KR20040037910A KR1020020066597A KR20020066597A KR20040037910A KR 20040037910 A KR20040037910 A KR 20040037910A KR 1020020066597 A KR1020020066597 A KR 1020020066597A KR 20020066597 A KR20020066597 A KR 20020066597A KR 20040037910 A KR20040037910 A KR 20040037910A
Authority
KR
South Korea
Prior art keywords
sheet pile
beams
top plate
construction
sheet
Prior art date
Application number
KR1020020066597A
Other languages
Korean (ko)
Other versions
KR100508773B1 (en
Inventor
유근무
Original Assignee
유근무
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 유근무 filed Critical 유근무
Priority to KR10-2002-0066597A priority Critical patent/KR100508773B1/en
Publication of KR20040037910A publication Critical patent/KR20040037910A/en
Application granted granted Critical
Publication of KR100508773B1 publication Critical patent/KR100508773B1/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/12Grating or flooring for bridges; Fastening railway sleepers or tracks to bridges
    • E01D19/125Grating or flooring for bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges

Abstract

PURPOSE: A floor slab of a temporary bridge using a sheet pile is provided to secure the safety of traffic, the pleasant working environment, to shorten a period of construction, and to cut down the construction expense and the maintenance expense. CONSTITUTION: The floor slab of a temporary bridge using a sheet pile comprises: many H beams(10) installed on the lower structure at regular intervals; many sheet piles(20) provided with a retreated part(24) unified with a floor unit, both inclined units and both wing units, fixed on H-beams(10) perpendicular to the H-beams(10) while the opened plane of the retreated part(24) is located on the upper part; and a pavement layer(30) paved on the sheet pile(20) to the appointed thickness.

Description

시트파일을 이용한 가교 상판 및 그것의 시공방법{A Floor of Temporary Bridge for using Seet Pile and It's Constructing Method}A Floor of Temporary Bridge for using Seet Pile and It's Constructing Method}

본 발명은 일시적으로 설치되는 임시교량이나 지하철 건설공사에서 차량의 통행·자재적치·작업장 확보 등의 목적으로 설치되는 복공의 상판에 관한 것으로, 특히 흙막이 가시설용으로 개발된 시트파일(sheet pile)을 상판재로 이용하고 그 상부에 콘크리트 또는 아스팔트 등의 포장을 시행함으로써, 평탄성이 좋고 미끄럼이 방지되도록 하여 주기 위한 시트파일을 이용한 가교 상판 및 그것의 시공방법에 관한 것이다.The present invention relates to a top plate of a perforated plate which is installed for the purpose of temporarily passing a temporary bridge or a subway construction work, and for securing a traffic, material storage, and a workplace, and in particular, a sheet pile developed for a temporary wall temporary facility. The present invention relates to a cross-linked top plate using a sheet pile for providing flatness and preventing slipping by using a top plate and paving concrete or asphalt on top thereof, and a construction method thereof.

가교는 교량의 신설·개축·확장·보강 등을 위한 공사중의 우회로, 재해복구용 응급로, 긴급 군용도로 등의 확보 또는 지하철 등의 지하시설 구축을 위해 파해친 구간의 복공을 위해 일시적으로 가설되는 도로 시설물로서, 일반 교량과는 달리 그 사용목적에 따라 다양한 현장 여건에 맞춰 최소의 공사비로 신속히 설치해야 하는 특성이 있다.Bridge construction is temporarily installed for the reconstruction of damaged sections for detours during construction for new construction, reconstruction, expansion, and reinforcement of bridges, emergency roads for disaster recovery, securing emergency military roads, or for building underground facilities such as subways. Unlike road bridges, it is a road facility that has to be installed quickly and with minimal construction costs according to various site conditions depending on its purpose of use.

종래 위와 같은 가교의 상판은 도1의 도시와 같이 하부구조물 위에 철제빔 (1)들을 설치하고, 그 철제빔(1)들 위에 장방형 판체 형상으로 된 철제 복공판(2)을 배열·설치하는 방법을 통해 시공하는 것이 일반적이다.Conventionally, the upper plate of the bridge as shown in FIG. 1 is provided with a method for arranging and installing iron beams (1) on the lower structure as shown in FIG. 1, and arranging and installing the iron porous plates (2) in the shape of a rectangular plate on the iron beams (1). It is common to construct through.

그러나, 위와 같이 철제 복공판을 사용하는 가교 상판의 시공은 아래와 같은여러 문제점을 가지고 있다.However, the construction of the crosslinked top plate using the iron porous plate as described above has several problems as follows.

첫째, 노면을 형성하는 복공판의 표면이 매끄럽기 때문에, 아스팔트나 콘크리트 도로면보다 마찰력이 현저히 작고 눈이나 비가 올 경우 미끄럼 현상이 쉽게 일어나 교통사고나 안전사고의 원인이 되는 문제점이 있다.First, since the surface of the perforated plate forming the road surface is smooth, frictional force is significantly smaller than that of asphalt or concrete road surface, and slipping occurs easily when snow or rain occurs, causing a traffic accident or a safety accident.

둘째, 복공판들이 연결되는 부분의 틈새로 인한 요철 및 시공상의 단차가 형성되기 때문에 노면의 평탄성이 나빠 그 위를 주행하는 차량의 운전자에게 불안감을 조성하여 줄 뿐만 아니라, 차량의 고장 원인을 제공하고 심할 경우 교통사고로 이어지는 문제점이 있었다.Second, because the unevenness and construction step due to the gap between the two perforated plates are formed, the flatness of the road surface is bad, which not only creates anxiety for the driver of the vehicle driving on the road, but also provides a cause for the failure of the vehicle If there were problems leading to traffic accidents.

셋째, 방수기능이 없어 복공판들이 연결되는 부분의 틈새나 인양고리 구멍으로 빗물이나 오수가 새기 때문에 하부에서 작업하는 자 또는 점검하는 자의 행동을 부자연스럽게 할 뿐만 아니라, 각종 안전사고의 원인을 제공하며, 복공판 하부의 시설물 및 작업 장비들의 고장을 일으키는 문제점이 있었다.Third, because there is no waterproof function, rainwater or sewage leaks through gaps or lifting hook holes at the parts where the ventral plates are connected, which not only makes the worker's work or inspector's actions unnatural, but also provides various causes of safety accidents. There was a problem that caused the failure of the facilities and work equipment under the perforated plate.

넷째, 틈새 및 인양 고리구멍 등으로 먼지가 통과되어 하부공간의 환경이 열악해짐으로써, 작업자의 건강을 해치는 문제점이 있어 하부 작업을 기피하게 된다.Fourth, the dust is passed through the gap and the lifting ring hole, such that the environment of the lower space is inferior, there is a problem that damages the health of the worker to avoid the lower work.

다섯째, 상판재로 사용되는 복공판이 일률적인 치수로 제작되기 때문에, 정밀시공 능력이 있는 특수 기능공이 필요하여 노무 단가가 고가이고, 복공판에 철물의 양이 많이 들어가고 무겁기 때문에 자재비용이 고가이며 운반이 용이치 않고 작업성이 떨어지는 결과를 초래하여서 공사비용이 증대되는 문제점이 있었다.Fifth, since the perforated plate used as the upper plate material is manufactured in uniform dimensions, special functional workers with precision construction ability are required, and the labor cost is high, and the material cost is high and the transportation is easy because the amount of hardware is high and heavy in the perforated plate. There was a problem that the construction cost is increased by the result that is not easy and workability is poor.

여섯째, 차량의 통행에 의해 위치 이동이나 단차발생이 쉽게 일어나 잦은 유지보수가 소요되어 유지보수를 하기 위한 비용 부담이 큰 문제점이 있었다.Sixth, there is a problem in that the cost burden for the maintenance is frequent, because the frequent movement of the location occurs due to the movement of the position or the occurrence of a step by the traffic of the vehicle.

한편, 종래 차량의 미끄러짐을 방지하기 위해 개발된 것으로, 국내 공개실용신안공보 공개번호 제1999-0015930호 및 제1998-057334호, 국내 등록실용신안공보 등록번호 제0163394호, 제0232743호, 제0234610호의 것들과 그외 다수의 미끄럼 방지용 복공판들이 개시된 바 있다.On the other hand, it was developed to prevent the slip of the conventional vehicle, the Korean Utility Model Publication No. 1999-0015930 and 1998-057334, the Korean Utility Model Registration No. 0163394, 0232743, 0234610 Ones and many other non-slip perforated plates have been disclosed.

이들 복공판들은 철제로 된 복공판의 상면에 콘크리트 또는 아스팔트 등의 표층재를 덧씌워 일체화시킨 것으로서, 마찰력이 큰 콘크리트 또는 아스팔트 등의 표층재가 노면을 형성하기 때문에 차량의 제동거리를 짧게 하여 교통사고의 위험성을 어느 정도 저하시키는 것은 사실이다.These perforated plates are integrated by covering the surface of the steel plate with concrete or asphalt, and the surface of the concrete or asphalt with high friction forms the road surface, so the braking distance of the vehicle is shortened and the risk of traffic accident is reduced. It is true that to some extent.

그러나, 이러한 미끄럼 방지용 복공판들도 일률적인 치수의 장방형으로 제작되어 연결 설치되는 관계로 앞서 설명한 철제 복공판에서 나타나는 연결부분의 틈새 및 연접도로와의 단차로 인한 문제, 제작비가 고가인 문제, 시공이 난해한 문제, 파손 및 변형에 의한 유지보수 문제 등 대부분의 문제점들을 극복하지 못하고 있다.However, these non-slip backing plates are also manufactured in a uniform size and are connected to each other. Therefore, there are problems due to gaps and connection roads of the connecting parts appearing in the steel backing plates described above, problems with high manufacturing costs, and difficulty in construction. Most problems such as problems, breakage and maintenance due to deformation are not overcome.

이에 따라 본 발명은 일시적으로 설치되는 임시교량이나 지하철 건설공사에서 차량의 통행·자재적치·작업장 확보 등의 목적으로 설치되는 복공의 상판에서 나타나는 종래의 문제점을 해결하기 위해 안출한 것으로, 본 발명의 목적은 흙막이 가시설용으로 개발되어 사용하는 시트파일(sheet pile)을 교량 상판재로 이용하면서 시트파일의 요부에 적절한 채움재를 채운 후 그 상부에 포장공사를 시행함으로써, 마찰력이 확보되어 주행 차량의 미끄러짐을 방지하여 줄 뿐만 아니라, 평탄성이 좋아 각종 교통사고나 안전사고를 예방할 수 있는 시트파일을 이용한 가교 상판 및 그것의 시공방법을 제공하는데 있다.Accordingly, the present invention has been made to solve the conventional problems appearing in the upper plate of the temporary hole that is temporarily installed in the temporary construction or subway construction work for the purpose of securing the traffic, materials, workshops, etc. of the vehicle, The purpose of this is to use sheet piles developed and used for the temporary fences as bridge top plate, fill the main parts of the sheet piles with appropriate fillers, and carry out pavement work on the upper part to secure the frictional force of the driving vehicle. In addition to providing a high level of flatness, it is to provide a cross-linked top plate and a construction method using a sheet pile to prevent various traffic accidents and safety accidents.

본 발명의 다른 목적은 설치후 교량의 보수나 지하철 공사 등의 본공사가 완료될 때까지 파손이나 변형됨이 없이 유지관리할 수 있고, 하부 공간의 쾌적한 작업환경을 보장할 수 있는 시트파일을 이용한 가교 상판 및 그것의 시공방법을 제공하는데 있다.Another object of the present invention can be maintained without damage or deformation until the completion of the main construction, such as bridge repair or subway construction after installation, bridge construction using a sheet pile to ensure a pleasant working environment of the lower space It is to provide a top plate and a construction method thereof.

도1은 종래 기술에 따른 가교 상판의 구조를 보여주는 사시도1 is a perspective view showing the structure of a crosslinked top plate according to the prior art;

도2는 본 발명에 따른 가교 상판의 구조를 나타낸 사시도Figure 2 is a perspective view showing the structure of the crosslinked top plate according to the present invention

도3은 본 발명에 따른 가교 상판의 가교 진행방향측 단면도Figure 3 is a cross-sectional view of the cross-linking direction of the crosslinked top plate according to the present invention

도4는 본 발명에 따른 가교 상판의 가교 폭방향측 단면도Figure 4 is a cross-sectional cross-sectional side view of the crosslinked top plate according to the present invention

도5는 본 발명에 따른 가교 상판에서 H빔과 시트파일의 고정수단을 나타내기 위한 분리 사시도Figure 5 is an exploded perspective view showing the fixing means of the H beam and the sheet pile in the cross-linked top plate according to the present invention

< 도면의 주요 부분에 대한 부호의 설명 ><Description of Symbols for Main Parts of Drawings>

10:H빔 11:상측플랜지부 20:시트파일10: H beam 11: Upper flange 20: Sheet pile

21:바닥부 22:경사부 23:날개부21: Bottom part 22: Tilt part 23: Wing part

24:요부 30:포장층 31:채움재24: Main part 30: Packing layer 31: Filling material

32:표층재 41:고정편 42:볼트32: surface material 41: fixed piece 42: bolt

43:너트43: Nut

상기 목적을 달성하기 위한 본 발명은, 기존교량 개축시 우회도로나 긴급복구교량 가설시 또는 지하철 공사와 같은 깊은 굴착공사에서 차량통행을 위한 복공용으로 설치되는 상판 구조에 있어서;The present invention for achieving the above object is, in the construction of a top plate installed for rehabilitation for vehicle traffic in deep excavation work, such as a bypass road or emergency recovery bridge construction when constructing an existing bridge or subway construction;

하부구조물 위에 일정간격으로 설치되는 다수의 H빔과; 바닥부·양측 경사부 및 양측 날개부가 일체로 형성된 요부를 가지며, 요부의 개방면이 상측으로 위치한 상태에서 상기 H빔들과 직교하면서 H빔들의 상부에 얹혀져 고정되고, 전후 좌우로 밀착되면서 연이어 설치되는 다수의 시트파일과; 상기 시트파일 위에 일정두께로 포설되는 포장층;으로 구성됨을 특징으로 하는 시트파일을 이용한 가교 상판을 제공한다.A plurality of H beams installed on the lower structure at regular intervals; The bottom part, both inclined parts and both wing parts have recesses formed integrally, and are mounted on the upper part of the H beams while being orthogonal to the H beams with the open surface of the recesses positioned upward, and are installed while being in close contact with each other. A plurality of sheet piles; It provides a cross-linked top plate using a sheet pile, characterized in that consisting of; a paving layer is installed on the sheet pile to a predetermined thickness.

상기 포장층은 상기 시트파일 요부의 상측 일부를 뺀 중하반부에 채워지는모래 또는 발포스티렌수지로 된 채움재와, 상기 채움재 위의 나머지 요부에 채워지면서 날개부 위로 포장되는 콘크리트 또는 아스팔트로 된 표층재로 구성되는 것을 특징으로 한다.The pavement layer is filled with a sand or foamed styrene resin filled in the lower and lower half of the upper portion of the sheet pile recess, and a concrete or asphalt surface layer packed over the wing while filled with the remaining recesses on the filler. It is characterized in that the configuration.

상기와 같은 특징의 가교 상판을 건설하기 위한 본 발명의 시공방법은, 다수의 H빔들을 일정간격을 두면서 평행하게 배치한 상태로 하부구조물 위에 지지시켜 설치하는 단계; 상기 H빔들의 상부에 요부의 개방면을 상부로 위치시킨 상태로 시트파일을 직교시키면서 볼트와 너트 및 고정편을 이용해 H빔의 상측플랜지부에 고정시키는 작업을 통해 다수의 시트파일을 전후 좌우로 밀착시키면서 연이어 설치하는 단계; 상기 시트파일들의 요부에 모래 또는 발포스티렌수지로 된 채움재를 중하반부까지 채우는 단계; 상기 채움재와 시트파일 위에 콘크리트 또는 아스팔트로 된 표층재를 일정두께 포설하는 단계;로 구성됨을 특징으로 한다.The construction method of the present invention for constructing a cross-linked top plate of the above features, the step of supporting and installing a plurality of H beams on a lower structure in parallel with a predetermined interval; The sheet pile is orthogonal to the upper part of the H beams, and the sheet piles are orthogonal to each other, and the sheet piles are fixed to the upper flange part of the H beam using bolts, nuts, and fixing pieces. Successively installing while being in close contact; Filling the main part of the sheet piles with a filling material made of sand or expanded styrene resin to the lower half of the sheet piles; Characterized in that the step of laying a predetermined thickness of the surface material of concrete or asphalt on the filling material and the sheet pile.

위와 같은 특징의 본 발명에 의하면, 종래 여러 문제점을 일으키는 복공판을 사용하지 않고, 강성이 좋고 제작단가가 저렴한 시트파일을 상판의 구조재로 이용하면서 그 위에 일반 도로의 노면과 같은 재질의 콘크리트 또는 아스팔트 포장을 시행함으로써, 시공성이 좋고 공사비용이 저렴할 뿐만 아니라, 통과 차량의 주행성 및 안전성을 크게 향상시켜 각종 교통사고나 안전사고를 근본적으로 막을 수 있게 된다.According to the present invention having the above characteristics, without using a perforated plate that causes various problems in the past, while using a rigid and low-cost sheet pile as a structural material of the top plate concrete or asphalt pavement of the same material as the road surface of the general road thereon By implementing this, not only constructability is good and construction cost is low, but also greatly improves the running and safety of the passing vehicle, it is possible to fundamentally prevent various traffic accidents and safety accidents.

그리고 상판이 전체적으로 포장층에 의해 밀폐된 구조를 갖게 됨으로써, 하부의 작업공간으로 오수나 빗물 또는 먼지 등의 작업 저해물질이 침투되지 않아 쾌적하고도 안전한 작업공간을 확보하여 준다.And since the upper plate has a structure that is entirely sealed by the packaging layer, work inhibitors such as sewage, rainwater or dust do not penetrate into the lower working space, thereby ensuring a comfortable and safe working space.

또한, 차량의 통과시 충격이 발생되지 않음으로써 파손되거나 변형될 우려가 없기 때문에 가교의 유지관리 측면에서 대단히 유리한 이점이 있다.In addition, since there is no risk of being damaged or deformed due to no impact generated when the vehicle passes, there is an extremely advantageous advantage in terms of maintenance of bridge construction.

이하, 본 발명의 기술구성을 본 발명의 시공예에 따른 도2 내지 도5의 첨부도면을 참조하여 보다 상세히 설명한다.Hereinafter, the technical configuration of the present invention will be described in more detail with reference to the accompanying drawings of FIGS. 2 to 5 according to the construction example of the present invention.

본 발명에 의한 가교 상판은 하부구조물 위에 일정간격으로 설치되는 다수의 H빔(10)과, 상기 H빔(10)들과 직교하면서 H빔(10)들의 상부에 얹혀져 고정되는 다수의 시트파일(20)과, 상기 시트파일(20)위에 일정두께로 포설되는 포장층(30)으로 구성된다.The cross-linked top plate according to the present invention includes a plurality of H beams 10 installed at predetermined intervals on a lower structure, and a plurality of sheet piles mounted on and fixed to the H beams 10 while being orthogonal to the H beams 10 ( 20) and a packing layer 30 which is disposed on the sheet pile 20 at a predetermined thickness.

이와 같은 상판의 구조를 시공함에 있어서, 상기 H빔(10)은 하부구조물(미도시) 위에 지지시켜 설치하는데, 다수의 H빔(10)들을 상호 이웃하는 것들끼리 일정간격을 두면서 평행하게 배치한 상태로 설치한다.In constructing the structure of the upper plate, the H beam 10 is installed by supporting it on a lower structure (not shown), and the plurality of H beams 10 are arranged in parallel with a predetermined interval between the neighboring ones. Install in state.

하부구조물은 본 발명이 적용되는 구조물에 따라 다른데, 임시교량의 경우에는 교각이나 교대 위에 교축방향으로 길게 설치되는 메인빔이 될 수도 있고, 지하철 공사의 경우 통상 H빔 등의 철골을 이용해 지반에 정착되어 세워지는 기둥이 될 수 있으며, 하부구조물 위에 설치되는 H빔(10)은 도로 진행방향을 따라 평행하게 배치될수도 있고 도로 폭방향을 따라 평행하게 배치될 수도 있다.The substructure differs depending on the structure to which the present invention is applied. In the case of temporary bridges, the main structure may be a main beam installed long in the direction of the bridge or bridges, and in the case of subway construction, it is usually settled on the ground using steel frames such as H beams. It can be a pillar to be built, the H beam 10 is installed on the lower structure may be arranged in parallel along the road progress direction or may be arranged in parallel along the road width direction.

이러한 하부구조물과 상기 H빔(10)의 설치는 종래의 설치구조 및 시공방법과 별반 다를게 없으므로 상세한 설명을 생략하며, 다만 본 발명은 기본적으로 상판의 구조재로서 종래의 복공판 대신 길이가 길고 휨 저항성이 큰 시트파일(20)을 사용하므로 구조적으로 문제가 없는 범위 내에서 상기 H빔(10)의 설치간격을 넓게 할 수 있다.Since the installation of the lower structure and the H beam 10 is not much different from the conventional installation structure and construction method, the detailed description is omitted, but the present invention basically has a length and bending resistance instead of the conventional perforated plate as a structural member of the upper plate. Since the large sheet pile 20 is used, the installation interval of the H beam 10 can be widened within a range without structural problems.

H빔(10)들의 설치가 완료되면 상기 H빔(10)들의 상부에 시트파일(20)을 설치한다.When the installation of the H beams 10 is completed, the sheet pile 20 is installed on the H beams 10.

시트파일(20)은 바닥부(21)와 양측 경사부(22) 및 양측 날개부(23)가 일체로 형성되고, 상기 바닥부(21)과 양측 경사부(22)에 의해 가로막힌 요부(24)를 갖는다.The sheet pile 20 has a bottom portion 21, both inclined portions 22 and both wing portions 23 are integrally formed, and the recessed portion blocked by the bottom portion 21 and both inclined portions 22 ( 24).

이러한 시트파일(20)은 통상 흙막이 가시설용이나 차수공법에서 사용되는 강재(鋼材)로서 일반 토목공사에 많이 사용되고 있기 때문에 자재취득과 시공이 용이하며, 휨 저항성이 좋아 눕혀서 설치할 경우 상부하중을 감당하는 능력이 탁월한 장점이 있다.Since the sheet pile 20 is generally used in general civil engineering work as a steel material used for temporary equipment or ordering method, it is easy to acquire and construct a material, and it has good bending resistance to bear the upper load when it is laid down. The ability is excellent.

본 발명에서 시트파일(20)은 요부(24)의 개방면을 상부로 위치시킨 상태로 상기 H빔(10)들과 직교시키면서 고정수단을 이용해 H빔(10)의 상측플랜지부(11)에 고정시키는 작업을 통해 고정하며, 다수의 시트파일(20)을 전후 좌우로 밀착시키면서 연이어 설치한다.In the present invention, the sheet pile 20 is placed on the upper flange portion 11 of the H beam 10 using a fixing means while being orthogonal to the H beams 10 with the open surface of the recess 24 positioned upward. It is fixed through the fixing operation, and the plurality of sheet piles 20 are installed in succession while in close contact with the front and rear left and right.

상기 H빔(10)과 시트파일(20)의 고정수단은 상기 H빔(10)의 길이방향을 따라 일정간격으로 배치되면서 H빔(10)의 상측플랜지부(11) 하면과 시트파일(20)의 바닥부(21) 하면에 맞대어지는 다수의 고정편(41)과, 고정편(41)들과 상기 시트파일 (20)의 바닥부(21)를 연통하는 다수의 볼트(42)와, 볼트(42)들의 선단부에 체결되는 너트(43)들로 구성된다.The fixing means of the H beam 10 and the sheet pile 20 are arranged at regular intervals along the longitudinal direction of the H beam 10 and the lower flange portion 11 of the H beam 10 and the sheet pile 20. A plurality of fixing pieces 41 facing the bottom surface of the bottom portion 21), a plurality of bolts 42 communicating the fixing pieces 41 and the bottom portion 21 of the sheet pile 20, It consists of nuts 43 fastened to the tips of the bolts 42.

이때, 상기 고정편(41)은 크랭크 형태로 구부린 것을 사용하여 H빔(10)의 상측플랜지부(11)로 인한 단차를 흡수하며, 상기 볼트(42)는 위에서 아래로 꽂는 형태로 체결하는 것이 바람직하다.At this time, the fixing piece 41 absorbs the step caused by the upper flange portion 11 of the H beam 10 by using a bent in the crank form, the bolt 42 is fastened in the form of plugging from top to bottom. desirable.

위와 같이 시트파일(20)들의 설치가 완료되면 시트파일(20) 위에 일정두께의 포장층을 시공한다.When the installation of the sheet pile 20 is completed as described above, a paving layer having a predetermined thickness is installed on the sheet pile 20.

이 포장층(30)은 시트파일(20)들의 요부(24)에 모래 또는 발포스티렌수지(일명 스티로폴 또는 스티로폼)로 된 채움재(31)를 중하반부(대략 2/3높이)까지 먼저 채우고, 상기 채움재(31)와 시트파일(20) 위에 콘크리트 또는 아스팔트로 된 표층재(32)를 일정두께 포설하는 방법을 통해 시공하는 것이 좋다.The pavement layer 30 first fills the recesses 24 of the sheet piles 20 with a filling material 31 made of sand or foamed styrene resin (also called styropol or styrofoam) up to the lower half (approximately 2/3 height). The filling material 31 and the sheet pile 20 may be constructed by a method of laying a predetermined thickness of the surface layer material 32 made of concrete or asphalt.

물론 본 발명을 실시함에 있어서, 포장층은 채움재의 사용없이 아스팔트나 콘크리트로 된 표층재만을 사용하여 포장층을 구성할 수도 있으나, 상기와 같이 포장층(30)을 채움재(31)와 표층재(32)로 구분 시공하는 이유는 가교의 이용이 끝난 후 해체시 시트파일(20)과 포장층(30)의 분리를 용이하게 하면서 시트파일을 재사용하는데 이물질로 인한 문제가 없도록 하기 위함이다.Of course, in the practice of the present invention, the pavement layer may be composed of the pavement layer using only the surface material of asphalt or concrete without the use of the filling material, but as described above, the filling material 31 and the surface material ( The reason why the construction is divided into 32) is to make it easy to separate the sheet pile 20 and the packaging layer 30 when dismantling after use of the crosslinking, so that there is no problem due to the foreign matter in reusing the sheet pile.

이상에서 설명한 바와 같이, 본 발명은 상부의 사하중이나 교통하중을 주도적으로 받아주는 구조재로서 시트파일을 이용하고 그 위에 콘크리트 등의 포장층을 형성하는 방법을 통한 가교의 상판을 제공하며, 이러한 본 발명에 의하면 다음과 같은 효과가 있다.As described above, the present invention provides a top plate of crosslinking through a method of forming a pavement layer of concrete or the like using a sheet pile as a structural material that receives a dead load or a traffic load of the upper part, and in the present invention According to the following effects.

첫째, 상판의 표면이 아스팔트나 콘크리트로 포장됨으로써 평탄성이 좋고 시공상의 단차없이 동일한 레벨로의 시공이 가능하여서 통과 차량에게 쾌적한 주행성을 제공하고 원활한 교통소통을 도모할 수 있게 된다.First, the surface of the top plate is paved with asphalt or concrete, so that the flatness is good and the construction can be performed at the same level without a step difference in construction, thereby providing a comfortable running property to the passing vehicle and promoting smooth traffic communication.

둘째, 미끄럼이 방지되고 덜컹대는 현상이 없으므로 교통사고의 위험성이 제거되고 운전자의 불안감을 해소하여 줄 뿐만 아니라, 통과차량의 파손을 방지하여 준다.Second, since the slip is prevented and there is no rattling phenomenon, the risk of traffic accidents is eliminated and the driver's anxiety is eliminated, as well as the damage of the passing vehicle is prevented.

셋째, 상판이 전체적으로 포장층에 의해 밀폐됨으로써, 상판 하부공간에 대한 방수기능이 확보되고 공해가 없는 양호한 작업환경을 유지시킬 수 있게 되어서, 하부 작업을 원활하게 수행할 수 있게 하여 줄 뿐만 아니라, 각종 안전사고 원인을 근본적으로 해소하여 주고, 상판 하부의 시설물 및 기계장비를 보호할 수 있는 효과가 있다.Third, as the upper plate is sealed by the whole packing layer, it is possible to ensure a waterproof working environment for the lower space of the upper plate and to maintain a good working environment without pollution, so that the lower work can be performed smoothly, It fundamentally solves the cause of safety accidents, and has the effect of protecting the facilities and machinery under the roof.

넷째, 공사자재의 단가가 저렴하고 설치가 간단하며 시공이 양호하고 공기를 크게 단축시킬 수 있게 되어 공사비용이 저렴하다.Fourth, the cost of construction materials is cheap, the installation is simple, the construction is good, and the air can be shortened significantly, so the construction cost is low.

다섯째, 차량의 통과시 충격이 발생되지 않음으로써 파손되거나 변형될 우려가 없기 때문에 보수할 일이 거의 없어 장기간 유지관리하기에 편리하고 경제적이다.Fifth, since there is no risk of being damaged or deformed due to no impact when the vehicle passes, it is convenient and economical for long-term maintenance because there is little work to repair.

여섯째, 구조적으로 다수의 H빔에 의해 지지되는 연속보 형태가 되므로, 설치후 처짐·진동 등이 현저히 감소되고 임시교량의 구조적 안정성을 제고시키며, 종래의 복공판을 사용하는 교량에 비해 상대적으로 받침간의 길이를 넓게 할 수 있어 공사비 절감효과가 크다.Sixth, structurally, it becomes a continuous beam type supported by a large number of H beams, which drastically reduces the deflection and vibration after installation and improves the structural stability of temporary bridges. The length can be widened, which greatly reduces the cost of construction.

일곱째, 시트파일 자재를 포개어 겹쳐서 운반이 가능하므로 긴급상황 발생시 자재운반 및 가설이 신속한 장점이 있다.Seventh, because the pile pile material can be stacked and transported, the material transport and hypothesis has a quick advantage in case of emergency.

여덟째, 안전난간과 부대시설을 시트파일에 직접 조립하여 설치할 수 있으므로 가교를 건설하기 위한 전체적인 공기 단축 및 비용저감 효과가 크다.Eighth, safety balustrades and additional facilities can be assembled and installed directly on the seat pile, which greatly reduces the overall air and cost.

이상과 같이 본 발명은 시트파일을 사용하고 포장을 시행하는 간단하면서도 효율적인 방법을 통해 통행차량의 안전성 보장, 쾌적한 하부 작업환경 확보, 공사기간 단축, 공사비용 절감 및 유지관리 비용을 절감할 수 있는 고품질의 가교 상판을 제공하는 매우 유용한 발명이다.As described above, the present invention is a high quality that can ensure the safety of the traffic vehicle, secure a pleasant lower working environment, shorten the construction period, reduce the construction cost and maintenance cost through a simple and efficient way to use the sheet pile and pavement It is a very useful invention for providing a crosslinked top plate.

Claims (4)

기존교량 개축시 우회도로나 긴급복구교량 가설시 또는 지하철 공사와 같은 깊은 굴착공사에서 차량통행을 위한 복공용으로 설치되는 상판 구조에 있어서;In the structure of the top plate installed for the rehabilitation of the vehicle in the deep excavation work such as the bypass road or emergency recovery bridge construction when the existing bridge is reconstructed or the subway construction; 하부구조물 위에 일정간격으로 설치되는 다수의 H빔(10)과;A plurality of H beams 10 installed on the lower structure at regular intervals; 바닥부(21)·양측 경사부(22) 및 양측 날개부(23)가 일체로 형성된 요부(24)를 가지며, 요부(24)의 개방면이 상측으로 위치한 상태에서 상기 H빔(10)들과 직교하면서 H빔(10)들의 상부에 얹혀져 고정되고, 전후 좌우로 밀착되면서 연이어 설치되는 다수의 시트파일(20)과;The H beams 10 have a recessed portion 24 having a bottom portion 21, both inclined portions 22, and both wing portions 23 formed integrally, and the open surface of the recessed portion 24 is positioned upward. A plurality of sheet piles 20 which are installed while being perpendicular to the upper part of the H beams 10 and fixed and closely contacted with each other from side to side; 상기 시트파일(20)위에 일정두께로 포설되는 포장층(30);으로 구성됨을 특징으로 하는 시트파일을 이용한 가교 상판.Cross-linked top plate using a sheet pile, characterized in that consisting of; a pavement layer (30) laid on the sheet pile 20 to a predetermined thickness. 제1항에 있어서, 상기 포장층(30)은,The method of claim 1, wherein the packaging layer 30, 상기 시트파일(20) 요부(24)의 상측 일부를 뺀 중하반부에 채워지는 모래 또는 발포스티렌수지로 된 채움재(31)와, 상기 채움재(31)위의 나머지 요부(24)에 채워지면서 날개부(23)위로 포장되는 콘크리트 또는 아스팔트로 된 표층재(32)로 구성되는 것을 특징으로 하는 시트파일을 이용한 가교 상판.Filling material 31 made of sand or foamed styrene resin filled in the lower and lower half of the upper portion of the sheet pile 20 recessed portion 24, and the wing portion while being filled in the remaining recesses 24 on the filling material 31 (23) The cross-linked top plate using a sheet pile, characterized in that consisting of a surface layer material 32 of concrete or asphalt to be paved. 제1항에 있어서, 상기 H빔(10)과 시트파일(20)을 고정하는 수단이,According to claim 1, wherein the means for fixing the H beam 10 and the sheet pile 20, 상기 H빔(10)의 길이방향을 따라 일정간격으로 배치되면서 H빔(10)의 상측플랜지부(11) 하면과 시트파일(20)의 바닥부(21) 하면에 맞대어지는 다수의 고정편 (41)과, 고정편(41)들과 상기 시트파일(20)의 바닥부(21)를 연통하는 다수의 볼트 (42)와, 볼트(42)들의 선단부에 체결되는 너트(43)들로 구성되는 것을 특징으로 하는 시트파일을 이용한 가교 상판.A plurality of fixing pieces which are disposed at regular intervals along the longitudinal direction of the H beam 10 but against the lower surface of the upper flange portion 11 of the H beam 10 and the lower surface of the bottom portion 21 of the sheet pile 20 ( 41, a plurality of bolts 42 communicating with the fixing pieces 41 and the bottom 21 of the sheet pile 20, and nuts 43 fastened to the tips of the bolts 42. Cross-linked top plate using a sheet pile, characterized in that. 지하시설 공사를 위해 도로를 파헤친 구간의 복공, 우회 또는 응급 도로를 확보하기 위한 임시교량의 상판을 설치함에 있어서,In installing the tops of temporary bridges to secure ventilated, detoured or emergency roads in sections dug for underground construction, 다수의 H빔(10)들을 일정간격을 두면서 평행하게 배치한 상태로 하부구조물에 지지시켜 설치하는 단계;Supporting and installing the plurality of H beams 10 in a state in which the plurality of H beams 10 are arranged in parallel at regular intervals; 상기 H빔(10)들의 상부에 요부(24)의 개방면을 상부로 위치시킨 상태로 시트파일(20)을 직교시키면서 볼트(42)와 너트(43) 및 고정편(41)을 이용해 H빔(10)의 상측플랜지부(11)에 고정시키는 작업을 통해 다수의 시트파일(20)을 전후 좌우로 밀착시키면서 연이어 설치하는 단계;H-beam using bolt 42, nut 43 and fixing piece 41 while orthogonally seating sheet 20 in a state in which open surface of recessed portion 24 is located above the H-beams 10. Successively installing the plurality of sheet piles 20 in close contact with each other from side to side through fixing to the upper flange portion 11 of the 10; 상기 시트파일(20)들의 요부(24)에 모래 또는 발포스티렌수지로 된 채움재 (31)를 중하반부까지 채우는 단계;Filling the concave portion 24 of the sheet piles 20 with a filling material 31 made of sand or foamed styrene resin to the lower half of the sheet pile 20; 상기 채움재(31)와 시트파일(20) 위에 콘크리트 또는 아스팔트로 된 표층재 (32)를 일정두께 포설하는 단계;로 구성됨을 특징으로 하는 시트파일을 이용한 가교 상판의 시공방법.Method of installing a cross-linked top plate using a sheet pile, characterized in that consisting of; the step of laying a predetermined thickness of the surface material (32) of concrete or asphalt on the filler 31 and the sheet pile (20).
KR10-2002-0066597A 2002-10-30 2002-10-30 A Floor of Temporary Bridge for using Seet Pile and It's Constructing Method KR100508773B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR10-2002-0066597A KR100508773B1 (en) 2002-10-30 2002-10-30 A Floor of Temporary Bridge for using Seet Pile and It's Constructing Method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR10-2002-0066597A KR100508773B1 (en) 2002-10-30 2002-10-30 A Floor of Temporary Bridge for using Seet Pile and It's Constructing Method

Related Child Applications (1)

Application Number Title Priority Date Filing Date
KR20-2002-0032429U Division KR200302138Y1 (en) 2002-10-30 2002-10-30 A Floor of Temporary Bridge for using Sheet-Pile

Publications (2)

Publication Number Publication Date
KR20040037910A true KR20040037910A (en) 2004-05-08
KR100508773B1 KR100508773B1 (en) 2005-08-17

Family

ID=37336175

Family Applications (1)

Application Number Title Priority Date Filing Date
KR10-2002-0066597A KR100508773B1 (en) 2002-10-30 2002-10-30 A Floor of Temporary Bridge for using Seet Pile and It's Constructing Method

Country Status (1)

Country Link
KR (1) KR100508773B1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100794444B1 (en) * 2006-10-20 2008-01-16 원대연 Construction Method of Composite Slab Bridge Using Composite Truss Girder

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100775936B1 (en) 2007-08-02 2007-11-15 주식회사 지구코퍼레이션 Lining board and method manufacturing of the same
KR101067895B1 (en) * 2007-12-20 2011-09-27 수림산업(주) Deck plate
KR101057409B1 (en) 2010-12-03 2011-08-17 (주)다음기술단 Hollow prestressed concrete girder and method for manufacturing thereof

Family Cites Families (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5153630Y2 (en) * 1973-08-25 1976-12-22
JPS51109130U (en) * 1975-02-24 1976-09-01
JPS5992710U (en) * 1982-12-15 1984-06-23 富士ピ−.エス.コンクリ−ト株式会社 Concrete version with hollow parts
JPS6124709A (en) * 1984-07-12 1986-02-03 石川島播磨重工業株式会社 Bridge
KR100200433B1 (en) * 1994-05-09 1999-06-15 백호익; 박태권 Execution method of the slab in bridge
JP3366110B2 (en) * 1994-05-25 2003-01-14 川商ジェコス株式会社 Mounting structure of lining plate
KR19980057334U (en) * 1997-02-01 1998-10-15 박상희 Lobby
KR19990015930U (en) * 1997-10-22 1999-05-15 김헌출 Anti-slip Double Plate
KR200162027Y1 (en) * 1997-12-24 1999-12-01 권오태 Deck plate for a building
JP3844394B2 (en) * 1998-02-23 2006-11-08 日鐵建材工業株式会社 Attaching structure for walkway material of sound absorption system for both footing and underside of underside of elevated road
JP3151191B2 (en) * 1998-11-02 2001-04-03 積水樹脂株式会社 Plate-shaped member mounting bracket and plate-shaped member mounting structure in structure
KR200163394Y1 (en) * 1999-07-06 2000-02-15 부세산업주식회사 Covering plate for construction

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100794444B1 (en) * 2006-10-20 2008-01-16 원대연 Construction Method of Composite Slab Bridge Using Composite Truss Girder

Also Published As

Publication number Publication date
KR100508773B1 (en) 2005-08-17

Similar Documents

Publication Publication Date Title
US8171590B2 (en) Anti-expansion joint bridge constructed through detailed survey for bridge
US4653956A (en) Highway pavement
KR100814388B1 (en) A bridge lifting method during vehicle passing
PL190117B1 (en) Modular set of components for construction of railway station platforms
JPH11152761A (en) Underground structure and construction method thereof
JP5928944B2 (en) Improvement method of abutment chest wall
KR100642332B1 (en) A fabric for preventing fall of a road bridge
JP5273556B2 (en) Widening structure of road bridge and widening method of road bridge
KR100571525B1 (en) Expansion method of a bridge using concrete structure
KR100650411B1 (en) Tunnel cover plate
KR100508773B1 (en) A Floor of Temporary Bridge for using Seet Pile and It&#39;s Constructing Method
KR100884780B1 (en) A structure of prestressed concrete pavement and its construction method
JP6144726B2 (en) Rehabilitation method for mountain road tunnels on expressway and suspension pier for rehabilitation method
JP4901178B2 (en) Steel / concrete composite rigid frame bridge construction method
KR101761477B1 (en) Construction method of jointless bridge with reinforced earth retaining wall and spread bearing block
KR200302138Y1 (en) A Floor of Temporary Bridge for using Sheet-Pile
JP5848716B2 (en) Floor slab replacement method
KR100622008B1 (en) Composition structure of integral abutment bridge
CA2965450C (en) System, apparatus and related method for raised ground cover mat
KR20090095204A (en) Method of repairing and reinforcing submarine concrete constructions
KR102529660B1 (en) Temporary installed structure for covering and construction method there of
KR101011443B1 (en) Structure with integrated slab beam bridge and method of manufacturing thereof
CN218175578U (en) Inverted T-shaped beam is with strengthening section mould number formula telescoping device
JP2584443Y2 (en) Lining board
CN116608324B (en) Underground pipeline reinforcing structure below river-crossing bridge under tunnel construction

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20100910

Year of fee payment: 6

LAPS Lapse due to unpaid annual fee