KR100323112B1 - Reinforcement structure for a foundation pile - Google Patents

Reinforcement structure for a foundation pile Download PDF

Info

Publication number
KR100323112B1
KR100323112B1 KR1020000050551A KR20000050551A KR100323112B1 KR 100323112 B1 KR100323112 B1 KR 100323112B1 KR 1020000050551 A KR1020000050551 A KR 1020000050551A KR 20000050551 A KR20000050551 A KR 20000050551A KR 100323112 B1 KR100323112 B1 KR 100323112B1
Authority
KR
South Korea
Prior art keywords
steel pipe
reinforcement
vertical
disc
welding
Prior art date
Application number
KR1020000050551A
Other languages
Korean (ko)
Other versions
KR20000064205A (en
Inventor
배정효
Original Assignee
배정효
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 배정효 filed Critical 배정효
Priority to KR1020000050551A priority Critical patent/KR100323112B1/en
Publication of KR20000064205A publication Critical patent/KR20000064205A/en
Application granted granted Critical
Publication of KR100323112B1 publication Critical patent/KR100323112B1/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/226Protecting piles
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/223Details of top sections of foundation piles

Abstract

본 발명은 기초공사용 강관의 상단부 보강구조에 관한 것으로, 종래에는 강관의 내부에 모래를 채워넣거나 거푸집을 설치한 후 그 상부에 수직 연결철근과 함께 콘크리트를 부어 양생시킨 후 확대기초 수평철근을 시공해야 하므로 시공성이 나쁘게 되는 문제가 있고, 강관의 내상부에 십자형 보강부재를 용접하거나 체결볼트를 통해 고정설치하고 십자형 보강부재에 지지원판과 수직연결철근을 용접하는 보강구조는 각 부재를 강관과 용접하는 과정에서 열변형에 의해 강관의 강도가 저하되고, 많은 용접작업에 의해 수직 연결철근을 설치하게 되므로 그 작업이 극히 번거롭게 되고 작업 시간 및 인력이 많이 소요되어 작업비용이 많이 들게 되는 문제점을 갖고 있으며, 볼트체결식의 경우 부재와 강관을 볼트로 체결할때 시공의 어려움이 있을뿐아니라 수직철근을 일일이 나선형홈을 형성해야 하는 문제가 있었다.The present invention relates to the reinforcement structure of the upper end of the steel pipe for the basic construction, conventionally, after filling the sand inside the steel pipe or installing the formwork to pour concrete with a vertical connecting reinforcement on top of it to expand the horizontal foundation reinforcement Therefore, there is a problem of poor workability, and the reinforcing structure for welding the cross reinforcement member to the upper portion of the steel pipe or fixedly fixed through the fastening bolts and welding the support disc and the vertical connecting bar to the cross reinforcing member welds each member to the steel pipe. Due to the heat deformation during the process, the strength of the steel pipe is reduced, and the vertical connection rebar is installed by many welding operations, which makes the work extremely cumbersome and requires a lot of work time and manpower. In the case of bolt fastening, there is no difficulty in construction when bolting members and steel pipes. A vertical reinforcement individually had the problem of forming a spiral groove.

이에 본 발명은, 강관의 내상단부에 지지로드 및 원형링과 원판으로 이루어진 강관보강부재를 용접없이 설치하고 콘크리트를 넣어 양생시키면, 지면에 타설되는 강관의 상단부를 보다 안정적으로 보강함은 물론 강관의 상단부에 보다 간편하게 수직연결철근을 설치하는 기초공사용 강관의 상단부 보강구조를 제공한다.Therefore, the present invention, if the steel rod reinforcing member consisting of the support rod and the circular ring and the disc is installed without welding, and the concrete is cured, the upper end of the steel pipe placed on the ground more stably reinforcement of the steel pipe It provides a reinforcement structure of the upper part of the steel pipe for basic construction for installing vertical connecting bars more easily in the upper part.

Description

기초공사용 강관의 상단부 보강구조{Reinforcement structure for a foundation pile}Reinforcement structure for a foundation pile}

본 발명은 건축이나 토목의 기초공사에 있어서 지면에 타설한 강관의 상단부를 보강하기 위한 기초공사용 강관의 상단부 보강구조에 관한 것으로, 특히 강관의 상단부에 다수의 끼움공을 마련한 원형캡의 강관보강부재를 설치하여 강관에 작용하는 수직 하중 및 측토압에 의해 강관의 상단부가 변경되는 것을 방지할수 있도록 함은 물론 확개기초콘크리트의 수직 연결철근을 간편하게 설치할수 있도록 한 기초공사용 강관의 상단부 보강구조에 관한 것이다.The present invention relates to the reinforcing structure of the upper end of the steel pipe for basic construction for reinforcing the upper end of the steel pipe placed on the ground in the construction or foundation work of civil engineering, in particular the steel pipe reinforcement member of the circular cap provided a plurality of fitting holes in the upper end of the steel pipe To prevent the upper end of the steel pipe from being changed by the vertical load and side soil pressure acting on the steel pipe, as well as to reinforce the structure of the upper end of the steel pipe for basic construction for easy installation of the vertical connecting reinforcement of the basic foundation concrete. .

일반적으로, 건물이나 교량을 축조할 때에는 지면에 해머 등으로 강관을 타설한 후 각 강관의 상부에 수직 연결철근을 설치하고 확대기초콘크리트를 타설하게 되는 바,In general, when constructing a building or a bridge, steel pipes are placed on the ground with hammers, and vertical connecting bars are installed on the upper parts of each steel pipe, and the basic foundation concrete is placed.

하단부가 지하의 암반에 지지되는 각 강관의 상단부에 작용하는 수직 하중 및 강관의 외주면으로 작용하는 측토압에 의해 강관의 상단부가 변형되는 것을 방지하기 위해 강관의 상단부에 보강부재를 설치하는 것이 보통이다.It is common to install a reinforcing member at the upper end of the steel pipe to prevent the upper end of the steel pipe from being deformed by the vertical load acting on the upper end of each steel pipe whose lower end is supported by the rock under the ground and the soil pressure acting as the outer circumferential surface of the steel pipe. .

종래에 있어서 상기 강관의 상단부 보강구조는 강관의 내 상단부에 수직 연결철근과 함께 콘크리트를 타설하는 것과, 도 1 및 도 2에 도시된 바와같이 강관(100)의 내상단부에 십자형 보강부재(200)를 용접한 후 그 상부에 다시 지지원판(300)을 용접하고, 지지원판(300)의 상단 둘레에 다수의 수직 연결철근(400)을용접하는 것, 그리고 지지원판을 용접한 십자형 보강부재를 체결볼트를 통해 강관에 고정 설치하고, 지지원판의 상단 둘레에 형성된 볼트체결공에 수직 연결철근을 나사 결합하는 것 등이 주로 사용되었다.Conventionally, the reinforcing structure of the upper end of the steel pipe is to cast concrete together with the vertical connecting reinforcing bar on the inner upper end of the steel pipe, and the cross-shaped reinforcing member 200 on the inner upper end of the steel pipe 100 as shown in Figs. After welding the welded support disc 300 on top again, welding a plurality of vertical connecting reinforcement 400 around the upper end of the support disc 300, and fastening the cross reinforcement member welded to the support disc It was mainly used to fix the steel pipes through bolts, and to screw vertical connecting bars into bolt fastening holes formed around the top of the support disk.

상기 종래 구조 중에서 우선 강관의 내상단부에 수직 연결철근과 함께 콘크리트를 타설하는 구조는 강관의 상단부를 견고하게 보강할수 있기는 하지만, 강관의 내부에 모래를 채워넣거나 거푸집을 설치한 후 그 상부에 수직 연결철근과 함께 콘크리트를 부어 양생시킨 후 확대기초 수평철근을 시공해야 하므로 시공성이 나쁘게 되는 문제가 있고, 도 1 및 도 2와 같이 강관(100)의 내상부에 십자형 보강부재(200)를 용접하거나 체결볼트를 통해 고정설치하고 십자형 보강부재(200)에 지지원판(300)과 수직 연결철근(400)을 용접하는 보강구조는 각 부재(200)(300)(400)를 강관(100)과 용접하는 과정에서 열변형에 의하여 강관(100)의 강도가 저하되고, 볼트체결식의 경우 부재와 강관을 볼트로 체결할때 시공의 어려움이 있을뿐아니라 수직철근을 일일이 나선형홈을 형성해야 하는 문제가 있었다.Among the conventional structures, the structure in which concrete is poured with the vertical connecting reinforcement at the inner upper end of the steel pipe can be firmly reinforced at the upper end of the steel pipe, but the sand is filled in the inside of the steel pipe or the formwork is installed vertically thereon. Pour the concrete with the connecting reinforcement and then expand the horizontal foundation reinforcement to be installed, there is a problem that the construction is bad, welding the cross-shaped reinforcing member 200 in the upper portion of the steel pipe 100 as shown in Figs. The reinforcing structure fixedly installed through the fastening bolt and welding the support disc 300 and the vertical connecting reinforcement 400 to the cross-shaped reinforcement member 200 welds each member 200, 300, 400 to the steel pipe 100. In the process of heat deformation, the strength of the steel pipe 100 is lowered, and in the case of bolting type, there is not only the difficulty of construction when fastening the member and the steel pipe with bolts, but also the spiral grooves are vertically There was a problem of sex.

한편, 지면에 타설되는 다수의 강관의 상부에는 바닥면 확대기초콘크리트공사를 위한 수평 바닥철근이 가로방향 및 세로방향으로 설치되는 바, 상기 종래의 강관 상단부 보강구조들에 있어서는 강관(100)의 상부에 수직 연결철근(400)을 먼저 설치하는 경우에 수직으로 세워진 수직 연결철근(400)이 강관(100) 주변에 수평 바닥철근을 설치하는 것을 방해하게 되어 작업이 힘들게 되는 문제가 있었고, 수평바닥철근을 먼저 설치한 후에 수직연결철근(400)을 용접하는 경우에도 강관(100)주위에 설치된 수평바닥철근이 수직연결철근(400)의 설치작업에 방해하게 되는 문제점을 안고 있었다.On the other hand, in the upper part of the plurality of steel pipes to be placed on the ground horizontal bar is installed in the horizontal direction and vertical direction for the bottom-based foundation concrete construction bar, in the conventional steel pipe upper end reinforcement structures of the upper part of the steel pipe 100 In the case of installing the vertical connecting reinforcing bar (400) first in the vertical connecting bar (400) vertically erected to interfere with the installation of the horizontal floor reinforcement around the steel pipe 100, there was a problem that the work becomes difficult, horizontal floor rebar Even after the first installation of the vertical connecting reinforcement (400) even when welding the horizontal floor reinforcement installed around the steel pipe 100 had a problem that interferes with the installation work of the vertical connecting reinforcement (400).

이에 종래에는 도 3에서와 같이, 강관(100)의 내상단부에 원형의 걸림돌기 (5)를 용접으로 고정한 후 그 위로 원형판(6)을 올려 용접으로 고정하였다.Therefore, in the related art, as shown in FIG. 3, the circular locking protrusion 5 is fixed to the inner upper end of the steel pipe 100 by welding, and then the circular plate 6 is placed thereon to be fixed by welding.

그리고, 상기 강관(100)의 내상단부에 고정된 걸림돌기(5)의 위로는 다시 원형링(7)을 복수단으로 용접 고정한 후, 상기 강관(100)의 내상단부로 수직연결철근 (400)이 삽입되도록 하였다.Then, the welding protrusions 5 fixed to the inner upper end of the steel pipe 100 are welded to the circular ring 7 in a plurality of stages again, and then vertically connected reinforcement 400 to the inner upper end of the steel pipe 100. This was to be inserted.

이후, 상기 수직연결철근(400)이 삽입되어 있는 강관(100)의 내상단부로 확대기초콘크리트(500)가 삽입되도록 하였는 바,Thereafter, the expanded basic concrete 500 was inserted into the inner upper end of the steel pipe 100 into which the vertical connection rebar 400 was inserted.

상기 확대기초콘크리트(500)는 강관(100)의 내상단부에 용접으로 고정된 원형판(6)에 의해 지지된 후 그 내측 둘레면에 형성되어 있는 복수단의 원형링(7)으로 부터 양생시의 견고함을 유지할수 있도록 하였다.The expanded basic concrete 500 is supported by a circular plate 6 fixed to the inner upper end of the steel pipe 100 by welding, and then cured from a plurality of stages of circular rings 7 formed on the inner circumferential surface thereof. It was able to maintain the robustness.

그러나, 상기와 같은 종래의 제 2 실시예 또한 다음과 같은 문제점을 안고 있었다.However, the second conventional embodiment as described above also has the following problems.

즉, 강관(100)의 내상단부로 확대기초콘크리트(500)를 삽입하기 위한 걸림돌기(5), 원형판(6), 원형링(7)이 모두 용접으로 그 고정이 이루어지는 관계로, 작업의 효율성이 저하되는 단점을 갖고 있다.That is, since the locking projection 5, the circular plate 6, and the circular ring 7 for inserting the enlarged basic concrete 500 into the inner upper end of the steel pipe 100 are all fixed by welding, the efficiency of work This has the disadvantage of deteriorating.

더불어, 종래 구조의 제 1 실시예에서와 같이, 강관(100)의 상부에 수직연결철근(400)을 먼저 설치하는 경우에 수직으로 세워진 수직연결철근(400)이 강관(100) 주변에 수평바닥철근(3)을 설치하는 것을 방해하게 되어 작업이 힘들게되는 문제가 있었고, 수평바닥철근(3)을 먼저 설치한 후에 수직연결철근(400)을 용접하는 경우에도 강관(100) 주위에 설치된 수평바닥철근(3)이 수직연결철근(400)의 설치작업에 방해하게 되는 문제점을 안고 있었다.In addition, as in the first embodiment of the conventional structure, in the case of installing the vertical connecting bar 400 first on the upper portion of the steel pipe 100, the vertical connecting bar 400, which is vertically erected on the horizontal bottom around the steel pipe 100 There was a problem that the work is difficult to interfere with the installation of the reinforcing bar (3), even when the horizontal bottom reinforcing bar (3) is installed first and then the vertical connection reinforcement (400) welded horizontal floor installed around the steel pipe (100) Rebar (3) had a problem that interferes with the installation of the vertical connection rebar (400).

따라서, 본 발명은 상기와 같은 종래의 문제점을 해결하기 위해 안출된 것으로서 본 고안의 목적은, 지면에 타설되는 강관의 상단부를 보다 안정적으로 보강할수 있도록 함은 물론 강관의 상단부에 보다 간편하게 수직연결철근을 설치할수 있도록 하는 기초공사용 강관의 상단부 보강구조를 제공하려는데 있는 것이다.Therefore, the present invention has been made to solve the conventional problems as described above, an object of the present invention, to more stably reinforce the upper end of the steel pipe to be placed on the ground, as well as more easily vertical connecting rebar on the upper end of the steel pipe It is to provide the reinforcement structure of the upper part of the steel pipe for the foundation works to be installed.

도 1은 종래 구조의 사시도를 보인 제 1 실시예.1 is a first embodiment showing a perspective view of a conventional structure;

도 2는 종래 구조의 종단면도를 보인 제 1 실시예.Figure 2 is a first embodiment showing a longitudinal cross-sectional view of a conventional structure.

도 3은 종래 구조의 단면도를 보인 제 2 실시예.3 is a second embodiment showing a sectional view of a conventional structure;

도 4는 본 발명의 일실시예로 기초공사용 강관 상단부 보강구조의 분해사시도.Figure 4 is an exploded perspective view of the reinforcement structure of the upper end of the steel pipe for public works as an embodiment of the present invention.

도 5는 본 발명의 일실시예로 기초공사용 강관 상단부 보강구조의 결합단면도.Figure 5 is a cross-sectional view of the coupling structure of the steel pipe upper end reinforcement structure for an embodiment of the present invention.

도 6은 본 발명의 일실시예로 기초공사용 강관 상단부 보강구조의 사용상태도.Figure 6 is a state of use of the steel pipe upper end reinforcement structure for the basic construction as an embodiment of the present invention.

*도면의주요부분에대한부호의설명** Explanation of symbols on the main parts of the drawings *

1 ; 체결볼트 2 ; 지면One ; Fastening bolt 2; surface

3 ; 수평바닥철근 4 ; 암반3; Horizontal bottom rebar 4; Bedrock

10; 지지로드 20; 원형링10; Support rod 20; Circular ring

30; 원판 40; 수직철근삽입구멍30; Disc 40; Vertical Rebar Insertion Holes

100; 강관 100a; 볼트삽입공100; Steel pipe 100a; Bolt inserter

400; 수직연결철근 500; 확대기초콘크리트400; Vertical rebar 500; Expanding foundation concrete

이하, 첨부된 도면에 의거하여 본 발명의 바람직한 일실시예를 설명하면 다음과 같다.Hereinafter, preferred embodiments of the present invention will be described with reference to the accompanying drawings.

참고로 이하에 참조되는 도면에 대하여는 설명의 편의상 종래와 동일한 부분에 대해서는 동일한 참조 번호를 부여하여 설명한다.For reference, the drawings referred to below will be described with the same reference numerals for the same parts as in the prior art for convenience of description.

도 4는 본 발명의 일실시예로 기초공사용 강관 상단부 보강구조의 분해사시도이고, 도 5는 본 발명의 일실시예로 기초공사용 강관 상단부 보강구조의 결합단면도이며, 도 6은 본 발명의 일실시예로 기초공사용 강관 상단부 보강구조의 사용상태도 이다.Figure 4 is an exploded perspective view of the steel pipe upper end reinforcement structure for the basic construction as an embodiment of the present invention, Figure 5 is a cross-sectional view of the coupling structure of the steel pipe upper end reinforcement structure for the basic construction as an embodiment of the present invention, Figure 6 is an embodiment of the present invention For example, the state of use of reinforcement structure at the top of steel pipe for basic construction.

도 4 내지 도 6에 도시된 바와같이, 강관(100)의 내상단부에 확대기초콘크리트(500)가 삽입되도록 강관보강부재를 결합시키되,As shown in Figure 4 to Figure 6, but combines the steel pipe reinforcement member so that the expansion-based concrete 500 is inserted into the inner upper end of the steel pipe 100,

상기 강관보강부재는 수직으로 세워지는 다수의 지지로드(10)로 부터 일체화되는 원형링(20)과 원판(30)으로 구성하면서 콘크리트가 채워졌을 때 볼트체결공 (100a)으로 체결이 이루어지는 체결볼트(1)로 부터 그 이탈이 방지되도록 하고,The steel pipe reinforcing member is composed of a circular ring 20 and a disc 30, which are integrated from a plurality of support rods 10 which are erected vertically, and is fastened to a bolt fastening hole 100a when concrete is filled. To prevent its departure from (1),

상기 원형링(20)의 직경은 원판(30)의 직경보다 크게 하여 강관(100)의 상단부에 걸림이 이루어지도록 하고, 그 평면상에는 수직연결철근(400)이 삽입되면서 원판(30)의 상면 또는 스페이셔에 접촉될수 있도록 다수의 수직철근삽입구멍(40)을 형성하며,The diameter of the circular ring 20 is larger than the diameter of the disc 30 so that the upper end of the steel pipe 100 is engaged, and the vertical connecting reinforcement 400 is inserted into the top surface of the disc 30 or Forming a plurality of vertical rebar insertion holes 40 to be in contact with the spacer;

상기 원형링(20)과 원판(30)은 동일직선(수직)상에 위치하면서 강관(100)의 내상단부로 삽입되어 내측면과 밀접상태를 유지하게 하고,The circular ring 20 and the disc 30 is inserted into the inner upper end of the steel pipe 100 while being located on the same straight line (vertical) to maintain a close state with the inner surface,

상기 원형링(20)과 원판(30) 사이에는 레미콘을 채워지게 하여 강관(100)의 상단부 보강구조를 이루도록 하고, 수직연결철근(400)과 함께 확대기초에 연결되는 구조를 갖고 있다.Between the circular ring 20 and the disc 30 is filled with ready-mixed concrete to form a reinforcing structure of the upper end of the steel pipe 100, and has a structure connected to the expansion base with the vertical connection reinforcement (400).

여기서, 상기 강관(100)의 볼트체결공(100a)으로 체결되는 체결볼트(1)는 내상단부로 삽입이 이루어진 원형링(20)과 원판(30) 사이를 수평으로 관통하게 되는 바, 상기 체결볼트(1)는 콘크리트의 조밀도를 향상시킬수 있을뿐만 아니라 원판(30)의 이탈을 방지하는 기능을 하게 된다.Here, the fastening bolt 1 is fastened to the bolt fastening hole (100a) of the steel pipe 100 is to pass horizontally between the circular ring 20 and the disc 30 is inserted into the inner upper end, the fastening The bolt 1 may not only improve the density of the concrete but also function to prevent the departure of the disc 30.

이하, 미설명된 도면부호 2는 지면, 4는 암반이다.Hereinafter, reference numeral 2, which is not described, refers to the ground, and 4 to the rock.

이와같이 구성된 본 발명의 일실시예에 대한 작용을 첨부된 도 4 내지 도 6을 참조하여 설명하면 다음과 같다.Referring to Figures 4 to 6 attached to the operation of an embodiment of the present invention configured as described above are as follows.

도 6에 도시된 바와같이, 지면(2)에 강관(100)을 타설시킨다.As shown in FIG. 6, the steel pipe 100 is poured on the ground 2.

이후, 상기 강관(100)의 내상단부에 강관보강부재로서 수직으로 세워지는 다수의 지지로드(10)로 부터 일체화되는 원형링(20)과 원판(30)을 삽입한다.Subsequently, the circular ring 20 and the disc 30 are integrated into the inner upper end of the steel pipe 100 from a plurality of support rods 10 which are vertically erected as steel pipe reinforcing members.

그러면, 상기 수직으로 일직선상에 위치하는 원판(30)과 지지로드(10)는 강관(100)의 내상단부 내부로 그 삽입이 이루어지면서 강관(100)의 내측면과 긴밀한 접촉상태를 유지하게 된다.Then, the disk 30 and the support rod 10 positioned in a vertical line are inserted into the inner upper end of the steel pipe 100 to maintain intimate contact with the inner surface of the steel pipe 100. .

더불어, 상기 원형링(20)은 그 직경이 원판(30)의 직경보다 크게 설계되어 있는 바, 상기 원형링(20)은 강관(100)의 상단부면에 걸림동작을 한다.In addition, the diameter of the circular ring 20 is designed to be larger than the diameter of the disc 30, the circular ring 20 is engaged with the upper end surface of the steel pipe (100).

이후, 상기 강관(100)의 내상단부 둘레면에 형성된 볼트체결공(100a)으로 체결볼트(1)를 체결하면, 상기 체결볼트(1)는 강관(100)의 내상단부로 삽입이 이루어진 원형링(20)과 원판(30) 사이를 수평으로 관통하게 되는 바, 상기 체결볼트(1)는 콘크리트의 조밀도를 향상시킬수 있을뿐만 아니라 원판(30)의 이탈을 방지하는 기능을 하게 된다.Then, when the fastening bolt 1 is fastened to the bolt fastening hole 100a formed on the inner upper end circumferential surface of the steel pipe 100, the fastening bolt 1 is inserted into the inner upper end of the steel pipe 100. Bar 20 is to penetrate horizontally between the disc 30, the fastening bolt 1 can not only improve the density of the concrete but also to prevent the departure of the disc 30.

이후, 상기 강관(100)의 상부에 가로방향 및 세로방향으로 확대기초콘크리트 (500)의 수평바닥철근(3)을 엮어 설치작업을 종료한다.Thereafter, the installation of the horizontal bottom reinforcing bar 3 of the expanded basic concrete 500 in the horizontal and vertical directions on the top of the steel pipe 100 is completed.

이때, 상기 원형링(20)의 면상에는 다수의 수직철근삽입구멍(40)이 형성되어 있는 바, 상기 수평바닥철근(3)의 틈새를 이용하여 수직철근삽입구멍(40)으로 수직연결철근(400)을 삽입하면, 상기 수직연결철근(400)의 일측끝단은 원판(30)의 상면으로 그 접촉상태를 유지하면서 용접작업없이도 그 설치가 간편하게 이루어진다.At this time, a plurality of vertical reinforcing hole 40 is formed on the surface of the circular ring 20, using the gap of the horizontal bottom reinforcing bar (3) vertical connecting reinforcement (40) When the 400 is inserted, one end of the vertical connection rebar 400 is easily installed without welding while maintaining its contact with the upper surface of the disc 30.

한편, 상기 강관(100)의 위로 수직연결철근(400) 및 수평바닥철근(3)이 설치된 지면(2)으로 확대기초콘크리트(500)를 부으면, 상기 확대기초콘크리트(500)는 수직연결철근(400) 및 수평바닥철근(3)을 덮음과 동시에 강관(100)의 내상단부 내부로 유입된다.On the other hand, when the expansion foundation concrete 500 is poured into the ground (2) on which the vertical connection reinforcement 400 and the horizontal bottom reinforcement (3) is installed above the steel pipe 100, the expansion foundation concrete 500 is a vertical connection reinforcement ( 400 and the horizontal bottom reinforcement (3) and at the same time flows into the inner upper end of the steel pipe (100).

즉, 상기 강관(100)의 내상단부에 설치되어 있는 강관보강부재의 원판(30)과 지지로드(10)가 강관(100)의 내상단부 내부에 삽입되면서 강관(100)의 내측면과 긴밀한 접촉상태를 유지하면서 공간을 형성하고 있는 바,That is, the disc 30 and the support rod 10 of the steel pipe reinforcing member is installed in the inner upper end of the steel pipe 100 is in close contact with the inner surface of the steel pipe 100 while being inserted into the inner upper end of the steel pipe (100). Bars forming a space while maintaining the state,

상기 원판(30)과 지지로드(10) 및 강관(100)의 긴밀한 접촉상태에 따라 형성된 공간으로는 확대기초콘크리트(500)가 유입되는 것이다.Expanded basic concrete 500 is introduced into the space formed according to the close contact state of the disc 30, the support rod 10 and the steel pipe 100.

이때, 상기 유입되는 확대기초콘크리트(500)는 원형링(20)과 원판(30) 사이에 수직으로 세워진 수직연결철근(400) 및 수평으로 관통된 체결볼트(1)에 의해 그 조밀도가 높아질뿐만 아니라 원판(30)의 이탈을 방지하게 되는 것이다.At this time, the flow of the expanded basic concrete 500 is increased by the vertical connection reinforcement 400 and the fastening bolt (1) vertically erected vertically between the circular ring 20 and the disc 30 As well as to prevent the departure of the disc (30).

이상에서 설명한 바와같이 본 발명은 강관의 내상단부에 지지로드 및 원형링과 원판으로 이루어진 강관보강부재를 용접없이 설치하므로서, 지면에 타설되는 강관의 상단부를 보다 안정적으로 보강할수 있도록 함은 물론 강관의 상단부에 용접작업없이도 보다 간편하게 수직연결철근을 설치할수 있도록 하는 효과를 제공한다.As described above, the present invention installs a steel rod reinforcing member consisting of a support rod and a circular ring and a disc at the inner upper end of the steel pipe without welding, thereby making it possible to more stably reinforce the upper end of the steel pipe being placed on the ground. It provides the effect that vertical connecting bar can be installed more easily without welding work on the upper part.

본 발명은 상술한 특정의 바람직한 실시예에 한정되지 아니하며, 청구범위에서 청구하는 본 발명의 요지를 벗어남이 없이 당해 발명이 속하는 기술분야에서 통상의 지식을 가진 자라면 누구든지 다양한 변형 실시가 가능한 것은 물론이고, 그와같은 변경은 청구범위 기재의 범위내에 있게 된다.The present invention is not limited to the above-described specific preferred embodiments, and various modifications can be made by any person having ordinary skill in the art without departing from the gist of the present invention claimed in the claims. Of course, such changes will fall within the scope of the claims.

Claims (1)

강관의 내상단부에 확대기초콘크리트가 삽입되도록 강관보강부재를 결합시키되,Coupling the steel pipe reinforcing member so that the expansion-based concrete is inserted into the inner upper end of the steel pipe, 상기 강관보강부재는 수직으로 세워지는 다수의 지지로드로 부터 일체화되는 원형링과 원판으로 구성하면서 콘크리트가 채워졌을 때 볼트체결공으로 체결이 이루어지는 체결볼트로 부터 그 이탈이 방지되도록 하고,The steel pipe reinforcement member is composed of a circular ring and a disc integrated from a plurality of support rods erected vertically to prevent the departure from the fastening bolt is fastened to the bolt fastening when the concrete is filled, 상기 원형링의 직경은 원판의 직경보다 크게 하여 강관의 상단부에 걸림이 이루어지도록 하고, 그 평면상에는 수직연결철근이 삽입되면서 원판의 상면 또는 스페이셔에 접촉될수 있도록 다수의 수직철근삽입구멍을 형성하며,The diameter of the circular ring is larger than the diameter of the disk to be hooked to the upper end of the steel pipe, the vertical connection reinforcement is inserted into the plane to form a plurality of vertical reinforcement insertion holes to be in contact with the top surface or the spacer of the disk , 상기 원형링과 원판은 동일직선(수직)상에 위치하면서 강관의 내상단부로 삽입되어 내측면과 밀접상태를 유지하게 하고,The circular ring and the disc is placed on the same straight line (vertical) and inserted into the inner upper end of the steel pipe to maintain a close state with the inner surface, 상기 원형링과 원판 사이에는 레미콘이 채워지게 하여 강관의 상단부 보강을 이루도록 하고, 수직연결철근과 함께 확대기초에 연결함을 특징으로 하는 기초공사용 강관의 상단부 보강구조.Between the circular ring and the disc to be filled with ready-mixed concrete to achieve the reinforcement of the upper end of the steel pipe, and the reinforcement structure of the upper end of the basic public steel pipe, characterized in that it is connected to the expansion base with a vertical connecting rebar.
KR1020000050551A 2000-08-29 2000-08-29 Reinforcement structure for a foundation pile KR100323112B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020000050551A KR100323112B1 (en) 2000-08-29 2000-08-29 Reinforcement structure for a foundation pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020000050551A KR100323112B1 (en) 2000-08-29 2000-08-29 Reinforcement structure for a foundation pile

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
KR2020000022652U Division KR200212743Y1 (en) 2000-08-09 2000-08-09 Reinforcement structure for a foundation pile

Publications (2)

Publication Number Publication Date
KR20000064205A KR20000064205A (en) 2000-11-06
KR100323112B1 true KR100323112B1 (en) 2002-02-06

Family

ID=19685967

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020000050551A KR100323112B1 (en) 2000-08-29 2000-08-29 Reinforcement structure for a foundation pile

Country Status (1)

Country Link
KR (1) KR100323112B1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100488897B1 (en) * 2002-02-01 2005-05-17 비비엠코리아(주) Head reinforced apparatus for steel pipe piles

Families Citing this family (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100387751B1 (en) * 2000-10-16 2003-06-25 배정효 Reinforcement structure for a foundation pile
KR100394072B1 (en) * 2000-10-24 2003-08-09 주식회사삼안건설기술공사 The connectors for steel pile head embedded in concrete footing and thereof structure
KR20010067001A (en) * 2000-11-14 2001-07-12 홍성영,이병도 The connection structure between steel pile head and concrete footing using connector and thereof connector
KR100397847B1 (en) * 2000-12-06 2003-09-13 비비엠코리아(주) Head reinforced apparatus for steel pipe piles
KR100423933B1 (en) * 2000-12-06 2004-03-24 비비엠코리아(주) Head rein forced apparatus for steel pipe piles
KR100437260B1 (en) * 2001-05-22 2004-06-23 비비엠코리아(주) steel pipe pile connecting head reinforce ment structure
KR100437261B1 (en) * 2001-08-03 2004-06-23 비비엠코리아(주) steel pipe pile head reinforcement structure
CN103114581B (en) * 2013-01-28 2015-06-03 杨发 Manufacture method of prestressed reinforced concrete piles

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100488897B1 (en) * 2002-02-01 2005-05-17 비비엠코리아(주) Head reinforced apparatus for steel pipe piles

Also Published As

Publication number Publication date
KR20000064205A (en) 2000-11-06

Similar Documents

Publication Publication Date Title
JP5023219B2 (en) Precast temporary structure and construction method thereof
KR100788623B1 (en) Top-down method using precast-concrete colum
KR101687495B1 (en) Partial top-down construction method for building underground structures
KR100886922B1 (en) Footing reinforcing or structure recovering method
JP2007051541A (en) Retaining wall and construction method therefor
KR200212743Y1 (en) Reinforcement structure for a foundation pile
KR20130006420A (en) Method of constructing underground structure to be newly built
KR100323112B1 (en) Reinforcement structure for a foundation pile
KR101648704B1 (en) Underground wall structure
KR102286225B1 (en) Method for constructing underground structure busing PC integrating method without support
KR20080100740A (en) Strut system of temporary plate with opening supporting temporary retaining wall and subgrade external wall construction method utilizing the same
JP2007162266A (en) Two-step earth retaining wall and its construction method
KR101331219B1 (en) Method for constructing micro pile using reinforcing end bearing capacity
KR100673475B1 (en) A pc girder member for frame of underground layer and assembling structure of frame of underground by using of it and the method therof
KR100662524B1 (en) Double pipe girder struts as permanent system
KR20060048843A (en) Reinforcement structure for a foundation pile
JPH1018424A (en) Root wrapping reinforcing structure of column base of steel post or the like
KR100387751B1 (en) Reinforcement structure for a foundation pile
KR20190142546A (en) Construction method of subsurface structure using outer shell suspension
KR100458323B1 (en) The upper part reinforcement structure of a steel pipe for base construction
JP7275844B2 (en) WALL-LIKE STRUCTURE AND METHOD OF CONSTRUCTING WALL-LIKE STRUCTURE
KR200219074Y1 (en) Reinforcement structure for a foundation pile
RU2123091C1 (en) Foundation for metal column, method of foundation construction and alignment
KR101845870B1 (en) Reinforcement Structure and Method of PHC Pile, and PHC Pile having such Reinforcement Structure
JP2006188862A (en) Construction method of structure, and foundation structure used for the same

Legal Events

Date Code Title Description
A108 Dual application of patent
A201 Request for examination
G15R Request for early opening
A302 Request for accelerated examination
E801 Decision on dismissal of amendment
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
O035 Opposition [patent]: request for opposition
O132 Decision on opposition [patent]
O074 Maintenance of registration after opposition [patent]: final registration of opposition
FPAY Annual fee payment

Payment date: 20121231

Year of fee payment: 12

FPAY Annual fee payment

Payment date: 20131126

Year of fee payment: 13

FPAY Annual fee payment

Payment date: 20141128

Year of fee payment: 14

FPAY Annual fee payment

Payment date: 20160105

Year of fee payment: 15

FPAY Annual fee payment

Payment date: 20170213

Year of fee payment: 16

LAPS Lapse due to unpaid annual fee