KR101886661B1 - Steel Aqueduct and Construction Methods thereof - Google Patents

Steel Aqueduct and Construction Methods thereof Download PDF

Info

Publication number
KR101886661B1
KR101886661B1 KR1020180015767A KR20180015767A KR101886661B1 KR 101886661 B1 KR101886661 B1 KR 101886661B1 KR 1020180015767 A KR1020180015767 A KR 1020180015767A KR 20180015767 A KR20180015767 A KR 20180015767A KR 101886661 B1 KR101886661 B1 KR 101886661B1
Authority
KR
South Korea
Prior art keywords
side plate
plate
steel
water channel
main body
Prior art date
Application number
KR1020180015767A
Other languages
Korean (ko)
Inventor
정계연
Original Assignee
대영스틸산업주식회사
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 대영스틸산업주식회사 filed Critical 대영스틸산업주식회사
Priority to KR1020180015767A priority Critical patent/KR101886661B1/en
Application granted granted Critical
Publication of KR101886661B1 publication Critical patent/KR101886661B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B5/00Artificial water canals, e.g. irrigation canals
    • E02B5/08Details, e.g. gates, screens
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B5/00Artificial water canals, e.g. irrigation canals
    • E02B5/02Making or lining canals

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Sewage (AREA)

Abstract

The present invention relates to a steel channel, comprising: a water channel main body (100) including a bottom plate (101) of a flat plate shape, a first side plate (102) standing upright on both side surfaces of the bottom plate and a second side plate (103); a first stiffener (200) formed on an outer side of a cross section of the water channel main body and formed in plural; a second stiffener (300) formed on the outer surface of the water channel main body and formed in the longitudinal direction and formed in a plural; a coating layer (400) formed on the inner surface of the water channel main body (100); and an upper bracket (500) coupled between the first side plate and the second side plate, formed in plural, and arranged at uniform and/or nonuniform intervals.

Description

강재 수로 및 이를 이용한 시공방법 {Steel Aqueduct and Construction Methods thereof}Technical Field [0001] The present invention relates to a steel water channel,

본 발명은 강재 수로 및 이를 이용한 시공방법에 관한 기술이다. The present invention relates to a steel material channel and a construction method using the same.

특허문헌 001은 본 발명은 U형의 내측면과, 상기 내측면과 일정 간격을 두고 구비되며 간헐적으로 시멘트 몰탈 투입구가 관통 형성되는 U형의 외측면과, 상기 외측면에 소정 간격을 두고 나선권회되며 내측면 방향으로 소정의 깊이만큼 절곡되는 요홈구를 형성하되, 상기 요홈구는 간헐적으로 내측면에 접합점에 의해 접합하여 천공구를 천공하여, PE 유공나선관의 나선권회하여 구성된 내측면과 외측면 사이의 내부공간에서 길이방향 및 원주방향으로 관통구간을 제공하며, 용도의 다양화를 유도하기 위하여 길이방향으로 2등분으로 절개시켜서 형성된 일정 간격인 내,외측면 사이의 투입구로 시멘트 몰탈을 투입시키며, 보온용 및 시멘트 몰탈과 같은 이형 복합 제품의 도로 공사용 U형 배수로관을 제공하고자 하는 것이다.Patent Literature 001 discloses a U-shaped outer surface which has an inner surface of a U-shape, a U-shaped outer surface provided at a certain distance from the inner surface and intermittently penetrating the cement mortar input port, Wherein the recessed portions are intermittently joined to the inner side by joining points to form an inner side surface formed by spirally winding the PE pierced spiral tube, The cement mortar is inserted into the gap between the inner and outer sides of the inner space between the inner and outer sides formed by cutting the cement mortar into two equal parts in the longitudinal direction in order to diversify the applications. And a U-shaped drainage pipe for road construction of a mold release composite product such as a heat insulation and cement mortar.

특허문헌 002는 본 발명은 수로교를 구성함에 수로관, 수로관설치대, 상기 수로관과 수로관설치대를 지지하는 교각 및 지반에 매설되는 매설부로 구성되며, 상기 매설부는 형강파일로서 교각의 하부지지대에 볼트 등의 고정부재로 고정되어 일부가 지반에 매설됨으로 수로교가 단단하게 고정되고, 상기 교각은 상부지지대, 하부지지대와 상기 상/하부지지대 사이에 형성된 수직지지대로 구성되고, 상기 수직지지대는 이단분리가 가능하게 이루어져 시공 및 유지보수 시 용이하게 상/하부지지대를 탈부착 할 수 있으며, 상기 교각의 상부지지대의 상측면에는 수로관설치대의 하측면에 형성된 삽입홈에 끼움되는 가동플랜지 및 고정플랜지가 설치되며, 상기 수로관은 양측단부에 수로관 이음장치가 삽설되는 안착부가 형성되어 수로관의 연속적인 연결이 용이하며 견고하게 연결할 수 있어 수로관을 통해 흐르는 용수의 누수를 방지하게 되어, 상기 수로교 시공 시에 더욱 빠르고 쉽게 작업할 수 있을 뿐만 아니라 보강ㆍ보수 시에도 빠르고 쉽게 작업할 수 있으며, 수로교의 시공 뿐만 아니라 이를 유지하기 위한 보수/보강 시에도 부분적인 분리가 용이하도록 상기 수로교를 수로관, 수로관설치대, 상기 수로관과 수로관 설치대를 지지하는 교각 및 지반에 매설되는 매설부로 구성하여, 각 부분을 먼저 제작하고 이를 다시 설치할 장소로 운반하여 결합함으로 각 부분을 제작할 때 외부환경의 영향을 크게 받지 않아 공사시간을 정확하게 예상할 수 있게 된다. 또한, 장기간 설치에 따른 내구성 저하 및 급격한 기후/기온변화에 의한 구조물의 변형에 대한 보수/보강 시에 필요한 부분만을 따로 교체 또는 분리 하여 보수/보강 작업을 할 수 있으므로 작업시간을 단축할 수 있을 뿐만 아니라, 작업비용 또한 감소시킬 수 있는 수로교 시공 및 보수/보강 시 용이하게 작업을 수행할 수 있게 하는 탈부착이 용이한 조립식 수로교 구조를 제공하는 것이다. Patent Document 002 discloses a construction of a waterway bridge in which a waterway pipe, a waterway pipe mounting block, a pier supporting the waterway pipe and the waterway pipe mounting block, and a buried portion buried in the ground are fixed, And a vertical support formed between the upper and lower supports and the upper and lower supports, the vertical support being capable of being separated from the upper and lower supports, A movable flange and a fixing flange are provided on the upper side of the upper support of the bridge pier to be inserted into an insertion groove formed in a lower side of the water pipe installation base, At the ends of the two sides, there is formed a seating part in which the pipe fitting is inserted, It can be easily and firmly connected to prevent water leakage through the water pipe. Thus, it is possible to work more quickly and easily at the time of constructing the waterway bridge, and it is possible to work quickly and easily at the time of reinforcement and repair. In order to facilitate partial separation during maintenance / reinforcement, the water canal is constructed of a water pipe, a water pipe installation block, a bridge supporting the water pipe and the water pipe installation block, and a buried part buried in the ground. It is possible to accurately estimate the construction time because it is not influenced greatly by the external environment when each part is manufactured by transporting it to the installation place. In addition, since it is possible to repair / reinforce work by replacing or separating only necessary parts in maintenance / reinforcement of deformation of structure due to deterioration of durability due to long-term installation and sudden change of climate / temperature, work time can be shortened It is another object of the present invention to provide a prefabricated hanging bridge structure which is easy to attach and detach, which enables easy operation during construction and repair / reinforcement of a waterway bridge capable of reducing work costs.

특허문헌 003은 개거수로는 외측면에 부벽이 형성된 경사진 부벽측벽부 및 상기 부벽측벽부 하부에 일체로 형성된 수평판 형태의 저판부를 포함하여 형성되는 것으로서, 저판부들의 내측 연결측면부가 수평으로 연결되어 내부공간 하부가 상부보다 작은 횡방향 폭을 가지는 사다리꼴 단면으로 형성되는 분절된 양 개거수로 세그먼트 및 상기 부벽의 하부와 서로 수평으로 연결된 저판부를 횡방향으로 관통하는 정착홀에 삽입되어 양 단부가 부벽 측면에 긴장 후 정착되어 분절된 양 개거수로 세그먼트가 서로 횡방향으로 압착되어 연결되도록 설치되는 긴장재를 포함하여, 프리캐스트 방식으로 개거수로를 시공함에 있어 프리캐스트 방식의 장점을 그대로 살리면서도 경제적인 개거수로 시공이 가능한 것이다.Patent Document 003 is formed to include an inclined wall side wall portion having a side wall on an outer side surface and a bottom plate portion in the form of a horizontal plate integrally formed under the side wall portion of the side wall, And a lower plate portion horizontally connected to the lower portion of the sub-wall, the lower plate portion being inserted into a fixing hole passing through in a transverse direction, And a tension member which is installed so that the segments are squeezed and connected to each other in a transverse direction by two pieces of segregated seats which are fixed after the tension on the side wall of the submerged wall to allow the advantage of the precast method But it is possible to construct it as an economic dog.

특허문헌 004는 변형 방지 조립식 수로관에 관한 것으로, 상부에 내측 길이방향으로 연장 형성시킨 배력빔을 포함하며, 수지재의 U자 형태로 형성되는 수로관 본체와, 수로관 본체의 외측 하단 길이방향으로 결합홈을 갖도록 형성된 결합구와, 결합홈에 결합되는 결합돌기를 갖도록 길이방향 수평으로 구비되는 저판과, 저판의 외측 끝단에 수직으로 연장 형성되는 뒤판과, 수로관 본체의 외측에 T자 홈을 갖도록 복수개가 형성되는 제 1 고정구와, 제 1 고정구에 대응하는 위치의 저판의 상부에 T자 홈을 갖도록 복수개가 형성되는 제 2 고정구와, 제 2 고정구에 대응하는 위치의 뒤판의 내측면에 T자 홈을 갖도록 복수개가 형성되는 제 3 고정구와, 제 1 고정구, 제 2 고정구 및 제 3 고정구에 결합되도록 측면과 하부면이 T자 형태로 복수개가 구비되는 날개벽을 포함하며, 수로관 본체를 양측에서 지지하는 지지부를 포함하여, U자형 수로관 본체 상부에 내측 길이방향으로 배력빔을 연장 형성하고, 수로관 본체의 외측 측면에 저판, 뒤판 및 날개벽을 포함하는 지지부를 이용하여 수로관 본체를 지지함으로써, 수로관의 변형을 방지할 수 있는 변형 방지 조립식 수로관을 제공하는 것이다.Patent Literature 004 relates to a deformation-preventing prefabricated water pipe, which comprises a water pipe main body formed in a U-shape of a resin material and including an expansion beam formed in an upper portion thereof in an inner longitudinal direction, A bottom plate horizontally provided in the longitudinal direction so as to have a coupling protrusion coupled to the coupling groove, a back plate extending perpendicularly to the outer end of the bottom plate, and a plurality of T- A plurality of second fixtures each having a T-shaped groove formed in an upper portion of a bottom plate at a position corresponding to the first fixture, and a plurality of second fixtures each having a T-shaped groove at an inner surface of a back plate at a position corresponding to the second fixture And a third fixing member having a plurality of side surfaces and a lower surface in a T-shape so as to be coupled to the first fixing member, the second fixing member and the third fixing member, And a supporting portion for supporting the main body of the water pipe from both sides and extending in an inner longitudinal direction on the upper side of the U-shaped channel body, and a support portion including a bottom plate, a back plate and a wing wall on the outer side surface of the main body And to provide a deformation-preventing prefabricated water pipe capable of preventing deformation of the water pipe by supporting the water pipe main body.

KR 10-0421462 (2004년03월18일)KR 10-0421462 (March 18, 2004) KR 10-0697331 (2007년03월26일)KR 10-0697331 (March 26, 2007) KR 10-1301073 (2013년08월29일)KR 10-1301073 (August 29, 2013) KR 10-2015-0001401 (2015년01월06일)KR 10-2015-0001401 (Jan 06, 2015)

본 발명은 현재 시공되어진 수로의 경우 시공년도가 30년전 시공되어 노후화는 물론 곳곳에 생긴 균열현상으로 인한 누수현상이 발생되어 농어촌 물공급에 불편을 줄 뿐만 아니라, 자칫 붕괴 우려감이 있는 실정이며, 기존 구조물의 시공 형태가 콘크리트 방식의 수로로 농어촌 경관을 해치고 있는 상태이며, 지역별로 민원제기 등에 있어도 해결되지 못하고 있으며, 이에 대체가 가능한 농어촌에 어울려 친환경적인 수로 개발이 필요한 실정이다.In the case of the presently-constructed waterway, the construction year is constructed 30 years ago, and water leakage due to the cracking phenomenon occurring not only in the aging but also in the places is caused, causing inconvenience to the supply of water for farming and fishing villages, The construction type of the structure is hurting the scenery of farming and fishing villages with the concrete type water channel. It is not solved even in the case of complaints by region, and it is necessary to develop eco - friendly waterway in accordance with the alternative farming and fishing village.

콘크리트 수로의 경우 투박한 크기와 지간 구성이 작아 기둥이 많으며 5년마다 안전진단 후 보수공사가 잦아 보수비용 또한 증가되고 있다. 2000년대에 접어들면서 국민소득 증가, 삶의 질 향상, 농어촌 주민 의식 개선 등으로 시골 농촌의 새로운 수리 시설물 중 경관이 고려 되어야할 수로 구조물이 필요한 상태로 친환경적이며 환경 개선형 수로 개발이 필요한 상태이다. 따라서 본 발명은 이를 충족하고자 강재 구조물을 활용하여 경관성 및 장경간이 가능하며, 급속시공이 가능하고, 기존 누수 문제 등을 해결할 수 있는 새로운 강재 수로 및 이를 이용한 시공방법를 제안하는 것을 목적으로 한다. Concrete channel has a small size and small struc- ture, and there are many pillars. After 5-year safety inspection, repair work is frequent and maintenance cost is also increasing. In the 2000s, as a result of increasing national income, improving quality of life, and improving residents' awareness of farming and fishing villages, it is necessary to develop eco-friendly and environmentally friendly water supply systems in a situation where landscaping should be considered among new repair facilities in rural areas. Therefore, it is an object of the present invention to propose a new steel material channel which can be made into a landscape and a long diameter by utilizing a steel structure, capable of rapid construction, and can solve the existing leakage problem, and a construction method using the same.

본 발명은 강재수로에 대한 발명으로서, 강재로 형성되며, 평판형상의 바닥판(101), 상기 바닥판 양측면에 직립되는 제1측판(102) 및 제2측판(103)으로 이루어진 수로본체(100);, 상기 수로본체 단면외측에 형성되며, 복수로 형성되는 제1보강재(200);, 상기 수로본체 외측면에 형성되며, 길이방향으로 형성되며, 복수로 형성되는 제2보강재(300);, 수로 본체(100) 내면에 형성되는 코팅층(400);, 제1측판 및 제2측판 사이에 결합되며, 복수로 형성되며, 균일 및/또는 불균일 간격으로 배치되는 상부브라켓(500);으로 형성된다. The present invention relates to a waterway furnace, which comprises a water channel body (100) formed of a steel material and having a flat plate-like bottom plate (101), a first side plate (102) standing upright on both side surfaces of the bottom plate and a second side plate A second stiffener 300 formed on the outer surface of the water channel main body and formed in a plurality of lengths, the second stiffener 300 being formed on the outer surface of the water channel main body; A coating layer 400 formed on the inner surface of the water channel body 100, an upper bracket 500 coupled between the first side plate and the second side plate and formed in a plurality of units and arranged at uniform and / or nonuniform intervals; do.

본 발명은 강재수로에 대한 발명으로서, 앞에서 제시한 발명의 제1보강재는 상기 제1측판 및 제2측판에 형성되는 제1측면보강재(210);, 상기 바닥판에 형성되는 제1바닥보강재(220);를 포함한다. The first reinforcing member of the present invention includes a first side stiffener (210) formed on the first side plate and a second side plate, a first bottom stiffener (210) formed on the bottom plate, 220).

본 발명은 강재수로에 대한 발명으로서, 앞에서 제시한 발명의 제2보강재는 절곡된 판재로 형성되며, 일측이 제1측판 및 제2측판에 결합되는 것을 포함한다. The present invention relates to a steel watercraft, wherein the second reinforcing member of the present invention is formed of a bent plate member and includes one side joined to the first side plate and the second side plate.

본 발명은 강재수로에 대한 발명으로서, 앞에서 제시한 수로본체는 상기 제1측판 및 제2측판 상부에 형성되며, 중앙부가 만곡된 아치부(104);를 포함한다. According to the present invention, there is provided a steel water channel, wherein the water channel body described above is formed on the first side plate and the second side plate and includes an arch portion (104) having a curved central portion.

본 발명은 강재수로에 대한 발명으로서, 앞에서 제시한 발명에 수로본체(100) 양단에 형성되며, 상기 바닥판, 제1측판 및 제2측판에 부착되는 제1플랜지(110);를 포함한다. The present invention relates to a steel waterway, and includes a first flange (110) formed at both ends of a main body (100) of a water channel and attached to the bottom plate, the first side plate, and the second side plate.

본 발명은 강재수로에 대한 발명으로서, 앞에서 제시한 발명에 상기 수로본체(100) 하부에 형성되며, 길이방향으로 형성되며, 복수로 형성되는 강성보강판(130);을 포함한다. The present invention relates to a steel waterway, and includes a steel sheet 130 formed in a lower portion of the waterway main body 100 and formed in a longitudinal direction and formed in a plurality of shapes as described above.

본 발명은 강재수로에 대한 발명으로서, 앞에서 제시한 발명에 있어서, 상기 수로본체 하부에 형성되며, 베어링이 삽입된 신축부(600);를 포함한다. According to the present invention, there is provided a steel waterway, comprising the elastic part (600) formed in the lower part of the waterway body and having a bearing inserted therein.

본 발명은 강재수로에 대한 발명으로서, 앞에서 제시한 발명에 있어서, 제1측판 및 제2측판 상부에 형성되며, 판재형상으로 형성된 제2플랜지(120);를 포함한다. According to the present invention, the present invention is a steel water furnace, which includes the second flange (120) formed on the first side plate and the second side plate and formed in a plate shape.

본 발명은 강재수로 시공방법에 대한 발명으로서, 앞에서 제시한 강재수로를 제작하는 제작단계(S100);, 강재수로 설치장소의 터파기 및 기둥부를 시공하는 토목기초단계(S200);, 상기 토목기초단계 후, 강재수로를 기둥부에 안착하며, 조립하는 현장조립단계(S300);, 상기 현장조립단계 중 발판을 설치하는 발판가설단계(S500);, 상기 발판가설단계 후, 난간을 설치하는 난간설치단계(S600);를 포함하는 시계열적 단계로 이루어진다. The present invention relates to a method of constructing a steel waterworks, comprising: a manufacturing step (S100) of manufacturing a steel waterway as described above; a civil engineering foundation step (S200) of constructing a trencher and a column of a steel water installation site; (S500) for installing a foot plate during the field assembling step (S500); a step for railing the railing of the railing And an installation step (S600).

본 발명의 강재수로 시공방법은 앞에서 제시한 시공방법에 있어서, 상기 토목기초단계(S200)는 기둥부 시공시, 교좌받침 시공을 하는 교좌받침 시공 단계(S210)를 포함한다. In the construction method of the present invention, in the above-mentioned construction method, the civil engineering foundation step (S200) includes a step of constructing a counter support structure (S210).

본 발명은 콘크리트로 형성된 수로의 제조비용 증가, 이송 및 설치의 어려움, 누수, 내부 박피의 문제점을 해소하고, 콘크리트 수로의 철근을 설치하여 외부를 보강하는 등으로 인한 비용 증가 및 시공의 어려움을 해소하기 위해 강재로 형성한 수로에 관한 것으로, 상대적으로 가벼운 강재를 사용하여 이송 및 설치 등의 시공이 용이하고, 또한 보수가 용이하며, 각종 보강재에 의해 변형을 방지할 수 있으며, 지점부의 롤 베이링을 이용하여 온도차에 따른 신축을 허용할 수 있다. 또한 공장에서 강재수로를 제조한 후, 현장에서 시공하므로 급속시공이 가능한 효과가 있다. The present invention eliminates the problems of increase in manufacturing cost of a waterway formed of concrete, difficulty of transportation and installation, problems of leakage and internal peeling, and elimination of difficulties of increase in cost and construction due to reinforcement of concrete by installing reinforcing bars of concrete channel The present invention relates to a water channel formed of a steel material in order to facilitate the construction such as conveyance and installation by using a relatively light steel material and to easily repair it and to prevent deformation by various stiffeners, It is possible to allow the expansion and contraction according to the temperature difference. In addition, it is possible to construct rapidly after constructing a steel waterway in a factory and then constructing it in the field.

도 1은 종래기술의 콘크리트 수로 누수 발생 사례
도 2는 종래기술의 콘크리트 수로 하자 보수 사례
도 3은 본 발명의 강재수로의 사시도
도 4는 본 발명의 강재수로의 부분 사시도.
도 5는 본 발명의 강재수로 단면도
도 6은 본 발명의 발판 및 안전난간 실시예
도 7은 본 발명의 강재 수로의 측면도(아치형)
도 8은 본 발명의 신축부 실시예
Fig. 1 is a view showing a case
Fig. 2 is a schematic view showing a conventional concrete water-
Fig. 3 is a perspective view of the steel water according to the present invention
4 is a partial perspective view of the steel water according to the present invention.
Fig. 5 is a cross-
Figure 6 is a side view of the foot and safety rail embodiments of the present invention
7 is a side view (arcuate) view of a steel material channel of the present invention;
FIG. 8 is a cross-

이하, 본 발명이 속하는 기술분야에서 통상의 지식을 가진 자가 본 발명을 용이하게 실시할 수 있을 정도로 상세히 설명하기 위하여, 본 발명의 가장 바람직한 실시 예를 상세하게 설명한다.DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS Hereinafter, preferred embodiments of the present invention will be described in detail with reference to the accompanying drawings.

[실시예 1-1] 본 발명은 강재수로에 대한 발명으로서, 강재로 형성되며, 평판형상의 바닥판(101), 상기 바닥판 양측면에 직립되는 제1측판(102) 및 제2측판(103)으로 이루어진 수로본체(100);를 포함하는 구성으로 이루어진다. [Embodiment 1-1] The present invention relates to a steel waterway, which comprises a bottom plate 101 of a flat plate shape, a first side plate 102 standing upright on both side surfaces of the bottom plate and a second side plate 103 And a water channel main body 100 made of a water pipe.

본 발명은 강재 수로는 바닥판, 제1측판 및 제2측판의 조합에 의해

Figure 112018014109187-pat00001
형태의 형상을 형성한다. 상부에 개방부를 형성하여 수로를 형성하며, 측면과 하부면은 밀폐된 판재를 형성한다. 이는 콘크리트 수로의 단점을 보완하기 위한 것으로, 강재를 수로에 적용시, 공장제조후 현장제조를 가능하게 하므로 급속시공이 가능하며, 제조비용이 낮아지며, 이송 및 설치 등 시공이 간편하며, 보수가 용이하며, 경제성이 우수하다.According to the present invention, a steel material channel is formed by a combination of a bottom plate, a first side plate and a second side plate
Figure 112018014109187-pat00001
Shape. An opening is formed in the upper part to form a channel, and the side surface and the lower surface form a closed plate material. This is to compensate for the shortcomings of concrete waterway. When steel material is applied to a waterway, it can be manufactured on site after the factory is manufactured, so rapid construction is possible, manufacturing cost is lowered, construction of transportation and installation is simple, It is economical.

[실시예 1-2] 본 발명은 강재수로에 대한 발명으로서, 실시예 1-1에 있어서, 상기 수로본체 단면외측에 형성되며, 복수로 형성되는 제1보강재(200);, 상기 수로본체 외측면에 형성되며, 길이방향으로 형성되며, 복수로 형성되는 제2보강재(300);로 형성된다. [Example 1-2] The present invention is an invention relating to a steel water reactor, which comprises: a first reinforcing member (200) formed on the outside of the end face of the body of the water channel and formed in plural, And a second stiffener 300 formed on the side surface and formed in a plurality of lengthwise directions.

상기 제1보강재 및 제2보강재는 수로본체외부에 붙여지는 보강판재를 구성하며, 이는 얇은 두께로 형성된 수로본체 강성을 증대시킨다. 따라서 안전성을 확보할 수 있다. The first reinforcing member and the second reinforcing member constitute a reinforcing plate bonded to the outside of the water channel main body, which increases the rigidity of the water channel body formed to have a thin thickness. Therefore, safety can be secured.

[실시예 1-3] 본 발명은 강재수로에 대한 발명으로서, 실시예 1-1에 있어서, 수로 본체(100) 내면에 형성되는 코팅층(400);을 포함한다.[Examples 1-3] The present invention relates to a steel water furnace, and includes a coating layer (400) formed on the inner surface of a water channel main body (100) in Example 1-1.

수로본체 내부에는 방수 코팅제가 도포된 코팅층을 형성한다. 코팅제는 강재수로 내부에 도포되어 방수기능을 하며, 또한 상기 코팅제는 부식 방지제가 함께 도포되거나, 방수와 부식을 동시에 방지하는 방수부식 코팅제가 적용될 수 있다. A coating layer coated with a waterproof coating agent is formed inside the water channel body. The coating agent may be coated with a water-proofing agent to provide a waterproof function, and the coating agent may be coated with a corrosion-inhibiting agent or a water-repellent corrosion-inhibiting coating agent to prevent water and corrosion at the same time.

[실시예 1-4] 본 발명은 강재수로에 대한 발명으로서, 실시예 1-1에 있어서, 제1측판 및 제2측판 사이에 결합되며, 복수로 형성되며, 균일 및/또는 불균일 간격으로 배치되는 상부브라켓(500);을 포함하는 구성으로 이루어진다. [Example 1-4] The present invention is an invention relating to a steel water furnace, and it is an object of the present invention, in Embodiment 1-1, to be combined with a first side plate and a second side plate, and formed in plural and arranged at uniform and / And an upper bracket (500).

강재수로 내부에 물이 채워지는 경우, 물의 압력은 제1측판 및 제2측판에 작용되며, 물의 압력은 제1측판 및 제2측판의 변형을 발생시킨다. 상기 제1, 2측판은 개방면에서 많은 변형이 유발된다. 이를 방지하기 위해 상기 개방면에 일정한 간격으로 상부브라켓을 장착하며, 이는 개방면의 변형을 방지할 수 있다. When the water is filled with the steel water, the pressure of the water acts on the first side plate and the second side plate, and the pressure of the water causes deformation of the first side plate and the second side plate. The first and second side plates are deformed in many directions on the open side. In order to prevent this, the upper bracket is mounted on the opening face at regular intervals, which can prevent deformation of the opening face.

상기 상부브라켓을 안착시키기 위해 제1측판 및 제2측판에는 돌출된 지지플랜지(501)를 형성한다. 상기 제1플랜지 및 상부브라켓은 체결수단으로 체결된다. 상기 체결수단은 볼트 및 너트를 채용하며, 이와 균등한 대상이 치환되어 적용될 수 있다. A protruding support flange (501) is formed on the first side plate and the second side plate to seat the upper bracket. The first flange and the upper bracket are fastened by fastening means. The fastening means employs bolts and nuts, and equivalents of the fastening means can be applied.

[실시예 2-1] 본 발명의 강재수로는 실시예 1-1에 있어서, 상기 제1보강재는 상기 제1측판 및 제2측판에 형성되는 제1측면보강재(210);, 상기 제1보강재 바닥판에 형성되는 제1바닥보강재(220);를 포함한다.[Example 2-1] A steel material according to Example 1-1 of the present invention is the one in Example 1-1, wherein the first reinforcing material is a first side reinforcing material 210 formed on the first side plate and the second side plate; And a first bottom stiffener 220 formed on the bottom plate.

상기 제1측판보강재(210) 및 제1바닥보강재(220)는 일체 또는 분리되어 수로본체와 접합되며, 제1측판보강재 양측은 중앙보다 돌출되며, 제1바닥보강재 양측은 중앙보다 돌출되며, 제1측판보강재 및 제1바닥보강재 양측은 라운드 형상 또는 모따기 형상으로 형성된다. The first side plate stiffener 210 and the first bottom floor stiffener 220 are integrally or separately joined to the water channel main body. Both side portions of the first side plate stiffener are protruded from the center. Both sides of the first bottom stiffener are protruded from the center, Both the side plate stiffener and the first bottom stiffener are formed in a round shape or a chamfer shape.

제1측판 및 제2측판의 하부는 많은 수압이 작용하므로 상부보다 변형이 크게 발생된다. 이를 방지하기 위해 제1측면보강재의 하부는 중앙보다 돌출되며, 돌출된 보강판에 의해 높은 수압을 효과적으로 저지할 수 있다. 상기 라운드 형상 및 모따기 형상은 제1측면보강재(210)와 제1바닥판보강재(220)의 접경 지역에 대해 저항성을 향상시키며, 보강력을 높이기 위함이다.The lower portions of the first side plate and the second side plate are deformed more than the upper portion due to a large hydraulic pressure. In order to prevent this, the lower portion of the first side reinforcing member is protruded from the center, and the protruding reinforcing plate can effectively block the high water pressure. The round shape and the chamfer shape are designed to improve the resistance to the bordering area between the first side plate stiffener 210 and the first bottom plate stiffener 220 and to increase the stiffness.

[실시예 3-1] 본 발명의 강재수로는 실시예 1-1에 있어서, 상기 제2보강재는 절곡된 판재로 형성되며, 일측이 제1측판 및 제2측판에 결합되는 것을 포함한다.[Example 3-1] A steel material according to Example 1-1 of the present invention comprises the reinforcing member formed of a bent plate member and having one side joined to the first side plate and the second side plate.

상기 제2보강재(300)는 바닥판과 평행하며, 제1측판과 제2측판 외측으로 각각 돌출 형성되는 수평부와 수평부 끝에서 수평부의 수직 하방향으로 절곡 형성되는 수직부를 포함한다. 수평부 및 수직부의 이중형상은 변형저항성을 향상시킬 수 있으며, 표준강재형상을 사용하므로 경제성을 확보할 수 있다. 제2 보강재(300)는 제1측판과 제2측판에 각각 3개 내지 5개가 구비되는 것이 바람직하며, 강재수로의 크기에 따라 수치범위를 변경하여 실시할 수 있다. 또한, ㄱ자 형상 외에도 판재형상, 박스형상 원관형상의 보강재가 치환되어 사용될 수 있다. The second stiffener 300 includes a horizontal portion that is parallel to the bottom plate and protrudes from the first side plate and the second side plate, and a vertical portion that is bent in the vertical downward direction of the horizontal portion at the end of the horizontal portion. The dual shape of the horizontal part and the vertical part can improve the deformation resistance and the economical efficiency can be secured by using the standard steel material shape. It is preferable that three or five second stiffeners 300 are provided on each of the first side plate and the second side plate, and the numerical range may be changed according to the size of the steel material. Further, in addition to the L-shape, a plate material and a box-like pipe-like stiffener may be substituted.

[실시예 4-1] 본 발명의 강재수로는 실시예 1-1에 있어서, 상기 제1측판 및 제2측판 상부에 형성되며, 중앙부가 만곡된 아치부(104);를 포함한다. [Example 4-1] A steel water furnace according to the present invention includes the arch portion 104 formed on the first side plate and the second side plate and having a curved central portion in Example 1-1.

제1측판 및 제2측판 상부 중간부는 아치형상을 취한다. 이는 미적 효과를 발휘함과 동시에 굽힘저항을 높이는 변형저항성을 향상시킬 수 있다. The intermediate portions of the first side plate and the second side plate take an arch shape. This can enhance the aesthetic effect and the deformation resistance which increases the bending resistance.

하나의 강재수로가 아치부를 형성할 수 있으며, 복수의 강재수로가 하나의 아치형상을 형성할 수 있다.One steel waterway can form an arch part, and a plurality of steel waterways can form one arch shape.

[실시예 5-1] 본 발명의 강재수로는 실시예 1-1에 있어서, 수로본체(100) 양단에 형성되며, 상기 바닥판, 제1측판 및 제2측판에 부착되는 제1플랜지(110);를 포함한다.[Example 5-1] A steel water furnace according to the present invention was manufactured in the same manner as in Example 1-1 except that the first flange 110 (first flange) formed on both ends of the water channel main body 100 and attached to the bottom plate, ).

강재수로는 복수개를 일열로 결합한다. 결합을 위해, 각각의 강재수로들은 양단에 제1플랜지를 형성한다. 상기 제1플랜지는 바닥판, 제1측판, 제2측판에 형성되며, 대응되는 강재수로의 제1플랜지와 결합된다. 제1플랜지와 제1플랜지 면은 기밀성 확보를 위해 기밀수단을 결합한다. 상기 기밀수단은 가스켓, 고무판 등이 사용되며, 이와 균등한 목적과 효과를 발휘하는 대상으로 치환되어 사용될 수 있다. 제1플랜지와 제1플랜지는 체결구를 형성하며, 상기 체결구는 체결수단으로 결합된다. 상기 체결수단은 볼트 및 너트를 사용할 수 있으며, 이와 균등한 목적과 효과를 발휘하는 대상으로 결합될 수 있다. A plurality of pieces of steel are combined in a row. For engagement, each steel water channel forms a first flange at both ends. The first flange is formed on the bottom plate, the first side plate, the second side plate, and is engaged with the first flange of the corresponding steel number. The first flange and the first flange surface join the airtight means to ensure airtightness. The hermetic means may be a gasket, a rubber plate, or the like, and may be used as a substitute for an object having the same purpose and effect. The first flange and the first flange form a fastener, and the fastener is fastened by fastening means. The fastening means may be a bolt and a nut, and may be combined with an object having the same purpose and effect.

[실시예 6-1] 본 발명의 강재수로는 실시예 1-1에 있어서, 상기 수로본체(100) 하부에 형성되며, 길이방향으로 형성되며, 복수로 형성되는 강성보강판(130);을 포함한다. [Example 6-1] A steel water according to the present invention includes, in Example 1-1, a rigid steel plate 130 formed in a lower portion of the water channel main body 100 and formed in a longitudinal direction and formed in a plurality of do.

수로본체 길이방향 중 정모멘트를 받는 정모멘트부에는 바닥판 양측면에 정모멘트부 강성보강판(130)을 구비한다. The bottom portion of the bottom portion of the main body portion receiving the longitudinal grooves in the longitudinal direction of the main body of the watercraft is provided with a longitudinally-facing portion rigid steel plate 130.

[실시예 7-1] 본 발명의 강재수로는 실시예 1-1에 있어서, 상기 수로본체 하부에 형성되며, 베어링이 삽입된 신축부(600);를 포함한다.[Example 7-1] A steel water according to the present invention includes, in Example 1-1, a stretchable portion 600 formed in the lower portion of the water channel main body and having a bearing inserted therein.

복수의 수로본체가 결합된 수로는 기둥에 안착된다. 기둥과 수로 사이에는 신축부를 형성하며, 상기 신축부는 수로 신축을 허용한다. 상기 신축부는 베어링을 장착한다. A channel in which a plurality of water channel bodies are combined is seated on the column. A stretchable portion is formed between the column and the water channel, and the stretchable and contractible portion is allowed to extend and contract in the water channel. The stretchable and contractible portion mounts the bearing.

상기 베어링은 하부에 롤지지대(610)를 형성하며, 상기 롤지지대에는 복수의 롤러(620)를 안착하며, 수로본체와 롤러 사이에는 이탈방지장치(631)가 형성된 슬라이딩받침대(630)를 형성한다. The bearing has a lower roller support 610 on which a plurality of rollers 620 are mounted and a sliding pedestal 630 having a separation preventing device 631 formed between the roller body and the rollers .

[실시예 8-1] 본 발명의 강재수로는 실시예 1-1에 있어서, 제1측판 및 제2측판 상부에 형성되며, 판재형상으로 형성된 제2플랜지(120);를 포함한다. [Example 8-1] The steel water according to Example 1-1 of the present invention includes a second flange 120 formed on the first side plate and the second side plate and formed in a plate shape.

제1측판과 제2측판 상부 외측에는 돌출 형성되는 제2플랜지를 형성한다. 상기 제2플랜지는 강재수로 중앙부변형을 차단하는 효과를 가진다. And a second flange protruding from the upper side of the first side plate and the upper side of the second side plate is formed. The second flange has the effect of blocking the central deformation by the number of steel.

[실시예 8-2] 본 발명의 강재수로는 실시예 8-1에 있어서, 판재형상이며, 상기 제2플랜지에 안착되는 발판(710)을 형성하며, 상기 제2플랜지에 형성되는 안전난간(720)을 포함한다. [Example 8-2] A steel water according to example 8-1 of the present invention was formed into a plate shape and formed with a foot plate 710 to be seated on the second flange, and a safety guardrail (not shown) formed on the second flange 720).

발판은 수로본체에 가설치되며, 시공 및 점검시 사용된다. 또한 시공 및 점검후에 제거 가능하다. 따라서 탈착 가능하게 형성된다. 시공 후 발판을 통해 사람의 이동을 가능하게 한다. 안전난간(900)은 작업자의 추락을 방지하기 위한 것이며, 제2프랜지에 착탈 가능하다. Scaffolds are installed on the main body of the waterway and are used for construction and inspection. It can also be removed after construction and inspection. So that it is detachably formed. After construction, it enables people to move through the footing. The safety guardrail 900 is provided to prevent an operator from falling, and is removably attachable to the second flange.

[실시예 9-1] 본 발명의 강재수로 시공방법은 청구항 1 내지 8중 어느 하나의 강재수로를 제작하는 제작단계(S100);, 강재수로 설치장소의 터파기 및 기둥부를 시공하는 토목기초단계(S200);, 상기 토목기초단계 후, 강재수로를 기둥부에 안착하며, 조립하는 현장조립단계(S300);, 상기 현장조립단계 중 발판을 설치하는 발판가설단계(S500);, 상기 발판가설단계 후, 난간을 설치하는 난간설치단계(S600);를 포함하는 시계열적 단계로 이루어진다. [Example 9-1] A method of constructing steel water according to the present invention comprises: a manufacturing step (S100) of manufacturing a steel waterway as set forth in any one of claims 1 to 8; a step of constructing a trencher (S200); a field assembling step (S300) of mounting and assembling a steel water channel to the column after the civil engineering foundation step; a stepping step (S500) of installing a stepping board during the field assembling step; (S600) for installing a handrail after the step S600.

[실시예 10-1] 본 발명의 강재수로 시공방법은 실시예 9-1에 있어서, 상기 토목 기초 단계(S200)는 기둥부 시공시, 교좌받침 시공을 하는 교좌받침 시공 단계(S210)을 포함하는 것을 포함한다. [Example 10-1] The steel waterproofing method of the present invention is the method of Example 9-1, wherein the civil engineering foundation step (S200) includes a step of constructing a counter support structure (S210) .

100 : 수로본체 101 : 바닥판
102 : 제1측판 103 : 제2측판
104 : 아치부 110 : 제1플랜지
120 : 제2플랜지 130 : 강성보강판
200 : 제1보강재 210 : 제1측면보강재
220 : 제1바닥보강재 300 : 제2보강재
400 : 코팅층 500 : 상부브라켓
501 : 지지플랜지 600 : 신축부
610 : 롤지지대 620 : 롤러
630 : 슬라이딩받침대 631 : 이탈방지장치
710 : 발판 720 : 안전난간
100: channel body 101: bottom plate
102: first side plate 103: second side plate
104: Arch portion 110: 1st flange
120: second flange 130: steel plate with rigidity
200: first stiffener 210: first side stiffener
220: first bottom stiffener 300: second stiffener
400: Coating layer 500: Upper bracket
501: support flange 600: stretchable portion
610: Roll support 620: Rollers
630: Sliding pedestal 631:
710: Scaffolding 720: Safety railings

Claims (10)

강재 수로에 있어서,
강재로 형성되며, 평판형상의 바닥판(101), 상기 바닥판 양측면에 직립되는 제1측판(102) 및 제2측판(103)으로 이루어진 수로본체(100);,
상기 수로본체 단면외측에 형성되며, 복수로 형성되는 제1보강재(200);,
상기 수로본체 외측면에 형성되며, 길이방향으로 형성되며, 복수로 형성되는 제2보강재(300);,
수로 본체(100) 내면에 형성되는 코팅층(400);,
제1측판 및 제2측판 사이에 결합되며, 복수로 형성되며, 균일 및/또는 불균일 간격으로 배치되는 상부브라켓(500);,
상기 수로본체 하부에 형성되며, 베어링이 삽입된 신축부(400);,
상기 베어링은 하부에 롤지지대(610)를 형성하며, 상기 롤지지대에는 복수의 롤러(620)를 안착하며, 수로본체와 롤러 사이에는 이탈방지장치(631)가 형성된 슬라이딩받침대(630);,
상기 제2보강재는 절곡된 판재로 형성되며, 일측이 제1측판 및 제2측판에 결합되는 것;을 포함하는 강재수로.
In the steel channel,
A water channel main body 100 made of a steel material and composed of a flat plate-like bottom plate 101, a first side plate 102 standing upright on both side surfaces of the bottom plate and a second side plate 103;
A first stiffener (200) formed on the outside of the end surface of the water channel body and formed in a plurality of;
A second stiffener 300 formed on the outer surface of the water channel main body and formed in a plurality of longitudinal stiffeners 300;
A coating layer 400 formed on the inner surface of the water channel body 100;
An upper bracket 500 coupled between the first side plate and the second side plate, the upper bracket 500 being formed in plural and arranged at uniform and / or non-uniform intervals;
A stretchable portion 400 formed at the bottom of the water channel main body and having a bearing inserted therein;
A sliding base 630 having a plurality of rollers 620 mounted on the roll support and having a separation preventing device 631 formed between the main body and the rollers;
And the second reinforcing member is formed of a bent plate member, and one side of the second reinforcing member is coupled to the first side plate and the second side plate.
청구항 1에 있어서,
상기 제1보강재는 상기 제1측판 및 제2측판에 형성되는 제1측면보강재(210);,
상기 바닥판에 형성되는 제1바닥보강재(220);를 포함하는 강재수로.
The method according to claim 1,
The first stiffener includes a first side stiffener 210 formed on the first side plate and the second side plate;
And a first bottom stiffener (220) formed on the bottom plate.
삭제delete 청구항 1에 있어서,
상기 제1측판 및 제2측판 상부에 형성되며, 중앙부가 만곡된 아치부(104);를 포함하는 강재수로.
The method according to claim 1,
And an arch portion (104) formed on the first side plate and the second side plate and having a curved central portion.
청구항 1에 있어서,
수로본체(100) 양단에 형성되며, 상기 바닥판, 제1측판 및 제2측판에 부착되는 제1플랜지(110);를 포함하는 강재수로.
The method according to claim 1,
And a first flange (110) formed at both ends of the water channel body (100) and attached to the bottom plate, the first side plate, and the second side plate.
청구항 1에 있어서,
상기 수로본체(100) 하부에 형성되며, 길이방향으로 형성되며, 복수로 형성되는 강성보강판(130);을 포함하는 강재수로.
The method according to claim 1,
And a rigid steel plate (130) formed at a lower portion of the water channel main body (100) and formed in a longitudinal direction and formed in plural.
삭제delete 청구항 1에 있어서,
제1측판 및 제2측판 상부에 형성되며, 판재형상으로 형성된 제2플랜지(120);를 포함하는 강재수로.
The method according to claim 1,
And a second flange (120) formed on the first side plate and the second side plate and formed in a plate shape.
강재수로 시공방법에 있어서,
청구항 1, 2, 4, 5, 6 또는 8중 어느 하나의 강재수로를 제작하는 제작단계(S100);,
강재수로 설치장소의 터파기 및 기둥부를 시공하는 토목기초단계(S200);,
상기 토목기초단계 후, 강재수로를 기둥부에 안착하며, 조립하는 현장조립단계(S300);,
상기 현장조립단계 중 발판을 설치하는 발판가설단계(S500);,
상기 발판가설단계 후, 난간을 설치하는 난간설치단계(S600);,
를 포함하는 강재 수로 시공 방법.
In the construction method using steel water,
(S100) for manufacturing a steel waterway according to any one of claims 1, 2, 4, 5, 6 and 8;
A civil engineering foundation step (S200) for constructing a trench and a pillar of the installation site with steel water;
A field assembling step (S300) in which the steel water channel is seated and assembled into the column portion after the civil engineering foundation step;
Step S500 of setting a footstep during the field assembly step (S500);
A parapet installation step (S600) for installing a parapet after the parapet installation step;
Wherein said method comprises the steps of:
청구항 9에 있어서,
상기 토목 기초 단계(S200)는 기둥부 시공시, 교좌받침 시공을 하는 교좌받침 시공 단계(S210)을 포함하는 것을 특징으로 하는 강재 수로 시공 방법.
The method of claim 9,
Wherein the civil engineering foundation step (S200) includes a step (S210) of constructing a concrete supporting structure for constructing a concrete supporting structure at the time of constructing the column portion.
KR1020180015767A 2018-02-08 2018-02-08 Steel Aqueduct and Construction Methods thereof KR101886661B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020180015767A KR101886661B1 (en) 2018-02-08 2018-02-08 Steel Aqueduct and Construction Methods thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020180015767A KR101886661B1 (en) 2018-02-08 2018-02-08 Steel Aqueduct and Construction Methods thereof

Publications (1)

Publication Number Publication Date
KR101886661B1 true KR101886661B1 (en) 2018-08-08

Family

ID=63230183

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020180015767A KR101886661B1 (en) 2018-02-08 2018-02-08 Steel Aqueduct and Construction Methods thereof

Country Status (1)

Country Link
KR (1) KR101886661B1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109112951A (en) * 2018-10-11 2019-01-01 中铁六局集团广州工程有限公司 Open cut of crossing the river is leaked water apparatus and system
KR20220128877A (en) * 2021-03-15 2022-09-22 김병남 Drainage device for agricultural levee

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR0182245B1 (en) * 1996-07-25 1999-04-01 이근희 Structure of water pipe for preventing from leaking
KR100421462B1 (en) 2003-03-04 2004-03-18 (주)아이티 distributing pipe
KR100697331B1 (en) 2006-07-10 2007-03-26 (주)영광산업개발 The assembly type structure of aqueduct bridges
KR101237708B1 (en) * 2012-12-18 2013-02-27 (주)에이치엔피테크 Aqueduct and installation methods thereof
KR20130041528A (en) * 2011-10-17 2013-04-25 강원대학교산학협력단 Construction method of open conduit for aqueduct bridges
KR101265582B1 (en) * 2012-01-20 2013-05-22 이예순 A structure for drainage
KR101301073B1 (en) 2013-03-15 2013-08-29 안창일 Precast waterway pipe with buttress using tendon and the construction method therefor
KR20150001401A (en) 2013-06-27 2015-01-06 조춘호 Prefabricated water channel for protecting modification
KR101634589B1 (en) * 2016-01-26 2016-07-08 주식회사 홍지 Composite girder with variable under casing concrete and the construction method therefor

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR0182245B1 (en) * 1996-07-25 1999-04-01 이근희 Structure of water pipe for preventing from leaking
KR100421462B1 (en) 2003-03-04 2004-03-18 (주)아이티 distributing pipe
KR100697331B1 (en) 2006-07-10 2007-03-26 (주)영광산업개발 The assembly type structure of aqueduct bridges
KR20130041528A (en) * 2011-10-17 2013-04-25 강원대학교산학협력단 Construction method of open conduit for aqueduct bridges
KR101265582B1 (en) * 2012-01-20 2013-05-22 이예순 A structure for drainage
KR101237708B1 (en) * 2012-12-18 2013-02-27 (주)에이치엔피테크 Aqueduct and installation methods thereof
KR101301073B1 (en) 2013-03-15 2013-08-29 안창일 Precast waterway pipe with buttress using tendon and the construction method therefor
KR20150001401A (en) 2013-06-27 2015-01-06 조춘호 Prefabricated water channel for protecting modification
KR101634589B1 (en) * 2016-01-26 2016-07-08 주식회사 홍지 Composite girder with variable under casing concrete and the construction method therefor

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109112951A (en) * 2018-10-11 2019-01-01 中铁六局集团广州工程有限公司 Open cut of crossing the river is leaked water apparatus and system
KR20220128877A (en) * 2021-03-15 2022-09-22 김병남 Drainage device for agricultural levee
KR102472627B1 (en) * 2021-03-15 2022-11-29 김병남 Drainage device for agricultural levee

Similar Documents

Publication Publication Date Title
KR101886661B1 (en) Steel Aqueduct and Construction Methods thereof
KR101588593B1 (en) Temporary bridge construction method
KR100549691B1 (en) A steel- concrete composite lining system for road tunnel and construction method
US11987938B2 (en) Drainage device and methods for constructing and use
KR101108650B1 (en) Manhole for water valve a prefabricated in the field
CN211421178U (en) Prefabricated platform structure of assembled subway station
KR101491450B1 (en) Manhole cover for adjusting height
KR101457373B1 (en) Duplex type subsurface construction using precast members
KR101490756B1 (en) Prefabricated wall frame unit and prefabricated wall frame using the same
KR101806326B1 (en) Prefabricated precast concrete culvert with integral anchor embedded
KR101739126B1 (en) Method for Forming Top-down-typed Underground Strucutre
KR101624864B1 (en) An up-and-down joint construction device for concrete Structure
CN110469026B (en) Waterproof structure for constructional engineering and installation method
CN215715783U (en) Integrated waterproof bottom plate
CN111749403A (en) Drainage ditch and deformation joint combined structure and construction method thereof
CN214739575U (en) Netted drainage structures and ground drainage system and floor structure
CN221345677U (en) Novel waterproof reinforced concrete underground well
KR101984238B1 (en) Construction method of slide steel structure for connection of culverts for prevention of urban flooding
CN117738238B (en) Prefabricated assembled utility tunnel
CN109760178A (en) The production method of assembled integral floor
CN216108347U (en) Prefabricated assembled ditch
CN220666460U (en) Assembled ditch
CN216074993U (en) Double-bin prefabricated assembly type ditch
CN115288298B (en) Assembled steel structure building
KR101984237B1 (en) Slide steel structure for connection of culverts for prevention of urban flooding

Legal Events

Date Code Title Description
E701 Decision to grant or registration of patent right
GRNT Written decision to grant