KR200435532Y1 - Rotary boom for pylon assembly - Google Patents

Rotary boom for pylon assembly Download PDF

Info

Publication number
KR200435532Y1
KR200435532Y1 KR2020060024794U KR20060024794U KR200435532Y1 KR 200435532 Y1 KR200435532 Y1 KR 200435532Y1 KR 2020060024794 U KR2020060024794 U KR 2020060024794U KR 20060024794 U KR20060024794 U KR 20060024794U KR 200435532 Y1 KR200435532 Y1 KR 200435532Y1
Authority
KR
South Korea
Prior art keywords
main body
wire
boom
pulley
rotary
Prior art date
Application number
KR2020060024794U
Other languages
Korean (ko)
Inventor
황철욱
복기용
Original Assignee
(자)자유이엔씨
지에스건설 주식회사
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by (자)자유이엔씨, 지에스건설 주식회사 filed Critical (자)자유이엔씨
Priority to KR2020060024794U priority Critical patent/KR200435532Y1/en
Application granted granted Critical
Publication of KR200435532Y1 publication Critical patent/KR200435532Y1/en

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C23/00Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
    • B66C23/18Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes
    • B66C23/20Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes with supporting couples provided by walls of buildings or like structures
    • B66C23/203Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes with supporting couples provided by walls of buildings or like structures with supporting couples provided by posts, e.g. scaffolding, trees or masts
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66DCAPSTANS; WINCHES; TACKLES, e.g. PULLEY BLOCKS; HOISTS
    • B66D3/00Portable or mobile lifting or hauling appliances
    • B66D3/04Pulley blocks or like devices in which force is applied to a rope, cable, or chain which passes over one or more pulleys, e.g. to obtain mechanical advantage

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Jib Cranes (AREA)

Abstract

본 고안은 철탑 조립용 회전식 붐에 관한 것으로, 더욱 상세하게는 360°회전 가능한 회전활차를 붐(boom)의 상단에 연결 설치하여 회전활차와 철근골조 사이의 인상와이어 길이를 최대한 길게 함으로써, 인상와이이에 작용하는 장력을 최소화하여 인상와이어가 회전활차에서 탈선하거나 끊어지는 등의 안전사고를 사전에 방지하고 철근골조를 더욱 안전하게 인상할 수 있도록 한 철탑 조립용 회전식 붐에 관한 것이다.The present invention relates to a rotary boom for assembling a steel tower, and more particularly, a 360 ° rotatable pulley connected to an upper end of a boom is installed to lengthen the length of the pulling wire between the rotary pulley and the reinforcing steel frame to maximize the length of the pulley. The present invention relates to a rotary boom for assembling a steel tower, which minimizes the tension acting on the wire to prevent safety accidents such as derailing or breaking of the pulley and to raise the steel frame more safely.

즉, 본 고안은 인상와이어가 내부를 통과할 수 있도록 속이 빈 파이프 형태로 형성되는 본체와; 상기 본체의 상부 끝단에 설치되며 회전 가능하도록 하단이 본체의 상부 내측에 설치된 베어링과 결합되는 회전활차를; 포함하여 구성됨을 기술적 구성상의 특징으로 한다.That is, the present invention and the main body is formed in the form of a hollow pipe so that the impression wire can pass through; A rotary pulley installed at an upper end of the main body and having a lower end coupled to a bearing installed at an upper inside of the main body so as to be rotatable; It is characterized by including the technical configuration.

붐, 철탑, 롤러, 와이어, 장력 Boom, pylon, roller, wire, tension

Description

철탑 조립용 회전식 붐{Rotary boom for pylon assembly}Rotary boom for pylon assembly

도 1, 2는 종래의 철탑조립용 붐의 설치상태도.1 and 2 are installed state of the conventional steel tower assembly boom.

도 3은 본 고안의 일실시예에 따른 설치상태도.3 is an installation state according to an embodiment of the present invention.

도 4는 본 고안의 일실시예에 따른 단면도.4 is a cross-sectional view according to an embodiment of the present invention.

도 5는 본 고안의 일실시예에 따른 A-A 선 단면도.5 is a cross-sectional view taken along the line A-A according to an embodiment of the present invention.

도 6은 본 고안의 일실시예에 따른 사용상태도.6 is a state diagram used in accordance with an embodiment of the present invention.

<도면의 주요 부분에 대한 부호의 설명><Explanation of symbols for the main parts of the drawings>

10:붐 11:본체 12:회전활차10: Boom 11: Body 12: Rotary pulley

13:베에링 14:연결고리 15:안내롤러13: bearing 14: hook 15: guide roller

20:인상와이어 21:이동와이어 22:지선20: impression wire 21: moving wire 22: branch line

30:철탑 31:철탑주재 32:철근골조30: steel tower 31: steel tower presence 32: steel frame

40:윈치 L:여유길이40: winch L: free length

본 고안은 철탑 조립용 회전식 붐에 관한 것으로, 더욱 상세하게는 360°회전 가능한 회전활차를 붐(boom)의 상단에 연결 설치하여 회전활차와 철근골조 사이의 인상와이어 길이를 최대한 길게 함으로써, 인상와이이에 작용하는 장력을 최소화하여 인상와이어가 회전활차에서 탈선하거나 끊어지는 등의 안전사고를 사전에 방지하고 철근골조를 더욱 안전하게 인상할 수 있도록 한 철탑 조립용 회전식 붐에 관한 것이다.The present invention relates to a rotary boom for assembling a steel tower, and more particularly, a 360 ° rotatable pulley connected to an upper end of a boom is installed to lengthen the length of the pulling wire between the rotary pulley and the reinforcing steel frame to maximize the length of the pulley. The present invention relates to a rotary boom for assembling a steel tower, which minimizes the tension acting on the wire to prevent safety accidents such as derailing or breaking of the pulley and to raise the steel frame more safely.

우리나라는 국토의 절반이 산악지형으로 되어 있다.In Korea, half of the country is mountainous.

따라서 산악지형의 특성상 철탑의 조립작업시 이동에 제약을 받는 크레인을 사용하기보다는 이동이 쉽고 조립이 간편한 재래식 붐을 사용하여 철탑의 조립 작업을 하고 있다.Therefore, due to the nature of the mountainous terrain, the steel tower is assembled using a conventional boom, which is easy to move and easy to assemble, rather than using a crane that is restricted in movement when the steel tower is assembled.

단, 붐은 154kv, 345kv와 같이 중량이 적은 철탑의 조립 작업에 많이 사용되며 765kv 송전 철탑을 조립할 경우에는 모든 철골자재의 중량이 많이 나가고 높이가 높아 사실상 붐 작업이 불가능하기 때문에 부득이 많은 비용을 투자하여 크레인으로 철탑 조립 작업을 하고 있는 실정이다.However, the boom is often used for assembling low-weight steel towers such as 154kv and 345kv.In case of assembling 765kv power transmission tower, all steel materials are heavy and high, so virtually no boom can be used. As a result, the crane is working to assemble the steel tower.

이와 같이 붐을 이용한 철탑조립 공법은 현재 가장 많이 사용되고 있는 공법으로서 데릭(derrick) 방식에 의한 공법이다.As such, the steel tower assembly method using the boom is the most widely used method, which is a derrick method.

즉, 데릭 방식은 철탑주재의 어느 한쪽에 붐을 취부하여 철근골조를 매달아 올려 철탑을 조립해 나가는 공법으로서, 도 1, 2에 도시된 바와 같이 먼저 윈치(100)의 작동에 의한 인상와이어(110)의 당김으로 철근골조(120)를 들어올리는 붐(140)의 밑단을 사방으로 설치되는 철탑주재(131) 중 한쪽 철탑주재(131)에 16mm 이상의 와이어로 2회 이상 돌려 감아 내려가지 않도록 고정하고, 붐(140)의 상단부에 일단이 고정된 지선(112)의 타단을 지면에 고정시킨 후 일단은 철근골조(120)와 연결되고 타단은 붐(140) 상단에 설치된 활차(150)와 철탑(130)에 설치된 활차(150)를 경유하여 윈치(100)와 연결되는 인상와이어(110)를 원치(100)로 잡아당겨 철근골조(120)를 들어올리면서 쌓아가는 식으로 철탑(130)을 시공하는 공법이다.That is, the derrick method is a method of assembling the steel tower by mounting the boom on either side of the pylon base to assemble the steel tower, as shown in Figures 1 and 2, the first impression wire by the operation of the winch 100 (110) Rotate the bottom of the boom 140, which lifts the reinforcing steel frame 120 by pulling the wire) to one of the pylon base 131, which is installed in all directions, to be fixed at least twice by using a wire of 16 mm or more. After fixing the other end of the branch line 112, one end of which is fixed to the upper end of the boom 140 to the ground, one end is connected to the reinforcing frame 120 and the other end is pulley 150 and the iron tower (top) installed on the top of the boom 140 ( The construction of the pylon 130 by pulling up the impression wire 110 connected to the winch 100 via the pulley 150 installed at 130) to the base 100 to lift and raise the reinforcing steel frame 120. It is a construction method.

그리고 철탑(130)의 높이가 올라가면 붐(140)과 지선(112)의 위치를 계속 이동시키면서 작업을 행한다.And when the height of the pylon 130 rises, the operation is continued while moving the position of the boom 140 and the branch line 112.

그러나 종래의 붐(140)은 이동하고자 하는 철탑주재(131)로 철근골조(120)를 옮기고자 할 경우 철근골조(120)와 연결된 이동와이어(111)를 작업자가 잡아당겨 철근골조(120)를 원하는 철탑주재(131)로 옮겼으나, 이러한 작업을 할 때 붐(140)의 상단에 설치된 활차(150)가 붐(140) 상단 아래 설치되어 있음에 따라 활차(150)와 철근골조(120) 사이의 인상와이어(110) 길이가 짧아져 철근골조(120)를 이동하고자 하는 철탑주재(131)로 옮기기 위해 철근골조(120)와 연결된 이동와이어(111)를 작업자가 잡아 당기면 인상와이어(110)의 길이가 짧은 만큼 인상와이어(110)에 과도한 장력이 전달되어 인상와이어(110)가 활차(150)에서 탈선하거나 끊어지는 등 의 안전사고가 발생하였다.However, when the conventional boom 140 is to move the reinforcing steel frame 120 to the steel tower base 131 to be moved, the worker pulls the moving wire 111 connected to the reinforcing steel frame 120 to the reinforcing steel frame 120. Moved to the desired pylon base 131, but when doing this operation between the pulley 150 and the reinforcement frame 120 is installed according to the pulley 150 installed on the top of the boom 140 under the top of the boom 140 The length of the impression wire 110 is shortened so that the worker pulls the mobile wire 111 connected with the reinforcing steel frame 120 to move the reinforcing steel frame 120 to the steel tower base 131 to be moved of the impression wire 110 As the length is short, excessive tension is transmitted to the pulling wire 110, and thus, the pulling wire 110 is derailed or broken from the pulley 150, and a safety accident has occurred.

그리고 이동와이어를 잡아당길 때 붐의 상단이 회전될 경우 인상와이어에 장력이 상쇄되어 인상와이어가 활차에서 탈선하거나 끊어지는 것을 어느 정도 방지할 수 있으나, 종래의 붐은 상단이 전혀 회전되지 않기 때문에 이는 인상와이어가 활차에서 탈선하거나 끊어지는 등의 안전사고를 유발하는 요인으로 작용하였다.In addition, when the top of the boom is rotated when the moving wire is pulled, the tension wire is offset to the impression wire to prevent the impression wire from being derailed or cut off from the pulley. However, since the top of the conventional boom does not rotate at all, The impression wire acted as a factor inducing safety accidents such as derailing or breaking the pulley.

또한, 종래의 붐에 설치된 인상와이어는, 일단은 철근골조와 연결되고 타단은 활차를 지나 윈치와 연결 되도록 붐의 외측에 설치되어 있기 때문에 철탑골조를 다른 철탑주재로 이동하기 위해 이동와이어를 잡아당길 경우 인상와이어가 철탑에 설치된 다른 물체와 부딪치는 등의 간섭으로 인해 작업에 어려움이 있었다.In addition, since the impression wire installed in the conventional boom is installed on the outside of the boom so that one end is connected to the reinforcement frame and the other end is connected to the winch through the pulley, the moving wire can be pulled to move the pylon frame to other steel towers. In this case, there was difficulty in the operation due to interference such as bumping the wire with other objects installed in the tower.

본 고안은 상기와 같은 문제를 해결하기 위해 안출된 것으로, 본 고안의 목적은, 본체의 상부 끝단에 회전활차를 설치하여 회전활차와 인상되는 철근골조 사이의 인상와이어 길이를 최대한 길게 확보함으로써, 인상와이어에 작용하는 장력을 최소화하는 한편, 인상와이어를 잡아당길 때 회전활차가 회전되면서 인상와이어에 작용하는 장력을 상쇄시켜 더욱 안전하게 철근골조를 인상할 수 있도록 한 철탑 조립용 회전식 붐을 제공함에 그 목적이 있다.The present invention was devised to solve the above problems, an object of the present invention, by installing a rotary pulley at the upper end of the main body by securing the length of the pull wire between the rotating pulley and the reinforcing frame to be raised as long as possible, The purpose of the present invention is to provide a rotary boom for assembling a steel tower that minimizes the tension applied to the wire and, when the pulley is pulled, rotates the pulley to offset the tension applied to the impression wire to raise the steel frame more safely. There is this.

본 고안의 다른 목적은 본체의 상부 일단에 연결고리를 형성하여 지선을 용 이하게 연결설치할 수 있도록 한 철탑 조립용 회전식 붐을 제공함에 그 목적이 있다.Another object of the present invention is to provide a rotary boom for assembling a steel tower to form a connecting ring at the upper end of the main body so that the branch line can be easily connected and installed.

본 고안의 또 다른 목적은 본체의 내부 하단에 인상와이어가 통과할 공간을 두고 사방으로 안내롤러를 설치하여 본체 내부를 통과하는 인상와이어가 항상 본체의 내부 중앙에 위치될 수 있도록 한 철탑 조립용 회전식 붐을 제공함에 그 목적이 있다.Another object of the present invention is to install a guide roller in all directions with a space for the impression wire to pass through the inner bottom of the main body so that the impression wire passing through the inside of the main body is always located in the inner center of the main assembly The purpose is to provide a boom.

상기와 같은 기술적 과제를 해결하기 위해 본 고안은, 인상와이어가 내부를 통과할 수 있도록 속이 빈 파이프 형태로 형성되는 본체와; 상기 본체의 상부 끝단에 설치되며 회전 가능하도록 하단이 본체의 상부 내측에 설치된 베어링과 결합되는 회전활차를; 포함하여 구성됨을 기술적 구성상의 특징으로 한다.The present invention to solve the above technical problem, the main body is formed in the form of a hollow pipe so that the impression wire can pass through; A rotary pulley installed at an upper end of the main body and having a lower end coupled to a bearing installed at an upper inside of the main body so as to be rotatable; It is characterized by including the technical configuration.

또한, 상기 본체의 상부 일단에는 지선을 용이하게 연결할 수 있는 연결고리가 형성되며, 본체는 절반으로 분할 구성되는 것으로서 분리된 한쪽 본체의 선단을 다른 쪽 본체의 하단에 끼움 결합 한 다음 이 연결부위에 볼트의 결합수단이 체결됨을 특징으로 한다.In addition, the upper end of the main body is formed with a connecting ring that can easily connect the branch line, the main body is divided into half, and the front end of the separated one main body is inserted into the bottom of the other main body and then coupled to this connection part It is characterized in that the coupling means of the bolt is fastened.

또한, 상기 본체 내부 하단에는 인상와이어가 항상 본체의 내부 중앙에 위치하도록 중앙에 인상와이어가 통과할 공간을 두고 사방으로 안내롤러가 설치됨을 특징으로 한다.In addition, the lower end inside the main body is characterized in that the guide roller is installed in all directions with a space for the impression wire to pass through the center so that the impression wire is always located in the inner center of the main body.

도 3은 본 고안의 일실시예에 따른 설치상태도이고, 도 4는 본 고안의 일실시예에 따른 단면도이며, 도 5는 본 고안의 일실시예에 따른 A-A 선 단면도이고, 도 6은 본 고안의 일실시예에 따른 사용상태도를 각각 도시한 것으로서, 이하 첨부되는 도면을 참조하여 본 고안의 구성을 설명하면 다음과 같다.Figure 3 is an installation state diagram according to an embodiment of the present invention, Figure 4 is a cross-sectional view according to an embodiment of the present invention, Figure 5 is a cross-sectional view AA line according to an embodiment of the present invention, Figure 6 As shown in each of the use state diagram according to an embodiment of the present invention, the configuration of the present invention with reference to the accompanying drawings as follows.

도 3, 4와 같이 본 고안의 철탑 조립용 회전식 붐(10)은 일정 길이를 가지며 속이 빈 파이프 형태의 본체(11)와, 상기 본체(11)의 상부 끝단에 회전 가능하도록 결합되는 회전활차(12)로 구성된다.The rotary boom 10 for assembling the steel tower of the present invention as shown in FIGS. 3 and 4 has a predetermined length and a hollow pipe-shaped body 11 and a rotary pulley coupled to be rotatable to an upper end of the body 11. 12).

상기 본체(11)는, 일단은 철근골조(32)에 연결되고 타단은 철근골조(32)를 인상하기 위한 윈치(40)와 연결되는 인상와이어(20)가 내부를 통과할 수 있도록 속이 빈 형태로 형성된다.The main body 11, one end is connected to the reinforcement frame 32 and the other end is hollow form so that the impression wire 20 connected to the winch 40 for raising the reinforcement frame 32 can pass through the interior. Is formed.

또한, 상기 본체(11)는 일체형으로 형성할 수도 있으나 운반이 용이하도록 분할 가능한 형태로 형성하는 것이 바람직하다.In addition, the main body 11 may be integrally formed, but preferably, the main body 11 may be formed in a partitionable form to facilitate transportation.

즉, 본체(11)를 절반으로 분리 한 다음 분리된 본체(11)의 한쪽 선단을 다른 쪽 본체(11) 저면에 끼움 결합하고, 이 연결부위에 볼트 등의 결합수단을 체결하여 견고한 결합이 이루어지게 한다.That is, the main body 11 is separated in half, and one end of the separated main body 11 is fitted into the bottom of the other main body 11, and a fastening means such as a bolt is fastened to the connection part to make a strong coupling. Let it go.

따라서, 첩탑(30) 시공 시에는 분할된 본체(11)를 결합하여 사용하고, 철탑(30) 시공완료 후에는 결합수단을 풀어 본체(11)의 길이를 절반으로 줄인 상태로 운반할 수 있다.Therefore, when constructing the pedestal 30, the divided main body 11 may be used in combination, and after completion of the construction of the pylon 30, the coupling means may be released and transported in a state in which the length of the main body 11 is reduced by half.

그리고 상기 본체(11)의 상부 끝단에는, 일단은 철근골조(32)와 연결되고 타단은 윈치(40)와 연결되는 인상와이어(20)가 걸림되는 회전활차(12)가 결합된다.And the upper end of the main body 11, one end is connected to the reinforcing frame 32 and the other end is coupled to the rotary pulley 12 is engaged with the impression wire 20 is connected to the winch 40.

상기 회전활차(12)는 철근골조(32)와 연결된 이동와이어(21)를 잡아당길 때 회전이 가능하도록 본체(11) 상부의 내부에 베어링(13)을 설치한 다음 이 베어링(13)을 회전활차(12) 하부와 연결한다.The rotary pulley 12 installs a bearing 13 in the upper part of the main body 11 so as to be rotatable when pulling the movable wire 21 connected to the reinforcing bar frame 32 and then rotates the bearing 13. Connect with the bottom of the pulley (12).

따라서, 철근골조(32)를 다른 철탑주재(31)로 이동하기 위해 작업자가 이동와이어(21)를 잡아당기면 회전활차(12)가 회전됨에 따라 적은 힘으로도 쉽게 철근골조(32)를 이동할 수 있다.Therefore, when the worker pulls the moving wire 21 to move the reinforcement frame 32 to another pylon base 31, the rebar frame 32 can be easily moved with little force as the rotary pulley 12 is rotated. have.

또한, 회전활차(12)를 본체(11)의 상부 끝단에 형성함으로써, 회전활차(12)와 철근골조(32) 사이의 인상와이어(20) 구간의 여유길이(L)가 길어진 상태로 철근골조(32)를 이동할 수 있다.In addition, by forming the rotary pulley 12 at the upper end of the main body 11, the reinforcing frame in the state that the length (L) of the lifting wire 20 section between the rotary pulley 12 and the reinforcing frame 32 is longer Can move 32.

즉, 종래의 붐은 작업자가 철근골조(32)를 이동하기 위해 철근골조(32)에 연결된 이동와이어(21)를 잡아당겼을 때 활차와 철근골조(32) 사이의 인상와이어(20) 구간의 여유길이(L)가 짧고 활차가 회전하지 않기 때문에 인상와이어(20)에 과도한 힘이 전달되어 인상와이어(20)가 탈선하는 등의 안전사고의 위험이 있었으나, 본 고안은 회전활차(12)가 본체(11)의 상부 끝단에 설치되고 이동와이어(21)를 잡아당겼을 때 회전활차(12)가 회전하기 때문에 인상와이어(20)의 탈선을 방지하고 안전하게 철근골조(32)를 이동할 수 있다.That is, the conventional boom of the pull wire 20 between the pulley and the reinforcement frame 32 when the worker pulls the moving wire 21 connected to the reinforcement frame 32 to move the reinforcement frame 32 Since the length L is short and the pulley does not rotate, there is a risk of safety accident such as excessive force is transmitted to the impression wire 20 and the impression wire 20 is derailed. Since the rotary pulley 12 is rotated when the moving wire 21 is pulled at the upper end of the main body 11 to prevent derailment of the pulling wire 20, the reinforcing frame 32 can be safely moved.

또한, 본체(11)의 상부 일단에는 연결고리(14)를 형성하여 본체(11)의 후방을 당겨서 지지하는 지선(22)과 용이하게 결합될 수 있게 한다.In addition, the upper end of the main body 11 is formed with a connecting ring 14 so that it can be easily coupled with the branch line 22 that pulls and supports the rear of the main body 11.

한편, 도 5와 같이 상기 본체(11)의 내부 하단에는 안내롤러(15)를 설치하여 본체(11) 내부를 통과하는 인상와이어(20)가 항상 본체(11) 내부 중앙에 위치되게 한다.Meanwhile, as shown in FIG. 5, the guide roller 15 is installed at the lower end of the main body 11 so that the impression wire 20 passing through the main body 11 is always positioned at the center of the main body 11.

여기서, 인상와이어(20)를 본체(11) 내부 중앙에 위치되게 하는 것은 윈치(40)를 작동시켜 인상와이어(20)를 당길 때 인상와이어(20)에 큰 힘이 작용하고 이때 인상와이어(20)가 본체(11) 내벽에 닿게 되면 마찰이 일어나 인상와이어(20)에 손상을 가져올 수 있다.Here, placing the impression wire 20 in the center of the main body 11 is a large force acting on the impression wire 20 when pulling the impression wire 20 by operating the winch 40, the impression wire 20 ) Touches the inner wall of the main body 11 may cause friction to cause damage to the impression wire 20.

따라서, 이러한 인상와이어(20)의 손상을 사전에 방지하기 위한 것이다.Therefore, it is for preventing the damage of the impression wire 20 in advance.

상기 안내롤러(15)는 본체(11) 내부 하단에 회전가능하도록 설치되는 것으로서, 본체(11) 내부 중앙으로 인상와이어(20)가 통과할 수 있는 공간을 두고 4개의 롤러를 회전가능하도록 사방으로 설치한다.The guide roller 15 is installed to be rotatable at the lower end of the main body 11, and the four rollers are rotatable in all directions to allow the impression wire 20 to pass through the center of the main body 11. Install.

즉, 4개의 롤러 중 2개의 롤러는 일정간격을 두고 아래에 설치하고 그 위에 또 2개의 롤러를 아래의 롤러와 교차되게 설치하는 식으로 사방으로 설치한다.That is, two of the four rollers are installed in four directions so that they are installed at a predetermined interval below and two rollers are installed thereon to cross the rollers below.

이상에서 상세히 살펴본 바와 같이, 본 고안의 철탑 조립용 회전식 붐(10)은 본체(11) 상부 끝단에 회전활차(12)를 설치하여 더욱 안전하게 철근골조(32)를 이동할 수 있도록 한 것으로, 이하 첨부되는 도면을 참조하여 본 고안의 작용을 설명하면 다음과 같다.As described in detail above, the rotary boom 10 for assembly of the present invention is to install the rotary pulley 12 at the upper end of the main body 11 to be able to move the reinforcement frame 32 more safely, attached below Referring to the drawings will be described the operation of the present invention as follows.

먼저, 본 고안의 붐(10)을 도 6과 같이 사방으로 설치된 철탑주재(31)중 어느 한 철탑주재(31)에 본체(11)의 밑단을 와어어로 감아서 설치한다.First, the boom 10 of the present invention is installed by winding the hem of the main body 11 in any one of the pylon bases 31 installed in all directions as shown in FIG. 6.

그런 다음 인상와이어(20)는 본체(11) 내부를 통과하도록 설치하고, 지선(22)은 본체(11) 상부 일단에 형성된 연결고리(14)와 연결하여 본체(11)를 지지하게 한다.Then, the impression wire 20 is installed to pass through the main body 11, the branch line 22 is connected to the connecting ring 14 formed on the upper end of the main body 11 to support the main body 11.

이와 같이 붐(10)의 설치가 완료되면 붐(10)이 설치되지 않은 철탑주재(31)로 철근골조(32)를 이동하기 위해 윈치(40)로 인상와이어(20)를 끌어당겨 철근골조(32)를 수직으로 인상한다.When the installation of the boom 10 is completed as described above, the pull wire 20 is pulled to the winch 40 to move the reinforcing steel frame 32 to the steel tower base 31 on which the boom 10 is not installed. 32) raise it vertically.

어느 정도 철근골조(32)가 인상되면 정지 상태에서 철근골조(32)와 연결된 이동와이어(21)를 잡아당긴다.When the reinforcement frame 32 is raised to some extent, the moving wire 21 connected to the reinforcement frame 32 is pulled in the stationary state.

이때, 회전활차(12)는 이동와이어(21)를 잡아당기는 쪽으로 회전되며, 회전활차(12)와 철근골조(32) 사이의 구간에 설치된 인상와이어(20)의 여유길이(L) 또한 최대한으로 길기 때문에 회전활차(12)와 철근골조(32) 사이의 인상와이어(20)에 작용하는 장력은 최소화되어 인상와이어(20)가 회전활차(12)에서 탈선하거나 끊어지는 등의 안전사고를 사전에 방지함과 아울러 더욱 안전하게 철근골조(32)를 이동시킬 수 있다.At this time, the rotary pulley 12 is rotated to pull the moving wire 21, the length (L) of the impression wire 20 installed in the section between the rotary pulley 12 and the reinforcement frame 32 to the maximum. Since it is long, the tension acting on the pulling wire 20 between the rotary pulley 12 and the reinforcing frame 32 is minimized, so that the safety wires such as the pulling wire 20 are derailed or broken in the rotary pulley 12 in advance. In addition to preventing and can move the steel frame 32 more secure.

그리고 철근골조(32)를 인상하기 위해 윈치(40)를 작동시켜 인상와이어(20)를 잡아당기면 인상와이어(20)는 회전활차(12) 및 본체(11) 내부를 따라 윈치(40) 쪽으로 당겨지게 되는데, 이때 본체(11)의 내부 하단에는 인상와이어(20)가 항상 본체(11) 내부 중앙에 위치하도록 안내롤러(15)가 설치되어 있기 때문에 인상와이어(20)가 본체(11) 내벽에 닿지않고 윈치(40) 쪽으로 당겨지게 되어 안전한 인상와이어(20)의 당김이 이루어진다.And to pull up the impression wire 20 by operating the winch 40 to raise the reinforced frame 32, the impression wire 20 is pulled toward the winch 40 along the inside of the rotary pulley 12 and the main body (11). In this case, since the guide roller 15 is installed at the inner lower end of the main body 11 so that the impression wire 20 is always located at the inner center of the main body 11, the pulling wire 20 is formed on the inner wall of the main body 11. It is pulled toward the winch 40 without touching, the pulling of the secure impression wire 20 is made.

이상에서 상세히 살펴본 바와 같이 본 고안은 다음과 같은 장점이 있다.As described in detail above, the present invention has the following advantages.

1. 기존의 붐은 인상와이어가 활차를 탈선하거나 절단될 경우 작업자가 위험을 감수하고 새로운 활차의 교체를 위해 붐 상단까지 올라가야만 했고 이러한 위험한 작업으로 작업자가 추락하는 등의 인명사고로 이어지는 경우가 있었다.1. Existing booms require workers to take risks when the pull wires derail or cut pulleys, and have to climb to the top of the boom to replace new pulleys. there was.

그러나 본 고안의 철탑 조립용 회전식 붐은 상단부에 베어링을 설치하여 회 전활차가 360°회전할 수 있게 하고, 회전활차를 본체의 최상단에 설치하여 인상와이어의 여유길이를 최대한 길게 확보함으로써, 인상와이어에 작용하는 장력을 최소화하여 인상와이어의 끊어짐이나 탈선을 방지할 수 있다.However, the rotary boom for assembling the steel tower of the present invention has a bearing installed at the upper end thereof so that the rotary pulley can rotate 360 °, and the rotary pulley is installed at the top of the main body to secure the maximum length of the impression wire. By minimizing the tension applied, the pulling wire can be prevented from being broken or broken.

2. 기존의 붐은 길이가 12m~14m나 되는 하나의 커다란 나무 형태로 이동이 불편하였으나 본 고안의 붐은 반으로 분리하여 대형차가 아닌 소형 차량으로 이동할 수 있어 운반비가 절감되고, 철탑의 상부 조립작업시 작업이 신속하게 이루어지며 작업이 용이하여 작업인원을 20~30%가량 축소시 킬 수 있어 인건비를 절감할 수 있다.2. The existing boom was inconvenient to move in the shape of one large tree with a length of 12m ~ 14m, but the boom of the present invention can be separated into half and moved to a small vehicle instead of a large car, thereby reducing the transportation cost and assembling the upper part of the steel tower. The work is done quickly and the work is easy, which can reduce the workforce by 20 ~ 30%.

Claims (3)

인상와이어가 내부를 통과할 수 있도록 속이 빈 파이프 형태로 형성되는 본체와;A main body formed in the shape of a hollow pipe so that the impression wire can pass therethrough; 상기 본체의 상부 끝단에 설치되며 회전 가능하도록 하단이 본체의 상부 내측에 설치된 베어링과 결합되는 회전활차를; 포함하여 구성됨을 특징으로 하는 철탑 조립용 회전식 붐.A rotary pulley installed at an upper end of the main body and having a lower end coupled to a bearing installed at an upper inside of the main body so as to be rotatable; Rotary boom for steel tower assembly, characterized in that configured to include. 제 1항에 있어서,The method of claim 1, 상기 본체의 상부 일단에는 지선을 용이하게 연결할 수 있는 연결고리가 형성되며, 본체는 절반으로 분할 구성되는 것으로서 분리된 한쪽 본체의 선단을 다른 쪽 본체의 하단에 끼움 결합 한 다음 이 연결부위에 볼트의 결합수단이 체결됨을 특징으로 하는 철탑 조립용 회전식 붐.The upper end of the main body is formed with a connecting ring to easily connect the branch line, the main body is divided into half, and the front end of the separated one main body is inserted into the bottom of the other main body and then coupled to the connection part of the bolt Rotary boom for assembling the steel tower, characterized in that the coupling means is fastened. 제 1항에 있어서,The method of claim 1, 상기 본체 내부 하단에는 인상와이어가 항상 본체의 내부 중앙에 위치하도록 중앙에 인상와이어가 통과할 공간을 두고 사방으로 안내롤러가 설치됨을 특징으로 하는 철탑 조립용 회전식 붐.The rotary boom for assembling the steel tower, characterized in that the guide roller is installed in all directions with a space for the impression wire to pass through the center so that the impression wire is always located at the inner center of the main body.
KR2020060024794U 2006-09-14 2006-09-14 Rotary boom for pylon assembly KR200435532Y1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR2020060024794U KR200435532Y1 (en) 2006-09-14 2006-09-14 Rotary boom for pylon assembly

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR2020060024794U KR200435532Y1 (en) 2006-09-14 2006-09-14 Rotary boom for pylon assembly

Publications (1)

Publication Number Publication Date
KR200435532Y1 true KR200435532Y1 (en) 2007-01-29

Family

ID=41611553

Family Applications (1)

Application Number Title Priority Date Filing Date
KR2020060024794U KR200435532Y1 (en) 2006-09-14 2006-09-14 Rotary boom for pylon assembly

Country Status (1)

Country Link
KR (1) KR200435532Y1 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101640141B1 (en) 2015-09-11 2016-07-15 이창호 Sliding belt of assembly bong for building the steel tower, installation method for the assembly bong thereof
CN110817692A (en) * 2019-09-29 2020-02-21 国网江苏省电力有限公司徐州供电分公司 Combined electric holding pole for erecting power transmission tower
CN110817697A (en) * 2019-09-29 2020-02-21 国网江苏省电力有限公司徐州供电分公司 Servo motor control and protection circuit of combined electric holding pole

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101640141B1 (en) 2015-09-11 2016-07-15 이창호 Sliding belt of assembly bong for building the steel tower, installation method for the assembly bong thereof
CN110817692A (en) * 2019-09-29 2020-02-21 国网江苏省电力有限公司徐州供电分公司 Combined electric holding pole for erecting power transmission tower
CN110817697A (en) * 2019-09-29 2020-02-21 国网江苏省电力有限公司徐州供电分公司 Servo motor control and protection circuit of combined electric holding pole

Similar Documents

Publication Publication Date Title
CN109973112B (en) Super-large-dip-angle narrow-space tunnel anchor cable saddle gantry system and installation method thereof
CN202080836U (en) Material lifting equipment for aerial operation
CN212251443U (en) Special pipeline of old factory building dust removal pipeline transformation installation removes hoist device
CN105003082A (en) Glass curtain wall mounting equipment and glass curtain mounting method
KR200435532Y1 (en) Rotary boom for pylon assembly
KR101429343B1 (en) Multi-Rail Climbing device
CN106245984B (en) Jack up Multifunctional creeping gin pole
CN104989111A (en) Construction method for steel structure high-rise hoisting
WO2011087398A1 (en) Lift crane system
KR101063308B1 (en) Elevating lighting tower equipped with system for preventing lifting frame from falling
CN107476556A (en) A kind of packaged type automatic lifting operating platform
CN206769526U (en) Jack up Multifunctional creeping gin pole
CN205892679U (en) A magnetic force lifting machine for steel structure installation
CN211498471U (en) Hanging basket device for bridge diaphragm beam construction
EP3911592B1 (en) Overhead travelling crane assembly
CN112377672A (en) Old factory dust removal pipeline reconstruction and installation method and special pipeline moving and hoisting device thereof
CN210209147U (en) Wind power tower cylinder door frame welding platform
CN209353221U (en) A kind of packaged type cantilever job platform for the construction of side guardrail
KR200426297Y1 (en) Construcion safety working cage with scaffold
CN221090684U (en) Liftable motorcycle bracket for motor home
CN220247551U (en) Climbing frame structure
CN219670013U (en) Hoisting system suitable for long and narrow tunnel anchor hole with multiple dip angles
CN220283436U (en) Hoisting mechanism, wind power device thereof and full-automatic tower crane
CN112010218B (en) Attaching cable crane assembly platform
CN216190583U (en) Automatic retracting and releasing device for folding arm crane supporting leg

Legal Events

Date Code Title Description
REGI Registration of establishment
FPAY Annual fee payment

Payment date: 20111230

Year of fee payment: 6

FPAY Annual fee payment

Payment date: 20130122

Year of fee payment: 7

LAPS Lapse due to unpaid annual fee