KR200444170Y1 - An artificial turf - Google Patents

An artificial turf Download PDF

Info

Publication number
KR200444170Y1
KR200444170Y1 KR2020080014739U KR20080014739U KR200444170Y1 KR 200444170 Y1 KR200444170 Y1 KR 200444170Y1 KR 2020080014739 U KR2020080014739 U KR 2020080014739U KR 20080014739 U KR20080014739 U KR 20080014739U KR 200444170 Y1 KR200444170 Y1 KR 200444170Y1
Authority
KR
South Korea
Prior art keywords
layer
artificial turf
grass
buffer
permeable
Prior art date
Application number
KR2020080014739U
Other languages
Korean (ko)
Inventor
김광제
유수정
Original Assignee
김광제
유수정
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 김광제, 유수정 filed Critical 김광제
Priority to KR2020080014739U priority Critical patent/KR200444170Y1/en
Application granted granted Critical
Publication of KR200444170Y1 publication Critical patent/KR200444170Y1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C13/00Pavings or foundations specially adapted for playgrounds or sports grounds; Drainage, irrigation or heating of sports grounds
    • E01C13/08Surfaces simulating grass ; Grass-grown sports grounds
    • E01C13/083Construction of grass-grown sports grounds; Drainage, irrigation or heating arrangements therefor
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C13/00Pavings or foundations specially adapted for playgrounds or sports grounds; Drainage, irrigation or heating of sports grounds
    • E01C13/02Foundations, e.g. with drainage or heating arrangements
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C2201/00Paving elements
    • E01C2201/10Paving elements having build-in shock absorbing devices
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C2201/00Paving elements
    • E01C2201/20Drainage details

Abstract

본 고안은 이용자들의 신체적 손상의 예방과 인조잔디의 시공과 유지보수의 용이성을 제공하면서 시공비용을 절감할 수 있도록 한 인조잔디 시공구조에 관한 것으로서, 지반 위에 형성하는 쇄석층과, 상기 쇄석층의 상면에 형성하는 투수층과, 상면에 포설되는 잔디파일과 상기 잔디파일이 직립된 상태를 유지할 수 있도록 규사와 고무칩을 채운 잔디층을 상기 투수층의 상면에 형성하여 구성되는 인조잔디에 있어서;

상기 투수층을 투수콘크리트로 성형된 투수블럭을 조립하여 구성하고, 상기 투수층과 잔디층 사이에 충격과 진동을 흡수하기 위한 완충층을 더 구비하고, 상기 완충층은 충격흡수력을 가진 소재로 조직 사이에 배수를 위한 공극을 가지는 완충블럭으로 구성하는 것이 특징이다.

Figure R2020080014739

인조잔디, 충격, 진동, 완충층

The present invention relates to an artificial turf construction structure that can reduce the construction cost while providing the user with the prevention of physical damage and ease of construction and maintenance of artificial turf, the crushed stone layer formed on the ground and the crushed stone layer In the artificial turf formed by forming a water permeable layer formed on the upper surface, the grass pile formed on the upper surface and a grass layer filled with silica sand and rubber chips to maintain the upright state of the grass pile;

The water permeable layer is formed by assembling a water permeable block formed of water permeable concrete, and further comprising a buffer layer for absorbing shock and vibration between the water permeable layer and the grass layer, and the buffer layer is a material having shock absorbing power to drain drainage between tissues. Characterized in that it consists of a buffer block having a gap for.

Figure R2020080014739

Artificial turf, shock, vibration, buffer layer

Description

인조잔디 시공구조{AN ARTIFICIAL TURF}Artificial turf construction structure {AN ARTIFICIAL TURF}

본 고안은 인조잔디 시공구조에 관한 것으로서 더욱 상세하게는 시공의 용이성은 물론 투수성과 수분함수로 인한 지열감소 및 재활용성이 우수하도록 한 개선된 시공구조의 제공에 관한 것이다.The present invention relates to an artificial turf construction structure, and more particularly, to providing an improved construction structure that is excellent in ease of construction and excellent geothermal reduction and recyclability due to water permeability and water function.

인조잔디는 천연잔디 대용으로 사용되는 것으로서 주로 체육경기를 수행하는 운동장이나 산책로 또는 주택의 마당이나 건물의 옥상정원 등에 시공하여 사용하게 된다.Artificial grass is used as a substitute for natural grass. It is mainly used for construction of sports grounds, promenades, or yards of houses or roofs of buildings.

상기와 같은 인조잔디는 기술의 발전으로 거의 천연잔디에 버금가는 수준으로 시공되고 있으며, 학교, 공설, 또는 축구장, 풋살경기장 등과 같은 운동장에 많이 시공되고 있는 실정이다.The artificial turf as described above is being constructed at a level comparable to that of natural grass due to the development of technology, and is being installed in a school, a public field, or a sports field such as a soccer field or a futsal stadium.

상기와 같이 운동장에 많이 시공되는 인조잔디(10)의 구조를 도 5를 통하여 살펴보면 다음과 같다.Looking at the structure of the artificial turf (10) that is a lot of construction on the playground as described above as follows.

베이스(1)에 심어진 잔디파일(2)이 직립된 상태를 유지할 수 있도록 하면서 이용자들의 충격을 흡수할 수 있도록 규사(3)와 고무칩(4)을 일정한 높이로 채운 잔디층(5)과, 상기 잔디층(5)의 하방에 투수콘크리트(또는 투수아스콘 이거나 2차 쇄석층, 이하 투수콘크리트라 함.)를 타설하여 구성되는 투수층(6)을 형성하고, 상기 투수층(6)과 지반(7) 사이에는 쇄석층(8)을 형성하여 구성하고 있다.Grass layer (5) filled with silica sand (3) and rubber chip (4) to a certain height to absorb the impact of the user while maintaining the grass pile (2) planted in the base (1), A water permeable layer 6 formed by pouring permeable concrete (or permeable ascone or secondary crushed stone, hereinafter referred to as permeable concrete) is formed below the grass layer 5, and the permeable layer 6 and the ground 7 The crushed stone layer 8 is formed in between.

상기와 같은 종래 기술이 적용되는 인조잔디는 이용자들이 운동과정 또는 보행과정에서 발생하는 충격의 흡수를 잔디층을 구성하는 규사와 고무칩에 의해서만 흡수하도록 하는 구조이기 때문에 충격 또는 진동흡수가 원활하지 못하여 이용자들의 신체에 상당한 부담을 주게 된다.Artificial grass to which the prior art is applied as described above is a structure that allows the user to absorb the shock generated during the exercise or walking process only by the silica sand and the rubber chip constituting the grass layer, so the shock or vibration absorption is not smooth. It puts a significant burden on users' bodies.

특히, 축구, 야구 등과 같이 순간적인 순발력을 필요로 하거나 슬라이딩, 점프 후 착지등과 같이 과격한 운동경기에서 신발 등을 착용하고 있는 상태이나 특히 심한 충격과 진동이 발생하게 된다.In particular, it requires a momentary quick power, such as football, baseball, etc., or wear a shoe, etc. in extreme athletics, such as landing after sliding or jumping, but particularly severe shock and vibration occurs.

상기와 같이 운동과정에서 발생하는 충격을 인조잔디가 충분하게 흡수하지 못하고 잔디층 하방에 위치한 투수층과 이용자의 신체가 거의 직접적으로 닿는 형태가 됨으로서 경질의 투수층에 의하여 충격이 심화되어 신체적인 손상을 유발하게 되는 것이다.As described above, the artificial turf does not sufficiently absorb the impact generated during the exercise process, and the permeable layer located below the grass layer and the user's body are almost in direct contact with the hard permeable layer. Will be done.

그리고, 투수층을 투수콘크리트로 전체면적에 대하여 현장에서 타설하여 시공하기 때문에 운동장의 특성상 넓은 면적 전체를 평탄하게 유지하여야 하는 시공의 어려움이 있는 것은 물론, 시공비용이 상승하는 원인이 되고 있는 실정이다.In addition, since the permeable layer is installed in the field with the permeable concrete in the field, there is a difficulty in maintaining the entire large area flat due to the characteristics of the playground, and the situation is causing the construction cost to increase.

특히 어느 한 부위의 지반이 침하될 경우에는 타설 시공에 의하여 전체가 연결된 특성에 의하여 지반의 침하부위는 물론 주변 전체에 대하여 연속하여 침하되는 문제가 발생하게 된다.In particular, when the ground of any one site is settled, there is a problem that the ground is settled continuously, as well as the entire settlement of the ground due to the nature of the entire connection by placing.

또한, 침하된 부위를 보수하고자 할 경우에도 침하된 부위만 제거한 후 신속 하게 보수하지 못하고, 침하된 부위보다 많은 면적을 절단하여 절개한 후 보수하여야 하는 어려움이 따르고, 특히 보수 후에는 절단면의 기존시공부위와 보수한 시공부위와의 다짐정도의 차이 등으로 인하여 동일한 평평도를 유지하지 못하고 단차가 발생하게 되는 등 여러 문제점들이 발생하고 있는 실정이다.In addition, even if you want to repair the submerged site, it is difficult to repair it after removing only the submerged site, and it is difficult to repair after cutting a larger area than the submerged site, especially after repairing the existing construction of the cut surface. Due to the difference in the degree of compaction between the site and the repaired construction site, there are many problems such as not being able to maintain the same flatness and causing a step.

이에 본 고안에서는 상기와 같은 문제점들을 해결하기 위하여 고안한 것으로서 지반 위에 형성하는 쇄석층과, 상기 쇄석층의 상면에 형성하는 투수층과, 상면에 베이스에 포설되는 잔디파일과 상기 잔디파일이 직립된 상태를 유지할 수 있도록 규사와 고무칩을 채운 잔디층을 상기 투수층의 상면에 형성하여 구성되는 인조잔디에 있어서;Therefore, in the present invention, a crushed stone layer formed on the ground, a permeable layer formed on the upper surface of the crushed stone layer, a grass pile installed on a base on the upper surface, and the grass pile are upright. In the artificial turf consisting of a grass layer filled with silica sand and rubber chips to maintain the upper surface of the permeable layer;

상기 투수층을 투수콘크리트로 성형된 투수블럭을 조립하여 구성하고, 상기 투수층과 잔디층 사이에 충격과 진동을 흡수하기 위한 완충층을 더 구비하고, 상기 완충층은 충격흡수력을 가진 소재로 조직 사이에 배수를 위한 공극을 가지는 완충블럭으로 구성하여,The water permeable layer is formed by assembling a water permeable block formed of water permeable concrete, and further comprising a buffer layer for absorbing shock and vibration between the water permeable layer and the grass layer, and the buffer layer is a material having shock absorbing power to drain drainage between tissues. It is composed of a buffer block having a gap for

이용자들의 신체적 손상의 예방과 인조잔디의 시공과 유지보수의 용이성을 제공하면서 시공비용을 절감할 수 있는 목적을 달성할 수 있다.It can achieve the purpose of reducing the construction cost while providing the prevention of physical damage of users and the ease of construction and maintenance of artificial turf.

본 고안은 인조잔디를 구성하는 잔디층과 투수층 사이에 사용 과정에서 발생하는 충격과 진동을 흡수하기 위한 완충층을 더 구비하고, 완충층과 투수층을 블럭화 함으로서 시공과 유지 보수의 용이성을 제공하여 공기 단축과 시공비용의 절감 은 물론 이용자들의 편의성을 증대시킬 수 있는 등 다양한 효과를 가지는 고안이다.The present invention further includes a buffer layer for absorbing the shock and vibration generated during the use process between the grass layer and the permeable layer constituting the artificial turf, and provides easy construction and maintenance by blocking the buffer layer and the permeable layer. It is designed to have various effects such as saving construction cost and increasing convenience of users.

이하 첨부되는 도면과 관련하여 상기 목적을 달성하기 위한 본 고안의 구성과 작용에 대하여 설명하면 다음과 같다.Hereinafter, with reference to the accompanying drawings will be described the configuration and operation of the present invention for achieving the above object.

도 1은 본 고안의 기술이 적용된 인조잔디 시공구조를 도시한 단면상태의 구성도, 도 2는 본 고안의 기술이 적용된 인조잔디 시공구조의 완충층을 발췌한 평면 사시도, 도 3은 본 고안의 기술이 적용된 인조잔디 시공구조의 완충층을 발췌한 저면 사시도, 도 4는 본 고안의 기술이 적용된 인조잔디 시공구조의 투수층을 발췌한 사시도로서 함께 설명한다.1 is a block diagram showing a cross-sectional state showing the artificial turf construction structure applied to the technology of the present invention, Figure 2 is a plan perspective view of the buffer layer of the artificial turf construction structure applied to the technology of the present invention, Figure 3 is a technique of the present invention 4 is a perspective view of the bottom surface extracting the buffer layer of the artificial turf construction structure to which the present invention is applied. FIG.

통상적으로 인조잔디(100)는 지반(101) 위에 배수와 하중지지를 목적으로 쇄석층(102)을 형성하고, 상기 쇄석층(102)의 상면에는 우수 등에 의하여 인조잔디 표면에 물이 고이는 것을 방지하도록 투수층(103)을 형성한다.Typically, the artificial turf 100 forms a crushed stone layer 102 on the ground 101 for drainage and load support, and prevents water from pooling on the surface of the artificial turf due to rainwater on the upper surface of the crushed stone layer 102. The permeable layer 103 is formed so that it may become.

상기 투수층(103)의 상면에는 베이스(104)에 심어진 잔디파일(105)과 상기 잔디파일(105)이 직립된 상태를 유지할 수 있도록 하면서 이용자들의 충격을 흡수할 수 있도록 규사(106)와 고무칩(107)을 일정한 높이로 채운 잔디층(108)을 형성하여 구성된다.On the upper surface of the water permeable layer 103, the grass pile 105 and the grass pile 105 planted on the base 104 can maintain the upright state while absorbing the impact of the user's silica sand 106 and the rubber chip It consists of forming the grass layer 108 which filled 107 to a fixed height.

본 고안에서는 상기 투수층(103)을 개선하고 투수층(103)과 잔디층(108) 사이에 충격과 진동을 흡수하기 위한 완충층(110)을 더 구비하여 시공과 유지보수의 용이성을 제공하면서 이용자들의 편의성을 증대시킬 수 있도록 하는 것을 특징으로 한다.The present invention improves the permeable layer 103 and further includes a buffer layer 110 for absorbing shocks and vibrations between the permeable layer 103 and the grass layer 108 to provide ease of construction and maintenance while providing convenience for users. Characterized in that to increase the.

이를 위하여 상기 투수층(103)을 투수콘크리트로 성형된 투수블럭(111,112)을 퍼즐타입으로 조립하여 구성할 수 있도록 하고, 상기 완충층(110)은 충격흡수력이 우수한 소재로 조직(113) 사이에 배수를 위한 공극(114)을 가지는 완충블럭(115,116)으로 구성한다.To this end, the permeable layers 103 may be formed by assembling the permeable blocks 111 and 112 formed of permeable concrete into a puzzle type, and the buffer layer 110 is a material having excellent impact absorption ability to drain drainage between the tissues 113. And buffer blocks 115 and 116 having voids 114.

상기 완충층(110)을 구성하는 소재는 폐타이어 등을 분쇄하여 만들어진 고무칩이나 우레탄칩 등과 같이 폐자재를 재활용하여 사용하는 것이 원재료비를 절감하면서 충격과 진동흡수 및 배수 문제를 해결할 수 있게 된다.The material constituting the buffer layer 110 is to recycle waste materials such as rubber chips or urethane chips made by crushing waste tires, etc., thereby reducing shock and vibration absorption and drainage problems while reducing raw material costs.

상기 투수블럭(111,112)과 완충블럭(115,116)의 형상은 다양한 모양과 형상을 가지도록 만들 수 있으나 특별한 도구 없이 자체적으로 결속할 수 있도록 판상으로 구비되는 블럭베이스(117,118)에 상반되게 결합돌기(119)와 돌기홈(120)을 형성하여 구성하는 것이 바람직하다.The permeable blocks 111 and 112 and the buffer blocks 115 and 116 may have various shapes and shapes, but the coupling protrusions 119 are opposed to the block bases 117 and 118 provided in a plate shape so that they can be bound together without a special tool. ) And the protrusion groove 120 are preferably configured.

물론, 상기 투수블럭(111,112)과 완충블럭(115,116)에는 조직에 의하여 형성되는 공극 외에 배수성을 높일 수 있도록 미세한 크기를 가지는 많은 수의 투수공(121,122)을 더 형성하여도 된다.Of course, in the permeable blocks 111 and 112 and the buffer blocks 115 and 116, a large number of permeable holes 121 and 122 having a fine size may be further formed to increase drainage in addition to the pores formed by the tissue.

상기 완충블럭(115,116)의 저면에는 열선을 삽입한 배관이 경유할 수 있는 배관라인(123)을 더 형성하여 동절기와 같이 외부기온이 낮아 동결되거나 강설상태에 있는 잔디층(108)을 신속하고 쉽게 해빙할 수 있도록 구성한다.The bottom of the buffer block (115, 116) further forms a pipe line 123 through which a pipe inserted with a heating wire, so that the outside air temperature is low, such as winter, the grass layer 108 in a frozen or snow state quickly and easily Configure to thaw.

상기와 같은 본 고안의 기술이 적용된 인조잔디 시공구조는,Artificial turf construction structure applied to the technology of the present invention as described above,

지반(101)위에 형성되는 쇄석층(102)의 상면에 투수층(103)을 블럭화된 투수 블럭(111,112)을 퍼즐과 같이 블럭베이스(117)에 형성되는 결합돌기(119)와 돌기홈(120)을 맞춤결합시켜 형성한다.Coupling protrusions 119 and protrusion grooves 120 formed on the block base 117 like a puzzle, the permeable blocks 111 and 112 in which the permeable layer 103 is blocked on the upper surface of the crushed stone layer 102 formed on the ground 101. It is formed by custom bonding.

상기 투수층(103)의 상면에는 충격흡수성이 뛰어나면서 배수성이 좋은 완충블럭(115,116)을 역시 퍼즐과 같이 블럭베이스(118)에 형성되는 결합돌기(119)와 돌기홈(120)을 맞춤결합시켜 완충층(110)을 더 형성한다.On the upper surface of the permeable layer 103, the shock absorbing layer having excellent shock absorbing properties and good drainage, the buffer layer by custom coupling the engaging projection 119 and the projection groove 120 is also formed in the block base 118 like a puzzle Further forms 110.

상기 완충층(110)의 상면에는 베이스(104)에 심어진 잔디파일(105)에 규사(106)와 고무칩(107)을 채운 잔디층(108)을 형성하여 인조잔디(100)를 구성한다.The artificial turf 100 is formed on the upper surface of the buffer layer 110 by forming a grass layer 108 filled with the silica sand 106 and the rubber chip 107 in the grass pile 105 planted in the base 104.

상기와 같이 형성되는 인조잔디(100)는 이용자들이 운동 등을 하는 과정에서 발생하는 충격이나 진동이 잔디층(108)의 하방에 더 형성하는 완충층(110)에 의하여 완화하고 흡수하게 되므로 신체적인 손상을 유발하는 사례를 방지할 수 있게 되는 것이 가장 큰 장점이라 할 것이다.The artificial turf 100 formed as described above is physically damaged because the shock or vibration generated during the process of the user's exercise are alleviated and absorbed by the buffer layer 110 further formed below the grass layer 108. It is the biggest advantage to be able to prevent the case that causes the problem.

그리고, 지반의 이상으로 인한 침하현상이 발생하여 복구하여야 할 경우에도 이상이 발생한 부위의 잔디층(108)과 완충층(110), 투수층(103)을 제거하여 재 사용할 수 있도록 한 곳으로 모아둔 후, 쇄석층(102)을 제거한 후 지반(101)을 다짐한다.In addition, even when the settlement occurs due to the ground abnormalities to be recovered, after removing the grass layer 108, the buffer layer 110, and the permeable layer 103 of the area where the abnormalities are collected and put in one place for reuse. After removing the crushed stone layer 102, the ground 101 is compacted.

상기와 같이 다짐이 완료된 지반(101)의 상면에 쇄석층(102)을 형성하고, 분리하였던 투수층(103)과 완충층(110) 및 잔디층(108)을 순차적으로 적층하여 형성하면 유지, 보수가 완료되는 것이다.When the crushed stone layer 102 is formed on the upper surface of the ground 101 where the compaction is completed as described above, and the water-permeable layer 103, the buffer layer 110, and the grass layer 108 are sequentially stacked, the maintenance and repair are performed. It's done.

이는 투수층(103)과 완충층(110)을 블럭화하여 퍼즐과 같이 맞춤에 의하여 쉽게 결합되고 분리될 수 있기 때문에 가능한 것이며, 운동장의 폐쇄 등으로 인하여 인조잔디(100)가 필요 없게 된 경우에는 쇄석층(102)을 제외한 잔디층(108)과 완충층(110) 및 투수층(103)은 분리하여 다른 곳에 재 시공할 수 있기 때문에 불필요한 자원의 폐기처분을 방지할 수 있고 그에 따르는 페기비용의 절감 및 폐기물의 무단방치로 야기될 수 있는 환경보전 등에 기여할 수 있는 장점을 가진다.This is possible because the water permeable layer 103 and the buffer layer 110 can be easily combined and separated by fitting, such as a puzzle, and when the artificial turf 100 is not needed due to the closing of the playground, the stone layer ( The grass layer 108, the buffer layer 110, and the permeable layer 103 except for 102 may be separated and re-installed elsewhere, thereby preventing disposal of unnecessary resources, thereby reducing the disposal cost and the unauthorized waste. Has the advantage of contributing to environmental conservation that can be caused by neglect.

또한 외부기온이 낮은 동절기에는 완충층(110)을 구성하는 완충블럭(115,116)의 저면에 형성되는 배관라인(123)을 통하여 열선을 가지는 배관을 배설하여 신속하여 결빙된 잔디층(108)을 녹이거나, 잔디층(108)에 내려진 눈을 녹일 수 있는 장점도 가진다.In addition, in winter, when the external temperature is low, the pipe having heat wires is disposed through pipe lines 123 formed on the bottoms of the buffer blocks 115 and 116 constituting the buffer layer 110 to quickly melt the frozen grass layer 108. , Has the advantage of melting the snow falling on the grass layer 108.

이상에서 본 고안은 상기 실시예를 참고하여 설명하였지만 본 고안의 기술사상범위내에서 다양한 변형실시가 가능함은 물론이며 투수블럭(111) 및 완충블럭(115)의 개별 사용도 포함된다.Although the present invention has been described with reference to the above embodiment, various modifications can be made within the technical scope of the present invention, as well as the individual use of the permeable block 111 and the buffer block 115.

도 1은 본 고안의 기술이 적용된 인조잔디 시공구조를 도시한 단면상태의 구성도.1 is a configuration of the cross-sectional view showing the artificial turf construction structure to which the technique of the present invention is applied.

도 2는 본 고안의 기술이 적용된 인조잔디 시공구조의 완충층을 발췌한 평면 사시도.Figure 2 is a plan perspective view taken from the buffer layer of the artificial turf construction structure to which the technique of the present invention is applied.

도 3은 본 고안의 기술이 적용된 인조잔디 시공구조의 완충층을 발췌한 저면 사시도.Figure 3 is a bottom perspective view of the buffer layer of the artificial turf construction structure to which the technique of the present invention is applied.

도 4는 본 고안의 기술이 적용된 인조잔디 시공구조의 투수층을 발췌한 사시도.Figure 4 is a perspective view of the water permeable layer of artificial turf construction structure to which the technique of the present invention is applied.

도 5는 종래 기술이 적용된 인조잔디 시공구조를 도시한 단면 구성도.Figure 5 is a cross-sectional view showing a construction structure artificial turf applied to the prior art.

*도면의 주요 부분에 사용된 부호의 설명** Description of the symbols used in the main parts of the drawings *

100; 인조잔디100; Artificial turf

103; 투수층103; Permeable layer

108; 잔디층108; Grass layer

110; 완충층110; Buffer layer

111,112; 투수블럭111,112; Pitcher Block

115,116; 완충블럭115,116; Buffer block

Claims (3)

지반(101) 위에 형성하는 쇄석층(102)과;A crushed stone layer (102) formed on the ground (101); 상기 쇄석층(102)의 상면에 형성하는 투수층(103)과;A permeable layer 103 formed on an upper surface of the crushed stone layer 102; 상면에 베이스(104)에 심어진 잔디파일(105)과 상기 잔디파일(105)이 직립된 상태를 유지할 수 있도록 규사(106)와 고무칩(107)을 채운 잔디층(108)을 상기 투수층(103)의 상면에 형성하여 구성되는 인조잔디(100)에 있어서;The grass layer 108 filled with the silica sand 106 and the rubber chip 107 to maintain the grass pile 105 planted on the base 104 and the grass pile 105 upright on the upper surface of the water permeable layer 103. In the artificial turf 100 is formed on the upper surface; 상기 투수층(103)을 투수콘크리트로 성형된 투수블럭(111,112)을 조립하여 구성하고;Assembling the permeable blocks (111, 112) molded into the permeable concrete (103); 상기 투수층(103)과 잔디층(108) 사이에 충격과 진동을 흡수하기 위한 완충층(110)을 더 구비하고;A buffer layer (110) for absorbing shock and vibration between the water permeable layer (103) and the grass layer (108); 상기 완충층(110)은 충격흡수력이 있는 소재로 조직(113) 사이에 배수를 위한 공극(114)을 가지는 완충블럭(115,116)으로 구성하는 것을 특징으로 하는 인조잔디 시공구조.The buffer layer 110 is artificial turf construction structure, characterized in that the shock absorbing material is composed of a buffer block (115,116) having a gap 114 for drainage between the tissue 113. 제 1 항에 있어서;The method of claim 1; 상기 투수블럭(111,112)과 완충블럭(115,116)은 판상으로 블럭베이스(117,118)를 구비하고;The permeable blocks (111, 112) and the buffer blocks (115, 116) have a block base (117, 118) in a plate shape; 상기 블럭베이스(117,118)에 결합을 위하여 형성하는 결합돌기(119)와 돌기홈(120)을 포함하는 것을 특징으로 하는 인조잔디 시공구조.Artificial turf construction structure, characterized in that it comprises a coupling protrusion 119 and the projection groove 120 to form a coupling to the block base (117,118). 제 1 항에 있어서;The method of claim 1; 상기 완충블럭(115,116)의 저면에는 열선을 삽입한 배관이 경유할 수 있는 배관라인(123)을 더 형성하는 것을 특징으로 하는 인조잔디 시공구조.Artificial turf construction structure, characterized in that the bottom of the buffer block (115, 116) further comprises a pipe line 123 through which a pipe inserted with a heating wire can pass.
KR2020080014739U 2008-11-04 2008-11-04 An artificial turf KR200444170Y1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR2020080014739U KR200444170Y1 (en) 2008-11-04 2008-11-04 An artificial turf

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR2020080014739U KR200444170Y1 (en) 2008-11-04 2008-11-04 An artificial turf

Publications (1)

Publication Number Publication Date
KR200444170Y1 true KR200444170Y1 (en) 2009-04-17

Family

ID=41348125

Family Applications (1)

Application Number Title Priority Date Filing Date
KR2020080014739U KR200444170Y1 (en) 2008-11-04 2008-11-04 An artificial turf

Country Status (1)

Country Link
KR (1) KR200444170Y1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200459916Y1 (en) * 2011-06-20 2012-04-20 강남화성 (주) File for artificial turf and artificial turf structure having the same
WO2020240189A1 (en) * 2019-05-28 2020-12-03 England Hockey Temporary, relocatable, sports pitch assembly amd its method of assembling

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200459916Y1 (en) * 2011-06-20 2012-04-20 강남화성 (주) File for artificial turf and artificial turf structure having the same
WO2020240189A1 (en) * 2019-05-28 2020-12-03 England Hockey Temporary, relocatable, sports pitch assembly amd its method of assembling
GB2584628A (en) * 2019-05-28 2020-12-16 England Hockey Temporary sports pitch assembly

Similar Documents

Publication Publication Date Title
KR100881167B1 (en) Structure comprising grass and method for instalation thereof
KR100578039B1 (en) Shock-absorbing underground drainage material
KR20110000261U (en) An elastic mat
KR101298008B1 (en) road pavement methods of using stone basket
ES2767374T3 (en) Method for cooling a sports field
PL176888B1 (en) Construction of a horse yard, particularly a horse riding yard, and a method of making it
JP4746654B2 (en) Surface layer body and surface layer construction method
KR200444170Y1 (en) An artificial turf
KR101019181B1 (en) Structure of pavement using road block
KR100734177B1 (en) Elastic pavement structure having a mesh frame
JP6362998B2 (en) Playground drainage structure
KR101206728B1 (en) Nature-friendly artificial grass structure set for enable to rain-watwe utilization and construction method thereof
KR20050090699A (en) Drainage block
KR100976157B1 (en) Resilient floor structure with high permeability and paving method thereof
KR101689380B1 (en) Water permeable block with transplanted artificial grass
KR100776705B1 (en) Artificial turf fixing apparatus for preparing green streets around the trees lining a street and promenade and its constructing method thereof
KR100926538B1 (en) Temperature and humidity control apparatus of foot path and bicycle path by geothermy and rainwater circulation, using the same Eco-friendly foot path and bicycle path constructing
KR200444169Y1 (en) An artificial turf
CN104594604A (en) Embedded and bonded composite type elastic rubber floor tile and laying and replacing method thereof
KR101689381B1 (en) Water permeable block
KR100966468B1 (en) The water run-through-base combine armature mat with invisible water punctured pipe`s construction process
JP2009024460A (en) Base course for artificial lawn underlayer and method of developing the same
JP5520165B2 (en) Artificial lawn laying structure
KR200433398Y1 (en) A lawn grass block structure
CN207452627U (en) A kind of water penetration urban roadbed

Legal Events

Date Code Title Description
A201 Request for examination
A302 Request for accelerated examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
REGI Registration of establishment
FPAY Annual fee payment

Payment date: 20120323

Year of fee payment: 4

LAPS Lapse due to unpaid annual fee