KR200263283Y1 - Apparatus for replacing shoes in girder bridge - Google Patents

Apparatus for replacing shoes in girder bridge Download PDF

Info

Publication number
KR200263283Y1
KR200263283Y1 KR2020010029198U KR20010029198U KR200263283Y1 KR 200263283 Y1 KR200263283 Y1 KR 200263283Y1 KR 2020010029198 U KR2020010029198 U KR 2020010029198U KR 20010029198 U KR20010029198 U KR 20010029198U KR 200263283 Y1 KR200263283 Y1 KR 200263283Y1
Authority
KR
South Korea
Prior art keywords
girder
bridge
cross beam
hydraulic jack
support
Prior art date
Application number
KR2020010029198U
Other languages
Korean (ko)
Inventor
김진수
Original Assignee
티앤알비 주식회사
김진수
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 티앤알비 주식회사, 김진수 filed Critical 티앤알비 주식회사
Priority to KR2020010029198U priority Critical patent/KR200263283Y1/en
Application granted granted Critical
Publication of KR200263283Y1 publication Critical patent/KR200263283Y1/en

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

본 고안은 플레이트 거더(PLATE GIRDER)교의 받침장치 교체장치에 관한 것으로서, 종래의 방법인 교각의 전면에 설치된 거더를 인상하기 위한 브라켓(주로 강재, 콘크리트)의 설치가 불필요한 받침장치 교체공법이다. 본 고안은 플레이트 거더교의 양측의 플레이트 거더사이에 미리 규격에 맞도록 제작한 ⊂형 크로스빔(CROSS BEAM)을 지점부 보강 브레이싱의 전후면에 보강 설치한 후, 크로스 빔의 하단에 설치된 유압 잭(HYDRAULIC JACK)으로 거더를 인상하는 공법이다. 거더 교의 받침장치의 인상에 사용된 ⊂형 크로스 빔은 인상작업 후에도 철거시키지 않을 수도 있으며, 이 경우 영구적인 거더 보강재로서 역할을 하므로 교량의 안전성을 증대시킬 뿐만 아니라 향후 받침장치의 교체가 요구될 때 활용이 가능하다. 또한 공장에서 제작 운반된 ⊂형 크로스 빔을 사용하게 되므로 품질관리가 용이하고, 안전성이 우수할 뿐만 아니라 시공이 간편하여 공기 단축은 물론 공사비가 저렴한 효과를 제공한다.The present invention relates to a support device replacement device of the plate girder (PLATE GIRDER) bridge, it is a conventional support method replacement method for the support device that does not need to install a bracket (mainly steel, concrete) to raise the girder installed on the front of the pier. The present invention reinforces and installs a cross beam (BROS) BEAM made to meet the standard between the plate girders on both sides of the plate girder bridge in front and rear of the branch reinforcement bracing, and then installs a hydraulic jack ( HYDRAULIC JACK) is a technique for raising girders. The cross-beams used to raise the girder bridge support may not be demolished even after the lifting work.In this case, it acts as a permanent girder reinforcement, which not only increases the safety of the bridge but also requires replacement of the support device in the future. It can be used. In addition, the use of 크로스 type cross beams manufactured and transported at the factory provides easy quality control, excellent safety, and simple construction, resulting in shortening of air and low cost of construction.

Description

거더교에 있어서 받침장치 교체장치{Apparatus for replacing shoes in girder bridge}Apparatus for replacing shoes in girder bridge}

본 고안은 교량에 설치되어 있는 받침장치(교좌장치)를 교체하기 위한 장치에 관한 것으로, 보다 상세하게는 플레이트 거더(PLATE GIRDER)교의 받침장치를 교체할 때, 별도의 강재 또는 콘크리트와 같은 브라켓을 사용하지 않고, 거더사이에 크로스 빔을 연결하고 유압잭을 사용하여 거더를 들어올림으로써 받침장치를 교체하여, 안전성이 우수할 뿐만 아니라 시공이 간편하여 공기 단축은 물론 공사비가 저렴한 거더교의 받침장치 교체장치에 관한 것이다.The present invention relates to a device for replacing the support device (bridge device) installed in the bridge, and more specifically, when replacing the support device of the plate girder (PLATE GIRDER) bridge, a bracket such as a separate steel or concrete It replaces the supporting device by connecting the cross beam between girders and lifting the girder by using hydraulic jacks to replace the supporting device of the girder bridge. It is about.

일반적으로 플레이트 거더교(I-빔 거더교)는 교각 위에 강재 플레이트 거더가 걸쳐지며, 그 플레이트 거더위에 상부 슬라브가 설치되어 있는 구조이다. 여기서 바닥판과 플레이트 거더를 포함하는 상부구조와 하부구조의 연결부 즉, 교각의 코핑(COPPING)의 상면과 강재 플레이트 거더의 하면 사이에는 받침장치(shoes, bearings, 교좌장치 등으로도 불리워진다)가 설치된다. 받침장치는 상부 구조의 하중을 하부구조에 전달하는 중요한 기능을 담당할 뿐만 아니라 충격 및 수평변위를 흡수하는 기능도 가지고 있다. 그러므로 이러한 받침장치의 파손은 교량의 안전에 치명적일 수 있으므로 신속히 보수하거나 교체하는 것이 필요하다.In general, the plate girder bridge (I-beam girder bridge) is a structure in which the steel plate girders are suspended over the piers, the upper slab is installed on the plate girders. Here, the connection between the upper structure and the lower structure including the bottom plate and the plate girder, that is, between the upper surface of the piercing COPPING and the lower surface of the steel plate girder (also called shoes, bearings, bridge device, etc.) Is installed. The supporting device not only plays an important role in transmitting the load of the superstructure to the substructure, but also absorbs shock and horizontal displacement. Therefore, it is necessary to promptly repair or replace the damage of the supporting device can be fatal to the safety of the bridge.

이와 같이 받침장치를 교체하기 위하여 거더 등의 상부 구조물을 인상하고자 하는 경우, 기존 받침장치 전면의 거더의 하면에 유압 잭을 설치하게 되는데 통상 교각 단부측(받침장치 전면)에 잭을 설치할 여유가 없으므로 교각 전면을 강재나콘크리트 브라켓으로 보강하고 그 브라켓의 하부를 유압 잭으로 들어올려 거더의 하부에 달려있는 받침장치를 교체하게 된다. 이런 경우 콘크리트 브라켓을 설치하여 인상하는 공법은 거푸집 설치, 철근조립 및 콘크리트 타설 등이 수반되므로 작업성이 떨어지며 공기가 길어지게 된다. 또한 강재 브라켓의 경우도 기존 콘크리트 구조물에 천공을 하여 앵커볼트를 설치하게 되므로 기존 하부구조에 손상을 주게되는 문제점이 있고, 하부구조가 무근콘크리트 구조물일 경우 교각측면에 브라켓을 설치하는 것이 구조적으로 불가능한 경우가 있을 수 있으며, 점검통로(check hole)가 설치되어 있을 경우 점검통로를 철거한 후 재시공을 해야하는 등 매우 번거로운 단점이 있다.In order to raise the upper structure such as the girder to replace the supporting device like this, the hydraulic jack is installed on the lower surface of the girder on the front of the existing supporting device, but usually there is no room to install the jack on the end of the pier (front of the supporting device). The front of the pier is reinforced with steel or concrete brackets, and the lower part of the bracket is lifted by the hydraulic jack to replace the supporting device on the lower part of the girder. In this case, the installation method by raising the concrete bracket is accompanied by formwork installation, reinforcing steel reinforcement and concrete pouring, so workability and air is long. In addition, in the case of steel brackets, the anchor bolt is installed by drilling the existing concrete structure, thereby causing damage to the existing substructure. If the underlying structure is a plain concrete structure, it is structurally impossible to install the bracket on the pier side. There may be a case, and if a check hole is installed, it is very cumbersome, such as having to reconstruct after removing the check passage.

본 고안이 이루고자 하는 기술적 과제는 거더(GIRDER)교의 받침장치를 교체할 때, 교량의 구조물에 손상을 줄 뿐만 아니라 공기 지연 및 경제적인 측면등 에서 문제점을 발생시킬 수 있는 별도의 강재 또는 콘크리트와 같은 브라켓을 사용하지 않고, 거더사이에 크로스 빔을 연결하고 유압잭을 사용하여 거더를 들어올림으로써 받침장치를 교체하여, 충분한 작업공간 확보가 가능하며, 교각 구조물에 손상을 주지 않고 교량의 인상이 가능하므로, 안전성이 우수할 뿐만 아니라 시공이 간편하여 공기 단축은 물론 공사비가 저렴한 거더교의 받침장치 교체장치를 제공함을 목적으로 한다.The technical problem of the present invention is to replace the supporting device of the GIRDER bridge, such as a separate steel or concrete that can not only damage the structure of the bridge but also cause problems in terms of air delay and economic aspects. It is possible to secure a sufficient working space by connecting the cross beam between girders and lifting the girders using hydraulic jacks, without using brackets, and to raise the bridge without damaging the bridge structure. In addition, it aims to provide a replacement device for the supporting device of the girder bridge, which is not only excellent in safety, but also easy to construct, which shortens the air as well as low construction cost.

본 고안이 이루고자 하는 다른 기술적 과제는 상술한 거더 교의 받침장치의 인상에 사용된 ⊂형 크로스 빔을 인상작업 후에도 철거시키지 않음으로써, 영구적인 거더 보강재로서 역할을 하므로 교량의 안전성을 증대시킬 뿐만 아니라 향후 받침장치의 교체가 요구될 때 곧바로 받침장치 교체작업에 활용할 수 있는 거더교의 받침장치 교체장치를 제공함을 목적으로 한다.Another technical problem to be achieved by the present invention is not to dismantle the beam-shaped cross beam used for the lifting of the above-mentioned girder bridge support device even after the lifting work, thereby serving as a permanent girder reinforcement material, thereby increasing the safety of the bridge as well as the future. It is an object of the present invention to provide a support device replacement device of a girder bridge that can be used for support device replacement work when a support device replacement is required.

본 고안이 이루고자 하는 또다른 기술적 과제는 상술한 거더 교의 받침장치의 인상에 사용되는 ⊂형 크로스 빔으로서, 공장에서 제작 운반된 ⊂형 크로스 빔을 사용하게 되므로 품질관리가 용이한 거더교의 받침장치 교체장치를 제공함을 목적으로 한다.Another technical problem to be achieved by the present invention is the cross beam used for the raising of the support device of the girder bridge described above. It is an object to provide a device.

도 1은 본 고안의 실시예에 따른 플레이트 거더교에서의 받침장치 교체장치를 설명하기 위한 ⊂형 크로스 빔을 설치한 교량의 개략적인 정면도이다.1 is a schematic front view of a bridge provided with a cross-shaped beam for explaining a support device replacement device in a plate girder bridge according to an embodiment of the present invention.

도 2는 도 1의 개략적인 평면도이다.FIG. 2 is a schematic plan view of FIG. 1.

도 3은 도 1의 개략적인 측면도이다.3 is a schematic side view of FIG. 1.

도 4는 본 고안의 실시예에 따른 플레이트 거더교의 받침장치 교체장치를 개략적으로 도시한 정면도이다.Figure 4 is a front view schematically showing a replacement device for the support plate of the plate girder bridge according to an embodiment of the present invention.

도 5는 도 4의 개략적인 측단면도이다.5 is a schematic side cross-sectional view of FIG. 4.

도 6은 도 4의 개략적인 평면도이다.6 is a schematic plan view of FIG. 4.

<도면의 주요 부분에 대한 부호의 설명><Explanation of symbols for the main parts of the drawings>

1...거더교, 10...플레이트 거더1 ... girder bridge, 10 ... plate girder

20...기존 지점부 보강 브레이싱, 30...크로스 빔20 ... existing point bracing reinforcement, 30 ... cross beam

32, 35, 37...연결플레이트, 36, 38, 39...볼팅부32, 35, 37 ... connection plate, 36, 38, 39 ... bolt

40...임시 빔, 50...유압 잭40 ... temporary beam, 50 ... hydraulic jack

60...받침 빔, 70...받침장치60 ... support beam, 70 ... support

100...코핑부100 ... coping part

본 고안은 상술한 기술적 과제를 달성하기 위하여, 기존 교량의 받침장치 교체시 적용되는 공법이 교량의 구조물에 손상을 줄뿐만 아니라 공기지연 및 경제적인 측면에서 발생되는 문제점들을 해결하기 위해 창안한 것으로, 거더교의 받침장치 교체장치에 있어서, 거더교의 지점부에 거더에 직각으로 설치 되어있는 지점부 보강 브레이싱을 피하여 브레이싱과 평행하게 거더의 전면 및 후면에 설치된 ⊂자형 크로스 빔; 및 상기 크로스 빔의 하부에 고정 설치되어, 그 하부에 교량의 상부 구조를 인상하는 유압잭을 설치하는 임시 빔을 포함하는 거더교의 받침장치 교체장치를 제공한다.In order to achieve the above technical problem, the present invention was created to solve the problems caused by not only damage to the structure of the bridge but also air delay and economic aspects applied to replace the existing bridge support device, An apparatus for replacing a girder bridge, comprising: a U-shaped cross beam installed at the front and rear of the girder in parallel with the bracing to avoid reinforcing bracing provided at right angles to the girder at the point of the girder bridge; And it is fixed to the lower portion of the cross beam, to provide a support device replacement device for the girder bridge including a temporary beam to install a hydraulic jack for raising the upper structure of the bridge in the lower portion.

바람직하기로는 상기 크로스 빔은 미리 제작되며, 상기 크로스 빔을 거더와 볼팅고정하는 연결 플레이트를 포함하는 것을 특징으로 한다.Preferably, the cross beam is made in advance, characterized in that it comprises a connecting plate for bolting the cross beam to the girder.

더욱 바람직하기로는 상기 크로스 빔은 2개로 분할 제작되어 상하 연결플레이트와 측면 연결플레이트를 이용하여 상호 볼팅고정됨을 특징으로 한다.More preferably, the cross beam is divided into two and is bolted to each other by using a vertical connecting plate and a side connecting plate.

바람직하기로는 상기 크로스 빔의 하부에 상기 유압잭을 설치하기 위하여, 상기 코핑상부에 상기 유압잭을 설치할 받침 빔을 더 포함하여 상기 임시 빔과 상기 받침 빔의 사이에 상기 유압잭을 설치하는 것을 특징으로 한다.Preferably, in order to install the hydraulic jack in the lower portion of the cross beam, the hydraulic jack is further installed between the temporary beam and the support beam, further comprising a support beam for installing the hydraulic jack on the top of the coping.

이하, 이와 같은 본 고안의 거더교의 받침장치 교체장치의 실시예를 첨부도면을 참조하여 상세히 설명하면 다음과 같다.Hereinafter, with reference to the accompanying drawings an embodiment of the support device replacement device of the girder bridge as described above in detail as follows.

본 고안의 실시예에 따른 플레이트 거더교에서의 받침장치 교체장치를 설명하기 위한 ⊂형 크로스 빔을 설치한 교량의 개략적인 정면도, 평면도 및 측면도를 각각 도시한 도 1 내지 도 3을 참조하여, 본 고안의 거더교에서의 받침장치 교체방법을 상세히 설명하기로 한다.Referring to FIGS. 1 to 3, which show schematic front, plan and side views, respectively, of a bridge provided with a cross beam for explaining a support device replacing device in a plate girder bridge according to an embodiment of the present invention, The method of replacing the supporting device in the girder bridge of the design will be described in detail.

본 고안의 거더교의 받침장치 교체장치는 거더교(1)의 지점부에 거더(10)에 직각으로 설치 되어있는 지점부 보강 브레이싱(20)을 피하여 브레이싱과 평행하게 ⊂자형 크로스 빔(30)을 전면 및 후면에 설치하고, 상기 크로스 빔(30)의 하부에 설치된 유압잭(50)을 이용하여 상부 구조를 인상하고, 상기 거더의 하부에 있는 받침장치(70)를 교체하는 것으로, 종래의 공법에서와 같이, 기존 받침장치의 전면의 거더 하부에 잭을 설치하기 위한 강재 또는 콘크리트 브라켓을 설치하는 공정이 가 불필요하다. 상기 크로스 빔(30)을 설치하기 위하여, 본 고안에서는 미리 제작된 크로스 빔(30)을 연결 플레이트(35)를 이용하여 거더(10)와 볼트(36)로 볼팅고정한다. 또한, 본 고안에서는 상기 크로스 빔(30)을 단일몸체로 제작하여도 되나, 제작상, 운반상, 설치상 간편하게 하기 위하여, 크로스 빔을 2개로 분할 제작하여 상하 연결플레이트(37)와 측면 연결플레이트(32)를 이용하여 상호 볼트(38, 39)로 볼팅고정한다. 또한, 상기 크로스 빔(30)의 하부를 인상하기 위하여, 상기 크로스빔(30)의 하부에 유압잭(50)을 설치하게 되는데, 상기 유압잭(50)은 크로스 빔(50)의 전체 길이에 따라서 적정 수로 설치되며, 본 실시예에서는 크로스 빔(30)의 전면 및 후면 각 하부에 2개의 유압잭(50)이 설치되는 것으로 한다. 상기 유압잭(50)은 바람직하기로는 상기 크로스 빔의 하부에 설치된 크로스 빔 연결용 임시 빔(40)과 코핑상부에 설치된 받침 빔(60)의 사이에 설치된다.The support device replacement device of the girder bridge of the present invention avoids the point reinforcement bracing 20 installed at right angles to the girder 10 at the point portion of the girder bridge, and faces the U-shaped cross beam 30 in parallel with the bracing. And installed on the rear side, by using the hydraulic jack 50 installed in the lower portion of the cross beam 30 to raise the upper structure, by replacing the supporting device 70 in the lower portion of the girder, Likewise, there is no need to install steel or concrete brackets for installing jacks on the bottom of the girder on the front of the existing backing device. In order to install the cross beam 30, in the present invention, the pre-fabricated cross beam 30 is bolted to the girder 10 and the bolt 36 by using the connection plate 35. In addition, in the present invention, the cross beam 30 may be manufactured in a single body, but in order to make it easy to manufacture, transport, and install, the cross beam is divided into two and manufactured by connecting the upper and lower connecting plates 37 and the side connecting plates. Use (32) to bolt to each other's bolts (38, 39). In addition, in order to raise the lower portion of the cross beam 30, the hydraulic jack 50 is installed in the lower portion of the cross beam 30, the hydraulic jack 50 is appropriate according to the overall length of the cross beam (50). It is installed in water, in this embodiment, two hydraulic jacks 50 are installed in each lower part of the front and rear of the cross beam 30. The hydraulic jack 50 is preferably installed between the temporary beam 40 for connecting the cross beams provided below the cross beams and the support beams 60 installed above the coping.

본 고안에서는 상기 받침장치(70)의 교체 후에 상기 받침장치(70)를 인상하기 위한 장치들, 즉 유압잭(50) 및 크로스 빔(30)과 유압잭(50)을 설치하기 위한 그 설치용 빔들(40, 60)을 철거할 수도 있지만, 바람직하기로는 상기 받침장치(70)의 교체 후에도 상기 받침장치의 인상에 사용된 ⊂형 크로스 빔(30)을 인상작업 후에도 철거시키지 않으면, 영구적인 거더 보강재로서 역할을 하여 교량의 안전성을 증대시킬 뿐만 아니라 향후 받침장치의 교체가 요구될 때 곧바로 받침장치 교체작업에 활용할 수 있게 되는 매우 뛰어난 효과를 제공한다. 그러나, 상기 임시 빔(40)과 받침 빔(60)은 철거되어 다른 경간의 받침장치(70)의 교체작업에 사용되는 것이 바람직하다.In the present invention, the devices for raising the support device 70 after the replacement of the support device 70, that is, the installation beams 40 for installing the hydraulic jack 50 and the cross beam 30 and the hydraulic jack 50, are installed. , 60) may be dismantled, but preferably serves as a permanent girder reinforcement if the X-shaped cross beam 30 used for the raising of the supporting device is not removed even after the pulling operation, even after the replacement of the supporting device 70. Not only does this increase the safety of the bridge, it also provides a very good effect that can be used for the replacement of the supporting device immediately when the replacement of the supporting device is required. However, the temporary beam 40 and the support beam 60 is preferably removed to be used for the replacement of the support device 70 of another span.

이하, 본 고안에 의한 거더교의 받침장치 교체장치의 바람직한 실시예를 첨부된 도면을 참조하여 보다 상세하게 설명하기로 한다. 본 고안의 거더교에서의 받침장치 교체장치는 ⊂형 크로스 빔(30), 크로스 빔 연결용 임시 빔(40), 유압잭(50), 유압잭 받침 빔(60)을 포함하여 구성된다. 거더 교량의 상부 구조를 지지하는 ⊂형 크로스 빔(30)은 기존 지점부 보강 브레이싱(20)의 위치를 피하며보강 브레이싱(20)의 전후 2개소에 제작설치되어 상부하중을 분산 지지하게 된다. 또한 ⊂형 크로스 빔은 2개로 분할 제작되어, 거더 측에서 연결 플레이트(35)에 의해 볼트(36)로 볼팅고정되고, 중앙부에서 상하 연결플레이트(37)와 측면 연결플레이트(32)에 의해 볼트 조립 형식(38, 39)으로 하부 구조물 상단부에서 조립이 가능하도록 제작하여 작업성을 향상시켰다. 여기서, 거더사이에 설치되는 ⊂형 크로스 빔(30)의 설치 위치는 작업성을 고려하여 높낮이를 조정하여 설치할 수 있으며, 이동 및 설치가 용이하도록 2개의 부분으로 분리 제작되므로 중량이 가벼워 현장에서의 조립 설치가 용이하다.Hereinafter, with reference to the accompanying drawings a preferred embodiment of the support device replacement device of the girder bridge according to the present invention will be described in more detail. Supporting device replacement device in the girder bridge of the present invention is composed of a cross beam 30, temporary beam 40 for cross beam connection, hydraulic jack 50, hydraulic jack support beam 60. The beam-shaped cross beam 30 supporting the upper structure of the girder bridge is manufactured and installed at two front and rear positions of the reinforcing bracing 20 to avoid the position of the existing branch reinforcing bracing 20 to distribute and support the upper load. In addition, the beam cross beam is divided into two parts and bolted to the bolt 36 by the connecting plate 35 at the girder side, and the bolt is assembled by the upper and lower connecting plates 37 and the side connecting plates 32 at the center part. Forms (38, 39) were made to be assembled at the top of the lower structure to improve workability. Here, the installation position of the X-shaped cross beam 30 is installed between the girders can be installed by adjusting the height in consideration of workability, and is manufactured in two parts for easy movement and installation, so the weight is light Easy assembly and installation

이렇게 지점부 보강 브레이싱(20)의 전후 2개소에 제작설치된 ⊂형 크로스 빔(30)은 하부에 설치되는 임시 연결용 빔(40)에 볼트(39)로 체결되어 유압 잭(50)에 의해 동시에 인상된다. 지압면적을 고려하여 제작된 유압잭(50)을 받치는 받침 빔(60)은 유압 잭(50)에서 발생하는 응력을 하부 구조물에 고르게 분포시키는 역할을 하여 하부구조물의 손상이 없도록 하는 역할을 하게 된다.Thus, the cross-shaped beam 30, which is manufactured and installed at two front and rear portions of the reinforcement bracing portion 20, is fastened by a bolt 39 to the temporary connection beam 40 installed at the bottom thereof, and simultaneously by the hydraulic jack 50. Is raised. The supporting beam 60 supporting the hydraulic jack 50 manufactured in consideration of the acupressure area serves to distribute the stress generated in the hydraulic jack 50 evenly to the lower structure so as not to damage the lower structure.

이렇게 유압잭(50)을 인상하여 크로스 빔(30)에 연결된 교량의 상부구조는 인상되고, 거더(10)의 하부에 설치된 받침장치(70)를 교체한다. 받침장치(70)의 교체가 끝난 후 사용된 ⊂형 크로스 빔(30)은 인상작업 후에도 철거시키지 않아 영구 보강재로서 교량의 안전성을 증대시킬 뿐만 아니라 향후 받침장치의 교체가 요구될 때 곧바로 활용이 가능하다. 그러나, 연결용 임시 빔(40) 및 유압 잭 받침 빔(60)은 해체되어 다른 경간의 받침장치를 교체하는 데에 사용하게 된다. 이상과 같이, 본 고안에서 기존 교량의 교각 구조물에 손상을 주지 않고 교량의 인상이 가능하다.Thus, the upper structure of the bridge connected to the cross beam 30 by raising the hydraulic jack 50 is raised, and replaces the supporting device 70 installed in the lower part of the girder 10. ⊂ type cross beam 30 used after the replacement of the supporting device 70 is not demolished even after the lifting work, so as to increase the safety of the bridge as a permanent reinforcement material, and can be used immediately when the supporting device needs to be replaced in the future. Do. However, the connecting temporary beam 40 and the hydraulic jack bearing beam 60 are dismantled and used to replace the bearing device of another span. As described above, the present invention can raise the bridge without damaging the bridge structure of the existing bridge.

상술한 바와 같이, 본 고안에 의한 거더교의 받침장치 교체장치는 기존 교량의 하부 구조물에 손상을 주지 않고 교량을 인상하여 받침장치를 교체할 수 있을 뿐만 아니라, 작업성을 고려하여 크로스 빔의 설치 위치의 상하 조정이 가능하기 때문에, 형하공간이 협소한 경우에도 적용이 가능하며, 이동 및 설치가 용이하도록 크로스 빔을 2개의 부분으로 분리 제작하는 경우 현장에서의 작업 효율성 및 시공속도가 우수하다. 받침장치의 인상에 사용된 ⊂형 크로스 빔은 인상작업 후에도 철거하지 않는 경우 영구 보강재로서 교량의 안전성을 증대시킬 뿐만 아니라 향후 받침장치의 교체가 요구될 때 활용이 가능하다. 또한 공장에서 제작 운반된 ⊂형 크로스 빔을 사용하게 되므로 품질관리가 용이하며 설치가 간단하므로 공기를 단축시킬 수 있는 장점이 있다.As described above, the support device replacement device of the girder bridge according to the present invention can replace the support device by raising the bridge without damaging the lower structure of the existing bridge, as well as the installation position of the cross beam in consideration of workability It is possible to adjust up and down, so that it can be applied even when the space is small, and when the cross beam is separated into two parts for easy movement and installation, work efficiency and construction speed in the field are excellent. The X-shaped cross beams used to raise the support system can be used as permanent reinforcement to increase the safety of the bridge if it is not demolished after the lifting work, and can be used when the support device needs to be replaced in the future. In addition, since the use of the 크로스 type cross beam manufactured and transported at the factory, the quality control is easy and the installation is simple, thereby reducing the air.

이상으로 본 고안의 바람직한 실시예에 대해 상세히 기술하였지만, 본 고안이 속하는 기술분야에 있어서 통상의 지식을 가진 사람이라면, 첨부된 청구 범위에 정의된 본 고안의 정신 및 범위를 벗어나지 않으면서 본 고안을 여러 가지로 변형 또는 변경하여 실시할 수 있음을 알 수 있을 것이다. 따라서 본 고안의 실시예들의 단순한 변경은 본 고안의 청구범위 기술을 벗어날 수 없을 것이다.Although the preferred embodiments of the present invention have been described in detail above, those of ordinary skill in the art to which the present invention pertains may devise the present invention without departing from the spirit and scope of the present invention as defined in the appended claims. It will be appreciated that various modifications or changes can be made. Therefore, a simple change of the embodiments of the present invention will not depart from the claims technology of the present invention.

Claims (4)

거더교의 받침장치 교체장치에 있어서,In the supporting device replacement device of the girder bridge, 거더교의 지점부에 거더에 직각으로 설치 되어있는 지점부 보강 브레이싱을 피하여 브레이싱과 평행하게 거더의 전면 및 후면에 설치된 ⊂자형 크로스 빔; 및A U-shaped cross beam installed at the front and rear of the girder in parallel with the bracing, avoiding the reinforcement bracing at the point of the girder bridge installed at right angles to the girder; And 상기 크로스 빔의 하부에 고정 설치되어, 그 하부에 교량의 상부 구조를 인상하는 유압잭을 설치하는 임시 빔을 포함하는 거더교의 받침장치 교체장치.It is fixed to the lower portion of the cross beam, the support device replacement device for a girder bridge including a temporary beam to install a hydraulic jack for raising the upper structure of the bridge in the lower portion. 제1항에 있어서, 상기 크로스 빔은 미리 제작되며, 상기 크로스 빔을 거더와 볼팅고정하는 연결 플레이트를 포함하는 것을 특징으로 하는 거더교의 받침장치의 교체장치.The apparatus of claim 1, wherein the cross beam is manufactured in advance and includes a connecting plate for fixing the cross beam to bolting the cross beam. 제2항에 있어서, 상기 크로스 빔은 2개로 분할 제작되어 상하 연결플레이트와 측면 연결플레이트를 이용하여 상호 볼팅고정됨을 특징으로 하는 거더교의 받침장치의 교체장치.The device of claim 2, wherein the cross beam is divided into two and fixed by mutual bolting using an upper and lower connecting plate and a side connecting plate. 제1항 내지 제3항 중의 어느 한 항에 있어서, 상기 크로스 빔의 하부에 상기 유압잭을 설치하기 위하여, 상기 코핑상부에 상기 유압잭을 설치할 받침 빔을 더 포함하여 상기 임시 빔과 상기 받침 빔의 사이에 상기 유압잭을 설치하는 것을 특징으로 하는 거더교의 받침장치의 교체장치.The support beam according to any one of claims 1 to 3, further comprising a support beam for installing the hydraulic jack on the top of the coping to install the hydraulic jack under the cross beam. Replacement device for the support device of the girder bridge, characterized in that for installing the hydraulic jack.
KR2020010029198U 2001-09-21 2001-09-21 Apparatus for replacing shoes in girder bridge KR200263283Y1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR2020010029198U KR200263283Y1 (en) 2001-09-21 2001-09-21 Apparatus for replacing shoes in girder bridge

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR2020010029198U KR200263283Y1 (en) 2001-09-21 2001-09-21 Apparatus for replacing shoes in girder bridge

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
KR1020010058574A Division KR20010099349A (en) 2001-09-21 2001-09-21 Method and apparatus for replacing shoes in girder bridge

Publications (1)

Publication Number Publication Date
KR200263283Y1 true KR200263283Y1 (en) 2002-02-04

Family

ID=73109237

Family Applications (1)

Application Number Title Priority Date Filing Date
KR2020010029198U KR200263283Y1 (en) 2001-09-21 2001-09-21 Apparatus for replacing shoes in girder bridge

Country Status (1)

Country Link
KR (1) KR200263283Y1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200326710Y1 (en) * 2003-05-27 2003-09-19 주식회사 동아기술공사 Strong form structure that ease exchange of support

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200326710Y1 (en) * 2003-05-27 2003-09-19 주식회사 동아기술공사 Strong form structure that ease exchange of support

Similar Documents

Publication Publication Date Title
KR100808212B1 (en) The bridge upper structure pulling up for which construction bent for bridge upper structure pulling up and this were used
JP5047680B2 (en) Construction method of continuous viaduct
KR100820299B1 (en) Temporary structure and precast concrete beam of pylon setting method using the bracket
KR100964729B1 (en) Bridge lifting apparatus for changing bridge bearings
KR20090098180A (en) Method for broadening width of existing bridge without temporary road
KR101004795B1 (en) Method for raising a bridge and the raising structure there of
KR100355091B1 (en) Method for reinforcing resistance force of a bridge using a prefabricated bracket
KR20040004819A (en) Method for changing steel bridge of supporting rail into concreat bridge
KR100214387B1 (en) Jack supporting apparatus in raising the bridge super structure and bridge repairing method using it
KR100478701B1 (en) Pulling up, repair and reinforcement method for the upper structure of a bridge
KR100892751B1 (en) Bridge repairng method by upper structure lifting and hinge typeed temporary bridge construction
KR101130166B1 (en) Apparatus and method for replacing bearings of box girder bridge
KR100214386B1 (en) Jack supproting apparatus in raising the bridge super structure
KR101605011B1 (en) Repair and Reinforcement method of lower structure of bridge
KR200263283Y1 (en) Apparatus for replacing shoes in girder bridge
CN208167484U (en) The steel construction overline bridge being easily installed
KR20010099349A (en) Method and apparatus for replacing shoes in girder bridge
KR102109816B1 (en) Method of Replacing Bearing for Bridge and Bearing Structure
JP2001106484A (en) Jack device dedicated for replacement of steel bridge support and method for replacement
KR100907141B1 (en) Mobile crane installation structure and method for replacing an upper structure of a railway bridge using the same
KR100478702B1 (en) Successively replacement method of the upper structure of a bridge
KR100454387B1 (en) Support-type temporary bent for jacking-up upper structure and forming method thereof and upper structure jack-up method using the same
KR100519718B1 (en) Strong form structure that ease exchange of support
KR100734019B1 (en) Bridge construction method using a bridge girder supporting bracket which four or two-direction supporter is installed
KR200290739Y1 (en) Jacking system of bridge repair

Legal Events

Date Code Title Description
U107 Dual application of utility model
REGI Registration of establishment
FPAY Annual fee payment

Payment date: 20070710

Year of fee payment: 6

LAPS Lapse due to unpaid annual fee