CN211498471U CN201922140200.8U CN201922140200U CN211498471U CN 211498471 U CN211498471 U CN 211498471U CN 201922140200 U CN201922140200 U CN 201922140200U CN 211498471 U CN211498471 U CN 211498471U
Authority
CN
China
Prior art keywords
bottom plate
trolley
hanging basket
steel
roller
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201922140200.8U
Other languages
Chinese (zh)
Inventor
李富有
李聪霖
李铃灿
佟艳丽
王学龙
陈晓霞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Huaheng Traffic Construction Supervision Co ltd
Original Assignee
Zhejiang Huaheng Traffic Construction Supervision Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Huaheng Traffic Construction Supervision Co ltd filed Critical Zhejiang Huaheng Traffic Construction Supervision Co ltd
Priority to CN201922140200.8U priority Critical patent/CN211498471U/en
Application granted granted Critical
Publication of CN211498471U publication Critical patent/CN211498471U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model relates to a hanging basket device for bridge diaphragm beam construction, which is erected on adjacent prefabricated box beams, and wet joints are arranged between the adjacent prefabricated box beams; the steel wire rope hoisting device comprises a trolley bottom plate, a roller device, a channel steel rail, an anchoring steel plate, a winch, a steel wire rope and a hanging basket; wherein the trolley bottom plate shields a wet joint below the trolley bottom plate; the roller device is arranged at 4 corners of the bottom plate of the trolley; the channel steel rails are arranged along the radial direction of the precast box girder and are fixed on the precast box girder; the roller device is embedded in the channel steel track and can move along the extending direction of the channel steel track; the anchoring steel plate is welded on the bottom plate of the trolley; the winch is arranged on the anchoring steel plate; the steel wire rope is wound on the winch, and the other end of the steel wire rope is connected with the hanging basket, so that the hanging basket can be lifted to the position below the wet joint; the hanging basket is positioned under the bottom plate of the trolley. The utility model discloses a bridge diaphragm roof beam construction hanging flower basket device has safe and reliable, and stability is good, and a great deal of advantages such as convenient to use.

Description

Hanging basket device for bridge diaphragm beam construction
[ technical field ] A method for producing a semiconductor device
The utility model relates to a hanging flower basket device, concretely relates to bridge diaphragm roof beam construction hanging flower basket device belongs to construction and equips technical field.
[ background of the invention ]
As is known, the transverse direction of a prefabricated box girder or a T-girder of a bridge is generally provided with a diaphragm girder to reinforce the transverse connection between adjacent girders. In the construction stage of the bridge deck system, the steel bars of the diaphragm beams are required to be welded and templates are required to be installed.
Because the diaphragm beam is located the web position of roof beam, the construction stage relates to high altitude, unsettled operation, simultaneously because the wet seam space between the adjacent roof beam is narrow, conventionally adopts the reinforcing bar crotch to hang simple and easy hanging flower basket, and constructor gets into the hanging flower basket and carries out diaphragm beam steel bar welding and the construction of installation template. However, potential safety hazards exist in the top surface protection of the hanging basket and the hanging basket, and the stability is insufficient, so that the hanging basket is a high-incidence link of bridge safety accidents.
Therefore, in order to solve the above technical problems, it is necessary to provide an innovative hanging basket device for bridge beam spacer construction, so as to overcome the above-mentioned drawbacks in the prior art.
[ Utility model ] content
In order to solve the problems, the utility model aims to provide a bridge diaphragm beam construction hanging basket device which is safe, reliable, good in stability and convenient to use.
In order to achieve the above purpose, the utility model adopts the following technical scheme: a hanging basket device for bridge diaphragm beam construction is erected on adjacent prefabricated box beams, and wet joints are arranged between the adjacent prefabricated box beams; the steel wire rope hoisting device comprises a trolley bottom plate, a roller device, a channel steel rail, an anchoring steel plate, a winch, a steel wire rope and a hanging basket; wherein the trolley bottom plate shields a wet joint below the trolley bottom plate; the roller device is arranged at 4 corners of the bottom plate of the trolley; the channel steel rails are arranged along the radial direction of the precast box girder and are fixed on the precast box girder; the roller device is embedded in the channel steel track and can move along the extending direction of the channel steel track; the anchoring steel plate is welded on the bottom plate of the trolley; the winch is arranged on the anchoring steel plate; the steel wire rope is wound on the winch, and the other end of the steel wire rope is connected with the hanging basket, so that the hanging basket can be lifted to the position below the wet joint; the hanging basket is positioned under the bottom plate of the trolley.
The utility model discloses a bridge diaphragm beam construction hanging flower basket device further sets up to: one side of the trolley bottom plate is provided with a push-pull handle which can push the trolley bottom plate to walk to adjust the position.
The utility model discloses a bridge diaphragm beam construction hanging flower basket device further sets up to: the roller device comprises a roller seat, a roller and a locking bolt; the roller seat is arranged on the trolley bottom plate through a locking bolt and can turn over relative to the trolley bottom plate; the roller is pivoted on the roller seat.
The utility model discloses a bridge diaphragm beam construction hanging flower basket device still sets up to: the hanging basket comprises a bottom steel plate, a fence and an opening and closing door; the bottom steel plate is a 30mm steel plate; the enclosure is welded to the periphery of the bottom steel plate; the opening and closing door is arranged between the enclosing baffles.
Compared with the prior art, the utility model discloses following beneficial effect has:
1. the utility model discloses a bridge diaphragm roof beam construction hanging flower basket device can hang constructor to wet seam below from bottom to top, and constructor operation in the hanging flower basket to constructor's operation safety has been improved greatly.
2. The utility model discloses a bridge diaphragm roof beam construction hanging flower basket device adopts gyro wheel and channel-section steel track cooperation, makes the dolly walking convenient, and the guidance quality is good, and uses lightly.
3. The utility model discloses a bridge diaphragm roof beam construction hanging flower basket device shields wet seam through the dolly bottom plate, and the top surface protection of hanging flower basket can be regarded as to the dolly bottom plate, prevents that the eminence junk from hindering the people.
[ description of the drawings ]
Figure 1 is the utility model discloses a bridge diaphragm roof beam construction hanging flower basket device's in service condition diagram.
Fig. 2 is a state diagram of the roller device of the present invention traveling on the channel steel rail.
Fig. 3 is a state diagram of the roller device according to the present invention after being turned up.
[ detailed description ] embodiments
Referring to the attached drawings 1 to 3 in the specification, the present invention relates to a hanging basket device for bridge beam diaphragm construction, which is erected on adjacent prefabricated box girders 10, and wet joints 11 are arranged between the adjacent prefabricated box girders. The hanging basket device for bridge diaphragm beam construction comprises a trolley bottom plate 1, a roller device 2, a channel steel rail 3, an anchoring steel plate 4, a winch 5, a steel wire rope 6, a hanging basket 7 and the like.
The trolley bottom plate 1 shields a wet joint 11 below the trolley bottom plate, so that the trolley bottom plate 1 can be used as a top surface protection of the hanging basket 7, and high falling objects are prevented from penetrating the wet joint 11 to hurt people. One side of the trolley bottom plate 1 is provided with a push-pull handle 8, and the push-pull handle 7 can push the trolley bottom plate 1 to walk to adjust the use position.
The roller device 2 is arranged at the corners of the trolley bottom plate 1. In the present embodiment, the roller device 2 is composed of several parts, such as a roller seat 21, a roller 22, and a lock bolt 23. The roller seat 21 is mounted on the carriage base plate 1 by means of a locking bolt 23, which can be turned over relative to the carriage base plate 1 (see fig. 3). The roller 22 is pivoted on the roller seat 21. The roller device 2 can also adopt a brake device, and after the trolley bottom plate 1 moves in place, the roller device 2 is positioned through the brake device, so that the roller device 2 does not need to be turned over.
The channel steel track 3 is arranged along the radial direction of the precast box girder 10, is fixed on the precast box girder 3, and is provided with two parallel channels. The roller device 2 is embedded in the channel steel track 3 and can move along the extending direction of the channel steel track 3.
The anchoring steel plate 4 is welded on the bottom plate 1 of the trolley. The winch 5 is installed on the anchoring steel plate 4, and is the winch 5 in the prior art, so the detailed description is omitted.
The steel wire rope 6 is wound on the winch 5, and the other end of the steel wire rope 6 is connected with the hanging basket 7, so that the hanging basket 7 can be lifted to the position below the wet joint 11.
The hanging basket 7 is positioned under the trolley bottom plate 1 and consists of a bottom steel plate 71, a fence 72, an opening and closing door 73 and the like. The bottom steel plate 71 is a 30mm steel plate and can meet the load requirements of the number of operating personnel and material stacking. The fence 72 is welded around the bottom steel plate 71, which prevents the worker from falling. The opening and closing door 73 is arranged between the enclosing barriers 72, so that the safety of the closed door can be ensured by facilitating the entering and exiting of personnel and materials.
The utility model discloses a bridge diaphragm beam construction hanging flower basket device's theory of operation as follows:
when the trolley bottom plate 1 needs to be moved, the trolley bottom plate 1 is jacked up by using a jack, then the roller 22 is turned over to be as shown in the state of figure 2, and the roller seat 21 and the trolley bottom plate 1 are locked by the locking bolt 23, so that the roller 22 is supported on the channel steel rail 3; the trolley bottom plate 1 is pushed to move by the push-pull handle 7.
After the trolley bottom plate 1 moves in place, the locking bolt 23 is loosened to enable the roller seat 21 and the roller 22 to be turned upwards, and the trolley bottom plate 1 is supported on the steel rail 3, so that the trolley bottom plate 1 is stable and incomprehensible, and construction and operation of operators are facilitated. Then, the wire rope 6 is hooked on the basket 7, and the hoist 5 is started to wind the wire rope 6, so that the basket 7 is raised to the work surface.
The above embodiments are merely preferred embodiments of the present disclosure, which are not intended to limit the present disclosure, and any modifications, equivalents, improvements and the like, which are within the spirit and principle of the present disclosure, should be included in the scope of the present disclosure.

Claims (4)

1. A hanging basket device for bridge diaphragm beam construction is erected on adjacent prefabricated box beams, and wet joints are arranged between the adjacent prefabricated box beams; the method is characterized in that: the trolley comprises a trolley bottom plate, a roller device, a channel steel rail, an anchoring steel plate, a winch, a steel wire rope and a hanging basket; wherein the trolley bottom plate shields a wet joint below the trolley bottom plate; the roller device is arranged at 4 corners of the bottom plate of the trolley; the channel steel rails are arranged along the radial direction of the precast box girder and are fixed on the precast box girder; the roller device is embedded in the channel steel track and can move along the extending direction of the channel steel track; the anchoring steel plate is welded on the bottom plate of the trolley; the winch is arranged on the anchoring steel plate; the steel wire rope is wound on the winch, and the other end of the steel wire rope is connected with the hanging basket, so that the hanging basket can be lifted to the position below the wet joint; the hanging basket is positioned under the bottom plate of the trolley.
2. The hanging basket device for bridge beam diaphragm construction according to claim 1, wherein: one side of the trolley bottom plate is provided with a push-pull handle which can push the trolley bottom plate to walk to adjust the position.
3. The hanging basket device for bridge beam diaphragm construction according to claim 1, wherein: the roller device comprises a roller seat, a roller and a locking bolt; the roller seat is arranged on the trolley bottom plate through a locking bolt and can turn over relative to the trolley bottom plate; the roller is pivoted on the roller seat.
4. The hanging basket device for bridge beam diaphragm construction according to claim 1, wherein: the hanging basket comprises a bottom steel plate, a fence and an opening and closing door; the bottom steel plate is a 30mm steel plate; the enclosure is welded to the periphery of the bottom steel plate; the opening and closing door is arranged between the enclosing baffles.
CN201922140200.8U 2019-12-04 2019-12-04 Hanging basket device for bridge diaphragm beam construction Active CN211498471U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201922140200.8U CN211498471U (en) 2019-12-04 2019-12-04 Hanging basket device for bridge diaphragm beam construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201922140200.8U CN211498471U (en) 2019-12-04 2019-12-04 Hanging basket device for bridge diaphragm beam construction

Publications (1)

Publication Number Publication Date
CN211498471U true CN211498471U (en) 2020-09-15

Family

ID=72413136

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201922140200.8U Active CN211498471U (en) 2019-12-04 2019-12-04 Hanging basket device for bridge diaphragm beam construction

Country Status (1)

Country Link
CN (1) CN211498471U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113403954A (en) * 2021-06-28 2021-09-17 中国十七冶集团有限公司 Manufacturing method of bridge diaphragm plate reinforcing steel bar welding auxiliary device

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113403954A (en) * 2021-06-28 2021-09-17 中国十七冶集团有限公司 Manufacturing method of bridge diaphragm plate reinforcing steel bar welding auxiliary device

Similar Documents

Publication Publication Date Title
CN110092264B (en) Material lifting system in elevator shaft in building construction stage
CN100476076C (en) Mobile integral construction platform, construction method thereof and special sling for the same
CN208122371U (en) On across the high-speed rail safe guarding shed fast dismounting device of operation line
CN213328698U (en) Prefabricated member mounting equipment for high-speed railway bridge deck system
CN211498471U (en) Hanging basket device for bridge diaphragm beam construction
CN206581141U (en) Bridge maintenance system
CN103899093A (en) Step-by-step hoisting construction method of mega-frame steel truss beam
CN202879487U (en) Transfer carriage in steel box
CN108277994A (en) On across the high ferro safe guarding shed quick method for dismounting of operation line
CN111287498B (en) Protective shed frame for construction of overhead bridge box girder crossing railway and erection method
CN207405485U (en) A kind of intelligence system for bridge machinery
CN108625270A (en) Nose girder gantry crane installs bridge prefabrication box girder construction method
CN211171456U (en) Laying trolley for laying U-shaped beam rails
CN210713752U (en) High-altitude operation construction hanging basket capable of moving in three-dimensional space
CN101704374A (en) Bottom lifting type U-shaped tram guard
CN106320716B (en) High-building construction adjustable division discharging platform
CN218893051U (en) Step stone traction track device
CN106320181A (en) Construction method for installing precast beam slabs by adopting bridge girder erection machine
CN210049105U (en) Self-propelled bridge formwork operation trolley
CN214329956U (en) Ring rail hoisting device for curtain wall installation
JP4187445B2 (en) crane
CN212101770U (en) Double-rail device convenient to install and detach quickly and used for hoisting curtain wall unit plate
CN211200116U (en) Protective frame for construction of mid-span closure section steel shell of continuous beam of cross highway
CN204899240U (en) Subregion platform of unloading with adjustable high -rise building usefulness of being under construction
KR200435532Y1 (en) Rotary boom for pylon assembly