KR102416943B1 - Fixing device and method of rail plate for crane - Google Patents

Fixing device and method of rail plate for crane Download PDF

Info

Publication number
KR102416943B1
KR102416943B1 KR1020210177432A KR20210177432A KR102416943B1 KR 102416943 B1 KR102416943 B1 KR 102416943B1 KR 1020210177432 A KR1020210177432 A KR 1020210177432A KR 20210177432 A KR20210177432 A KR 20210177432A KR 102416943 B1 KR102416943 B1 KR 102416943B1
Authority
KR
South Korea
Prior art keywords
bolt
fixing
rail
plate
fitted
Prior art date
Application number
KR1020210177432A
Other languages
Korean (ko)
Inventor
정민주
Original Assignee
정민주
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 정민주 filed Critical 정민주
Priority to KR1020210177432A priority Critical patent/KR102416943B1/en
Application granted granted Critical
Publication of KR102416943B1 publication Critical patent/KR102416943B1/en

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C7/00Runways, tracks or trackways for trolleys or cranes
    • B66C7/08Constructional features of runway rails or rail mountings
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C19/00Cranes comprising trolleys or crabs running on fixed or movable bridges or gantries
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C2700/00Cranes
    • B66C2700/01General aspects of mobile cranes, overhead travelling cranes, gantry cranes, loading bridges, cranes for building ships on slipways, cranes for foundries or cranes for public works
    • B66C2700/012Trolleys or runways

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Revetment (AREA)

Abstract

The present invention relates to a device and a method for fixing a rail plate for a harbor, which install and fix a rail plate for supporting a rail installed in a harbor to a correct position to move a container unloading crane. The method comprises the steps of: installing a mold to install a concrete structure and placing reinforcing bars inside the mold; fixing, at regular intervals, fixing plates to a guide having a certain length; preparing corrugated tubular bolt caps that fix anchor bolts to be fitted into a rail plate in a diagonal direction, and blocking lower sides thereof; preparing bolt lids for blocking the tops of the corrugated tubular bolt caps in a screw manner; fitting and fixing fully threaded bolts to the center of the bolt lids, and fixing the guide in the direction in which a rail is placed on the mold; fixing the fully threaded bolts to the fixing plate of the guide; pouring concrete into the mold, curing the same, separating the fully threaded bolts from the fixing plate, and removing the guide; separating the bolt lids, which block the tops of the bolt caps, from the bolt caps by turning the fully threaded bolts; and filling the bolt caps with mortar, and fitting and fixing the anchor bolts, which are fitted into the rail plate in the diagonal direction, to the mortar. Therefore, the rail plates can be placed and installed at correct positions and intervals.

Description

크레인용 레일 플레이트 고정장치 및 방법{Fixing device and method of rail plate for crane}Rail plate fixing device and method for crane {Fixing device and method of rail plate for crane}

본 발명은 콘테이너 하역용 크레인의 이동을 위하여 항만에 설치되는 레일을 받치는 레일 플레이트를 정확한 위치에 설치 고정시키는 항만용 레일 플레이트 고정장치 및 방법에 관한 것이다.The present invention relates to a port rail plate fixing device and method for installing and fixing a rail plate supporting a rail installed in a harbor in an accurate position for movement of a container unloading crane.

항만용 크레인은 항만에 설치되어 선박으로 이동하는 콘테이너를 적재하거나 하역하는 작업을 수행하는 것으로, 주행 방향의 이동을 위하여 콘크리트 바닥면에 크레인용 레일 시스템을 설치하게 되며, 이러한 레일은 설치 과정에서 정확한 위치를 갖고 설치되어야만 크레인의 작동을 보장할 수 있는 것으로, 그 중에서도 레일 의 저면에서 일정 간격을 두고 설치되며, 레일에 가해지는 하중을 바닥의 콘크리트 구조물로 전달하는 레일 플레이트를 정확하게 설치하여야 한다.A port crane is installed in a port to load or unload a container moving to a ship, and a rail system for crane is installed on the concrete floor for movement in the driving direction. The operation of the crane can be guaranteed only when it has a position and installed, and among them, the rail plate that is installed at a certain distance from the bottom of the rail and transmits the load applied to the rail to the concrete structure on the floor must be installed accurately.

크레인용 레일은 콘크리트 구조물에 레일 플레이트를 고정시킨 후 상기 레일 플레이트의 상측에 고정클립을 이용하여 고정시켜야 하는 것으로, 레일 플레이트를 콘트리트 구조물의 양생 후 고정시키기 위해서는 앵커볼트를 박아 고정시켜야 하나, 양생이 완료된 콘크리트 구조물을 뚫고 앵커볼트를 고정시키는 작업은 시간이 오래 걸림은 물론 정확한 위치에 고정시킬 수 없는 문제가 있기 때문에 콘크리트 구조물을 설치하기 위하여 철근을 배근할 때 철근에 앵커볼트가 끼워지는 볼트캡을 고정시킨 후 콘크리트 양생이 끝난 다음 볼트캡의 상부를 개방시킨 후 내부에 몰탈을 채우고, 콘크리트 구조물의 상측에 레일 플레이트를 위치시키되 레일 플레이트에 끼워지는 앵커볼트가 볼트캡에 채워진 몰탈을 끼워지게 한 다음 몰탈의 양생으로 앵커볼트를 고정시키고 있다.The rail for crane is to be fixed using a fixing clip on the upper side of the rail plate after fixing the rail plate to the concrete structure. Drilling the completed concrete structure and fixing the anchor bolt takes a long time and there is a problem that it cannot be fixed in the correct position. After fixing and curing the concrete, open the upper part of the bolt cap, fill the inside with mortar, place the rail plate on the upper side of the concrete structure, and let the anchor bolt that fits into the rail plate fit the mortar filled in the bolt cap. Anchor bolts are fixed by curing the mortar.

상기 방식은 콘크리트 구조물을 완성하기 위한 철근의 배근이 완료된 다음 볼트캡을 정확한 위치에 고정시킨 후 콘크리트를 붇고 양생이 이루어져야 하나, 볼트캡을 철근 사이에서 정확한 위치와 간격을 두고 설치하기가 쉽지 않은 것으로, 볼트캡의 위치와 높낮이가 정확치 않으면, 레일 플레이트를 고정시키기 위한 앵커볼트가 정확한 위치에 설치되지 않는 문제와 함께 볼트캡이 낮거나 높을 경우, 볼트캡의 내부가 콘크리트로 채워지거나 콘크리트 구조물의 상부로 돌출되어 설치되기 때문에 추가 작업을 하지 않으면 몰탈을 채운 후 앵커볼트를 끼워 고정시키는 작업을 할 수 없는 것이었다.In the above method, after the reinforcement of the reinforcing bars to complete the concrete structure is completed, the bolt cap is fixed at the correct position, the concrete is poured and cured, but it is not easy to install the bolt cap with the correct position and spacing between the reinforcing bars. , If the position and height of the bolt cap are not correct, the anchor bolt for fixing the rail plate is not installed in the correct position. If the bolt cap is low or high, the inside of the bolt cap is filled with concrete or the upper part of the concrete structure Since it is installed protruding from the mortar, it was impossible to fix it by inserting the anchor bolt after filling the mortar without additional work.

특허공개 10-2009-0101559호(2009.09.29 공개)Patent Publication No. 10-2009-0101559 (published on September 29, 2009) 특허공개 10-2013-0131065호(2013.12.03 공개)Patent Publication No. 10-2013-0131065 (published on December 3, 2013) 실용신안등록 20-0359400호(2004.08.09 등록)Utility model registration No. 20-0359400 (registration on Aug. 9, 2004) 실용신안등록 20-0444991호)2009.06.16 등록)Utility model registration No. 20-0444991) 2009.06.16 registration)

본 발명은 항만에서 사용되는 항만용 크레인의 주행을 위하여 설치되는 레일을 받치는 레일 플레이트를 콘크리트 구조물의 상측에 고정시키되 레일 플레이트를 정확한 위치에서 정확한 간격을 두고 정확한 높이로 설치하기 어려운 문제를 해결하기 위한 것으로, 콘크리트 구조물의 설치를 위하여 철근의 배근이 완료된 상태에서 거푸집의 중앙을 가로질러 가이드를 고정시킨 후 상기 가이드에 일정 간격을 두고 고정판을 설치한 다음 상기 고정판의 선단에서 일정 간격을 두고 볼트캡을 고정시키도록 함으로써, 콘크리트 구조물의 완성 후 가이드를 제거하여 볼트캡이 콘크리트 구조물에 고정된 상태에서 상측이 개방된 형태를 갖도록 한 다음 볼트캡에 몰탈을 붇고 레일 플레이트를 콘크리트 구조물에 올리면서 레일 플레이트에 끼워진 앵커볼트가 볼트캡에 채워진 몰탈에 끼워지면서 양생이 이루어지게 하는 것이다.The present invention is to fix the rail plate supporting the rail installed for the driving of the harbor crane used in the harbor to the upper side of the concrete structure, but to solve the problem of difficulty in installing the rail plate at the correct height at the correct position and at the correct height. In order to install a concrete structure, after fixing the guide across the center of the formwork in a state where the reinforcement of the reinforcing bar is completed, a fixing plate is installed on the guide at a predetermined interval, and then a bolt cap is installed at a predetermined interval from the tip of the fixing plate. By fixing it, after the concrete structure is completed, the guide is removed so that the upper side has an open shape while the bolt cap is fixed to the concrete structure. The anchor bolt is inserted into the mortar filled in the bolt cap so that it is cured.

본 발명은 크레인용 레일을 받치는 레일 플레이트를 설치하기 위한 것으로, 콘크리트 구조물을 설치하기 위하여 거푸집을 설치하는 한편 거푸집의 내측으로 철근을 배근하는 과정을 수행하고, 일정 길이를 갖는 가이드에 일정 간격으로 고정판을 고정시키는 과정을 수행하고, 레일 플레이트에 대각선 방향으로 끼워지는 앵커볼트를 고정시키는 주름관형 볼트캡을 준비하여 하측을 막아주는 과정을 수행하고, 상기 주름관형 볼트캡의 상부를 나사 방식으로 막아주는 볼트마개를 준비하는 과정을 수행하고, 상기 볼트마개의 중앙에 전산볼트를 끼워 고정시키는 과정을 수행한 다음 가이드를 거푸집에 레일이 놓이는 방향으로 고정시키는 과정을 수행하고, 상기 가이드의 고정판에 전산볼트를 고정시키는 과정을 수행하고, 상기 거푸집에 콘크리트를 부어 양생시키는 과정을 수행한 다음 고정판에서 전산볼트를 분리한 후 가이드를 제거하는 과정과, 전산볼트를 돌려 볼트캡의 상부를 막아주는 볼트마개를 볼트캡에서 분리하는 과정을 수행하고, 상기 볼트캡에 몰탈을 채운 후 레일 플레이트의 대각선 방향으로 끼워지는 앵커볼트를 몰탈에 끼워서 고정시키는 과정을 수행함으로써 이루어지게 된다.The present invention is to install a rail plate supporting a rail for a crane, and while installing a formwork to install a concrete structure, a process of reinforcing reinforcing bars inside the formwork is performed, and a fixed plate at regular intervals on a guide having a certain length performing the process of fixing the corrugated tubular bolt cap to fix the anchor bolt fitted in the diagonal direction to the rail plate and performing the process of blocking the lower side, and blocking the upper part of the corrugated tubular bolt cap with a screw method A process of preparing a bolt stopper is performed, a process of inserting a computerized bolt in the center of the bolt stopper is performed, and then a process of fixing the guide in the direction in which the rail is placed on the formwork is performed, and a computerized bolt is installed on the fixing plate of the guide After performing the process of fixing the mold, pouring the concrete into the form and curing it, then removing the threaded bolt from the fixing plate, removing the guide, and turning the computerized bolt to block the upper part of the bolt cap It is made by performing a process of separating from the bolt cap, filling the bolt cap with mortar, and then performing a process of fixing anchor bolts fitted in a diagonal direction of the rail plate to the mortar.

본 발명은 항만용 크레인의 주행을 위해 설치되는 레일을 콘크리트 구조물에서 정확히 고정시키기 위하여 철근이 배근된 거푸집의 상측에 레일이 설치되는 방향으로 고정되는 가이드를 구비하고, 상기 가이드에는 일정 간격으로 가이드와 어긋나는 방향으로 고정되는 고정판을 구비하고, 상기 고정판의 선단에서 수직 방향으로 끼워져 고정되는 전산볼트를 구비하고, 상기 전산볼트의 하측에 고정되는 볼트마개를 구비하고, 상기 볼트마개가 나사 방식으로 끼워져 상부를 막아주고 하측은 고정마개로 막아주는 주름관형 볼트캡을 구비하여 이루어지게 된다.The present invention is provided with a guide fixed in the direction in which the rail is installed on the upper side of the form in which reinforcing bars are reinforced in order to accurately fix the rail installed for the operation of the harbor crane in the concrete structure, and the guide includes a guide and a guide at regular intervals. A fixing plate fixed in a shifting direction is provided, and a computerized bolt is fitted and fixed in a vertical direction from the tip of the fixing plate, and a bolt stopper fixed to the lower side of the computerized bolt is provided, and the bolt stopper is screwed into the upper part. It is made by providing a corrugated tube-type bolt cap to block the lower side with a fixed stopper.

본 발명은 거푸집에 배근된 철근 사이로 일정 높이와 일정 간격으로 볼트캡을 고정시키기 위하여 주름관형 볼트캡을 사용하되 하부는 고정마개로 막아주고 상부는 나사방식으로 끼워지는 볼트마개로 막아준 후 볼트마개에 수직 방향으로 전산볼트를 고정시킨 다음 전산볼트를 가이드의 고정판에 끼워서 볼트캡이 다른 지지물에 지지되지 않더라도 전산볼트에 매달린 상태로 정확한 위치에 놓이게 함으로써 콘크리트 구조물을 형성할 때 정확히 원하는 위치에서 볼트캡의 상부가 개방된 상태를 만들 수 있고, 이러한 볼트캡의 공간을 이용하여 레일 플레이트를 정확한 위치에 고정시킴으로써 결과적으로 레일로 정확한 고정이 이루어지게 된다. The present invention uses a corrugated tube-type bolt cap to fix the bolt cap at a certain height and at regular intervals between the reinforcing bars placed in the formwork, but the lower part is blocked with a fixing stopper and the upper part is closed with a bolt stopper fitted in a screw method, then the bolt stopper After fixing the threaded bolt in the vertical direction, insert the threaded bolt into the fixing plate of the guide so that the bolt cap is placed in the correct position while hanging on the threaded bolt even if the bolt cap is not supported by other supports. can make the upper part of the open state, and by using the space of the bolt cap to fix the rail plate at the correct position, as a result, the correct fixation with the rail is made.

본 발명은 항만에서 사용되는 항만용 크레인의 주행을 위하여 설치되는 레일을 받치는 레일 플레이트를 콘크리트 구조물의 상측에서 정확한 위치와 간격을 유지하며 고정시키도록 콘크리트 구조물의 철근 배근이 완료된 상태에서 레일 플레이트를 고정시키기 위한 앵커볼트가 끼워지는 공간을 확보하기 위하여 주름형 볼트캡을 고정시킬 때 가이드에 고정된 고정판에 끼워지는 전산볼트를 이용하여 거푸집에 콘트리트를 붇기 전에 볼트캡이 정확한 높이와 간격을 유지할 수 있도록 함으로써, 콘크리트 양생 후 레일 플레이트를 고정시키기 위한 앵커볼트가 끼워지는 자리를 볼트캡을 이용하여 확보할 수 있기 때문에 레일 플레이트를 정확한 위치에서 정확한 간격을 두고 설치할 수 있는 효과가 있다.The present invention fixes the rail plate in the state where the reinforcement of the concrete structure is completed so as to fix the rail plate supporting the rail installed for the operation of the harbor crane used in the harbor while maintaining the correct position and spacing from the upper side of the concrete structure. When fixing the corrugated bolt cap in order to secure the space where the anchor bolt is inserted for By doing so, it is possible to secure the position where the anchor bolt for fixing the rail plate is inserted after curing the concrete using the bolt cap, so that the rail plate can be installed at an accurate location at an accurate interval.

도 1은 본 발명의 가이드와 고정판이 설치되는 상태를 보인 사시도
도 2는 본 발명의 가이드와 고정판이 설치된 상태의 평면도
도 3은 본 발명의 실시예 설명을 위한 분해 사시도
도 4는 본 발명의 실시예 정면도
도 5는 본 발명의 실시예 단면도
도 6은 본 발명의 고정 캡 설치 상태를 보인 단면도
도 7은 본 발명의 레일 플레이트 설치 상태를 보인 사시도
도 8은 본 발명의 레일 플레이트 설치 상태 확대도
도 9는 본 발명의 레일 설치 상태를 보인 분해 사시도
1 is a perspective view showing a state in which a guide and a fixing plate of the present invention are installed;
Figure 2 is a plan view of a state in which the guide and the fixing plate of the present invention are installed;
3 is an exploded perspective view for explaining an embodiment of the present invention;
4 is a front view of an embodiment of the present invention;
5 is a cross-sectional view of an embodiment of the present invention;
6 is a cross-sectional view showing a fixed cap installation state of the present invention;
7 is a perspective view showing a rail plate installation state of the present invention;
8 is an enlarged view of the rail plate installation state of the present invention
9 is an exploded perspective view showing a rail installation state of the present invention;

본 발명은 항만용 크레인의 주행을 위한 레일을 설치함에 있어서, 레일을 받치는 레일 플레이트를 정확한 위치에 설치하기 위하여 레일 플레이트를 고정시키기 위한 앵커볼트를 고정시키는 앵커캡을 정확한 높이와 간격을 유지하며 설치하는 방법 및 장치에 관한 것이다.The present invention installs an anchor cap for fixing an anchor bolt for fixing the rail plate at an accurate height and spacing in order to install the rail plate supporting the rail in an accurate position when installing the rail for the crane for the harbor. It relates to a method and apparatus for doing so.

본 발명을 첨부된 실시예 도면에 의거 상세히 설명한다.The present invention will be described in detail with reference to the accompanying drawings.

본 발명은 항만용 크레인의 주행을 위하여 설치되는 레일(10)을 받치는 레일 플레이트(11)를 콘크리트 구조물(20)에서 정확한 위치와 간격을 유지하며 설치하기 위한 것으로, 레일 플레이트(11)는 사각 형태를 갖고 모서리 부위에 상부에서 하부를 향하는 앵커볼트(30)와, 하부에서 상부를 향하는 고정볼트(31)가 끼워지는 구멍이 형성되는 한편 앵커볼트(30)와 고정볼트(31)는 대각선 방향으로 고정되며, 상기 앵커볼트(30)는 콘크리트 구조물(20)에 앵커볼트(30)가 끼워지는 공간을 형성한 다음 레일 플레이트(11)를 콘크리트 구조물(20)의 상부에 놓을 때 앵커볼트(30)가 콘크리트 구조물에 형성된 공간에 끼워지게 되고, 앵커볼트(30)가 끼워진 공간에는 몰탈(53)을 채워서 앵커볼트(30)의 고정이 이루하고 있으나, 콘크리트 구조물(20)에 앵커볼트(30)가 끼워지는 공간을 형성하는 작업은 상당한 어려움이 있는 것으로, 본 발명에서는 주름관형 볼트캡(50)을 이용하여 정확한 위치와 높이를 두고 공간을 형성하는 방법 및 장치에 관한 것이다.The present invention is to install the rail plate 11 supporting the rail 10 installed for the operation of the harbor crane while maintaining the correct position and spacing in the concrete structure 20, and the rail plate 11 has a square shape. A hole is formed in the corner area through which the anchor bolt 30 facing from the top to the bottom and the fixing bolt 31 from the bottom toward the top are fitted, while the anchor bolt 30 and the fixing bolt 31 are diagonally It is fixed, and the anchor bolt 30 forms a space in which the anchor bolt 30 is fitted in the concrete structure 20, and then when the rail plate 11 is placed on the top of the concrete structure 20, the anchor bolt 30 is inserted into the space formed in the concrete structure, and the anchor bolt 30 is fixed in the space where the anchor bolt 30 is inserted by filling the mortar 53 to achieve the fixation of the anchor bolt 30, but the anchor bolt 30 to the concrete structure 20 The task of forming a space to be fitted is quite difficult, and the present invention relates to a method and an apparatus for forming a space with an accurate position and height using a corrugated tubular bolt cap (50).

콘크리트 구조물(20)은 거푸집(21)의 내부에 철근(22)의 배근을 완료한 다음 콘크리트를 타설하여 양생시킴으로써 이루어지는 것으로, 볼트캡(50)은 상하가 개방된 형태의 주름관으로 이루어지게 되며, 이러한 볼트캡(50)을 이용하여 콘크리트 구조물(20)에 앵커볼트(30)가 끼워지는 공간을 형성하기 위해서는 거푸집(21)에 철근(22)을 배근 한 후 앵커볼트(30)가 고정될 위치마다 볼트캡(50)을 고정시킨 다음 커푸집(21)에 콘크리트 타설을 하게 되면, 볼트캡(50)의 내부 공간이 콘크리트 구조물(20)의 상부로 노출되어 앵커볼트(30)를 손쉽게 설치할 수 있으나, 거푸집(21)의 내부에 철근(22)의 배근이 완료된 상태에서 볼트캡(50)을 설치할 때 볼트캡(50)의 위치를 정확히 잡아서 철근(22)에 고정시키기가 어렵고, 또한, 볼트캡(50)의 높이를 일정하게 유지시키기 위한 작업도 어렵기 때문에 본 발명과 같은 방법을 이용하여 볼트캡(50)의 설치와 높낮이 조절이 간단히 이루어지게 하는 것이다.The concrete structure 20 is formed by completing the reinforcement of the reinforcing bar 22 inside the formwork 21 and then pouring and curing the concrete, and the bolt cap 50 is made of a corrugated pipe with an open top and bottom, In order to form a space in which the anchor bolt 30 is fitted in the concrete structure 20 by using the bolt cap 50, the reinforcing bar 22 is reinforced in the formwork 21, and then the anchor bolt 30 is fixed. When the bolt cap 50 is fixed for each and concrete pouring on the mold 21, the inner space of the bolt cap 50 is exposed to the upper part of the concrete structure 20, so that the anchor bolt 30 can be easily installed. However, when installing the bolt cap 50 in a state in which the reinforcement of the reinforcement 22 is completed inside the form 21, it is difficult to accurately position the bolt cap 50 and fix it to the reinforcement 22, and also Since it is difficult to keep the height of the cap 50 constant, the installation and height adjustment of the bolt cap 50 are made simple by using the same method as in the present invention.

본 발명은 거푸집(21)의 중앙을 가로질러 레일(10)이 설치되는 방향으로 거푸집(21)의 상부에 고정되는 각관으로 이루어지는 가이드(70)를 구비하고, 상기 가이드(70)에는 일정 간격을 두고 대각 방향으로 고정판(71)을 고정시키되 상기 고정판(71)은 가이드(70)의 양쪽으로 돌출되어 선단에 전산볼트(60)가 끼워지는 구멍(72)이 형성되며, 상기 고정판(71)에 형성된 구멍(72)은 레일 플레이트(11)의 앵커볼트(30)가 끼워지는 구멍과 일치되게 한다.The present invention is provided with a guide 70 made of a square tube that is fixed to the upper part of the form 21 in a direction in which the rail 10 is installed across the center of the form 21, and the guide 70 has a predetermined interval. The fixing plate 71 is fixed in a diagonal direction, and the fixing plate 71 protrudes from both sides of the guide 70 and a hole 72 through which the computerized bolt 60 is fitted is formed at the tip of the fixing plate 71. The formed hole 72 matches the hole into which the anchor bolt 30 of the rail plate 11 is fitted.

고정판(71)은 선단의 구멍(72)에 끼워지는 전산볼트(60)가 레일 플레이트(11)의 앵커볼트(30)가 끼워지는 구멍과 일치되게 하는 것으로, 고정판(71)은 가이드(70)에 레일 플레이트(11)의 앵커볼트(30)가 끼워지는 대각방향과 일치되게 고정된다.The fixing plate 71 is such that the threaded bolt 60 fitted in the hole 72 at the tip coincides with the hole in which the anchor bolt 30 of the rail plate 11 is fitted, and the fixing plate 71 is the guide 70 The anchor bolt 30 of the rail plate 11 is fixed to match the diagonal direction in which it is fitted.

본 발명은 콘크리트 구조물(20)에 볼트캡(50)을 이용하여 앵커볼트(30)가 끼워지는 공간을 형성하는 것으로, 볼트캡(50)은 주름관형태를 갖도록 하되 하측은 고정마개(51)를 끼워 고정시키는 한편 상부에는 볼트마개(52)를 나사 방식으로 끼워줌으로써 볼트캡(50)의 내부는 고정마개(51)와 볼트마개(52)에 의해 폐쇄된 공간을 형성하고, 상기 볼트마개(52)의 중앙에는 전산볼트(60)를 끼운 후 너트(61)를 이용하여 전산볼트(60)가 볼트마개(52)와 고정되게 함으로써, 전산볼트(60)를 돌려 볼트마개(52)가 볼트캡(50)에 나사 방식으로 끼워지거나 풀어줄 수 있도록 한다.The present invention is to form a space in which the anchor bolt 30 is fitted by using the bolt cap 50 in the concrete structure 20, and the bolt cap 50 has a corrugated pipe shape, but the lower side has a fixing stopper 51 The inside of the bolt cap 50 forms a space closed by the fixing stopper 51 and the bolt stopper 52 by screwing the bolt stopper 52 on the upper part while fixing it, and the bolt stopper 52 ), after inserting the computerized bolt 60 in the center, by using the nut 61 to fix the computerized bolt 60 with the bolt stopper 52, by turning the computerized bolt 60, the bolt stopper 52 is the bolt cap. (50) so that it can be screwed into or released by a screw method.

본 발명의 전산볼트(60)는 하측에 볼트캡(50)의 입구를 막은 볼트마개(52)에 고정되고, 상측은 고정판(71)의 구멍(72)에 끼워진 후 너트(62)를 이용하여 고정시키게 되는 것으로, 본 발명의 볼트캡(50)은 전산볼트(60)에 매달린 채로 놓이게 되고, 상기 전산볼트(60)는 고정판(71)에 끼워진 상태에서 너트(62)를 풀거나 조여서 볼트캡(50)의 높낮이를 조절할 수 있기 때문에 결국 가이드(70)를 레일(10)의 설치방향에 따라 고정시키고 고정판(71)을 레일 플레이트(11)의 설치간격으로 고정시키게 되면, 볼트캡(50)의 설치위치를 정확히 설치할 수 있음은 물론 볼트캡(50)의 높낮이 조절이 가능한 효과가 있다.The computerized bolt 60 of the present invention is fixed to the bolt stopper 52 blocking the entrance of the bolt cap 50 on the lower side, and the upper side is inserted into the hole 72 of the fixing plate 71 using the nut 62 To be fixed, the bolt cap 50 of the present invention is placed while being suspended from the computerized bolt 60, and the computerized bolt 60 is inserted in the fixing plate 71 by loosening or tightening the nut 62 to tighten the bolt cap. Since the height of (50) can be adjusted, eventually, when the guide 70 is fixed according to the installation direction of the rail 10 and the fixing plate 71 is fixed at the installation interval of the rail plate 11, the bolt cap 50 It has the effect of being able to accurately install the installation position of the bolt cap 50 as well as adjusting the height of the bolt cap 50 .

본 발명은 철근(22)의 배근이 이루어진 거푸집(21)의 상부에 가이드(70)를 설치한 후 가이드(70)에 고정된 고정판(71)의 구멍(72)에 볼트캡(50)의 볼트마개(52)에 끼워진 전산볼트(60)를 끼워 고정시키되 볼트캡(50)의 높낮이를 조절하게 되면, 결국 볼트캡(50)은 정확한 간격을 두고 정확한 높이에서 고정되며, 이 상태에서 콘크리트를 타설하여 양생함으로써 콘크리트 구조물(20)을 형성하게 되면, 볼트캡(50)의 볼트마개(52)가 콘크리트 구조물(20)의 상면에서 돌출되지 않은 상태로 콘크리트 구조물(20)이 형성되며, 콘크리트 구조물(20)이 양생되면, 고정판(71)에 고정된 전산볼트(60)를 풀어준 다음 가이드(70)를 제거하여 콘크리트 구조물(20)에 전산볼트(60)만 상부로 돌출된 상태가 되게 한다.In the present invention, after the guide 70 is installed on the upper part of the form 21 in which the reinforcement of the reinforcing bar 22 is made, the bolt of the bolt cap 50 is inserted into the hole 72 of the fixing plate 71 fixed to the guide 70. When the computerized bolt 60 inserted into the stopper is inserted and fixed, but the height of the bolt cap 50 is adjusted, eventually the bolt cap 50 is fixed at the correct height at an accurate interval, and concrete is poured in this state. When the concrete structure 20 is formed by curing, the concrete structure 20 is formed in a state where the bolt stopper 52 of the bolt cap 50 does not protrude from the upper surface of the concrete structure 20, and the concrete structure ( When 20) is cured, loosen the computerized bolts 60 fixed to the fixing plate 71 and then remove the guide 70 so that only the computerized bolts 60 protrude upwards in the concrete structure 20.

이 상태에서 전산볼트(60)를 나사 풀림 방향으로 돌리게 되면, 볼트캡(50)의 상부를 막고 있는 볼트마개(52)가 볼트캡(50)에서 이탈되어 볼트캡(50)의 상부 구멍이 콘크리트 구조물(20)의 상부로 노출된 상태가 되며, 이 같이 볼트캡(50)의 상부가 노출되면 볼트캡(50)의 내부로 몰탈(53)를 투입한 다음 레일 플레이트(11)를 콘크리트 구조물(20)에 설치하되 레일 플레이트(11)에서 대각선 방향으로 하부를 향하여 끼워진 앵커볼트(30)가 볼트캡(50)의 내부에 끼워지는 형태로 설치함으로써 레일 플레이트(11)에 대각선 방향으로 상측을 향하여 끼워진 고정볼트(31)가 상부로 돌출되게 고정된다.When the computerized bolt 60 is turned in the unscrewing direction in this state, the bolt stopper 52 blocking the upper part of the bolt cap 50 is separated from the bolt cap 50, and the upper hole of the bolt cap 50 is made of concrete. It becomes the state exposed to the upper part of the structure 20, and when the upper part of the bolt cap 50 is exposed in this way, the mortar 53 is put into the inside of the bolt cap 50, and then the rail plate 11 is inserted into the concrete structure ( 20), but by installing the anchor bolts 30 fitted diagonally downward from the rail plate 11 to the inside of the bolt cap 50, diagonally upward to the rail plate 11 The fitted fixing bolt 31 is fixed to protrude upward.

레일 플레이트(11)의 대각 방향으로 설치되는 앵커볼트(30)는 볼트캡(50)에 채워진 몰탈(53)에 끼워진 상태에서 양생이 이루어지게 되므로, 결국 볼트캡(50)이 정확한 위치에서 정확한 간격을 두고 정확한 높이로 설치되기 때문에 레일 플레이트(11)도 설계위치에 고정될 수밖에 없다.Since the anchor bolts 30 installed in the diagonal direction of the rail plate 11 are cured while being inserted in the mortar 53 filled in the bolt cap 50, eventually the bolt cap 50 is positioned at the correct spacing. Since the rail plate 11 is installed at an accurate height with

레일 플레이트(11)의 고정이 완료된 후에는 레일 플레이트(11)를 에폭시 수지 등으로 견고히 고정시킨 다음 고정클립 등을 이용하여 레일(10)을 고정시키게 되는 것으로, 레일 플레이트(11)의 설치 이후에 대한 작업은 공지된 기술을 사용한다.After the fixing of the rail plate 11 is completed, the rail plate 11 is firmly fixed with an epoxy resin, etc., and then the rail 10 is fixed using a fixing clip, etc., after installation of the rail plate 11 For the work, known techniques are used.

본 발명은 주름관형 볼트캡(50)을 이용하여 하부를 고정마개(51)로 막아 고정시키는 한편 상부는 볼트마개(52)로 막아주되 나사 돌림 방식으로 막거나 풀어줄 수 있도록 하는 것으로, 정확한 위치와 간격을 유지하며 볼트캡(50)을 설치하기 위하여 고정판(71)이 고정된 가이드(70)를 사용하고, 고정판(71)에 고정된 전산볼트(60)를 이용하여 볼트마개(52)를 고정시킴으로써 정확한 높낮이를 잡아줄 수 있으며, 콘크리트 구조물(20)의 양생 후 전산볼트(60)로 볼트마개(52)를 풀어서 제거하게 되고, 이 과정에 의해 볼트캡(50)의 상부가 개방되어 몰탈(53)을 채운 다음 레일 플레이이트(11) 고정용 앵커볼트(30)가 끼워지게 함으로써, 정확한 위치에서 레일 플레이트(11)의 설치가 이루어지는 것이다.The present invention uses a corrugated tubular bolt cap 50 to block and fix the lower part with a fixing stopper 51, while the upper part is blocked with a bolt stopper 52, so that it can be blocked or released by a screw turning method. To install the bolt cap 50 while maintaining the distance, the guide 70 to which the fixing plate 71 is fixed is used, and the bolt stopper 52 is fixed using the computerized bolt 60 fixed to the fixing plate 71. It is possible to hold the correct height by doing this, and after curing the concrete structure 20, it is removed by loosening the bolt stopper 52 with the computerized bolt 60, and by this process, the upper part of the bolt cap 50 is opened and the mortar ( 53) is filled and then the rail plate 11 fixing anchor bolt 30 is fitted, so that the rail plate 11 is installed at the correct position.

이러한 작업은 다음의 과정에 의하여 이루어진다. This work is done by the following process.

본 발명은 콘크리트 구조물(20)을 설치하기 위하여 거푸집(21)을 설치하는 한편 거푸집(21)의 내측으로 철근(22)을 배근하는 과정을 수행하고, 일정 길이를 갖는 가이드(70)에 일정 간격으로 고정판(71)을 대각 방향으로 고정시키는 과정을 수행하고, 레일 플레이트(11)에 대각 방향으로 끼워지는 앵커볼트(30)를 고정시키는 주름관형 볼트캡(50)을 준비하여 하측을 고정마개(51)로 막아주는 과정을 수행하고, 상기 주름관형 볼트캡(50)의 상부를 나사 고정 방식으로 막아주는 볼트마개(52)를 준비하는 과정을 수행하고, 상기 볼트마개(52)의 중앙에 전산볼트(60)를 끼워 너트(61)로 고정시키는 과정을 수행한 다음 가이드(70)를 거푸집(21)에 레일(10)이 놓이는 방향으로 고정시키는 과정을 수행하고, 상기 가이드(70)의 고정판(71)에 전산볼트(60)를 끼워 너트(62)로 고정시키는 과정을 수행하고, 상기 거푸집(21)에 콘크리트를 부어 양생시키는 과정을 수행한 다음 고정판(71)에서 전산볼트(60)를 분리한 후 가이드(70)를 제거하는 과정과, 전산볼트(60)를 돌려 볼트캡(50)의 상부를 막아주는 볼트마개(52)를 나사 풀림 방식으로 볼트캡(50)에서 분리하여 볼트캡(50)의 상부가 콘크리트 구조물(20)의 상부로 노출되는 과정을 수행하고, 상기 볼트캡(50)에 몰탈(53)을 채운 후 레일 플레이트(11)의 대각선 방향으로 끼워지는 앵커볼트(30)를 몰탈(53)에 끼워서 고정시키는 과정을 수행하게 된다.In the present invention, while installing the formwork 21 to install the concrete structure 20, the process of reinforcing the reinforcing bar 22 to the inside of the formwork 21 is performed, and the guide 70 having a predetermined length is provided at a predetermined interval. The process of fixing the fixing plate 71 in the diagonal direction with 51), a process of preparing a bolt stopper 52 that blocks the upper part of the corrugated tubular bolt cap 50 in a screw fixing method is performed, and a computerized in the center of the bolt stopper 52 After performing the process of fixing the bolt 60 by inserting the nut 61, the process of fixing the guide 70 in the direction in which the rail 10 is placed on the form 21 is performed, and the fixing plate of the guide 70 is performed. After performing the process of inserting the computerized bolt 60 into the 71 and fixing it with the nut 62, pouring concrete into the formwork 21 to cure it, and then inserting the computerized bolt 60 from the fixing plate 71. After separation, the process of removing the guide 70 and the bolt cap 52 blocking the upper part of the bolt cap 50 by turning the computerized bolt 60 is separated from the bolt cap 50 by unscrewing the bolt cap. Anchor bolts 30 fitted in a diagonal direction of the rail plate 11 after performing a process in which the upper part of the 50 is exposed to the upper part of the concrete structure 20, and filling the bolt cap 50 with mortar 53 ) is inserted into the mortar 53 to perform the fixing process.

본 발명은 거푸집(21)에 배근된 철근(22) 사이로 일정 높이와 일정 간격으로 볼트캡(50)을 고정시키기 위하여 주름관형 볼트캡(50)을 사용하되 하부는 고정마개(51)로 막아주고 상부는 나사방식으로 끼워지는 볼트마개(52)로 막아준 후 볼트마개(52)에 수직 방향으로 전산볼트(60)를 고정시킨 다음 전산볼트(60)를 가이드(70)에 대각방향으로 고정된 고정판(71)에 끼워서 볼트캡(50)이 다른 지지물에 지지되지 않더라도 전산볼트(60)에 매달린 상태에서 정확한 위치에 놓이게 함으로써 콘크리트 구조물(20)을 형성할 때 정확히 원하는 위치에서 볼트캡(50)의 상부가 개방된 상태를 만들 수 있고, 이같이 상부로 개방된 볼트캡(50)의 내부 공간을 이용하여 몰탈(53)을 붇고 레일 플레이트(11)를 고정시키는 앵커볼트(30)를 끼워 고정시킴으로써 레일 플레이트(11)를 정확한 위치에 간단히 고정시키게 된다. The present invention uses a corrugated tubular bolt cap 50 to fix the bolt cap 50 at a certain height and at regular intervals between the reinforcing bars 22 reinforced in the form 21, but the lower part is blocked with a fixing stopper 51 The upper part is blocked with a bolt stopper 52 that is screwed in, and then the threaded bolt 60 is fixed in the vertical direction to the bolt stopper 52, and then the threaded bolt 60 is fixed to the guide 70 in the diagonal direction. When the concrete structure 20 is formed by inserting it into the fixing plate 71 so that the bolt cap 50 is placed in the correct position while being suspended from the computerized bolt 60 even if the bolt cap 50 is not supported by other supports, the bolt cap 50 is positioned exactly at the desired position. By using the inner space of the bolt cap 50 opened to the upper part as described above, the mortar 53 is poured and the anchor bolt 30 for fixing the rail plate 11 is inserted and fixed. The rail plate 11 is simply fixed in the correct position.

10 : 레일 11 : 레일 플레이트
20 : 콘크리트 구조물 21 : 거푸집
22 : 철근 30 : 앵커볼트
50 : 볼트캡 51 : 고정마개
52 : 볼트마개 53 : 몰탈
60 : 전산볼트 70 : 가이드
71 : 고정판
10: rail 11: rail plate
20: concrete structure 21: formwork
22: reinforcing bar 30: anchor bolt
50: bolt cap 51: fixing stopper
52: bolt stopper 53: mortar
60: computerized bolt 70: guide
71: fixed plate

Claims (4)

항만용 크레인의 주행을 위한 레일(10)이 설치되는 콘크리트 구조물(20)을 설치하기 위하여 거푸집(21)을 설치하는 한편 거푸집(21)의 내측으로 철근(22)을 배근하는 과정을 수행하고,
일정 길이를 갖는 가이드(70)에 일정 간격으로 고정판(71)을 대각 방향으로 고정시키고 상기 고정판(71)에는 전산볼트(60)가 끼워지는 구멍(72)을 형성하는 과정을 수행하고,
레일(10)을 고정시키는 레일 플레이트(11)에 대각 방향으로 끼워지는 앵커볼트(30)를 고정시키는 주름관형 볼트캡(50)을 준비하여 하측을 고정마개(51)로 막아주는 과정을 수행하고,
상기 주름관형 볼트캡(50)의 상부를 나사 방식으로 막아주는 볼트마개(52)를 준비하는 과정을 수행하고,
상기 볼트마개(52)의 중앙에 전산볼트(60)의 하측을 끼워 고정시키는 과정을 수행하고,
준비된 가이드(70)를 거푸집(21)에 레일(10)이 놓이는 방향으로 고정시키는 과정을 수행하고,
상기 가이드(70)에 고정된 고정판(71)에 형성된 구멍(72)에 주름관형 볼트캡(50)에 끼워진 볼트마개(52)의 중앙에 고정된 전산볼트(60)의 상측을 끼워 고정시키는 과정을 수행하고,
상기 거푸집(21)에 콘크리트를 부은 후 양생시켜 콘크리트 구조물(20)을 형성한 다음 고정판(71)에서 전산볼트(60)를 분리한 후 가이드(70)를 제거하는 과정을 수행하고,
고정판(70)이 제거된 상태에서 전산볼트(60)를 돌려 볼트캡(50)의 상부를 막아주는 볼트마개(52)를 볼트캡(50)에서 분리 제거하는 과정을 수행하고,
상기 볼트캡(50)의 내부에 몰탈(53)을 채운 후 레일 플레이트(11)의 대각선 방향으로 끼워지는 앵커볼트(30)를 몰탈(53)에 끼워서 고정시키는 과정을 수행하여 이루어지는 것을 특징으로 하는 크레인용 레일 플레이트 고정방법.
While installing the formwork 21 to install the concrete structure 20 in which the rail 10 for the running of the harbor crane is installed, the process of reinforcing the reinforcing bar 22 inside the formwork 21 is performed,
The fixing plate 71 is diagonally fixed to the guide 70 having a predetermined length at regular intervals, and the fixing plate 71 performs a process of forming a hole 72 through which the computerized bolt 60 is fitted,
Prepare a corrugated tubular bolt cap 50 for fixing the anchor bolt 30 fitted in a diagonal direction to the rail plate 11 for fixing the rail 10, and perform the process of blocking the lower side with the fixing stopper 51, ,
A process of preparing a bolt stopper 52 that blocks the upper part of the corrugated tubular bolt cap 50 in a screw method is performed,
performing the process of fitting and fixing the lower side of the computerized bolt 60 in the center of the bolt stopper 52,
A process of fixing the prepared guide 70 in the direction in which the rail 10 is placed on the form 21 is performed,
The process of fitting and fixing the upper side of the computerized bolt 60 fixed to the center of the bolt stopper 52 fitted to the corrugated tubular bolt cap 50 in the hole 72 formed in the fixing plate 71 fixed to the guide 70 do,
After pouring concrete into the formwork 21 and curing it to form a concrete structure 20, after separating the computerized bolt 60 from the fixing plate 71, the process of removing the guide 70 is performed,
In the state in which the fixing plate 70 is removed, the bolt cap 52 that blocks the upper part of the bolt cap 50 is separated and removed from the bolt cap 50 by turning the computerized bolt 60,
After filling the inside of the bolt cap (50) with mortar (53), anchor bolts (30) fitted in a diagonal direction of the rail plate (11) are inserted into the mortar (53) and fixed by performing a process characterized in that How to fix rail plate for crane.
제1항에 있어서, 가이드(70)에 고정된 고정판(71)은 레일 플레이트(11)의 앵커볼트(30)가 끼워지는 대각 방향으로 설치되는 한편 고정판(71)에 형성된 구멍(72)과 레일 플레이트(11)의 앵커볼트(30)가 끼워지는 구멍은 수직 방향으로 일치되게 형성하고, 상기 고정판(71)의 구멍(72)에 끼워진 전산볼트(60)의 높낮이를 조절하여 콘크리트 구조물(20)에 설치되는 주름관형 볼트캡(50)의 높낮이를 조절하는 것을 특징으로 하는 크레인용 레일 플레이트 고정방법.According to claim 1, wherein the fixing plate (71) fixed to the guide (70) is installed in the diagonal direction where the anchor bolts (30) of the rail plate (11) are fitted, while the hole (72) formed in the fixing plate (71) and the rail The hole into which the anchor bolt 30 of the plate 11 is fitted is formed to coincide in the vertical direction, and the height of the computerized bolt 60 inserted into the hole 72 of the fixing plate 71 is adjusted to adjust the height of the concrete structure 20 A method of fixing a rail plate for a crane, characterized in that it adjusts the height of the corrugated tube-type bolt cap (50) installed in the . 철근(22)이 배근된 거푸집(21)의 상측에 레일(10)이 설치되는 방향으로 고정되는 가이드(70)를 구비하고,
상기 가이드(70)에는 일정 간격을 두고 대각 방향으로 고정되는 고정판(71)을 구비하되 상기 고정판(71)의 선단에는 전산볼트(60)가 끼워지는 구멍(72)을 형성하고,
상기 고정판(71)에 형성된 구멍(72)에 수직 방향으로 끼워져 고정되는 전산볼트(60)를 구비하고,
상기 전산볼트(60)의 하측이 중앙에 끼워져 고정되는 볼트마개(52)를 구비하고,
상기 볼트마개(52)가 나사 조임 방식으로 끼워져 상부를 막아주는 주름관형 볼트캡(50)을 구비하고,
상기 볼트캡(50)의 하측은 고정마개(51)로 막아주어 이루어지는 것을 특징으로 하는 크레인용 레일 플레이트 고정장치.
A guide 70 fixed in the direction in which the rail 10 is installed is provided on the upper side of the form 21 on which the reinforcing bar 22 is reinforced,
The guide 70 is provided with a fixing plate 71 fixed in a diagonal direction at regular intervals, but at the tip of the fixing plate 71, a hole 72 through which the computerized bolt 60 is fitted is formed,
and a computerized bolt 60 fitted and fixed in a vertical direction in the hole 72 formed in the fixing plate 71,
The lower side of the computerized bolt 60 is provided with a bolt stopper 52 that is fitted and fixed in the center,
The bolt stopper 52 is fitted with a screw fastening method and provided with a corrugated tube-type bolt cap 50 that blocks the upper part,
A rail plate fixing device for a crane, characterized in that the lower side of the bolt cap (50) is blocked with a fixing stopper (51).
제3항에 있어서, 가이드(70)에 고정된 고정판(71)은 레일 플레이트(11)의 앵커볼트(30)가 끼워지는 대각 방향으로 설치되는 한편 고정판(71)에 형성된 구멍(72)과 레일 플레이트(11)의 앵커볼트(30)가 끼워지는 구멍은 일치되게 형성하고, 상기 고정판(71)의 구멍(72)에 끼워진 전산볼트(60)의 높낮이를 조절하여 주름관형 볼트캡(50)의 높낮이를 조절하는 것을 특징으로 하는 크레인용 레일 플레이트 고정장치.4. The rail according to claim 3, wherein the fixing plate (71) fixed to the guide (70) is installed in a diagonal direction in which the anchor bolts (30) of the rail plate (11) are fitted while the hole (72) formed in the fixing plate (71) and the rail The hole in which the anchor bolt 30 of the plate 11 is fitted is formed to match, and the height of the computerized bolt 60 fitted in the hole 72 of the fixing plate 71 is adjusted to adjust the height of the corrugated tubular bolt cap 50. Rail plate fixing device for crane, characterized in that the height is adjusted.
KR1020210177432A 2021-12-13 2021-12-13 Fixing device and method of rail plate for crane KR102416943B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020210177432A KR102416943B1 (en) 2021-12-13 2021-12-13 Fixing device and method of rail plate for crane

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020210177432A KR102416943B1 (en) 2021-12-13 2021-12-13 Fixing device and method of rail plate for crane

Publications (1)

Publication Number Publication Date
KR102416943B1 true KR102416943B1 (en) 2022-07-05

Family

ID=82401699

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020210177432A KR102416943B1 (en) 2021-12-13 2021-12-13 Fixing device and method of rail plate for crane

Country Status (1)

Country Link
KR (1) KR102416943B1 (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200359400Y1 (en) 2004-05-06 2004-08-21 (주)홍주산업 Rail system for a crane
KR100881598B1 (en) * 2008-08-06 2009-02-17 궤도공영 주식회사 Method for construction of track for linear induction motor panel in linear induction motor
KR200444991Y1 (en) 2009-02-03 2009-06-19 (주)홍주산업 Rail system for crane
KR20090101559A (en) 2008-03-24 2009-09-29 주식회사 넥스탑 Anchor bolt for crane rail
KR20130131065A (en) 2012-05-23 2013-12-03 박태진 Port crane rail clamp device driving
KR102201590B1 (en) * 2020-07-20 2021-01-12 대광공영(주) Crane rail fastening structure

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200359400Y1 (en) 2004-05-06 2004-08-21 (주)홍주산업 Rail system for a crane
KR20090101559A (en) 2008-03-24 2009-09-29 주식회사 넥스탑 Anchor bolt for crane rail
KR100881598B1 (en) * 2008-08-06 2009-02-17 궤도공영 주식회사 Method for construction of track for linear induction motor panel in linear induction motor
KR200444991Y1 (en) 2009-02-03 2009-06-19 (주)홍주산업 Rail system for crane
KR20130131065A (en) 2012-05-23 2013-12-03 박태진 Port crane rail clamp device driving
KR102201590B1 (en) * 2020-07-20 2021-01-12 대광공영(주) Crane rail fastening structure

Similar Documents

Publication Publication Date Title
CN108222056B (en) Equipment foundation bolt group installation method
CN102510927A (en) Adjustable metal formwork system for concrete structures
US7942385B2 (en) Adjustable railing post bracket
KR102077307B1 (en) Landfill type detachable fixed support device for bridge inspection facility and construction method
KR101848727B1 (en) Joint structure for PC column and joining method using the same
KR102294565B1 (en) embeded anchor and construction method thereof
KR102416943B1 (en) Fixing device and method of rail plate for crane
CN110485707B (en) Wall column formwork plugging leveling device and construction method thereof
CN209941510U (en) Adjustable positioning fixture for pier embedded steel bars
CN105625730A (en) Method for assembling precast column
KR100879615B1 (en) Clamping device of base plate for rail of crane and clamping method of the same
JP4915653B2 (en) Anchor bolt positioning jig
CN203383332U (en) Adjustable positioning structure with two positioning plates for embedded bolts
JP2008255724A (en) Jig for execution of work of foundation structure with anchor bolt
CN208363650U (en) The mounting bracket of prefabricated components, the precast wall body containing the bracket
CN110984568A (en) Water stop ridge platform template device and construction method
CN102720159A (en) Adjusting device specially for steel hoop two-way suspension supporting system
DK162782B (en) PROCEDURE FOR DETERMINING A FOUNDATION ON A FOUNDATION
JP2012067441A (en) Installation method for anchor bolt
KR101977762B1 (en) Anchor Bolt Hole making device to make hole for Anchor Bolt on Concrete depositing and Method thereof
JP3072294B1 (en) Formwork equipment for manufacturing hollow PCa members
CN218441029U (en) Comprehensive support connecting device
JPH07119297A (en) Steel form installing device
CN217461468U (en) Concrete frame post template reinforced structure
GB2403736A (en) Shroud for a bolt to be set in concrete

Legal Events

Date Code Title Description
E701 Decision to grant or registration of patent right
GRNT Written decision to grant