South Korea
Prior art keywords
manhole
water pipe
manhole body
support plate
connection flange
Prior art date
Application number
KR1020110046318A
Other languages
Korean (ko)
Inventor
정철회
신병윤
Original Assignee
신병윤
주식회사 신평주철
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Family has litigation
First worldwide family litigation filed litigation Critical https://patents.darts-ip.com/?family=45614646&utm_source=google_patent&utm_medium=platform_link&utm_campaign=public_patent_search&patent=KR101108650(B1) "Global patent litigation dataset” by Darts-ip is licensed under a Creative Commons Attribution 4.0 International License.
Application filed by 신병윤, 주식회사 신평주철 filed Critical 신병윤
Priority to KR1020110046318A priority Critical patent/KR101108650B1/en
Application granted granted Critical
Publication of KR101108650B1 publication Critical patent/KR101108650B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/12Manhole shafts; Other inspection or access chambers; Accessories therefor
    • E02D29/121Manhole shafts; Other inspection or access chambers; Accessories therefor characterised by the connection between shaft elements, e.g. of rings forming said shaft
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2200/00Geometrical or physical properties
    • E02D2200/16Shapes
    • E02D2200/1607Shapes round, e.g. circle
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2450/00Gaskets
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2600/00Miscellaneous
    • E02D2600/20Miscellaneous comprising details of connection between elements

Abstract

PURPOSE: An assemblable manhole for a water valve is provided to prevent damage even if load is applied to a water pipe, since flexibility required when the water pipe fixed and supported on a pipe support plate makes vertical movement is ensured. CONSTITUTION: An assemblable manhole for a water valve comprises a lower manhole body(10), a central manhole body(20), an upper manhole body, a first support plate(40), a second support plate(50), and a fastening member. The lower manhole body comprises a lower guide plate(14) and a lower moving groove. The central manhole body is assembled to the upper end of the lower manhole body, and comprises an upper guide plate(24), an upper moving groove(25), and a pipe moving path. The upper manhole body is assembled to the upper end of the central manhole body.

Description

현장조립식 제수변용 맨홀{Manhole for water valve a prefabricated in the field}Manhole for water valve a prefabricated in the field}

본 발명은 현장 조립방식으로 제수변 맨홀을 간편 시공함은 물론 높낮이를 자유롭게 조절하면서 지면의 높이에 알맞도록 맞춤 시공하며, 상기 제수변용 맨홀에 설치되는 상수관에 하중이 작용하더라도 파손됨을 효율적으로 방지하고자 하는 기술에 관한 것이다. The present invention is to easily install the distillation side manhole in the field assembly method as well as to adjust the height freely to fit the height of the ground, to effectively prevent damage even if the load acts on the water pipe installed in the distillation manhole It is about technology to do.

일반적으로 제수변은 지하에 매설된 상수도관의 일정구간마다 설치하는 상수도 배관 개폐밸브로서, 상기 상수도관의 교환이나 수리와 같은 유지 보수를 원활하게 하기 위해 설치되며, 이와 같은 제수변은 지상에서 밸브를 개폐할 수 있도록 통상 지하에 매설되는 제수변용 맨홀의 내부에 설치된다.In general, a distillation valve is a water supply pipe on / off valve installed at a predetermined section of a water supply pipe buried underground, and is installed to facilitate maintenance such as replacement or repair of the water supply pipe. It is usually installed inside the distillation manhole buried underground.

현재 널리 사용되는 제수변용 맨홀의 시공 방법은 현장타설 콘크리트 맨홀이 가장 많이 활용되고 있으나, 현장타설 콘크리트 맨홀의 단점인 공사기간의 장기화, 공사비의 증가, 교통체증의 유발, 시공품질의 저하, 기능공 확보의 어려움, 민원의 증가, 완전한 누수 차단의 어려움, 높이 조절의 어려움 등으로 인해 그 사용을 점차 기피하고 있는 실정이다.The most commonly used construction method for water-saving manholes is the site-cast concrete manhole, but the shortcomings of the site-cast concrete manhole are prolonged construction periods, increased construction costs, traffic congestion, deterioration of construction quality, and securing skilled workers. Difficulty in using it due to difficulties in the public, increase in complaints, difficulty in preventing complete leakage, and difficulty in adjusting height.

이에 대한 대안으로 공장에서 조립식으로 타설시킨 콘크리트나 합성수지 구조물을 이용하여 맨홀을 제작하고 있는 추세이며, 이는 공기의 단축, 제품의 표준화 등으로 공사의 편리성을 향상하는 효과를 제공한다.As an alternative to this, manholes are manufactured using prefabricated concrete or synthetic resin structures. This provides the effect of improving construction convenience by shortening air and standardizing products.

그러나 공장에서 제작한 맨홀을 현장에서 시공할 때 터파기한 주변을 되메우면서 다짐작업을 하는 과정이나, 또는 시공 후 지반이 침하하는 경우 상기 제수변용 맨홀을 관통하여 고정상태로 설치된 상수관은 큰 하중을 받게 되어 휘어지거나 파손되는 일이 빈번하게 발생하는 문제점이 야기된다.However, when the manhole manufactured in the factory is installed in the field, the water pipe is installed in a fixed state through the distillation manhole when the ground is submerged, or when the ground subsides after construction. Receives a problem that causes frequent occurrence of bending or breakage.

아울러 종래의 제수변용 맨홀은 미처 높이조절 기능이 구비되지 않아 상기 제수변용 맨홀의 상단에 설치되는 철개를 지면과 수평상으로 위치하도록 맞춤 시공하는 작업이 매우 어려우며, 이에 따른 많은 시간과 인력이 소요되어 공사기간이 지연됨은 물론 시공비가 높아지는 폐단이 있다.In addition, since the conventional water-repellent manhole is not equipped with a height adjustment function, it is very difficult to fit and install the iron installed at the top of the water-repellent manhole horizontally with the ground, thus requiring a lot of time and manpower. Not only is the construction period delayed, but the construction cost increases.

본 발명은 종래의 기술에 따른 제수변용 맨홀이 내포하고 있는 제반 문제점을 감안하여 이를 적극적으로 해소하기 위한 것으로, 다수의 맨홀바디 및 상수관 지지판을 현장에서 즉석으로 조립하는 방식으로 완성된 제수변용 맨홀을 간편 설치할 수 있도록 하고, 상기 상수관 지지판에 고정지지된 상수관의 상하 이동에 따른 유연성을 확보하여 상기 상수관에 하중이 작용하더라도 파손됨을 방지하도록 함을 발명의 해결과제로 한다.The present invention is to actively solve the problem in consideration of the problems contained in the conventional manhole for the water-contained water, the manure for the water-filled manhole is completed by the method of assembling a number of manhole body and water pipe support plate on the spot immediately In order to simplify the installation, and to ensure the flexibility of the vertical movement of the water pipe fixed to the support pipe support plate to prevent damage even if the load acts on the water pipe to be a problem of the invention.

또한, 본 발명은 상부 맨홀바디의 외측에 끼워진 철개 받침을 상하로 슬라이딩 위치 이동하면서 높낮이를 자유롭게 조절하여 맨홀의 시공성을 획기적으로 개선할 수 있도록 함을 발명의 해결과제로 한다.In addition, the present invention is to solve the problem that the construction of the manhole can be significantly improved by freely adjusting the height while the sliding support is moved up and down the retractor inserted to the outside of the upper manhole body.

본 발명은 상기한 과제를 해결하기 위한 수단으로 하부 맨홀바디의 상단에 중앙 맨홀바디를 일체로 조립 설치하고, 상기 중앙 맨홀바디의 상단에는 상부 맨홀바디를 일체로 조립 설치하는 한편, 상기 하부 맨홀바디의 양측에는 지지판 하부이동홈을 형성하고, 상기 중앙 맨홀바디의 양측에는 지지판 상부이동홈을 형성하되 상기 지지판 상부이동홈의 하측에는 상수관 이동통로를 형성하며, 상기 지지판 상부이동홈 및 지지판 하부이동홈에는 각각 반원형의 상수관 통공이 형성된 상수관 상부지지판 및 상수관 하부지지판을 각각 삽입 설치하고, 상기 상수관 상부지지판 및 상수관 하부지지판을 체결부재를 이용하여 일체화 연결조립하는 기술을 강구한다.The present invention provides a means for solving the above problems, the central manhole body is integrally installed on the upper end of the lower manhole body, and the upper manhole body is integrally assembled and installed on the upper end of the central manhole body, the lower manhole body A support plate lower movement groove is formed on both sides of the support plate, and a support plate upper movement groove is formed on both sides of the central manhole body, but a water pipe movement passage is formed on the lower side of the support plate upper movement groove, and the support plate upper movement groove and the support plate lower movement. The groove is inserted into the water pipe upper support plate and the water pipe lower support plate, each of which is formed with a semicircular water pipe through-hole, respectively, and devises a technique for integrally connecting and assembling the water pipe upper support plate and the water pipe lower support plate by using a fastening member.

또한, 본 발명은 상기 상부 맨홀바디의 외측에 철개 받침을 상하로 이동가능하게 끼움 설치하고, 상기 철개 받침의 외측에는 높낮이조절 나사축을 고정 설치하며, 상기 높낮이조절 나사축은 상부 맨홀바디 및 중앙 맨홀바디에 각각 형성된 연결플랜지를 동시에 관통하여 설치하되 상기 높낮이조절 나사축에는 상부 맨홀바디및 중앙 맨홀바디의 연결플랜지에 밀착되는 높이조절 너트를 나사결합하는 기술을 강구한다.In addition, the present invention is installed on the outer side of the upper manhole body to be installed to move the up and down pedestal up and down, fixed to the height adjustment screw shaft on the outside of the pedestal, the height adjustment screw shaft is the upper manhole body and the center manhole body The connecting flanges respectively formed at the same time to be installed through, but the height adjustment screw shaft is devised a technique for screwing the height adjustment nut in close contact with the connection flange of the upper manhole body and the central manhole body.

본 발명에 따르면, 현장에서 즉석으로 제수변용 맨홀을 간편하게 조립 시공함으로써 맨홀 시공에 따른 시간과 인력을 대폭 감축할 수 있어 공기단축 및 시공비를 획기적으로 절감할 수 있는 효과를 제공한다.According to the present invention, it is possible to drastically reduce the time and manpower according to the construction of the manhole by simply assembling and constructing the dilution manhole on the spot immediately, it provides an effect that can significantly reduce the air shortening and construction costs.

또한, 상기 제수변용 맨홀에 고정지지된 상수관은 상하로 자유롭게 위치 이동할 수 있는 유연성을 확보함에 따라 현장시공과정에서 다짐작업을 하거나, 또는 시공 후 지반이 침하하면서 하중을 받게 되더라도 휘어짐, 전단, 파손됨을 방지하여 고품질의 시공이 가능한 효과를 제공한다.In addition, the water pipe fixed to the water-reducing manhole secures flexibility to move freely up and down, thereby compacting in the field construction process, or bending, shearing, or damage even when the ground is submerged after construction. It is possible to prevent high quality and provide high quality construction.

또한, 상기 제수변용 맨홀의 상단에 설치되는 철개 받침은 높낮이를 자유롭게 조절 가능함으로써 상기 철개 받침의 높낮이를 간편하게 조절하면서 더욱 편리하게 지면의 높이에 알맞도록 제수변용 맨홀을 맞춤 시공할 수 있는 효과를 제공한다.In addition, the reinforcement is installed on the top of the mandibular manhole for the height can be freely adjusted to provide an effect that can be easily adjusted to suit the height of the ground to adjust the height of the reinforcement support to suit the height of the ground do.

도 1은 본 발명이 적용된 제수변용 맨홀의 분해사시도
도 2는 본 발명 제수변용 맨홀의 사시도
도 3은 본 발명 제수변용 맨홀의 일부절결 정단면도
도 4는 본 발명 도 3의 A-A선 단면도
도 5는 본 발명 제수변용 맨홀의 측면도
도 6은 본 발명에 따른 상수관의 설치상태 확대단면도
도 7은 본 발명의 맨홀 높낮이조절장치에 따른 철개 받침의 높낮이 조절상태도
Figure 1 is an exploded perspective view of a manhole for the water side to which the present invention is applied
Figure 2 is a perspective view of the present invention manhole
Figure 3 is a partial cutaway front cross-sectional view of the manhole for the water confinement of the present invention
4 is a cross-sectional view taken along the line AA of the present invention Figure 3
Figure 5 is a side view of the present invention manhole
6 is an enlarged cross-sectional view of the installation state of the water pipe according to the present invention;
Figure 7 is a height adjustment state diagram of the pedestal according to the manhole height adjustment device of the present invention

본 발명이 해결하고자 하는 과제의 해결수단을 보다 구체적으로 구현하기 위한 바람직한 실시 예에 대하여 설명하기로 한다.Preferred embodiments of the present invention will now be described in more detail with reference to the accompanying drawings.

본 발명의 바람직한 실시 예에 따른 전체적인 기술구성을 첨부된 도면에 의거 개략적으로 살펴보면, 양 측면(13)에 하부이동 가이드판(14)이 이격 설치되어 상기 하부이동 가이드판(14) 및 측면(13) 사이에 지지판 하부이동홈(15)이 형성된 하부 맨홀바디(10)와; 상기 하부 맨홀바디(10)의 상단에 조립설치되고, 양 측면(23)에는 상부이동 가이드판(24)이 이격 설치되어 상기 상부이동 가이드판(24) 및 측면(23) 사이에 지지판 상부이동홈(25)이 형성되며, 상기 상부이동 가이드판(24) 및 측면(23)의 하측에 상수관 이동통로(26)가 관통형성된 중앙 맨홀바디(20)와; 상기 중앙 맨홀바디(20)의 상단에 조립설치된 상부 맨홀바디(30)와; 상기 지지판 상부이동홈(25)에 끼워지고, 하단에 반원형의 상수관 통공(41)이 형성된 상수관 상부지지판(40)과; 상기 지지판 하부이동홈(15)에 끼워지고, 상단에 반원형의 상수관 통공(51)이 형성된 상수관 하부지지판(50)과; 상기 상수관 상부지지판(40) 및 상수관 하부지지판(50)의 외면에 각각 고정부착된 연결너트(61)에 나사결합된 체결부재(60)의 유기적인 결합구성으로 이루어짐을 알 수 있다.Looking at the overall technical configuration according to the accompanying drawings in accordance with a preferred embodiment of the present invention, the lower guide plate 14 is installed on both sides 13 spaced apart from the lower guide plate 14 and the side 13 A lower manhole body 10 having a support plate lower movable groove 15 formed therebetween; Assembled and installed on the upper end of the lower manhole body 10, the upper side guide plate 24 is installed on both sides 23 spaced apart between the upper plate guide plate 24 and the upper movable guide plate 24 A center manhole body 20 having a water pipe moving passage 26 formed therethrough at a lower side of the upper moving guide plate 24 and the side surface 23; An upper manhole body 30 assembled to an upper end of the central manhole body 20; A water pipe upper support plate 40 fitted into the support plate upper moving groove 25 and having a semicircular water pipe opening 41 formed at a lower end thereof; A water pipe lower support plate 50 fitted into the support plate lower movable groove 15 and having a semicircular water pipe hole 51 formed at an upper end thereof; It can be seen that the organic coupling configuration of the fastening member 60 screwed to the connection nut 61 fixedly attached to the outer surface of the water pipe upper support plate 40 and the water pipe lower support plate 50, respectively.

이하, 상기 개략적인 구성으로 이루어진 본 발명을 실시 용이하도록 좀더 상세하게 설명하기로 한다.Hereinafter, the present invention having the above-described schematic configuration will be described in more detail for facilitating the implementation.

우선적으로 본 발명의 하부 맨홀바디(10)는 상부가 개방되고, 하단부에 바닥판(11)이 막음 설치되며, 전후면 상단 둘레에는 상기 중앙 맨홀바디(20)와 일체화 연결조립하기 위한 제1 연결플랜지(12)가 형성되고, 양 측면(13)에는 전후 양측이 상기 하부 맨홀바디(10)의 전후면에 각각 부착된 하부이동 가이드판(14)이 이격상태로 설치됨으로써 상기 하부이동 가이드판(14)과 측면(13)의 사이에는 지지판 하부이동홈(15)이 형성될 수 있게 된다.First of all, the lower manhole body 10 of the present invention is open at the top, and the bottom plate 11 is installed at the lower end, and the first connection for integrally assembling and assembling the central manhole body 20 around the front and rear front and rear surfaces. The flange 12 is formed, and the lower side movement guide plate 14 is installed on both side surfaces 13 at the front and rear sides of the lower manhole body 10, respectively, spaced apart from each other. The support plate lower movable groove 15 may be formed between the 14 and the side surface 13.

상기 하부 맨홀바디(10)의 상단에 일체화 조립설치되는 중앙 맨홀바디(20)는 상하부가 개방되고, 전후면 하단 둘레에는 제2 연결플랜지(22)가 형성됨으로써 상기 제1, 제2 연결플랜지(12)(22)는 상호 체결구(1)로 동시에 관통하여 일체화 조립될 수 있으며, 양 측면(23)에는 전후 양측이 상기 중앙 맨홀바디(20)의 전후면에 각각 부착된 상부이동 가이드판(24)이 이격상태로 설치됨으로써 상기 상부이동 가이드판(24) 및 측면(23)의 사이에는 지지판 상부이동홈(25)이 형성될 수 있게 된다. The central manhole body 20, which is integrally assembled and installed at the upper end of the lower manhole body 10, has an upper and lower portions open, and a second connection flange 22 is formed around the bottom of the front and rear surfaces so that the first and second connection flanges ( 12 and 22 may be integrally assembled by passing through the fasteners 1 at the same time, and both side surfaces 23 may have upper and lower guide plates having front and rear sides attached to front and rear surfaces of the central manhole body 20, respectively. Since the 24 is spaced apart from each other, the support plate upper movable groove 25 may be formed between the upper guide plate 24 and the side surface 23.

이때 상기 상부이동 가이드판(24) 및 측면(23)의 하측에는 본 발명의 제수변용 맨홀(M)을 관통한 상태로 지하에 매설되는 상수관(2)이 상하로 자유롭게 이동할 수 있는 상수관 이동통로(26)가 관통 형성된다.At this time, the lower side of the upper movable guide plate 24 and the side 23 moves the constant pipe 2 which can be freely moved up and down in the water pipe 2 which is buried underground while penetrating through the dilution manhole M of the present invention. A passage 26 is formed through.

이와 같은 중앙 맨홀바디(20)의 상단 둘레에는 상부 맨홀바디(30)와 일체화 연결 조립하기 위한 제2 연결플랜지(22a)가 형성됨으로써 상기 중앙 맨홀바디(20)의 상단에 상부 맨홀바디(30)를 안착상태로 조립 설치할 수 있게 된다.The upper manhole body 30 is formed at the upper end of the central manhole body 20 by forming a second connection flange 22a for integrally connecting and assembling the upper manhole body 30 around the upper end of the central manhole body 20. It can be installed assembled in a seated state.

상기 상부 맨홀바디(30)는 상하부가 개방되고, 하단 둘레에는 상기 상부 맨홀바디(30)의 제2 연결플랜지(22a)에 안착되는 제3 연결플랜지(32)가 형성됨으로써 상기 제2, 제3 연결플랜지(22a)(32)는 체결구(1)로 동시에 관통하여 일체화 조립될 수 있으며, 상단 둘레에는 제수변 철개(3)를 안정적인 받침상태로 설치할 수 있도록 하는 받침플랜지(31)가 내향으로 일체화 절곡 형성된다.The upper manhole body 30 has upper and lower portions open, and a third connection flange 32 seated on the second connection flange 22a of the upper manhole body 30 is formed at the lower circumference of the second and third parts. The connecting flanges 22a and 32 can be integrally assembled by passing through the fasteners 1 at the same time, and the supporting flanges 31 for integrating the water-reducing pawls 3 in a stable supporting state are integrated inwardly at the upper circumference thereof. Bending is formed.

따라서, 본 발명에서는 지면으로 노출되는 제수변 철개(3)를 상기 상부 맨홀바디(30)의 상단에 직접 설치할 수 있을 뿐만 아니라 후술하는 높낮이조절 가능한 별도의 철개 받침(110)에 설치할 수도 있게 된다.Therefore, in the present invention, not only can be directly installed on the upper end of the upper manhole body 30 exposed to the water-retaining iron pawl (3) exposed to the ground can also be installed in a separate adjustable pedestal 110, which will be described later.

상기 지지판 상부이동홈(25)에는 상수관(2)의 상측을 지지하는 상수관 상부지지판(40)이 상하로 이동 자유롭게 끼워지고, 하단에는 반원형의 상수관 통공(41)이 형성되며, 이 상수관 통공(41)은 도 2와 같이 상수관 이동통로(26)와 중첩되는 위치에 형성된다.The support plate upper moving groove 25 is fitted with a water pipe upper support plate 40 for supporting the upper side of the water pipe (2) to move freely up and down, the bottom of the semi-circular water pipe through hole 41 is formed, this constant The through hole 41 is formed at a position overlapping with the constant pipe moving passage 26 as shown in FIG. 2.

상기 상수관 상부지지판(40)과 1조를 이루면서 상수관(2)을 상하로 이동 자유롭게 지지하는 상수관 하부지지판(50)은 상기 지지판 하부이동홈(15)에 상하로 이동 자유롭게 끼워지고, 상단에는 반원형의 상수관 통공(51)이 형성되며, 이 상수관 통공(51)의 경우에도 상수관 이동통로(26)와 중첩되는 위치에 형성된다.The water pipe lower support plate 50 which supports the water pipe 2 freely up and down while forming one set with the water pipe upper support plate 40 is freely fitted in the support plate lower movable groove 15 to be moved up and down freely. The semicircular water pipe through-hole 51 is formed, and in the case of the water pipe through-hole 51, it is formed in the position which overlaps with the water pipe moving path 26. As shown in FIG.

따라서, 상기 상수관 통공(41)(51)은 상호 맞대어진 상태로 상수관(2)이 통과할 수 있는 완성된 원형의 통공을 조성함으로써 상수관(2)을 파지상태로 지지할 수 있게 된다.Therefore, the water pipe through-holes 41 and 51 can support the water pipe 2 in a gripped state by forming a completed circular through hole through which the water pipe 2 can pass in a butted state. .

이때 상기 상수관 통공(41)(51)의 내주면에는 상수관(2)의 외경을 밀착상태로 감싸는 링가스켓(45)이 추가로 끼움 설치됨으로써 금속재인 상수관(2)과 상수관 통공(41)(51) 간의 마찰로 인한 마모발생을 방지함은 물론 틈새를 없애 기밀을 유지하는 효과를 제공한다.At this time, the inner circumferential surface of the water pipe through-holes 41 and 51 is additionally fitted with a ring gasket 45 covering the outer diameter of the water pipe 2 in close contact with the water pipe 2 and the water pipe through-hole 41. It prevents abrasion due to friction between the (51) as well as provides the effect of maintaining the airtight by eliminating gaps.

그리고 상기 상수관 상부지지판(40) 및 상수관 하부지지판(50)의 외면 양측에는 각각 연결너트(61)가 용접작업을 통해 일체로 고정부착되고, 상기 연결너트(61)의 사이에는 체결부재(60)가 나사 결합됨으로써 상수관 상부지지판(40) 및 상수관 하부지지판(50)은 상수관(2)을 파지한 상태로 일체성을 유지하면서도 고정된 위치를 고수하지 않고 상기 지지판 상부이동홈(25) 및 지지판 하부이동홈(15)의 내부에서 상수관(2)과 함께 상하로 자유롭게 위치 이동할 수 있게 된다.And connecting nut 61 is fixedly attached to both sides of the outer surface of the water pipe upper support plate 40 and the water pipe lower support plate 50 through a welding operation, and between the connection nut 61 fastening member ( 60 is screwed to the water pipe upper support plate 40 and the water pipe lower support plate 50 while maintaining the integrity in the state holding the water pipe (2) while holding the fixed position of the support plate upper movement groove ( 25) and the inside of the support plate lower moving groove 15 can be freely moved up and down with the water pipe 2.

이와 같이 본 발명에서 상수관(2)을 고정상태로 설치하지 않고, 상하로 자유롭게 위치 이동할 수 있도록 유연성을 확보한 이유는 현장시공과정에서 터파기한 주변을 되메우면서 다짐작업을 하는 과정이나, 또는 시공 후 지반이 침하하는 경우 상기 상수관(2)에 하중이 가해지면서 발생하는 변형, 전단, 파손을 미연에 방지하기 위함이다.As described above, the reason for securing flexibility to move freely up and down without installing the water pipe 2 in a fixed state is that the process of compacting while filling the perforated area in the field construction process, or When the ground subsides after construction, it is to prevent the deformation, shear, and breakage occurring while the load is applied to the water pipe (2).

즉 본 발명에 따르면, 상기 상수관(2)은 하중을 받게 되더라도 상하로 자유롭게 위치 이동하면서 하중을 상쇄함으로써 상수관(2)에는 실제 하중이 전달되지 않아 상수관(2)의 파손을 원천적으로 봉쇄하는 특별한 효과를 제공한다.
That is, according to the present invention, even when subjected to a load, the water pipe is freely moved up and down while offsetting the load, so that the actual load is not transmitted to the water pipe 2, so that the water pipe 2 is essentially blocked. To provide a special effect.

한편, 본 발명은 상기 상부 맨홀바디(30)의 상단에 제수변 철개(3)가 직접 설치되지 않고, 상기 상부 맨홀바디(30)의 외측에 상하로 슬라이딩 이동가능하게 끼움 설치된 철개 받침(110)의 상단에 설치될 수 있으며, 상기 철개 받침(110)의 상하 위치이동에 따라 제수변용 맨홀(M)의 높낮이를 간편하게 조절할 수 있는 맨홀 높낮이조절장치(100)가 추가로 접목된다.On the other hand, the present invention is not directly installed on the upper end of the upper manhole body (30) of the demolition valve (3) of the pedestal base 110 installed to be slidably movable up and down on the outside of the upper manhole body (30) Can be installed on the top, the manhole height adjustment device 100 that can easily adjust the height of the dividing manhole (M) according to the vertical position of the pedestal base 110 is further grafted.

상기 맨홀 높낮이조절장치(100)가 적용되는 경우에는 전자와 같이 중앙 맨홀바디(20)의 상단에 형성된 제2 연결플랜지(22a)와 상부 맨홀바디(30)에 형성된 제3 연결플랜지(32)가 상호 체결구(1)로 관통하여 일체화 조립되는 구성을 탈피하고, 별도의 높낮이조절 나사축(120)으로 관통하여 조립됨을 전제로 한다.When the manhole height adjusting device 100 is applied, the second connection flange 22a formed on the upper end of the central manhole body 20 and the third connection flange 32 formed on the upper manhole body 30 are formed as in the former. Penetrating through the mutual fastener (1) to assemble integrally assembled, it is assumed that the assembly is penetrated through a separate height adjustment screw shaft 120.

이와 같은 맨홀 높낮이조절장치(100)를 구성하는 철개 받침(110)은 상부 맨홀바디(30)의 외측에 끼움 설치될 수 있도록 상하부가 개방되고, 상하단 둘레에 각각 받침플랜지(111) 및 제4 연결플랜지(112)가 일체로 형성된다.The pedestal support 110 constituting such a manhole height adjustment device 100 is open so that the upper and lower portions can be fitted to the outside of the upper manhole body 30, the support flange 111 and the fourth connection around the upper and lower ends, respectively The flange 112 is integrally formed.

상기 제4 연결플랜지(112)에는 다수의 높낮이조절 나사축(120)이 간격을 두고 상하로 관통하여 상측이 고정설치되고, 하측은 제3 연결플랜지(32) 및 제2 연결플랜지(22a)를 동시에 관통하여 설치된다.A plurality of height adjustment screw shaft 120 penetrates up and down at intervals in the fourth connection flange 112, the upper side is fixed and installed, the lower side of the third connection flange 32 and the second connection flange 22a. It is installed through at the same time.

즉 상기 높낮이조절 나사축(120)은 상측이 제4 연결플랜지(112)를 관통한 상태에서 상부 및 중앙에 각각 한 쌍의 고정너트(122)가 나사결합되고, 이 고정너트(122)는 받침플랜지(111) 및 제4 연결플랜지(112)에 밀착됨으로써 상기 높낮이조절 나사축(120)은 견고한 고정상태를 유지할 수 있게 된다.That is, the height adjustment screw shaft 120 has a pair of fixing nuts 122 are screwed into the upper and the center, respectively, while the upper side passes through the fourth connection flange 112, the fixing nut 122 is supported By being in close contact with the flange 111 and the fourth connection flange 112, the height adjustment screw shaft 120 can maintain a firm fixed state.

그리고, 상기 높낮이조절 나사축(120)의 하측에는 다른 한 쌍의 높이조절 너트(130)가 나사결합되고, 이 높이조절 너트(130)는 제2, 제3 연결플랜지(22a)(32)에 각각 밀착됨으로써 철개 받침(110)은 상하로 이동하지 않고 고정위치를 고수할 수 있게 된다.And, a lower pair of height adjustment nuts 130 are screwed to the lower side of the height adjustment screw shaft 120, the height adjustment nut 130 to the second, third connection flanges (22a) (32) By being in close contact with each other, the pedestal support 110 can adhere to a fixed position without moving up and down.

나아가 상기 철개 받침(110)을 상하로 이동할 경우에는 상기 높이조절 너트(130)의 조임상태를 해제하고 상기 철개 받침(110)을 상하로 이동시키면 높낮이조절 나사축(120)이 동시에 함께 이동하며, 상기 철개 받침(110)이 적당한 위치에 도달하면 상기 높이조절 너트(130)를 조여주어 상기 철개 받침(110)이 상하로 이동하지 못하도록 고정상태를 유지하면 된다.In addition, when moving the pedestal 110 up and down, the height adjustment nut 130 to release the tightening state and moving the pedestal 110 up and down, the height adjustment screw shaft 120 is moved together at the same time, When the retractor 110 reaches the proper position, tighten the height adjustment nut 130 to maintain the fixed state so that the retractor 110 does not move up and down.

따라서, 상기 제수변용 맨홀(M)의 조립시공시 철개 받침(110)의 높낮이를 자유롭게 조절함으로써 더욱 편리하게 상기 철개 받침(110)의 상단에 설치되는 제수변 철개(3)를 지면의 높이에 알맞도록 맞춤 시공할 수 있는 특별한 효과를 제공한다.Therefore, by freely adjusting the height of the reinforcement support 110 during the assembly and construction of the dire manhole (M) to more conveniently fit the height of the dire valve (3) installed on the top of the reinforcement support 110 to the height of the ground. It provides a special effect that can be customized.

아울러 상기 높낮이조절 나사축(120)은 상기 받침플랜지(111)와 제4 연결플랜지(112)의 사이에 추가로 연결 설치된 사각형 보강틀(114)의 내측에 설치됨으로써 상기 받침플랜지(111)의 상단에 설치되는 제수변 철개(3)의 하중이 높낮이조절 나사축(120)에 작용함에도 상기 받침플랜지(111) 및 제4 연결플랜지(112)가 국부적으로 휘어지거나 변형됨을 효과적으로 방지할 수 있게 된다.
In addition, the height adjustment screw shaft 120 is installed inside the rectangular reinforcement frame 114 is further connected between the support flange 111 and the fourth connection flange 112, the upper end of the support flange 111 Even when the load of the dividing iron pawl (3) is installed on the height adjustment screw shaft 120, it is possible to effectively prevent the support flange 111 and the fourth connecting flange 112 is locally bent or deformed.

한편, 본 발명의 맨홀 높낮이조절장치(100)를 이용하여 제수변 철개(3)를 시공한 기존의 아스팔트 포장도로가 노후된 경우 통상 상기 노후된 아스팔트 포장도로의 표면에는 새롭게 아스콘을 2단으로 포설함으로써 기 설치된 제수변 철개(3)의 상단부보다 새롭게 포설한 아스팔트 포장도로의 표층은 상대적으로 높게 위치하게 된다.On the other hand, when the existing asphalt pavement is constructed by using the manhole height adjustment device 100 of the present invention is the old asphalt pavement (3) is usually installed on the surface of the old asphalt pavement by newly installed ascon two stages The surface layer of the newly paved asphalt pavement is located relatively higher than the upper end of the dividing bilge 3.

따라서, 이러한 경우 기 설치된 제수변 철개(3)의 주변을 터파기한 후 맨홀 높낮이조절장치(100)를 이용하여 새롭게 포설할 아스팔트 포장도로의 표층과 상기 제수변 철개(3)의 높이가 상호 일치하도록 상기 제수변 철개(3)를 상부로 인상하는 간단한 방법으로 새로운 아스팔트 포장도로를 더욱 편리하게 유지, 보수할 수 있는 편의성을 제공한다.Therefore, in this case, after breaking the periphery of the already installed dikes 3, the surface of the asphalt pavement to be newly installed using the manhole height adjustment device 100 and the dikes side so that the height of the dikes 3 to be mutually coincide with each other. In a simple way to raise the tow (3) to the top provides a convenience to maintain and repair the new asphalt pavement more convenient.

M: 제수변용 맨홀 1: 체결구
2: 상수관 3: 제수변 철개
10: 하부 맨홀바디 12: 제1 연결플랜지
13, 23: 측면 14: 하부이동 가이드판
15: 지지판 하부이동홈 20: 중앙 맨홀바디
22, 22a: 제2 연결플랜지 24: 상부이동 가이드판
25: 지지판 상부이동홈 26: 상수관 이동통로
30: 상부 맨홀바디 31, 111: 받침플랜지
32: 제3 연결플랜지 40: 상수관 상부지지판
41, 51: 상수관 통 공 50: 상수관 하부지지판
60: 체결부재 61: 연결너트
100: 맨홀 높낮이조절장치 110: 철개 받침
112: 제4 연결플랜지 120: 높낮이조절 나사축
122: 고정너트 130: 높이조절 너트
M: Water Manhole 1: Fastener
2: water pipe 3: hydrostatic
10: lower manhole body 12: first connection flange
13, 23: side 14: lower moving guide plate
15: support plate lower movable groove 20: center manhole body
22, 22a: second connecting flange 24: the upper moving guide plate
25: support plate upper moving groove 26: water pipe moving passage
30: upper manhole body 31, 111: support flange
32: third connection flange 40: the upper support plate of the water pipe
41, 51: water pipe through hole 50: water pipe lower support plate
60: fastening member 61: connecting nut
100: manhole height adjustment device 110: reinforcement
112: fourth connecting flange 120: height adjustment screw shaft
122: fixing nut 130: height adjustment nut

Claims (7)

양 측면(13)에 하부이동 가이드판(14)이 이격 설치되어 상기 하부이동 가이드판(14) 및 측면(13) 사이에 지지판 하부이동홈(15)이 형성된 하부 맨홀바디(10)와;
상기 하부 맨홀바디(10)의 상단에 조립설치되고, 양 측면(23)에는 상부이동 가이드판(24)이 이격 설치되어 상기 상부이동 가이드판(24) 및 측면(23) 사이에 지지판 상부이동홈(25)이 형성되며, 상기 상부이동 가이드판(24) 및 측면(23)의 하측에 상수관 이동통로(26)가 관통형성된 중앙 맨홀바디(20)와;
상기 중앙 맨홀바디(20)의 상단에 조립설치된 상부 맨홀바디(30)와;
상기 지지판 상부이동홈(25)에 끼워지고, 하단에 반원형의 상수관 통공(41)이 형성된 상수관 상부지지판(40)과;
상기 지지판 하부이동홈(15)에 끼워지고, 상단에 반원형의 상수관 통공(51)이 형성된 상수관 하부지지판(50)과;
상기 상수관 상부지지판(40) 및 상수관 하부지지판(50)의 외면에 각각 고정부착된 연결너트(61)에 나사결합된 체결부재(60)로 이루어진 것을 특징으로 하는 현장조립식 제수변용 맨홀.
A lower manhole body 10 having a lower movable guide plate 14 spaced apart from each other at both sides 13, and having a lower movable guide plate 15 between the lower movable guide plate 14 and the side 13;
Assembled and installed on the upper end of the lower manhole body 10, the upper side guide plate 24 is installed on both sides 23 spaced apart between the upper plate guide plate 24 and the upper movable guide plate 24 A center manhole body 20 having a water pipe moving passage 26 formed therethrough at a lower side of the upper moving guide plate 24 and the side surface 23;
An upper manhole body 30 assembled to an upper end of the central manhole body 20;
A water pipe upper support plate 40 fitted into the support plate upper moving groove 25 and having a semicircular water pipe opening 41 formed at a lower end thereof;
A water pipe lower support plate 50 fitted into the support plate lower movable groove 15 and having a semicircular water pipe hole 51 formed at an upper end thereof;
On-site prefabricated water-draining manhole, characterized in that made of a fastening member 60 screwed to the connection nut 61 fixed to the outer surface of the water pipe upper support plate 40 and the water pipe lower support plate 50, respectively.
제 1항에 있어서,
상수관 통공(41)(51)은 상호 맞대어진 상태로 상수관(2)이 통과할 수 있는 완성된 원형의 통공을 이루는 것을 특징으로 하는 현장조립식 제수변용 맨홀.
The method of claim 1,
Water pipe through-hole (41) (51) is a field assembly type sewage manhole, characterized in that to form a completed circular through hole through which the water pipe (2) can pass in a mutually opposed state.
제 2항에 있어서,
상수관 통공(41)(51)의 내주면에는 상수관(2)의 외경을 밀착상태로 감싸는 링가스켓(45)이 끼움 설치된 것을 특징으로 하는 현장조립식 제수변용 맨홀.
The method of claim 2,
On-site circumferential type sewage manholes, characterized in that the ring gasket 45 is installed on the inner circumferential surface of the water pipe through-hole (41) (51) in close contact with the outer diameter of the water pipe (2).
제 1항에 있어서,
하부 맨홀바디(10)는 하단부에 바닥판(11)이 막음 설치되고, 전후면 상단 둘레에 제1 연결플랜지(12)가 형성되며, 상기 중앙 맨홀바디(20)의 전후면 하단 둘레에는 제2 연결플랜지(22)가 형성되며, 상기 제1, 제2 연결플랜지(12)(22)는 상호 체결구(1)로 동시에 관통하여 일체화 조립되는 것을 특징으로 하는 현장조립식 제수변용 맨홀.
The method of claim 1,
The lower manhole body 10 is installed by blocking the bottom plate 11 at a lower end thereof, and a first connection flange 12 is formed around the upper and rear front and rear surfaces thereof, and the second manhole body is formed around the lower front and rear surfaces of the central manhole body 20. A connection flange 22 is formed, and the first and second connection flanges 12 and 22 are on-site prefabricated water-reducing manholes, characterized in that they are integrally assembled by passing through the fasteners 1 at the same time.
제 1항에 있어서,
중앙 맨홀바디(20)의 상단 둘레에는 제2 연결플랜지(22a)가 형성되고, 상기 상부 맨홀바디(30)의 하단 둘레에는 제3 연결플랜지(32)가 형성되며, 상기 제2, 제3 연결플랜지(22a)(32)는 체결구(1)로 동시에 관통하여 일체화 조립되는 것을 특징으로 하는 현장조립식 제수변용 맨홀.
The method of claim 1,
A second connection flange 22a is formed around the upper end of the central manhole body 20, and a third connection flange 32 is formed around the lower end of the upper manhole body 30. Flange (22a) (32) is a field assembly type manipulator for manholes, characterized in that the fastener (1) at the same time and integrally assembled.
제 1항에 있어서,
중앙 맨홀바디(20)의 상단 둘레에는 제2 연결플랜지(22a)가 형성되고, 상기 상부 맨홀바디(30)의 하단 둘레에는 제3 연결플랜지(32)가 형성되며, 상기 상부 맨홀바디(30)의 외측에는 철개 받침(110)이 끼움 설치되어 상기 철개 받침(110)의 상하 위치이동에 따라 제수변용 맨홀(M)의 높낮이가 조절되는 맨홀 높낮이조절장치(100)가 추가로 구비되는 한편;
상기 맨홀 높낮이조절장치(100)는 상하단 둘레에 각각 받침플랜지(111) 및 제4 연결플랜지(112)가 형성된 철개 받침(110)과;
상기 제4 연결플랜지(112)를 상하로 관통하여 상측이 고정설치되고, 하측은 제3 연결플랜지(32) 및 제2 연결플랜지(22a)를 동시에 관통하여 설치된 높낮이조절 나사축(120)과;
상기 제2, 제3 연결플랜지(22a)(32)에 밀착된 상태로 높낮이조절 나사축(120)에 나사결합되는 높이조절 너트(130)로 이루어진 것을 특징으로 하는 현장조립식 제수변용 맨홀.
The method of claim 1,
A second connection flange 22a is formed around the top of the central manhole body 20, and a third connection flange 32 is formed around the bottom of the upper manhole body 30, and the upper manhole body 30 is formed. A manhole height adjusting device (100) is additionally provided on the outside of the manhole height adjusting device (100) which is installed to be fitted with fittings to adjust the height of the dividing manhole (M) according to the vertical position movement of the pedestal support (110);
The manhole height adjustment device 100 includes a support pedestal 110 having a support flange 111 and a fourth connection flange 112 around the upper and lower ends, respectively;
A height adjustment screw shaft 120 installed through and penetrating the fourth connection flange 112 up and down, and through the third connection flange 32 and the second connection flange 22a at the same time;
Field assembly-type water-reducing manhole, characterized in that consisting of the height adjustment nut 130 is screwed to the height adjustment screw shaft 120 in close contact with the second, third connection flanges (22a) (32).
제 6항에 있어서,
높낮이조절 나사축(120)은 상부 및 중앙에 한 쌍의 고정너트(122)가 나사결합되고, 상기 고정너트(122)는 받침플랜지(111) 및 제4 연결플랜지(112)에 밀착되면서 상기 높낮이조절 나사축(120)의 고정상태를 유지하는 것을 특징으로 하는 현장조립식 제수변용 맨홀.
The method of claim 6,
The height adjustment screw shaft 120 has a pair of fixing nuts 122 are screwed to the upper and center, the fixing nut 122 is in close contact with the support flange 111 and the fourth connection flange 112 the height On-site prefabricated water-reducing manhole, characterized in that to maintain a fixed state of the adjustment screw shaft (120).
KR1020110046318A 2011-05-17 2011-05-17 Manhole for water valve a prefabricated in the field KR101108650B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020110046318A KR101108650B1 (en) 2011-05-17 2011-05-17 Manhole for water valve a prefabricated in the field

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020110046318A KR101108650B1 (en) 2011-05-17 2011-05-17 Manhole for water valve a prefabricated in the field

Publications (1)

Publication Number Publication Date
KR101108650B1 true KR101108650B1 (en) 2012-01-31

Family

ID=45614646

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020110046318A KR101108650B1 (en) 2011-05-17 2011-05-17 Manhole for water valve a prefabricated in the field

Country Status (1)

Country Link
KR (1) KR101108650B1 (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101415096B1 (en) 2014-03-03 2014-07-04 (주)형제이형관 Manufacturing mold for prestress concrete box with valve chamber of water works
KR101522253B1 (en) * 2014-08-19 2015-05-26 주식회사 정광 Manhole for water valve with function preventing sewage influent
KR101724274B1 (en) * 2015-11-06 2017-04-07 주식회사 퍼팩트 manhole comprise changeable main-parts according to connecting pipe
KR101799828B1 (en) * 2016-03-24 2017-11-21 주식회사 정광 Manhole with flexible joint
KR20190065853A (en) 2017-12-04 2019-06-12 전정훈 Eccentricity manhole
KR102236509B1 (en) * 2020-06-08 2021-04-06 이재덕 Gradient and height adjuster of manhole cover
KR102273215B1 (en) * 2021-05-03 2021-07-05 주식회사 선도기술 Valve Room with Movable Moving Plate

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100928469B1 (en) * 2009-02-02 2009-11-25 덕성밸브 주식회사 Height conditioning of valve room
KR101017026B1 (en) * 2010-06-24 2011-02-22 삼영기술주식회사 Assembly for construction of the valve room structure to a pipe buried

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100928469B1 (en) * 2009-02-02 2009-11-25 덕성밸브 주식회사 Height conditioning of valve room
KR101017026B1 (en) * 2010-06-24 2011-02-22 삼영기술주식회사 Assembly for construction of the valve room structure to a pipe buried

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101415096B1 (en) 2014-03-03 2014-07-04 (주)형제이형관 Manufacturing mold for prestress concrete box with valve chamber of water works
KR101522253B1 (en) * 2014-08-19 2015-05-26 주식회사 정광 Manhole for water valve with function preventing sewage influent
KR101724274B1 (en) * 2015-11-06 2017-04-07 주식회사 퍼팩트 manhole comprise changeable main-parts according to connecting pipe
KR101799828B1 (en) * 2016-03-24 2017-11-21 주식회사 정광 Manhole with flexible joint
KR20190065853A (en) 2017-12-04 2019-06-12 전정훈 Eccentricity manhole
KR102236509B1 (en) * 2020-06-08 2021-04-06 이재덕 Gradient and height adjuster of manhole cover
KR102273215B1 (en) * 2021-05-03 2021-07-05 주식회사 선도기술 Valve Room with Movable Moving Plate

Similar Documents

Publication Publication Date Title
KR101108650B1 (en) Manhole for water valve a prefabricated in the field
KR100973229B1 (en) The valve room that adjustable is high easy of a manhole fram
KR101276620B1 (en) Valve room including height control and waterproof fuction
KR101017026B1 (en) Assembly for construction of the valve room structure to a pipe buried
CN106013954A (en) Construction method for combined enclosure
KR101522253B1 (en) Manhole for water valve with function preventing sewage influent
KR101491450B1 (en) Manhole cover for adjusting height
KR101839087B1 (en) Foundation pad for water tank which is easy to control the height and construction method of prefabricated water tank using the same
KR101299008B1 (en) Vertical shear connector for precast concrete bridge pier
KR20160075179A (en) Road gutter with a corrugated steel pipe
KR100967427B1 (en) Prefabricated manhole having fastening structure by coupler
KR101017030B1 (en) Method for construction of the valve room structure to a pipe buried
KR101886661B1 (en) Steel Aqueduct and Construction Methods thereof
KR100949575B1 (en) Height adjustable manhole cover device
KR101545438B1 (en) Installing drainage pipe structure of building
KR101682406B1 (en) Drainpipe construction method for bridge
US9528258B1 (en) Manhole ring support for unified concrete pours around grease interceptor
KR100616325B1 (en) Device for adjustment the hight of manhole cover
KR20190139578A (en) The Construction sleeve with adjustable ring With micro-height control and anti-rotation function
KR101361660B1 (en) Manhole assembly
KR101117774B1 (en) Basic concrete structure of valve room and valve room embedding method using the same
KR102322911B1 (en) Underground common duct using corrugated steel pipe and method of constructing the same
JP2000213026A (en) Drain pipe installation structure and work execution method therefor
KR20140136629A (en) Assembly manhole
KR100668781B1 (en) Height controller of manhole cover

Legal Events

Date Code Title Description
A201 Request for examination
A302 Request for accelerated examination
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20150112

Year of fee payment: 4

FPAY Annual fee payment

Payment date: 20160107

Year of fee payment: 5

FPAY Annual fee payment

Payment date: 20160908

Year of fee payment: 6

FPAY Annual fee payment

Payment date: 20180104

Year of fee payment: 7

FPAY Annual fee payment

Payment date: 20190114

Year of fee payment: 8

FPAY Annual fee payment

Payment date: 20200102

Year of fee payment: 9