KR200247044Y1 - the head reinforcement structure of steel pipe - Google Patents

the head reinforcement structure of steel pipe Download PDF

Info

Publication number
KR200247044Y1
KR200247044Y1 KR2020010018267U KR20010018267U KR200247044Y1 KR 200247044 Y1 KR200247044 Y1 KR 200247044Y1 KR 2020010018267 U KR2020010018267 U KR 2020010018267U KR 20010018267 U KR20010018267 U KR 20010018267U KR 200247044 Y1 KR200247044 Y1 KR 200247044Y1
Authority
KR
South Korea
Prior art keywords
steel pipe
pipe pile
circular tube
head reinforcement
reinforcement structure
Prior art date
Application number
KR2020010018267U
Other languages
Korean (ko)
Inventor
이상복
지효선
Original Assignee
이상복
지효선
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 이상복, 지효선 filed Critical 이상복
Priority to KR2020010018267U priority Critical patent/KR200247044Y1/en
Application granted granted Critical
Publication of KR200247044Y1 publication Critical patent/KR200247044Y1/en

Links

Landscapes

  • Foundations (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

본 고안은 강관 파일 두부 보강구조에 관한 것으로, 상기 강관 파일(11)의 두부에 결합되고, 상단에 플랜지(14)가 형성되며, 내주면에 지지단턱(15)이 형성되고 바닥 부분에 공기구멍(20)이 형성된 원형튜브(13)와; 절단된 강관 파일(11)의 상면과 상기 원형튜브(13)의 플랜지(14) 저면 사이에 구비되는 마감링(12)과; 상기 원형튜브(13) 내측에 삽입되어 둘레가 상기 원형튜브(13)의 지지단턱(15)에 지지되고, 방사상으로 철근고정구멍(17)이 형성되며, 다수의 구멍(18)이 형성된 링형상의 좌대(16)로 이루어진 강관 파일 두부 보강구조를 구비하였다.The present invention relates to a steel pipe pile head reinforcement structure, is coupled to the head of the steel pipe pile (11), the flange 14 is formed on the upper end, the support step (15) is formed on the inner peripheral surface and the air hole ( 20 and a circular tube 13 formed; A finishing ring 12 provided between an upper surface of the cut steel pipe pile 11 and a bottom surface of the flange 14 of the circular tube 13; The inner side of the circular tube 13 is inserted into the circumferential support of the support step 15 of the circular tube 13, the radially fixed reinforcing hole 17 is formed, a plurality of holes 18 is formed in a ring shape A steel pipe pile head reinforcement structure consisting of a pedestal 16 was provided.

그러므로, 강관 파일(11) 단부에 마감링(12)을 끼워 넣어 수평을 유지ㅏㄴ 다음, 강관 파일(11) 내주면과 마감링(12) 상단부 및 원형튜브(13) 외주면에 접착제를 도포하여 좌대(16)가 지지단턱(15)에 미리 고정 설치된 원형튜브(13)를 강관 파일(11) 내측으로 삽입하여 고정설치하는 작업으로, 보강철근(19)은 원형튜브(13)와 구조물 기초의 바닥 부분 철근이 모두 배근된 후에 좌대(16)의 철근고정구멍(17)에 삽입설치함으로써, 강관 파일(11) 두부 보강 시공을 완료하게 되므로 볼트, 용접작업이 필요없고, 작업시간을 단축시킬 수 있을 뿐 아니라 강관 파일(11) 단부와 원형튜브(13) 사이에 공극이 없이 밀착시공됨으로써 매우 우수한 품질을 확보할 수 있도록 하였다.Therefore, the finishing ring (12) is inserted into the end of the steel pipe pile (11) to maintain the horizontal, and then the adhesive is applied to the inner peripheral surface of the steel pipe pile (11), the upper end of the finishing ring (12) and the outer peripheral surface of the circular tube (13) 16 is the operation of inserting and fixing the circular tube 13, which is fixed in advance in the support step 15, into the steel pipe pile 11, the reinforcing bar 19 is the bottom portion of the circular tube 13 and the foundation of the structure After all of the reinforcing bars are inserted into the reinforcing bar fixing hole 17 of the base 16, the steel pipe pile 11 head reinforcement construction is completed, so no bolts or welding work is required, and the working time can be shortened. Rather, the steel pipe pile 11 and the circular tube 13 is tightly installed without voids to ensure very good quality.

Description

강관 파일 두부 보강구조 {the head reinforcement structure of steel pipe}Steel head pile head reinforcement structure {the head reinforcement structure of steel pipe}

본 고안은 강관 파일에 관한 것으로, 특히 강관 파일 두부 보강구조에 관한 것이다.The present invention relates to a steel pipe pile, and more particularly to a steel pipe pile head reinforcement structure.

강관 파일은 연약한 지반에 교량과 같은 대형 구조물을 시공할 경우에 시공한다. 연약한 지반에 교량과 같은 구조물을 시공할 경우에는 무엇보다 기초가 튼튼해야 한다. 기초가 튼튼하지 않으면 지반침하에 의한 피해가 발생할 수 있으므로 지반의 지내력을 확인하여 충분하지 못할 경우 양호한 지반이 나타날 때까지 기초 터파기를 추가로 실시하거나 또는 파일을 박은 후 기초 부분을 시공해야 한다.Steel pipe piles are used when constructing large structures such as bridges on soft ground. When constructing structures such as bridges on soft ground, the foundation must be strong. If the foundation is not strong, damage by ground subsidence may occur, so if the ground strength of the ground is not sufficient, additional foundation dig should be carried out or piled up until the good ground appears.

기초 터파기를 추가로 시행할 것인지, 파일을 박은 후 기초 콘크리트를 타설할 것인지의 선택은 대개 시공비에 의해 결정되는데, 정도의 차이는 있으나 터파기 깊이가 약 5m 이상이 되면 파일을 박는 것이 경제적이다. 강관 파일은 여러 종류의 파일 중 하나로, 신뢰성이 좋아 많이 이용되고 있다.The choice of whether to carry out additional foundation excavation or to install foundation concrete after laying piles is usually determined by the construction cost. However, it is economical to drill piles when the depth of excavation is about 5m or more. Steel pipe files are one of several types and are widely used because of their high reliability.

강관 파일의 시공과정을 살펴 보면, 평탄 작업을 한 후 측량하여 파일을 박을 위치를 결정하고, 햄머로 지지력이 확보되는 깊이까지 파일을 박고 일정한 높이로 잘라낸다. 파일을 일정한 높이로 자른 후에는 파일과 기초 콘크리트가 일체가 되도록 하기 위해 파일 절단 부분을 보강하는데 이를 두부 보강이라 한다.Looking at the construction process of the steel pipe pile, after the flattening work, surveying to determine the location to pile the pile, hammered the pile to the depth to secure the support force with a hammer and cut to a constant height. After the pile is cut to a certain height, the pile cutout is reinforced to bring the pile and the foundation concrete together. This is called head reinforcement.

종래의 방식에 있어서, 공장에서 제작된 두부 보강체(2)를 강관 파일(1) 내부에 삽입하고 볼트(6)를 체결하고 기초의 바닥 부분 철근이 배근된 후에 미리 형성된 구멍(4)에 보강철근(5)을 삽입하는 볼트식 두부 보강 방식이다.In the conventional manner, the factory-made head reinforcement 2 is inserted into the steel pipe pile 1, the bolt 6 is fastened and the reinforcement is formed in the preformed hole 4 after the bottom part of the foundation is reinforced. Bolt type head reinforcement method to insert reinforcing bar (5).

이 방법은 강관 절단시에 매끄럽고 수평이 되게 처리되지 못하므로 두부 보강체의 하단부와 강관 단부 사이에 공극이 생겨 기초 상부의 하중이 원형판을 통해 볼트 부분으로 전달되어, 볼트 부분에 상단한 크기의 응력이 집중되고, 강관 내측에 십자의 형태(3)로만 보강되어 있고, 두부 보강체에 정착된 보강철근(5)의 정착 깊이가 충분하지 못한 구조로 되어 있고, 강판으로 제작되어 부식의 우려가 있으며, 두부보강체(2)의 제작 및 현장 설치 과정 등을 고려하여 볼때 개선의 필요가 있는 것으로 판단되었다.This method does not process smoothly and horizontally when cutting the steel pipe, so there is a gap between the lower end of the head reinforcement and the end of the steel pipe so that the load on the upper part of the foundation is transferred to the bolt part through the circular plate, and the stress of the upper part of the bolt part is increased. This structure is concentrated and reinforced only in the form of crosses 3 inside the steel pipe, and has a structure in which the reinforcing bar 5 fixed to the head reinforcement 5 is not sufficiently settled. In consideration of the manufacturing process and installation of the tofu reinforcement body (2), it was judged that there is a need for improvement.

상술한 문제를 해결하기 위한 본 고안의 목적은, 방식성이 뛰어나고 작업시간이 단축되어 시공성이 우수하고 안정적인 조립구조를 갖도록 한 강관 파일 두부 보강구조를 제공하는데 있다.An object of the present invention for solving the above problems is to provide a steel pipe pile head reinforcement structure to have an excellent anticorrosive and shortened working time to have excellent workability and stable assembly structure.

이와 같은 목적을 달성하기 위한 본 고안 강관 파일 두부 보강구조는, 강관 파일 두부 보강구조에 있어서, 강관 파일의 두부에 결합되고, 상단에 플랜지가 형성되며, 내주면에 지지단턱이 형성되고 바닥 부분에 공기구멍이 형성된 원형튜브와; 절단된 강관 파일의 상면과 상기 튜브의 플랜지 저면 사이에 구비되는 마감링과; 원형튜브 내측에 삽입되어 둘레가 상기 원형튜브의 지지단턱에 지지되고, 방사상으로 철근고정구멍이 형성되며, 다수의 구멍이 형성된 링형상의 좌대로 이루어진 것을 특징으로 한다.The steel pipe pile head reinforcement structure of the present invention for achieving the above object, in the steel pipe pile head reinforcement structure, is coupled to the head of the steel pipe pile, a flange is formed on the top, a support step is formed on the inner circumferential surface, A circular tube having a hole formed therein; A finishing ring provided between an upper surface of the cut steel pipe pile and a flange bottom surface of the tube; It is inserted into the inner circular tube is supported on the support step of the circular tube, the reinforcing bar is formed radially, characterized in that made of a ring-shaped seat formed with a plurality of holes.

따라서, 강관 파일 단부에 마감링을 끼워 넣어 수평을 유지한 다음, 강관 파일 내주면과 마감링 상단부 및 원형튜브 외주면에 접착제를 도포하여 좌대가 지지단턱에 미리 고정 설치된 원형튜브를 강관 파일 내측으로 삽입하여 고정설치하는 작업으로, 보강철근은 원형튜브와 구조물 기초의 바닥 부분 철근이 모두 배근된 후에 좌대의 구멍에 삽입설치함으로써, 강관 파일 두부 보강 시공을 완료하게 되므로 볼트, 용접작업이 필요없고, 작업시간을 단축시킬 수 있을 뿐 아니라 강관 파일 단부와 원형튜브 사이에 공극이 없이 밀착시공됨으로써 매우 우수한 품질을 확보할수 있는 효과가 있다.Therefore, insert the finishing ring at the end of the steel pipe pile to maintain the horizontal, then apply adhesive to the inner circumferential surface of the steel pipe pile, the upper end of the ring ring and the outer circumferential surface of the round tube to insert the round tube pre-installed in the steel pipe pile into the inside of the steel pipe pile The fixed reinforcing bar is installed by inserting the reinforcing bar into the hole of the seat after both the round tube and the bottom part of the base of the structure have been placed, thus completing the reinforcement construction of the steel pipe pile, so no bolts and welding work are required. In addition to shortening the construction, there is no effect between the end of the steel pipe pile and the circular tube without any voids, there is an effect that can ensure a very good quality.

도1은 종래 강관 파일 두부 보강구조의 일 실시예를 보이는 분리 사시도1 is an exploded perspective view showing an embodiment of a conventional steel pipe pile head reinforcement structure

도2는 본 고안 강관 파일 두부 보강구조를 보이는 분리 사시도Figure 2 is an exploded perspective view showing the steel pipe pile head reinforcement structure

도3은 도2의 결합 단면도3 is a cross sectional view of FIG.

*도면의 주요 부분에 대한 부호의 설명** Description of the symbols for the main parts of the drawings *

11 ; 강관 파일 12 ; 마감링11; Steel pipe pile 12; Finishing ring

13 ; 원형튜브 14 ; 플랜지13; Round tube 14; flange

15 ; 지지단턱 16 ; 좌대15; Support step 16; Base

17 ; 철근고정구멍 19 ; 보강철근17; Rebar fixing holes 19; Rebar

20 ; 공기구멍(원형튜브의)20; Air hole (of round tube)

본 고안의 구체적 특징 및 이점은 첨부된 도면을 참조한 이하의 설명으로 더욱 명확해 질 것이다.Specific features and advantages of the present invention will become more apparent from the following description with reference to the accompanying drawings.

도2는 본 고안 강관 파일 두부 보강구조를 보인 분리 사시도이고, 도3은 그 결합 단면도로써, 이는, 원형튜브(13)와, 마감링(12), 좌대(16)로 이루어진다.Figure 2 is an exploded perspective view showing the steel pipe pile head reinforcement structure of the present invention, Figure 3 is a coupling cross-sectional view, which is composed of a circular tube 13, the closing ring 12, the base 16.

원형튜브(13)는 강관 파일(11)의 두부에 결합되고, 상단에 플랜지(14)가 형성되며, 내주면에 지지단턱(15)이 형성되어 있다.The circular tube 13 is coupled to the head of the steel pipe pile 11, the flange 14 is formed on the upper end, the support step 15 is formed on the inner peripheral surface.

마감링(12)은 절단된 강관 파일(11)의 상면과 원형튜브(13)의 플랜지(14) 저면 사이에 구비되는바, 다수의 구멍(21)이 형성되어 있고 내측부분(원형튜브(13) 플랜지의 굴곡부 접착면)은 둥굴게 처리된 구조를 갖는다.Finishing ring 12 is provided between the upper surface of the cut steel pipe pile 11 and the bottom surface of the flange 14 of the circular tube 13, a plurality of holes 21 are formed and the inner portion (circular tube 13 ) The bent side of the flange) has a rounded structure.

강관 파일(11)을 지반에 박고 일정한 높이로 잘라 낼시 강관 파일(11) 절단면이 매끄럽지 못하고 절단면 내외측으로 가각이 지게 된다. 따라서 접착제를 도포하여 마감링(12)을 강관 파일(11)에 끼우고 구멍(21)으로 에폭시 등 접착제를 주입하여 공극이 발생하지 않도록 하고, 원형튜브(13) 플랜지와 닿는 부분을 둥글게 처리하여 원형튜브(13)와 밀착시공되도록 한다.When the steel pipe pile 11 is put into the ground and cut out to a certain height, the cut surface of the steel pipe pile 11 is not smooth, and angles are cut in and out of the cut surface. Therefore, by applying an adhesive, insert the finishing ring 12 into the steel pipe pile (11) and injecting an adhesive such as epoxy into the hole (21) to prevent the occurrence of voids, by rounding the part that contacts the flange of the circular tube (13) To be in close contact with the round tube (13).

강관 파일(11)을 지반에 박고 일정한 높이로 잘라 낼시 강관 파일(11)의 절단면은 매끄럽지 못하게 되고, 절단시 발생된 노치부에서 전단 파괴 현상이 발생된다. 따라서 강관 파일(11)의 절단면 내측(원형튜브 플랜지의 굴곡부 접착면)이 굴곡처리되고 상면에 다수의 구멍을 형성하여 접착제가 채워질 수 있도록 제작된 마감링(12)이 씌워지게 된다.When the steel pipe pile 11 is driven into the ground and cut out to a certain height, the cut surface of the steel pipe pile 11 is not smooth, and shear failure occurs in the notch portion generated during cutting. Therefore, the inside of the cut surface of the steel pipe pile 11 (bending surface of the bent portion of the circular tube flange) is bent and the finishing ring 12 is formed so as to form a plurality of holes in the upper surface so that the adhesive can be filled.

좌대(16)는 원판형 링형상을 가지고, 철근고정구멍(17)이 방사상으로 형성되어 있으며, 다수의 구멍(18)이 형성되어 있다.The pedestal 16 has a disk-shaped ring shape, a reinforcing bar fixing hole 17 is formed radially, and a plurality of holes 18 are formed.

이러한 좌대(16)는 원형튜브(13) 내측에 수평으로 장착되는바, 좌대(16)를 원형튜브(13) 내에 삽입시키면 좌대(16)의 외측 둘레가 지지단턱(15) 상에 안착지지되며, 이는 현장에 반입되기 이전에 이루어지는 사항이다.The pedestal 16 is horizontally mounted inside the circular tube 13, when the pedestal 16 is inserted into the circular tube 13, the outer circumference of the pedestal 16 is seated and supported on the support step 15. This is done prior to bringing it into the field.

이러한 구성의 본 고안 강관 파일 두부 보강구조는, 강관 파일(11) 내측과 원형튜브(13) 외측에 고분자 재료인 에폭시 등과 같은 접착강도가 높은 재료를 도포한다. 그리고 일정한 규격으로 제작된 플랜지(14)가 형성된 FRP(Fiber Reinforced Polymers) 원형튜브(13)를 강관 파일(11)에 끼워 넣는다. 원형튜브(13)를 강관 파일(11) 내측에 끼워 넣을시 강관 파일(11) 내측의 공기는 원형튜브(13) 바닥판에 형성된 공기구멍(20)으로 배출되므로 강관 파일(11)의 내측과 원형튜브(13)의 외측면이 더욱 밀실하게 접착된다.The steel pipe pile head reinforcement structure of this structure applies a material with high adhesive strength, such as epoxy, which is a polymer material, to the inside of the steel pipe pile 11 and the outer side of the circular tube 13. Then, the FRP (Fiber Reinforced Polymers) circular tube 13 having the flange 14 manufactured to a predetermined size is inserted into the steel pipe pile 11. When the circular tube 13 is inserted into the steel pipe pile 11, the air inside the steel pipe pile 11 is discharged through the air hole 20 formed in the bottom plate of the circular tube 13, so that the inside of the steel pipe pile 11 The outer surface of the circular tube 13 is more tightly bonded.

또한 구조물 기초 바닥 철근을 배근한 후에 좌대(16)에 형성된 철근고정구멍(17)에 보강철근(19)을 끼워 넣는다. 보강철근(19)은 도1의 보강철근(5)의 형상으로 설치되며 일반철근을 절단하여 설치한다.In addition, the reinforcing bar 19 is inserted into the reinforcing bar fixing hole 17 formed in the pedestal 16 after reinforcing the structure foundation bottom reinforcing bar. The reinforcing bar 19 is installed in the shape of the reinforcing bar 5 of FIG. 1 and is installed by cutting the general bar.

철근고정구멍(17)은 좌대(16) 둘레에 방사상으로 다수 형성되어 있으므로 보강철근(19)을 구조물 기초 바닥 철근과 간섭되지 않게 설치할 수 있으며, 구멍(18)은 콘크리트가 좌대(16)에 의해 분리되지 않도록 하고, 필요시 보강철근(19)을 추가적으로 설치할 수 있도록 배려한 것이다.Since the reinforcing bar fixing holes 17 are radially formed around the base 16, the reinforcing bar 19 can be installed so as not to interfere with the bottom of the structure foundation, and the holes 18 are made of concrete by the base 16. It is not to be separated, it is considered to be able to install additional reinforcing bars (19) if necessary.

이러한 본 고안 강관 파일 두부 보강구조는, 여러가지 장점을 가지는바, 첫째, 강관 파일(11)에 볼트 구멍을 성형할 필요가 없고, 공장에서 제작된 기성제품을 강관 파일(11) 내측에 삽입하는 방식으로 설치하기 때문에 작업이 간단하다.The steel pipe pile head reinforcement structure of the present invention has various advantages. First, there is no need to form a bolt hole in the steel pipe pile 11, and a method of inserting a ready-made product manufactured at the factory into the steel pipe pile 11 inside. The operation is simple because it is installed as.

둘째, 종래의 방법에서는 십자보강판(3)으로 보강되었던 부분이 플랜지(14)가 형성된 원형튜브(13)로 보강되므로 강관 파일(11) 두부의 원주면이 고르게 보강되므로, 구조적으로 매우 안전하다.Secondly, in the conventional method, since the portion reinforced with the cross reinforcing plate 3 is reinforced with the circular tube 13 having the flange 14 formed thereon, the circumferential surface of the head of the steel pipe pile 11 is uniformly reinforced, so it is very structurally safe. .

셋째, 마감링(16)으로 절단부의 수평상태를 유지한 다음, 강관 파일(11)과 원형튜브(13)를 접착 강도가 큰 접착제를 사용하여 밀실하게 채워 일체화시켜 주므로 구조적으로 매우 안정적인데, 접착제로는 에폭시 등을 사용할 수 있다.Third, after maintaining the horizontal state of the cut portion with the finishing ring (16), the steel pipe pile (11) and the circular tube (13) is tightly integrated using a large adhesive strength adhesive, so structurally very stable, the adhesive Epoxy etc. can be used as a furnace.

넷째, 좌대(16)에 다수의 철근고정구멍(17)이 성형되어 있으므로 구조물 기초바닥 부분철근을 배근한 후에 서로 간섭되지 않도록 선택적으로 보강철근(19)을 삽입설치할 수 있다.Fourth, since the reinforcing bars 17 are formed in the base 16, the reinforcing bars 19 can be selectively inserted and installed so as not to interfere with each other after reinforcing the partial bottom of the structure foundation.

다섯째, 보강철근(19)이 강관 파일(11) 내측에 충분히 삽입되고 기초 콘크리트가 원형튜브(13) 내에 삽입되므로 강관 파일(11) 부분과 기초 부분이 충분히 일체화된 구조를 갖는다.Fifth, since the reinforcing bar 19 is sufficiently inserted into the steel pipe pile 11 and the foundation concrete is inserted into the circular tube 13, the steel pipe pile 11 portion and the foundation portion have a sufficiently integrated structure.

여섯째, 충분한 강성을 갖고 일정한 규격으로 제작된 FRP로 설치하므로 방식성이 뛰어나고, 강관 파일(11)의 두부 정리가 양호하게 이루어져 구조적 안정을 유지시킬 수 있다.Sixth, because it is installed in a FRP manufactured to a certain standard with sufficient rigidity is excellent in anticorrosion, and can be maintained in the head stability of the steel pipe pile (11) is made structurally stable.

이상에서와 같은 본 고안에 따른 강관 파일 두부 보강구조에 의하면, 강관 파일(11) 단부에 마감링(12)을 끼워 넣어 수평을 유지한 다음, 강관 파일(11) 내주면과 마감링(12) 상단부 및 원형튜브(13) 외주면에 접착제를 도포하여 좌대(16)가 지지단턱(15)에 미리 고정 설치된 원형튜브(13)를 강관 파일(11) 내측으로 삽입하여 고정설치하는 작업으로, 보강철근(19)은 원형튜브(13)와 구조물 기초의 바닥 부분 철근이 모두 배근된 후에 좌대(16)의 구멍(18)에 삽입설치함으로써, 강관 파일(11) 두부 보강 시공을 완료하게 되므로 볼트, 용접작업이 필요없고, 작업시간을 단축시킬 수 있을 뿐 아니라 강관 파일(11) 단부와 원형튜브(13) 사이에 공극이 없이 밀착시공됨으로써 매우 우수한 품질을 확보할 수 있는 효과가 있다.According to the steel pipe pile head reinforcement structure according to the present invention as described above, by inserting the finishing ring 12 at the end of the steel pipe pile (11) to maintain the horizontal, the inner circumferential surface of the steel pipe pile (11) and the upper end of the finishing ring (12) And by applying the adhesive on the outer peripheral surface of the round tube 13, the base 16 is inserted into the steel tube pile 11 inside the steel tube pile 11 is fixed to the support step (15) in advance and fixed installation, reinforcing bars ( 19) is inserted into the hole 18 of the pedestal 16 after the circular tube 13 and the bottom reinforcing bar of the structure foundation are all reinforcement, thereby completing the reinforcement construction of the steel pipe pile 11 head bolt, welding There is no need to reduce the working time as well as close contact between the end of the steel pipe pile 11 and the circular tube 13 without voids has the effect of ensuring a very good quality.

Claims (1)

강관 파일 두부 보강구조에 있어서,In the steel pipe pile head reinforcement structure, 상기 강관 파일(11)의 두부에 결합되고, 상단에 플랜지(14)가 형성되며, 내주면에 지지단턱(15)이 형성되고 바닥부분에 구멍(20)이 형성된 원형튜브(13)와;A circular tube 13 coupled to the head of the steel pipe pile 11, a flange 14 formed at an upper end thereof, a support step 15 formed at an inner circumferential surface thereof, and a hole 20 formed at a bottom portion thereof; 절단된 강관 파일(11)의 상면과 상기 원형튜브(13)의 플랜지(14) 저면 사이에 구비되는 마감링(12)과;A finishing ring 12 provided between an upper surface of the cut steel pipe pile 11 and a bottom surface of the flange 14 of the circular tube 13; 상기 원형튜브(13) 내측에 삽입되어 둘레가 상기 원형튜브(13)의 지지단턱(15)에 지지되고, 방사상으로 철근고정구멍(17)이 형성되며, 다수의 구멍(18)이 형성된 링형상의 좌대(16)로 이루어진 것을 특징으로 하는 강관 파일 두부 보강구조.The inner side of the circular tube 13 is inserted into the circumferential support of the support step 15 of the circular tube 13, the radially fixed reinforcing hole 17 is formed, a plurality of holes 18 is formed in a ring shape Steel pipe pile head reinforcement structure, characterized in that consisting of the pedestal (16).
KR2020010018267U 2001-06-19 2001-06-19 the head reinforcement structure of steel pipe KR200247044Y1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR2020010018267U KR200247044Y1 (en) 2001-06-19 2001-06-19 the head reinforcement structure of steel pipe

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR2020010018267U KR200247044Y1 (en) 2001-06-19 2001-06-19 the head reinforcement structure of steel pipe

Publications (1)

Publication Number Publication Date
KR200247044Y1 true KR200247044Y1 (en) 2001-10-31

Family

ID=73054459

Family Applications (1)

Application Number Title Priority Date Filing Date
KR2020010018267U KR200247044Y1 (en) 2001-06-19 2001-06-19 the head reinforcement structure of steel pipe

Country Status (1)

Country Link
KR (1) KR200247044Y1 (en)

Similar Documents

Publication Publication Date Title
JP4800899B2 (en) Pile head joint structure and construction method
KR100698878B1 (en) Y Type Connecting Structure of Steel Pipe Struts
US20100319280A1 (en) Precast Temporary Facility Structure and a Construction Method for the Same
KR101714371B1 (en) Joints Appartus of The Concrete Piles and Steel Pipe
JP3071402B2 (en) Lifting method of structure, jack engaging structure and bracket used in the method
KR20210033815A (en) Method for strengthening the foundation of a structure with improved construction precision and reinforced structural strength
JP2003232033A (en) Foundation pile structure
KR200212743Y1 (en) Reinforcement structure for a foundation pile
JP5077865B2 (en) Ready-made pile and foundation pile structure
KR101618719B1 (en) Top-down underground construction method using the connecting structure of the CFT column
KR100323112B1 (en) Reinforcement structure for a foundation pile
KR20100052847A (en) Apparatus for connecting both piles
KR20110016846A (en) The iron frame which has the senior means which is strong being empty
KR20180007292A (en) Connecting device for PHC pile
KR20110026206A (en) Joint for concrete pile
JP6256383B2 (en) Column and pile joining method and structure
KR200247044Y1 (en) the head reinforcement structure of steel pipe
KR100349107B1 (en) Shaft construction system using precasted segment block
JP3899094B2 (en) Foundation reinforcement method for existing structures by press-fitting steel pipe piles
JP5008683B2 (en) Pile head reinforcement member and pile head reinforcement structure using it
KR101452185B1 (en) Concrete Composite Steel Pile and Its Manufacturing Apparatus and Method
KR101845870B1 (en) Reinforcement Structure and Method of PHC Pile, and PHC Pile having such Reinforcement Structure
JP4209314B2 (en) Pile head joint structure and pile body construction method
KR100387751B1 (en) Reinforcement structure for a foundation pile
KR101270040B1 (en) The concrete file which has the senior means which is strong and the establishment method

Legal Events

Date Code Title Description
REGI Registration of establishment
T701 Written decision to grant on technology evaluation
LAPS Lapse due to unpaid annual fee