KR200260683Y1 - Movable a mold for operation of retaining wall - Google Patents
Movable a mold for operation of retaining wall Download PDFInfo
- Publication number
- KR200260683Y1 KR200260683Y1 KR2020010032049U KR20010032049U KR200260683Y1 KR 200260683 Y1 KR200260683 Y1 KR 200260683Y1 KR 2020010032049 U KR2020010032049 U KR 2020010032049U KR 20010032049 U KR20010032049 U KR 20010032049U KR 200260683 Y1 KR200260683 Y1 KR 200260683Y1
- Authority
- KR
- South Korea
- Prior art keywords
- retaining wall
- support beam
- steel panel
- concrete
- rail
- Prior art date
Links
Landscapes
- Retaining Walls (AREA)
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
Abstract
본 고안은 옹벽시공을 위한 이동식 거푸집에 관한 것으로서, 종래의 거푸집은 자재가 많이 소모되며 구간을 이동할 때 마다 거푸집의 조립 및 해체를 반복해야 함에 따라 공사기간이 오래 걸리고 작업성이 불량하며 품질 또한 저하되었다.The present invention relates to a movable formwork for the retaining wall construction, the conventional formwork takes a lot of material, and as the assembly and disassembly of the form must be repeated every time the section is moved, the construction takes a long time, poor workability, and also deteriorates the quality. It became.
따라서 본 고안은 받침목에 받쳐지는 하부레일(120)과, 저면에 로울러(141)가 설치되며 연결빔(150)으로 연결되어 있는 지지빔(140)과, 상기 지지빔(140)의 상부를 연결하는 상부레일(130)과, 기초콘크리트(200)의 상면에 한쌍을 이루면서 세워진 상태로 설치되며 바깥면에는 지지빔(140)과 턴버클(170)로 고정되는 철재판넬(110)과, 상기 상부레일(130)을 감싸는 가이드(161)의 상부 내면에는 로울러 (162)가 설치되고 저면은 상기 철재판넬(110)의 상면과 볼트(163)와 핸들 (164)에 의해 연결된 높이조절장치(160)와, 작업대(180)를 구성하므로서, 하부레일 (120)을 따라 지지빔(140)이 구간별로 움직이면서 철재판넬(110) 사이로 콘크리트가 타설되어 옹벽의 한 구간을 완성시키고 이 후 지지빔(140)을 다음 구간으로 간단히 이동시킨 뒤 다음 구간을 연이어 완성시킬 수 있도록 함에 따라 인력소모를 줄이고 자재의 절감 및 옹벽시공을 신속하고 효율적으로 할 수 있는 것이다.Therefore, the present invention supports the lower rail 120 supported by the support neck, the roller 141 is installed on the bottom surface, the support beam 140 is connected to the connection beam 150 and the upper portion of the support beam 140 The upper rail 130 and the base concrete is installed in a state standing in pairs on the upper surface of the concrete 200, and the outer panel is fixed to the steel panel 110 and the turnbuckle 170 and the upper rail, The upper inner surface of the guide 161 surrounding the 130 is installed a roller 162 and the bottom is the height adjusting device 160 connected by the upper surface and the bolt 163 and the handle 164 of the steel panel 110 and , By constructing the working table 180, the support beam 140 is moved along the lower rail 120 for each section, concrete is poured between the steel panel 110 to complete a section of the retaining wall and then the support beam 140 Simply move to the next section and then complete the next section Therefore, it is possible to reduce manpower consumption and to save materials and construct retaining walls quickly and efficiently.
Description
본 고안은 토압력(土壓力)에 저항하여 흙이 무너지지 못하게 만든 벽체(壁體)인 옹벽 시공용 거푸집에 관한 것으로, 더욱 상세히는 옹벽을 거푸집으로서 구간별로 축조함에 있어 거푸집을 구간에 따라 간단히 이동시키면서 옹벽의 시공을 간단하고 저렴하며 용이하게 할 수 있도록 하므로서 제작에 따른 비용의 절감효과와 제작성의 향상효과를 얻을 수 있도록 한 옹벽시공을 위한 이동식 거푸집에 관한 것이다.The present invention relates to a retaining wall construction formwork, which is a wall that resists earth pressure and prevents soil from collapsing. More specifically, the formwork is simply moved along a section in the construction of retaining walls by section. The present invention relates to a movable formwork for a retaining wall construction, which allows the construction of the retaining wall to be simple, inexpensive, and easy, and thus obtains a cost reduction effect and an improvement in manufacturability.
일반적으로 옹벽은 땅을 깎거나 흙을 쌓아 생기는 비탈면이 흙의 압력으로 무너져 내리지 않도록 하거나, 도로 및 단지 축조공사시 높이차이를 해결하기 위하여 만든 벽이며, 이러한 옹벽을 거푸집으로 제작하는 방법은 다음과 같다.In general, the retaining wall is a wall made to prevent the slope surface caused by cutting the soil or the soil from falling down due to the pressure of the soil, or to solve the height difference during the construction of roads and complexes. same.
즉, 도 1 은 종래의 거푸집을 이용하여 옹벽의 한 구간을 시공하는 상태를 도시한 단면도로서, 이에 도시한 바와 같이 종래의 거푸집은 옹벽을 시공하기 위한 기초콘크리트(20)의 상면으로 서로 일정한 간격을 유지하는 한쌍의 목재합판(11)이 세워진 상태로 위치되며, 상기 각각의 목재합판(11) 바깥면에는 종방향의 세로지지대(12)와 횡방향의 가로지지대(13)가 격자상으로 결합되고 상기 가로지지대(13)에는 지면과 버팀목(16)으로 연결되며 버팀목(16)의 지면쪽 끝단에는 밀림방지목(17)이 설치된다.That is, Figure 1 is a cross-sectional view showing a state of constructing a section of the retaining wall using a conventional formwork, as shown in the conventional formwork at regular intervals from each other to the upper surface of the foundation concrete 20 for the construction of the retaining wall A pair of wood plywood 11 to maintain the position is placed in the standing state, the longitudinal support 12 in the longitudinal direction and the horizontal support 13 in the transverse direction are coupled to the grid on each outer side of the wood plywood 11 The horizontal support 13 is connected to the ground and the crutch 16, and the thrust block 17 is installed at the end of the ground side of the crutch 16.
또한 목재합판(11)의 바깥면 양쪽에는 각각 조립식 비계(15)가 설치되며 상기 조립식 비계(15)의 상면에는 작업대(14)가 설치되어 작업자가 상기 작업대(14)에서 콘크리트 타설 등의 작업을 수행할 수 있도록 한것이다.In addition, prefabricated scaffolds 15 are installed on both sides of the outer surface of the wood plywood 11, and a workbench 14 is installed on the upper surface of the prefabricated scaffolding 15 so that a worker can perform concrete work on the workbench 14. This is what you can do.
그러나 상기와 같은 종래의 옹벽시공은 목재합판(11)에 가로지지대(13)와 세로지지대(12)를 설치해야 하며 버팀목(16)으로 목재합판(11)을 지지해주어야 하고 콘크리트 타설 등을 위하여 비계(15)와 작업대(14)를 조립해야 하며, 옹벽의 한 구간을 완성한 다음에는 거푸집을 다시 분리하여 다음 구간으로 이동시키고 다시 거푸집을 조립하여 공사를 진행해야 함에 따라 전체적인 작업성이 불량함은 물론 공사기간이 오래 걸리고 자재와 인력이 많이 소모되며 목재합판(11)의 간격이 단순히 버팀목(16)에 의해서만 지지됨에 따라 옹벽의 두께나 표면이 고르지 못하면서 옹벽의 전체적인 품질이 저하되는 문제점이 있었다.However, in the conventional retaining wall construction as described above, the horizontal support 13 and the vertical support 12 should be installed on the wood plywood 11, and the support 16 should support the wood plywood 11 with the support 16 and the scaffolding for concrete placement. (15) and the work table 14 should be assembled, and after completing one section of the retaining wall, the formwork should be separated and moved to the next section, and the formwork should be assembled again to proceed with construction. As the construction takes a long time and consumes a lot of materials and manpower, and the gap of the wood plywood 11 is supported only by the shoring 16, there is a problem that the overall quality of the retaining wall is deteriorated while the thickness or surface of the retaining wall is uneven.
따라서 본 고안의 목적은 상기와 같은 문제점을 해결하기 위한 것으로서, 레일을 따라 이동되는 철재판넬으로 거푸집을 제작하여 전체적인 공사기간을 단축시킬 수 있도록 하고 인력과 자재를 적게 사용하면서 옹벽의 품질 또한 향상시킬 수 있도록 한 옹벽 시공을 위한 이동식 거푸집을 제공하는데 있다.Therefore, the object of the present invention is to solve the problems as described above, to form a formwork with a steel panel moved along the rail to reduce the overall construction period and to improve the quality of the retaining wall while using less manpower and materials It is to provide a movable formwork for the construction of retaining wall.
이와 같은 본 고안의 목적은 기초콘크리트를 따라 양쪽에 위치되며 받침목에 받쳐지는 하부레일과, 상기 하부레일을 따라 이동될 수 있도록 저면에는 로울러가 설치되어 있고 하부레일의 전방 양측과 후방 양측에 위치되면서 전방과 후방은 연결빔으로 서로 연결되어 있는 지지빔과, 상기 전방의 양 지지빔과 후방의 양 지지빔의 상부를 연결하는 상부레일과, 상기 기초콘크리트의 상면에 한쌍을 이루면서 세워진 상태로 설치되며 바깥면에는 지지빔과 다수의 턴버클에 의해 연결되는 철재판넬과, 상기 상부레일을 감싸는 가이드의 상부 내면에는 로울러가 설치되어 상부레일을 따라 가이드가 이동될 수 있도록 하고 가이드의 저면은 상기 철재판넬의 상면과 볼트와 핸들에 의해 연결되어 핸들의 회전에 따라 철재판넬이 승하강이 될 수 있도록 한 높이조절장치와, 전방의 지지빔과 후방의 지지빔의 사이에 설치되는 작업대를 구성하므로서 달성되는 것이다.The purpose of the present invention is located on both sides along the foundation concrete and the lower rail supported by the support, and the roller is installed on the bottom so that it can be moved along the lower rail and located on both front and rear sides of the lower rail The front and the rear are installed in pairs on the support beams connected to each other by a connecting beam, the upper rails connecting upper portions of both the support beams in the front and both support beams in the rear, and the upper surface of the foundation concrete. The outer surface of the steel panel is connected by a support beam and a plurality of turnbuckles, the upper inner surface of the guide surrounding the upper rail is provided with a roller to move the guide along the upper rail and the bottom of the guide of the steel panel Connected by the upper surface and bolt and handle, the height of steel panel can be raised or lowered as the handle is rotated. This is achieved by configuring a control device and a workbench provided between the front support beam and the rear support beam.
이러한 본 고안은 하부레일을 따라 전방 지지빔과 후방지지빔이 함께 구간별로 움직이게 되면서 지지빔의 내면과 턴버클로 고정된 양쪽 철재판넬 사이로 콘크리트가 타설되어 옹벽의 한 구간을 완성시킬 수 있고 이 후 지지빔을 다음 구간으로 간단히 이동시킨 뒤 옹벽의 다른 구간을 연이어 완성시킬 수 있도록 함에 따라 옹벽을 구간별로 완성하기 위하여 거푸집을 구간별로 조립 및 해체를 반복하던 종래와는 달리 인력소모를 줄이고 자재의 절감 및 옹벽시공을 신속하고 효율적으로 할 수 있으며 철제합판을 이용하여 옹벽의 품질을 향상시킬 수 있으므로 상기 목적을 달성할 수 있는 것이다.In this invention, the front support beam and the rear support beam move together along the lower rail by section, and concrete is poured between the inner surface of the support beam and both steel panels fixed by the turnbuckle to complete a section of the retaining wall. Unlike simply moving the beam to the next section and completing the other sections of the retaining wall in succession, as compared to the conventional method of assembling and disassembling the formwork by section to complete the retaining wall by section, it reduces manpower consumption and saves materials and The construction of the retaining wall can be achieved quickly and efficiently, and the above object can be achieved because the quality of the retaining wall can be improved by using an iron laminate.
도 1 은 본 고안에 따른 종래의 거푸집을 도시한 단면도.1 is a cross-sectional view showing a conventional formwork according to the present invention.
도 2 는 본 고안에 따른 이동식 거푸집의 구성을 예시한 사시도.Figure 2 is a perspective view illustrating the configuration of a movable formwork according to the present invention.
도 3 은 본 고안에 따른 이동식 거푸집의 작동상태를 예시한 단면도.3 is a cross-sectional view illustrating an operating state of the movable formwork according to the present invention.
도 4 는 본 고안에 따른 이동식 거푸집의 다른 작동상태를 예시한 단면도.4 is a cross-sectional view illustrating another operating state of the movable formwork according to the present invention.
도 5 는 본 고안에 따른 이동식 거푸집의 또 다른 작동상태를 예시한 단면도.5 is a cross-sectional view illustrating another operating state of the movable formwork according to the present invention.
도면의 주요 부분에 대한 부호의 설명Explanation of symbols for the main parts of the drawings
110 : 철재판넬 120 : 하부레일110: steel panel 120: lower rail
121 : 받침목 130 : 상부레일121: support 130: upper rail
140 : 지지빔 141,162 : 로울러140: support beam 141,162: roller
150 : 연결빔 160 : 높이조절장치150: connection beam 160: height adjustment device
161 : 가이드 163 : 볼트161: Guide 163: Bolt
164 : 핸들 170 : 턴버클164 handle 170 turnbuckle
180 : 작업대180: worktable
이하, 본 고안의 특징을 효과적으로 달성할 수 있는 바람직한 실시 예로서 그 기술구성 및 작용효과를 첨부된 도면에 의하여 상세히 설명하면 다음과 같다.Hereinafter, with reference to the accompanying drawings, the technical configuration and operation effects as a preferred embodiment that can effectively achieve the features of the present invention as follows.
즉, 도 2 은 본 고안에 따른 이동식 거푸집의 구성을 예시한 사시도이며, 도3 은 이동식 거푸집의 철재판넬 간격이 조절된 후 그 사이로 콘크리트가 타설된 상태를 예시한 단면도이고, 도 4 는 도 3 에 의해 타설된 콘크리트가 양생된 후 턴버클을 이용하여 철재판넬을 옹벽으로부터 분리시키는 과정을 예시한 단면도이며, 도 5 는 이동식 거푸집을 다음 구간으로 이동시키기 위하여 철재판넬을 상측으로 들어올리는 상태를 예시한 단면도이다.That is, Figure 2 is a perspective view illustrating a configuration of a movable formwork according to the present invention, Figure 3 is a cross-sectional view illustrating a state in which concrete is poured between the steel panel spacing of the movable formwork, Figure 4 is After the concrete poured by the curing is a cross-sectional view illustrating a process of separating the steel panel from the retaining wall using a turnbuckle, Figure 5 illustrates a state of lifting the steel panel upward to move the movable formwork to the next section. It is a cross section.
이에 예시한 바와 같이 본 고안은 기초콘크리트의 상부로 일정한 두께의 옹벽을 구간별로 연이어 형성하기 위한 거푸집을 구성함에 있어서, 받침목(121)에 받쳐진 상태로 기초콘크리트(200)의 양쪽을 따라 설치되는 하부레일(120)과, 저면에는 상기 하부레일(120)을 따라 이동될 수 있는 로울러(141)가 설치되며 하부레일 (120)의 전방 양측과 후방 양측에 각각 세워진 상태로 위치되면서 전방과 후방은 상하의 연결빔(150)으로 서로 고정되어 있는 지지빔(140)과, 상기 전방의 양측 지지빔(140)과 후방의 양측 지지빔(140)의 상부를 서로 연결하고 있는 상부레일(130)과, 상기 기초콘크리트(200) 상면으로 일정한 간격을 유지하면서 세워진 상태로 설치되며 바깥면에는 상기 지지빔(140)의 내면과 다수의 턴버클(170)로 연결되어 있는 한쌍의 철재판넬(110)으로 구성된 것을 특징으로 하는 것이다.As exemplified in the present invention, in forming a formwork for successively forming a retaining wall having a predetermined thickness to the upper portion of the foundation concrete, sections are installed along both sides of the foundation concrete 200 in a state supported by the support wood 121. The lower rail 120 and the lower surface is provided with a roller 141 that can be moved along the lower rail 120, and the front and rear of the lower rail 120 is located in a standing state on both front and rear sides, respectively. A support beam 140 fixed to each other by upper and lower connection beams 150, an upper rail 130 connecting upper portions of both front support beams 140 and rear support beams 140 at the rear, The base concrete 200 is installed in a state of being installed while maintaining a constant interval and the outer surface consisting of a pair of steel panel 110 is connected to the inner surface of the support beam 140 and a plurality of turnbuckles (170).To a gong.
또한 상기 상부레일(130)을 감싸는 가이드(161)의 상부 내면에는 로울러 (162)가 설치되어 상부레일(130)을 따라 가이드(161)가 좌우로 이동될 수 있도록 하고 가이드(161)의 저면은 상기 철재판넬(110)의 상부와 핸들(164)이 설치된 볼트 (163)로서 연결되어 핸들(164)의 회전에 따라 철재판넬(110)이 상하로 이동될 수 있도록 한 높이조절장치(160)와, 전방의 지지빔(140)과 후방의 지지빔(140)의 사이에 설치되어 작업자의 작업공간이 되는 작업대(180)로서 이루어진 이동식 거푸집을 특징으로 하는 것이다.In addition, a roller 162 is installed on the upper inner surface of the guide 161 surrounding the upper rail 130 so that the guide 161 can be moved left and right along the upper rail 130 and the bottom surface of the guide 161 is The height adjustment device 160 and the upper portion of the steel panel 110 and the handle 164 is connected as a bolt 163 is installed so that the steel panel 110 can be moved up and down in accordance with the rotation of the handle 164 and It is characterized in that the movable formwork is formed between the support beam 140 of the front and the support beam 140 of the rear to be a working table 180 that becomes the working space of the worker.
이러한 본 고안은 기초콘크리트(200)를 따라 양쪽에 하부레일(120)이 설치되고 상기 하부레일(120)에는 내부로 턴버클(170)에 의해 철재판넬(110)이 고정되어 있는 지지빔(140)이 이동되면서 상기 철재판넬(110)에 의해 옹벽이 구간별로 형성되도록 함에 따라 옹벽의 시공을 위한 자재를 최대한 절감시킬 수 있고 적은 인력으로 신속하게 공사를 완료할 수 있어 비용의 절감효과와 작업성의 향상효과를 얻을 수 있는 것이며 아울러 철재판넬(110)으로 옹벽을 제작하므로 옹벽의 표면과 전체적인 품질을 향상시킬 수 있도록 한 것이다.The present invention has a support beam 140, the lower rail 120 is installed on both sides along the foundation concrete 200 and the steel panel 110 is fixed to the lower rail 120 by a turnbuckle 170 therein. As the retaining wall is formed for each section by the steel panel 110 as it moves, the material for construction of the retaining wall can be reduced as much as possible, and construction can be completed quickly with less manpower, thereby reducing cost and improving workability. In addition, it is possible to obtain the effect and also to improve the surface and overall quality of the retaining wall because the retaining wall is made of the steel panel (110).
상기와 같은 본 고안의 이동식 거푸집의 상세한 구조와 이동식 거푸집에 의해 옹벽이 시공되는 상태를 예시된 도면을 통해 살펴보면 다음과 같다.Looking at the detailed structure of the movable formwork of the present invention as described above and the state in which the retaining wall is constructed by the movable formwork is illustrated as follows.
즉, 도 2 는 옹벽을 구간별로 시공하기 위한 이동식 거푸집의 설치상태를 예시한 사시도로서, 지면에는 옹벽을 설치하기 위한 구간을 따라 기초콘크리트(200)가 형성되어 있는 상태에서 상기 기초콘크리트(200)의 양쪽으로 하부레일(120)이 설치되는데, 이때 하부레일(120)의 저면에는 받침목(121)을 설치하여 하부레일 (120)이 지면에 침하되거나 유동되는 것을 방지토록 한 것이다..That is, FIG. 2 is a perspective view illustrating an installation state of a movable formwork for constructing the retaining wall by section, and the foundation concrete 200 is formed on the ground in a state where the foundation concrete 200 is formed along the section for installing the retaining wall. The lower rail 120 is installed on both sides of the lower rail 120, and the base rail 121 is installed on the bottom of the lower rail 120 to prevent the lower rail 120 from sinking or flowing to the ground.
또한 상기 하부레일(120)의 상면으로는 지지빔(140)의 로울러(414)가 위치됨에 따라 지지빔(140)이 하부레일(120)을 따라 이동될 수 있도록 있는 것이며, 전방의 지지빔(140)과 후방의 지지빔(140)은 각각 상하부의 연결빔(150)으로 연결되어 전,후방 지지빔(140)이 옹벽의 한 구간을 형성하게 되는 것이다.In addition, as the roller 414 of the support beam 140 is positioned on the upper surface of the lower rail 120, the support beam 140 can be moved along the lower rail 120, and the support beam in front of the 140 and the rear support beam 140 is connected to the upper and lower connection beams 150, respectively, so that the front and rear support beams 140 form a section of the retaining wall.
그리고 상기 전방 한쌍의 지지빔(140)과 후방 한쌍의 지지빔(140) 상부에는 각각 상부레일(130)이 설치되며 상기 각각의 상부레일(130)에는 2개의 높이조절장치(160)가 각각 설치되는데, 상기 높이조절장치(160)는 상부레일(130)을 감싸도록 가이드(161)가 설치되어 있고 상기 가이드(161)의 상부 내면에는 로울러(162)가 설치되어 상부레일(130)을 따라 높이조절장치(160)가 좌우로 이동될 수 있도록 한 것이며, 가이드(161)의 저면에 핸들(164)이 구비된 볼트(163)가 설치되어 있다.In addition, upper rails 130 are respectively installed on the pair of front support beams 140 and rear pairs of support beams 140, and two height adjusting devices 160 are installed on the upper rails 130, respectively. The height adjusting device 160 has a guide 161 is installed to surround the upper rail 130 and a roller 162 is installed on the upper inner surface of the guide 161 and the height along the upper rail 130. The adjusting device 160 is to be moved from side to side, and the bolt 163 is provided with a handle 164 on the bottom of the guide 161.
한편 양측 지지빔(140)의 내측으로는 철재판넬(110)이 설치되는데, 철재판넬 (110)은 그 내부로 타설되는 콘크리트가 일정한 두께를 가질 수 있도록 소정의 간격을 유지하면서 기초콘크리트(200)의 상면에 세워져 설치되어 있으며, 각각의 철재판넬(110)의 상면은 상기 높이조절장치(160)의 볼트(163)와 연결되어 있어 높이조절장치(160)의 볼트(163)에 구비된 핸들(164)을 회전시키게 되면 철재판넬(110)을 기초콘크리트(200)로부터 들어올리거나 다시 내려놓을 수 있도록 한 것이다.On the other hand, the inner side of the support beam 140, the steel panel 110 is installed, the steel panel 110 while maintaining the predetermined interval so that the concrete to be cast therein has a certain thickness of the base concrete 200 Is installed on the upper surface of the upper surface of each of the steel panel 110 is connected to the bolt 163 of the height adjusting device 160, the handle provided in the bolt (163) of the height adjusting device 160 ( When rotating 164, the steel panel 110 is to be lifted or lowered from the base concrete 200.
여기서 합판을 종래의 목재합판을 사용하지 않고 철재판넬(110)으로 사용함에 따라 자재를 장시간 동안 반복하여 사용할 수도 있으며, 철재판넬(110)의 내부에 형성되는 콘크리트의 표면과 품질을 더욱 향상시킬 수 있도록 한 것이다.Here, the plywood may be used repeatedly for a long time as the steel panel 110 without using a conventional wood plywood, it can further improve the surface and quality of the concrete formed inside the steel panel (110). It would be.
또한 상기 각각의 지지빔(140) 내면과 철재판넬(110)은 턴버클(170)에 의해 연결되도록 함에 따라 턴버클(170)의 조절로 철재판넬(110)간의 간격을 간단하게 좁게하거나 넓게 조절할 수 있도록 한 것이며, 턴버클(170)에 의해 철재판넬(110)의 간격이 조절된 다음 그 위치가 견고하게 유지될 수 있는 것이고, 철재판넬(110)의 사이로 타설된 콘크리트가 완전히 양생된 후에는 턴버클(170)을 풀어 철재판넬(110)을 완성된 콘크리트로부터 간단히 분리시킬 수 있도록 한 것이다.In addition, the inner surface of each support beam 140 and the steel panel 110 is connected by the turnbuckle 170, so that the interval between the steel panel 110 can be easily narrowed or wided by adjusting the turnbuckle 170. It is one, and the position of the steel panel 110 is adjusted by the turnbuckle 170 and then the position can be maintained firmly, and after the concrete poured through the steel panel 110 is completely cured turnbuckle 170 Loosen the iron panel 110 to be easily separated from the finished concrete.
그리고 상기 전방의 지지빔(140)과 후방의 지지빔(140)의 사이에는 작업대 (180)를 설치하므로서 작업대(180)에 작업자가 올라가서 철재판넬(110)의 사이로 콘크리트를 타설하거나 턴버클(170)의 조절 및 높이조절장치(160)의 조절등을 용이하게 할 수 있도록 한 것이다.And while installing the workbench 180 between the front support beam 140 and the rear support beam 140, the worker climbs on the workbench 180 to pour concrete between the steel panel 110 or turnbuckle 170 It will be to facilitate the adjustment and adjustment of the height adjustment device (160).
상기와 같이 구성된 이동식 거푸집을 이용하여 옹벽을 구간별로 시공하는 과정을 예시된 도면을 통해 살펴보면 도 3 에 예시한 바와 같이 철재판넬(110)과 지지빔(140)을 연결하고 있는 양측 턴버클(170)을 각각 조절하여 기초콘크리트(200)의 상면에 세워져 있는 철재판넬(110)이 내측으로 모여지도록 하므로서 철재판넬 (110)의 간격을 원하는 옹벽의 두께에 맞도록 설정한 다음 상기 철재판넬(110)의 사이로 콘크리트를 타설하게 되는 것이다.Looking at the process of constructing the retaining wall by section using the movable formwork configured as described above through the illustrated drawings, as shown in FIG. 3, the two turnbuckles 170 connecting the steel panel 110 and the support beam 140. By adjusting each of the steel panel 110 standing on the upper surface of the foundation concrete 200 to be gathered to the inside while setting the interval of the steel panel 110 to meet the desired thickness of the retaining wall and then of the steel panel 110 Concrete will be poured in between.
그리고 타설된 콘크리트가 양생되면 도 4 에 예시한 바와 같이 턴버클(170)을 반대로 회전시켜 철재판넬(110)이 벌어지도록 하여 양생된 콘크리트에서 분리되도록 한것이며, 이 후 옹벽의 한 구간이 완료됨에 따라 다음 구간으로 이동시켜야 하므로 도 5 에 예시한 바와 같이 높이조절장치(160)의 핸들(164)을 회전시켜 철재판넬(110)의 상단을 잡아당기게 되면 철재판넬(110)의 저면이 기초콘크리트로부터 이격됨에 따라 거푸집 전체를 하부레일(120)을 따라 다음 구간으로 간단히 이동시킨 후 다음 구간의 옹벽을 연속으로 제작할 수 있는 것이다.When the poured concrete is cured, as shown in FIG. 4, the turnbuckle 170 is reversely rotated so that the steel panel 110 is separated from the cured concrete, and then, as one section of the retaining wall is completed. Since it is necessary to move to the next section as shown in Figure 5 to rotate the handle 164 of the height adjustment device 160 to pull the top of the steel panel 110, the bottom surface of the steel panel 110 is spaced apart from the base concrete As the entire form is simply moved to the next section along the lower rail 120 it is possible to continuously manufacture the retaining wall of the next section.
이상에서 상술한 바와 같이 본 고안은 이동식 거푸집이 기초콘크리트의 양쪽에 형성된 레일을 따라 구간별로 이동되고 턴버클에 의해 간격이 조절되는 철재판넬으로 옹벽이 시공될 수 있도록 함에 따라 옹벽 시공을 위한 자재의 절감과 인력의 감소로 인하여 비용의 절감효과를 얻을 수 있는 것이며, 거푸집의 조립 및 해체를 구간에 따라 반복할 필요가 없어 공사기간을 단축시킬 수 있고 옹벽의 시공작업을 효율적으로 할 수 있으며, 아울러 철재판넬을 사용함에 따라 합판을 반영구적으로 사용할 수 있고 옹벽의 표면을 깨끗하게 할 수 있으며 전체적인 품질의 향상효과를 얻을 수 있는 것이다.As described above, the present invention reduces the material for the construction of the retaining wall as the movable formwork allows construction of the retaining wall with steel panels that are moved by sections along the rails formed on both sides of the foundation concrete and whose spacing is controlled by the turnbuckles. The cost reduction effect can be obtained by reducing the number of workers and manpower, and it is not necessary to repeat the assembly and disassembly of formwork for each section, which can shorten the construction period and make the construction of retaining wall more efficient. By using the panel, the plywood can be used semi-permanently, the surface of the retaining wall can be cleaned, and the overall quality can be improved.
Claims (1)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR2020010032049U KR200260683Y1 (en) | 2001-10-19 | 2001-10-19 | Movable a mold for operation of retaining wall |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR2020010032049U KR200260683Y1 (en) | 2001-10-19 | 2001-10-19 | Movable a mold for operation of retaining wall |
Publications (1)
Publication Number | Publication Date |
---|---|
KR200260683Y1 true KR200260683Y1 (en) | 2002-01-12 |
Family
ID=73110707
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR2020010032049U KR200260683Y1 (en) | 2001-10-19 | 2001-10-19 | Movable a mold for operation of retaining wall |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR200260683Y1 (en) |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100463032B1 (en) * | 2002-08-30 | 2004-12-23 | 주식회사 토암건설 | Movable Steel Form for Constructing Culvert and Continuous Constructing Method of Culvert Using the Same |
KR101081791B1 (en) | 2011-06-21 | 2011-11-10 | 브릿지테크놀러지(주) | Beam making method using moulding jack apparatus and end moulding apparatus |
KR101124692B1 (en) * | 2011-06-21 | 2012-03-22 | 브릿지테크놀러지(주) | Beam making apparatus using prefabricated moulding frame and beam making method using the same |
KR101150829B1 (en) * | 2010-09-07 | 2012-06-13 | 동우건설(주) | The mold with self-propelled type trolley for construction of retaining wall |
KR101421664B1 (en) * | 2011-12-19 | 2014-07-24 | 주식회사 네비엔 | Mold structure for benting beam and manufactureing method using the same |
KR101781067B1 (en) * | 2015-06-10 | 2017-09-25 | 현대건설(주) | Casing Apparatus and Method for Constructing In-situ Concrete Pile |
CN108104156A (en) * | 2017-12-31 | 2018-06-01 | 安徽水利开发股份有限公司 | Retaining wall synovial membrane pours device and retaining wall synovial membrane casting method |
KR102060692B1 (en) * | 2019-06-25 | 2019-12-30 | 허연희 | Construction method using road soundproof wall concrete retaining wall construction device |
-
2001
- 2001-10-19 KR KR2020010032049U patent/KR200260683Y1/en not_active IP Right Cessation
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100463032B1 (en) * | 2002-08-30 | 2004-12-23 | 주식회사 토암건설 | Movable Steel Form for Constructing Culvert and Continuous Constructing Method of Culvert Using the Same |
KR101150829B1 (en) * | 2010-09-07 | 2012-06-13 | 동우건설(주) | The mold with self-propelled type trolley for construction of retaining wall |
KR101081791B1 (en) | 2011-06-21 | 2011-11-10 | 브릿지테크놀러지(주) | Beam making method using moulding jack apparatus and end moulding apparatus |
KR101124692B1 (en) * | 2011-06-21 | 2012-03-22 | 브릿지테크놀러지(주) | Beam making apparatus using prefabricated moulding frame and beam making method using the same |
KR101421664B1 (en) * | 2011-12-19 | 2014-07-24 | 주식회사 네비엔 | Mold structure for benting beam and manufactureing method using the same |
KR101781067B1 (en) * | 2015-06-10 | 2017-09-25 | 현대건설(주) | Casing Apparatus and Method for Constructing In-situ Concrete Pile |
CN108104156A (en) * | 2017-12-31 | 2018-06-01 | 安徽水利开发股份有限公司 | Retaining wall synovial membrane pours device and retaining wall synovial membrane casting method |
CN108104156B (en) * | 2017-12-31 | 2024-01-23 | 安徽水利开发有限公司 | Retaining wall slip form pouring device and retaining wall slip form pouring method |
KR102060692B1 (en) * | 2019-06-25 | 2019-12-30 | 허연희 | Construction method using road soundproof wall concrete retaining wall construction device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR100839352B1 (en) | The horizentally controlled molding panel and the method of construction using the same | |
KR20110080499A (en) | Apparatus of constructing bridge and method of constructing bridge by using the same | |
KR200260683Y1 (en) | Movable a mold for operation of retaining wall | |
KR100665340B1 (en) | The construction structure of slab deck being dismantled easily | |
KR101013450B1 (en) | Apparatus for forming underground concrete structure in which dome is integrated to vertical tunnel and constructing method using the same | |
KR20090123388A (en) | Mold for manufacturing pc beam | |
KR101217683B1 (en) | Pc column form device and pc column manufacturing method using the same | |
JP7126248B2 (en) | Culvert manufacturing method | |
KR101021945B1 (en) | Steel form for forming lining wall of vertical tunnel | |
CN209413302U (en) | Movable side wall form support system with operation platform | |
KR100361047B1 (en) | Construction mold | |
KR100429270B1 (en) | Movable scaffolding of operation concrete slab of bridge | |
JP2829363B2 (en) | Formwork equipment for pillar construction | |
KR100336713B1 (en) | Steel form to be constructed inside of cross beam which is to connect precast concrete beam of pir using reinforced concrete | |
KR200250571Y1 (en) | Movable scaffolding of operation concrete slab of bridge | |
CN213797166U (en) | Simple mould for assembling building unit | |
CN215212305U (en) | Concrete side wall top pushes away portable large-scale steel form of support formula | |
KR102636240B1 (en) | Tableform system and method of disassembling by the same | |
JP2874539B2 (en) | Method for constructing concrete structure and weir plate used in this method | |
CN219710906U (en) | Finalized movable template assembling and disassembling construction platform | |
KR20050076059A (en) | Form for using construction of a pier | |
CN212249181U (en) | Integrated formwork system suitable for concrete pouring of pool wall | |
KR200337174Y1 (en) | Mould assembly for constructing the tunnel type water conduit | |
KR100201758B1 (en) | Process for installing concrete slab form | |
EP3495578B1 (en) | A method for realising a prefabricated wall for a colum and beam construction made of reinforced concrete, and a method for realising the construction |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
REGI | Registration of establishment | ||
T201 | Request for technology evaluation of utility model | ||
T701 | Written decision to grant on technology evaluation | ||
G701 | Publication of correction | ||
FPAY | Annual fee payment |
Payment date: 20061229 Year of fee payment: 6 |
|
LAPS | Lapse due to unpaid annual fee |