KR101004795B1 - Method for raising a bridge and the raising structure there of - Google Patents

Method for raising a bridge and the raising structure there of Download PDF

Info

Publication number
KR101004795B1
KR101004795B1 KR1020080034107A KR20080034107A KR101004795B1 KR 101004795 B1 KR101004795 B1 KR 101004795B1 KR 1020080034107 A KR1020080034107 A KR 1020080034107A KR 20080034107 A KR20080034107 A KR 20080034107A KR 101004795 B1 KR101004795 B1 KR 101004795B1
Authority
KR
South Korea
Prior art keywords
vertical
bridge
coupling
horizontal support
hydraulic jack
Prior art date
Application number
KR1020080034107A
Other languages
Korean (ko)
Other versions
KR20090108810A (en
Inventor
심현보
Original Assignee
(주)안풍건설
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by (주)안풍건설 filed Critical (주)안풍건설
Priority to KR1020080034107A priority Critical patent/KR101004795B1/en
Publication of KR20090108810A publication Critical patent/KR20090108810A/en
Application granted granted Critical
Publication of KR101004795B1 publication Critical patent/KR101004795B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D22/00Methods or apparatus for repairing or strengthening existing bridges ; Methods or apparatus for dismantling bridges

Abstract

본 발명은 강판형교의 상부구조물 인상방법 및 그 구조에 있어서, The present invention in the method of lifting the upper structure of the steel sheet bridge and its structure,
교각 상면의 일측에 설치된 제1 I형강빔(10)과 상기 제1 I형강빔(10)에서 일정거리 떨어져 타측에 설치된 제2 I형강빔(12)의 양단부에 수직방향으로 다수개의 결합구멍(14)을 천공하는 단계와; A plurality of coupling holes in the vertical direction at both ends of the first I-beam beam 10 provided on one side of the pier upper surface and the second I-beam beam 12 provided on the other side away from the first I-beam beam 10 by a predetermined distance ( Perforating 14);
상기에서 천공된 제1 I형강빔(10)과 제2 I형강빔(12)의 결합구멍(14)에 결합구멍(31)이 형성된 적어도 하나이상의 수직브라켓(30)을 결합수단을 이용하여 제1 I형강빔(10)과 제2 I형강빔(12)의 내측에 각각 결합하는 단계와;At least one or more vertical brackets 30 having coupling holes 31 formed in the coupling holes 14 of the first I-beam beam 10 and the second I-beam beam 12 are formed by using a coupling means. Coupling each of the first I-beam 10 and the second I-beam 12;
상기 수직브라켓(30)에 가로방향으로 결합되는 가로지지대(40)에서 유압잭(50)이 당접하는 부위에 적어도 2개 이상의 수직보강편(42)을 부착수단을 이용하여 부착하여 가로지지대(40)를 보강하는 단계와;At least two or more vertical reinforcing pieces 42 are attached to a portion where the hydraulic jack 50 abuts on the horizontal support 40 coupled to the vertical bracket 30 in the horizontal direction by using an attachment means. Reinforcing;
상기 일측 제1 I형강빔(10)에 설치된 수직브라켓(30)과 타측에 설치된 제2 I형강빔(12)의 수직브라켓(30) 사이에 상기 가로지지대(40)를 위치시키고, 상기 수직브라켓(30)의 결합구멍(31)과 상기 가로지지대(40)의 결합구멍(41)을 맞추고 결합수단을 이용하여 결합하는 단계와;Position the horizontal support 40 between the vertical bracket 30 installed on the one side first I-beam 10 and the vertical bracket 30 of the second I-beam 12 provided on the other side, the vertical bracket Aligning the engaging holes 31 of the 30 with the engaging holes 41 of the horizontal support 40 and engaging using the engaging means;
상기 제1 I형강빔(10)과 제2 I형강빔(12)의 양단부 사이에 설치된 가로지지대(40)의 수직보강편(42)이 부착된 부위의 하부에 유압잭(50)을 설치하고, 상기 유압잭(50)의 상부에 상부 하중을 분산하기 위하여 받침판(52)을 올려놓는 단계와;The hydraulic jack 50 is installed below the portion where the vertical reinforcing piece 42 of the horizontal support 40 is installed between both ends of the first I-beam 10 and the second I-beam 12, Placing a support plate (52) on top of the hydraulic jack (50) to distribute the upper load;
상기에서 설치된 유압잭(50)들을 동시에 상승시켜 강판빔구조물(200)을 포함 한 강판형교의 상부구조물을 인상하는 단계 및 그 구조로서, 본 발명은 가교각이나 교각의 단면확대 공사를 하지 않으므로서 시간과 비용이 절감되도록 하였으며 상부구조물의 안정적 인상으로 교좌장치를 신속, 안전하게 보수하거나 교체작업이 이루어질 수 있도록 한 것이다.Lifting the hydraulic jacks 50 installed above at the same time to raise the upper structure of the steel plate girder bridge including the steel plate beam structure 200, and the structure thereof, the present invention does not have to increase the cross-sectional angle or bridge cross-sectional construction time In addition, the cost and cost are reduced, and the stable structure of the superstructure allows quick and safe repair or replacement of the device.
교각, 교좌장치, 상부구조물, 인상, I형강빔, 수직브라켓, 가로지지대 Pier, bridge arrangement, superstructure, impression, I-beam, vertical bracket, horizontal support

Description

강판형교의 상부구조물 인상방법 및 그 구조{METHOD FOR RAISING A BRIDGE AND THE RAISING STRUCTURE THERE OF}Raising method of superstructure of steel plate bridge and its structure {METHOD FOR RAISING A BRIDGE AND THE RAISING STRUCTURE THERE OF}
본 발명은 강판형교의 상부구조물 인상방법 및 그 구조에 관한 것이다.The present invention relates to a method for lifting an upper structure of a steel plate bridge and its structure.
본 발명은 강판형교의 상부구조물 인상방법 및 그 구조에 관한 것으로서, 특히 교각의 상부에 설치된 강판빔구조물을 포함하는 상부 구조물을 인상하는 과정에서 강판빔구조물과 교각 상면 사이의 형하공간이 낮거나, 교각 상면의 연단거리가 좁아서 강판빔구조물과 교각 상면 사이에 유압잭을 설치할 수 없을 경우, 가교각이나 교각에 대한 단면확대 공사를 하지 않고, 본 발명을 이용하여 강판빔구조물을 인상하고, 상기 강판빔구조물을 받치고 있는 교좌장치를 신속하게 보수하거나 교체작업이 이루어질 수 있도록 한 것이다.The present invention relates to a method for lifting an upper structure of a steel plate bridge and its structure, in particular, in the process of raising the upper structure including the steel plate beam structure installed on the upper part of the bridge, the lower geometry space between the steel plate beam structure and the upper surface of the bridge, When the hydraulic jack cannot be installed between the steel beam beam structure and the pier upper surface due to the narrow end distance of the pier upper surface, the steel beam beam structure is raised using the present invention without the cross-sectional enlargement or cross sectional expansion work for the pier. It was designed to quickly repair or replace the bridge system supporting the structure.
일반적으로 강판형교는 주로 철도교에서 많이 시공되어지고 있으며, 이러한 강판형교는 통상 교각과 교각 사이에 교좌장치를 개재하여 단순보 형태로 설치된다.In general, steel plate girder bridges are mainly constructed in railway bridges, these steel plate girder bridges are usually installed in the form of a simple beam through the bridge device between the piers and the piers.
즉, 일정 길이를 갖는 제1 I형강빔(10)과 상기 제1 I형강빔(10)에서 일정거리 떨어져 제2 I형강빔(12)을 설치하고, 제1 I형강빔(10)과 제2 I형강빔(12)을 다수개의 브레이스(20)로 연결하고 일체화하여 강판빔구조물(200)을 설치하고, 상기 교좌장치(24) 상부에 상기 강판빔구조물(200)의 양단부를 올려놓아 받쳐지도록 하고, 상기 강판빔구조물(200)의 상부에는 일정 간격으로 침목(도시하지 않음)이 얹혀지고, 침목의 상부에는 강판빔구조물(200)의 방향과 동일한 방향을 갖는 레일(도시하지 않음)이 고정되어지도록 구성되어 있다.That is, the first I-beam 10 having a predetermined length and the second I-beam 10 is provided a predetermined distance away from the first I-beam 10, and the first I-beam 10 and the first 2 I-beam steel beam 12 is connected to and integrated with a plurality of braces 20 to install a steel plate beam structure 200, and to support both ends of the steel plate beam structure 200 on the top of the staircase device 24 To the top of the steel plate beam structure 200, a sleeper (not shown) is placed at a predetermined interval, and the rail (not shown) having the same direction as the direction of the steel plate beam structure 200 is placed on the top of the sleeper. It is configured to be fixed.
이러한 구성을 가진 강판형교는 열차의 통행시 발생되는 진동 및 충격에 의하여 교좌장치(24)가 파손되는 일이 빈번하게 발생되었고, 이 같은 원인으로 파손된 교좌장치(24)를 보수하거나 교체를 하기 위해서는 교각의 상면에 설치된 강판빔구조물을 포함하는 상부 구조물 전체를 유압잭으로 동시 인상시켜 교좌장치 보수 및 교체작업이 이루어진다.Steel plate girder bridge having such a configuration is frequently caused the bridge device 24 is damaged by the vibration and shock generated during the passage of the train, to repair or replace the broken bridge device 24 for this reason In order to simultaneously raise the entire upper structure including the steel plate beam structure installed on the top of the piers with a hydraulic jack repair and replacement of the bridge device is made.
그런데 철도교의 교각은 대부분 형하공간(교각의 상면과 강판빔구조물 저부 사이 공간)이 낮거나, 교각 상부면의 연단거리가 부족하므로서 유압잭을 설치할 공간이 부족하여 교각 상면과 강판빔구조물 저부 사이에 유압잭을 설치하여 상부 구조물을 인상하기가 어렵다.However, most of the bridge piers in railroad bridges have low spaces (the space between the top of the bridge and the bottom of the steel beam structure) or lack the space for installing the hydraulic jack due to the lack of the edge of the top of the steel piling. It is difficult to raise the upper structure by installing it.
종래에 유압잭을 이용하여 상부 구조물을 인상하는 방법은, 먼저 형하공간이 부족한 경우에 교각의 양측면에 대하여 단면확대 공사를 하여 단면이 확대된 교각의 상부에 유압잭을 설치하여 상부 구조물을 인상하는 방법이 있다.Conventionally, the method of raising the upper structure by using the hydraulic jack, the first method of raising the upper structure by installing a hydraulic jack on the upper part of the piers with the cross-sectional enlargement work on both sides of the pier when the mold space is insufficient. have.
다음, 유압잭을 설치할 수 있는 연단거리가 부족할 경우에는 교각의 기초부 로 부터 가교각을 설치하고, 설치된 가교각의 상부에 유압잭을 설치하여 상부 구조물을 인상하여 보수 및 교체작업을 하였으나, 하천 하부의 대부분이 연약한 지반으로 이루어져 가교각을 견딜만한 보강이 필요함에 따라 공사의 어려움과 막대한 공사비가 소요되는 비경제적인 문제점이 있었다.Next, when the shortage distance for installing the hydraulic jack is insufficient, the bridge is installed from the foundation of the bridge, and the hydraulic jack is installed at the upper part of the bridge to raise the upper structure for repair and replacement. As most of them are made of soft ground, reinforcement to withstand the cross-linking angle is required, which leads to difficulty in construction and enormous cost of construction.
또는, 교각의 양측면에 대하여 단면확대 공사를 하여 단면이 확대된 교각의 상부에 유압잭을 설치하여 상부 구조물을 인상하는 방법이 제안되었으나, 이 역시 콘크리트 양생기간이 필요함에 따라 공사기간이 길어지게 되며 그에 따른 비용이 증대되는 문제점이 있었다.Or, a method of raising the upper structure by installing a hydraulic jack on the upper side of the piers whose cross sections are enlarged by performing cross-sectional enlargement work on both sides of the piers is proposed, but the construction period becomes longer as the concrete curing period is required. There was a problem that the cost is increased.
본 발명의 목적은 교각 상부에 형하공간이 부족하거나, 연단거리가 부족할 경우에도 가교각이나 교각의 단면확대 공사를 하지 않고, 본 발명을 이용하여 강판형교의 상부 구조물을 용이하게 인상하는데 그 목적이 있다. It is an object of the present invention to easily raise the upper structure of a steel plate bridge using the present invention, without performing cross-sectional angle or cross-sectional enlargement construction of the bridge piers even when the space of the top of the piers lacks a space or a short distance. have.
본 발명은, 교각 상면의 일측에 설치된 제1 I형강빔(10)과 상기 제1 I형강빔(10)에서 일정거리 떨어져 타측에 설치된 제2 I형강빔(12)의 양단부에 수직방향으로 다수개의 결합구멍(14)을 천공하는 단계와; The present invention is a plurality of first I-beam beam 10 provided on one side of the pier upper surface and the second I-beam beam 12 provided on the other side at a predetermined distance away from the first I-beam beam 10 in the vertical direction Drilling two coupling holes (14);
상기에서 천공된 제1 I형강빔(10)과 제2 I형강빔(12)의 결합구멍(14)에 결합구멍(31)이 형성된 적어도 하나이상의 수직브라켓(30)을 결합수단을 이용하여 제1 I형강빔(10)과 제2 I형강빔(12)의 내측에 각각 결합하는 단계와;At least one or more vertical brackets 30 having coupling holes 31 formed in the coupling holes 14 of the first I-beam beam 10 and the second I-beam beam 12 are formed by using a coupling means. Coupling each of the first I-beam 10 and the second I-beam 12;
상기 수직브라켓(30)에 가로방향으로 결합되는 가로지지대(40)에서, 유압잭(50)이 당접하는 부위에 적어도 2개 이상의 수직보강편(42)을 부착수단을 이용하여 부착하여 가로지지대(40)를 보강하는 단계와;In the horizontal support 40 coupled to the vertical bracket 30 in the horizontal direction, at least two or more vertical reinforcing pieces 42 are attached to a portion where the hydraulic jack 50 abuts by using an attachment means. Reinforcing);
상기 일측 제1 I형강빔(10)에 설치된 수직브라켓(30)과 타측에 설치된 제2 I형강빔(12)의 수직브라켓(30)의 사이에 상기 가로지지대(40)를 위치시키고, 상기 수직브라켓(30)의 결합구멍(31)과 상기 가로지지대(40)의 결합구멍(41)을 맞추고 결합수단을 이용하여 결합하는 단계와;Position the horizontal support 40 between the vertical bracket 30 installed on the one side first I-beam 10 and the vertical bracket 30 of the second I-beam 12 provided on the other side, the vertical Aligning the coupling holes 31 of the brackets 30 with the coupling holes 41 of the horizontal support 40 and coupling them using coupling means;
상기 제1 I형강빔(10)과 제2 I형강빔(12)의 양단부 사이에 설치된 가로지지대(40)의 수직보강편(42)이 부착된 부위의 하부에 유압잭(50)을 설치하고, 상기 유압잭(50)의 상부에 상부 하중을 분산하기 위하여 받침판(52)을 올려놓는 단계와;The hydraulic jack 50 is installed below the portion where the vertical reinforcing piece 42 of the horizontal support 40 is installed between both ends of the first I-beam 10 and the second I-beam 12, Placing a support plate (52) on top of the hydraulic jack (50) to distribute the upper load;
상기에서 설치된 유압잭(50)들을 동시에 상승시켜 강판빔구조물(200)을 포함한 강판형교의 상부구조물을 인상하는 단계로 이루어져, 본 발명은 가교각이나 교각의 단면확대 공사를 하지 않아 시간과 비용이 절감되도록 하였으며 상부구조물의 안정적 인상으로 교좌장치를 신속, 안전하게 보수하거나 교체작업이 이루어질 수 있도록 한 것이다.Simultaneously raising the hydraulic jacks 50 installed above to raise the upper structure of the steel plate bridge including the steel plate beam structure 200, the present invention does not do a cross-sectional expansion of the bridge angle or piers to save time and cost The stable lifting of the upper structure allows for quick and safe repair or replacement of the device.
본 발명은, 제1 I형강빔 및 제2 I형강빔의 양단부 내측에적어도 하나 이상의 수직브라켓을 결합하고 상기 수직브라켓과 수직브라켓의 사이에 가로방향으로 결합 되는 긴 직사각형의 가로지지대의 하부에 유압잭을 설치하고, 설치된 유압잭들을 동시에 상승시켜 강판형교의 상부구조물을 인상하므로서, 본 발명은 가교각이나 교각의 단면확대 공사를 하지 않아 시간과 비용이 절감되도록 하였으며 상부구조물의 안정적 인상으로 교좌장치를 신속, 안전하게 보수하거나 교체작업이 이루어질 수 있도록 한 것이다.The present invention, the hydraulic jack in the lower portion of the long rectangular horizontal support that is coupled to at least one vertical bracket inside the both ends of the first I-beam and the second I-beam beam and horizontally coupled between the vertical bracket and the vertical bracket By raising the installed hydraulic jacks at the same time to raise the upper structure of the steel plate girder bridge, the present invention is to reduce the time and cost by the cross-sectional angle or pier enlargement construction work, and to quickly increase the device by the stable lifting of the upper structure In other words, they can be safely repaired or replaced.
이와 같은 목적을 달성하기 위한 본 발명에서 강판형교의 상부구조물 인상방법 및 그 구조를 상세히 설명하면 다음과 같다.In the present invention for achieving the above object, the method of lifting the upper structure of the steel plate bridge and its structure will be described in detail.
도3은 본 발명을 강판형교에 적용한 상태의 사시도(브레이스 생략), 도4는 도3의 일부 확대 사시도, 도5a,b는 본 발명 수직브라켓의 실시예의 사시도, 도6a,b는 본 발명 수직보강편의 실시예의 사시도, 도7은 본 발명을 강판형교에 적용한 상태의 정면도(브레이스 생략), 도8은 도7에서 유압잭을 상승시켜 상부구조물을 인상한 상태의 정면도, 도9는 형하공간이 부족한 경우에 본 발명을 강판형교에 적용한 상태의 정면도, 도10은 곡선 강판형교에서 연단거리가 부족한 경우에 교각의 측면에 유압잭 받침용 브라켓을 설치한 상태의 사시도이다.Figure 3 is a perspective view (brace omitted) of the present invention applied to the steel plate bridge, Figure 4 is a partially enlarged perspective view of Figure 3, Figures 5a, b is a perspective view of an embodiment of the vertical bracket of the present invention, Figure 6a, b is a vertical view of the present invention 7 is a front view of a state where the present invention is applied to a steel plate bridge (brace omitted), FIG. 8 is a front view of a hydraulic jack being raised in FIG. 7 to raise an upper structure, and FIG. In this case, the front view of the state in which the present invention is applied to a steel plate bridge, FIG. 10 is a perspective view of a state where the hydraulic jack support bracket is installed on the side of the bridge when the short distance is short in the curved steel plate bridge.
본 발명을 강판형교의 상부구조물 인상방법과 강판형교의 상부구조로 나누어 설명하기로 한다. The present invention will be described by dividing the upper structure of the steel plate girder bridge and the upper structure of the steel plate girder bridge.
먼저 강판형교의 상부구조물 인상방법을 설명하면,First, the method of raising the upper structure of the steel plate bridge,
교각 상면의 일측에 설치된 제1 I형강빔(10)과 상기 제1 I형강빔(10)에서 일 정거리 떨어져 타측에 설치된 제2 I형강빔(12)의 양단부에 수직방향으로 다수개의 결합구멍(14)을 천공하는 단계와; A plurality of coupling holes in the vertical direction at both ends of the first I-beam beam 10 provided on one side of the pier upper surface and the second I-beam beam 12 provided on the other side away from the first I-beam beam 10 by a certain distance ( Perforating 14);
상기에서 천공된 제1 I형강빔(10)과 제2 I형강빔(12)의 결합구멍(14)에 결합구멍(31)이 형성된 적어도 하나 이상의 수직브라켓(30)을 결합수단을 이용하여 제1 I형강빔(10)과 제2 I형강빔(12)의 내측에 각각 결합하는 단계와;At least one or more vertical brackets 30 having coupling holes 31 formed in the coupling holes 14 of the first I-beam beam 10 and the second I-beam beam 12 are formed by using a coupling means. Coupling each of the first I-beam 10 and the second I-beam 12;
상기 수직브라켓(30)에 가로방향으로 결합되는 가로지지대(40)에서 유압잭(50)이 당접하는 부위에 적어도 2개 이상의 수직보강편(42)을 부착수단을 이용하여 부착하여 가로지지대(40)를 보강하는 단계와;At least two or more vertical reinforcing pieces 42 are attached to a portion where the hydraulic jack 50 abuts on the horizontal support 40 coupled to the vertical bracket 30 in the horizontal direction by using an attachment means. Reinforcing;
상기 일측 제1 I형강빔(10)에 설치된 수직브라켓(30)과 타측에 설치된 제2 I형강빔(12)의 수직브라켓(30)의 사이에 상기 가로지지대(40)를 위치시키고, 상기 수직브라켓(30)의 결합구멍(31)과 상기 가로지지대(40)의 결합구멍(41)을 맞추고 결합수단을 이용하여 결합하는 단계와;Position the horizontal support 40 between the vertical bracket 30 installed on the one side first I-beam 10 and the vertical bracket 30 of the second I-beam 12 provided on the other side, the vertical Aligning the coupling holes 31 of the brackets 30 with the coupling holes 41 of the horizontal support 40 and coupling them using coupling means;
상기 제1 I형강빔(10)과 제2 I형강빔(12)의 양단부 사이에 설치된 가로지지대(40)의 수직보강편(42)이 부착된 부위의 하부에 유압잭(50)을 설치하고, 상기 유압잭(50)의 상부에 상부 하중을 분산하기 위하여 받침판(52)을 올려놓는 단계와;The hydraulic jack 50 is installed below the portion where the vertical reinforcing piece 42 of the horizontal support 40 is installed between both ends of the first I-beam 10 and the second I-beam 12, Placing a support plate (52) on top of the hydraulic jack (50) to distribute the upper load;
상기에서 설치된 유압잭(50)들을 동시에 상승시켜 강판빔구조물(200)을 포함한 강판형교의 상부구조물을 인상하는 단계로 이루어지는 강판형교의 상부구조물 인상방법으로 이루어진다.Simultaneously raising the hydraulic jacks 50 installed above to raise the upper structure of the steel plate bridge including the steel plate beam structure 200 is made of a method of lifting the upper structure of the steel plate bridge.
먼저, 교각 상면의 일측에 설치된 제1 I형강빔(10)과 상기 제1 I형강빔(10)에서 일정거리 떨어져 타측에 설치된 제2 I형강빔(12)의 양단부에 수직방향으로 다 수개의 결합구멍(14)을 천공하는 단계를 도3을 참조하여 본 발명의 일실시예를 설명하면, 교각(100)의 상면에 교좌장치(24)를 개재하여 일측에 설치된 제1 I형강빔(10)과 상기 제1 I형강빔(10)에서 일정거리 떨어져 타측에 설치된 제2 I형강빔(12)의 양단부에 수직방향으로 다수개의 결합구멍(14)을 드릴로 천공하는 단계에서, 다수의 결합구멍(31)이 형성된 적어도 하나 이상의 수직브라켓(30)을 제1 I형강빔(10) 과 제2 I형강빔(12)의 양단부 내측에 결합할 수 있도록 제1 I형강빔(10)과 제2 I형강빔(12)의 양단부에 드릴로 한쌍의 결합구멍(31)을 수직방향으로 다수개 천공한다.First, a plurality of first I-beam beams 10 provided on one side of the upper surface of the bridge and a second I-beam beam 12 provided on the other side away from the first I-beam beam 10 by a predetermined distance, Referring to FIG. 3, a step of drilling the coupling hole 14 will be described. Referring to FIG. 3, the first I-shaped steel beam 10 installed at one side of the bridge 100 via the bridge device 24 is provided. In the step of drilling a plurality of coupling holes 14 in the vertical direction at both ends of the second I-beam beam 12 installed on the other side away from the first I-beam beam 10 by a predetermined distance, a plurality of coupling The first I-beam 10 and the first bracket so that the at least one vertical bracket 30 formed with a hole 31 can be coupled to both ends of the first I-beam 10 and the second I-beam 12; 2 A plurality of pairs of coupling holes 31 are drilled in the vertical direction at both ends of the I-beam 12 by a drill.
본 발명의 일실시예에서는 상기 결합구멍(14)을 제1 I형강빔(10) 및 제2 I형강빔(12)의 하부 플랜지에서 상부 플랜지 사이의 웨브 전체에 걸쳐 천공하였으나, 수직브라켓(30)의 길이가 낮으면 낮게 수직브라켓(30)의 높이가 높으면 높게, 수직브라켓(30)의 높이에 따라 결합구멍(14)을 수직방향으로 천공하는 것이다. In an embodiment of the present invention, the coupling hole 14 was drilled through the entire web between the upper flange and the lower flange of the first I-beam 10 and the second I-beam 10, but the vertical bracket 30 If the length of the lower is low, the height of the vertical bracket 30 is high, and the coupling hole 14 in the vertical direction according to the height of the vertical bracket (30).
본 발명의 일실시예에서는 제1 I형강빔(10) 및 제2 I형강빔(12)의 양단부에 긴 사각형 평판(34)이 중앙부에서 직각 절곡된 앵글형 수직브라켓(30)을 결합하여 사용하고 있으나(도3,4 참조), 상기 제1 I형강빔(10) 및 제2 I형강빔(12)의 양단부에 수직브라켓(30)을 수직으로 나란히 2개를 결합하고, 여기에 상기 가로지지대(40)를 2개 결합하여 더 견고하게 사용할 수도 있다.In an embodiment of the present invention, a long rectangular flat plate 34 is used at both ends of the first I-beam 10 and the second I-beam 12 by combining an angle-type vertical bracket 30 bent at a right angle in the center. 3 and 4, but two vertical brackets 30 are vertically coupled to both ends of the first I-beam 10 and the second I-beam 12, and the horizontal support is here. Two (40) can also be combined and used more firmly.
그리고, 상기 앵글형 수직브라켓(30)의 다른 실시예로는 도5b와 같이, 결합구멍(31)을 구비한 긴 사각형의 평판(34)에 결합구멍(31)이 형성된 수직편(36)이 부착된 T형 수직브라켓(30)을 사용할 수도 있다.As another embodiment of the angle-type vertical bracket 30, as shown in FIG. 5B, a vertical piece 36 having an engaging hole 31 is attached to an elongated flat plate 34 having an engaging hole 31. As shown in FIG. T-shaped vertical bracket 30 may be used.
상기 제1 I형강빔(10) 및 제2 I형강빔(12)의 양단부 내측에 결합되는 앵글형 수직브라켓(30) 및 T형 수직브라켓(30)의 결합수단은 용접으로도 결합할 수 있으나, 제1,2 I형강빔(10)(12)이 용접열에 의해 약해질 수 있으므로 고장력 볼트(16)와 너트(18)를 사용하는 것이 바람직하다.The coupling means of the angle-type vertical bracket 30 and the T-type vertical bracket 30 which are coupled to both ends of the first I-beam 10 and the second I-beam 10, can also be combined by welding, Since the first and second I-beams 10 and 12 may be weakened by the heat of welding, it is preferable to use the high tension bolt 16 and the nut 18.
다음, 상기에서 천공된 제1 I형강빔(10) 및 제2 I형강빔(12)의 결합구멍(14)에 결합구멍(31)이 형성된 적어도 하나 이상의 수직브라켓(30)을 결합수단을 이용하여 각각 결합하는 단계에서, 본 발명에서는 상기 제1 I형강빔(10) 및 제2 I형강빔(12)의 결합구멍(14)에 앵글형 수직브라켓(30) 또는 T형 수직브라켓(30)의 결합구멍(31)을 맞추고 결합수단인 고장력 볼트(16)와 너트(18)로 결합한다.Next, at least one or more vertical brackets 30 having coupling holes 31 formed in the coupling holes 14 of the first I-beam beam 10 and the second I-beam beam 12 are formed by using the coupling means. In the step of coupling, respectively, in the present invention, the angled vertical bracket 30 or the T-shaped vertical bracket 30 of the coupling hole 14 of the first I-beam 10 and the second I-beam 12 Fit the coupling hole 31 and combine with a high-strength bolt 16 and a nut 18 as a coupling means.
다음, 상기 수직브라켓(30)에 가로방향으로 결합되는 긴 직사각형 형상인 가로지지대(40)에서, 유압잭(50)이 당접하는 부위에 적어도 2개 이상의 수직보강편(42)을 부착수단을 이용하여 부착하여 가로지지대(40)를 보강하는 단계에서, 상기 가로지지대(40)에서 유압잭(50)이 당접하는 부위에 수직보강편(42)을 용접 부착하는데, 이것은 유압잭(50)에 의해서 받쳐져 인상되는 가로지지대(40)를 보강하는 역할을 한다.Next, in the horizontal support 40 having a long rectangular shape coupled to the vertical bracket 30 in the horizontal direction, at least two or more vertical reinforcing pieces (42) to the site where the hydraulic jack 50 abuts using attachment means. In the step of attaching and reinforcing the horizontal support 40, the vertical reinforcing piece 42 is welded and attached to a portion where the hydraulic jack 50 abuts on the horizontal support 40, which is supported by the hydraulic jack 50 and pulled up. It serves to reinforce the horizontal support 40 to be.
상기 수직보강편(42)은 도4와 같은 직사각형 형상, 도6a와 같은 앵글 형상, 도6b와 같은 T 형상 등 여러 가지 형상이 가능하고, 상기 수직보강편(42)을 용접 부착하여 보강하므로서 가로지지대(40)의 변형을 방지할 수 있다. The vertical reinforcing piece 42 may have various shapes such as a rectangular shape as shown in FIG. 4, an angle shape as shown in FIG. 6A, and a T shape as shown in FIG. 6B. Deformation of the support 40 can be prevented.
다음, 상기 일측 제1 I형강빔(10)에 설치된 수직브라켓(30)의 하측과 타측에 설치된 제2 I형강빔(12)의 수직브라켓(32)의 하측 사이에 가로지지대(40)를 위치시 키고 결합수단을 이용하여 결합하는 단계에서, 상기 일측 제1 I형강빔(10) 및 타측 제1 I형강빔(10)에 설치된 각각의 수직브라켓(30) 하측의 결합구멍(31)과 상기 가로지지대(40)의 양단부에 형성된 결합구멍(41)을 맞춰 고장력 볼트(16)와 너트(18)로 결합하여 고정한다.Next, the horizontal support 40 is positioned between the lower side of the vertical bracket 30 installed on the one side first I-beam 10 and the lower side of the vertical bracket 32 of the second I-beam 12 provided on the other side. In the step of coupling using a coupling means, the coupling hole 31 and the lower side of each vertical bracket 30 installed in the one side first I-beam 10 and the other side first I-beam 10 The coupling holes 41 formed at both ends of the horizontal support 40 are fitted to be fixed by engaging with the high tension bolt 16 and the nut 18.
다음, 상기 제1 I형강빔(10)과 제2 I형강빔(12)의 수직브라켓(30) 사이에 각각 설치된 가로지지대(40)에서, 적어도 2개 이상의 수직보강편(42)이 부착된 부위의 하부에 각각 유압잭(50)을 설치하고, 상기 유압잭(50)의 상부에 받침판(52)을 올려놓는 단계는, 상기 가로지지대(40)의 수직보강편(42)이 부착된 부위의 하부에 받침판(52)을 받치는 것은 가로지지대(40)의 손상을 방지하고 교량 상부 하중을 상기 받침판(52)에서 분산하여 강판빔구조물(200)을 포함한 상부 구조물을 효율적으로 인상할 수 있게 한다.Next, in the horizontal support 40 respectively provided between the vertical bracket 30 of the first I-beam 10 and the second I-beam 12, at least two or more vertical reinforcing pieces 42 are attached Installing the hydraulic jack 50 at the lower part of the site, and placing the supporting plate 52 on the upper part of the hydraulic jack 50, the lower part of the site where the vertical reinforcing piece 42 of the horizontal support 40 is attached Supporting the support plate 52 to prevent the damage of the cross support 40 and to distribute the bridge upper load from the support plate 52 to be able to efficiently raise the upper structure including the steel plate beam structure 200.
다음, 상기에서 설치된 유압잭(50)들을 동시에 상승시켜 강판빔구조물(200)을 포함한 강판형교의 상부구조물을 인상하는 단계는, 도8과 같이 상기에서 설치된 유압잭(50)들을 동시에 상승시켜 강판빔구조물(200)을 포함한 강판형교의 상부구조물을 인상하고 교좌장치(24)를 보수하거나 교체하게 되는 것이다.Next, the step of raising the upper structure of the steel plate bridge including the steel plate beam structure 200 by simultaneously raising the hydraulic jacks 50 installed in the above, as shown in Figure 8 by simultaneously lifting the hydraulic jacks 50 installed in the steel plate beam structure Raising the upper structure of the steel plate bridge including the 200 and to repair or replace the bridge device (24).
그리고, 본 발명의 다른 실시예로서 상기 수직브라켓(30)은 상기 제1 I형강빔(10) 및 제2 I형강빔(12)의 내측에 수직방향으로 2개를 나란히 각각 결합하고, 상기 수직브라켓(30)과 수직브라켓(30) 사이에는 가로방향으로 결합되는 긴 직사각형의 가로지지대(40) 2개를 각각 결합하여 가로지지대를 더 견고하게 구성할 수도 있다.In addition, as another embodiment of the present invention, the vertical brackets 30 are coupled to each other in the vertical direction to the inside of the first I-beam 10 and the second I-beam 12, respectively, side by side, the vertical Between the bracket 30 and the vertical bracket 30 may be combined with each of the two long rectangular horizontal support 40 which is coupled in the horizontal direction to configure the horizontal support more firmly.
그리고, 상기 강판형교에서 간혹 곡선 구간이 생기게 되는데, 이 경우에는 연단거리가 부족하여 교각 상면에 유압잭(50)을 설치할 수 없으므로 본 발명의 가로지지대(40)를 인상할 수 없는 경우가 생긴다. In addition, sometimes the curved section is generated in the steel plate girder bridge, in this case, because the shortage distance is insufficient, the hydraulic jack 50 can not be installed on the upper surface of the piers can not raise the horizontal support 40 of the present invention.
이 경우에 도10에서와 같이 유압잭 고정봉(62)이 구비된 유압잭 받침용 브라켓(60)을 교각(100)의 측면에 앵커볼트(64)로 설치하고, 상기 유압잭 받침용 브라켓(60)의 고정봉(62)에 유압잭(50)의 저부 구멍(도시하지 않음)을 끼워 고정한 후 본 발명의 가로지지대(40)를 인상하면 된다.In this case, as shown in FIG. 10, the hydraulic jack support bracket 60 having the hydraulic jack fixing rod 62 is installed as an anchor bolt 64 on the side of the piers 100, and the hydraulic jack support bracket 60 is provided. After fixing the bottom hole (not shown) of the hydraulic jack 50 to the fixing rod 62, the horizontal support 40 of the present invention may be raised.
본 발명의 강판형교의 상부구조물 인상구조는,The upper structure pulling structure of the steel sheet bridge of the present invention,
교각 상면의 일측에 설치된 제1 I형강빔(10)과 상기 제1 I형강빔(10)에서 일정거리 떨어져 타측에 설치된 제2 I형강빔(12)의 양단부에 수직방향으로 형성된 다수개의 결합구멍(14)과;A plurality of coupling holes formed at both ends of the first I-beam beam 10 provided on one side of the pier upper surface and the second I-beam beam 12 provided on the other side at a predetermined distance away from the first I-beam beam 10 (14);
상기 제1 I형강빔(10) 및 제2 I형강빔(12)의 결합구멍(14)의 내측에 결합되는 결합구멍(31)이 형성된 적어도 하나 이상의 수직브라켓(30)과;At least one or more vertical brackets (30) having coupling holes (31) formed inside the coupling holes (14) of the first I-beam beams (10) and the second I-beam beams (12);
상기 수직브라켓(30)과 수직브라켓(30) 사이의 하측에서 가로방향으로 결합되는 양단부에 결합구멍(41)을 구비한 긴 직사각형 형상의 가로지지대(40)와;A horizontal rectangular support 40 having a long rectangular shape having coupling holes 41 at both ends thereof coupled in the horizontal direction from the bottom side between the vertical bracket 30 and the vertical bracket 30;
상기 가로지지대(40)에서 유압잭(50)이 당접하는 부위를 보강하기 위하여 용접 부착되는 적어도 2개 이상의 수직보강편(42)과;At least two or more vertical reinforcing pieces (42) welded to reinforce a portion of the horizontal support (40) where the hydraulic jack (50) abuts;
상기 가로지지대(40)의 수직보강편(42)이 부착된 부위의 하부에 설치되는 유압잭(50)과;A hydraulic jack 50 installed at a lower portion of the vertical reinforcing piece 42 of the horizontal support 40;
상기 유압잭(50)의 상부에 설치되어 상부 하중을 분산시키는 받침판(52)으로 이루어져 상기 설치된 유압잭(50)들을 동시에 상승시켜 강판형교의 상부구조물을 인상하는 강판형교의 상부구조물 인상구조로 이루어진다. The hydraulic jack 50 is provided on the upper portion of the hydraulic jack 50 to distribute the upper load is made up of the lifting structure of the upper structure of the steel plate bridge to raise the upper structure of the steel plate bridge by simultaneously raising the installed hydraulic jack 50.
먼저, 교각 상면의 일측에 설치된 제1 I형강빔(10)과 상기 제1 I형강빔(10)에서 일정거리 떨어져 타측에 설치된 제2 I형강빔(12)의 양단부에 수직방향으로 형성된 다수개의 결합구멍(14)은 적어도 하나 이상의 수직브라켓(30)을 결합할 수 있도록 드릴로 수직방향으로 결합구멍(14)을 천공한다.First, a plurality of first I-beams 10 provided on one side of the upper surface of the bridge and the second I-beams 12 provided on the other side at a predetermined distance away from the first I-beams 10 are formed in the vertical direction The coupling hole 14 drills the coupling hole 14 in the vertical direction with a drill so as to couple the at least one vertical bracket 30.
상기 제1 I형강빔(10) 및 제2 I형강빔(12)의 결합구멍(14)의 내측에 결합되는 결합구멍(31)이 형성된 적어도 하나 이상의 수직브라켓(30)은, 앵글형 수직브라켓(30) 또는 T형 수직브라켓(30)이 바람직하지만, 상기 형상에 한정되는 것은 아니다.At least one vertical bracket 30 having a coupling hole 31 coupled to the inner side of the coupling hole 14 of the first I-beam beam 10 and the second I-beam beam 12 is an angle-type vertical bracket ( 30) or the T-type vertical bracket 30 is preferred, but is not limited to the above shape.
상기 수직브라켓(30)과 수직브라켓(30) 사이의 하측에서 가로방향으로 결합되는 긴 직사각형 형상의 가로지지대(40)는, 상기 수직브라켓(30)에 결합할 수 있도록 양단부에 다수개의 결합구멍(41)이 천공되어 있다.The horizontal support 40 having a long rectangular shape that is horizontally coupled from the bottom side between the vertical bracket 30 and the vertical bracket 30 has a plurality of coupling holes at both ends thereof so as to be coupled to the vertical bracket 30. 41) is perforated.
상기 가로지지대(40)에서 유압잭(50)이 당접하는 부위를 보강하기 위하여 용접 부착되는 수직보강편(42)은, 판형 수직보강편(42), 앵글형 수직보강편(42) 또는 T형 수직보강편(42)으로 형성할 수 있으나, 상기 형상에 한정되는 것은 아니다.The vertical reinforcing piece 42 welded to reinforce the portion where the hydraulic jack 50 abuts on the horizontal support 40 is a plate type vertical reinforcing piece 42, an angle type vertical reinforcing piece 42 or a T type vertical reinforcing piece. It may be formed as a piece 42, but is not limited to the above shape.
그리고, 본 발명의 다른 실시예로서 상기 수직브라켓(30)은 상기 제1 I형강빔(10) 및 제2 I형강빔(12)의 내측에 수직방향으로 2개가 나란히 각각 결합되고, 상기 수직브라켓(30)과 수직브라켓(30) 사이에는 가로방향으로 결합되는 긴 직사각형의 가로지지대(40) 2개를 각각 결합하여 가로지지대를 더 견고하게 구성할 수도 있다.In addition, as another embodiment of the present invention, the vertical brackets 30 are coupled to each other in the vertical direction to the inside of the first I-beam 10 and the second I-beam 12, respectively, side by side, the vertical bracket Between the 30 and the vertical bracket 30 may be combined with each of the two long rectangular horizontal support (40) coupled in the horizontal direction to configure the horizontal support more firmly.
상기 가로지지대(40)의 수직보강편(42)이 부착된 부위의 하부에 설치되는 유압잭(50)과, 상기 유압잭(50)의 상부에 설치되어 상부 하중을 분산시키는 받침판(52)으로 이루어져 있는데, 상기 받침판(52)은 강판빔구조물(200)을 포함한 상부 하중을 분산시키는 역할을 한다.The hydraulic jack 50 is installed on the lower portion of the vertical reinforcing piece 42 is attached to the horizontal support 40, and the support plate 52 is installed on the upper portion of the hydraulic jack 50 to distribute the upper load The support plate 52 serves to disperse the upper load including the steel plate beam structure 200.
다음, 상기 설치된 유압잭(50)들을 동시에 상승시켜 강판빔구조물(200)을 포함한 강판형교의 상부구조물을 인상하는 강판형교의 상부구조물 인상구조로 이루어진다. Next, the hydraulic jacks 50 are installed at the same time to raise the upper structure of the steel plate bridge to raise the upper structure of the steel plate bridge including the steel plate beam structure 200.
그리고, 상기 강판형교에서 간혹 곡선 구간이 생기게 되는데, 이 경우에는 연단거리가 부족하여 교각 상면에 유압잭(50)을 설치할 수 없으므로 본 발명의 가로지지대(40)를 인상할 수 없는 경우가 생긴다. In addition, sometimes the curved section is generated in the steel plate girder bridge, in this case, because the shortage distance is insufficient, the hydraulic jack 50 can not be installed on the upper surface of the piers can not raise the horizontal support 40 of the present invention.
이 경우에 도10에서와 같이 유압잭 고정봉(62)이 구비된 유압잭 받침용 브라켓(60)을 교각(100)의 측면에 앵커볼트(64)로 설치하고, 상기 유압잭 받침용 브라켓(60)의 고정봉(62)에 유압잭(50)의 저부 구멍(도시하지 않음)을 끼워 고정한 후 본 발명의 가로지지대(40)를 인상하면 된다.In this case, as shown in FIG. 10, the hydraulic jack support bracket 60 having the hydraulic jack fixing rod 62 is installed as an anchor bolt 64 on the side of the piers 100, and the hydraulic jack support bracket 60 is provided. After fixing the bottom hole (not shown) of the hydraulic jack 50 to the fixing rod 62, the horizontal support 40 of the present invention may be raised.
도1은 일반적인 강판형교의 사시도.1 is a perspective view of a general steel plate bridge.
도2는 일반적인 강판형교의 정면도.2 is a front view of a general steel plate bridge.
도3은 본 발명을 강판형교에 적용한 상태의 사시도(브레이스 생략).3 is a perspective view of a state in which the present invention is applied to a steel plate bridge (brace omitted).
도4는 도3의 일부 확대 사시도.4 is a partially enlarged perspective view of FIG. 3;
도5a,b는 본 발명 수직브라켓의 실시예의 사시도.Figure 5a, b is a perspective view of an embodiment of the vertical bracket of the present invention.
도6a,b는 본 발명 수직보강편의 실시예의 사시도.Figure 6a, b is a perspective view of an embodiment of the present invention vertical reinforcement piece.
도7은 본 발명을 강판형교에 적용한 상태의 정면도(브레이스 생략).Fig. 7 is a front view of a state in which the present invention is applied to a steel sheet bridge (brace omitted).
도8은 도7에서 유압잭을 상승시켜 상부구조물을 인상한 상태의 정면도.8 is a front view of a state in which the hydraulic jack is raised to raise the upper structure in FIG.
도9는 형하공간이 부족한 경우에 본 발명을 강판형교에 적용한 상태의 정면도.Fig. 9 is a front view of a state in which the present invention is applied to a steel sheet bridge when the mold space is insufficient.
도10은 곡선 강판형교에서 연단거리가 부족한 경우에 교각의 측면에 유압잭 받침용 브라켓을 설치한 상태의 사시도.Figure 10 is a perspective view of the hydraulic jack support brackets installed on the side of the piers when the shortage distance in the curved steel sheet girder bridge.
<도면의 주요 부분에 대한 부호의 설명><Explanation of symbols for the main parts of the drawings>
10:제1 I형강빔 12:제2 I형강빔 10: first type I beam 12: second type I beam
14: 결합구멍 30: 수직브라켓 14: coupling hole 30: vertical bracket
40: 가로지지대 42: 수직보강편40: horizontal support 42: vertical reinforcement
50: 유압잭 200: 강판빔구조물50: hydraulic jack 200: steel plate beam structure

Claims (7)

  1. 교각 상면의 일측에 설치된 제1 I형강빔(10)과 상기 제1 I형강빔(10)에서 일정거리 떨어져 타측에 설치된 제2 I형강빔(12)의 양단부에 수직방향으로 다수개의 결합구멍(14)을 천공하는 단계와;A plurality of coupling holes in the vertical direction at both ends of the first I-beam beam 10 provided on one side of the pier upper surface and the second I-beam beam 12 provided on the other side away from the first I-beam beam 10 by a predetermined distance ( Perforating 14);
    상기에서 천공된 제1 I형강빔(10)과 제2 I형강빔(12)의 결합구멍(14)에 결합구멍(31)이 형성된 적어도 하나 이상의 앵글형 수직브라켓(30)을 결합수단을 이용하여 제1 I형강빔(10)과 제2 I형강빔(12)의 내측에 각각 결합하는 단계와;At least one angle-type vertical bracket 30 having a coupling hole 31 formed in the coupling hole 14 of the first I-beam beam 10 and the second I-beam beam 12 drilled in the above is used by a coupling means. Coupling inside the first I-beam 10 and the second I-beam 12, respectively;
    상기 앵글형 수직브라켓(30)에 가로방향으로 결합되는 가로지지대(40)에서 유압잭(50)이 당접하는 부위에 적어도 2개 이상의 판형 수직보강편(42)을 부착수단을 이용하여 부착하여 가로지지대(40)를 보강하는 단계와;At least two or more plate-shaped vertical reinforcing pieces 42 are attached to a portion where the hydraulic jack 50 abuts on the horizontal support 40 which is horizontally coupled to the angle type vertical bracket 30 by using an attachment means. 40) reinforcing;
    상기 일측 제1 I형강빔(10)에 설치된 앵글형 수직브라켓(30)과 타측에 설치된 제2 I형강빔(12)의 앵글형 수직브라켓(30)의 사이에 상기 가로지지대(40)를 위치시키고, 상기 수직브라켓(30)의 결합구멍(31)과 상기 가로지지대(40)의 결합구멍(41)을 맞추고 결합수단을 이용하여 결합하는 단계와;Position the horizontal support 40 between the angle-type vertical bracket 30 installed on the one side first I-beam 10 and the angle-shaped vertical bracket 30 of the second I-beam 12 provided on the other side, Aligning the coupling holes 31 of the vertical bracket 30 with the coupling holes 41 of the horizontal support 40 and using the coupling means;
    상기 제1 I형강빔(10)과 제2 I형강빔(12)의 양단부 사이에 설치된 가로지지대(40)에서, 판형 수직보강편(42)이 부착된 부위의 하부에 유압잭(50)을 설치하고, 상기 유압잭(50)의 상부에 상부 하중을 분산하기 위하여 받침판(52)을 올려놓는 단계와;In the horizontal support 40 installed between the both ends of the first I-beam 10 and the second I-beam 12, the hydraulic jack 50 is installed in the lower portion of the plate-shaped vertical reinforcement piece 42 is attached And, the step of placing the support plate (52) to distribute the upper load on the upper portion of the hydraulic jack (50);
    상기에서 설치된 유압잭(50)들을 동시에 상승시켜 강판빔구조물(200)을 포함한 강판형교의 상부구조물을 인상하는 강판형교의 상부구조물 인상방법.Lifting the hydraulic jacks (50) installed in the above at the same time to raise the upper structure of the steel sheet bridge bridge including the steel plate beam structure 200.
  2. 제1항에 있어서, 상기에서 천공된 제1 I형강빔(10)과 제2 I형강빔(12)의 결합구멍(14)에 결합구멍(31)이 형성된 2개의 앵글형 수직브라켓(30)을 제1 I형강빔(10)과 제2 I형강빔(12)의 내측에 수직방향으로 나란히 각각 결합하고, 상기 2개의 앵글형 수직브라켓(30)과 상기 2개의 앵글형 수직브라켓(30)의 사이에 적어도 2개 이상의 판형 수직보강편(42)이 부착된 2개의 가로지지대(40)를 각각 위치시키고, 결합수단을 이용하여 결합하여 이루어지는 강판형교의 상부구조물 인상방법.The two angle type vertical brackets 30 according to claim 1, wherein the coupling holes 31 are formed in the coupling holes 14 of the first I-beam beam 10 and the second I-beam beam 12, respectively. The inner side of the first I-beam beam 10 and the second I-beam beam 12 is coupled to each other in a vertical direction, and between the two angled vertical brackets 30 and the two angled vertical brackets 30, respectively. At least two plate-shaped vertical reinforcing piece (42) is positioned, each of the two horizontal support 40 is attached, and the upper structure of the steel structure bridge is made by coupling using a coupling means.
  3. 교각 상면의 일측에 설치된 제1 I형강빔(10)과 상기 제1 I형강빔(10)에서 일정거리 떨어져 타측에 설치된 제2 I형강빔(12)의 양단부에 수직방향으로 형성된 다수개의 결합구멍(14)과;A plurality of coupling holes formed at both ends of the first I-beam beam 10 provided on one side of the pier upper surface and the second I-beam beam 12 provided on the other side at a predetermined distance away from the first I-beam beam 10 (14);
    상기 제1 I형강빔(10) 및 제2 I형강빔(12)의 결합구멍(14)의 내측에 결합되는 결합구멍(31)이 형성된 적어도 하나 이상의 앵글형 수직브라켓(30)과;At least one angled vertical bracket (30) having a coupling hole (31) coupled to the inner side of the coupling hole (14) of the first I-beam beam (10) and the second I-beam beam (12);
    상기 앵글형 수직브라켓(30)과 앵글형 수직브라켓(30) 사이의 하측에서 가로방향으로 결합되는 긴 직사각형 형상의 가로지지대(40)와;A horizontal support 40 having a long rectangular shape that is coupled in a horizontal direction from the bottom side between the angle type vertical bracket 30 and the angle type vertical bracket 30;
    상기 가로지지대(40)에서 유압잭(50)이 당접하는 부위를 보강하기 위하여 용접 부착되는 적어도 2개 이상의 판형 수직보강편(42)과;At least two or more plate-shaped vertical reinforcing pieces (42) welded to reinforce a portion where the hydraulic jack (50) abuts on the horizontal support (40);
    상기 가로지지대(40)의 판형 수직보강편(42)이 부착된 부위의 하부에 설치되는 유압잭(50)과;A hydraulic jack (50) installed at a lower portion of the portion where the plate-shaped vertical reinforcing piece (42) of the horizontal support (40) is attached;
    상기 유압잭(50)의 상부에 설치되어 상부 하중을 분산시키는 받침판(52)으로 이루어져 상기 설치된 유압잭(50)들을 동시에 상승시켜 강판빔구조물(200)을 포함한 강판형교의 상부구조물을 인상하는 강판형교의 상부구조물 인상구조.Steel plate bridge is formed on the hydraulic jack 50 of the support plate 52 for dispersing the upper load to raise the installed hydraulic jack 50 at the same time to raise the upper structure of the steel plate bridge including the steel plate beam structure 200 Superstructure impression structure.
  4. 삭제delete
  5. 제3항에 있어서, 상기 앵글형 수직브라켓(30)은 상기 제1 I형강빔(10)과 제2 I형강빔(12)의 내측에 수직방향으로 2개가 나란히 각각 결합되고, 상기 2개의 앵글형 수직브라켓(30)과 앵글형 수직브라켓(30) 사이에는 적어도 2개 이상의 판형 수직보강편(42)이 부착된 가로지지대(40) 2개가 각각 결합되는 강판형교의 상부구조물 인상구조.According to claim 3, The angle-type vertical bracket 30 is coupled to each other in a vertical direction to the inside of the first I-beam 10 and the second I-beam 12, respectively, the two angled vertical The upper structure of the steel sheet bridge bridge structure is coupled between the bracket 30 and the angled vertical bracket 30, each of the two horizontal support (40) to which at least two or more plate-shaped vertical reinforcement pieces 42 are attached.
  6. 삭제delete
  7. 삭제delete
KR1020080034107A 2008-04-14 2008-04-14 Method for raising a bridge and the raising structure there of KR101004795B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020080034107A KR101004795B1 (en) 2008-04-14 2008-04-14 Method for raising a bridge and the raising structure there of

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020080034107A KR101004795B1 (en) 2008-04-14 2008-04-14 Method for raising a bridge and the raising structure there of

Publications (2)

Publication Number Publication Date
KR20090108810A KR20090108810A (en) 2009-10-19
KR101004795B1 true KR101004795B1 (en) 2011-01-04

Family

ID=41552180

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020080034107A KR101004795B1 (en) 2008-04-14 2008-04-14 Method for raising a bridge and the raising structure there of

Country Status (1)

Country Link
KR (1) KR101004795B1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105507126A (en) * 2015-12-17 2016-04-20 中铁第四勘察设计院集团有限公司 Magnetic suspension XRB rail transit double-line track beam
KR20210069771A (en) 2019-12-03 2021-06-14 한국철도기술연구원 Girder lifting apparatus using downward-jack and construction method therefor

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103938556B (en) * 2014-04-29 2016-02-24 长安大学 Concrete T-shaped cross section beam bridge Space Double K word supports horizontal intensifier
CN105421166B (en) * 2015-12-17 2017-09-29 中铁第四勘察设计院集团有限公司 Rail track traffic two-wire track girder is embraced in a kind of magnetic suspension
CN105568788B (en) * 2015-12-17 2017-09-29 中铁第四勘察设计院集团有限公司 Rail track traffic two-wire track girder is embraced in a kind of magnetic suspension
CN112064524A (en) * 2020-10-13 2020-12-11 上海同罡建筑工程有限公司 Reinforcing structure and method for jacking box girder

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20010099349A (en) * 2001-09-21 2001-11-09 김진수 Method and apparatus for replacing shoes in girder bridge
KR20040000051A (en) * 2002-06-21 2004-01-03 주식회사 솔세라믹 Particles for insulation material, and its production method
KR20040037310A (en) * 2002-10-28 2004-05-07 노윤근 Bracket for holding up bridge manufactured with steel plate and constructing method of bridge hold-up system the bracket
KR200400051Y1 (en) 2005-08-17 2005-11-01 지산공업 (주) The fabricated temporary bridge
KR20070111435A (en) * 2007-10-31 2007-11-21 우혜민 The bridge adjustable bearing for change off pc-beam puilling up system and the method

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20010099349A (en) * 2001-09-21 2001-11-09 김진수 Method and apparatus for replacing shoes in girder bridge
KR20040000051A (en) * 2002-06-21 2004-01-03 주식회사 솔세라믹 Particles for insulation material, and its production method
KR20040037310A (en) * 2002-10-28 2004-05-07 노윤근 Bracket for holding up bridge manufactured with steel plate and constructing method of bridge hold-up system the bracket
KR200400051Y1 (en) 2005-08-17 2005-11-01 지산공업 (주) The fabricated temporary bridge
KR20070111435A (en) * 2007-10-31 2007-11-21 우혜민 The bridge adjustable bearing for change off pc-beam puilling up system and the method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105507126A (en) * 2015-12-17 2016-04-20 中铁第四勘察设计院集团有限公司 Magnetic suspension XRB rail transit double-line track beam
KR20210069771A (en) 2019-12-03 2021-06-14 한국철도기술연구원 Girder lifting apparatus using downward-jack and construction method therefor

Also Published As

Publication number Publication date
KR20090108810A (en) 2009-10-19

Similar Documents

Publication Publication Date Title
KR101004795B1 (en) Method for raising a bridge and the raising structure there of
KR100707312B1 (en) Bridge jacking and repair method using safety system
KR100726163B1 (en) Apparatus for supporting an upper structure of a bridge
EP2148956A1 (en) Scaffold arrangement and method for repairing the edge structure of a concrete bridge
CN101839070A (en) Construction method for temporarily supporting and strengthening reinforced concrete structured beam by using steel column
KR20090001261A (en) Prestressed concrete girder bridge having connecting structure using steel bar, and constructing method thereof
KR100478701B1 (en) Pulling up, repair and reinforcement method for the upper structure of a bridge
KR101066837B1 (en) Lifting and bearing apparatus preventing fracture on the pier or abutment of bridge
KR101971274B1 (en) Bridge lifting apparatus and lifing method using it
KR101026012B1 (en) Bridge deck dismantling method by means of united pulling jack and pier
CN106400622A (en) Repair structure for plate type ballastless track in turnout zone
KR100780888B1 (en) Bracket structure for replacing the old shoe with new one continuously and method lifting the bridge slab
KR20040076348A (en) Apparatus and method for pulling up and prevention of falling down of bridge beam
KR100415768B1 (en) Process and frame for substituting steel girder of a railway bridge for concrete slab
KR20090027052A (en) Precast concrete panel, construction method and structure of precast concrete panel using steel plate
KR200439935Y1 (en) device of fixing tower crane for bridge
KR101605011B1 (en) Repair and Reinforcement method of lower structure of bridge
EP1835076A1 (en) Method and arrangement for moving a bridge
KR100478702B1 (en) Successively replacement method of the upper structure of a bridge
KR20020025131A (en) Apparatus and method for repairing and reinforcing bridge by using truss members
KR100452495B1 (en) The support and pulling up method using support and pulling up bracket for bridge up structure repair and reinforcement pulling up apparatus, and this
JP6180376B2 (en) Main girder provision method in composite girder floor slab replacement method, composite girder floor slab replacement method, and main girder provision structure in composite girder floor slab replacement method
KR100944007B1 (en) The bridge adjustable bearing for change off PC-beam puilling up system and the method
KR200290739Y1 (en) Jacking system of bridge repair
JP5020163B2 (en) Support for overhanging slab

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20131025

Year of fee payment: 4

FPAY Annual fee payment

Payment date: 20141222

Year of fee payment: 5

FPAY Annual fee payment

Payment date: 20151007

Year of fee payment: 6

FPAY Annual fee payment

Payment date: 20161103

Year of fee payment: 7

FPAY Annual fee payment

Payment date: 20171222

Year of fee payment: 8

FPAY Annual fee payment

Payment date: 20181031

Year of fee payment: 9

FPAY Annual fee payment

Payment date: 20191030

Year of fee payment: 10