KR200422924Y1 - pile for temporary well - Google Patents

pile for temporary well Download PDF

Info

Publication number
KR200422924Y1
KR200422924Y1 KR2020060010459U KR20060010459U KR200422924Y1 KR 200422924 Y1 KR200422924 Y1 KR 200422924Y1 KR 2020060010459 U KR2020060010459 U KR 2020060010459U KR 20060010459 U KR20060010459 U KR 20060010459U KR 200422924 Y1 KR200422924 Y1 KR 200422924Y1
Authority
KR
South Korea
Prior art keywords
polyurethane
foam layer
construction
urethane foam
pile
Prior art date
Application number
KR2020060010459U
Other languages
Korean (ko)
Inventor
황윤근
Original Assignee
황윤근
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 황윤근 filed Critical 황윤근
Priority to KR2020060010459U priority Critical patent/KR200422924Y1/en
Application granted granted Critical
Publication of KR200422924Y1 publication Critical patent/KR200422924Y1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D13/00Accessories for placing or removing piles or bulkheads, e.g. noise attenuating chambers
    • E02D13/04Guide devices; Guide frames
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/02Foundation pits
    • E02D17/04Bordering surfacing or stiffening the sides of foundation pits
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/24Prefabricated piles
    • E02D5/30Prefabricated piles made of concrete or reinforced concrete or made of steel and concrete
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/60Piles with protecting cases

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

본 고안은 가설 흙막이 벽 시공용 파일에 관한 것으로, H빔(10)의 외면에 폴리우레탄을 발포하여 일정두께의 우레탄발포층(11)을 형성한 가설 흙막이 벽 시공용 파일에 있어서, 상기 H빔과 우레탄발포층 사이에 중간매개의 이형재를 삽입함으로 H빔의 외형에 관계없이 인발성이 우수하고, 우레탄발포층의 1/2~1/3을 가격이 저렴한 이형재가 차지하므로 고가의 폴리우레탄이 적게 들어가 원가를 절감할 수 있으며, 공장 또는 시공현장에서 간단하고 용이하게 파일을 제작할 수 있으므로 작업시간을 단축할 수 있는 가설 흙막이 벽 시공용 파일을 제공한다.The present invention relates to a temporary soil wall construction pile, in the temporary soil wall construction pile formed by foaming polyurethane on the outer surface of the H beam 10 to form a urethane foam layer 11 of a predetermined thickness, the H beam Intermediate release material is inserted between the polyurethane foam and the urethane foam layer, which is excellent in drawing ability regardless of the appearance of the H-beam, and inexpensive mold release occupies 1/2 to 1/3 of the urethane foam layer, thus making expensive polyurethane It can reduce the cost by reducing the cost, and can provide a file for the construction of temporary wall walls that can shorten the working time because the file can be produced simply and easily at the factory or construction site.

흙막이벽, H빔, 이형재, 폴리우레탄, 콘크리트기둥 Retaining Wall, H Beam, Release Material, Polyurethane, Concrete Column

Description

가설 흙막이 벽 시공용 파일{pile for temporary well}Temporary wall construction pile {pile for temporary well}

도 1은 본 고안에 따른 가설 흙막이 시공용 파일의 사시도.1 is a perspective view of the construction pile construction piles according to the present invention.

도 2는 본 고안을 사용하여 가설 흙막이 벽을 시공한 상태의 단면도Figure 2 is a cross-sectional view of the construction of the temporary construction wall using the present invention

도 3은 본 고안의 파일을 가설 흙막이 벽에 시공한 후에 파일의 H빔을 외부로 인발하는 상태를 나타낸 도면.3 is a view showing a state of drawing the H beam of the pile to the outside after constructing the pile of the present invention on the temporary barrier wall.

*도면의 주요 부분에 대한 부호의 설명*  * Description of the symbols for the main parts of the drawings *

10: H빔             10: H beam

11: 우레탄발포층             11: urethane foam layer

20: 이형재             20: Lee Hyung-jae

21: 새끼줄             21: rope

22: 철사             22: wire

30: 슬라이드커버             30: slide cover

31: 요철             31: unevenness

40: 콘크리트기둥             40: concrete pillar

본 고안은 H빔의 표면에 이형재를 구비한 가설 흙막이 벽 시공용 파일에 관한 것으로, 더 상세하게는 건물 신축을 위하여 기초공사로서 지반을 굴착하기 위하여 콘크리트기둥에 매설되었다가 재사용이 가능한 가설 흙막이 벽 시공용 파일에 관한 것이다.The present invention relates to a construction pile wall construction file having a release material on the surface of an H beam, and more specifically, a construction soil wall which is reusable after being buried in a concrete column to excavate the ground as a basic construction for building construction. It is about a construction file.

건물 등 구조물을 신축하기 위하여 지반을 굴착할 때 사전에 토사붕괴와 주변 건물을 안전성을 위하여 가설 흙막이 벽을 시공하여야 한다.When excavating the ground in order to build new structures such as buildings, temporary earthquake walls should be constructed for the safety of earth and sand collapse and surrounding buildings in advance.

도심에서는 주로 연속벽체 공법이 주로 사용되고 있는데, 연속벽체 공법은 연속벽체 속에 H빔을 삽입하여 벽체의 강성을 증대시키고 있다.In the city center, the continuous wall method is mainly used. The continuous wall method increases the rigidity of the wall by inserting the H beam into the continuous wall.

이러한 연속벽체 공법은 지반에 미리 굴착된 파일공들의 일부 또는 전부에 H빔을 삽입한 후 파일공에 콘크리트몰탈을 타설하여 흙막이 벽을 구축하게 되며, 파일공들의 일부에는 H빔을 삽입하지 않고 콘크리트몰탈을 타설하여 콘크리트 기둥을 양생하게 된다.In this continuous wall method, H beam is inserted into some or all of the pile holes pre-excavated in the ground, and concrete mortar is poured into the pile holes to construct the wall of the pile. Mortar is poured to cure concrete columns.

이와같이 콘크리트기둥을 연속적으로 양생하여 구축된 흙막이 벽은 콘크리트기둥의 일부 또는 전부에 H빔이 매설되어 있으므로 보다 완전하게 지반의 붕괴를 방지할 수 있는 것이다.As described above, the earthen wall constructed by continuously curing the pillars of concrete has H beams embedded in some or all of the pillars of concrete, thereby more completely preventing the collapse of the ground.

상기와 같은 연속벽체 시공방법은 콘크리트기둥 속에 고가의 H빔이 매설된 상태로 사장되기 때문에 자원의 낭비를 초래하게 된다. 이러한 점을 감안하여 대한민국 등록실용신안 제20-0362090호, 제20-0372006호, 제20-0370627호 에 따르면 H빔의 외주면에 별도의 이형재를 결합하여 추후에 콘크리트 기둥에 매설된 H빔을 인발할 수 있도록 하고 H빔을 재사용할 수 있도록 소개하였다.The continuous wall construction method as described above causes waste of resources because the expensive H-beams are buried in a concrete pillar. In view of this, according to Korean Registered Utility Model Nos. 20-0362090, 20-0372006, and 20-0370627, a separate release material is coupled to the outer circumferential surface of the H-beam, and subsequently the H-beam embedded in the concrete pillar is drawn out. Introduced to make it possible to reuse the H beam.

그러나, 상술한 이형재들은 별도로 제작하여 H빔에 조립하여야 함으로 원가상승요인이 되며 조립에 따른 번거로움이 있다.However, the above-described release members are manufactured separately and assembled to the H beam, which is a cost increase factor and hassle due to assembly.

그리고, 파일공에 삽입될 H빔의 길이가 짧을 경우에는 2개 이상의 H빔을 연결하여 사용하는데, 그 연결부위의 외면에는 철판을 덧대고 용접하거나 볼트와 너트로 체결된다. 따라서 H빔의 연결부위가 외부로 돌출되어 있거나 외형이 매끄럽지 않으면 인발재의 결합이 곤란하고 H빔의 인발시에도 지장을 주게 된다.In addition, when the length of the H beam to be inserted into the pile hole is used to connect two or more H beams, the outer surface of the connection portion is padded and welded or fastened with bolts and nuts. Therefore, when the connection portion of the H beam is protruded to the outside or the outer shape is not smooth, it is difficult to bond the drawing material, and even when the H beam is drawn out.

이러한 문제점을 해결하기 위해서 본 출원인의 등록실용신안 제 20-0392543호에서는 H빔의 상단부와 하단부를 제외한 외면 전체에 폴리우레탄을 발포하여 일정 두께의 우레탄발포층을 일체로 형성한 것을 특징으로 하며, 상기 우레탄발포층의 내부에 형성되는 H빔의 모서리에 슬라이드커버가 설치되어 우레탄 발포층으로 부터 H빔의 인발시 인발이 용이하도록 한 가설 흙막이 벽 시공용 파일을 제시한 바 있다. In order to solve this problem, the applicant's registered utility model No. 20-0392543 is characterized in that the polyurethane foam layer of a certain thickness integrally formed by foaming the polyurethane on the entire outer surface except the upper end and the lower end of the H beam, The slide cover is installed at the edge of the H-beam formed in the urethane foam layer has been proposed for the construction of the temporary wall wall construction to facilitate the extraction of the H-beam from the urethane foam layer.

그러나, 상기의 고안은 우레탄발포층이 H빔 전체에 걸쳐 접촉되고 우레탄발포층의 접착력이 우수하여 재활용되는 H빔을 사용하였거나 이물질이 적당히 묻어있는 H빔을 사용하였을 경우 접착력이 떨어지므로 H빔의 인발이 용이하나 새것의 H빔 을 사용하였을 경우 접착력이 상대적으로 강해 인발이 잘 안 되어 고가의 H빔을 종종 뽑아내지 못하는 경우가 있었다.However, the above-mentioned design has a problem that the urethane foaming layer is in contact with the entire H beam and the adhesiveness of the urethane foaming layer is excellent, so that when the H beam is recycled or the H beam is properly covered with foreign matter, the adhesive strength is reduced. Although it is easy to draw, when using a new H-beam, the adhesive strength is relatively high, so it is difficult to pull out the expensive H-beam because it is not drawn well.

따라서, 본 고안은 이러한 종래기술의 근본적인 문제점들을 해결하기 위하여 안출된 것으로,Therefore, the present invention has been made to solve the fundamental problems of the prior art,

본 고안의 목적은 H빔과 우레탄발포층 사이에 중간매개의 이형재를 삽입하여 H빔의 외형에 관계없이 인발이 용이하도록 하고, 제조원가를 절감할 수 있도록 하며, 공장 또는 시공현장에서 간단히 제조되어 작업이 편리하도록 한 가설 흙막이 벽 시공용 파일을 제공하는 데 있다.The purpose of the present invention is to insert an intermediate media release agent between the H-beam and urethane foam layer to facilitate drawing regardless of the appearance of the H-beam, to reduce the manufacturing cost, and to simply work in the factory or construction site It is to provide a temporary piling wall construction pile for this convenience.

상기 목적을 달성하기 위하여 본 고안은 H빔의 외면에 폴리우레탄을 발포하여 일정두께의 우레탄발포층을 형성한 가설 흙막이 벽 시공용 파일에 있어서, 상기 H빔과 우레탄발포층 사이에는 중간매개의 이형재를 삽입하여 형성한 것을 특징으로 한다.In order to achieve the above object, the present invention is a temporary soil wall construction pile formed by foaming polyurethane on the outer surface of the H beam to form a urethane foam layer having a predetermined thickness, and the intermediate media between the H beam and the urethane foam layer. Characterized in that formed by inserting.

여기에서, 상기 이형재는 새끼줄로 이루어지되, 상기 새끼줄은 길이방향 일정간격으로 철사가 끼워지고 상기 철사가 끼워진 새끼줄 중간 중간이 절단되어 이루어진 것을 특징으로 한다.Here, the release material is made of a rope, the rope is characterized in that the wire is inserted at a predetermined interval in the longitudinal direction and the middle of the rope is inserted in the middle of the wire.

또한, 상기 H빔의 모서리에는 길이방향으로 슬라이드커버를 끼운 것을 특징 으로 한다.In addition, the edge of the H beam is characterized in that the slide cover fitted in the longitudinal direction.

(실시예)(Example)

이하, 본 고안의 바람직한 실시예를 첨부된 도면을 참조하여 보다 상세히 설명하면 다음과 같다. Hereinafter, with reference to the accompanying drawings, preferred embodiments of the present invention in more detail as follows.

첨부된 도 1은 본 고안에 따른 가설 흙막이 시공용 파일의 사시도 이고, 도 2는 본 고안을 사용하여 가설 흙막이 벽을 시공한 상태의 단면도 이며, 도 3은 본 고안의 파일을 가설 흙막이 벽에 시공한 후에 파일의 H빔을 외부로 인발하는 상태를 각각 나타내고 있다.Attached FIG. 1 is a perspective view of a construction pile construction file according to the present invention, FIG. 2 is a cross-sectional view of a construction construction of a construction soil wall using the present invention, and FIG. After that, the states in which the H beam of the pile is drawn out to the outside are shown.

도1에 도시한 바와 같이 본 고안은 H빔(10)의 외면을 감싸는 이형재(20)와, 상기 이형재(20)의 외면에 발포하는 폴리우레탄이 이형재(20) 사이사이로 삽입되어 H빔(10)과 일체를 이루는 일정두께의 우레탄발포층(11)으로 이루어진다.As shown in FIG. 1, the present invention includes a release material 20 surrounding the outer surface of the H beam 10, and a polyurethane foamed on the outer surface of the release material 20 is inserted between the release material 20 and the H beam 10. It consists of a urethane foam layer (11) of a certain thickness integrally with).

여기에서, 상기 이형재(20)는 천, 부직포로도 사용가능하지만 인발력이 용이하고 가격이 저렴한 새끼줄(21)을 사용하는 것이 가장 바람직하다.Here, the release material 20 can be used as a cloth, non-woven fabric, but it is most preferable to use the rope 21 is easy to draw force and low cost.

상기 H빔(10)의 외면에 놓여 지는 다수의 새끼줄(21)에는 길이방향 일정간격으로 철사(22)를 끼워 고정하고, 상기 철사(22)가 끼워진 새끼줄(21)을 적당한 길이로 중간 중간 절단하여 H빔(10)의 인발시 새끼줄(21)이 밀려 겹쳐지지 않도록 한다.A plurality of ropes 21 placed on the outer surface of the H beam 10 are fixed by inserting the wires 22 at regular intervals in the longitudinal direction, and the wires 21 in which the wires 22 are fitted are cut in the middle. When the H beam 10 is drawn out so that the rope 21 is not pushed overlap.

이때, 상기 새끼줄(21)을 철사(22)에 끼울 때 외면에 발포되는 폴리우레탄이 사이사이 삽입되어 H빔(10)의 외면에 부착되도록 일정간격을 두고 끼우는 것이 바 람직하고, 새끼줄(21)의 절단된 면에도 폴리우레탄이 삽입되도록 간격을 두어 새끼줄(21)이 단단히 접착되고 우레탄발포층(11)과 H빔(10)의 결합력이 좋아지도록 한다.At this time, it is preferable to insert the polyurethane foam foamed on the outer surface when the wire rope 21 is inserted between the wires 22 to be attached to the outer surface of the H beam 10 at intervals, and the wire rope 21 may be inserted therebetween. The spacing so that the polyurethane is inserted into the cut surface of the rope 21 is firmly bonded to improve the bonding force of the urethane foam layer 11 and the H beam (10).

그리고, 상기 우레탄발포층(11)은 폴리우레탄을 이형재(20) 외면에 발포하여 이형재(20) 사이사이를 통해 H빔(10)의 외면에 부착되는 것으로, 스프레이로 직접 이형재(20)가 놓여진 H빔(10)의 외면에 발포하여 형성하거나 H빔(10)과 이형재(20)를 감싸는 거푸집을 사용하여 거푸집 속에 액상의 폴리우레탄을 주입하여 형성시키는 방법이 있다.In addition, the urethane foam layer 11 is foamed polyurethane on the outer surface of the release material 20 to be attached to the outer surface of the H beam 10 through between the release material 20, the release material 20 is placed directly by spray There is a method of forming by foaming on the outer surface of the H beam 10 or by injecting a liquid polyurethane into the form using a formwork surrounding the H beam 10 and the release material 20.

상기 우레탄발포층(11)을 형성하기 위한 폴리우레탄은 통상적으로 방수, 단열, 보온을 위한 방수 단열재로 사용되는데, 가볍고 내구성이 좋으며 강한 접착성을 발휘하여 시멘트, 목재, 스테인레스 강판 뿐만 아니라 철판의 매끄러운 표면에도 강한 접착력을 발휘하며 압축강도가 양호하다.Polyurethane for forming the urethane foam layer 11 is typically used as a waterproof insulating material for waterproof, heat insulation, insulation, light, durable and strong adhesiveness to smooth the cement, wood, stainless steel plate as well as iron plate Strong adhesion to the surface and good compressive strength.

또한, 폴리우레탄은 발포 후 4초 이내에 완전히 발포되며 약 20초 정도면 거의 경화됨으로 H빔(10)에 우레탄발포층(11)을 신속히 형성할 수 있는 장점이 있다.In addition, the polyurethane is fully foamed within 4 seconds after foaming, and almost 20 seconds is hardened so that the urethane foam layer 11 can be quickly formed on the H beam 10.

본 고안에 사용되는 폴리우레탄은 경질이면서 밀도가 낮아 취성이 큰 반경질폼 또는 경질폼을 사용하는 것이 바람직하다. 예를들어 독일회사인'피셔'에서 생산되며 스프레이식으로서 발포 후 노란색으로 스폰지처럼 굳어지는 발포 폴리우레탄 제품이 양호하다.Polyurethane used in the present invention is rigid and low in density it is preferable to use a semi-rigid semi-rigid foam or rigid foam. For example, a foamed polyurethane product produced by the German company Fischer, which is spray-type and turns yellow like a sponge after foaming, is good.

상기 H빔(10)의 모서리에는 길이방향으로 슬라이드커버(30)를 끼워 인발력이 향상되도록 하는 것도 바람직하다.It is also preferable to insert the slide cover 30 in the longitudinal direction at the corner of the H beam 10 to improve the pulling force.

상기 슬라이드커버(30)는 플라스틱제로서 호스를 길이방향으로 절반 자른 형태의 것으로, H빔(10)의 모서리에 각각 탄성적으로 끼운 후 모서리 외의 면에는 이형재(20)를 놓고 폴리우레탄을 발포하여 우레탄발포층(11)을 형성한다.The slide cover 30 is made of plastic and has a shape in which the hose is cut in half in the longitudinal direction. The slide cover 30 is elastically fitted to the corners of the H beam 10, and then the release member 20 is placed on the outer surface of the corner to foam the polyurethane. The urethane foam layer 11 is formed.

상기 슬라이드커버(30)의 외면은 요철(31)을 형성함으로서 우레탄발포층(11)과의 결합력을 증대시키는 것이 더욱 좋다.The outer surface of the slide cover 30 is more preferable to increase the bonding force with the urethane foam layer 11 by forming the concave-convex (31).

상기 슬라이드커버(30)를 H빔(10)의 모서리에 끼운 것은 파일을 인발할 때 우레탄발포층(11)이 파손되더라도 콘크리트기둥(40)과 H빔(10)이 직접 접촉되지 않도록 하고 잘 인발되도록 하기 위함이다.The slide cover 30 is inserted at the corners of the H beam 10 so that the concrete pillar 40 and the H beam 10 do not directly contact each other even when the urethane foam layer 11 is broken when the pile is pulled out. To make it possible.

한편, 본 고안의 제작시 H빔(10)의 길이가 짧으면 2개 이상의 H빔(10)을 서로 연결하고 그 연결부위는 철판을 덧대고 용접하거나 볼트 등으로 체결한 후에 H빔(10)의 외면에 이형재와 우레탄발발포층(11)을 형성하면 된다. 이때 연결부의가 돌출되는 등 H빔(10)의 외면이 매끄럽지 않더라도 이형재와 우레탄발포층(11)을 신속하고 용이하게 형성할 수 있다.On the other hand, if the length of the H-beam 10 is short in the production of the present invention, the two or more H-beams 10 are connected to each other, and the connecting portion of the H-beam 10 after the padding and welding or fastening with bolts, etc. What is necessary is just to form the mold release material and the urethane foaming layer 11 in the outer surface. At this time, even if the outer surface of the H beam 10 is not smooth, such as the protruding of the connecting portion, the release material and the urethane foam layer 11 can be formed quickly and easily.

이와 같이 구성된 본 고안은 가설 흙막이벽을 시공할 때, 도 2에 도시한 바와같이, 지반굴착 경계부위를 따라 파일공을 형성한 다음 파일을 가설하게 된다. 이때, 본 고안의 파일을 공장에서 미리 제작하거나 현장에서 제작한 것을 파일공에 수직으로 삽입 한 후에 파일공에 콘크리트몰탈을 타설하여 콘크리트기둥(40)을 양생하면 우레탄발포층(11)이 콘크리트기둥(40)의 내면과 결합력 갖는 상태로 매설된다.The present invention configured as described above, when constructing a temporary barrier wall, as shown in Figure 2, to form a pile ball along the ground excavation boundary site, and then the construction of the pile. At this time, after manufacturing the pile of the present invention in advance in the factory or in the field is inserted vertically into the pile hole, and then cast concrete mortar in the pile hole to cure the concrete pillar 40, the urethane foam layer 11 is a concrete pillar It is embedded in a state having a bonding force with the inner surface of (40).

이와 같이 콘크리트 기둥(40)을 양생하여 흙막이 벽을 시공하고 지하 구조물 공사를 완료한 후에는 H빔(10)을 인발하게 된다. 이때, H빔(10)의 외면에 부착된 폴리우레탄폼은 콘크리트기둥(40)과의 결합력으로 매설되며 H빔(10)은 이형재(20)와 모서리 부분의 슬라이드커버(30)와 접촉되어 있으므로 H빔(10)이 쉽게 인발된다.After curing the concrete pillars 40 as described above, after constructing the wall of the earth and completing the construction of the underground structure, the H beam 10 is drawn out. At this time, the polyurethane foam attached to the outer surface of the H beam 10 is buried in the bonding force with the concrete pillar 40 and the H beam 10 is in contact with the release member 20 and the slide cover 30 of the corner portion The H beam 10 is easily drawn out.

이상에서는 본 고안을 특정의 바람직한 실시예를 들어 도시하고 설명하였으나, 본 고안은 상기한 실시예에 한정되지 아니하며, 본 고안의 정신을 벗어나지 않는 범위 내에서 당해 고안이 속하는 기술분야에서 통상의 지식을 가진 자에 의해 다양한 대체 변경과 수정이 가능할 것이다.In the above, the present invention has been illustrated and described with reference to certain preferred embodiments, but the present invention is not limited to the above-described embodiments, and the general knowledge in the technical field to which the present invention belongs does not depart from the spirit of the present invention. Various alternative changes and modifications will be possible by the possessor.

이상에서 설명한 바와 같이 본 고안은 H빔과 우레탄발포층 사이에 중간매개의 이형재를 삽입함으로 H빔의 외형에 관계없이 인발성이 우수하고, 우레탄발포층의 1/2~1/3을 가격이 저렴한 이형재가 차지하므로 고가의 폴리우레탄이 적게 들어가 원가를 절감할 수 있으며, 공장 또는 시공현장에서 간단하고 용이하게 파일을 제작할 수 있으므로 작업시간을 단축할 수 있는 효과가 있다.As described above, the present invention inserts an intermediate medium release material between the H beam and the urethane foam layer, and thus has excellent pullability regardless of the appearance of the H beam, and costs 1/2 to 1/3 of the urethane foam layer. Inexpensive release material occupies less expensive polyurethane, reducing costs, and can reduce the work time because the file can be produced simply and easily at the factory or construction site.

또한, 가설흙막이벽 시공시에 사용한 고가의 H빔을 손상시키지 않고 모두 인발하여 재사용할 수 있으므로 공사비용을 크게 절감시킬 수 있는 효과가 있다.In addition, since it can be drawn out and reused without damaging the expensive H-beam used in the construction of the temporary wall, there is an effect that can significantly reduce the construction cost.

Claims (3)

H빔(10)의 외면에 폴리우레탄을 발포하여 일정두께의 우레탄발포층(11)을 형성한 가설 흙막이 벽 시공용 파일에 있어서,In the pile for temporary wall construction, in which polyurethane is foamed on the outer surface of the H beam 10 to form a urethane foam layer 11 having a predetermined thickness, 상기 H빔(10)과 우레탄발포층(11) 사이에는 중간매개의 이형재(20)를 삽입하여 형성한 것을 특징으로 하는 가설 흙막이 벽 시공용 파일.Temporary earth wall construction piles, characterized in that formed between the intermediate beam release material 20 between the H beam 10 and the urethane foam layer (11). 제1항에 있어서, The method of claim 1, 상기 이형재(20)는 새끼줄(21)로 이루어지되, 상기 새끼줄(21)은 길이방향 일정간격으로 철사(22)가 끼워지고 상기 철사(22)가 끼워진 새끼줄(21) 중간 중간이 절단되어 이루어진 것을 특징으로 하는 가설 흙막이 벽 시공용 파일.The release material 20 is made of the rope line 21, the rope line 21 is a wire 22 is inserted at a predetermined interval in the longitudinal direction and the middle of the rope line 21 is inserted in the middle of the wire line 21 is cut Temporary wall construction file, characterized in that. 제 1항에 있어서,The method of claim 1, 상기 H빔(10)의 모서리에는 길이방향으로 슬라이드커버(30)를 끼운 것을 특징으로 하는 가설 흙막이 벽 시공용 파일.Hypothesis wall construction piles, characterized in that the slide cover 30 in the longitudinal direction at the corner of the H beam (10).
KR2020060010459U 2006-04-19 2006-04-19 pile for temporary well KR200422924Y1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR2020060010459U KR200422924Y1 (en) 2006-04-19 2006-04-19 pile for temporary well

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR2020060010459U KR200422924Y1 (en) 2006-04-19 2006-04-19 pile for temporary well

Publications (1)

Publication Number Publication Date
KR200422924Y1 true KR200422924Y1 (en) 2006-08-02

Family

ID=41771550

Family Applications (1)

Application Number Title Priority Date Filing Date
KR2020060010459U KR200422924Y1 (en) 2006-04-19 2006-04-19 pile for temporary well

Country Status (1)

Country Link
KR (1) KR200422924Y1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100834920B1 (en) 2007-02-15 2008-06-03 남현 Sheathing of tapetum sheet and construction method to use the above sheet
CN107299636A (en) * 2017-07-11 2017-10-27 臧金龙 A kind of I-shaped support pile of pretensioned prestressing high-strength concrete

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100834920B1 (en) 2007-02-15 2008-06-03 남현 Sheathing of tapetum sheet and construction method to use the above sheet
CN107299636A (en) * 2017-07-11 2017-10-27 臧金龙 A kind of I-shaped support pile of pretensioned prestressing high-strength concrete

Similar Documents

Publication Publication Date Title
KR101204763B1 (en) Structure of sandwich pannel with precast concrete and cast in place concrete for pipe utility conduit
CN104018518B (en) The method of prefabricated diaphragm wall and construction outer wall of basement and floor
KR101331261B1 (en) Underground prefabricated precast concrete rainwater recycling facility using precast concrete continuous wall in strut structure or earth anchor and construction method of the same
CN101250886B (en) Method for reinforcing masonry structure building base
KR101542126B1 (en) PHC pile for Prestressed Concrete Member, Manufacturing method of PHC pile amd Construction method of retaining wall using PHC pile
KR20130006420A (en) Method of constructing underground structure to be newly built
CN110820762A (en) Construction method of stiff-core curtain pile and retaining wall pile anchor combined supporting structure
KR101014018B1 (en) Composite Wall Using Angled Channel
KR101524303B1 (en) The wall members and underground wall, underground wall construction method using the same
KR100618597B1 (en) Cast in place concrete pile using vibro magnetic shovel hammer, and the construction method of this
JP2006132219A (en) Underground structure construction method, underground structure, and precast concrete side wall or intermediate wall/pole for use in the same
KR101038945B1 (en) A filling structure of upper part of a tunnel and its procedure
KR101296857B1 (en) Underground structure having slab beam with enhanced bearing power against earth pressure and construction methods of the same
KR200422924Y1 (en) pile for temporary well
KR200392543Y1 (en) pile for temporary well
KR101021137B1 (en) Precast concrete block for expanding sidewalk using micro pile, expanding sidewalk using the same and the constructing method thereof
KR101259054B1 (en) Box structure for shear bucking prevention that habe rotation function
KR101545713B1 (en) Composite type cutoff wall of steel temporary facility and construction method of the same
JP2012251292A (en) Pile foundation structure of outdoor facility and construction method for the same
CN111733855A (en) Construction method of underground continuous wall and underground continuous wall
KR101219451B1 (en) Concrete structure and construction method for the same, constructing method of underground wall as a retaining structural wall used in the same
JP2002030674A (en) Polystyrene resin foam plate assembly, method of constructing lightweight ground, method of constructing foundation, and method of constructing lightweight banking
KR100711574B1 (en) Soil Nail
JP4553190B2 (en) Formwork device for fabric foundation
JP2015206174A (en) Liquefaction countermeasure foundation pile and liquefaction countermeasure foundation structure

Legal Events

Date Code Title Description
REGI Registration of establishment
T201 Request for technology evaluation of utility model
T701 Written decision to grant on technology evaluation
G701 Publication of correction
FPAY Annual fee payment

Payment date: 20080125

Year of fee payment: 3

LAPS Lapse due to unpaid annual fee