공함에 있다.In addition, another object of the present invention is to provide a post-maintenance fixing fixture in the cross beam to form a hole through which the steel wire passes through to install the post-maintenance fixture to reinforce the old bridge after a long time, and to provide a bridge manufactured by the method Is in.

이러한 목적을 달성하기 위한 본 발명은 복수의 1차 긴장재가 삽입되었거나 삽입할 수 있도록 이루어지고, 양단부 상측에 2차 긴장재가 고정되는 정착구가 수용되는 노치부가 형성되어진 거더를 제작하는 단계와, 상기 거더를 교각위에 거치하는 단계와, 상기 거더를 횡방향으로 연결하기 위한 크로스빔을 거더에 설치하는 단계와, 상기 정착구에 2차 긴장재를 삽입하여 고정하는 단계와, 상기 노치부를 제외한 상기 거더 위에 바닥판을 시공하는 단계와, 상기 노치부의 정착구를 통하여 설치된 2차 긴장재를 긴장하는 단계와, 상기 노치부를 포함한 바닥판을 콘크리트 등으로 매립하여 마무리 하는 단계를 포함한 것이다.The present invention for achieving this object is made to be inserted or inserted into a plurality of primary tension material, the step of manufacturing a girder is formed in the notch portion is accommodated in the fixing fixture is fixed to the secondary tension material on both ends, and the girder Mounting on the pier, installing a crossbeam for connecting the girders in the lateral direction, inserting and fixing a secondary tension member in the anchorage, and a bottom plate on the girder except for the notch. The construction step, and the step of tensioning the secondary tension material installed through the fixing unit of the notch, and comprises the step of finishing by filling the bottom plate including the notch with concrete or the like.

또한, 상기 바닥판을 시공하는 단계에서 상기 바닥판을 현장 타설 및 양생하는 것이다.In addition, in the step of constructing the bottom plate is to place and curing the bottom plate.

또한, 상기 바닥판을 시공하는 단계에서 상기 바닥판을 프리캐스트로 시공하 는 것을 특징으로 하는 것이다.In addition, in the step of constructing the bottom plate is characterized in that the construction of the bottom plate by precast.

또한, 상기 바닥판을 시공하는 단계에서 상기 바닥판을 프리캐스트 바닥판을 설치한 상태에서 상기 프리캐스트 바닥판의 상면에 콘크리트를 현장 타설 및 양생하는 것이다.In addition, in the step of constructing the bottom plate in the state in which the precast bottom plate installed in the bottom plate is to cast and curing concrete on the top surface of the precast floor plate.

또한, 상기 크로스빔을 거더에 형성하는 단계에서 사후 유지 보수용 정착구설치와 강선재가 통과하는 홀을 형성하도록 하는 것이다.In addition, in the step of forming the cross beam in the girder is to form a hole for the post-maintenance fixing fixture installation and the steel wire passes through.

또한, 복수의 1차 긴장재가 삽입되었거나 삽입할 수 있도록 이루어지고, 2경간 이상으로 배치되며, 상기 경간의 최외측 단부 상측에 2차 긴장재가 고정되는 정착구가 수용되는 노치부가 형성되어진 거더를 제작하는 단계와, 상기 거더를 복수개 교각위에 거치하는 단계와, 상기 거더를 횡방향으로 연결하기 위한 크로스빔을 각 거더에 설치하는 단계와, 상기 정착구에 2차 긴장재를 전경간에 걸쳐 연속적으로 삽입 배치하는 단계와, 상기 거더 사이를 각각 연결하는 단계와, 상기 노치부를 제외한 상기 거더 위에 바닥판을 시공하는 단계와, 상기 노치부의 정착구를 통하여 설치된 2차 긴장재를 긴장하는 단계와, 상기 노치부를 포함한 바닥판을 콘크리트 등으로 마무리 하는 단계를 포함한 것이다.In addition, a plurality of primary tension members are inserted or inserted, and are arranged in more than two spans, the girder for manufacturing a girder formed in the notch portion is accommodated in the upper part of the outermost end of the span fixed to the secondary tension member is fixed. Mounting the girder on a plurality of piers, installing a crossbeam for connecting the girders in the transverse direction to each girder, and continuously inserting a secondary tension member in the anchorage over the foreground; And connecting each of the girders, constructing a bottom plate on the girder except for the notch part, tensioning a secondary tension member installed through the fixing part of the notch part, and a bottom plate including the notch part. This includes finishing the concrete.

또한, 상기의 시공방법으로 제작된 것을 특징으로 하는 피에스씨 연속 거더교인 것이다.In addition, it is a PS C continuous girder bridge, characterized in that produced by the above construction method.

또한, 상기 거더 사이를 각각 연결하는 단계 후 2차 긴장재를 일부 긴장하여 거더를 구조적으로 연속화하기 위한 보조 긴장단계를 더 포함하는 것이다.The method may further include an auxiliary tension step for structurally continuizing the girder by partially tensioning the secondary tension member after each connecting the girder.

또한, 상기 바닥판을 시공하는 단계에서 상기 바닥판을 현장 타설 및 양생하 는 것이다.In addition, in the step of constructing the bottom plate is to place and curing the floor plate.

또한, 상기 바닥판을 시공하는 단계에서 상기 바닥판을 프리캐스트로 시공하는 것을 특징으로 하는 것이다.In addition, in the step of constructing the bottom plate is characterized in that the construction of the bottom plate by precast.

또한, 상기 바닥판을 시공하는 단계에서 상기 바닥판을 프리캐스트 바닥판을 설치한 상태에서 상기 프리캐스트 바닥판의 상면에 콘크리트를 현장 타설 및 양생하는 것을 특징으로 하는 것이다.In addition, in the step of constructing the bottom plate in the state in which the precast bottom plate is installed in the bottom plate is characterized in that the site is cast and cured concrete on the upper surface of the precast bottom plate.

또한, 상기 크로스빔을 거더에 형성하는 단계에서 사후 유지 보수용 정착구 설치와 강선재가 통과하는 홀을 형성하도록 하는 것을 특징으로 하는 것이다.In addition, in the step of forming the crossbeam in the girder, it is characterized in that to form a hole for the post-maintenance fixing fixture installation and the steel wire passes through.

또한, 상기 노치부를 포함한 바닥판을 콘크리트 등으로 마무리 하는 단계후 익스팬션 조인트 설치 단계를 더 포함하는 것이다.In addition, after the step of finishing the bottom plate including the notch with concrete or the like will further comprise an expansion joint installation step.

또한, 장시간 사용하여 노후된 교량에서 상기 사후 유지 보수용 정착구와 강선재가 통과하는 홀에 강선재를 삽입하여 인장하도록 하는 것이다.In addition, the steel wire rod is inserted into the hole through which the post-maintenance fixing fixture and the steel wire pass through the old bridge for a long time to be tensioned.

이하 본 발명의 바람직한 실시예를 첨부된 도면에 의거하여 상세하게 설명하면 다음과 같다.Hereinafter, preferred embodiments of the present invention will be described in detail with reference to the accompanying drawings.

도 1은 본 발명에 따른 피에스씨 단순 거더교의 시공방법을 설명하기 위한 도면으로서, 본 발명에 따른 피에스씨 거더를 나타낸 정면도이고, 도 2는 도 1의 A - A선 단면도이며, 도 3은 본 발명에 따른 피에스씨 거더의 요부 사시도이다. 이하에서 부호 10은 거더, 20은 교각, 30은 교좌장치, 40은 바닥판을 나타낸다.1 is a view for explaining the construction method of the PS simple girder bridge according to the present invention, a front view showing a PS girder according to the present invention, Figure 2 is a cross-sectional view taken along the line A-A of Figure 1, Figure 3 It is a perspective view of the main part of PS girder which concerns on this invention. Hereinafter, reference numeral 10 denotes a girder, 20 denotes a pier, 30 denotes a bridge arrangement, and 40 denotes a bottom plate.

도시한 바와 같이 피에스씨 단순 거더교를 시공하기 위해서는 거더(10)를 미리 공장에서 제작하게 되는데, 상기 거더(10)는 복수의 1차 긴장재(11)가 삽입되었 거나 삽입할 수 있도록 이루어지고, 양단부 상측에 2차 긴장재(12)가 고정되는 정착구(13)가 수용되는 노치부(14)가 형성되도록 제작하게 된다.In order to construct the PS simple girder bridge as shown, the girder 10 is manufactured in advance in the factory, the girder 10 is made so that a plurality of primary tension material 11 is inserted or inserted, both ends The notches 14 to accommodate the fixing unit 13 to which the secondary tension member 12 is fixed are formed on the upper side.

또한, 상기 1차 긴장재는 거더(10)의 제작시에 긴장하여 거더(10)의 압축력을 향상시키도록 하는 것이 바람직하다.In addition, the primary tension member is preferably tensioned at the time of manufacture of the girder 10 to improve the compressive force of the girder 10.

도 4는 도 1의 피에스씨 거더를 교각에 거치시키는 것을 나타낸 도면으로서, 도면상에는 한쌍의 거더(10)를 교각(20)에 거치시킨 상태를 나타내고 있으며, 교량의 폭에 따라 복수개의 거더(10)를 거치시킬 수 있는 것이다.FIG. 4 is a view showing the PS girder of FIG. 1 mounted on a pier. FIG. 4 illustrates a state in which a pair of girders 10 are mounted on a pier 20, and a plurality of girders 10 are disposed depending on the width of the bridge. ) Can be mounted.

도 5는 도 4의 상태에서 거더에 크로스 빔을 설치하는 단계를 설명하기 위한 도면으로서, 상기 크로스 빔(15)은 한쌍의 거더(10) 사이를 현장에서 철근 등을 배근하여 현장에서 타설하게 된다.FIG. 5 is a view for explaining a step of installing a cross beam in a girder in the state of FIG. 4, wherein the cross beam 15 is placed in the field by reinforcing bars or the like between the pair of girders 10 in the field. .

또한, 상기 크로스 빔(15)은 거더(10)의 중앙부와 양단부에 형성된 지점부에 형성하도록 한다.In addition, the cross beam 15 is to be formed in the point portion formed in the center and both ends of the girder 10.

또한, 도 14에서는 본 발명에 따른 거더(10)의 지점부에 형성된 크로스 빔(15)에 장착구(15a)가 설치된 상태를 나타내고, 도 15에서는 본 발명에 따른 거더(10)의 중앙부에 형성된 크로스 빔에 홀(15b)이 형성된 상태를 나타내며, 장시간 사용되어 노후화된 교량을 보수할 때 상기 장착구(15a)와 홀(15b)에는 강선재를 삽입하여 인장하도록 하는 것이다.In addition, FIG. 14 shows a state where the mounting hole 15a is installed in the cross beam 15 formed at the point portion of the girder 10 according to the present invention. The hole 15b is formed in the cross beam, and when the old bridge is used for a long time to repair the bridge, a wire rod is inserted into the mounting hole 15a and the hole 15b so as to be tensioned.

도 6은 도 5의 상태에서 2차 긴장재를 삽입하여 고정하는 단계를 설명하기 위한 도면으로서, 노치부(14)에 설치된 정착구(13)에 2차 긴장재(12)를 삽입하여 고정하게 된다.FIG. 6 is a view for explaining the step of inserting and fixing the secondary tension member in the state of FIG. 5, and inserting and fixing the secondary tension member 12 in the fixing unit 13 installed in the notch 14.

또한, 상기 거더(10)에 크로스 빔(15)을 설치하는 단계와 2차 긴장재(12)를 삽입하여 고정하는 단계는 순서에 상관없이 시행할 수 있으나, 본 발명에서는 설명의 편의상 거더(10)에 크로스 빔(15)을 설치하는 단계를 먼저 시행하도록 한 것이다.In addition, the step of installing the cross beam 15 to the girder 10 and the step of fixing by inserting the secondary tension member 12 may be carried out in any order, in the present invention, for convenience of description girders 10 The step of installing the cross beam 15 is to be performed first.

도 7 내지 도 11은 도 6의 상태에서 노치부를 제외한 바닥판을 시공하는 단계의 여러가지 실시예를 나타낸 도면이다7 to 11 are views showing various embodiments of the step of constructing the bottom plate except the notch in the state of FIG.

즉, 도 7은 상기 바닥판(40)을 시공하는 단계에서 상기 바닥판(40a)을 현장 타설 및 양생하는 것이고, 도 8 및 도 9는 상기 바닥판(40)을 시공하는 단계에서 상기 바닥판(40b)을 프리캐스트로 시공하는 것이며, 도 8은 상기 바닥판(40)을 시공하는 단계에서 상기 바닥판(40c)을 프리캐스트 바닥판을 설치한 상태에서 상기 프리캐스트 바닥판의 상면에 콘크리트를 현장 타설 및 양생하는 것이다.That is, FIG. 7 is to place and cure the bottom plate 40a in the step of constructing the bottom plate 40, and FIGS. 8 and 9 show the bottom plate in the step of constructing the bottom plate 40. 40b is a precast construction, and FIG. 8 shows concrete on the upper surface of the precast deck in a state in which the precast deck is installed at the bottom plate 40c in the construction of the deck 40. It is to place and cure.

도 12는 도 7 내지 도 11 상태에서 노치부(14)의 정착구(13)를 통해 2차 긴장재를 긴장하는 단계를 설명하기 위한 도면으로서, 바닥판(40)을 시공하는 단계에서 노치부(14)를 제외하고, 바닥판(40)을 시공함으로서, 노치부(14)는 개방된 상태이며, 이 노치부(14)에 수용되어진 정착구(13)에 고정되어진 2차 긴장재(12)를 거더(10)의 양측에서 긴장하게 된다.(도면상 화살표 참고)FIG. 12 is a view for explaining the step of tensioning the secondary tension member through the fixing unit 13 of the notch part 14 in FIGS. 7 to 11, and the notch part 14 in the step of constructing the bottom plate 40. By constructing the bottom plate 40, the notch 14 is in an open state, and the secondary tension member 12 fixed to the fixing unit 13 accommodated in the notch 14 is girder 10) on both sides (see arrows in the drawing).

도 13은 도 7 상태에서 노치부를 포함한 바닥판을 콘크리트 등으로 매립하여 마무리 하는 단계를 설명하기 위한 도면으로서, 노치부(14)에 고정된 정착구(13)를 통해 2차 긴장재(12)를 양측에서 긴장한 후에는 노치부(14)를 포함한 바닥판(40)을 콘크리트 등으로 매립하여 바닥판(40)을 마무리 하게 되는 것이다.FIG. 13 is a view for explaining a step of finishing by filling a bottom plate including notches in concrete in FIG. 7 with concrete, etc., both sides of the secondary tension member 12 through the fixing unit 13 fixed to the notches 14. After the tension in the bottom plate 40 including the notch 14 is to be buried in concrete or the like to finish the bottom plate 40.

상기에서는 피에스씨 단순 거더교의 시공방법을 살펴보았으며, 이하에서는 피에스씨 연속 거더교의 시공방법을 살펴보면 다음과 같다.In the above, the construction method of the CS simple girder bridge has been examined, and the construction method of the CS continuous girder bridge will be described below.

도 16은 본 발명에 따른 피에스씨 연속 거더교의 시공방법을 설명하기 위한 도면이다.16 is a view for explaining the construction method of the CS continuous girder bridge according to the present invention.

도시한 바와 같이 피에스씨 연속 거더교는 복수의 1차 긴장재(11)가 삽입되었거나 삽입할 수 있도록 이루어지고, 2경간 이상으로 배치되며, 상기 경간의 최외측 단부 상측에 2차 긴장재(12)가 고정되는 정착구(13)가 수용되는 노치부(14)가 형성되어진 거더(10)를 제작하는 단계(S10)와, 상기 거더(10)를 복수개 교각(20)위에 거치하는 단계(S20)와, 상기 거더(10)를 횡방향으로 연결하기 위한 크로스 빔(15)을 각 거더(10)에 설치하는 단계(S30)와, 상기 정착구(13)에 2차 긴장재(12)를 전경간에 걸쳐 연속적으로 삽입 배치하는 단계(S40)와, 상기 거더(10) 사이를 각각 연결하는 단계(S50)와, 상기 노치부(14)를 제외한 상기 거더(10) 위에 바닥판(40)을 시공하는 단계(S60)와, 상기 노치부(14)의 정착구(13)를 통하여 설치된 2차 긴장재(12)를 긴장하는 단계(S70)와, 상기 노치부(14)를 포함한 바닥판(40)을 콘크리트 등으로 마무리 하는 단계(S80)를 포함한 것이다.As shown, the CS continuous girder bridge is formed so that a plurality of primary tension members 11 can be inserted or inserted therein, and are arranged in two or more spans, and the secondary tension members 12 are fixed above the outermost end of the span. Producing a girder 10 in which the notch 14 to accommodate the anchorage 13 is formed (S10), and mounting the girder 10 on a plurality of piers (20) (S20), and Installing a cross beam 15 to each girder 10 for connecting the girder 10 in the lateral direction (S30), and the secondary tension member 12 is continuously inserted into the fixing unit 13 over the foreground. Arranging step (S40), and connecting between the girder 10 (S50), respectively, and the step of constructing the bottom plate 40 on the girder 10 except the notch 14 (S60) And tensioning the secondary tension member 12 installed through the fixing unit 13 of the notch 14 (S70) and the notch 14. One bottom plate 40 is to include a step (S80) to finish with concrete or the like.

또한, 상기의 시공 방법으로 제작된 피에스씨 연속교 거더교도 본 발명의 권리에 속하는 것은 당연한 것이다.In addition, it is natural that the CS continuous bridge girder bridge produced by the above-mentioned construction method belongs to the right of the present invention.

또한, 상기 거더(10) 사이를 각각 연결하는 단계 후 2차 긴장재(12)를 일부 긴장하여 거더(10)를 구조적으로 연속화하기 위한 보조 긴장단계를 더 포함하는 것이 바람직하다.In addition, it is preferable to further include an auxiliary tension step for structurally continuing the girder 10 by partially tensioning the secondary tension member 12 after each step of connecting the girder 10, respectively.

즉, 2경간 사이에 설치된 거더(10)를 연속화 하기 위해 거더(10) 사이를 각각 연결한 후 2차 긴장재(12)을 일부 긴장하여 압축력을 향상시키게 된다.That is, after connecting each between the girders 10 in order to continue the girder 10 installed between the two spans, the secondary tension member 12 is partially tensioned to improve the compressive force.

또한, 상기 노치부(14)를 제외한 상기 거더(10) 위에 바닥판(40)을 시공하는 단계는 단순 거더교와 마찬가지로 상기 바닥판(40)을 현장 타설 및 양생할 수도 있고, 상기 바닥판(40)을 프리캐스트로 시공할 수 있으며, 상기 바닥판(40)을 프리캐스트 바닥판(40)을 설치한 상태에서 상기 프리캐스트 바닥판의 상면에 콘크리트를 현장 타설 및 양생할 수 도 있다.In addition, the step of constructing the bottom plate 40 on the girder 10 except for the notch 14 may be cast and cured the bottom plate 40 in the same way as a simple girder bridge, the bottom plate 40 ) Can be constructed by precast, and in the state in which the precast bottom plate 40 is installed, the floor plate 40 can be placed and cured concrete on the upper surface of the precast bottom plate.

또한, 상기 거더(10)의 크로스 빔(15)에 사후 유지 보수용 정착구(15a) 설치와 강선재가 통과하는 홀(15b)을 형성하도록 하여 장시간 사용하여 노후된 교량에서 상기 사후 유지 보수용 정착구(15a) 설치와 강선재가 통과하는 홀(15b)에 강선재를 삽입하여 인장하도록 하여 노후된 교량을 보수하도록 하는 것이다.In addition, the post-maintenance fixing unit 15a is installed in the cross beam 15 of the girder 10 so that the post-maintenance fixing unit 15a and the hole 15b through which the steel wire passes can be formed. ) The installation and the wire rod is inserted into the hole (15b) through which the wire rod is to be repaired to repair the old bridge.

또한, 본 발명의 피에스씨 연속 거더교는 거더(10)와 거더(10) 사이의 연결부위에 노치부(14)를 포함한 바닥판(40)을 콘크리트 등으로 마무리 하는 단계 후 익스팬션 조인트 설치 단계(미도시)를 더 포함할 수 있다.In addition, the CS continuous girder bridge of the present invention is the expansion joint installation step after the step of finishing the bottom plate 40 including the notch 14 in the connection between the girder 10 and the girder 10 with concrete or the like (not shown) May further include).

상기 익스팬션 조인트는 주지의 기술임으로 여기에서는 상세한 설명은 생략한다.Since the expansion joint is a well-known technique, detailed description thereof will be omitted.

본 발명은 첨부된 도면에 도시된 일 실시예를 참고로 설명한 것이나, 당해 기술 분야의 통상의 지식을 가진 자들에게는 다양한 변형 및 다른 실시예가 가능하다는 점이 이해될 것이다.Although the present invention has been described with reference to one embodiment shown in the accompanying drawings, it will be understood that various modifications and other embodiments are possible to those skilled in the art.

이상 상세히 설명한 바와 같은 본 발명은 2차 긴장재가 고정되는 정착구가 수용되는 노치부를 거더 상단부에 형성하여 단속교 또는 연속교을 용이하게 2차 긴장할 수 있고, 장시간 경과하여 노후화된 교량을 보강하도록 크로스빔에 사후 유지 보수용 정착구 설치와 강선재가 통과하는 홀을 형성하도록 하여 시공성과 사후 보수가 용이하게 이루어 질 수 있다. The present invention as described in detail above can form a notch portion in the upper part of the girder to accommodate the anchorage to which the secondary tension member is fixed, so that the intermittent bridge or the continuous bridge can be easily secondary tensioned, and the crossbeams to reinforce the aged bridge after a long time The installation and post maintenance can be easily made by installing the fixing fixture for post maintenance and forming a hole through which steel wire passes.

Claims (14)

복수의 1차 긴장재(11)가 삽입되었거나 삽입할 수 있도록 이루어지고, 양단부 상측에 2차 긴장재(12)가 고정되는 정착구(13)가 수용되는 노치부(14)가 형성되어진 거더(10)를 제작하는 단계; A plurality of primary tension members (11) is inserted or can be inserted, the girders (10) formed with a notch (14) for receiving the anchorage 13 is fixed to the secondary tension member 12 is fixed on both ends of the upper side. Manufacturing step; 상기 거더(10)를 교각(20)위에 거치하는 단계; Mounting the girder (10) on the piers (20); 상기 거더(10)를 횡방향으로 연결하기 위한 크로스빔을 거더(10)에 설치하는 단계; Installing a crossbeam on the girder (10) for connecting the girder (10) in the transverse direction; 상기 정착구(13)에 2차 긴장재(12)를 삽입하여 고정하는 단계; Inserting and fixing a secondary tension member (12) in the anchorage (13); 상기 노치부(14)를 제외한 상기 거더(10) 위에 바닥판(40)을 시공하는 단계; Constructing a bottom plate 40 on the girder 10 except for the notch 14; 상기 노치부(14)의 정착구(13)를 통하여 설치된 2차 긴장재(12)를 긴장하는 단계; 및 Tensioning the secondary tension member (12) installed through the anchorage (13) of the notch (14); And 상기 노치부를 포함한 바닥판(40)을 콘크리트 등으로 매립하여 마무리 하는 단계를 포함한 것을 특징으로 하는 피에스씨 단순 거더교 시공방법.PS simple girder bridge construction method comprising the step of finishing by filling the bottom plate 40 including the notch with concrete or the like. 제1항에 있어서, 상기 바닥판(40)을 시공하는 단계에서 상기 바닥판(40a)을 현장 타설 및 양생하는 것을 특징으로 하는 피에스씨 단순 거더교의 시공방법.The method of claim 1, wherein in the step of constructing the bottom plate (40), the bottom plate (40a) is cast and cured in the field. 제1항에 있어서, 상기 바닥판(40)을 시공하는 단계에서 상기 바닥판(40b)을 프리캐스트로 시공하는 것을 특징으로 하는 피에스씨 단순 거더교의 시공방법.The method of claim 1, wherein in the step of constructing the bottom plate (40), the bottom plate (40b) is precast. 제1항에 있어서, 상기 바닥판(40)을 시공하는 단계에서 상기 바닥판(40c)을 프리캐스트 바닥판을 설치한 상태에서 상기 프리캐스트 바닥판의 상면에 콘크리트를 현장 타설 및 양생하는 것을 특징으로 하는 피에스씨 단순 거더교의 시공방법.The method of claim 1, wherein in the step of constructing the bottom plate 40, the concrete is placed on the top surface of the precast bottom plate and cured in the state in which the precast bottom plate is installed in the bottom plate 40c. Construction method of PS simple girder bridge to make. 제1항에 있어서, 상기 크로스 빔(15)을 거더(10)에 형성하는 단계에서 사후 유지 보수용 정착구(15a)와 강선재가 통과하는 홀(15b)을 형성하도록 하는 것을 특징으로 하는 피에스씨 단순거더교의 시공방법.The method of claim 1, wherein in the step of forming the cross beam 15 in the girder 10, the PS C simple, characterized in that to form a hole 15b through which the post-maintenance fixing unit 15a and the steel wire pass. Construction method of girder bridge. 복수의 1차 긴장재(11)가 삽입되었거나 삽입할 수 있도록 이루어지고, 2경간 이상으로 배치되며, 상기 경간의 최외측 단부 상측에 2차 긴장재(12)가 고정되는 정착구(13)가 수용되는 노치부(14)가 형성되어진 거더(10)를 제작하는 단계(S10);A furnace in which a plurality of primary tension members 11 are inserted or made to be inserted therein, and arranged in two or more spans, in which a fixing unit 13 in which the secondary tension members 12 are fixed is disposed above the outermost end of the span. Manufacturing the girder 10 in which the teeth 14 are formed (S10); 상기 거더(10)를 복수개 교각(20)위에 거치하는 단계(S20); Mounting the girder (10) on a plurality of piers (20) (S20); 상기 거더(10)를 횡방향으로 연결하기 위한 크로스 빔(15)을 각 거더(10)에 설치하는 단계(S30); Installing a cross beam (15) on each girder (10) for connecting the girders (10) in the transverse direction (S30); 상기 정착구(13)에 2차 긴장재(12)를 전경간에 걸쳐 연속적으로 삽입 배치하는 단계(S40); Continuously inserting the secondary tension member 12 into the anchorage 13 over the foreground (S40); 상기 거더(10) 사이를 각각 연결하는 단계(S50); Connecting each of the girder 10 (S50); 상기 노치부(14)를 제외한 상기 거더(10) 위에 바닥판(40)을 시공하는 단계(S60); Constructing a bottom plate 40 on the girder 10 except for the notch 14 (S60); 상기 노치부(14)의 정착구(13)를 통하여 설치된 2차 긴장재(12)를 긴장하는 단계(S70); 및Tensioning the secondary tension member 12 installed through the fixing hole 13 of the notch portion 14 (S70); And 상기 노치부(14)를 포함한 바닥판(40)을 콘크리트 등으로 마무리 하는 단계(S80); 를 포함한 것을 특징으로 하는 피에스씨 연속 거더교 시공방법. Finishing the bottom plate 40 including the notch 14 with concrete or the like (S80); PS continuous girder bridge construction method comprising a. 제6항에 있어서, 상기 거더(10) 사이를 각각 연결하는 단계 후 2차 긴장재(12)를 일부 긴장하여 거더(10)를 구조적으로 연속화하기 위한 보조 긴장단계를 더 포함하는 것을 특징으로 하는 피에스씨 연속 거더교 시공방법. The method according to claim 6, further comprising a secondary tension step for structurally continually girder 10 by partially tensioning the secondary tension member 12 after each connecting between the girders 10. Mr. continuous girder bridge construction method. 제6항에 있어서, 상기 바닥판(40)을 시공하는 단계에서 상기 바닥판(40a)을 현장 타설 및 양생하는 것을 특징으로 하는 피에스씨 연속 거더교의 시공방법The method of claim 6, wherein the construction of the CS continuous girder bridge, characterized in that the bottom plate (40a) in the field pouring and curing in the step of constructing the bottom plate (40). 제6항에 있어서, 상기 바닥판(40)을 시공하는 단계에서 상기 바닥판(40b)을 프리캐스트로 시공하는 것을 특징으로 하는 피에스씨 연속 거더교의 시공방법8. The method of claim 6, wherein the bottom plate 40b is precast in the step of constructing the bottom plate 40. 제6항에 있어서, 상기 바닥판(40)을 시공하는 단계에서 상기 바닥판(40c)을 프리캐스트 바닥판을 설치한 상태에서 상기 프리캐스트 바닥판의 상면에 콘크리트를 현장 타설 및 양생하는 것을 특징으로 하는 피에스씨 연속 거더교의 시공방법.The method according to claim 6, wherein in the step of constructing the bottom plate 40, the concrete is placed and cured on the upper surface of the precast bottom plate with the precast bottom plate installed in the bottom plate 40c. Construction method of PS continuous girder bridge to assume. 제6항에 있어서, 상기 크로스빔을 거더(10)에 형성하는 단계에서 사후 유지 보수용 정착구(15a)와 강선재가 통과하는 홀(15b)을 형성하도록 하는 것을 특징으로 하는 피에스씨 연속 거더교의 시공방법.8. The construction of the CS continuous girder bridge according to claim 6, wherein the cross beam is formed in the girder 10 so as to form a post-maintenance fixing fixture 15a and a hole 15b through which the steel wire passes. Way. 제6항에 있어서, 상기 노치부(14)를 포함한 바닥판(40)을 콘크리트 등으로 마무리 하는 단계후 익스팬션 조인트 설치 단계를 더 포함하는 것이 특징인 피에스씨 연속 거더교의 시공방법.The method of claim 6, further comprising an expansion joint installation step after finishing the bottom plate 40 including the notch 14 with concrete or the like. 제11항에 있어서, 장시간 사용하여 노후된 교량에서 상기 사후 유지 보수용 정착구(15a) 설치와 강선재가 통과하는 홀(15b)에 강선재를 삽입하여 인장하도록 하는 것을 특징으로 하는 피에스씨 연속 거더교의 시공방법.12. The construction of the CS continuous girder bridge according to claim 11, wherein the post-maintenance fixing unit 15a is installed in a bridge that has been used for a long time and the steel wire is inserted into the hole 15b through which the steel wire passes. Way. 제6항 기재의 시공방법으로 제작된 것을 특징으로 하는 피에스씨 연속 거더교.PS continuous girder bridge, characterized in that produced by the construction method of claim 6.
KR1020040095222A 2004-11-19 2004-11-19 Construction method for p.s.c. girder bridges and bridges production it KR100616533B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020040095222A KR100616533B1 (en) 2004-11-19 2004-11-19 Construction method for p.s.c. girder bridges and bridges production it

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020040095222A KR100616533B1 (en) 2004-11-19 2004-11-19 Construction method for p.s.c. girder bridges and bridges production it

Publications (2)

Publication Number Publication Date
KR20060056008A true KR20060056008A (en) 2006-05-24
KR100616533B1 KR100616533B1 (en) 2006-08-29

Family

ID=37151924

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020040095222A KR100616533B1 (en) 2004-11-19 2004-11-19 Construction method for p.s.c. girder bridges and bridges production it

Country Status (1)

Country Link
KR (1) KR100616533B1 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100923409B1 (en) * 2007-07-30 2009-10-27 (주)한맥기술 Construction method of Spliced Prestressed Concrete Girder Bridge in consideration of the construction sequence
WO2009136762A2 (en) * 2008-05-09 2009-11-12 주식회사 오케이컨설턴트 Method for the continuous construction of psc composite girders using cross beams as fixing parts, and a structure therefor
KR101682923B1 (en) * 2016-06-15 2016-12-06 주식회사 노빌테크 Manufacturing method of channel type prestressed girder and the construction method using the girder manufactured thereby

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100946739B1 (en) 2007-08-28 2010-03-11 이엔이건설주식회사 Long-span bridge construction method using prestressed concrete girder
KR100991869B1 (en) 2010-02-09 2010-11-04 추태헌 Single and continuous prestressed concrete girder bridge and the construction method

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20010036486A (en) * 1999-10-08 2001-05-07 박상일 Method for designing and fabricating multi-step tension prestressed girder
KR100456471B1 (en) * 2000-09-28 2004-11-10 주식회사 인터컨스텍 Open-type steel wire holding device and Metod for construction of continuous bridge using of prestressed concret beam having it

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100923409B1 (en) * 2007-07-30 2009-10-27 (주)한맥기술 Construction method of Spliced Prestressed Concrete Girder Bridge in consideration of the construction sequence
WO2009136762A2 (en) * 2008-05-09 2009-11-12 주식회사 오케이컨설턴트 Method for the continuous construction of psc composite girders using cross beams as fixing parts, and a structure therefor
WO2009136762A3 (en) * 2008-05-09 2010-02-18 주식회사 오케이컨설턴트 Method for the continuous construction of psc composite girders using cross beams as fixing parts, and a structure therefor
KR101682923B1 (en) * 2016-06-15 2016-12-06 주식회사 노빌테크 Manufacturing method of channel type prestressed girder and the construction method using the girder manufactured thereby

Also Published As

Publication number Publication date
KR100616533B1 (en) 2006-08-29

Similar Documents

Publication Publication Date Title
KR100926969B1 (en) Prestressed reinforced concrete girder and it's construction method
KR100991869B1 (en) Single and continuous prestressed concrete girder bridge and the construction method
KR100349864B1 (en) The Structural Continuity Method for Prestreseed Concrete Bridge of Composite I-Beam
KR100988074B1 (en) Girder bridge connected to abutment and the construction method thereof
KR20040098995A (en) Construction Method for PSC Girder Bridges
KR101107826B1 (en) Slab-type box girder made by precast concrete and method constructing the bridge therewith
KR20130036890A (en) Tied arched p.s.c girder for bridge and construction method for bridge by it
KR100823448B1 (en) The improved seismic resistant continuation structure of prestressed concrete composite beam bridge and method thereof
KR100720996B1 (en) Continuous bridge construction method using precast slab
KR100785634B1 (en) Continuation structure of prestressed concrete composite beam bridge and method thereof
KR100616533B1 (en) Construction method for p.s.c. girder bridges and bridges production it
KR100456471B1 (en) Open-type steel wire holding device and Metod for construction of continuous bridge using of prestressed concret beam having it
KR101067717B1 (en) Process for producing prestressed concrete girder and concrete girder structure
KR100522298B1 (en) Improved prestressed steel reinforced concrete beam and bridge construction method using the same beam
KR100547485B1 (en) Continuous multi-span bridge using bridge girder units and construction method thereof
KR100724739B1 (en) Construction method of PSC Girder bridge using Retensionable and Detensionable anchorage with unbonded tendon
KR100989153B1 (en) Psc girder connection structure with strength connector detail for substitution of rebar placement in deck and bridge construction method using the same
KR100669860B1 (en) Asymmetry Pretensioning Precast Beam Girder- APP Beam Girder
KR20080105588A (en) The assembly type hollow slab
KR20060017949A (en) Field-fabricated prestressing steel-composed girder and construction method of continuous bridge using the girder
KR20060025222A (en) Continuous Preflex Girder Structure Using Prestress in Parent Section Using Expanded Concrete and Its Construction Method
KR101081502B1 (en) Psc girder manufacturing method using end-mold with anchor plate and bridge construction method using the psc girder
KR20100137749A (en) Precast concrete girder unified with slab
KR100503855B1 (en) Bridge construction method by applying prestressed concrete girder
KR100500382B1 (en) Construction method and connection structure for construction continuous of precast girder

Legal Events

Date Code Title Description
A201 Request for examination
N231 Notification of change of applicant
A302 Request for accelerated examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20130604

Year of fee payment: 8

FPAY Annual fee payment

Payment date: 20140610

Year of fee payment: 9

FPAY Annual fee payment

Payment date: 20150630

Year of fee payment: 10

FPAY Annual fee payment

Payment date: 20161027

Year of fee payment: 11

FPAY Annual fee payment

Payment date: 20170817

Year of fee payment: 12

FPAY Annual fee payment

Payment date: 20180830

Year of fee payment: 13

FPAY Annual fee payment

Payment date: 20190814

Year of fee payment: 14