KR102038877B1 - 말뚝 프레임 및 이의 사용설치방법 - Google Patents
말뚝 프레임 및 이의 사용설치방법 Download PDFInfo
- Publication number
- KR102038877B1 KR102038877B1 KR1020187006162A KR20187006162A KR102038877B1 KR 102038877 B1 KR102038877 B1 KR 102038877B1 KR 1020187006162 A KR1020187006162 A KR 1020187006162A KR 20187006162 A KR20187006162 A KR 20187006162A KR 102038877 B1 KR102038877 B1 KR 102038877B1
- Authority
- KR
- South Korea
- Prior art keywords
- hydraulic cylinder
- connecting member
- frame
- pillar
- bracket
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D13/00—Accessories for placing or removing piles or bulkheads, e.g. noise attenuating chambers
- E02D13/04—Guide devices; Guide frames
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D7/00—Methods or apparatus for placing sheet pile bulkheads, piles, mouldpipes, or other moulds
- E02D7/02—Placing by driving
- E02D7/06—Power-driven drivers
- E02D7/14—Components for drivers inasmuch as not specially for a specific driver construction
- E02D7/16—Scaffolds or supports for drivers
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2250/00—Production methods
Landscapes
- Engineering & Computer Science (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
- Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
- Forklifts And Lifting Vehicles (AREA)
Abstract
Description
도 2는 도 1에 도시된 제1 형 말뚝 프레임의 A방향 투시도다.
도 3은 종래 기술에 따른 제2 형 말뚝 프레임의 정면도다.
도 4는 도 3에 도시된 제2 형 말뚝 프레임의 B방향 투시도다.
도 5는 본 발명의 실시예 1로서 말뚝 프레임의 정면도다.
도 6은 도 5에 도시된 말뚝 프레임의 C방향 투시도다.
도 7은 본 발명이 운송상태일 때의 구조 설명도다.
도 8은 본 발명이 조립상태일 때 상부 기둥이 매달려 조립되는 상태도다.
도 9는 본 발명이 조립상태일 때 상부 기둥과 하부 기둥이 연결되는 상태도다.
도 10은 본 발명이 조립상태일 때 슬라이딩 장치가 슬라이딩하는 상태도다.
도 11은 본 발명이 조립상태일 때 기둥과 지면과의 끼움각이 β일 경우 그리고 이동 가능한 연결부재와 고정 연결부재가 연결하지 않은 상태도다.
도 12는 도 11의 D방향 확대도다.
도 13은 제4 핀을 빼낸 후 도 11의 D방향 확대도다.
도 14는 본 발명이 조립상태일 때 기둥과 지면과의 끼움각이 β일 경우의 상태도로서 이동 가능한 연결부재와 고정 연결부재가 연결되는 상태도다.
도 15는 도 14의 E방향 확대도다.
도 16은 본 발명이 조립상태에서 작업상태로 운동하는 상태도다.
도 17은 본 발명의 작업 상태의 구조 설명도다.
2d' : 후방 지지다리 3' : 기둥
4' : 경사 지주 5a' : '一'형 프레임
5b' : 리프팅 유압실린더 1 : 섀시
2 : 본체 2a : 전방 지지 브라켓
2b : 전방 지지다리 2c : 중간 힌지 서포트
2d : 후방 지지다리 2e : 조종실
2f : 동력 시스템 2h : 고정 연결부재
3 : 기둥 3a : 하부 기둥
3b : 상부 기둥 3c : 가이드레일
3d : 슬라이딩 장치 3e : 현가 장치
3f : 제2 샤프트 핀 3g : 제3 샤프트 핀
4 : 경사 지주 4a : 서포트 바
4b : 신축 장치 4c : 신축 유압실린더
4d : 실린더 동체 4e : 돌출 커넥터
4f : 신축 로드 4g : 이동 가능한 연결부재
5 : ‘人’형 브라켓 5a : '一'형 프레임
5b : 리프팅 유압실린더 5c : 제1 중간 연결부재
5d : 제2 중간 연결부재 5e : 샤프트 핀
Claims (3)
- 이동 가능한 섀시(1), 본체(2), 기둥(3), 경사 지주(4) 및 ‘人’형 브라켓(5)을 포함하고; 상기 이동 가능한 섀시(1)의 이동 방식은 워킹형일 수 있고 캐터필러형일 수도 있으며; 상기 본체(2)에는 전방 지지 브라켓(2a), 전방 지지다리(2b), 중간 힌지 서포트(2c), 종횡으로 신축 가능한 후방 지지다리(2d), 조종실(2e) 및 동력 시스템(2f)이 구비되며; 상기 기둥(3)은 하부 기둥(3a)과 부 기둥(3b)로 구성되고 기둥(3)에는 가이드레일(3c)과 슬라이딩 장치(3d)가 구비되고 하부 기둥(3a)에는 현가 장치(3e)가 더 구비되고 기둥(3)의 하단은 본체(2) 상의 전방 지지 브라켓(2a)과 힌지 연결되며; 상기 슬라이딩 장치(3d)는 기둥(3)의 가이드레일(3c)에서 자유로이 슬라이딩할 수 있고 또한 각각 제2 샤프트 핀(3f), 제3 샤프트 핀(3g)에 의해 기둥(3)에 힌지 연결 및 고정될 수 있으며; 상기 경사 지주(4)는 서포트 바(4a)와 서포트 바(4a) 양단에 각각 연결되는 신축 장치(4b) 및 신축 유압실린더(4c)로 구성되고 경사 지주의 일단은 기둥(3)의 슬라이딩 장치(3d)에 힌지 연결되고 타단은 ‘人’형 브라켓(5)의 '一'형 프레임(5a)에 힌지 연결되어 기둥(3)이 3점 지지 상태를 갖게 하며; 상기 ‘人’형 브라켓(5)은 일단이 일체로 힌지 연결되는 '一'형 프레임(5a)과 리프팅 유압실린더(5b)로 구성되고 '一'형 프레임(5a)과 리프팅 유압실린더(5b)의 힌지 연결점 부위는 제1 샤프트 핀(2g)에 의해 본체(2)의 중간 힌지 서포트(2c)에 고정될 수 있고 '一'형 프레임(5a)과 리프팅 유압실린더(5b)의 타단은 각각 본체(2)의 앞 부분과 뒷 부분에 힌지 연결되는 말뚝 프레임에 있어서,
상기 경사 지주(4)의 신축 유압실린더(4c)의 실린더 동체(4d) 상에는 하나의 돌출 커넥터(4e)가 더 구비되고 경사 지주(4)의 신축 유압실린더(4c)의 신축 로드(4f) 상에는 하나의 이동 가능한 연결부재(4g)가 더 힌지 연결되며; 상기 ‘人’형 브라켓(5)의 '一'형 프레임(5a)에는 하나의 세트를 이루는 제1 중간 연결부재(5c)와 제2 중간 연결부재(5d)가 더 구비되며; 상기 본체(2)의 종횡으로 신축 가능한 후방 지지다리(2d)에는 하나의 세트를 이루는 고정 연결부재(2h)가 더 구비되는 것을 특징으로 하는 말뚝 프레임. - 제1항에 있어서,
상기 경사 지주(4)의 신축 유압실린더(4c)는 돌출 커넥터(4e)와 샤프트 핀(5e)에 의해 '一'형 프레임(5a)의 제2 중간 연결부재(5d)에 힌지연결될 수 있고; 상기 경사 지주(4)의 신축 유압실린더(4c)의 신축 로드(4f) 상의 이동 가능한 연결부재(4g)는 샤프트 핀(4h)에 의해 '一'형 프레임(5a)의 제1 중간 연결부재(5c) 상에 연결 고정될 수 있고 또한 본체(2)의 종횡으로 신축 가능한 후방 지지다리(2d)의 고정 연결부재(2h) 상에 연결 고정될 수도 있는 것을 특징으로 하는 말뚝 프레임. - (a) 말뚝 프레임의 섀시(1), 본체(2), 하부 기둥(3a), 경사 지주(4) 및 ‘人’형 브라켓(5)를 분해되지 않은 상태에서 전체로 시공 현장에 운송하고; 경사 지주의 신축 유압실린더(4c)의 신축 로드(4f) 상의 이동 가능한 연결부재(4g)는 제4 샤프트 핀(4h)에 의해 '一'형 프레임(5a) 상의 제1 중간 연결부재(5c)와 연결되어 고정되고; 슬라이딩 장치(3d)는 제3 샤프트 핀(3g)에 의해 하부 기둥(3a)과 연결 고정되는 단계;
(b) 이미 시공현장에 운송된 상부 기둥(3b)을 하부 기둥(3a)의 현가 장치(3e)를 사용하여 매달아서 섀시(1)의 이동에 의해 상부 기둥(3b)을 매달아서 설치 위치에 운반하여 받침대(6) 상에 수평 위치 시키는 단계;
(c) ‘人’형 브라켓(5)의 리프팅 유압실린더(5b)의 신출 동작을 이용하여 하부 기둥(3a)을 수평 상태로 조절하고 또한 섀시(1)의 이동을 이용하여 하부 기둥(3a)과 상부 기둥(3b)을 맞대게 정렬하여 연결하며; 또한 슬라이딩 장치(3d)와 하부 기둥(3a)을 연결 고정하기 위한 제3 샤프트 핀(3g)을 빼내서 고정 구속을 해제시키는 단계;
(d) 본체(2) 상의 전방 지지다리(2b)가 지면의 지지를 받게 하고 후방 지지다리(2d)를 가로로 설정 위치까지 연장시키고 세로로 연장하여 지면의 지지를 받게 하며; 경사 지주(4)의 신축 장치(4b) 및 신축 유압실린더(4c)의 신축 로드(4f)가 밖으로 연장 돌출되고 기둥(3) 상의 슬라이딩 장치(3d)는 뒤이어 가이드레일(3c)을 따라 설정 위치까지 슬라이딩하고 제2 샤프트 핀(3f)으로 슬라이딩 장치(3d)와 기둥(3)을 힌지 연결하고 고정시키는 단계;
(e) 경사 지주(4)의 신축 유압실린더(4c)의 신축 로드(4f)가 수축하고 기둥(3)은 경사 지주(4)에 의해 전방 지지 브라켓(2a)의 힌지 연결점을 축심으로 하여 회전하여 위로 리프팅되는 단계;
를 포함하고,
(f) 경사 지주(4)의 신축 유압실린더(4c)의 신축 로드(4f)가 설정 위치까지 수축될 때 기둥(3)은 설정 각도(β)까지 위로 상승하고 경사 지주(4)의 신축 유압실린더(4c)의 실린더 동체(4d) 상의 돌출 커넥터(4e)와 '一'형 프레임(5a) 상의 제2 중간 연결부재(5d)도 이미 맞대어 정렬되고 연결된 상태에 놓이며; 제5 샤프트 핀(5e)을 사용하여 신축 유압실린더(4c)의 실린더 동체(4d) 상의 돌출 커넥터(4e)와 '一'형 프레임(5a) 상의 제2 중간 연결부재(5d)를 힌지 연결하여 고정시키고 나서 신축 유압실린더(4c)의 신축 로드(4f)의 이동 가능한 연결부재(4g)와 '一'형 프레임(5a) 상의 제1 중간 연결부재(5c)를 연결 고정 시키는 제4 샤프트 핀(4h)을 빼내서 양자 간의 구속을 해제 시키는 단계;
(g) 신축 로드(4f) 상의 이동 가능한 연결부재(4g)와 후방 지지다리(2d) 상의 고정 연결부재(2h)가 맞대어 정렬될 때까지 경사 지주(4)의 신축 유압실린더(4c)의 신축 로드(4f)와 그 위의 이동 가능한 연결부재(4g)가 함께 밖으로 연장되게 하고, 제4 샤프트 핀(4h)을 사용하여 신축 유압실린더의 신축 로드(4f) 상의 이동 가능한 연결부재(4g)와 신축 가능한 후방 지지다리(2d) 상의 고정 연결부재(2h)를 연결 고정 시키는 단계;
(h) 신축 유압실린더(4c)의 실린더 동체(4d) 상의 돌출 커넥터(4e)와 '一'형 프레임(5a) 상의 제2 중간 연결부재(5d)를 연결 고정 시키는 제5 샤프트 핀(5e)을 빼내서 양자의 구속을 해제 시키는 단계;
(i) 경사 지주(4)의 신축 유압실린더(4c)의 신축 로드(4f)가 수축하고 기둥(3)은 경사 지주(4)에 의해 전방 지지 브라켓(2a)의 힌지 연결점을 축심으로 하여 회전하여 지면과 90도를 이루는 수직 상태에 도달할 때까지 계속 위로 리프팅되고; ‘人’형 브라켓(5)의 리프팅 유압실린더(5b)는 수축하여 ‘人’형 브라켓(5)이 초기 위치까지 오게 하고 또한 제1 샤프트 핀(2g)에 의해 ‘人’형 브라켓(5)을 본체(2)의 중간 힌지 서포트(2c)에 고정 시킴으로써 말뚝 프레임의 자체 세우기 작업을 완성하는 단계;
(j) 말뚝 프레임의 눕히기 작업은 상술한 바와 같은 단계들의 반대 순서대로 진행하는 단계;
를 더 포함하는 제1항 또는 제2항의 말뚝 프레임의 사용설치방법.
Applications Claiming Priority (3)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201510581326.2 | 2015-09-14 | ||
| CN201510581326.2A CN105089053B (zh) | 2015-09-14 | 2015-09-14 | 一种桩架及其使用安装方法 |
| PCT/CN2016/099087 WO2017045625A1 (zh) | 2015-09-14 | 2016-09-14 | 一种桩架及其使用安装方法 |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| KR20180037026A KR20180037026A (ko) | 2018-04-10 |
| KR102038877B1 true KR102038877B1 (ko) | 2019-10-31 |
Family
ID=54570312
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| KR1020187006162A Active KR102038877B1 (ko) | 2015-09-14 | 2016-09-14 | 말뚝 프레임 및 이의 사용설치방법 |
Country Status (4)
| Country | Link |
|---|---|
| JP (1) | JP6498361B2 (ko) |
| KR (1) | KR102038877B1 (ko) |
| CN (1) | CN105089053B (ko) |
| WO (1) | WO2017045625A1 (ko) |
Families Citing this family (9)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN105089053B (zh) * | 2015-09-14 | 2017-02-01 | 山河智能装备股份有限公司 | 一种桩架及其使用安装方法 |
| CA3004561A1 (en) * | 2018-05-09 | 2019-11-09 | Soletanche Freyssinet | Apparatus and method for subsea wall insertion |
| CN108808376B (zh) * | 2018-06-27 | 2024-06-21 | 武汉合智数字能源技术有限公司 | 充电桩自动对接装置 |
| CN108978657A (zh) * | 2018-09-21 | 2018-12-11 | 中国人民解放军军事科学院国防工程研究院 | 一种多功能植桩设备专用万向固定装置 |
| CN110526138B (zh) * | 2019-07-31 | 2024-07-23 | 中铁九桥工程有限公司 | 一种变幅式架梁起重机 |
| CN110952550B (zh) * | 2019-10-28 | 2024-02-27 | 广东力源液压机械有限公司 | 一种悬空自支撑式打桩方法及打桩机 |
| JP7752255B2 (ja) * | 2022-03-25 | 2025-10-09 | 山河智能装▲備▼股▲分▼有限公司 | パイルフレーム |
| CN114855745A (zh) * | 2022-06-21 | 2022-08-05 | 无锡中惠天泽智能科技有限公司 | 可翻转土壤参数测试装置 |
| CN115897579B (zh) * | 2022-11-25 | 2026-04-28 | 临清市安竣建设有限公司 | 一种建筑工程施工快速打桩装置 |
Citations (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| KR101114514B1 (ko) | 2010-03-31 | 2012-02-24 | 주식회사 다윈전자 | 전력용 반도체 모듈 |
Family Cites Families (15)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPS5726448U (ko) * | 1980-07-21 | 1982-02-10 | ||
| JPS57169131A (en) * | 1981-04-11 | 1982-10-18 | Nippon Sharyo Seizo Kaisha Ltd | Housing of pile driver |
| JPS6260631U (ko) * | 1985-09-30 | 1987-04-15 | ||
| DE9110495U1 (de) * | 1991-08-24 | 1991-10-17 | Ing. G. Klemm, Bohrtechnik GmbH, 5962 Drolshagen | Fahrbares Bohrgerät |
| DE4231553C1 (de) * | 1992-09-21 | 1993-12-02 | Bauer Spezialtiefbau | Mastabstützung für einen Kran-/Bohrgerätewagen |
| JP3532402B2 (ja) * | 1997-12-04 | 2004-05-31 | 日立建機株式会社 | リーダーを有する建設機械 |
| JP4038782B2 (ja) * | 1998-05-15 | 2008-01-30 | 三和機材株式会社 | 基礎工事用作業機における走行台車へのマスト支持装置 |
| JP3310241B2 (ja) * | 1999-07-28 | 2002-08-05 | 日本車輌製造株式会社 | 杭打機のリーダの立設方法及びその装置 |
| CN202202322U (zh) * | 2011-08-30 | 2012-04-25 | 毛杰 | 一种灌桩机折叠式主架 |
| CN202543926U (zh) * | 2012-01-17 | 2012-11-21 | 上海工程机械厂有限公司 | 一种打桩架自立起架机构 |
| CN202990884U (zh) * | 2012-11-03 | 2013-06-12 | 广东力源液压机械有限公司 | 一种新型桩机工作装置 |
| CN103866768B (zh) * | 2014-03-25 | 2016-04-06 | 张家港市兴鸿达基础有限公司 | 打桩机桩架结构 |
| CN104612152B (zh) * | 2015-01-16 | 2016-04-13 | 山河智能装备股份有限公司 | 一种桩架及其安装方法 |
| CN205077486U (zh) * | 2015-09-14 | 2016-03-09 | 山河智能装备股份有限公司 | 一种桩架 |
| CN105089053B (zh) * | 2015-09-14 | 2017-02-01 | 山河智能装备股份有限公司 | 一种桩架及其使用安装方法 |
-
2015
- 2015-09-14 CN CN201510581326.2A patent/CN105089053B/zh active Active
-
2016
- 2016-09-14 WO PCT/CN2016/099087 patent/WO2017045625A1/zh not_active Ceased
- 2016-09-14 KR KR1020187006162A patent/KR102038877B1/ko active Active
- 2016-09-14 JP JP2018532501A patent/JP6498361B2/ja active Active
Patent Citations (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| KR101114514B1 (ko) | 2010-03-31 | 2012-02-24 | 주식회사 다윈전자 | 전력용 반도체 모듈 |
Also Published As
| Publication number | Publication date |
|---|---|
| CN105089053A (zh) | 2015-11-25 |
| WO2017045625A1 (zh) | 2017-03-23 |
| CN105089053B (zh) | 2017-02-01 |
| JP6498361B2 (ja) | 2019-04-10 |
| JP2018530690A (ja) | 2018-10-18 |
| KR20180037026A (ko) | 2018-04-10 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| KR20180037026A (ko) | 말뚝 프레임 및 이의 사용설치방법 | |
| JP6483268B2 (ja) | パイルフレームおよびその組立方法 | |
| CN203813323U (zh) | 用于输电线跨越架的折叠式支撑架 | |
| CN212079327U (zh) | 一种液压调节式侧墙模板台车 | |
| CN205778918U (zh) | 黄土隧道开挖及初支模筑混凝土施工复合式台车 | |
| CN109441361B (zh) | 一种桩架及其立桅方法 | |
| CN108118950B (zh) | 一种标准化变电站台架双电杆架设装置 | |
| CN117868453A (zh) | 一种用于超高层核心筒斜墙施工的挂架系统 | |
| JP6668676B2 (ja) | 重量物建込装置 | |
| CN217324939U (zh) | 拱肋安装系统 | |
| CN111472526A (zh) | 一种岩壁加固悬空操作平台 | |
| CN107055367A (zh) | 内爬塔机的中央顶升系统 | |
| CN214834613U (zh) | 一种伸缩式电梯井道操作平台 | |
| CN109356616A (zh) | 下沉式隧道顶板模板台车装置 | |
| CN207960496U (zh) | 便于安装钻具的自起吊式卧式钻机 | |
| CN113464166B (zh) | 一种基于多模板式二衬台车的隧道二衬连续施工工艺 | |
| CN217582149U (zh) | 一种无骨架衬砌台车 | |
| CN205077486U (zh) | 一种桩架 | |
| CN110258629B (zh) | 预制构件的拼装设备及其拼装方法 | |
| CN209308697U (zh) | 下沉式隧道顶板模板台车装置 | |
| CN209837748U (zh) | 一种顶撑式防护架 | |
| WO2023178638A1 (zh) | 一种桩架 | |
| CN209780229U (zh) | 一种集成塔吊的顶升平台系统 | |
| CN105064396B (zh) | 一种大体积混凝土移动升降式施工平台 | |
| CN215256222U (zh) | 一种用于隧道施工的多模板式二衬台车 |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| A201 | Request for examination | ||
| PA0105 | International application |
St.27 status event code: A-0-1-A10-A15-nap-PA0105 |
|
| PA0201 | Request for examination |
St.27 status event code: A-1-2-D10-D11-exm-PA0201 |
|
| PG1501 | Laying open of application |
St.27 status event code: A-1-1-Q10-Q12-nap-PG1501 |
|
| E701 | Decision to grant or registration of patent right | ||
| PE0701 | Decision of registration |
St.27 status event code: A-1-2-D10-D22-exm-PE0701 |
|
| GRNT | Written decision to grant | ||
| PR0701 | Registration of establishment |
St.27 status event code: A-2-4-F10-F11-exm-PR0701 |
|
| PR1002 | Payment of registration fee |
St.27 status event code: A-2-2-U10-U12-oth-PR1002 Fee payment year number: 1 |
|
| PG1601 | Publication of registration |
St.27 status event code: A-4-4-Q10-Q13-nap-PG1601 |
|
| R18-X000 | Changes to party contact information recorded |
St.27 status event code: A-5-5-R10-R18-oth-X000 |
|
| FPAY | Annual fee payment |
Payment date: 20221004 Year of fee payment: 4 |
|
| PR1001 | Payment of annual fee |
St.27 status event code: A-4-4-U10-U11-oth-PR1001 Fee payment year number: 4 |
|
| R18-X000 | Changes to party contact information recorded |
St.27 status event code: A-5-5-R10-R18-oth-X000 |
|
| PR1001 | Payment of annual fee |
St.27 status event code: A-4-4-U10-U11-oth-PR1001 Fee payment year number: 5 |
|
| PR1001 | Payment of annual fee |
St.27 status event code: A-4-4-U10-U11-oth-PR1001 Fee payment year number: 6 |
|
| PR1001 | Payment of annual fee |
St.27 status event code: A-4-4-U10-U11-oth-PR1001 Fee payment year number: 7 |
|
| U11 | Full renewal or maintenance fee paid |
Free format text: ST27 STATUS EVENT CODE: A-4-4-U10-U11-OTH-PR1001 (AS PROVIDED BY THE NATIONAL OFFICE) Year of fee payment: 7 |