KR102191745B1 KR1020200070720A KR20200070720A KR102191745B1 KR 102191745 B1 KR102191745 B1 KR 102191745B1 KR 1020200070720 A KR1020200070720 A KR 1020200070720A KR 20200070720 A KR20200070720 A KR 20200070720A KR 102191745 B1 KR102191745 B1 KR 102191745B1
Authority
KR
South Korea
Prior art keywords
support
support body
wedge
wing
unit
Prior art date
Application number
KR1020200070720A
Other languages
Korean (ko)
Inventor
장병언
Original Assignee
주식회사 에스씨티앤씨
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 주식회사 에스씨티앤씨 filed Critical 주식회사 에스씨티앤씨
Priority to KR1020200070720A priority Critical patent/KR102191745B1/en
Application granted granted Critical
Publication of KR102191745B1 publication Critical patent/KR102191745B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/02Foundation pits
    • E02D17/04Bordering surfacing or stiffening the sides of foundation pits
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/06Foundation trenches ditches or narrow shafts
    • E02D17/08Bordering or stiffening the sides of ditches trenches or narrow shafts for foundations
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2220/00Temporary installations or constructions
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2600/00Miscellaneous
    • E02D2600/20Miscellaneous comprising details of connection between elements
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2600/00Miscellaneous
    • E02D2600/40Miscellaneous comprising stabilising elements

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The present invention relates to an H-beam reinforcement tool for a soil retaining construction, which is composed of a pair of a first support body and a second support body of a metallic material, wherein the first support body and the second support body are fastened by a bolt and a nut such that the first support body and the second support body may be constructed as a mutually connected reinforcement tool unit body. Here, a wedge having an inclination unit at both sides is disposed so as to, when descending by an artificial pressure after coming in contact with the inclination unit of the first support body and the inclination unit of the second support body, maintain the supporting state in which the vertical unit of the first support body and the vertical unit of the second support body come in contact with the flange of the H-beam as the first support body and the second support body are splayed to both sides. The present invention further comprises a magnet buried in the horizontal unit or the vertical unit of the first support body so as to be attached by the magnetic force to the H-beam. The wedge, which is prevented from being dislocated after being inserted by the artificial pressure while coming in contact with the inclination unit of the first support body and the inclination unit of the second support body, is made of one between a non-metallic material and a metallic material. The wedge of the non-metallic material has a micro-protrusion formed at the inclination unit of both sides or a magnet buried therein so as to be prevented from being dislocated by the frictional force and the magnetic force after coming in contact with the inclination unit of the first support body and the inclination unit of the second support body. The wedge of the metallic material has a wing protruding from the upper side, wherein a penetration hole is perforated at the wing such that the wing may be fastened to the upper portion of the first support body by a fixating bolt, thereby preventing dislocation. Consequently, the present invention provides a simple construction to reduce fabrication costs.

Description

흙막이 공사용 에이치빔 보강구{H-beam reinforcement for earth-walled}H-beam reinforcement for earth-walled construction

본 발명은 흙막이 공사용 에이치빔 보강구에 관한 것으로, 좀 더 상세하게는 가설 흙막이 공사의 버팀보로 사용되는 에이치빔에 결합되어 플랜지에 압축하중이 작용할 때 휨이나 비틀림을 방지하기 위해 사용할 수 있는 흙막이 공사용 에이치빔 보강구에 관한 것이다.The present invention relates to an H-beam reinforcement tool for soil barrier construction, and more particularly, it is coupled to H-beam used as a support for temporary soil barrier construction, and can be used to prevent bending or twisting when a compressive load acts on the flange. It relates to H-beam reinforcement.

일반적으로 흙막이 가시설에서 기초 터파기 공사를 실시하기 전에는 반드시 개량지반의 둘레에 걸쳐 기초터의 내부로 흙이 유입되는 것을 막고, 또 지하수나 침투수가 용출되는 것을 차단하기 위한 연속벽체를 시공하게 된다. 예를 들면, 각종 건축공사나 토목공사에서는 구조물의 설치 공간을 마련하기 위하여 터파기공사를 먼저 수행하게 되는데, 이와 같은 터파기공사에서는 주변지반이 구조물의 설치 공간으로 무너져 내리지 않도록 연속벽체를 설치하여 주변지반의 토압에 견디도록 하는 것이 일반적이다In general, a continuous wall is constructed to prevent soil from flowing into the foundation site across the perimeter of the improved ground and to block groundwater or infiltrating water from flowing out before the foundation digging construction is carried out in a temporary soil barrier facility. For example, in various construction and civil works, excavation work is first performed to prepare the installation space of the structure.In such excavation work, continuous walls are installed to prevent the surrounding ground from collapsing into the installation space of the structure. It is common to withstand the earth pressure of

상기 기초 터파기 공사의 연속벽체에 사용되는 버팀보 및 지주는 지하철 또는 건물을 만들기 위하여 터파기를 하면서 설치되는 흙막이 벽을 지지할 수 있도록 버팀력을 제공하는 구조체이며, 이러한 흙막이 가시설에서 사용되는 버팀보 및 지주의 종류로는 에이치빔(H형강), 원형강관, 사각강관, ㄱ자형강 등이 있으며, 특히 에이치빔의 경우 토압으로부터 압축하중이 작용할 때 플랜지부분에 휨이나 비틀림의 발생시 강도를 유지시켜 변형됨을 방지하도록 보강하는 기술이 제안되고 있다.The struts and struts used in the continuous wall of the foundation digging construction are structures that provide struts to support the earthen barrier wall installed while digging to make a subway or building, and the struts and struts used in such earthen stopping facilities Types of H-beam (H-beam), round steel pipe, square steel pipe, and angle-shaped steel are included. In particular, H-beam prevents deformation by maintaining strength when bending or twisting occurs on the flange when a compressive load is applied from earth pressure. A technique to reinforce it has been proposed.

예컨대 국내 등록특허 제10-0851062호(2008.08.12. 공고) "자성체가 부착된 잭 스티프너" 와, 등록특허 제10-0982650호(2010.09.16. 공고) "에이치빔 보강구" 및 공개특허 제10-2012-0140318호(2012.12.31. 공개) "에이치 형강용 가변 스티프너 잭" 이 제안되었으며, 이들은 에이치빔의 양측 플랜지에 접하는 한 쌍의 지지부와 이 한 쌍의 지지부에 양단에 형성된 나사산이 체결되는 나사봉으로 이루어진 것으로서, 상기 나사봉을 회전시키면 한 쌍의 지지부가 벌어지면서 에이치빔의 양측 플랜지에 접하여 지지하므로 응력을 증대시키게 된다. 그러나 상기 나사봉의 회전시 지지부가 함께 회전하므로 설치하는 정확한 위치로부터 이탈되는 문제점이 발생하므로 이를 방지하려고 자석이나 미끄럼방지용 패드를 부착하였으나 역시 나사봉의 회전시 위치를 이탈하여 허용응력의 증대를 보장할 수 없고, 토압의 발생으로 나사부분에 가해지는 힘을 견디지 못하고 뭉그러지면 재사용이 불가능하여 원가대비 경쟁력이 저하된다.For example, Korean Patent Registration No. 10-0851062 (2008.08.12. Announcement) "Jack stiffener with magnetic substance", Registration Patent No. 10-0982650 (2010.09.16. Announcement) "H-beam reinforcement" and publication patent No. 10-2012-0140318 (published on December 31, 2012) "H-beam variable stiffener jack" was proposed, and these are a pair of supports in contact with the flanges on both sides of H-beam and threads formed at both ends of the pair of supports are fastened. It is made of a screw rod, and when the screw rod is rotated, a pair of support portions are opened and supported in contact with the flanges on both sides of the H-beam, thereby increasing the stress. However, when the screw rod rotates, the support part rotates together, so there is a problem that it is separated from the correct position to be installed.Therefore, a magnet or a non-slip pad was attached to prevent this. There is no, and if it cannot withstand the force applied to the screw part due to the occurrence of earth pressure and is crushed, it cannot be reused, resulting in lower competitiveness against cost.

또한, 상기의 종래기술의 문제점을 해소하기 위한 국내 등록특허 제10-1484258호(2015.01.20. 공고) "에이치빔 변형방지용 스티프너"는 에이치빔의 플랜지 사이에 설치되어 플랜지에 접하는 한 쌍의 지지체와, 이 지지체에 돌출된 삽입바와, 이 삽입바가 이동가능하도록 끼우고 지지하는 본체와, 이 본체의 중앙으로 유입되어 상기 지지체의 삽입바의 선단에 접하여 가압하는 쐐기로 이루어지며, 상기 지지체의 삽입바가 본체로부터 이탈됨을 방지하고 직선운동하도록 본체에 장착되는 가이드봉 및 상기 쐐기를 가압하는 볼트로 이루어진 것으로, 상기 쐐기의 가압으로 직선운동하는 지지체가 에이치빔의 플랜지에 접하여 지지하므로 응력을 증대시킬 수 있으나, 이는 가이드봉 및 본체가 허공에 떠 있는 구성이므로 안전성이 결여됨은 물론 그 구성이 복잡 다단하다는 단점으로 인해 제작 단가는 물론, 유지보수가 용이하지 않다는 문제점이 있다.In addition, Korean Patent Registration No. 10-1484258 (Announcement on Jan. 20, 2015) “H-beam deformation prevention stiffener” for solving the problems of the prior art is installed between the flanges of the H-beam and a pair of supports in contact with the flange. And, an insertion bar protruding from the support, a main body that is inserted and supported so that the insertion bar is movable, and a wedge that flows into the center of the main body and presses against the tip of the insertion bar of the support, and inserts the support It is composed of a guide rod mounted on the main body to prevent the bar from being separated from the main body and presses the wedge and a bolt that presses the wedge.Since the support that moves linearly by the pressure of the wedge is supported by contacting the flange of the H-beam, the stress can be increased. However, since this is a configuration in which the guide rod and the main body are floating in the air, there is a problem in that the manufacturing cost as well as maintenance is not easy due to the shortcomings of not only lacking safety but also of complicated configuration.

국내 등록특허 제10-0851062호(2008.08.12. 공고)Domestic registered patent No. 10-0851062 (2008.08.12. Announcement) 국내 등록특허 제10-0982650호(2010.09.16. 공고)Domestic registered patent No. 10-0982650 (announced on September 16, 2010) 국내 공개특허 제10-2012-0140318호(2012.12.31. 공개)Korean Patent Publication No. 10-2012-0140318 (published on December 31, 2012) 국내 등록특허 제10-1484258호(2015.01.20. 공고)Domestic Registration Patent No. 10-1484258 (announced on January 20, 2015)

본 발명은 간단하고 단순한 구성을 통해서 안정적으로 간편하게 탈부착할 수 있도록 한 흙막이 공사용 에이치빔 보강구를 제공하는데 있다.The present invention is to provide an H-beam reinforcement tool for soil barrier construction that can be stably and easily detached through a simple and simple configuration.

본 발명의 또 다른 목적은 간단하고 단순한 구성을 통해 제조원가를 낮춤은 물론, 간단하고 단순한 구성을 통해 설치의 편리성 및 유지관리가 용이하고 다시 사용이 가능한 흙막이 공사용 에이치빔 보강구를 제공하는데 있다.Another object of the present invention is to provide an H-beam reinforcement tool for earth protection construction that can be reused and convenient for installation and maintenance through a simple and simple configuration, as well as lowering the manufacturing cost through a simple and simple configuration.

상기한 목적을 달성하기 위한 본 발명의 흙막이 공사용 에이치빔 보강구는 수평부와, 이 수평부의 외측에 위치한 수직부와, 상기 수평부의 내측 상부에 형성되는 경사부 및 이 경사부의 하부에 수평방향으로 돌출 형성되면서 체결용 장공이 천공된 가이드부로 이루어지는 금속 소재의 한 쌍의 제1 지지체 및 제2 지지체로 이루어지며; 상기 제1 지지체와 제2 지지체의 두께가 동일 평면 상태가 되도록 결합시키기 위해 제1 지지체의 가이드부와 제2 지지체의 가이드부를 이등분된 두께로 형성하고, 상기 제1 지지체의 가이드부와 제2 지지체의 가이드부에 천공된 장공에 볼트 및 너트로 체결하여 제1 지지체와 제2 지지체가 상호 연결된 보강구 단위체로 이루어지고; 상기 제1 지지체의 경사부와 제2 지지체의 경사부에 접한 후 인위적 가압에 의해 하강할 때 제1 지지체 및 제2 지지체가 양측으로 벌어지면서 에이치빔의 플랜지에 제1 지지체의 수직부 및 제2 지지체의 수직부가 접하여 지지하는 상태를 유지시키도록 양측 경사부를 갖는 쐐기가 마련되어 이루어지며; 상기 에이치빔에 자력에 의해 부착될 수 있도록 제1 지지체의 수평부 또는 수직부에 매립되는 자석을 포함하여 이루어지는 것에 있어서,
상기 제1 지지체의 경사부와 제2 지지체의 경사부에 접하면서 인위적 가압에 의해 끼워진 후 이탈이 방지되는 쐐기는 비금속재 또는 금속재 중 어느 하나로 형성하되, 상기 비금속재의 쐐기는 양측 경사부에 미세돌기를 형성시키거나 자석을 매립시켜 제1 지지체 경사부와 제2 지지체의 경사부에 접하여 마찰력 및 자력에 의해 이탈됨이 방지되도록 이루어지고, 상기 금속재의 쐐기는 상측에 날개를 돌출 형성하고, 상기 날개에 관통공을 천공하여 고정볼트로 제1 지지체의 상부에 날개를 체결하여어 이탈이 방지되도록 이루어진 것을 특징으로 한다.
The H-beam reinforcement tool for earth-blocking construction of the present invention for achieving the above object includes a horizontal portion, a vertical portion located outside the horizontal portion, an inclined portion formed on the inner upper portion of the horizontal portion, and a horizontal direction protruding from the lower portion of the inclined portion. It is formed of a pair of a first support and a second support made of a metal material made of a guide portion perforated with a long hole for fastening; In order to couple the first support and the second support to have the same thickness, the guide part of the first support and the guide part of the second support are formed to have a bisected thickness, and the guide part and the second support of the first support It is made of a reinforcing unit unit in which the first support and the second support are interconnected by fastening to the long hole perforated in the guide portion of the bolt and nut; When descending by artificial pressure after contacting the inclined portion of the first support and the inclined portion of the second support, the first support and the second support spread to both sides, and the vertical portion of the first support and the second A wedge having both side inclined portions is provided so as to maintain a state in which the vertical portion of the support is in contact and supported; In comprising a magnet embedded in the horizontal or vertical portion of the first support so that it can be attached to the H-beam by magnetic force,
The wedge, which is inserted by artificial pressure while contacting the inclined portion of the first support and the inclined portion of the second support, is formed of one of a non-metallic material or a metallic material, and the wedge of the non-metallic material is formed of fine protrusions on both sides Or by embedding a magnet to contact the inclined portion of the first support body and the inclined portion of the second support body to prevent separation by frictional force and magnetic force, and the wedge of the metal material protrudes from the upper side, and the wing It is characterized in that the through hole is drilled and the wing is fastened to the upper portion of the first support with a fixing bolt to prevent separation.

삭제delete

삭제delete

삭제delete

또한, 쐐기의 이탈을 방지하기 위해 쐐기의 상부 및 측면을 감싸도록 '∩' 형상으로 형성되고 상부 양측에 날개를 돌출 형성하며 상기 날개에 관통공을 천공하여 이루어지는 보조커버를 마련하고, 상기 보조커버의 날개를 제1 지지체 및 제2 지지체의 상부에 고정볼트에 의해 고정되도록 이루어진 것을 특징으로 한다.In addition, to prevent separation of the wedge, it is formed in a'∩' shape to surround the upper and side surfaces of the wedge, protruding wings on both sides of the upper side, and providing an auxiliary cover formed by drilling a through hole in the wing, and the auxiliary cover It characterized in that it is made to be fixed by fixing bolts on the upper portion of the first support and the second support.

상기한 구성을 통한 본 고안 발명의 흙막이 공사용 에이치빔 보강구는 그 구조가 동일 크기 또는 크기가 다른 제1 지지체의 경사부와 제2 지지체의 경사부에 쐐기의 경사부를 일치시킨 후 가압하여 제1 지지체와 제2 지지체를 양측으로 벌리거나 제1 지지체를 자력으로 고정하고 제2 지지체만 벌려 에이치빔의 플랜지를 지지시킴으로써 에이치빔의 플랜지에 압축하중이 작용할 때 휨이나 비틀림을 방지할 수 있는 매우 간단하고 단순한 구성을 통해서 안정적으로 간편하게 탈부착이 이루어지고 다시 사용할 수 있는 장점이 있다.The H-beam reinforcement tool for earth protection construction of the present invention through the above-described configuration matches the inclined portion of the wedge with the inclined portion of the first support having the same size or different in size, and pressurizing the first support. It is very simple to prevent bending or twisting when a compressive load is applied to the H-beam flange by spreading the and second support to both sides or fixing the first support with magnetic force and only opening the second support to support the flange of H-beam. There is an advantage that it can be easily attached and detached stably through a simple configuration and can be used again.

또한, 비금속의 소재로 형성되는 쐐기는 경사부에 미세돌기를 형성하거나 자석을 부착하여 제1 지지체 및 제2 지지체에 자력에 의해 부착되어 이탈됨을 방지함으로써 가압상태를 안정적으로 유지시키는 장점이 있다.In addition, the wedge formed of a non-metallic material has the advantage of stably maintaining a pressurized state by forming microprotrusions on the inclined portion or attaching a magnet to the first support and the second support by magnetic force to prevent separation.

또한, 금속의 소재로 형성되는 쐐기는 날개를 형성하여 제1 지지체에 직접 고정함으로써 이탈됨을 방지함으로써 가압상태를 안정적으로 유지시키는 장점이 있다.In addition, the wedge formed of a metal material has the advantage of stably maintaining a pressurized state by preventing separation by forming a wing and fixing it directly to the first support.

또한, 쇄기의 상부 및 양측면을 감싸면서 제1 지지체 및 제2 지지체의 상부에 고정되는 보조커버를 이용하여 이탈됨을 방지함으로써 가압상태를 안정적으로 유지시키는 장점이 있다.In addition, there is an advantage of stably maintaining a pressurized state by preventing separation by using an auxiliary cover fixed to the upper portion of the first support and the second support while surrounding the upper and both sides of the wedge.

도 1은 본 발명에 의한 흙막이 공사용 에이치빔 보강구의 장착 상태를 나타낸 사시도.
도 2는 도 1의 결합과정을 나타낸 단면도.
도 3은 본 발명에 의한 흙막이 공사용 에이치빔 보강구의 다른 실시 예의 장착 상태를 나타낸 사시도.
도 4는 도 3의 결합과정을 나타낸 단면도.
도 5는 본 발명에 의한 흙막이 공사용 에이치빔 보강구의 또 다른 실시 예의 장착 상태를 나타낸 사시도.
도 6은 도 5의 결합과정을 나타낸 단면도이다.
Figure 1 is a perspective view showing the mounting state of the H-beam reinforcement tool for earthwork construction according to the present invention.
Figure 2 is a cross-sectional view showing the coupling process of Figure 1;
Figure 3 is a perspective view showing a mounting state of another embodiment of the H-beam reinforcement tool for earthwork construction according to the present invention.
Figure 4 is a cross-sectional view showing the coupling process of Figure 3;
Figure 5 is a perspective view showing a mounting state of another embodiment of the H-beam reinforcement tool for earthwork construction according to the present invention.
6 is a cross-sectional view showing the bonding process of FIG. 5.

이하, 첨부한 도면을 이용하여 본 발명을 상세하게 설명한다. 다만, 첨부 도면은 본 발명의 바람직한 실시 예를 나타낸 것이므로, 이들 도면에 의해서 본 발명의 권리범위가 제한되는 것은 아니다. 그리고, 본 발명을 실시하는데 꼭 필요한 구성이라 하더라도 공지기술에 속하거나, 통상의 기술자가 공지기술로부터 용이하게 실시할 수 있는 구성에 대해서는 그 구체적인 설명을 생략한다.Hereinafter, the present invention will be described in detail with reference to the accompanying drawings. However, since the accompanying drawings show preferred embodiments of the present invention, the scope of the present invention is not limited by these drawings. Further, even if the configuration is essential for carrying out the present invention, a detailed description thereof will be omitted for a configuration that belongs to a known technology or that a person skilled in the art can easily implement from a known technology.

도 1에서와 같이, 본 발명의 흙막이 공사용 에이치빔 보강구의 기본 구성은 한 쌍을 이루는 제1 지지체(2) 및 제2 지지체(3)가 볼트(50)와 너트(51)에 의해 상호 연결되는 보강구 단위체(1)와, 이 보강구 단위체(1)의 제1 지지체(2) 및 제2 지지체(3)의 사이에 게재되어 인위적 가압을 통해 제1 지지체(2) 및 제2 지지체(3)가 양측으로 밀려나가면서 벌어져 에이치빔(6)의 플랜지(61)에 접하여 지지하는 상태를 유지시키는 쐐기(4)로 이루어진다.As shown in Figure 1, the basic configuration of the H-beam reinforcement tool for earthing construction of the present invention is a pair of the first support (2) and the second support (3) are interconnected by a bolt 50 and a nut 51 The reinforcement unit 1 and the first support 2 and the second support 3 of the reinforcement unit 1 are placed between the first support 2 and the second support 3 through artificial pressure. ) Consists of a wedge (4) that is pushed to both sides and is opened to maintain a state in contact with and supporting the flange (61) of the H-beam (6).

상기 한 쌍을 이루는 제1 지지체(2) 및 제2 지지체(3)는 에이치빔(6)의 수평 연결부(62)에 안착하는 수평부(21, 31)와, 이 수평부(21, 31)의 외측에 위치하는 수직부(22, 32)와, 상기 수평부(21, 31)의 내측 상부에 형성되는 경사부(23, 33) 및 이 경사부(23, 33)의 하부에 수평방향으로 돌출 형성되면서 체결용 장공(25, 35)이 천공된 가이드부(24, 25)를 형성하여 이루어지고, 소재는 금속 또는 비금속으로 제작된다.The first support body 2 and the second support body 3 constituting the pair are horizontal portions 21 and 31 seated on the horizontal connection portion 62 of the H-beam 6, and the horizontal portions 21 and 31 Vertical portions 22 and 32 located outside of the inclined portions 23 and 33 formed on the inner upper portions of the horizontal portions 21 and 31, and horizontally under the inclined portions 23 and 33 While protruding is formed, the fastening long holes 25 and 35 are formed by forming the perforated guide portions 24 and 25, and the material is made of metal or non-metal.

그리고 상기 제1 지지체(2)의 경사부(23) 및 제2 지지체(3)의 경사부(33)는 상측의 공간이 좁고 상측의 공간이 크도록 경사지게 이루어지는 역삼각형 형태로 형성하여 쐐기(4)의 끼움 결합이 용이하도록 이루어진다.In addition, the inclined portion 23 of the first support 2 and the inclined portion 33 of the second support 3 are formed in an inverted triangle shape that is inclined so that the upper space is narrow and the upper space is large. ) Is made easy to fit.

또한, 상기 제1 지지체(2)의 가이드부(24)와 제2 지지체(3)의 가이드부(34)를 이등분된 두께로 서로 엇갈리게 형성하면 상기 가이드부(24)와 가이드부(34)를 서로 접촉시킬 때 제1 지지체(2)와 제2 지지체(3)의 두께가 동일 평면 상태가 되므로 향후 압축하중이 작용할 때 에이치빔(6)의 플랜지(61)의 휨이나 비틀림을 방지하기 위한 지지력이 동일면에 이루어게 된다.In addition, when the guide portion 24 of the first support body 2 and the guide portion 34 of the second support body 3 are formed to have a bisected thickness, the guide portion 24 and the guide portion 34 are formed. When contacting each other, the thickness of the first support body 2 and the second support body 3 are in the same flat state, so the support force to prevent bending or twisting of the flange 61 of the H-beam 6 when a compressive load is applied in the future This is done on the same side.

그리고 상기 제1 지지체(2)의 가이드부(24)와 제2 지지체(3)의 가이드부(34)에 천공된 장공(25, 35)에 볼트(50) 및 너트(51)로 체결하면 제1 지지체(2)와 제2 지지체(3)가 상호 연결된 보강구 단위체(1)가 구성되고, 상기 장공(25, 35)의 이동 공간을 이용하여 제1 지지체(2)와 제2 지지체(3)가 좌우로 이동 가능하게 된다.In addition, when fastened with bolts 50 and nuts 51 to the long holes 25 and 35 drilled in the guide portion 24 of the first support 2 and the guide portion 34 of the second support 3 A reinforcing unit unit (1) in which the 1 support body (2) and the second support body (3) are interconnected is configured, and the first support body (2) and the second support body (3) are formed using the moving space of the long holes (25, 35). ) Can move left and right.

또한, 역삼각형 형태를 이루면서 양측 경사부(41)를 갖는 쐐기(4)는 상기 제1 지지체(2)의 경사부(23)와 제2 지지체(3)의 경사부(33)에 접한 후 망치, 유압잭 등을 이용한 인위적 가압에 의해 하강할 때 제1 지지체(2) 및 제2 지지체(3)가 양측으로 벌어지면서 에이치빔(6)의 플랜지(61)에 제1 지지체(2)의 수직부(22) 및 제2 지지체(3)의 수직부(32)가 접하여 지지되는 상태를 유지시키게 된다.In addition, the wedge 4 having an inverted triangle shape and having both sides of the inclined portion 41 is in contact with the inclined portion 23 of the first support 2 and the inclined portion 33 of the second support 3 and then hammered. , When descending by artificial pressure using a hydraulic jack, the first support body 2 and the second support body 3 open to both sides, and the vertical part of the first support body 2 on the flange 61 of the H-beam 6 (22) and the vertical portion 32 of the second support 3 are in contact with each other to maintain a supported state.

한편, 상기 제1 지지체(2) 및 제2 지지체(3)는 외형의 크기가 도 1의 에이치빔(6)에 결합된 것과 같이 동일하거나, 도 2에서와 같이 제1 지지체(2)를 크게 형성하여 고정용으로 사용하고 제2 지지체(3)를 작게 형성하여 이동형으로 사용하되 상기 고정용인 제1 지지체(2)의 수평부(21) 또는 수직부(22)에 자석(7)을 매립하여 자력에 의해 에이치빔(6)에 일차적으로 부착 상태로 유지되도록 하고 제2 지지체(3)를 이동시키도록 구성할 수 있다.On the other hand, the first support 2 and the second support 3 have the same external dimensions as those combined with the H-beam 6 of FIG. 1, or the first support 2 is larger as in FIG. Formed and used for fixing, and the second support (3) is formed small and used as a mobile type, but by embedding a magnet (7) in the horizontal portion (21) or vertical portion (22) of the first support body (2) for fixing It may be configured to be primarily maintained in a state of being attached to the H-beam 6 by magnetic force and to move the second support 3.

또한, 상기 쐐기(4)는 도 1에서와 같이 비금속재로 형성하되 경사부(41)에 미세돌기를 형성시키거나 자석(71)을 매립시켜 도 2에서와 같이 비금속 또는 금속 소재에 따라 선택 사용하여 제1 지지체(2)의 경사부(23)와 제2 지지체(3)의 경사부(33)에 끼워진 후 가압 상태로 접할 때 마찰력 및 자력에 의해 이탈이 방지되도록 구성할 수 있다.In addition, the wedge 4 is formed of a non-metallic material as shown in FIG. 1, but by forming a fine protrusion on the inclined portion 41 or embedding a magnet 71, it is selectively used according to the non-metallic or metallic material as shown in FIG. Thus, it can be configured to prevent separation by frictional force and magnetic force when it is inserted into the inclined portion 23 of the first support 2 and the inclined portion 33 of the second support 3 and comes into contact with a pressurized state.

또한, 상기 쐐기(4)는 금속재로 형성하되 도 3 및 도 4에서와 같이 상측에 날개(42)를 돌출 형성하고, 상기 날개(42)에 관통공을 천공하여 고정볼트(52)에 의해 제1 지지체(2)의 상부에 날개(42)를 체결함으로써 이탈이 방지되도록 구성할 수 있다.In addition, the wedge 4 is formed of a metal material, but as shown in Figs. 3 and 4, a wing 42 is protruded on the upper side, and a through hole is drilled in the wing 42 to be removed by a fixing bolt 52. 1 It can be configured to prevent separation by fastening the wings 42 on the upper portion of the support (2).

또한, 상기 쐐기(4)의 이탈을 방지하기 위해 도 5 및 도 6에서와 같이 쐐기(4)의 상부 및 양측면을 감싸도록 '∩' 형상으로 본체(81)를 형성되고 상부 양측 수평방향으로 날개(82)를 돌출 형성하며 상기 날개(82)에 관통공을 천공하여 이루어지는 보조커버(8)를 마련하고, 상기 보조커버(8)의 날개(82)를 제1 지지체(2) 및 제2 지지체(3)의 상부에 고정볼트(53)로 체결되도록 구성할 수 있다.In addition, in order to prevent separation of the wedge 4, the body 81 is formed in a'∩' shape so as to surround the upper and both sides of the wedge 4 as shown in FIGS. Protruding 82 and providing an auxiliary cover 8 formed by drilling a through hole in the wing 82, and attaching the wing 82 of the auxiliary cover 8 to the first support 2 and the second support (3) can be configured to be fastened to the upper portion of the fixing bolt 53.

상기와 같이 구성된 본 발명은 도 1 및 도 2에서와 같이 제1 지지체(2) 및 제2 지지체(3)의 크기가 동일 또는 다르게 형성되어도 장공(35, 35)으로 끼워져 체결되는 볼트(50) 및 너트(51)에 의해 가이드부(24, 34)가 상호 연결되어 간편하게 보강구 단위체(1)를 구성함으로써 취급 및 보관이 용이하게 된다.The present invention configured as described above is a bolt 50 that is inserted into the long holes 35 and 35 even if the first support 2 and the second support 3 are formed in the same or different sizes as in FIGS. 1 and 2. And the guide portions 24 and 34 are interconnected by the nut 51 to easily configure the reinforcing unit unit 1 to facilitate handling and storage.

상기 보강구 단위체(1)를 에이치빔(6)의 수평 연결부(62)에 안착시킨 후 제1 지지체(2)의 경사부(23)와 제2 지지체(3)의 경사부(33) 사이의 공간으로 쐐기(4)를 끼운 후 인위적으로 가압시키면 제1 지지체(2) 및 제2 지지체(3)가 양측으로 벌어지면서 에이치빔(6)의 플랜지(61)에 제1 지지체(2)의 수직부(22) 및 제2 지지체(3)의 수직부(32)가 접하여 지지하는 상태를 유지함으로써 에이치빔(6)의 플랜지(61)에 압축하중이 작용할 때 휨이나 비틀림을 방지할 있는 것이다.After mounting the reinforcing unit unit 1 on the horizontal connection part 62 of the H-beam 6, between the inclined part 23 of the first support 2 and the inclined part 33 of the second support 3 When the wedge (4) is inserted into the space and artificially pressurized, the first support (2) and the second support (3) are opened to both sides, and the first support (2) is perpendicular to the flange (61) of the H-beam (6). By maintaining a state in which the part 22 and the vertical part 32 of the second support 3 are in contact with each other, it is possible to prevent bending or twisting when a compressive load acts on the flange 61 of the H-beam 6.

또한, 도 2 (A)에서와 같이 크게 형성하여 고정용으로 사용하는 제1 지지체(2)를 에이치빔(6)의 일측 플랜지(61) 및 수평 연결부(62)에 자석(7)의 자력으로 부착하여 위치를 일차 선정하여 안착시키고 제1 지지체(2)의 경사부(23)와 제2 지지체(3)의 경사부(33) 사이의 공간으로 쐐기(4)를 끼운 후 인위적으로 가압시키면 제2 지지체(3)가 일측으로 밀려 벌어지면서 에이치빔(6)의 플랜지(61)에 제2 지지체(3)의 수직부(32)가 접하여 지지하는 상태를 유지함으로써 에이치빔(6)의 플랜지(61)에 압축하중이 작용할 때 휨이나 비틀림을 방지할 있는 것이다.In addition, as shown in Fig. 2 (A), the first support 2, which is largely formed and used for fixing, is attached to the flange 61 and the horizontal connection part 62 of the H-beam 6 by the magnetic force of the magnet 7 After attaching and selecting the position first, insert the wedge (4) into the space between the inclined portion (23) of the first support (2) and the inclined portion (33) of the second support (3) and pressurize artificially. 2 As the support 3 is pushed to one side and opens, the vertical part 32 of the second support 3 contacts and supports the flange 61 of the H-beam 6, thereby maintaining the 61) to prevent bending or twisting when a compressive load is applied.

상기 과정에서 비금속재의 쐐기(4)는 도 1 및 도 2에서와 같이 경사부(41)에 미세돌기를 형성시키거나 자석(71)을 매립시켜 비금속 또는 금속 소재에 따라 선택 사용하여 제1 지지체(2)의 경사부(23)와 제2 지지체(3)의 경사부(33)에 끼워진 후 가압 상태로 접할 때 마찰력 및 자력에 의해 쐐기(4)의 이탈이 방지되므로 안전한 것이다.In the above process, the wedge 4 of a non-metal material forms a fine protrusion on the inclined part 41 or embeds a magnet 71 as shown in FIGS. 1 and 2 to select a non-metal or metal material according to the first support ( It is safe because the wedge 4 is prevented from being separated by frictional force and magnetic force when it is inserted into the inclined portion 23 of 2) and the inclined portion 33 of the second support 3 and contacts it under pressure.

또한, 금속재로 형성된 쐐기(4)는 도 3 및 도 4에서와 같이 상측에 형성된 날개(42)에 형성된 관통공을 이용하여 고정볼트(52)로 제1 지지체(2)의 상부에 상기 날개(42)를 체결하면 매우 간편하게 고정되어 쐐기(4)의 이탈이 방지되므로 안전한 것이다.In addition, the wedge 4 formed of a metal material is a fixing bolt 52 using a through hole formed in the wing 42 formed on the upper side as in FIGS. 3 and 4, and the wing ( 42) is secured because it is fixed very easily and the wedge (4) is prevented from coming off.

또한, 별도로 마련된 보조커버(8)를 이용하여 도 5 및 도 6에서와 같이 쐐기(4)의 상부 및 양측면을 '∩' 형상의 본체(81)로 감싸고 상부 양측 수평방향으로 돌출 형성된 날개(82)의 관통공을 이용하여 고정볼트(53)로 제1 지지체(2) 및 제2 지지체(3)의 상부에 매우 간편하게 체결됨으로써 쐐기(4)의 이탈이 방지되므로 안전한 것이다.In addition, the upper and both sides of the wedge 4 are wrapped with a'∩'-shaped body 81 using the auxiliary cover 8 provided separately, and the wings 82 formed protruding in the horizontal direction on both sides of the upper side as shown in FIGS. 5 and 6 ) By using the through hole of the fixing bolt 53 to the top of the first support (2) and the second support (3) very easily, it is safe because it prevents the wedge (4) from being separated.

따라서, 본 발명은 제1 지지체(2) 및 제2 지지체(3)가 상호 연결되어 간편하게 보강구 단위체(1)를 구성하고 쐐기(4)를 이용하면서 이탈을 방지하는 구성들을 통해 이탈됨을 방지함으로써 제1 지지체(2) 및 제2 지지체(3)가 에이치빔(6)의 플랜지(61)에 가압상태를 안정적으로 유지시켜 압축하중이 작용할 때 플랜지(61)의 휨이나 비틀림을 방지할 수 있는 것이다.Accordingly, the present invention prevents the first support 2 and the second support 3 from being separated through configurations that easily constitute the reinforcement unit 1 by being interconnected and prevent separation while using the wedge 4 The first support (2) and the second support (3) stably maintain a pressurized state on the flange 61 of the H-beam 6 to prevent bending or twisting of the flange 61 when a compressive load is applied. will be.

1: 보강구 단위체 2: 제1 지지체
3: 제2 지지체 4: 쐐기
6: 에이치빔 7: 자석
8: 보조커버 21, 31: 수평부
22, 32: 수직부 23, 33: 경사부
24, 34: 가이드부 25, 35: 장공
41: 경사부 42: 날개
50: 볼트 51: 너트
52: 고정볼트 53: 고정볼트
61: 플랜지 62: 수평 연결부
71: 자석 81: 본체
82: 날개
1: reinforcing unit unit 2: first support
3: second support 4: wedge
6: H Beam 7: Magnet
8: auxiliary cover 21, 31: horizontal part
22, 32: vertical portion 23, 33: inclined portion
24, 34: guide part 25, 35: long hole
41: slope 42: wing
50: bolt 51: nut
52: fixing bolt 53: fixing bolt
61: flange 62: horizontal connection
71: magnet 81: main body
82: wings

Claims (5)

수평부(21, 31)와, 이 수평부(21, 31)의 외측에 위치한 수직부(22, 32)와, 상기 수평부(21, 31)의 내측 상부에 형성되는 경사부(23, 33) 및 이 경사부(23, 33)의 하부에 수평방향으로 돌출 형성되면서 체결용 장공(25, 35)이 천공된 가이드부(24, 25)로 이루어지는 한 쌍의 제1 지지체(2) 및 제2 지지체(3)로 이루어지며;
상기 제1 지지체(2)와 제2 지지체(3)의 두께가 동일 평면 상태가 되도록 결합시키기 위해 제1 지지체(2)의 가이드부(24)와 제2 지지체(3)의 가이드부(34)를 이등분된 두께로 형성하고, 상기 제1 지지체(2)의 가이드부(24)와 제2 지지체(3)의 가이드부(34)에 천공된 장공(25, 35)에 볼트(50) 및 너트(51)로 체결하여 제1 지지체(2)와 제2 지지체(3)가 상호 연결된 보강구 단위체(1)로 이루어지고;
상기 제1 지지체(2)의 경사부(23)와 제2 지지체(3)의 경사부(33)에 접한 후 인위적 가압에 의해 하강할 때 제1 지지체(2) 및 제2 지지체(3)가 양측으로 벌어지면서 에이치빔(6)의 플랜지(61)에 제1 지지체(2)의 수직부(22) 및 제2 지지체(3)의 수직부(32)가 접하여 지지하는 상태를 유지시키도록 양측 경사부(41)를 갖는 쐐기(4)가 마련되어 이루어지지며;
상기 에이치빔(6)에 자력에 의해 부착될 수 있도록 제1 지지체(2)의 수평부(21) 또는 수직부(22)에 매립되는 자석(7)을 포함하여 이루어지는 것에 있어서,
상기 제1 지지체(2)의 경사부(23)와 제2 지지체(3)의 경사부(33)에 접하면서 인위적 가압에 의해 끼워진 후 이탈이 방지되는 쐐기(4)는 비금속재 또는 금속재 중 어느 하나로 형성하되,
상기 비금속재의 쐐기(4)는 양측 경사부(41)에 미세돌기를 형성시키거나 자석(71)을 매립시켜 제1 지지체(2)의 경사부(23)와 제2 지지체(3)의 경사부(33)에 접하여 마찰력 및 자력에 의해 이탈됨이 방지되도록 이루어지고,
상기 금속재의 쐐기(4)는 상측에 날개(42)를 돌출 형성하고, 상기 날개(42)에 관통공을 천공하여 고정볼트(52)로 제1 지지체(2)의 상부에 날개(42)를 체결하여어 이탈이 방지되도록 이루어진 것을 특징으로 하는 흙막이 공사용 에이치빔 보강구.
Horizontal portions 21 and 31, vertical portions 22 and 32 positioned outside the horizontal portions 21 and 31, and inclined portions 23 and 33 formed on the inner upper portions of the horizontal portions 21 and 31 ), and a pair of first supports (2) formed of guide portions (24, 25) having long holes (25, 35) for fastening while protruding in the horizontal direction under the inclined portions (23, 33) and It consists of 2 supports 3;
The guide portion 24 of the first support body 2 and the guide portion 34 of the second support body 3 are combined so that the thickness of the first support body 2 and the second support body 3 are in the same plane. The bolts 50 and nuts are formed in two halved thicknesses, and in the long holes 25 and 35 drilled in the guide portion 24 of the first support 2 and the guide portion 34 of the second support 3 It is fastened with (51) and the first support (2) and the second support (3) are made of a reinforcing unit unit (1) interconnected;
When descending by artificial pressure after contacting the inclined portion 23 of the first support body 2 and the inclined portion 33 of the second support body 3, the first support body 2 and the second support body 3 Both sides to maintain a state in which the vertical part 22 of the first support body 2 and the vertical part 32 of the second support body 3 contact and support the flange 61 of the H-beam 6 while spreading to both sides. A wedge 4 having an inclined portion 41 is provided;
In comprising a magnet (7) embedded in the horizontal portion (21) or the vertical portion (22) of the first support (2) so that it can be attached to the H-beam (6) by magnetic force,
The wedge 4, which is inserted by artificial pressure while in contact with the inclined portion 23 of the first support 2 and the inclined portion 33 of the second support 3, is prevented from being separated, is a non-metal material or a metal material. Formed as one,
The non-metallic wedge (4) forms a fine protrusion on both sides of the inclined portion (41) or by embedding a magnet (71) to the inclined portion (23) of the first support (2) and the inclined portion of the second support (3) It is made to prevent separation by friction and magnetic force in contact with (33),
The wedge 4 of the metal material protrudes a wing 42 on the upper side, and a through hole is drilled in the wing 42 to attach the wing 42 to the upper portion of the first support 2 with a fixing bolt 52. H-beam reinforcement tool for soil barrier construction, characterized in that made to prevent separation by fastening.
삭제delete 삭제delete 삭제delete 제1항에 있어서,
상기 쐐기(4)의 이탈을 방지하기 위해 쐐기(4)의 상부 및 양측면을 감싸도록 '∩' 형상으로 본체(81)와, 상기 본체(81)의 상부 양측 수평방향으로 돌출된 날개(82)와, 상기 날개(82)에 관통공을 천공하여 이루어지는 보조커버(8)를 마련하고;
상기 보조커버(8)의 날개(82)를 제1 지지체(2) 및 제2 지지체(3)의 상부에 고정볼트(53)로 체결되도록 이루어진 것을 특징으로 하는 흙막이 공사용 에이치빔 보강구.
The method of claim 1,
In order to prevent separation of the wedge 4, the main body 81 in a'∩' shape so as to surround the upper and both sides of the wedge 4, and the wings 82 protruding in the horizontal direction on both upper sides of the main body 81 And, to provide an auxiliary cover (8) formed by drilling a through hole in the wing (82);
H-beam reinforcement tool for earth protection construction, characterized in that the wing 82 of the auxiliary cover (8) is fastened to the upper portion of the first support (2) and the second support (3) with fixing bolts (53).
KR1020200070720A 2020-06-11 2020-06-11 H-beam reinforcement for earth-walled KR102191745B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020200070720A KR102191745B1 (en) 2020-06-11 2020-06-11 H-beam reinforcement for earth-walled

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020200070720A KR102191745B1 (en) 2020-06-11 2020-06-11 H-beam reinforcement for earth-walled

Publications (1)

Publication Number Publication Date
KR102191745B1 true KR102191745B1 (en) 2020-12-16

Family

ID=74042047

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020200070720A KR102191745B1 (en) 2020-06-11 2020-06-11 H-beam reinforcement for earth-walled

Country Status (1)

Country Link
KR (1) KR102191745B1 (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3032286U (en) * 1996-06-10 1996-12-17 盟和工業株式会社 Reinforcing bracket for H-beam for temporary girder and H-beam reinforcing device for temporary girder using the reinforcing bracket
KR200270234Y1 (en) * 2001-12-29 2002-03-29 최갑상 construction jack
KR100851062B1 (en) 2007-05-29 2008-08-12 화엄토건(주) Magnetic attached jack stiffener
KR100982650B1 (en) 2009-08-11 2010-09-16 주식회사 대한 Reinforcing device of h-beam
KR20120140318A (en) 2011-06-21 2012-12-31 서상건 Variable stiffner jack for h-beam
KR101484258B1 (en) 2013-06-04 2015-01-20 윤용수 stiffener for h-beam

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3032286U (en) * 1996-06-10 1996-12-17 盟和工業株式会社 Reinforcing bracket for H-beam for temporary girder and H-beam reinforcing device for temporary girder using the reinforcing bracket
KR200270234Y1 (en) * 2001-12-29 2002-03-29 최갑상 construction jack
KR100851062B1 (en) 2007-05-29 2008-08-12 화엄토건(주) Magnetic attached jack stiffener
KR100982650B1 (en) 2009-08-11 2010-09-16 주식회사 대한 Reinforcing device of h-beam
KR20120140318A (en) 2011-06-21 2012-12-31 서상건 Variable stiffner jack for h-beam
KR101484258B1 (en) 2013-06-04 2015-01-20 윤용수 stiffener for h-beam

Similar Documents

Publication Publication Date Title
KR100633796B1 (en) Connecting structure of mid supporting beam for temporary soil sheathing work
US6539685B2 (en) Apparatus and method for lifting sunken foundations
CN102418345B (en) Apparatus for fixing steel wire of wale
CN107035159B (en) A method of suitable for frame structure isolated footing building underground increasing layer
KR100633795B1 (en) Fixing structure of assembling type wale
US6550199B2 (en) Permanent foundation system for manufactured housing
KR100635331B1 (en) Raker support structure for underground pre-scaffolding system
KR100855098B1 (en) Strut structure as temporary system using a vertical truss at the end and the method thereof
KR101595702B1 (en) Soil retaining structure using plate pile with reinforcing bridge and construction method thereof
CN106088133B (en) Power transmission line composite foundation for desert area
KR102191745B1 (en) H-beam reinforcement for earth-walled
KR102190480B1 (en) Implant pile pressing apparatus in architecture foundation system and a universal implant piling method
KR101331219B1 (en) Method for constructing micro pile using reinforcing end bearing capacity
KR20120067402A (en) Connecting structure for precast concrete column to cast-in-place footing
KR100808939B1 (en) wire-reinforced structure for underground pre-scaffolding system
KR100808977B1 (en) Connecting structure of corner supporting beam for temporary soil sheathing work
CN212656218U (en) Heavy pile machine load underpinning structure
KR102123666B1 (en) Implant pile installer in architecture foundation system and a universal implant pile method
KR101983650B1 (en) Perpendicular wall type block assembly breast wall
JP2016528407A (en) Deflection prevention beam for construction of earth retaining facilities
JP2019108701A (en) Fence for safety measures of reinforced soil wall construction
KR101958768B1 (en) Structure for Constructing the Lagging Board using Strut Beam having Reinforcement Bar
KR100858712B1 (en) Corner connecting apparatus of temporary soil sheathing work
KR20010028793A (en) Precast Retaining Wall Using High Strength Micro Pile
KR100880351B1 (en) Steel invert connection structure for tunnel capable of controlling a prestress

Legal Events

Date Code Title Description
E701 Decision to grant or registration of patent right
GRNT Written decision to grant