KR20010057454A - Anchor for steel pier by using deformed bar - Google Patents
Anchor for steel pier by using deformed bar Download PDFInfo
- Publication number
- KR20010057454A KR20010057454A KR1019990060895A KR19990060895A KR20010057454A KR 20010057454 A KR20010057454 A KR 20010057454A KR 1019990060895 A KR1019990060895 A KR 1019990060895A KR 19990060895 A KR19990060895 A KR 19990060895A KR 20010057454 A KR20010057454 A KR 20010057454A
- Authority
- KR
- South Korea
- Prior art keywords
- anchor
- steel
- frame
- construction
- present
- Prior art date
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D19/00—Structural or constructional details of bridges
- E01D19/02—Piers; Abutments ; Protecting same against drifting ice
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D22/00—Methods or apparatus for repairing or strengthening existing bridges ; Methods or apparatus for dismantling bridges
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Bridges Or Land Bridges (AREA)
Abstract
Description
본 발명은 강재교각의 기둥부 기초에 사용되는 앵커(ANCHOR)에 관한 것으로, 보다 상세히는 이형봉강에 다수개의 스터드를 장착하여 기초 콘크리트에 일체화함으로서 종래의 앵커프레임을 생략하여 시공과 설계의 편리성을 도모하고, 시공공정을 단축하여 경제적인 기초작업이 이루어질 수 있도록 개선된 이형봉강을 이용한 강재교각용 앵커에 관한 것이다.The present invention relates to an anchor (ANCHOR) used for the pillar base of steel piers, more specifically, by mounting a plurality of studs to the release bar to integrate to the foundation concrete, eliminating the conventional anchor frame, convenience of construction and design It is related to the anchor for steel piers using an improved release bar so that the basic construction can be made economically by shortening the construction process.
일반적으로 종래의 방식에 의한 강재교각 기초부(100)는 도 6에 나타낸 바와 같이 강재기둥(110)이 기초 콘크리트(120) 속에 매설된 앵커프레임(130a)(130b)과 앵커볼트(140)를 통하여 연결되어 외력에 저항하는 방식이다.In general, the steel piers foundation 100 according to the conventional method, as shown in FIG. 6, the steel pillars 110 are anchor frames 130a and 130b and anchor bolts 140 embedded in the foundation concrete 120. It is connected through and resists external force.
이와 같은 종래의 강재교각용 기초부(100)의 방식에 의하는 경우, 다수개의 앵커볼트(140)들이 도 7에 도시된 바와 같이 기초 콘크리트(120) 속에서 상하 철구조물을 이루는 상,하부 앵커 프레임(130a)(130b)에 의해서 매설 고정되고, 이러한 앵커볼트(140)들의 머리 나사부(140a)가 기초 콘크리트(120)의 상부로 돌출되어 교각 기둥부의 하단을 이루는 하측 프레임(150)에 연결 고정된다.According to the conventional method of the steel piers foundation 100 as described above, a plurality of anchor bolts 140 as shown in Figure 7, the upper and lower anchors forming the upper and lower steel structures in the base concrete 120 Buried and fixed by the frame (130a, 130b), the head screw portion (140a) of these anchor bolts 140 is projected to the upper portion of the base concrete 120 and fixed to the lower frame 150 forming the bottom of the pier pillar portion do.
상기 교각 기둥부의 하측 프레임(150)은 상,하부 플레이트(152)를 갖추고, 그 사이에는 다수개의 보강 리브(154)들을 장착하며, 상기 리브(154)들 사이의 공간에서 상,하부 플레이트(152)들을 관통하도록 앵커볼트(140)의 머리 나사부(140a)들이 끼워지고, 이들은 그 상부에서 너트(160)로 고정되며, 도 8에 도시된 바와 같이 하측 프레임(150)의 주위를 에워싸면서 형성된다.The lower frame 150 of the pier pillar portion has upper and lower plates 152, and a plurality of reinforcing ribs 154 are mounted therebetween, and upper and lower plates 152 in the space between the ribs 154. The head screws 140a of the anchor bolt 140 are fitted to penetrate through the pads, which are fixed to the nut 160 at an upper part thereof, and are formed while surrounding the lower frame 150 as shown in FIG. 8. do.
그러나, 이와 같은 종래의 강재 교각용 기초부(100)에서는 기초 콘크리트(120)내에 매설되는 상,하부 앵커프레임(130a)(130b)의 제작과 시공이 복잡하고 비경제적인 구조이며, 강재교각의 기둥부가 기초콘크리트(120)에 매설된 앵커프레임(130a)(130b)과 앵커볼트(140)의 체결력에 의존하게 되어 앵커 프레임(130a)(130b)과 앵커볼트(140)의 시공시 많은 주위가 필요하게 된다.However, in such a conventional steel piers foundation 100, the fabrication and construction of the upper and lower anchor frames (130a, 130b) embedded in the foundation concrete 120 is a complicated and uneconomical structure, pillars of steel piers Depending on the fastening force of the anchor frame (130a) (130b) and the anchor bolt 140 embedded in the additional foundation concrete 120, a lot of surroundings are required when constructing the anchor frame (130a) (130b) and the anchor bolt (140) Done.
즉, 종래의 앵커 프레임(130a)(130b)과 앵커볼트(140)의 시공방식은 각각의 앵커 프레임(130a)(130b)들을 기초 콘크리트(120)의 타설전에 수평상태로 조립하고, 이들에 각각 다수개의 앵커볼트(140)들을 수직으로 나사 결합시키는 것으로서, 이들 앵커프레임(130a)(130b)들은 중량의 철구조물이기 때문에 이들을 제작한다던가, 이들을 현장에서 레벨 맞춤하는 데에는 이들을 위치이동시키기 위한 별도의 크레인등이 마련되어야 하고, 다수의 작업자가 필요한 것이다.That is, in the conventional construction method of the anchor frame (130a, 130b) and the anchor bolt 140, each of the anchor frame (130a, 130b) is assembled in a horizontal state before the foundation concrete 120, respectively, By screwing a plurality of anchor bolts 140 vertically, these anchor frames (130a, 130b) is a heavy steel structure, so they are manufactured, or in order to level them in the field to separate them to move them A crane, etc. must be provided and a large number of workers are required.
또한, 종래의 앵커볼트(140)는 그 자체가 기초 콘크리트(120)와의 결합능력이 약한것이어서 이들은 반드시 앵커 프레임(130a)(130b)을 통하여 기초 콘크리트(120)에 매설되어야만 기초 콘크리트(120)와의 일체 거동이 가능한 것이다. 따라서, 종래의 앵커볼트(140)는 반드시 앵커 프레임(130a)(130b)의 시공을 수반하는 것이고, 강재교각용 기초부(100)의 시공을 어렵게 하는 것이었다.In addition, the conventional anchor bolt 140 itself is weak coupling capacity with the base concrete 120, so they must be embedded in the base concrete 120 through the anchor frame (130a, 130b) and the base concrete 120 Any behavior is possible. Therefore, the conventional anchor bolt 140 is necessarily accompanied by the construction of the anchor frame (130a, 130b), making the construction of the steel piercing base portion 100 difficult.
즉, 종래의 강재교각 기초부(100)는 구조적으로 복잡하여 설계, 제작 및 시공성이 나빠 비경제적이기 때문에, 조립식으로 시공이 용이하고 기초콘크리트(120)와의 일체화 거동을 도모한 효율적인 강재교각용 앵커의 개발이 크게 요구되는 것이었다.That is, since the conventional steel piers foundation 100 is structurally complicated and poor in design, fabrication, and construction, it is uneconomical, and therefore, it is easy to construct and can be integrated with the foundation concrete 120. Development was in great demand.
본 발명은 상기와 같은 종래의 문제점을 해소하기 위한 것으로 그 목적은, 종래의 앵커프레임을 생략하여 시공과 설계의 편리성을 도모할 수 있고, 시공공정을 단축하여 경제적인 기초작업이 이루어질 수 있도록 개선된 이형봉강을 이용한 강재교각용 앵커를 제공함에 있는 것이다.The present invention is to solve the conventional problems as described above, the purpose is to omit the conventional anchor frame to facilitate the construction and design, and to shorten the construction process so that the economical basic work can be made It is to provide an anchor for steel piers using an improved release bar.
도 1은 본 발명에 따른 강재교각용 앵커를 이용하여 강재교각 기초를 시공한 측단면도;1 is a side cross-sectional view of the construction of the steel piers foundation using the steel piers anchor according to the present invention;
도 2는 본 발명에 따른 강재교각용 앵커를 도시한 측면도;Figure 2 is a side view showing an anchor for a steel pier according to the present invention;
도 3은 본 발명의 변형실시예에 따른 강재교각용 앵커를 도시한 측면도;Figure 3 is a side view showing a steel pier anchor according to a modified embodiment of the present invention.
도 4는 도 3에 도시된 본 발명에 따른 강재교각용 앵커의 상세도로서,4 is a detailed view of a steel pier anchor according to the present invention shown in Figure 3,
a)는 도 3의 A-A선을 따른 단면도;a) is a sectional view along the line A-A of FIG. 3;
b)는 도 3의 B-B선을 따른 단면도;b) is a cross sectional view along line B-B in FIG. 3;
c)는 도 3의 C-C선을 따른 단면도;c) is a cross sectional view along line C-C in FIG. 3;
도 5는 본 발명의 강재교각용 앵커를 수직설치하기 위한 연결 프레임을 도시한 외관도;Figure 5 is an external view showing a connecting frame for vertical installation of the steel piers anchor of the present invention;
도 6은 일반적인 강재교각 기둥부의 기초부분을 도시한 측면도;Figure 6 is a side view showing the base portion of the general steel pier pillars.
도 7은 종래의 기술에 따른 강재교각용 앵커를 이용하여 강재교각 기초를 시공한 측단면도;Figure 7 is a side cross-sectional view of the construction of the steel piers base using the steel piers anchor according to the prior art;
도 8은 도 5의 D-D 선을 따른 단면도이다.FIG. 8 is a cross-sectional view taken along the line D-D of FIG. 5.
* 도면의 주요부분에 대한 부호의 설명 *Explanation of symbols on the main parts of the drawings
10..... 보디부 12..... 스터드10 ..... Body 12 ..... Stud
17..... 나사부 20..... 너트17 ... Thread 20 ... Nut
30..... 연결 프레임 32..... 클램프30 ..... Connection frame 32 ..... Clamp
40..... 경사면 100... 기초부40 ..... Slope 100 ... Foundation
120.... 기초 콘크리트 130a,130b... 상,하부 앵커프레임120 .... Foundation concrete 130a, 130b ... Upper and lower anchor frames
140.... 앵커볼트140 .... Anchor Bolt
상기와 같은 목적을 달성하기 위하여 본 발명은,The present invention to achieve the above object,
강재교각의 기둥부 기초에 사용되는 앵커(ANCHOR)에 있어서,In anchor used for pillar base of steel pier,
이형봉강으로 이루어진 보디부의 상하단에는 각각 너트가 장착되는 나사부가 형성되고, 길이방향으로는 다수개의 스터드가 일정간격으로 장착되어 기초 콘크리트에 매설됨으로서 기초 콘크리트와의 결합성능을 개선시킨 이형봉강을 이용한 강재교각용 앵커를 마련함에 의한다.The upper and lower ends of the body part made of the deformed bar are formed with threaded parts, each of which is equipped with a nut, and in the longitudinal direction, a plurality of studs are mounted at a predetermined interval and embedded in the base concrete, thereby improving the coupling performance with the base concrete. By providing pier anchors.
그리고, 본 발명은 상기 보디부의 양측면에 각각 길이방향의 절단면을 형성하고, 상기 스터드가 형성되는 이형봉강을 이용한 강재교각용 앵커를 마련함에 의한다.In addition, the present invention is to form a longitudinal cutting surface on each side surface of the body portion, and to provide a steel pier anchor using a release bar that the stud is formed.
이하, 본 발명을 도면에 따라서 보다 상세히 설명한다.Hereinafter, the present invention will be described in more detail with reference to the drawings.
본 발명의 강재교각용 앵커(1)는 교량의 하부구조에 사용되는 강재교각의 경제적및 효율적인 시공을 위하여 개발된 것으로, 앵커프레임(130a)(130b)과 앵커볼트(140)로 구성되어 볼트의 체결력에 의존하던 종래의 방식에 비해 앵커프레임(130a)(130b)의 생략과 스터드와 이형봉강, 대형너트를 이용하여 기초콘크리트(120)와의 일체거동을 향상시키고 설치 및 시공을 단순화하여 경제성을 향상시킬 수 있는 것이다.Steel pier anchor (1) of the present invention was developed for the economic and efficient construction of steel pier used in the substructure of the bridge, consisting of an anchor frame (130a) (130b) and the anchor bolt 140 of the bolt Compared with the conventional method, which relies on the fastening force, it is possible to omit the anchor frames 130a and 130b and to improve the integrated behavior with the foundation concrete 120 by using studs, deformed bars, and large nuts, and simplify the installation and construction, thereby improving economic efficiency. It can be done.
본 발명은 강재교각의 기초부(100)에 종래의 앵커볼트(140)와 앵커프레임(130a)(130b) 대신 장착되는 바, 본 발명은 스터드(12)가 설치된 이형봉강의 보디부(10)를 갖추고, 대형너트(20)와 강관(또는 철근)과 조인트를 이용한 조립식 연결프레임(30)에 의해 구성되는 앵커방식이다.The present invention is installed in place of the conventional anchor bolt 140 and the anchor frame (130a, 130b) to the base portion 100 of the steel piers, the present invention is the body portion 10 of the release bar is installed stud 12 Equipped with a large nut 20 and steel pipe (or reinforcing bar) and the anchor structure is composed of a prefabricated connecting frame 30 using a joint.
본 발명은 도 2에 도시된 바와 같이, 이형봉강으로 이루어진 보디부(10)의 상하단에는 각각 너트(20)가 장착되는 나사부(17)가 형성되고, 길이방향으로는 다수개의 스터드(12)가 일정간격으로 장착되어 기초 콘크리트(120)에 매설된다.In the present invention, as shown in Figure 2, the upper and lower ends of the body portion 10 made of a deformed bar is formed with a screw portion 17 to which the nut 20 is mounted, respectively, a plurality of studs 12 in the longitudinal direction Mounted at a predetermined interval is embedded in the foundation concrete (120).
따라서, 스터드(12)가 설치된 이형봉강의 보디부(10)로 인하여 기초콘크리트(120)와의 일체거동을 향상시키고 조립식 연결 프레임(30)에 의해서 도 1과 같이 레벨이 정렬되므로 기초콘크리트(120) 타설시, 타설압력에 의한 이동을 방지한다.Therefore, due to the body portion 10 of the deformed bar with the studs 12 installed to improve the integral behavior with the base concrete 120 and the level is aligned as shown in Figure 1 by the prefabricated connecting frame 30, the base concrete 120 When pouring, prevent movement by pouring pressure.
그리고, 도 3에는 본 발명의 변형실시예에 따른 강재교각용 앵커(1')가 도시되어 있다. 이는 상기 보디부(10)의 양측면에 각각 길이방향의 절단면(40)을 형성하고, 상기 스터드(12)가 절단면(40)에 형성된 구조를 갖는다.3 shows a steel piers anchor 1 'according to a modified embodiment of the present invention. This forms a cutting surface 40 in the longitudinal direction on each side surface of the body portion 10, the stud 12 has a structure formed on the cutting surface (40).
본 변형 실시예는 보디부(10)에 스터드(12)를 연결하는 제작작업시 보디부(10)와 스터드(12)의 연결작업이 보다 용이하게 이루어지도록 절단면(40)을 형성한 것으로서, 상기 절단면(40)은 보디부(10)에서 양측 반대방향으로 나란하게 형성되는 것이다.In this modified embodiment, the cut surface 40 is formed to make the connection of the body portion 10 and the stud 12 more easily during the manufacturing operation of connecting the stud 12 to the body portion 10. Cutting surface 40 is formed in the body portion 10 side by side in the opposite direction.
상기와 같이 구성된 본 발명의 이형봉강을 이용한 강재교각용 앵커(1)(1')는 스터드(12)를 설치한 이형봉강의 보디부(10)와 상기 보디부(10)의 하단 나사부(17)에 결합되는 대형너트(20)를 이용하여 기초콘크리트(120)와의 일체거동을 향상시키고 제작 및 시공의 편리성을 도모한다.Steel piercing anchor (1) (1 ') using the release bar of the present invention configured as described above is the body portion 10 of the release bar with the stud 12 and the lower threaded portion 17 of the body portion 10 Using a large nut 20 coupled to the) improves the integral behavior with the foundation concrete 120 and promotes the convenience of manufacturing and construction.
본 발명의 이형봉강을 이용한 강재교각용 앵커(1)(1')는 도 5에 도시된 바와 같이 연결 프레임(30)을 이용하여 수직으로 장착되는 바, 상기 연결 프레임(30)은 중간중간에 다수개의 클램프(32)들을 갖는 공지의 것으로서, 이들 클램프(32)를 이용하여 연결 프레임(30)들을 사각형으로 조립하고, 상기 연결 프레임(30)의 사각 조립구조에 클램프(32)를 이용하여 보디부(10)를 수직으로 연결시킴으로서 다수개의 본 발명의 앵커(1)(1')들이 도 1에 도시된 바와 같이 조립되고 기초 콘크리트(120)가 타설되어 매립될 수 있는 것이다.Steel pier anchors (1) (1 ') using a release bar of the present invention is mounted vertically using a connecting frame 30, as shown in Figure 5, the connecting frame 30 in the middle As known in the art having a plurality of clamps 32, the connecting frames 30 are assembled into a square using these clamps 32, and the body is formed using the clamps 32 in a rectangular assembly structure of the connecting frame 30. By connecting the part 10 vertically, a plurality of anchors 1, 1 ′ of the present invention can be assembled as shown in FIG. 1 and the foundation concrete 120 can be poured and embedded.
그리고, 본 발명의 앵커(1)(1')는 기초 콘크리트(120)의 내부에 매설된 보디부(10)의 상단 나사부(17)가 기초 콘크리트(120)의 상부로 돌출되고 이는 종래와같이 강재교각 기둥부의 하측 프레임(150)에 결합된다. 즉, 하측 프레임(150)의 보강리브(154)들 사이의 공간에서 상, 하부 플레이트(152)들을 관통하도록 보디부(10)의 상단 나사부(17)들이 끼워지고, 이들은 그 상부에서 너트(20)로 고정되며, 하측 프레임(150)의 주위를 에워싸면서 결합되는 것이다.In addition, the anchor (1) (1 ') of the present invention protrudes to the upper portion of the base concrete 120, the upper threaded portion 17 of the body portion 10 embedded in the base concrete 120, which is the same as conventional It is coupled to the lower frame 150 of the steel pier pillars. That is, the upper threaded portions 17 of the body portion 10 are fitted to penetrate the upper and lower plates 152 in the space between the reinforcing ribs 154 of the lower frame 150, and they are the nut 20 at the upper portion thereof. It is fixed to, and is coupled while surrounding the lower frame 150.
상기에서와 같이 본 발명에 의하면, 시공상 난이성이 있는 종래의 앵커프레임(130a)(130b)을 생략하고 강관(또는 철근)과 클램프(32)를 이용한 조립식 연결프레임(30)으로서 설치되고, 기초콘크리트(120)가 타설되어 매립되며, 매립상태에서도 보디부(10)의 다수개의 스터드(12)가 기초 콘크리트(120)와의 결합성능을 우수하게 하여 기초 콘크리트(120)와의 일체 거동이 가능한 것이다.According to the present invention as described above, it is installed as a prefabricated connecting frame 30 using a steel pipe (or reinforcing bar) and a clamp 32, omitting the conventional anchor frame (130a, 130b) of difficulty in construction, The concrete 120 is poured and embedded, and even in the buried state, the plurality of studs 12 of the body part 10 may have excellent coupling performance with the base concrete 120, thereby enabling integral behavior with the base concrete 120.
따라서 본 발명은 다수개의 스터드(12)가 기초 콘크리트(120)와의 일체거동을 도모하여 구조적 성능을 향상시키고, 조립식 연결프레임(30)을 이용하므로 종래와 같이 크레인을 필요로 하지 않고 소수의 작업자만으로 시공이 가능하여 시공성 및 경제성을 향상시킬 수 있다.Therefore, in the present invention, a plurality of studs 12 improve the structural performance by promoting the integral behavior with the base concrete 120, and using a prefabricated connecting frame 30, so as to require only a few workers without a crane as in the prior art Construction is possible to improve workability and economics.
Claims (2)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR10-1999-0060895A KR100431835B1 (en) | 1999-12-23 | 1999-12-23 | Anchor for steel pier by using deformed bar |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR10-1999-0060895A KR100431835B1 (en) | 1999-12-23 | 1999-12-23 | Anchor for steel pier by using deformed bar |
Publications (2)
Publication Number | Publication Date |
---|---|
KR20010057454A true KR20010057454A (en) | 2001-07-04 |
KR100431835B1 KR100431835B1 (en) | 2004-05-20 |
Family
ID=19628576
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR10-1999-0060895A KR100431835B1 (en) | 1999-12-23 | 1999-12-23 | Anchor for steel pier by using deformed bar |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR100431835B1 (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100938916B1 (en) * | 2009-06-29 | 2010-01-27 | 김미선 | Downward method by front reaming |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101781260B1 (en) * | 2015-04-16 | 2017-09-22 | 한양대학교 산학협력단 | RC Coupling Beam Reinforcement Structure Using Multi-headed Steel Elements |
Family Cites Families (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS62163546U (en) * | 1986-03-11 | 1987-10-17 | ||
US5505033A (en) * | 1988-12-06 | 1996-04-09 | 501 Hitachi Metals Ltd. | Column base structure and connection arrangement |
JPH06346629A (en) * | 1993-06-07 | 1994-12-20 | Kureha Seiko Kk | Support structure of building |
JP2859117B2 (en) * | 1993-12-28 | 1999-02-17 | 鹿島建設株式会社 | Steel column base anchoring structure |
JP3084654B2 (en) * | 1996-03-29 | 2000-09-04 | サンベース株式会社 | Construction foundation, foundation structure using the same, and construction method thereof |
KR19980017131U (en) * | 1996-09-18 | 1998-07-06 | 김상복 | Anchor Bolt for Foundation of Fixed Structure |
KR20010057453A (en) * | 1999-12-23 | 2001-07-04 | 이구택 | Steel pier anchorage system using large deformed bar |
-
1999
- 1999-12-23 KR KR10-1999-0060895A patent/KR100431835B1/en not_active IP Right Cessation
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100938916B1 (en) * | 2009-06-29 | 2010-01-27 | 김미선 | Downward method by front reaming |
Also Published As
Publication number | Publication date |
---|---|
KR100431835B1 (en) | 2004-05-20 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR101020865B1 (en) | Dry Beam-Column Connection of Precast Concrete Members within the Extended Limitation of Construction Tolerances | |
KR101995496B1 (en) | the rigid connection structure between the upper precast concrete column and the lower precast concrete column and the rigid connection structure of the precast concrete girder using the same | |
KR20010057453A (en) | Steel pier anchorage system using large deformed bar | |
KR200406615Y1 (en) | T shape precast concrete panel | |
KR100583687B1 (en) | Joining method of precast concrete pillar and girder in concrete structure | |
KR100431835B1 (en) | Anchor for steel pier by using deformed bar | |
CN111851737A (en) | Assembled concrete frame beam column trunk type connecting joint | |
KR100705560B1 (en) | Connecting structure between cft column and rc slab reinforced by high strength concrete | |
CN216109354U (en) | Conversion layer steel column mounting structure | |
KR101415695B1 (en) | Structure for clean room using composite beam | |
KR20120036614A (en) | Method of longitudinal connection for double steel box girder using tendon and connection plate and method steel box girder bridge using the same | |
KR20120003729U (en) | System support Head | |
KR200395572Y1 (en) | Precast concrete panel | |
JPH0579017A (en) | Composite bridge pier | |
JP5358203B2 (en) | Building unit fixed structure and unit building | |
CN209837321U (en) | Connection node of superposed beam and prefabricated column | |
KR101426392B1 (en) | Reinforcement member and girder using the same | |
JPH0128162B2 (en) | ||
CN215802567U (en) | Floor slab using concrete laminated slab | |
KR102086267B1 (en) | Precasted Inverted T Concerete Girder and Method for making thereof | |
SU1760036A1 (en) | Butt joint of wall panel | |
KR101059159B1 (en) | Steel Pipe Pile Head Reinforcement Coupler | |
JPS5920492Y2 (en) | PC version strength fixing structure | |
JP3084242B2 (en) | Bearing structure of precast hollow girder | |
JP2002275913A (en) | Foundation structure of building and building |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A201 | Request for examination | ||
E902 | Notification of reason for refusal | ||
E701 | Decision to grant or registration of patent right | ||
GRNT | Written decision to grant | ||
FPAY | Annual fee payment |
Payment date: 20080507 Year of fee payment: 5 |
|
LAPS | Lapse due to unpaid annual fee |