KR101848727B1 - Joint structure for PC column and joining method using the same - Google Patents

Joint structure for PC column and joining method using the same Download PDF

Info

Publication number
KR101848727B1
KR101848727B1 KR1020170161199A KR20170161199A KR101848727B1 KR 101848727 B1 KR101848727 B1 KR 101848727B1 KR 1020170161199 A KR1020170161199 A KR 1020170161199A KR 20170161199 A KR20170161199 A KR 20170161199A KR 101848727 B1 KR101848727 B1 KR 101848727B1
Authority
KR
South Korea
Prior art keywords
column
joint
nut
vertical
structural member
Prior art date
Application number
KR1020170161199A
Other languages
Korean (ko)
Inventor
우운택
이창환
Original Assignee
(주) 동양구조안전기술
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by (주) 동양구조안전기술 filed Critical (주) 동양구조안전기술
Priority to KR1020170161199A priority Critical patent/KR101848727B1/en
Application granted granted Critical
Publication of KR101848727B1 publication Critical patent/KR101848727B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C3/00Structural elongated elements designed for load-supporting
    • E04C3/30Columns; Pillars; Struts
    • E04C3/34Columns; Pillars; Struts of concrete other stone-like material, with or without permanent form elements, with or without internal or external reinforcement, e.g. metal coverings
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/32Foundations for special purposes
    • E02D27/42Foundations for poles, masts or chimneys
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/18Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
    • E04B1/20Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of concrete, e.g. reinforced concrete, or other stonelike material
    • E04B1/21Connections specially adapted therefor
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C5/00Reinforcing elements, e.g. for concrete; Auxiliary elements therefor
    • E04C5/16Auxiliary parts for reinforcements, e.g. connectors, spacers, stirrups
    • E04C5/162Connectors or means for connecting parts for reinforcements
    • E04C5/163Connectors or means for connecting parts for reinforcements the reinforcements running in one single direction
    • E04C5/165Coaxial connection by means of sleeves

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • General Engineering & Computer Science (AREA)
  • Joining Of Building Structures In Genera (AREA)

Abstract

The present invention relates to a joining structure for PC columns, and a construction method thereof. According to the present invention, the joining structure for PC columns comprises: a lower vertical reinforcing bar which is vertically arranged in a lower structure member, and has a lower joint protruding from an upper end of the lower structure member and having screw threads formed along an outer circumferential surface thereof; a grooved unit formed on a circumference of a lower end of a PC column; an upper vertical reinforcing bar which is vertically arranged in the PC column, and has an upper joint protruding from the lower end of the PC column to be positioned on the grooved unit and having screw threads formed along an outer circumferential surface thereof; a connection unit wherein a lower end thereof is screwed to the lower joint and an upper end thereof is screwed to the upper joint to connect the lower and the upper vertical reinforcing bar; and a mortar unit filled between the lower structure member and the PC column and in the grooved unit. Accordingly, the PC column can be firmly joined and joining work can be easily performed.

Description

피씨기둥의 접합구조와 이의 시공방법{Joint structure for PC column and joining method using the same}[0001] The present invention relates to a joining structure of a PC column and a construction method thereof,

본 발명은 피씨기둥의 접합구조와 이의 시공방법에 관한 것으로서, 보다 상세하게는 피씨기둥의 접합을 견고하게 할 수 있고 접합 작업을 용이하게 진행하는 것이 가능한 피씨기둥의 접합구조와 이의 시공방법에 관한 것이다.The present invention relates to a joining structure of a PC column and its construction method, and more particularly, to a joining structure of a PC column capable of firmly joining a PC column and facilitating joining work, and a construction method thereof will be.

피씨(PC; Precast concrete)공법이란 건축물을 시공함에 있어 기둥, 보 또는 슬래브 등 주요 구조부재의 일부 또는 전부를 공장에서 제작하여 현장에서 상기 구조부재들을 조립하는 공법이다.A PC (Precast concrete) method is a method in which a part or all of a main structural member such as a column, a beam, or a slab is manufactured at a factory to assemble the structural members in the field.

피씨 구조부재들은 서로 간의 접합을 위하여 철근의 일부가 콘크리트 외부로 노출되도록 제작되며, 현장에서 접합이 필요한 부재들의 철근을 연결하고 접합부 주위로 현장 콘크리트를 타설한다.The PC structural members are manufactured to expose a part of the reinforcing bars to the outside of the concrete for bonding to each other, and to connect the reinforcing bars of the members required to be joined in the field and to pour the concrete around the joints.

피씨기둥의 접합은 일반적으로 다음과 같은 방법으로 이루어지게 된다. 설치할 피씨기둥의 철근과 기 설치된 부재의 철근을 원통형의 슬리브를 이용해 길이방향으로 연결한 후, 철근과 슬리브 주변으로 모르타르를 타설하여 슬리브의 내주면과 철근의 외주면 사이에 모르타르가 채워지도록 함으로써 피씨기둥이 완전히 고정되게 한다.The joining of PC columns is generally done in the following way. The reinforcing bars of the PC column to be installed and the reinforcing bars of the existing members are longitudinally connected by using a cylindrical sleeve and then the mortar is poured around the reinforcing bars and the sleeves so that the mortar is filled between the inner peripheral surface of the sleeve and the outer peripheral surfaces of the reinforcing bars, Make it completely fixed.

그런데 슬리브로 피씨기둥의 철근을 기 설치된 부재의 철근과 연결하는 것만으로는 피씨기둥이 자립할 수 없기 때문에 모르타르가 양생 완료될 때까지 피씨기둥을 가설재로 지지해주어야 하며, 모르타르의 양생 중 피씨기둥에 예기치 못하게 외력이 가해지면 피씨기둥의 위치나 각도가 틀어지는 문제가 발생할 수 있다.However, since the PC column can not stand alone by connecting the reinforcing bars of the PC column to the reinforcing bars of the pre-installed member, it is necessary to support the PC column as a building material until the mortar is cured. If an external force is applied unexpectedly, the position or angle of the PC column may be changed.

한편, 기초와 접합되는 기둥은 상부로 위치하게 될 구조부재들의 기준이 되므로 위치나 각도를 정확하게 할 필요가 있는데, 피씨기둥의 경우 미리 제작되어 기초에 대한 위치나 각도의 조절에 한계가 있기 때문에 피씨기둥의 철근과 연결될 기초의 철근을 보다 정확하게 설치해주어야 한다.On the other hand, since the column connected to the foundation is the reference of the structural members to be positioned at the upper part, it is necessary to precisely position and angle. In the case of the PC column, since the position and angle of the foundation are limited, The reinforcement of the foundation to be connected with the reinforcement of the column should be installed more accurately.

KRKR 10-2013-010929810-2013-0109298 AA

본 발명은 상기한 것과 같은 종래기술의 문제점을 해결하기 위한 것으로서, 피씨기둥의 접합시 철근을 연결하는 것만으로 피씨기둥이 자립 가능하도록 하여 피씨기둥의 접합 작업을 용이하게 진행할 수 있고 피씨기둥의 접합 위치와 각도를 정확하게 하는 것이 가능한 피씨기둥의 접합구조와 이의 시공방법을 제공하는 데 그 목적이 있다.It is an object of the present invention to solve the problems of the prior art as described above, and it is an object of the present invention to provide a method of joining a PC column, The present invention provides a joining structure of a PC column that can accurately position and angle and a construction method thereof.

또한, 기초 상에도 피씨기둥의 접합 위치와 각도를 정확하게 하는 것이 가능한 피씨기둥의 접합구조와 이의 시공방법을 제공하고자 한다.Also, it is intended to provide a joining structure of a PC column capable of accurately positioning the joining position and angle of the PC column on a foundation, and a construction method thereof.

상기한 것과 같은 과제를 해결하기 위한 본 발명의 바람직한 실시예에 의하면, 하부 구조부재의 상부에 피씨기둥을 접합하기 위한 피씨기둥의 접합구조에 있어서, 하부 구조부재 내에 수직하게 배치되고, 하부 구조부재의 상단부에서 돌출되며 외주면을 따라 나사산이 형성된 하부 이음부를 구비하는 하부 수직철근; 피씨기둥의 하단 둘레에 형성되는 파임부; 피씨기둥 내에 수직하게 배치되고, 피씨기둥의 하단부에서 돌출되어 상기 파임부에 위치하며 외주면을 따라 나사산이 형성된 상부 이음부를 구비하는 상부 수직철근; 하단부가 상기 하부 이음부에 나사결합하고 상단부가 상기 상부 이음부에 나사결합하여 상기 하부 수직철근과 상기 상부 수직철근을 연결하는 연결부; 및 하부 구조부재와 피씨기둥 사이, 그리고 상기 파임부에 채워지는 모르타르부;를 포함하여 이루어지는 것을 특징으로 하는 피씨기둥의 접합구조가 제공된다.According to a preferred embodiment of the present invention for solving the above-mentioned problems, a joining structure of a PC column for joining a PC column to an upper part of a lower structural member, A lower vertical reinforcing bar projecting from an upper end of the lower reinforcing bar and having a lower joint formed with threads along an outer circumferential surface thereof; A fin portion formed around the lower end of the PC column; An upper vertical reinforcing bar disposed vertically in the PC column and projecting from a lower end of the PC column and having an upper joint located at the fold and formed with threads along the outer circumference; A connecting portion connecting the lower vertical reinforcing bar and the upper vertical reinforcing bar by screwing the lower end portion to the lower joint portion and screwing the upper end portion to the upper joint portion; And a mortar part between the lower structural member and the PC column, and a mortar part filled in the coupling part.

본 발명의 또 다른 실시예에 의하면, 상기 연결부는, 파이프 형상으로 이루어져 하단부에 상기 하부 이음부가 체결되고 상단부에 상기 상부 이음부가 체결되는 연결 너트, 상기 하부 이음부에 체결되며 상기 연결 너트의 하단부에 밀착되는 하부 너트 및 상기 상부 이음부에 체결되며 상기 연결 너트의 상단부에 밀착되는 상부 너트를 포함하여 이루어지는 것을 특징으로 하는 피씨기둥의 접합구조가 제공된다.According to another embodiment of the present invention, the connecting portion may include a connecting nut having a pipe shape and having the lower joint portion fastened to the lower joint portion and the upper joint portion fastened to the upper end portion, And a top nut fastened to the top end of the connecting nut and fastened to the top end of the connecting nut.

본 발명의 또 다른 실시예에 의하면, 상기 연결 너트의 벽면에는 유입구가 형성되는 것을 특징으로 하는 피씨기둥의 접합구조가 제공된다.According to another embodiment of the present invention, a connection structure of the PC column is provided, wherein an inlet is formed in a wall surface of the connection nut.

본 발명의 또 다른 실시예에 의하면, 상기 파임부는 3개 이상이 간격을 두고 형성되는 것을 특징으로 하는 피씨기둥의 접합구조가 제공된다.According to another embodiment of the present invention, the joining structure of the PC column is provided, wherein the joining structure of the PC column is provided with three or more spaced apart portions.

본 발명의 또 다른 실시예에 의하면, 하부 구조부재 내에 수직하게 배치되고, 하부 구조부재의 상단부에서 돌출되는 제2 하부 이음부를 구비하는 제2 하부 수직철근; 피씨기둥 내에 수직하게 배치되는 제2 상부 수직철근; 및 하단부에 상기 제2 하부 이음부가 삽입되고 상단부에 상기 제2 상부 수직철근의 하단부가 삽입되어 상기 제2 하부 수직철근과 상기 제2 상부 수직철근을 연결하는 슬리브;를 더 포함하는 것을 특징으로 하는 피씨기둥의 접합구조가 제공된다.According to another embodiment of the present invention, a second lower vertical steel bar vertically disposed in the lower structural member and having a second lower joint projecting from an upper end of the lower structural member; A second upper vertical steel bar vertically disposed in the PC column; And a sleeve inserted into the second lower joint at a lower end thereof and having a lower end inserted into the upper end of the second upper vertical bar to connect the second lower vertical bar to the second upper vertical bar, The joining structure of the PC column is provided.

본 발명의 또 다른 실시예에 의하면, 하부 구조부재와 피씨기둥 사이에 배치되고 상기 하부 이음부가 관통하는 수평한 판형의 베드블록을 더 포함하는 것을 특징으로 하는 피씨기둥의 접합구조가 제공된다.According to another embodiment of the present invention, there is provided a joining structure of a PC column, characterized by further comprising a horizontal plate-shaped bed block disposed between the lower structural member and the PC column and passing through the lower joining portion.

본 발명의 또 다른 실시예에 의하면, 상기 베드블록의 중앙에는 개구가 형성되는 것을 특징으로 하는 피씨기둥의 접합구조가 제공된다.According to another embodiment of the present invention, an opening is formed at the center of the bed block.

본 발명의 또 다른 실시예에 의하면, 하부 구조부재는 기초이고, 상기 하부 수직철근의 하단부에 결합하여 상기 하부 수직철근의 위치와 각도를 조절 가능하게 하는 육면체 프레임 형상의 기초 프레임부를 더 포함하는 것을 특징으로 하는 피씨기둥의 접합구조가 제공된다.According to another embodiment of the present invention, the lower structural member may further comprise a base frame portion having a base and a hexahedral frame-shaped base frame coupled to a lower end of the lower vertical bar to adjust the position and angle of the lower vertical bar A joining structure of the PC column is provided.

본 발명의 또 다른 실시예에 의하면, 상기 기초 프레임부는, 상기 하부 수직철근의 하단부가 결합하는 사각 프레임 형상의 상부 프레임, 상기 상부 프레임의 하부로 이격되어 위치하는 사각 프레임 형상의 하부 프레임, 상기 상부 프레임과 상기 하부 프레임을 연결하는 다수 개의 수직재 및 상기 수직재에 대해 상기 상부 프레임의 위치와 각도를 조절 가능하게 하는 조절수단을 포함하여 이루어지는 것을 특징으로 하는 피씨기둥의 접합구조가 제공된다.According to another embodiment of the present invention, the base frame portion includes a rectangular frame-shaped upper frame to which a lower end portion of the lower vertical reinforcing bar is engaged, a lower frame having a rectangular frame shape spaced apart from the lower portion of the upper frame, A plurality of vertical members connecting the frame and the lower frame, and adjusting means for adjusting the position and angle of the upper frame relative to the vertical member.

본 발명의 또 다른 실시예에 의하면, 상기 조절수단은, 상기 상부 프레임 상에 형성되는 다수 개의 수평한 제1 장공, 상기 각 수직재 상에 형성되는 수직한 제2 장공, 상기 제1 장공과 상기 제2 장공을 관통하는 볼트 및 상기 볼트에 체결되는 너트를 포함하여 이루어지는 것을 특징으로 하는 피씨기둥의 접합구조가 제공된다.According to another embodiment of the present invention, the adjusting means includes a plurality of horizontal first slots formed on the upper frame, a vertical second slot formed on each of the vertical members, A bolt passing through the two holes, and a nut fastened to the bolt. The joining structure of the PC column is provided.

본 발명의 또 다른 실시예에 의하면, 하부 구조부재 내에 수직하게 배치되고, 하부 구조부재의 상단부에서 돌출되며 외주면을 따라 나사산이 형성된 하부 이음부를 구비하는 하부 수직철근; 피씨기둥의 하단 둘레에 형성되는 파임부; 피씨기둥 내에 수직하게 배치되고, 피씨기둥의 하단부에서 돌출되어 상기 파임부에 위치하며 외주면을 따라 나사산이 형성된 상부 이음부를 구비하는 상부 수직철근; 하단부가 상기 하부 이음부에 나사결합하고 상단부가 상기 상부 이음부에 나사결합하여 상기 하부 수직철근과 상기 상부 수직철근을 연결하는 연결부; 및 하부 구조부재와 피씨기둥 사이, 그리고 상기 파임부에 채워지는 모르타르부;를 포함하여 이루어지는 것을 특징으로 하는 피씨기둥의 접합구조를 시공하는 방법에 있어서, 하부 구조부재를 설치하는 하부 구조부재 설치단계; 하부 구조부재 상부에 피씨기둥을 배치하는 피씨기둥 배치단계; 상기 연결부의 하단부에 상기 하부 이음부를 나사결합시키고, 상기 연결부의 상단부에 상기 상부 이음부를 나사결합시키는 연결단계; 및 하부 구조부재와 피씨기둥 사이, 그리고 상기 파임부에 모르타르부를 채우는 모르타르부 형성단계;를 포함하여 이루어지는 것을 특징으로 하는 피씨기둥 접합구조의 시공방법이 제공된다.According to another embodiment of the present invention, a lower vertical bar is vertically disposed in a lower structural member, the lower vertical bar protruding from an upper end of the lower structural member and having a lower joint threaded along an outer peripheral surface thereof; A fin portion formed around the lower end of the PC column; An upper vertical reinforcing bar disposed vertically in the PC column and projecting from a lower end of the PC column and having an upper joint located at the fold and formed with threads along the outer circumference; A connecting portion connecting the lower vertical reinforcing bar and the upper vertical reinforcing bar by screwing the lower end portion to the lower joint portion and screwing the upper end portion to the upper joint portion; And a mortar part which is filled between the lower structural member and the PC column, and the mortar part is filled in the frame part. In the method of constructing the joining structure of the PC column, ; Placing a PC column on the lower structural member; A coupling step of screwing the lower joint part to a lower end of the coupling part and screwing the upper joint part to an upper end of the coupling part; And forming a mortar part between the lower structural member and the PC column, and filling the mortar part with the mortar part.

본 발명의 또 다른 실시예에 의하면, 상기 피씨기둥 배치단계 전에 상기 연결부는 상기 하부 이음부 또는 상기 상부 이음부에 결합되는 것을 특징으로 하는 피씨기둥 접합구조의 시공방법이 제공된다.According to another embodiment of the present invention, the connection part is coupled to the lower joint or the upper joint before the step of arranging the PC column.

본 발명의 또 다른 실시예에 의하면, 상기 연결부는, 파이프 형상으로 이루어져 하단부에 상기 하부 이음부가 체결되고 상단부에 상기 상부 이음부가 체결되는 연결 너트, 상기 하부 이음부에 체결되며 상기 연결 너트의 하단부에 밀착되는 하부 너트 및 상기 상부 이음부에 체결되며 상기 연결 너트의 상단부에 밀착되는 상부 너트를 포함하여 이루어지며, 상기 피씨기둥 배치단계 전에 상기 하부 너트는 상기 하부 이음부에 결합되고, 상기 상부 너트는 상기 상부 이음부에 결합되며, 상기 연결 너트는 상기 하부 이음부 또는 상기 상부 이음부에 결합되고, 상기 연결단계는, 상기 연결 너트를 상하로 이동시켜 상기 연결 너트의 하단부에 상기 하부 이음부가 체결되도록 하고, 상기 연결 너트의 상단부에 상기 상부 이음부가 체결되도록 하는 제1 연결단계;와 상기 하부 너트를 상기 연결 너트의 하단부에 밀착시키고, 상기 상부 너트를 상기 연결 너트의 상단부에 밀착시키는 제2 연결단계;를 포함하여 이루어지는 것을 특징으로 하는 피씨기둥 접합구조의 시공방법이 제공된다.According to another embodiment of the present invention, the connecting portion may include a connecting nut having a pipe shape and having the lower joint portion fastened to the lower joint portion and the upper joint portion fastened to the upper end portion, Wherein the lower nut is fastened to the lower joint before the step of arranging the PC column and the upper nut is fastened to the upper joint before the step of arranging the PC column, The connection nut is coupled to the upper joint portion and the connection nut is coupled to the lower joint portion or the upper joint portion so that the lower joint portion is fastened to the lower end portion of the connection nut by vertically moving the connection nut And the upper end of the connecting nut has a first connecting end And a second connecting step of bringing the lower nut into close contact with the lower end of the connecting nut and closely fitting the upper nut to the upper end of the connecting nut. .

본 발명의 또 다른 실시예에 의하면, 하부 구조부재는 하부 구조부재 내에 수직하게 배치되고 하부 구조부재의 상단부에서 돌출되는 제2 하부 이음부를 구비하는 제2 하부 수직철근을 포함하고, 피씨기둥은 피씨기둥 내에 배치되는 제2 상부 수직철근을 포함하며, 상기 피씨기둥 배치단계에서 상기 제2 하부 수직철근과 상기 제2 상부 수직철근은, 하단부에 상기 제2 하부 이음부가 삽입되고 상단부에 상기 제2 상부 수직철근의 하단부가 삽입되는 슬리브에 의해 연결되는 것을 특징으로 하는 피씨기둥 접합구조의 시공방법이 제공된다.According to another embodiment of the present invention, the lower structural member includes a second lower vertical reinforcing bar vertically disposed in the lower structural member and having a second lower joint projecting from the upper end of the lower structural member, And a second upper vertical steel bar disposed in the column, wherein the second lower vertical steel bar and the second upper vertical steel bar in the PC column placing step are formed such that the second lower joining portion is inserted into the lower end portion, And a lower end of the vertical reinforcement is connected by a sleeve into which the lower end of the vertical reinforcement is inserted.

본 발명의 또 다른 실시예에 의하면, 상기 하부 구조부재 설치단계와 상기 피씨기둥 배치단계 사이에는, 하부 구조부재의 상부에 상기 하부 이음부가 관통하는 수평한 판형의 베드블록을 설치하는 베드블록 설치단계가 더 진행되는 것을 특징으로 하는 피씨기둥 접합구조의 시공방법이 제공된다.According to another embodiment of the present invention, a bed block installation step of installing a horizontally-plate-shaped bed block passing through the lower joint part on the lower structural member is provided between the lower structural member installing step and the PC column placing step The method of claim 1,

본 발명의 또 다른 실시예에 의하면, 하부 구조부재는 기초로서, 상기 하부 수직철근의 하단부가 결합하는 사각 프레임 형상의 상부 프레임, 상기 상부 프레임의 하부로 이격되어 위치하는 사각 프레임 형상의 하부 프레임, 상기 상부 프레임과 상기 하부 프레임을 연결하는 다수 개의 수직재 및 상기 수직재에 대해 상기 상부 프레임의 위치와 각도를 조절 가능하게 하는 조절수단을 구비하는 기초 프레임부를 더 포함하고, 상기 하부 구조부재 설치단계는, 상기 하부 수직철근의 하단부가 결합된 상기 기초 프레임부를 지면 위에 안착시키는 기초 프레임부 안착단계; 상기 하부 프레임과 상기 수직재의 주변으로 버림 콘크리트를 타설하되, 상기 수직재의 상단부는 버림 콘크리트의 상부로 돌출되도록 하는 버림 콘크리트 타설단계; 상기 조절수단으로 상기 수직재에 대해 상기 상부 프레임의 위치와 각도를 조절는 조절단계; 및 상기 버림 콘크리트의 상부로 기초 콘크리트를 타설하되 상기 하부 수직철근의 상단부가 기초 콘크리트 상부로 돌출되도록 하는 기초 콘크리트 타설단계;를 포함하여 이루어지는 것을 특징으로 하는 피씨기둥 접합구조의 시공방법이 제공된다.According to another embodiment of the present invention, the lower structural member includes a rectangular frame-shaped upper frame to which a lower end portion of the lower vertical reinforcing bar is engaged, a lower frame in a rectangular frame- Further comprising a plurality of vertical members connecting the upper frame and the lower frame and a base frame unit having adjustment means for adjusting the position and angle of the upper frame relative to the vertical member, A base frame part seating step of placing the base frame part coupled with the lower end of the lower vertical reinforcing bar on the ground; Placing an abandoned concrete around the lower frame and the vertical member so that an upper end of the vertical member protrudes to an upper portion of the abandoned concrete; Adjusting the position and angle of the upper frame with respect to the vertical member by the adjusting means; And a foundation concrete pouring step for pouring foundation concrete onto the top of the abandoned concrete, wherein an upper end of the lower vertical reinforcement protrudes to the upper part of the foundation concrete.

본 발명에 의한 피씨기둥의 접합구조에 의하면 피씨기둥의 접합 중 피씨기둥을 자립시킬 수 있어 피씨기둥을 지지하기 위한 가설재 등이 필요하지 않다. 이에 따라, 피씨기둥의 접합 작업을 용이하게 진행할 수 있다.According to the joining structure of the PC column according to the present invention, since the PC column can be self-supporting during joining of the PC column, a construction material for supporting the PC column is not required. Thus, the joining operation of the PC column can be facilitated.

피씨기둥의 접합은 연결 너트, 하부 너트 및 상부 너트로 이루어지는 연결부에 의해 견고하게 이루어지며, 연결 너트의 중간에 유입구를 형성하여 연결 너트 내에 모르타르가 유입될 수 있도록 하면 피씨기둥의 접합을 보다 견고하게 할 수 있다.The joining of the PC column is made solid by the connecting part composed of the connecting nut, the lower nut and the upper nut, and the inlet port is formed in the middle of the connecting nut so that the mortar can be introduced into the connecting nut, can do.

피씨기둥의 하부에 위치하는 하부 구조부재가 기초인 경우에, 피씨기둥 접합구조가 기초 프레임부를 더 구비하면 하부 구조부재의 위치와 각도를 매우 정확하게 설치하는 것이 가능하다.In the case where the lower structural member located at the lower portion of the PC column is the base, if the PC column connection structure further includes the base frame portion, it is possible to install the position and angle of the lower structural member with high accuracy.

도 1은 본 발명에 의한 피씨기둥 접합구조의 분해 사시도,
도 2는 상기 피씨기둥 접합구조에 의해 접합된 하부 구조부재와 피씨기둥의 단면도,
도 3은 상기 피씨기둥 접합구조를 구성하는 기초 프레임부에 관한 설명도,
도 4는 본 발명에 의한 피씨기둥 접합구조의 시공방법에 관한 순서도,
도 5는 상기 피씨기둥 접합구조의 시공방법에 관한 설명도,
도 6은 상기 피씨기둥 접합구조의 시공방법을 구성하는 연결단계에 관한 설명도,
도 7은 상기 피씨기둥 접합구조를 구성하는 하부 구조부재가 기초인 경우에잇어 피씨기둥 접합구조의 시공방법에 관한 순서도,
도 8은 상기 피씨기둥 접합구조의 시공방법을 구성하는 하부 구조부재 설치단계에 관한 설명도이다.
1 is an exploded perspective view of a PC column joint structure according to the present invention,
FIG. 2 is a cross-sectional view of a lower structural member and a PC column joined by the PC column-
3 is an explanatory diagram of a base frame portion constituting the PC columnar connection structure,
FIG. 4 is a flow chart of a method of constructing a PC column joint structure according to the present invention,
FIG. 5 is an explanatory diagram of a construction method of the PC column-
FIG. 6 is an explanatory view of a connection step constituting the method of constructing the PC column joint structure,
FIG. 7 is a flowchart showing a construction method of a PC column joint structure in a case where a lower structural member constituting the PC column joint structure is a base;
FIG. 8 is an explanatory view of a step of installing a substructure constituting a method of constructing the PC column joint structure. FIG.

이하에서는 본 발명의 실시예를 첨부된 도면을 참조하여 상세히 설명한다. 그러나 본 발명을 설명함에 있어 공지의 구성을 구체적으로 설명함으로 인하여 본 발명의 기술적 사상을 흐리게 하거나 불명료하게 하는 경우에는 위 공지의 구성에 관한 설명을 생략하기로 한다.Hereinafter, embodiments of the present invention will be described in detail with reference to the accompanying drawings. However, in order to obscure or obscure the technical idea of the present invention due to the detailed description of the known structure in describing the present invention, the description of the structure of the above known structure will be omitted.

본 발명은 하부 구조부재(2)의 상부에 피씨기둥(3)을 접합하기 위한 피씨기둥의 접합구조에 관한 것이다. 상기 하부 구조부재(2)는 기둥 또는 기초일 수 있으며, 하부 구조부재(2)가 기둥인 경우 피씨(PC; Precast Concrete)기둥이거나 현장 제작 기둥일 수 있다.The present invention relates to a joining structure of a PC column for joining a PC column (3) to an upper portion of a lower structural member (2). The lower structural member 2 may be a column or a foundation and may be a PC (Precast Concrete) column or a field production column when the lower structural member 2 is a column.

도 1에는 본 발명에 의한 피씨기둥 접합구조(1)의 분해 사시도가 도시되어 있고, 도 2에는 상기 피씨기둥 접합구조(1)에 의해 접합된 하부 구조부재(2)와 피씨기둥(3)의 단면도가 도시되어 있다.FIG. 1 is an exploded perspective view of a PC column connection structure 1 according to the present invention. In FIG. 2, a bottom structure member 2 and a PC column connection structure 1, which are joined by the PC column connection structure 1, Sectional view is shown.

본 발명에 의한 피씨기둥 접합구조(1)는 크게, 하부 수직철근(10), 파임부(20), 상부 수직철근(30), 연결부(40) 및 모르타르부(50)를 포함하여 이루어진다.The PC column connection structure 1 according to the present invention mainly comprises a lower vertical reinforcing bar 10, a fin portion 20, an upper vertical reinforcing bar 30, a connecting portion 40 and a mortar portion 50.

하부 수직철근(10)은 하부 구조부재(2)에 배근되는 수직철근으로서, 상단부에 하부 구조부재(2)의 상단면에서 돌출되는 하부 이음부(11)를 구비한다. 상기 하부 이음부(11)의 외주면을 따라서는 나사산이 형성된다.The lower vertical reinforcing bar 10 is a vertical reinforcing steel which is placed on the lower structural member 2 and has a lower joint 11 protruding from the upper surface of the lower structural member 2 at the upper end. A thread is formed along the outer circumferential surface of the lower joint 11. [

파임부(20)는 피씨기둥(3)의 하단 둘레에 형성되는 빈 공간으로서, 피씨기둥(3)의 외측면으로부터 파여진 형상을 갖는다. 상기 파임부(20)는 도 1에 도시되어 있는 바와 같이 다수 개가 피씨기둥(3)의 하단 둘레에서 간격을 두고 형성될 수도 있고, 피씨기둥(3)의 하단 둘레 전체에 형성될 수도 있다.The fringe portion 20 is an empty space formed around the lower end of the pillar post 3 and has a shape widened from the outer surface of the pillar post 3. As shown in FIG. 1, the pull-in portions 20 may be formed at intervals around the lower end of the PC column 3, or may be formed around the lower end of the PC column 3.

상부 수직철근(30)은 피씨기둥(3)에 배근되는 수직철근으로서, 하단부에 피씨기둥(3)의 하단부에서 돌출되어 상기 파임부(20) 내에 위치하는 상부 이음부(31)를 구비한다. 상부 이음부(31)의 외주면에도 상기 하부 이음부(11)에서와 마찬가지로 나사산이 형성된다.The upper vertical reinforcing bar 30 is a vertical reinforcing bar to be laid on the pillar column 3 and has an upper joint 31 protruding from the lower end of the pillar column 3 at the lower end and located in the pillar 20. [ A thread is formed on the outer circumferential surface of the upper joint 31 as well as the lower joint 11.

연결부(40)는 하부 구조부재(2)의 하부 수직철근(10)과 피씨기둥(3)의 상부 수직철근(30)을 연결하는 역할을 한다. 즉, 연결부(40)는 긴 너트 형상으로 이루어져 하단부는 하부 수직철근(10)의 하부 이음부(11)와 나사결합하고 상단부는 상부 수직철근(30)의 상부 이음부(31)와 나사결합함으로써 하부 수직철근(10)과 상부 수직철근(30)을 길이방향으로 일체화시킨다.The connecting portion 40 serves to connect the lower vertical steel bar 10 of the lower structural member 2 and the upper vertical steel bar 30 of the PC column 3. [ That is, the connecting portion 40 is formed in the shape of a long nut and the lower end portion is screwed to the lower joint portion 11 of the lower vertical steel bar 10 and the upper end portion is screwed to the upper joint portion 31 of the upper vertical steel bar 30 The lower vertical steel bar 10 and the upper vertical steel bar 30 are integrated in the longitudinal direction.

그리고 모르타르부(50)는 하부 구조부재(2)와 피씨기둥(3) 사이, 그리고 상기 파임부(20) 내에 채워져 하부 구조부재(2)와 피씨기둥(3)을 완전히 일체화시키고 하부 이음부(11), 상부 이음부(31) 및 연결부(40)가 외부로 노출되지 않도록 한다.The mortar portion 50 is filled between the lower structural member 2 and the PC column 3 and into the coupling portion 20 to completely integrate the lower structural member 2 and the PC column 3, 11, the upper joint portion 31, and the connecting portion 40 are not exposed to the outside.

이러한 본 발명에 의한 피씨기둥의 접합구조는 간략하게, 연결부(40)로 하부 구조부재(2)의 하부 수직철근(10)과 피씨기둥(3)의 상부 수직철근(30)을 연결한 후, 파임부(20) 등에 모르타르를 타설하는 방법으로 시공되는데, 연결부(40)에 의해 하부 수직철근(10)에 연결된 상부 수직철근(30)이 하부 수직철근(10)을 기준으로 길이방향이나 직경방향으로 움직이지 않고 견고하게 고정되기 때문에 모르타르가 양생되기 전에도 피씨기둥(3)이 하부 구조부재(2) 위에서 자립하는 것이 가능하다. 따라서, 피씨기둥의 접합구조의 시공 중 피씨기둥(3)을 임시적으로 지지해 줄 가설재 등이 필요하지 않으며, 예기치 못하게 피씨기둥(3)에 가해지는 작업하중 등의 외력에 의해 피씨기둥(3)의 위치나 각도가 변화될 염려가 없다. The joining structure of the PC column according to the present invention is as follows. After connecting the lower vertical steel bar 10 of the lower structural member 2 and the upper vertical steel bar 30 of the PC column 3 with the connection part 40, The upper vertical reinforcing bar 30 connected to the lower vertical reinforcing bar 10 by the connecting portion 40 is placed in the longitudinal direction or the radial direction with respect to the lower vertical reinforcing bar 10. [ It is possible that the PC column 3 is allowed to stand on the lower structural member 2 even before the mortar is cured. Therefore, there is no need to provide a temporary support for temporarily supporting the PC column 3 during the construction of the joining structure of the PC column, and the PC column 3 is unexpectedly moved by an external force such as a working load applied to the PC column 3, There is no possibility that the position or angle of the light guide plate is changed.

또한, 연결부(40)에 의한 하부 수직철근(10)과 상부 수직철근(30)의 연결 작업이 상부 수직철근(30)의 상부 이음부(31)가 위치하는 파임부(20) 내에서 이루어지는데, 파임부(20)가 피씨기둥(3)의 둘레에 위치하므로 작업자가 쉽게 파임부(20)로 접근하여 하부 수직철근(10)과 상부 수직철근(30)을 연결하는 것이 가능하다.The connecting operation of the lower vertical reinforcing bar 10 and the upper vertical reinforcing bar 30 by the connecting portion 40 is performed in the fitting portion 20 where the upper joining portion 31 of the upper vertical reinforcing bar 30 is located It is possible for an operator to easily approach the pulling portion 20 and connect the lower vertical reinforcing bar 10 and the upper vertical reinforcing bar 30 because the pulling portion 20 is located around the pillar 3.

상부 이음부(31)는 피씨기둥(3)의 외부로 돌출되기는 하지만 파임부(20) 내에 위치하여 피씨기둥(3)의 최하단면이나 최외측면 밖으로는 돌출되지 않기 때문에 피씨기둥(3)을 보관하거나 운반할 때 상부 이음부(31)가 충돌 등에 의해 손상될 위험이 적다.The upper joint 31 protrudes outside the PC column 3 but is not located outside the bottom or outermost side of the PC column 3 because it is located in the drawer 20 so that the PC column 3 is stored There is little risk that the upper joint 31 will be damaged by a collision or the like.

상기 연결부(40)는 보다 자세하게 연결 너트(41), 하부 너트(42) 및 상부 너트(43)로 이루어질 수 있다.The connection portion 40 may include a connection nut 41, a lower nut 42, and an upper nut 43 in more detail.

연결 너트(41)는 중심에 관통공이 형성된 파이프 형상으로 이루어지며, 하단부에 하부 이음부(11)가 체결되고 상단부에 상부 이음부(31)가 체결된다. 하부 너트(42)는 상기 하부 이음부(11)에 체결되어 연결 너트(41)의 하단부에 밀찰된다. 그리고 상부 너트(43)는 상부 이음부(31)에 체결되어 연결 너트(41)의 상단부에 밀착된다.The connecting nut 41 is formed in the shape of a pipe having a through hole at its center, and the lower joint portion 11 is fastened to the lower end portion and the upper joint portion 31 is fastened to the upper end portion. The lower nut 42 is fastened to the lower joint 11 and is stuck to the lower end of the coupling nut 41. The upper nut 43 is fastened to the upper joint portion 31 and is brought into close contact with the upper end of the connection nut 41.

이러한 연결부(40)에서 상기 연결 너트(41)는 하부 수직철근(10)과 상부 수직철근(30)을 길이방향으로 연결하는 역할을 한다. 그리고 하부 너트(42)와 상부 너트(43)는 하부 수직철근(10)이나 상부 수직철근(30)에 대해 연결 너트(41)가 길이방향으로 이동하는 것을 방지한다. 즉, 하부 너트(42)는 연결 너트(41)가 하부 수직철근(10)과 상부 수직철근(30)을 따라 하부로 이동하는 것을 방지하며, 상부 너트(43)는 연결 너트(41)가 하부 수직철근(10)과 상부 수직철근(30)을 따라 상부로 이동하는 것을 방지한다. 이에 따라, 하부 수직철근(10)과 상부 수직철근(30)의 연결이 보다 견고해지게 된다.In the connecting portion 40, the connecting nut 41 serves to connect the lower vertical reinforcing bar 10 and the upper vertical reinforcing bar 30 in the longitudinal direction. The lower nut 42 and the upper nut 43 prevent the connecting nut 41 from moving in the longitudinal direction with respect to the lower vertical bar 10 or the upper vertical bar 30. That is, the lower nut 42 prevents the connection nut 41 from moving downward along the lower vertical bar 10 and the upper vertical bar 30, and the upper nut 43 prevents the connection nut 41 from moving Thereby preventing upward movement along vertical reinforcement 10 and upper vertical reinforcement 30. Thus, the connection between the lower vertical reinforcing bar 10 and the upper vertical reinforcing bar 30 becomes more rigid.

연결 너트(41)의 벽면에는 유입구(41a)가 형성될 수 있다.An inlet port 41a may be formed in the wall surface of the connection nut 41. [

상기 유입구(41a)를 통해서는 모르타르부(50)의 형성시 연결 너트(41) 내부 공간으로 모르타르가 유입되어, 하부 이음부(11)와 상부 이음부(31) 사이, 하부 이음부(11)의 외주면과 연결 너트(41)의 내주면 사이, 그리고 하부 이음부(11)의 외주면과 연결 너트(41)의 내주면 사이에 모르타르가 채워지게 된다. 연결 너트(41) 내에서 양생된 모르타르는 하부 수직철근(10)과 상부 수직철근(30)의 결합력을 높이고, 하부 수직철근(10)에 대한 상부 수직철근(30)의 움직임을 완전히 차단한다.The mortar is introduced into the internal space of the connecting nut 41 when the mortar portion 50 is formed through the inlet port 41a so that the lower joint portion 11 and the upper joint portion 31, And between the outer circumferential surface of the lower joint portion 11 and the inner circumferential surface of the connecting nut 41, the mortar is filled. The mortar cured in the connection nut 41 enhances the bonding force between the lower vertical reinforcing bars 10 and the upper vertical reinforcing bars 30 and completely blocks the movement of the upper vertical reinforcing bars 30 with respect to the lower vertical reinforcing bars 10.

파임부(20)는 피씨기둥(3)의 하단 둘레에서 3개 이상이 간격을 두고 형성되는 것이 바람직하다.It is preferable that at least three portions of the drawer portion 20 are formed around the lower end of the PC column 3 with an interval therebetween.

파임부(20)가 3개 이상 형성되어 하부 수직철근(10)과 상부 수직철근(30)이 연결부(40)에 의해 3개소 이상에서 연결되는 경우, 피씨기둥(3)의 어느 방향에서 외력이 가해지더라도 피씨기둥(3)이 전도되는 것을 효과적으로 방지할 수 있다.When three or more fins 20 are formed so that the lower vertical reinforcing bars 10 and the upper vertical reinforcing bars 30 are connected at three or more places by the connecting portions 40, It is possible to effectively prevent the PC column 3 from being conducted.

피씨기둥(3)이 원형 단면을 가지는 경우에는 파임부(20)가 등간격으로 3개 이상 형성되는 것이 바람직하고, 피씨기둥(3)이 사각형 단면을 가지는 경우에는 파임부(20)가 피씨기둥(3)의 각 모서리 부분에 형성되는 것이 바람직하다.In the case where the PC column 3 has a circular cross-section, it is preferable that at least three wave columns 20 are formed at regular intervals. If the PC column 3 has a rectangular cross-section, It is preferable that the protrusions are formed at the respective corner portions of the substrate 3.

본 발명에 의한 피씨기둥의 접합구조는 제2 하부 수직철근(60), 제2 상부 수직철근(70) 및 슬리브(80)를 더 구비할 수 있다.The joining structure of the PC column according to the present invention may further include a second lower vertical steel bar 60, a second upper vertical steel bar 70 and a sleeve 80.

제2 하부 수직철근(60)은 하부 구조부재(2)의 수직철근 중 상기 하부 수직철근(10) 외의 수직철근을 가리키며, 하부 구조부재(2)의 상단부에서 돌출되는 제2 하부 이음부(61)를 구비한다. 제2 하부 이음부(61)는 특별히 가공되지 않는다.The second lower vertical reinforcing bar 60 indicates a vertical reinforcing bar other than the lower vertical reinforcing bar 10 among the vertical reinforcing bars of the lower structural member 2 and a second lower joining portion 61 projecting from the upper end of the lower structural member 2 . The second lower joint 61 is not specially worked.

제2 상부 수직철근(70)은 피씨기둥(3)의 수직철근 중 상기 상부 수직철근(30) 외의 수직철근을 가리킨다.And the second upper vertical steel bar 70 indicates a vertical steel bar other than the upper vertical steel bar 30 among the vertical steel bars of the PC column 3. [

상기 슬리브(80)는 중심에 관통공이 형성된 원통형의 것으로, 하단부에 제2 하부 이음부(61)가 삽입되고 상단부에 제2 상부 수직철근(70)의 하단부가 삽입되어, 제2 하부 수직철근(60)과 제2 상부 수직철근(70)은 길이방향으로 연결한다. 상기 슬리브(80)로는 수직철근을 길이방향으로 연결하는 데 사용되는 일반적인 슬리브가 사용될 수 있다.The sleeve 80 has a cylindrical shape with a through hole at its center. The sleeve 80 has a second lower joint 61 inserted into the lower end thereof and a lower end inserted into the upper end of the second upper vertical bar 70, 60 and the second upper vertical reinforcing bars 70 are connected in the longitudinal direction. As the sleeve 80, a general sleeve used for longitudinally connecting the vertical reinforcing bars may be used.

슬리브(80)에는 제2 하부 이음부(61)와 제2 상부 수직철근(70)의 하단부가 단순히 길이방향으로 삽입되어 제2 하부 수직철근(60)과 제2 상부 수직철근(70)을 쉽게 연결할 수 있다. 슬리브(80)에 의한 제2 하부 수직철근(60)과 제2 상부 수직철근(70)의 결합력은 연결부(40)에 의한 하부 수직철근(10)과 상부 수직철근(30)의 접합력에 비해 약하기는 하지만, 하부 수직철근(10)과 상부 수직철근(30)의 견고한 접합에 의해 피씨기둥(3)이 충분히 자립 가능하기 때문에 제2 하부 수직철근(60)과 제2 상부 수직철근(70)을 더 견고하게 연결해줄 필요는 없다.The second lower joint portion 61 and the lower end portion of the second upper vertical steel bar 70 are simply inserted into the sleeve 80 in the longitudinal direction so that the second lower vertical steel bar 60 and the second upper vertical steel bar 70 can be easily You can connect. The coupling force of the second lower vertical reinforcing bar 60 and the second upper vertical reinforcing bar 70 by the sleeve 80 is weaker than the joining force of the lower vertical reinforcing bar 10 and the upper vertical reinforcing bar 30 by the connecting portion 40 Since the PC column 3 can sufficiently stand by the rigid joining of the lower vertical steel bar 10 and the upper vertical steel bar 30, the second lower vertical steel bar 60 and the second upper vertical steel bar 70 You do not need to connect more solidly.

본 발명에 의한 피씨기둥의 접합구조는 베드블록(90)을 더 포함할 수 있다.The joining structure of the PC column according to the present invention may further include a bed block 90.

베드블록(90)은 하부 구조부재(2)와 피씨기둥(3) 사이에 배치되며 수평한 금속 판재로 이루어진다. 그리고 상기 베드블록(90)에는 하부 구조부재(2)의 하부 이음부(11)와 제2 하부 이음부(61)가 관통할 수 있도록 다수 개의 관통공이 형성된다.The bed block 90 is disposed between the lower structural member 2 and the column 3 and is made of a horizontal metal plate. A plurality of through holes are formed in the bed block 90 so that the lower joint part 11 and the second lower joint part 61 of the lower structural member 2 can pass through.

상기 베드블록(90)은 상면이 요철 없이 평평하게 형성되어 있어, 피씨기둥(3)을 하부 구조부재(2) 위에 안정적으로 배치할 수 있도록 해준다. 그리고 관통공의 위치에 의해 하부 구조부재(2)에서 돌출되는 하부 이음부(11)와 제2 하부 이음부(61)의 위치가 정확하게 정렬될 수 있도록 해준다.The top surface of the bed block 90 is flat without irregularities, so that the pillars 3 can be stably placed on the lower structural member 2. The positions of the lower joint portion 11 and the second lower joint portion 61 protruding from the lower structural member 2 can be accurately aligned by the positions of the through holes.

베드블록(90)의 중앙에는 개구를 형성하여 모르타르가 통과할 수 있도록 함으로써 하부 구조부재(2)와 피씨기둥(3) 사이로 모르타르가 채워질 수 있도록 한다. 이에 따라, 베드블록(90)에 의해 하부 구조부재(2) 콘크리트와 피씨기둥 콘크리트의 일체성이 저하되는 것을 방지할 수 있다.An opening is formed at the center of the bed block 90 so that the mortar can pass through the mortar so that the mortar can be filled between the lower structural member 2 and the column 3. Accordingly, the integrity of the concrete of the lower structural member 2 and the concrete of the column concrete can be prevented from being lowered by the bed block 90.

하부 구조부재(2)가 기초인 경우에, 본 발명에 의한 피씨기둥(3)의 접합구조는 기초 프레임부(100)를 더 포함할 수 있다. 도 3에는 상기 기초 프레임부(100)에 관한 설명도가 도시되어 있다.In the case where the substructure member 2 is the base, the joining structure of the PC column 3 according to the present invention may further include the base frame portion 100. [ 3 is an explanatory view of the base frame part 100. As shown in Fig.

기초 프레임부(100)는 하부 수직철근(10)의 하단부에 결합하는 육면체 프레임 형상의 부재로서, 하부 수직철근(10)의 위치와 각도를 조절할 수 있도록 한다. 이에 따라, 기초의 상부로 위치하게 될 구조부재들의 기준이 될 기초로서의 하부 구조부재(2)를 보다 정확하게 시공할 수 있도록 해준다.The base frame portion 100 is a hexahedral frame-shaped member that is coupled to a lower end portion of the lower vertical reinforcing bar 10, so that the position and angle of the lower vertical reinforcing bar 10 can be adjusted. This makes it possible to more accurately construct the substructure member 2 as a foundation to be the basis for the structural members to be positioned above the foundation.

상기 기초 프레임부(100)는 보다 자세하게 상부 프레임(110), 하부 프레임(120), 다수 개의 수직재(130) 및 조절수단을 포함한다.The base frame portion 100 includes an upper frame 110, a lower frame 120, a plurality of vertical members 130, and adjustment means in more detail.

상부 프레임(110)은 수평하게 배치되는 사각 프레임 형상의 부재이며, 하부 수직철근(10)과 제2 하부 수직철근(60)의 하단부가 접합된다. 하부 프레임(120)은 수평하게 배치되는 사각 프레임 형상의 부재이며 상기 상부 프레임(110)의 하부로 이격되어 배치된다. 상부 프레임(110)과 하부 프레임(120)은 다수 개의 수직재(130)에 의해 연결된다. 조절수단은 수직재(130)에 대해 상부 프레임(110)의 위치와 각도를 조절 가능하게 한다.The upper frame 110 is a rectangular frame-shaped member arranged horizontally, and the lower vertical reinforcing bars 10 and the lower ends of the second lower vertical reinforcing bars 60 are joined. The lower frame 120 is a horizontally arranged rectangular frame-shaped member and is disposed at a lower portion of the upper frame 110. The upper frame 110 and the lower frame 120 are connected by a plurality of vertical members 130. The adjustment means allows adjustment of the position and angle of the upper frame 110 with respect to the vertical member 130.

하부 프레임(120)은 기초의 버림 콘크리트를 시공할 때 기초의 위치를 결정하며, 상부 프레임(110)은 기초의 기초 콘크리트를 시공할 때 기초의 위치를 보다 정확하게 결정한다. 즉, 기초로서의 하부 구조부재(2)를 시공하는 과정에서, 버림 콘크리트에 의해 하부 프레임(120)과 수직재(130)의 하단부를 일정 위치에서 고정한 후, 고정된 상태의 수직재(130)에 대해 상부 프레임(110)의 위치와 각도를 다시 한번 조정하고 기초 콘크리트를 타설함으로써 하부 구조부재(2)를 매우 정확하게 시공해줄 수 있다.The lower frame 120 determines the position of the foundations when laying down the underlying concrete, and the upper frame 110 more accurately determines the location of the foundations when constructing the foundation concrete. That is, in the process of constructing the lower structural member 2 as a foundation, the lower frame 120 and the lower end of the vertical member 130 are fixed at a fixed position by the abandoned concrete, The position and angle of the frame 110 can be adjusted again and the foundation structure 2 can be installed with high accuracy by placing the foundation concrete.

참고로, 기초 콘크리트의 타설시 기초 콘크리트 내에는 상부 프레임(110) 외에 상부 프레임(110)에 하단부가 결합하는 하부 수직철근(10)과 제2 하부 수직철근(60) 또한 매립되며, 이때 하부 수직철근(10)과 제2 하부 수직철근(60)은 상부 프레임(110)과 함께 위치와 각도가 조정된 상태를 갖는다.In addition, when the foundation concrete is laid, the lower vertical steel bar 10 and the second lower vertical steel bar 60, which are joined to the lower end of the upper frame 110, are also embedded in the foundation concrete in addition to the upper frame 110, The reinforcing bars 10 and the second lower vertical reinforcing bars 60 are positioned and angled together with the upper frame 110.

조절수단은 보다 구체적으로 제1 장공(141), 제2 장공(142), 볼트(143) 및 너트(144)로 이루어진다.More specifically, the adjusting means comprises a first long hole 141, a second long hole 142, a bolt 143 and a nut 144.

제1 장공(141)은 수평한 방향으로 길게 형성되는 구멍으로서 상기 상부 프레임(110) 상에 다수 개가 형성되고, 제2 장공(142)은 수직한 방향으로 길게 형성되는 구멍으로서 각 수직재(130) 상에 형성된다. 볼트(143)는 상기 제1 장공(141)과 제2 장공(142)을 관통하며 너트(144)는 볼트(143)체 체결된다.A plurality of holes are formed in the upper frame 110 as long holes in the horizontal direction. The second elongated holes 142 are elongated holes formed in the vertical direction. As shown in FIG. The bolt 143 passes through the first long hole 141 and the second long hole 142 and the nut 144 is fastened to the bolt 143.

이러한 조절수단은 다음과 같은 방법으로 수직재(130)에 대해 상부 프레임(110)의 위치와 각도를 조절한다. 즉, 볼트(143)와 너트(144)로 수직재(130)와 상부 프레임(110)을 가조립한 후, 상기 제1 장공(141)과 제2 장공(142) 상에서 볼트(143)의 위치를 조절하고, 볼트(143)에 너트(144)를 완전히 체결하여 수직재(130)에 대해 상부 프레임(110)의 위치와 각도를 일정하게 고정한다. 제1 장공(141) 상에서 볼트(143)의 위치를 조절하면 상부 프레임(110)의 위치가 수평한 방향으로 조절되고, 제2 장공(142) 상에서 볼트(143)의 위치를 조절하면 상부 프레임(110)의 위치가 수직한 방향으로 조절된다. 그리고 각각의 제2 장공(142) 상에서 볼트(143)의 위치를 다르게 하면 상부 프레임(110)의 각도가 조절된다.This adjusting means adjusts the position and angle of the upper frame 110 with respect to the vertical member 130 in the following manner. That is, after the vertical member 130 and the upper frame 110 are assembled by the bolts 143 and the nuts 144, the positions of the bolts 143 are adjusted on the first and second long holes 141 and 142 And the nut 144 is completely fastened to the bolt 143 to fix the position and angle of the upper frame 110 to the vertical member 130 at a constant level. If the position of the bolt 143 is adjusted on the first long hole 141 and the position of the bolt 143 is adjusted on the second long hole 142, 110 are adjusted in the vertical direction. The angle of the upper frame 110 is adjusted by changing the positions of the bolts 143 on the respective second long holes 142.

이하에서는 본 발명에 의한 피씨기둥 접합구조의 시공방법에 대해 설명하도록 한다. 본 발명에 의한 피씨기둥 접합구조의 시공방법에 대해 설명하면서 피씨기둥의 접합구조 설명시 언급된 사항에 관해서는 자세한 설명을 생략한다.Hereinafter, a construction method of the PC column joint structure according to the present invention will be described. The construction method of the PC column joint structure according to the present invention will be described while omitting the detailed description of the joint structure of the PC column.

본 발명에 의한 피씨기둥 접합구조의 시공방법은 크게, 하부 구조부재 설치단계(S10), 피씨기둥 배치단계(S20), 연결단계(S30) 및 모르타르부 형성단계(S40)를 포함하여 이루어진다. 도 4에는 본 발명에 의한 피씨기둥 접합구조의 시공방법에 관한 순서도가 도시되어 있다.The method for constructing the PC column joint structure according to the present invention includes a substructure installation step S10, a PC column placement step S20, a connection step S30, and a mortar part formation step S40. FIG. 4 is a flowchart illustrating a method of constructing a PC column joint structure according to the present invention.

하부 구조부재 설치단계(S10)에서는 하부 구조부재(2)를 설치한다. 하부 구조부재(2)의 설치시 하부 수직철근(10)의 상단부에 형성되는 하부 이음부(11)는 하부 구조부재(2)의 상단부에서 돌출되도록 설치된다. 하부 구조부재(2)가 현장에서 시공되는 부재인 경우에는 하부 수직철근(10)에서 하부 이음부(11) 아래 위치까지 콘크리트를 타설함으로써 하부 이음부(11)가 하부 구조부재(2)의 상단부에서 돌출되도록 할 수 있고, 하부 구조부재(2)가 피씨부재인 경우에는 하부 수직철근(10)의 상단부가 거푸집의 외부에 위치하는 상태에서 하부 구조부재(2)를 제작하여 하부 이음부(11)가 하부 구조부재(2)의 상단부에서 돌출되도록 할 수 있다.In the substructure installation step S10, the substructure member 2 is installed. The lower joint 11 formed at the upper end of the lower vertical bar 10 at the time of installing the lower structural member 2 is installed to protrude from the upper end of the lower structural member 2. [ When the lower structural member 2 is a member to be installed in the field, the concrete is laid from the lower vertical reinforcing bar 10 to a position below the lower joint 11, When the lower structural member 2 is a PC member, the lower structural member 2 is manufactured in a state where the upper end of the lower vertical reinforcing bar 10 is located outside the formwork, May protrude from the upper end of the lower structural member 2.

피씨기둥 배치단계(S20)에서는 도 5의 (a)에 도시되어 있는 바와 같이, 하부 구조부재(2)와 피씨기둥(3)의 평면상 위치가 일치하도록 하부 구조부재(2) 위에 피씨기둥(3)을 단순히 안착시킨다. 안착된 피씨기둥(3)에서 상부 수직철근(30)의 상부 이음부(31)는 피씨기둥(3)의 하단부에서 돌출되어 파임부(20) 내에 위치한다.As shown in Fig. 5 (a), in the PC column placing step S20, the PC column 1 is placed on the lower structural member 2 in such a manner that the positions on the plane of the lower structural member 2 and the PC column 3 coincide with each other 3). The upper joint 31 of the upper vertical bar 30 at the seated PC column 3 protrudes from the lower end of the PC column 3 and is positioned in the drawer 20. [

연결단계(S30)에서는 도 5의 (b)에 도시되어 있는 바와 같이, 연결부(40)의 하단부에 하부 구조부재(2)의 하부 이음부(11)를 나사결합시키고, 연결부(40)의 상단부에 피씨기둥(3)의 상부 이음부(31)를 나사결합시킨다. 연결부(40)로 하부 구조부재(2)와 피씨기둥(3)을 연결하고 나면 피씨기둥(3)은 하부 구조부재(2) 위에서 자립이 가능하므로 피씨기둥(3)을 별도의 가설재 등으로 지지해줄 필요가 없다.5 (b), the lower joint portion 11 of the lower structural member 2 is screwed to the lower end portion of the joint portion 40, and the upper end portion of the joint portion 40 The upper joint portion 31 of the PC column 3 is screwed. Since the PC column 3 can stand on the lower structural member 2 after connecting the lower structural member 2 and the PC column 3 with the connection portion 40, the PC column 3 can be supported You do not have to.

모르타르부 형성단계(S40)에서는 도 5의 (c)에 도시되어 있는 바와 같이, 하부 구조부재(2)와 피씨기둥(3) 사이, 그리고 파임부(20) 내에 모르타르를 타설하여 모르타르부(50)를 형성한다. 상기했던 바와 같이 연결부(40)에 의해 피씨기둥(3)은 자립이 가능하므로 모르타르 타설 작업을 용이하게 진행할 수 있고, 모르타르 양생 중 피씨기둥(3)이 움직임으로 인해 모르타르의 결합력이 약해지는 것을 방지할 수 있다. 모르타르의 양생이 완료되면 하부 구조부재(2)와 피씨기둥(3)은 완전히 일체화 된다.5 (c), mortar is poured between the lower structural member 2 and the column 3 and into the fulcrum portion 20 to form the mortar portion 50 ). As described above, since the PC column 3 can be self-supported by the connecting portion 40, the mortar pouring operation can be facilitated, and the mortar bonding force can be prevented from weakening due to the movement of the PC column 3 during mortar curing can do. When the curing of the mortar is completed, the substructure member 2 and the PC column 3 are completely integrated.

상기 연결부(40)는 피씨기둥 배치단계(S20) 전에 하부 이음부(11) 또는 상부 이음부(31)에 결합되는 것이 바람직하다.The connecting portion 40 is preferably coupled to the lower or upper joint 11 or the upper joint 31 prior to the step of arranging the PC column.

하부 구조부재(2) 위에 피씨기둥(3)을 안착시키고 나면 하부 구조부재(2)의 하부 수직철근(10)과 피씨기둥(3)의 상부 수직철근(30)이 거의 맞닿게 되므로 하부 이음부(11)는 상부 이음부(31)에 체결하는 것이 어려울 수 있다. 따라서, 피씨기둥 배치단계(S20) 전 하부 이음부(11) 또는 상부 이음부(31)에 연결부(40)를 체결해 두고, 연결단계(S30)에서 연결부(40)의 위치를 변화시켜 연결부(40)가 하부 이음부(11)와 상부 이음부(31) 모두와 체결될 수 있도록 한다. 연결부(40)를 하부 수직철근(10) 또는 상부 수직철근(30)에 결합시켜 두는 경우, 연결부(40)를 따로 보관하거나 관리할 필요가 없다.Since the lower vertical bar 10 of the lower structural member 2 and the upper vertical bar 30 of the PC column 3 substantially abut each other after the PC column 3 is seated on the lower structural member 2, (11) may be difficult to fasten to the upper joint (31). Accordingly, the connection portion 40 is fastened to the lower joint portion 11 or the upper joint portion 31 before the columnar arrangement step S20, and the connection portion 40 is changed in the connection step S30, 40 can be fastened to both the lower joint 11 and the upper joint 31. It is not necessary to separately store or manage the connection portion 40 when the connection portion 40 is coupled to the lower vertical bar 10 or the upper vertical bar 30.

연결부(40)가 연결 너트(41), 하부 너트(42) 및 상부 너트(43)로 이루어지는 경우, 연결 너트(41) 등은 피씨기둥 배치단계(S20) 전에 하부 이음부(11)와 상부 이음부(31)에 분산되어 결합된다. 즉, 하부 너트(42)는 하부 이음부(11)에 결합되고, 상부 너트(43)는 상부 이음부(31)에 결합되며, 연결 너트(41)는 하부 이음부(11) 또는 상부 이음부(31)에 결합된다.The connection nut 41 and the like are connected to the lower joint 11 and the upper joint 43 before the PC column arranging step S20, (31). That is, the lower nut 42 is coupled to the lower joint 11, the upper nut 43 is coupled to the upper joint 31, and the connection nut 41 is coupled to the lower joint 11 or the upper joint 43, (31).

그리고 이 경우, 연결단계(S30)는 제1 연결단계(S31)와 제2 연결단계(S32)로 이루어진다.In this case, the connecting step S30 includes a first connecting step S31 and a second connecting step S32.

제1 연결단계(S31)에서는 도 6의 (a)에 도시되어 있는 바와 같이, 연결 너트(41)를 상하로 이동시켜, 연결 너트(41)의 하단부에 하부 이음부(11)가 삽입되도록 하고 연결 너트(41)의 상단부에 상부 이음부(31)가 삽입되도록 한다. 피씨기둥 배치단계(S20) 전에 연결 너트(41)가 하부 이음부(11)에 결합된 경우는 제1 연결단계(S31)에서 연결 너트(41)를 상부로 이동시키고, 피씨기둥 배치단계(S20) 전에 연결 너트(41)가 상부 이음부(31)에 결합된 경우는 제1 연결단계(S31)에서 연결 너트(41)를 하부로 이동시켜야 할 것이다.In the first connecting step S31, as shown in FIG. 6A, the connecting nut 41 is moved up and down so that the lower joint 11 is inserted into the lower end of the connecting nut 41 And the upper joint portion 31 is inserted into the upper end portion of the connecting nut 41. When the connecting nut 41 is coupled to the lower joint 11 before the PC column placing step S20, the connecting nut 41 is moved upward in the first connecting step S31 and the PC column placing step S20 The coupling nut 41 should be moved downward in the first coupling step S31 when the coupling nut 41 is coupled to the upper coupling part 31. [

제2 연결단계(S32)에서는 도 6의 (b)에 도시되어 있는 바와 같이, 하부 너트(42)를 연결 너트(41)의 하단부에 밀착시키고, 상부 너트(43)를 연결 너트(41)의 상단부에 밀착시킨다. 이에 의해, 연결 너트(41)는 상하로 이동하지 않고 하부 수직철근(10)과 상부 수직철근(30) 이음 상태를 견고하게 유지할 수 있게 된다.6 (b), the lower nut 42 is brought into close contact with the lower end of the connecting nut 41, and the upper nut 43 is fastened to the lower end of the connecting nut 41 And is brought into close contact with the upper end portion. Accordingly, the connecting nut 41 can be firmly held in the state of joining the lower vertical steel bar 10 and the upper vertical steel bar 30 without moving up and down.

하부 구조부재(2)가 제2 하부 수직철근(60)을 포함하고, 피씨기둥(3)이 제2 상부 수직철근(70)을 포함하는 경우, 피씨기둥 배치단계(S20)에서 제2 하부 수직철근(60)과 제2 상부 수직철근(70)은 일반적인 슬리브에 의해 연결될 수 있다.When the substructure member 2 includes the second lower vertical steel bars 60 and the PC column 3 includes the second upper vertical steel bars 70, The reinforcing bars 60 and the second upper vertical bars 70 may be connected by a general sleeve.

슬리브(80)에 의한 제2 하부 수직철근(60)과 제2 상부 수직철근(70)의 연결은, 제2 하부 수직철근(60)과 제2 상부 수직철근(70)을 단순히 슬리브(80)에 길이방향으로 삽입함으로써 이루어질 수 있으므로 피씨기둥(3)을 하부 구조부재(2) 위에 배치하는 작업과 동시에 이루어질 수 있다. 상기 슬리브(80)는 피씨기둥(3)의 제작시 제2 상부 수직철근(70)의 하단부에 연결되고 콘크리트 내에 매립된 상태로 준비되어 피씨기둥(3)과 함께 이동 및 배치되는 것이 작업을 용이하게 하는 측면에서 바람직하다.The connection of the second lower vertical steel bar 60 and the second upper vertical steel bar 70 by the sleeve 80 is achieved by simply connecting the second lower vertical steel bar 60 and the second upper vertical steel bar 70 to the sleeve 80, Since the columnar column 3 can be placed on the lower structural member 2 in the longitudinal direction. The sleeve 80 is connected to the lower end of the second upper vertical steel bar 70 at the time of manufacturing the pillar post 3 and is prepared to be embedded in the concrete so as to be moved and disposed together with the pillar post 3, .

하부 구조부재(2)와 피씨기둥 배치단계(S20) 사이에는 베드블록 설치단계(S15)가 더 진행될 수 있다.The bed block installing step S15 may be further performed between the substructure member 2 and the PC column placing step S20.

베드블록 설치단계(S15)에서는 하부 구조부재(2)의 상부에 하부 이음부(11)가 관통하는 수평한 판형의 베드블록(90)을 설치한다. 이에 따라, 피씨기둥(3)이 배치될 하부 구조부재(2)의 상단면을 요철 없이 평평하게 만들고, 하부 구조부재(2)의 하부 이음부(11)와 제2 하부 이음부(61)를 정위치에 위치시킬 수 있다.In the bed block installing step S15, a horizontally plate-shaped bed block 90 through which the lower joint 11 penetrates is provided at the upper part of the lower structural member 2. [ The upper end surface of the lower structural member 2 on which the PC column 3 is to be disposed is made flat without irregularities and the lower joint member 11 and the second lower joint member 61 of the lower structural member 2 It can be positioned in the correct position.

이와는 달리, 베드블록(90)의 설치는 하부 구조부재 설치단계(S10)의 진행시 이루어질 수도 있다.Alternatively, the installation of the bed block 90 may be performed during the substructure installation step S10.

상기 하부 구조부재(2)가 기초인 경우에 피씨기둥의 접합구조는 기초 프레임부(100)를 더 포함하고, 하부 구조부재 설치단계(S10)는 기초 프레임부 안착단계(S11), 버림 콘크리트 타설단계(S12), 조절단계(S13) 및 기초 콘크리트 타설단계(S14)로 이루어질 수 있다. 도 7에는 이러한 경우에 있어, 본 발명에 의한 피씨기둥 접합구조 시공방법의 순서도가 도시되어 있다.In the case where the lower structural member 2 is a base, the joining structure of the PC column further includes the base frame part 100, and the lower structural member installation step S10 includes a base frame part seating step S11, Step S12, adjustment step S13, and placement of foundation concrete S14. Fig. 7 shows a flow chart of the method of constructing the PC column joint structure according to the present invention in such a case.

기초 프레임부 안착단계(S11)에서는 하부 수직철근(10)과 제2 하부 수직철근(60)의 하단부가 결합된 상태의 기초 프레임부(100)를 지면 위의 일정한 위치에 안착시킨다. 이때, 기초 프레임부(100)의 상부 프레임(110)은 수직재(130)에 대해 가조립된 상태를 가지는 것이 바람직하다.In the base frame section seating step S11, the base frame section 100 in a state where the lower vertical reinforcing bars 10 and the lower ends of the second lower vertical reinforcing bars 60 are engaged is seated at a predetermined position on the ground. At this time, the upper frame 110 of the base frame 100 preferably has a state of being assembled with respect to the vertical member 130.

버림 콘크리트 타설단계(S12)에서는 도 8의 (a)에 도시되어 있는 바와 같이, 기초 프레임부(100)의 하부 프레임(120)과 수직재(130)의 주변으로 버림 콘크리트(C1)를 타설·양생하여 기초 프레임부(100)가 일정한 위치에서 고정되도록 한다. 버림 콘크리트 타설단계(S12)에서 버림 콘크리트(C1)는 수직재(130)의 상단부 아래 높이까지 타설되어 후속 단계에서 수직재(130)에 대해 상부 프레임(110)의 위치와 각도를 조절할 수 있도록 한다.8 (a), in the casting concrete pouring step S12, the pouring concrete C1 is poured around the lower frame 120 of the base frame part 100 and the vertical member 130, So that the base frame part 100 is fixed at a predetermined position. The abandoned concrete C1 is pushed up to a height below the upper end of the vertical member 130 so that the position and angle of the upper frame 110 relative to the vertical member 130 can be adjusted in a subsequent step.

조절단계(S13)에서는 도 8의 (b)에 도시되어 있는 바와 같이, 조절수단으로 수직재(130)에 대해 상부 프레임(110)의 위치와 각도를 조절하여 하부 수직철근(10)과 제2 하부 수직철근(60)이 정확한 위치와 각도를 가지고 배치되도록 한다. 상부 프레임(110)의 위치와 각도를 조절한 후에는 수직재(130)에 대해 상부 프레임(110)을 완전히 조립한다.8 (b), the position and angle of the upper frame 110 with respect to the vertical member 130 are adjusted by the adjusting means so that the lower vertical bar 10 and the second lower Allow vertical reinforcement 60 to be positioned with the correct position and angle. After adjusting the position and angle of the upper frame 110, the upper frame 110 is fully assembled with respect to the vertical member 130.

기초 콘크리트 타설단계(S14)에서는 도 8의 (c)에 도시되어 있는 바와 같이, 상기 버림 콘크리트(C1)의 상부로 기초 콘크리트(C2)를 타설하여 하부 구조부재(2)의 설치를 마무리한다. 기초 콘크리트 타설단계(S14)에서 하부 수직철근(10)과 제2 하부 수직철근(60)의 상단부는 기초 콘크리트(C2)의 상부로 돌출되도록 하여 피씨기둥(3)의 상부 수직철근(30)과 제2 상부 수직철근(70)에 연결될 수 있도록 한다.As shown in FIG. 8 (c), the foundation concrete 2 is laid on the upper part of the abandoned concrete C1 to finish the installation of the lower structural member 2 in the foundation concrete pouring step S14. The upper vertical reinforcing bars 10 and the upper ends of the second lower vertical reinforcing bars 60 are protruded to the upper portion of the foundation concrete C2 in the foundation concrete pouring step S14, So that it can be connected to the second upper vertical steel bar 70.

이와 같은 하부 구조부재 설치단계(S10)에 의하면, 하부 수직철근(10)과 제2 하부 수직철근(60)의 위치와 각도를 기초 프레임부 안착단계(S11)와 조절단계(S13)의 두 단계에 걸쳐 조절하기 때문에 하부 구조부재(2)의 위치와 각도를 매우 정확하게 형성하는 것이 가능하다.According to the step S10 of installing the lower structural member, the positions and angles of the lower vertical reinforcing bars 10 and the second lower vertical reinforcing bars 60 are determined in two steps of the base frame seating step S11 and the adjusting step S13 It is possible to form the position and angle of the substructure member 2 very accurately.

이상에서는 본 발명은 구체적인 실시예에 대하여 도면을 참조하여 상세히 설명하였으나, 상기 실시예는 본 발명을 이해하기 쉽도록 하게 하기 위한 예시에 불과한 것이므로, 이 분야에서 통상의 지식을 가진 자라면 본 발명의 기술적 사상의 범위 내에서 이를 다양하게 변형하여 실시할 수 있을 것임은 자명한 것이다. 따라서 그러한 변형 예들은 청구범위에 기재된 바에 의해 본 발명의 권리범위에 속한다고 할 것이다.While the present invention has been particularly shown and described with reference to exemplary embodiments thereof, it is to be understood that the invention is not limited to the disclosed embodiments, but, on the contrary, It will be obvious that various modifications may be made within the scope of technical thought. It is therefore intended that such modifications are within the scope of the invention as set forth in the claims.

1 : 피씨기둥의 접합구조 2 : 하부 구조부재
3 : 피씨기둥 10 : 하부 수직철근
11 : 하부 이음부 20 : 파임부
30 : 상부 수직철근 31 : 상부 이음부
40 : 연결부 41 : 연결 너트
41a : 유입구 42 : 하부 너트
43 : 상부 너트 50 : 모르타르부
41a : 유입구 60 : 제2 하부 수직철근
61 : 제2 하부 이음부 70 : 제2 상부 수직철근
80 : 슬리브 90 : 베드블록
100 : 기초 프레임부 110 : 상부 프레임
120 : 하부 프레임 130 : 수직재
141 : 제1 장공 142 : 제2 장공
143 : 볼트 144 : 너트
S10 : 하부 구조부재 설치단계 S11 : 기초 프레임부 안착단계
S12 : 버림 콘크리트 타설단계 S13 : 조절단계
S14 : 기초 콘크리트 타설단계 S15 : 베드블록 설치단계
S20 : 피씨기둥 배치단계 S30 : 연결단계
S31 : 제1 연결단계 S32 : 제2 연결단계
S40 : 모르타르부 형성단계(S40)
1: joining structure of PC column 2:
3: PC column 10: Lower vertical bar
11: lower joint part 20:
30: upper vertical bar 31: upper joint
40: connection part 41: connection nut
41a: inlet port 42: lower nut
43: upper nut 50: mortar portion
41a: inlet port 60: second lower vertical bar
61: second lower joint 70: second upper vertical bar
80: Sleeve 90: Bed block
100: base frame part 110: upper frame
120: lower frame 130: vertical member
141: 1st slot 142: 2nd slot
143: Bolt 144: Nut
S10: Substructure member installation step S11: Foundation frame part seating step
S12: Putting out forbidden concrete S13: Adjusting step
S14: Placing of foundation concrete S15: Step of installing a bed block
S20: PC column arrangement step S30: Connection step
S31: First connection step S32: Second connection step
S40: Mortar part forming step (S40)

Claims (16)

하부 구조부재의 상부에 피씨기둥을 접합하기 위한 피씨기둥의 접합구조에 있어서,
하부 구조부재 내에 수직하게 배치되고, 하부 구조부재의 상단부에서 돌출되며 외주면을 따라 나사산이 형성된 하부 이음부를 구비하는 하부 수직철근;
피씨기둥의 하단 둘레에 형성되는 파임부;
피씨기둥 내에 수직하게 배치되고, 피씨기둥의 하단부에서 돌출되어 상기 파임부에 위치하며 외주면을 따라 나사산이 형성된 상부 이음부를 구비하는 상부 수직철근;
하단부가 상기 하부 이음부에 나사결합하고 상단부가 상기 상부 이음부에 나사결합하여 상기 하부 수직철근과 상기 상부 수직철근을 연결하는 연결부; 및
하부 구조부재와 피씨기둥 사이, 그리고 상기 파임부에 채워지는 모르타르부;를 포함하여 이루어지고,
상기 하부 수직철근의 위치와 각도를 조절 가능하게 하는 육면체 프레임 형상의 기초 프레임부가 하부 수직철근의 하단부에 결합되되,
상기 기초 프레임부는, 상기 하부 수직철근의 하단부가 결합하는 사각 프레임 형상의 상부 프레임, 상기 상부 프레임의 하부로 이격되어 위치하는 사각 프레임 형상의 하부 프레임, 상기 상부 프레임과 상기 하부 프레임을 연결하는 다수 개의 수직재 및 상기 수직재에 대해 상기 상부 프레임의 위치와 각도를 조절 가능하게 하는 조절수단을 포함하여 이루어지는 것을 특징으로 하는 피씨기둥의 접합구조.
In the joining structure of the PC column for joining the PC column to the upper part of the lower structural member,
A lower vertical reinforcing bar vertically disposed in the lower structural member, the lower vertical reinforcing bar protruding from the upper end of the lower structural member and having a lower joint threaded along the outer peripheral surface;
A fin portion formed around the lower end of the PC column;
An upper vertical reinforcing bar disposed vertically in the PC column and projecting from a lower end of the PC column and having an upper joint located at the fold and formed with threads along the outer circumference;
A connecting portion connecting the lower vertical reinforcing bar and the upper vertical reinforcing bar by screwing the lower end portion to the lower joint portion and screwing the upper end portion to the upper joint portion; And
And a mortar part which is filled between the lower structural member and the PC column and in the coupling part,
Wherein a base frame portion of a hexahedron frame shape for adjusting the position and angle of the lower vertical reinforcing bars is coupled to a lower end portion of the lower vertical reinforcing bars,
The base frame portion includes a rectangular frame-shaped upper frame to which a lower end portion of the lower vertical reinforcing bar is engaged, a rectangular frame-shaped lower frame spaced apart from the lower portion of the upper frame, And adjusting means for adjusting the position and angle of the upper frame relative to the vertical member and the vertical member.
제1항에 있어서,
상기 연결부는,
파이프 형상으로 이루어져 하단부에 상기 하부 이음부가 체결되고 상단부에 상기 상부 이음부가 체결되는 연결 너트,
상기 하부 이음부에 체결되며 상기 연결 너트의 하단부에 밀착되는 하부 너트 및
상기 상부 이음부에 체결되며 상기 연결 너트의 상단부에 밀착되는 상부 너트를 포함하여 이루어지는 것을 특징으로 하는 피씨기둥의 접합구조.
The method according to claim 1,
The connecting portion
A connecting nut having a pipe shape and fastened to the lower joint at the lower end and fastened at the upper end to the upper joint,
A lower nut fastened to the lower joint and closely attached to a lower end of the connection nut,
And an upper nut fastened to the upper joint and closely attached to an upper end of the connection nut.
제2항에 있어서,
상기 연결 너트의 벽면에는 유입구가 형성되는 것을 특징으로 하는 피씨기둥의 접합구조.
3. The method of claim 2,
Wherein an inlet is formed in a wall surface of the connection nut.
제1항에 있어서,
상기 파임부는 3개 이상이 간격을 두고 형성되는 것을 특징으로 하는 피씨기둥의 접합구조.
The method according to claim 1,
Wherein at least three spacers are formed with a gap therebetween.
제1항에 있어서,
하부 구조부재 내에 수직하게 배치되고, 하부 구조부재의 상단부에서 돌출되는 제2 하부 이음부를 구비하는 제2 하부 수직철근;
피씨기둥 내에 수직하게 배치되는 제2 상부 수직철근; 및
하단부에 상기 제2 하부 이음부가 삽입되고 상단부에 상기 제2 상부 수직철근의 하단부가 삽입되어 상기 제2 하부 수직철근과 상기 제2 상부 수직철근을 연결하는 슬리브;를 더 포함하는 것을 특징으로 하는 피씨기둥의 접합구조.
The method according to claim 1,
A second lower vertical reinforcing bar vertically disposed in the lower structural member and having a second lower joint protruding from an upper end of the lower structural member;
A second upper vertical steel bar vertically disposed in the PC column; And
And a sleeve inserted into the second lower joint at a lower end thereof and having a lower end portion of the second upper vertical reinforcement inserted into the upper end thereof to connect the second lower vertical reinforcement to the second upper vertical reinforcement, Joining structure of columns.
제1항에 있어서,
하부 구조부재와 피씨기둥 사이에 배치되고 상기 하부 이음부가 관통하는 수평한 판형의 베드블록을 더 포함하는 것을 특징으로 하는 피씨기둥의 접합구조.
The method according to claim 1,
And a horizontal plate-shaped bed block disposed between the lower structural member and the PC column and penetrating the lower joint portion.
제6항에 있어서,
상기 베드블록의 중앙에는 개구가 형성되는 것을 특징으로 하는 피씨기둥의 접합구조.
The method according to claim 6,
And an opening is formed at the center of the bed block.
삭제delete 삭제delete 제1항에 있어서,
상기 조절수단은,
상기 상부 프레임 상에 형성되는 다수 개의 수평한 제1 장공,
상기 각 수직재 상에 형성되는 수직한 제2 장공,
상기 제1 장공과 상기 제2 장공을 관통하는 볼트 및
상기 볼트에 체결되는 너트를 포함하여 이루어지는 것을 특징으로 하는 피씨기둥의 접합구조.
The method according to claim 1,
Wherein the adjusting means comprises:
A plurality of horizontal first slots formed on the upper frame,
A vertical second slot formed on each of the vertical members,
A bolt passing through the first elongated hole and the second elongated hole;
And a nut fastened to the bolt.
하부 구조부재 내에 수직하게 배치되고, 하부 구조부재의 상단부에서 돌출되며 외주면을 따라 나사산이 형성된 하부 이음부를 구비하는 하부 수직철근; 피씨기둥의 하단 둘레에 형성되는 파임부; 피씨기둥 내에 수직하게 배치되고, 피씨기둥의 하단부에서 돌출되어 상기 파임부에 위치하며 외주면을 따라 나사산이 형성된 상부 이음부를 구비하는 상부 수직철근; 하단부가 상기 하부 이음부에 나사결합하고 상단부가 상기 상부 이음부에 나사결합하여 상기 하부 수직철근과 상기 상부 수직철근을 연결하는 연결부; 및 하부 구조부재와 피씨기둥 사이, 그리고 상기 파임부에 채워지는 모르타르부;를 포함하여 이루어지는 것을 특징으로 하는 피씨기둥의 접합구조를 시공하는 방법에 있어서,
하부 구조부재를 설치하는 하부 구조부재 설치단계;
하부 구조부재 상부에 피씨기둥을 배치하는 피씨기둥 배치단계;
상기 연결부의 하단부에 상기 하부 이음부를 나사결합시키고, 상기 연결부의 상단부에 상기 상부 이음부를 나사결합시키는 연결단계; 및
하부 구조부재와 피씨기둥 사이, 그리고 상기 파임부에 모르타르부를 채우는 모르타르부 형성단계;를 포함하여 이루어지는 것을 특징으로 하는 피씨기둥 접합구조의 시공방법.
A lower vertical reinforcing bar vertically disposed in the lower structural member, the lower vertical reinforcing bar protruding from the upper end of the lower structural member and having a lower joint threaded along the outer peripheral surface; A fin portion formed around the lower end of the PC column; An upper vertical reinforcing bar disposed vertically in the PC column and projecting from a lower end of the PC column and having an upper joint located at the fold and formed with threads along the outer circumference; A connecting portion connecting the lower vertical reinforcing bar and the upper vertical reinforcing bar by screwing the lower end portion to the lower joint portion and screwing the upper end portion to the upper joint portion; And a mortar part which is filled between the lower structural member and the PC column, and the filler part. The method of claim 1,
A substructure member installing step of installing a substructure member;
Placing a PC column on the lower structural member;
A coupling step of screwing the lower joint part to a lower end of the coupling part and screwing the upper joint part to an upper end of the coupling part; And
And forming a mortar part between the lower structural member and the PC column and filling the mortar part with the mortar part.
제11항에 있어서,
상기 피씨기둥 배치단계 전에 상기 연결부는 상기 하부 이음부 또는 상기 상부 이음부에 결합되는 것을 특징으로 하는 피씨기둥 접합구조의 시공방법.
12. The method of claim 11,
Wherein the connection part is coupled to the lower joint part or the upper joint part before the step of arranging the PC column.
제11항에 있어서,
상기 연결부는, 파이프 형상으로 이루어져 하단부에 상기 하부 이음부가 체결되고 상단부에 상기 상부 이음부가 체결되는 연결 너트, 상기 하부 이음부에 체결되며 상기 연결 너트의 하단부에 밀착되는 하부 너트 및 상기 상부 이음부에 체결되며 상기 연결 너트의 상단부에 밀착되는 상부 너트를 포함하여 이루어지며,
상기 피씨기둥 배치단계 전에 상기 하부 너트는 상기 하부 이음부에 결합되고, 상기 상부 너트는 상기 상부 이음부에 결합되며, 상기 연결 너트는 상기 하부 이음부 또는 상기 상부 이음부에 결합되고,
상기 연결단계는,
상기 연결 너트를 상하로 이동시켜 상기 연결 너트의 하단부에 상기 하부 이음부가 체결되도록 하고, 상기 연결 너트의 상단부에 상기 상부 이음부가 체결되도록 하는 제1 연결단계;와
상기 하부 너트를 상기 연결 너트의 하단부에 밀착시키고, 상기 상부 너트를 상기 연결 너트의 상단부에 밀착시키는 제2 연결단계;를 포함하여 이루어지는 것을 특징으로 하는 피씨기둥 접합구조의 시공방법.
12. The method of claim 11,
The connection unit includes a connection nut having a pipe shape and having a lower end coupled to the lower joint and an upper end coupled to the upper joint, a lower nut fastened to the lower joint and closely attached to a lower end of the connection nut, And an upper nut fastened to the upper end of the connecting nut,
Wherein the lower nut is coupled to the lower coupling part, the upper nut is coupled to the upper coupling part, and the coupling nut is coupled to the lower coupling part or the upper coupling part,
Wherein the connecting step comprises:
A first connecting step of moving the connecting nut up and down so that the lower end of the connecting nut is fastened to the lower end of the connecting nut and fastening the upper end of the connecting nut to the upper end of the connecting nut;
And a second connecting step of bringing the lower nut into close contact with the lower end of the connecting nut and bringing the upper nut into close contact with the upper end of the connecting nut.
제11항에 있어서,
하부 구조부재는 하부 구조부재 내에 수직하게 배치되고 하부 구조부재의 상단부에서 돌출되는 제2 하부 이음부를 구비하는 제2 하부 수직철근을 포함하고, 피씨기둥은 피씨기둥 내에 배치되는 제2 상부 수직철근을 포함하며,
상기 피씨기둥 배치단계에서 상기 제2 하부 수직철근과 상기 제2 상부 수직철근은, 하단부에 상기 제2 하부 이음부가 삽입되고 상단부에 상기 제2 상부 수직철근의 하단부가 삽입되는 슬리브에 의해 연결되는 것을 특징으로 하는 피씨기둥 접합구조의 시공방법.
12. The method of claim 11,
The lower structural member includes a second lower vertical reinforcing bar vertically disposed in the lower structural member and having a second lower joint projecting from the upper end of the lower structural member and the PC column includes a second upper vertical reinforcing bar disposed in the PC column, ≪ / RTI &
The second lower vertical reinforcing bar and the second upper vertical reinforcing bar are connected by a sleeve into which the second lower joint is inserted at the lower end and the lower end of the second upper vertical steel is inserted into the upper end at the upper end A method of constructing a PC column joint structure.
제11항에 있어서,
상기 하부 구조부재 설치단계와 상기 피씨기둥 배치단계 사이에는,
하부 구조부재의 상부에 상기 하부 이음부가 관통하는 수평한 판형의 베드블록을 설치하는 베드블록 설치단계가 더 진행되는 것을 특징으로 하는 피씨기둥 접합구조의 시공방법.
12. The method of claim 11,
Between the step of installing the substructure member and the step of arranging the PC column,
And a bed block installation step of installing a horizontal plate-shaped bed block passing through the lower joint part on the upper part of the lower structural member.
제11항에 있어서,
하부 구조부재는 기초로서, 상기 하부 수직철근의 하단부가 결합하는 사각 프레임 형상의 상부 프레임, 상기 상부 프레임의 하부로 이격되어 위치하는 사각 프레임 형상의 하부 프레임, 상기 상부 프레임과 상기 하부 프레임을 연결하는 다수 개의 수직재 및 상기 수직재에 대해 상기 상부 프레임의 위치와 각도를 조절 가능하게 하는 조절수단을 구비하는 기초 프레임부를 더 포함하고,
상기 하부 구조부재 설치단계는,
상기 하부 수직철근의 하단부가 결합된 상기 기초 프레임부를 지면 위에 안착시키는 기초 프레임부 안착단계;
상기 하부 프레임과 상기 수직재의 주변으로 버림 콘크리트를 타설하되, 상기 수직재의 상단부는 버림 콘크리트의 상부로 돌출되도록 하는 버림 콘크리트 타설단계;
상기 조절수단으로 상기 수직재에 대해 상기 상부 프레임의 위치와 각도를 조절는 조절단계; 및
상기 버림 콘크리트의 상부로 기초 콘크리트를 타설하되 상기 하부 수직철근의 상단부가 기초 콘크리트 상부로 돌출되도록 하는 기초 콘크리트 타설단계;를 포함하여 이루어지는 것을 특징으로 하는 피씨기둥 접합구조의 시공방법.
12. The method of claim 11,
The lower structural member includes a rectangular frame-shaped upper frame to which the lower end of the lower vertical reinforcing bar is coupled, a lower frame shaped like a square frame spaced apart from the lower portion of the upper frame, Further comprising a base frame portion having a plurality of vertical members and adjusting means for adjusting the position and angle of the upper frame relative to the vertical members,
In the step of installing the substructure member,
A base frame part seating step of placing the base frame part coupled with the lower end of the lower vertical reinforcing bar on the ground;
Placing an abandoned concrete around the lower frame and the vertical member so that an upper end of the vertical member protrudes to an upper portion of the abandoned concrete;
Adjusting the position and angle of the upper frame with respect to the vertical member by the adjusting means; And
And a base concrete pouring step for pouring the foundation concrete onto the upper part of the abandoned concrete, so that the upper end of the lower vertical reinforcement protrudes to the upper part of the foundation concrete.
KR1020170161199A 2017-11-29 2017-11-29 Joint structure for PC column and joining method using the same KR101848727B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020170161199A KR101848727B1 (en) 2017-11-29 2017-11-29 Joint structure for PC column and joining method using the same

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020170161199A KR101848727B1 (en) 2017-11-29 2017-11-29 Joint structure for PC column and joining method using the same

Publications (1)

Publication Number Publication Date
KR101848727B1 true KR101848727B1 (en) 2018-05-24

Family

ID=62299150

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020170161199A KR101848727B1 (en) 2017-11-29 2017-11-29 Joint structure for PC column and joining method using the same

Country Status (1)

Country Link
KR (1) KR101848727B1 (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109457800A (en) * 2018-12-26 2019-03-12 长安大学 A kind of assembly concrete column column connected node
CN110552423A (en) * 2018-05-30 2019-12-10 罗大威 Dry method connecting joint for assembling type building concrete beam, column and concrete node member
CN111677192A (en) * 2020-06-03 2020-09-18 浙江大学建筑设计研究院有限公司 Lightning protection downlead structure of fabricated building and construction method
KR102278625B1 (en) * 2020-09-29 2021-07-16 동서 피, 씨, 씨 주식회사 Apparatus combining rebars of pc member
CN114250912A (en) * 2021-12-30 2022-03-29 扬州大学 Prefabricated section steel concrete column and composite structure
KR102570239B1 (en) 2023-04-20 2023-08-25 홍종규 PC pole construction method using non-thread terminator of anchoring tensile force reinforcement structure
KR20240003697A (en) * 2022-07-01 2024-01-09 한국콘크리트산업 주식회사 SRC PC column and construction method using this

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110552423A (en) * 2018-05-30 2019-12-10 罗大威 Dry method connecting joint for assembling type building concrete beam, column and concrete node member
CN109457800A (en) * 2018-12-26 2019-03-12 长安大学 A kind of assembly concrete column column connected node
CN109457800B (en) * 2018-12-26 2024-01-02 长安大学 Assembled concrete column connection node
CN111677192A (en) * 2020-06-03 2020-09-18 浙江大学建筑设计研究院有限公司 Lightning protection downlead structure of fabricated building and construction method
KR102278625B1 (en) * 2020-09-29 2021-07-16 동서 피, 씨, 씨 주식회사 Apparatus combining rebars of pc member
CN114250912A (en) * 2021-12-30 2022-03-29 扬州大学 Prefabricated section steel concrete column and composite structure
KR20240003697A (en) * 2022-07-01 2024-01-09 한국콘크리트산업 주식회사 SRC PC column and construction method using this
KR102643020B1 (en) * 2022-07-01 2024-03-05 한국콘크리트산업 주식회사 SRC PC column and construction method using this
KR102570239B1 (en) 2023-04-20 2023-08-25 홍종규 PC pole construction method using non-thread terminator of anchoring tensile force reinforcement structure

Similar Documents

Publication Publication Date Title
KR101848727B1 (en) Joint structure for PC column and joining method using the same
KR101556545B1 (en) Method for constructing using a double wall Precast Concrete
US8056299B2 (en) Foundation construction for superstructures
KR101131679B1 (en) Splicing Method of Embedded type Baseplate with Steel Column
KR101527471B1 (en) Precast buit-up pier structure and construction method using the same
KR100873266B1 (en) Prefabricated pillar structure
KR101574253B1 (en) A method for construction using a twin wall structure using a PC panel
KR101990065B1 (en) Joint of PC column using steel block
KR101732716B1 (en) Soundproofing wall foundation and method for constructing this same
WO2015011641A1 (en) Semi rigid precast wall system
CN104018675A (en) Construction method for shear wall concrete formworks and pillar concrete formworks
KR101739126B1 (en) Method for Forming Top-down-typed Underground Strucutre
JP5484288B2 (en) Column foundations such as carports and terraces, column foundation construction methods and precast concrete blocks
KR101954387B1 (en) Grid precast concrete structure and constructing method thereof
US20210222455A1 (en) Border walls and related systems and methods
JP6632290B2 (en) Steel column leg structure and steel column leg construction method
KR102002429B1 (en) Sandwich precast concrete wall and construction method using the same
KR20210068958A (en) Basic column rod fixing system for pricast concrete column
KR20140115512A (en) Concrete cage and connecting structure and method strengthing flexural strength of steel column and steel pipe joint of the same
TWM510942U (en) Precasted concrete foundation for upright shape steel post
KR101165972B1 (en) The upright structure by docking of a file and a superstructure
JP6368630B2 (en) Foundation construction method
JP5345238B1 (en) Construction method of base-isolated base structure and base-isolated base structure
US11834806B2 (en) Method and kit for manufacturing foundations for uprights by using sheets embedded by vibration or by percussion
JP7474393B2 (en) Method of installing anchor bolts and formwork for box removal used in said method