KR20040091535A - manufacturing and installation process of hwangto panel for architecture - Google Patents
manufacturing and installation process of hwangto panel for architecture Download PDFInfo
- Publication number
- KR20040091535A KR20040091535A KR1020040013283A KR20040013283A KR20040091535A KR 20040091535 A KR20040091535 A KR 20040091535A KR 1020040013283 A KR1020040013283 A KR 1020040013283A KR 20040013283 A KR20040013283 A KR 20040013283A KR 20040091535 A KR20040091535 A KR 20040091535A
- Authority
- KR
- South Korea
- Prior art keywords
- panel
- ocher
- loess
- construction
- ocher panel
- Prior art date
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F13/00—Coverings or linings, e.g. for walls or ceilings
- E04F13/07—Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor
- E04F13/08—Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor composed of a plurality of similar covering or lining elements
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04C—STRUCTURAL ELEMENTS; BUILDING MATERIALS
- E04C2/00—Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels
- E04C2/30—Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels characterised by the shape or structure
- E04C2/38—Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels characterised by the shape or structure with attached ribs, flanges, or the like, e.g. framed panels
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F13/00—Coverings or linings, e.g. for walls or ceilings
- E04F13/07—Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor
- E04F13/08—Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor composed of a plurality of similar covering or lining elements
- E04F13/0801—Separate fastening elements
- E04F13/0803—Separate fastening elements with load-supporting elongated furring elements between wall and covering elements
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F13/00—Coverings or linings, e.g. for walls or ceilings
- E04F13/07—Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor
- E04F13/08—Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor composed of a plurality of similar covering or lining elements
- E04F13/0862—Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor composed of a plurality of similar covering or lining elements composed of a number of elements which are identical or not, e.g. carried by a common web, support plate or grid
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Floor Finish (AREA)
- Finishing Walls (AREA)
Abstract
Description
본 발명은 건축용 황토 판넬의 제조법 및 시공법에 관한 발명으로 콘크리트(시멘트)건물에서 야기되는 각종 시멘트독성에서 보호하기 위해 벽체에 직접 황토미장 등을 통하여 시멘트독성을 차단시켜 왔다. 그러나 직접미장의 방법은 인력낭비가 많고, 공사현장이 복잡하고, 시공기간이 수주일 이상 소요되는 등 여러 가지 불편하고 사회적비용이 많이 소모되어왔다. 이러한 부분을 개선하고자 몇몇 기술의 특허신청이 되어있으나, 종래의 기술에서는 황토판넬 제조법에 있어서 복잡하고 숙련된 공정이 필요하며, 황토판넬의 구체적인 시공법이 전무한 상태이며, 시공법이 기술되어 있더라도 숙련공을 통한 바닥 또는 벽체등 일부분에만 복잡하게 시공 가능한 것이 일반적이었다.The present invention relates to a manufacturing method and a construction method of the ocher panel for building has been blocking the cement toxicity through the clay soil directly on the wall in order to protect from various cement toxicity caused in the concrete (cement) building. However, the method of direct plastering has consumed a lot of inconvenience and social cost such as waste of manpower, complex construction site, and construction period that takes several weeks. In order to improve these parts, patents of several technologies have been applied, but in the prior art, a complex and skilled process is required in the ocher panel manufacturing method, and there is no specific construction method of the ocher panel, and even if the construction method is described, It was common to be able to construct a complex part only on the floor or wall.
기존의 황토판넬 에서는 없었던 최초로 시도되는 특이하고 단순한 구조로서 제작방법 및 시공법이 간단명료하고 비숙련자도 쉽게 시공가능하며, 어떤 치수의 현장구조에서도 즉석에서 현장시공할 수 있는 장점이 있다. 또한 무공해 플라스틱박스형태의 외형틀 안에 황토몰탈을 굳힘으로써 어떠한 충격에도 형태를 유지하며, 4)연결핀, 5)나사 등 기타의 자재는 현장에서 조립 시공함으로써 판넬자재의 이동 및 물류비용의 절감과 벽면이나 바닥 천정부분등 어떠한 위치에도 시공가능하며, 현장의 치수에 맞게 황토판넬을 절단가능함으로 비규격 크기도 얼마든지 시공가능하며, 빈공간에 벽체의 설치시에도 매우 유용한 시공법이다.It is a unique and simple structure that was tried for the first time in the existing ocher panel, and the manufacturing method and the construction method are simple and easy to be used by non-skilled workers. In addition, it maintains its shape under any impact by hardening ocher mortar in the outer frame of a pollution-free plastic box. 4) Connecting pins, 5) Screws and other materials are assembled on site to reduce the movement of panel materials and reduce logistics costs. It can be installed in any position such as wall surface or floor ceiling part, and can cut any size of non-standard by cutting ocher panel according to the size of the site, and it is very useful construction method when installing wall in empty space.
[도1] 황토판넬의 형태[Figure 1] Morphology of Ocher Panel
1)판넬 몸체 ; 박스형태로 제작된 황토판넬의 뼈대를 이루는 무공해 일체형 플라스틱(또는 대나무살) 조형물 - box 형태, 황토색상.1) Panel body; A pollution-free integral plastic (or bamboo) sculpture that forms the skeleton of an ocher panel made in the form of a box.
2)돌출구멍 ; 황토판넬을 고정시키기 위해 4)연결핀을 끼울 수 있도록 판넬몸체에 5개씩 뚫어져 있는 구멍(직경 10~30mm내외).2) protrusion hole; To fix the ocher panel, 4) 5 holes (about 10 ~ 30mm in diameter) perforated in the panel body to insert the connecting pin.
[도2] 시공을 위한 몇가지 부품[Figure 2] Some parts for construction
3)칼 블록 ; 시멘트벽에 판넬시공시 연결핀을 나사로 고정할때 나사를 조여주고, 이탈을 방지하기 위한 플라스틱 부품.3) knife block; Plastic parts to tighten the screws and to prevent them from coming off when fixing the connecting pins with screws when installing panels on cement walls.
4)연결핀 ; 탄성이 있는 스틸로 도면과 같이 제작되어 돌출구멍에 끼웠다 뺏다 할수 있는 연결장치로 판넬을 고정시키는데 사용한다.4) connecting pins; It is made of elastic steel and used to fix the panel with the connecting device that can be inserted into the protruding hole and made as shown in the drawing.
5)나사 ; 연결핀을 시멘트벽에 고정시키거나, 각목 또는 4각 스틸파이프에 고정시킬때 사용하며, 상황에 따라서 2)돌출구멍에 연결핀을 고정한다.5) screw; It is used to fix the connecting pin to the cement wall or to the wood or square steel pipe. 2) Fix the connecting pin to the protrusion hole depending on the situation.
6)앙카 ; 사각 스틸파이프나 각목등을 벽체,천정등에 고정시킬때 사용한다.6) anchor; It is used to fix square steel pipes or wooden blocks to walls and ceilings.
[도3] 여러가지 황토판넬의 형태Figure 3 Forms of various ocher panels
7)시공용 표시판 ; 황토판넬 시공시 3)연결핀을 고정시킬 정확한 자리를 표시하기 위해서 플라스틱으로 만들어진 보조장치.7) construction display board; 3) Auxiliary device made of plastic to mark the exact position to fix the connecting pin.
8)황토판넬의 뒷면8) Back side of ocher panel
9)황토판넬의 윗면9) Top side of ocher panel
10)원하는 형태에 맞게 잘라진 황토판넬 ; 비규격 사이즈는 얼마든지 크기에 맞추어서 전기원형톱을 이용하여 잘라서 사용할수 있다.10) ocher panel cut to desired shape; Non-standard size can be cut and used with electric circular saw according to size.
[도4] 시멘트벽이나 합판위에 바로 시공하는 모습의 사시도4 is a perspective view of a construction directly on a cement wall or plywood
[도5] 11)시공용 동판 또는 철판 ; 황토판넬과 같은크기로 강도성있는 동판 또는 철판으로 만들고, 적당한 두께를 유지하여 시공벽체에 먼저 부착할수 있게 함.5) construction copper plate or iron plate; It is made of strong copper plate or iron plate with the same size as ocher panel and maintains the proper thickness so that it can be attached to the construction wall first.
[도6] 시공용 동판(철판)을 이용한 시공의 사시도6 is a perspective view of the construction using the copper plate (iron plate) for construction
[도7] 벽체시공의 사시도7 is a perspective view of the wall construction
[도8] 천정시공의 사시도8 is a perspective view of the ceiling construction
[도9] 바닥시공의 사시도9 is a perspective view of the floor construction
[도10] 빈공간에서의 벽체시공의 사시도10 is a perspective view of wall construction in an empty space
[도11] 무자계열선을 내장한 황토판넬의 뒷면 사시도Fig. 11 is a rear perspective view of the ocher panel incorporating a non-magnetic line
12)동(銅)테이프로 감은 무자계열선12) Magnetic wire wound around copper tape
13)전원연결 콘넥트13) Power Connection Connector
[도12] 열선이 내장된 황토판넬의 온열작동원리 이해도[Figure 12] Understanding the thermal operation principle of the ocher panel with a built-in heating wire
14)온도 조절기14) Thermostat
15)과열방지를 위한 바이메탈15) Bimetal to prevent overheating
16)온도 감지센서16) Temperature sensor
황토판넬의 외형틀을 유지하는 판넬몸체인 플라스틱가공틀(대나무틀)과 황토몰탈, 연결핀, 나사, 철재사각파이프, 사각의 목재, 스티로폼 등으로 구성된다.It is composed of a plastic processing frame (bamboo frame) that maintains the appearance of ocher panel, ocher mortar, connecting pin, screw, steel square pipe, square wood, styrofoam and so on.
[도1]에서 외형을 유지하는 1)판넬몸체의 플라스틱(또는 대나무) 박스내에 2)돌출구멍이 묻히지 않게 황토몰탈로 3차에 걸친 공정을 갖는다. 1차적으로 황토몰탈은 황토흙, 볏짚, 소금, 몰탈용 원액(깨끗한 물에 두릅나무껍질,우뭇가사리,당귀, 해초류등을 넣고 24시간 이상 끓여 만드는 전통적인 방법으로 생산)으로 반죽한것으로 판넬몸체의 빈공간이 없도록 채워서 건조시킨후, 2차로 건조되면서 갈라진 틈사이를 재작업을 통해 미장하고, 3차로 마감작업은 고운황토가루에 황토원액, 콩액, 들기름등을 혼합한 다음 표면에 도포함으로 황토판넬 표면을 보호하고, 피부에 묻지않게 한다. 경우에 따라서는 시중에 유통되는 스프레이형 발수제를 뿌려준다.In Figure 1, to maintain the appearance 1) in the plastic (or bamboo) box of the panel body 2) has a three-step process with ocher mortar so that the protrusion hole is not buried. First of all, ocher mortar is kneaded with ocher soil, rice straw, salt, and mortar solution (produced by the traditional method of making bark, gourd, donkey, seaweed, etc. in clean water and boiling it for more than 24 hours). After filling and drying, re-work the gap between the cracks while drying it secondly, and finish the third process by mixing ocher juice, soybean juice, perilla oil with fine soil powder, and then applying the surface to the ocher panel surface. Protect it and keep it away from the skin. In some cases, spray spray repellents are available.
3차로 마감작업후에는 판넬몸체를 이루는 플라스틱(또는 대나무)틀이 전혀 보이지 않게 되며, 플라스틱박스 제작시 황토색상으로 한다. 판넬의 크기는 규격사이즈를 정하여 몇가지로 통일하고, 비규격은 전기원형톱등 장비를 이용해 크기에 맞게 절단하여 사용가능하다.After finishing the third round, the plastic frame (or bamboo) that forms the panel body is completely invisible. The size of the panel is unified in several ways by setting the standard size, and the non-standard size can be used by cutting it to the size using equipment such as electric circular saw.
규격크기로 사용시는 중앙의 돌출구멍을 제외한 4곳의 돌출구멍을 활용하여 시공하고, 비규격으로 절단하여 시공 시에는 중앙의 돌출구멍을 활용하여 3점 지지로도 황토판넬을 부착할 수 있게 한다.When using the standard size, construct by using 4 projecting holes except center projecting hole, and cut to non-standard, and when constructing, use the center projecting hole to attach ocher panel with 3 point support. .
*. 황토판넬의 권장규격크기의 예 (단위; ㎜)- 가로*세로*두께 *. Examples of recommended size of ocher panel (unit: ㎜) -width * length * thickness
1. 벽체용 1200*800*40 800*800*40 600*600*40 400*400*401.1200 * 800 * 40 800 * 800 * 40 600 * 600 * 40 400 * 400 * 40 for wall
2. 바닥용 800*800*40 600*600*40 500*500*40 400*400*402. 800 * 800 * 40 600 * 600 * 40 500 * 500 * 40 400 * 400 * 40 for floor
3. 천정용 600*600*20 500*500*20 400*400*20 300*300*203. 600 * 600 * 20 500 * 500 * 20 400 * 400 * 20 300 * 300 * 20 for ceiling
[도2]에서 연결핀(4)은 탄성이 좋은 금속으로 나사고정홈을 사선의 타원형으로 하여 판넬부착시 미세조정이 가능하도록 제작하고, 시멘트벽이나 천정, 사각 철제파이프나 각목등에 나사로 부착하여 판넬몸체의 돌출구멍에 끼워 황토판넬을 고정시키며, 시공상황에 따라서 나사(5)를 이용해 판넬몸체의 돌출구멍에 부착하여 사각철제파이프의 구멍에 황토판넬을 고정 시킬수도 있다. 각종 칼블록(3)은 시멘트벽체등에 뚫어진 구멍에 삽입하여 나사가 구멍에서 이탈되지 않게 하며, 앙카(6)등은 사각 철제파이프를 고정하거나 필요에 따라서 활용한다.In Figure 2, the connecting pin (4) is made of metal with good elasticity, the screw fixing grooves are oblique in shape to make fine adjustments when attaching the panel, and attached to the cement wall or ceiling, square iron pipe or wood with screws The ocher panel is fixed to the protruding hole of the panel body. Depending on the construction situation, the ocher panel may be fixed to the hole of the square steel pipe by attaching it to the protruding hole of the panel body using the screw (5). Various knife blocks 3 are inserted into holes drilled in cement walls and the like so that screws are not separated from the holes, and anchors 6 and the like are used to fix square steel pipes or as necessary.
[도3]에는 황토판넬의 여러가지 색상의 형태의 예인데, 시공시 벽면에 연결핀을 고정시킬때 정확한 지점을 표시하기위해 시공용표시판(7)을 활용하며, 판넬의 뒷면모양새(8)를 이용하여 크기에 맞게 절단한다면, 원하는 모양대로 얼마든지 비규격 사이즈의 황토판넬(10)을 만들수가 있다.Figure 3 is an example of the various color of the ocher panel, when using the construction display panel (7) to display the correct point when fixing the connection pins on the wall, the back shape of the panel (8) If cut to size using, you can make any size ocher panel of non-standard size as desired.
[도4]는 리모델링작업이나, 기존의 벽체두께가 충분하여 공간차지하지 않게 시공할경우에 시멘트벽체에 바로 판넬을 붙이는 작업의 예이다. 도면그림에서와 같이 시공용 표시판으로 연결핀 설치자리를 표시한다음, 드릴로 구멍을 뚫고칼블럭(3)을 끼우고, 나사를 이용하여 연결핀(4)을 고정한다음 판넬을 부착시공한다. 만일 벽체의 면이 고르지 못할경우는 10mm정도의 합판을 벽에 고정한후 합판에 연결핀을 설치한다음 판넬을 부착시공 할수있다. 인테리어 효과를 위해서는 벽체시공시 허리높이쯤에 띠를 두르듯이 10cm정도의 원목나무나 색상이 다른 황토판넬을 두르거나, 완성된후 띠벽지를 붙이거나 필요한 부위에 한지 벽지를 붙일수도 있고, 전체적으로 황토판넬 부착후 고운황토가루에 황토원액, 콩액과 들기름을 혼합하여 부드러운 붓으로 칠해준다면 통일된 일체형 마감처리가 된다.Figure 4 is an example of remodeling work, or the operation of attaching the panel directly to the cement wall when the existing wall thickness is sufficient so as not to fill the space. As shown in the figure, mark the installation pin installation place with the construction display board, drill a hole with a drill, insert the knife block (3), fix the connection pin (4) with screws, and then attach the panel. If the surface of the wall is uneven, fix the 10mm plywood to the wall, install the connecting pin on the plywood, and then install the panel. For interior effect, you can wrap 10cm of solid wood or ocher panel with different colors, or attach a wall paper wallpaper or attach a hanji wallpaper to the necessary area. After attaching the panel, if you mix the fine yellow clay powder with the ocher stock solution, the soybean juice and perilla oil, and paint it with a soft brush, it becomes a unified finish.
[도5]에서는 보다 더 시공의 속도나 작업능률을 향상시키기 위해 고안된 시공용 동판 또는 시공용 철판(11)으로, 강도가 있는 동판이나 철판등의 표면에 돌출구멍의 위치에 맞추어, 연결핀(4)이 용접등으로 부착되어 있는 상태로 미리제작해 놓은것을 나타낸 그림이다. 시공용 동판의 사용시는 원가부담은 있지만, 작업능률은 배가되어 인건비의 절감효과는 기대된다.5 is a construction copper plate or construction iron plate 11 designed to further improve the speed or work efficiency of the construction, in accordance with the position of the protrusion hole on the surface of the copper plate or steel plate with strength, 4) The drawing shows the pre-fabrication with the welding attached. Although there is a cost burden when using copper plates for construction, labor efficiency is expected to be doubled as work efficiency is doubled.
[도6]에서는 연결핀(4)이 부착된 시공용 동판 또는 철판(11)을 활용하여, 황토판넬을 부착시공해 나가는것을 나타낸 그림으로, 상하좌우를 밀착하여 시공용 동판을 콘크리트 못(콤프레샤를 이용한 타카등을 이용)이나 드릴나사등을 이용하여 벽체에 고정후, 부착된 연결핀(4)을 이용하여 황토판넬을 시공해 나간다면, 작업속도가 더욱 향상될 것이다.[Figure 6] is a drawing showing the attachment of the ocher panel using the construction copper plate or iron plate (11) attached to the connecting pin (4), the construction copper plate in close contact with the upper and lower left and right concrete nail (compressor) After fixing to the wall using a rudder, etc.) or a drill screw, and constructing the ocher panel using the attached connecting pin (4), the working speed will be further improved.
[도7]에서는 신축건물 또는 벽체의 흡음 및 냉난방을 위한 열손실차단을 보강할때의 시공예로써 각목이나, 철재 사각파이프를 벽면에 앙카나 ㄱ자꺽쇠 등을 통해 고정한후, 사이의 공간은 스틸로폼을 잘라서 끼워넣어서 흠음 및 열손실을 막게하고, 시공용표시판을 이용하여 위치를 잡은다음 나사를 이용해 각목이나 사각파이프에 연결핀을 직접고정하거나, 각목이나 사각파이프에 10mm정도의 합판을 고정한다음 합판위에 같은방법으로 연결핀을 고정한후 판넬을 부착시공한다. 합판을 부착시공할때는 각목이나 사각파이프의 이격거리를 보다 여유롭게 할수있고 시공면을 굴곡없이 깔끔하게 할수있다. 시공상황에 따라서는 시공용 동판(철판)을 사용하거나, 사각철제파이프에 구멍을 뚫고, 판넬몸체의 돌출구멍에 연결핀을 부착하여, 황토판넬을 설치할 수도 있다.In Figure 7 as a construction example when reinforcing the heat loss block for sound absorption and heating and cooling of a new building or wall, after fixing the wood or steel square pipe to the wall through an anchor or a bracket, the space between the steel Cut and insert the rofome to prevent flaws and heat loss, and position it using the construction display board, and then fix the connecting pin directly to the square or square pipe with screws, or fix the plywood of about 10 mm to the square or square pipe. Then fix the connecting pin on the plywood in the same way and attach the panel. When attaching plywood, the separation distance of lumber or square pipe can be more relaxed, and the construction surface can be neat without bending. Depending on the construction situation, a copper plate for use (iron plate) may be used, or a yellow earth panel may be installed by drilling a hole in a square steel pipe and attaching a connection pin to a protruding hole of the panel body.
[도8] 의 그림은 천정시공의 예로써 [도7]에서와 같은 방법으로 천정시공을 하며 합판을 고정시 무게를 감안하여 최대한 가벼우며 나사를 고정시킬수 있는 두께의 합판을 이용한다.Figure 8 is a ceiling construction as an example of the ceiling construction in the same way as in [7] using the plywood of the thickness that can be fixed as light as possible in consideration of the weight when fixing the plywood.
[도9] 의 그림은 난방이 필요한 바닥면 시공시 온수파이프의 시공예로써, 각목이나 녹슬지 않는 금속파이프로 XL파이프가 지날수 있게 고정하고, 사이사이에 XL파이프를 깔고, 빈 공간에 분말 황토(건조된 자연그대로의 흙), 또는 황토몰탈 등으로 채운다음 [도7]에서와 같이 나머지 공정을 통해 황토판넬을 부착시공한다. 전기로 난방을 할경우에는 시중에 유통되는 온돌침대용 무자계열판을 각목이나 금속파이프사이에 설치하고, 같은 방법으로 황토판넬을 부착시공한다.9 is an example of the construction of hot water pipes when the floor is required to be heated, the XL pipes are fixed by passing wood or anti-rust metal pipes, and the XL pipes are interposed between them. (Dried natural soil as it is), or after filling with ocher mortar and then attach the ocher panel through the rest of the process as shown in FIG. In case of heating by electricity, commercially available on-bed bedless heating plates are installed between wood or metal pipes and ocher panel is attached in the same way.
[도10]의 그림은 빈 공간에 벽체를 새롭게 설치하는 경우의 예로써 각목이나 사각 스틸파이프의 상부와 하부를 천정과 바닥에 앙카등으로 고정한 후 한면에 연결핀을 설치하여 직접 황토판넬을 설치하거나, 10mm정도의 합판을 각목이나 스틸파이프에 고정한후 합판위에 연결핀을 설치하여 황토판넬을 부착시공하고, 나머지 면에 스티로폼으로 공간을 채운 후 같은 방법으로 황토판넬을 부착시공하며, 경우에 따라 시공용 동판이나 시공용 철판도 적극활용한다.[Figure 10] is an example of newly installing a wall in an empty space. The upper and lower parts of a lumber or square steel pipe are fixed to the ceiling and the floor with anchors, and then connection pins are installed on one side to directly install the ocher panel. Or, fix the 10mm plywood to the wood or steel pipe and install the ocher panel by installing the connecting pin on the plywood, fill the space with styrofoam on the other side and attach the ocher panel in the same way. Construction copper plates and construction iron plates are also actively utilized.
이러한 방법으로 벽체를 설치할 시, 스틸로폼을 채우는 공간속에 필요에 따라서 전기배선이나 전화선,수도배관등 부가적인 설치도 얼마든지 가능하다. 이와같이 벽체를 설치할경우의 구체적인 각재료의 두께는 황토판넬; 20~40mm, 합판; 5~10mm, 스치로폼 및 사각스틸파이프; 30~100mm로 하며, 완성했을경우 전체의 두께는 80~200mm의 견고한 벽체가 된다.When installing the wall in this way, additional installations such as electric wires, telephone lines, water pipes, etc. can be installed as needed in the space filling the stilfo. Thus, the thickness of each concrete material when installing the wall is ocher panel; 20-40 mm, plywood; 5-10mm, styrofoam and square steel pipes; It is 30 ~ 100mm, and when finished, the whole wall becomes 80 ~ 200mm solid wall.
[도11]의 그림은 공기와의 접촉을 막기위해서 동(銅)테이프로 감은 무자계열선(12)을 내장한 황토판넬의 뒷모습으로서, 벽면이나 바닥시공시 온열작용이 요구될경우에는 전기공급콘넥트(13)가 달린 온열황토판넬 시공한다면 쉽게 따뜻한 난방을 할수 있다.Fig. 11 is a rear view of the ocher panel, which is equipped with a non-magnetic heating wire 12 wound with copper tape to prevent contact with air, and supplies electricity when a heating action is required during wall or floor construction. If you install the thermal yellow earth panel with the connector (13) can be easily heated.
[도12]는 온열작용이 가능한 황토판넬의 시공시, 전기공급 및 온도조절의 작용에 관하여 이해하기 쉽게 나타낸 그림으로서, 무자계열선(12)이 내장된 각각의 황토판넬의 전기연결 콘넥트(13) 여러개를 하나의 온도조절기(14)를 연결하고, 전원을 공급하면 원하는 온도로 상승하게 된다. 이때 과열방지를 위해서 바이메탈(15)을 설치하며, 적정한 온도의 측정을 위해서 온도센서(16)가 황토판넬 내부에 배치하여 온도조절기와 연결시켜둔다.12 is an easy-to-understand illustration of the operation of electricity supply and temperature control during construction of the loess panel, which is capable of heating, and the electrical connection connector of each loess panel in which the magnetless heating line 12 is embedded ( 13) Connect several thermostats 14, and supply power to rise to the desired temperature. At this time, the bimetal 15 is installed to prevent overheating, and the temperature sensor 16 is disposed inside the ocher panel to measure the appropriate temperature and connected to the temperature controller.
건물 내외부의 습기나 온도조절, 원적외선효과, 냄새제거는 물론이고, 황토미장에 비해서 사회적비용의 획기적인 절감과 시간단축, 각종 재료비의 절감, 시공의 공정 및 시간, 인건비의 대폭적인 절감, 미려하고 통일감을 줄 수 있는 인테리어 효과, 지저분하고 복잡한 연결선이나 연결장치가 전혀 보이지 않는 깔끔한 마무리 등 시멘트독성을 차단하고 황토판넬을 이용한 무공해환경을 조성하는데 있어서 획기적인 발명이라 할 수 있다.Moisture, temperature control, far-infrared effect, odor removal inside and outside of the building, as well as drastic reduction of social cost and time savings, reduction of various material costs, construction process and time, labor cost drastically reduced compared to ocher plastering, beautiful and unified feeling It is an innovative invention in blocking cement toxicity and creating a pollution-free environment using ocher panel, such as interior effect that can give a clean, messy and complicated connection line or a neat finish without any connecting device.
Claims (12)
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR20030025422 | 2003-04-22 | ||
KR1020030025422 | 2003-04-22 |
Publications (2)
Publication Number | Publication Date |
---|---|
KR20040091535A true KR20040091535A (en) | 2004-10-28 |
KR100586247B1 KR100586247B1 (en) | 2006-06-07 |
Family
ID=37372168
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR1020040013283A KR100586247B1 (en) | 2003-04-22 | 2004-02-27 | Structural Panel Assembly |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR100586247B1 (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20060014337A (en) * | 2004-08-10 | 2006-02-15 | 현익근 | How to produce ocher plates for interiors of houses and stores with ocher |
KR101667746B1 (en) * | 2016-08-30 | 2016-10-19 | 주식회사 삼원 에코웰 | Korean red clay houses using traditional Korean floor heating system |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100750346B1 (en) | 2005-12-08 | 2007-08-17 | 김기용 | The structure of floor materials |
KR102283881B1 (en) * | 2019-07-08 | 2021-07-30 | 김경수 | External panel for building with bird screen |
KR102419117B1 (en) * | 2020-02-10 | 2022-07-07 | 김정호 | Triple insulated structure container |
Family Cites Families (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR19980065817U (en) * | 1997-05-02 | 1998-12-05 | 임재호 | Ocher panel |
KR100236268B1 (en) | 1997-06-26 | 1999-12-15 | 이수용 | Yellow soil adhesion panel |
KR100257054B1 (en) * | 1997-11-17 | 2000-05-15 | 강무웅 | Hypocaust clay bed |
KR200280918Y1 (en) * | 1998-06-05 | 2002-07-18 | 강철우 | A ceramic loess hypocaust mattress |
KR200179066Y1 (en) | 1999-11-26 | 2000-04-15 | 오영석 | Mud panel to interior construction |
KR100342138B1 (en) * | 2000-04-08 | 2002-06-27 | 신한영 | A heating panel |
KR100465817B1 (en) * | 2002-12-12 | 2005-01-13 | 인건수 | A wall pannel and the manufacturing method for buildinr interior |
-
2004
- 2004-02-27 KR KR1020040013283A patent/KR100586247B1/en not_active IP Right Cessation
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20060014337A (en) * | 2004-08-10 | 2006-02-15 | 현익근 | How to produce ocher plates for interiors of houses and stores with ocher |
KR101667746B1 (en) * | 2016-08-30 | 2016-10-19 | 주식회사 삼원 에코웰 | Korean red clay houses using traditional Korean floor heating system |
Also Published As
Publication number | Publication date |
---|---|
KR100586247B1 (en) | 2006-06-07 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205557923U (en) | Light weight, high strength degree equipment wall body | |
CN208792663U (en) | A kind of room finishing system | |
RU2110654C1 (en) | Heated floor | |
CN107178166A (en) | A kind of light-high-strength assembles wall | |
KR20040091535A (en) | manufacturing and installation process of hwangto panel for architecture | |
US3742667A (en) | Architectural panel system | |
KR100828432B1 (en) | Light weight insulation block and energy saving type house using the same | |
CN109208773A (en) | A kind of graphene EPS assembled sandwich heat-preserving building system | |
CN205990692U (en) | A kind of furred ceiling | |
CN203583821U (en) | Polyphenyl granule inorganic insulation decorative sheet | |
KR100835338B1 (en) | A concrete block | |
KR100363524B1 (en) | Exterior panel for construction | |
CN209145085U (en) | A kind of building multi-layer heat preserving structure | |
KR200168591Y1 (en) | Concrete panel | |
KR200282055Y1 (en) | a yellow soil panel for construction | |
KR20000012584A (en) | Inner and outer material finishing method of assembly type insulation panel | |
KR20210001235A (en) | module type bathroom and building method using the same | |
CN202672593U (en) | Unit ultra-large scale indoor fabricated decorative wall system | |
CN100572707C (en) | Dynamic heat insulating material and preparation method | |
CN108978851A (en) | A kind of improvement room finishing system and decoration method | |
CN210598022U (en) | Skirting line assembly with face decoration closing-in function | |
CN202810069U (en) | Decorative cement foam insulation board | |
JPH0225852Y2 (en) | ||
CN209523347U (en) | Building heat preservation and structure-integrated steel wire net rack thermal-insulating board | |
CN208039604U (en) | A kind of ripple autoclave aerated concrete building block |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A201 | Request for examination | ||
E701 | Decision to grant or registration of patent right | ||
GRNT | Written decision to grant | ||
FPAY | Annual fee payment |
Payment date: 20120529 Year of fee payment: 7 |
|
LAPS | Lapse due to unpaid annual fee |