CN109112951A - Open cut of crossing the river is leaked water apparatus and system - Google Patents

Open cut of crossing the river is leaked water apparatus and system Download PDF

Info

Publication number
CN109112951A
CN109112951A CN201811186562.4A CN201811186562A CN109112951A CN 109112951 A CN109112951 A CN 109112951A CN 201811186562 A CN201811186562 A CN 201811186562A CN 109112951 A CN109112951 A CN 109112951A
Authority
CN
China
Prior art keywords
river
steel
crossing
walked
open cut
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811186562.4A
Other languages
Chinese (zh)
Inventor
王晨
马志国
王辉
蒋伟
郑垆杰
杜哲
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangzhou Railway Group Engineering Co. Ltd.
China Railway Sixth Group Co Ltd
Original Assignee
Guangzhou Railway Group Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangzhou Railway Group Engineering Co Ltd filed Critical Guangzhou Railway Group Engineering Co Ltd
Priority to CN201811186562.4A priority Critical patent/CN109112951A/en
Publication of CN109112951A publication Critical patent/CN109112951A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D18/00Bridges specially adapted for particular applications or functions not provided for elsewhere, e.g. aqueducts, bridges for supporting pipe-lines
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B5/00Artificial water canals, e.g. irrigation canals
    • E02B5/005Canals entirely situated above ground level, e.g. on piers
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D2101/00Material constitution of bridges
    • E01D2101/30Metal

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Architecture (AREA)
  • Revetment (AREA)

Abstract

The present invention discloses one kind open cut of crossing the river and leakes water apparatus and system, is related to open-cut foundation ditch technical field of tunnel construction, to solve the technical problem that existing suction pump draws water or when reinforced concrete structure aqueduct carries out the dredging of water flow is ineffective.Water installations are walked in open cut of the present invention of crossing the river, comprising: groove body, which is connected with support construction, and the both ends of groove body are fixed in the support construction of two sides;Also, groove body uses temporary steel aqueduct.Since steel construction aqueduct is effectively reduced compared to reinforced concrete flume structure own wt, construction is more convenient;Also, related material can be attached by welding manner, and speed of application is fast, be convenient for daily maintenance, and used steel are recyclable to be recycled, to effectively reduce cost, and steel construction has certain flexibility, be more in line with the condition of construction at scene.

Description

Open cut of crossing the river is leaked water apparatus and system
Technical field
The present invention relates to open-cut foundation ditch technical field of tunnel construction, in particular to one kind open cut of crossing the river walks water installations and is System.
Background technique
With the fast development of China express railway, open-cut foundation ditch tunnel has been widely used.Open-cut foundation ditch tunnel at present The problem of wearing outdoor drainage ditch and river under open trench tunnel can be often encountered in construction, brought to constructing tunnel difficult and dangerous.
In the prior art, it wears and draws water in the construction in outdoor drainage ditch and river frequently with suction pump or reinforcing bar under open trench tunnel Concrete structure aqueduct carries out the dredging of water flow, and leat or river are often mingled with house refuse to the side for using pumping for water pump Method is very unfavorable, and water pump is unable to satisfy the flow of channel when water is big, and reinforced concrete structure is larger suitable due to own wt The construction environment small for span is unable to satisfy all condition of construction.
Therefore, how to provide a kind of reliable, at low cost, easy construction the open cut of crossing the river of effect to leak water apparatus and system, energy Enough meet construction demand, it has also become the technical issues of those skilled in the art's urgent need to resolve.
Summary of the invention
The purpose of the present invention is to provide one kind open cuts of crossing the river to leak water apparatus and system, is drawn water with solving existing suction pump Or reinforced concrete structure aqueduct carries out technical problem ineffective when the dredging of water flow.
The present invention provides one kind open cut of crossing the river and walks water installations, comprising: groove body, the groove body are connected with support construction, and institute The both ends for stating groove body are fixed in the support construction of two sides;Also, the groove body uses temporary steel aqueduct.
When practical application, open cut of the present invention of crossing the river is walked in water installations, and the support construction includes: span centre lattice Column, the span centre lattice column are connected with span centre Two bors d's oeuveres I-steel, and the span centre Two bors d's oeuveres I-steel is connected with multiple main longitudinal griders, multiple The main longitudinal grider is connected with distribution beam.
Specifically, open cut of the present invention of crossing the river is walked in water installations, and the multiple main longitudinal grider is preferably along the support The span centre cross-sectional direction interval of structure is uniformly distributed.
Wherein, open cut of the present invention of crossing the river is walked in water installations, the span centre lattice column and the span centre Two bors d's oeuveres I-shaped Span centre bracket is connected between steel and across end bracket.
Also, open cut of the present invention of crossing the river is walked in water installations, and the span centre Two bors d's oeuveres I-steel uses Double-layer two-splice I45 I-steel.
Specifically, open cut of the present invention of crossing the river is walked in water installations, and the temporary steel aqueduct includes: and the distribution beam The aqueduct bottom steel plate of connection, aqueduct bottom steel plate are connected with sidewall steel plate, and the sidewall steel plate is connected with to drawing finish rolling screw thread Steel.
Further, open cut of the present invention of crossing the river is walked in water installations, aqueduct bottom steel plate and the sidewall steel plate Between be attached by corner steel plate.
Further, open cut of the present invention of crossing the river is walked in water installations, aqueduct bottom steel plate, the side wall steel Plate, described pair of drawing fining twisted steel and the corner steel plate are all made of reinforcement steel plate.
Still further, open cut of the present invention of crossing the river is walked in water installations, the sidewall steel plate is also connected with side wall and adds Gu channel steel.
When practical application, open cut of the present invention of crossing the river is walked in water installations, the support construction further include: end coagulation Soil matrix seat;The both ends of the temporary steel aqueduct are connect with the end concrete pedestal, and the gap of junction is stopped using rubber Water plate is blocked.
Wherein, open cut of the present invention of crossing the river is walked in water installations, and the rubber water-proof plate selects anchoring adhesive.
Specifically, open cut of the present invention of crossing the river is walked in water installations, is adopted between the groove body and the support construction It is attached with the mode of welding.
Compared with the existing technology, open cut of the present invention of crossing the river is walked water installations and is had the advantage that
Open cut provided by the invention of crossing the river is walked in water installations, comprising: groove body, the groove body are connected with support construction, and groove body Both ends be fixed in the support construction of two sides;Also, groove body uses temporary steel aqueduct.From this analysis, the present invention provides Open cut of crossing the river walk water installations, since steel construction aqueduct is effectively reduced compared to reinforced concrete flume structure own wt, Construction is more convenient;Also, related material can be attached by welding manner, and speed of application is fast, be convenient for daily dimension Shield, used steel are recyclable to be recycled, to effectively reduce cost, and steel construction has certain flexibility, more Add the condition of construction for meeting scene.
The present invention also provides one kind open cuts of crossing the river to walk water system, comprising: open cut as described in any one of the above embodiments of crossing the river is leaked water Device.
Water system is walked in the open cut of crossing the river and water installations possessed advantage compared with the existing technology is walked in above-mentioned open cut of crossing the river Identical, details are not described herein.
In addition, open cut provided by the invention of crossing the river is leaked water in apparatus and system, steel aqueduct groove body is welded using steel plate, Reinforcing is carried out shaping with channel steel and fining twisted steel, the gap that groove body both ends are generated with support construction is sealed using rubber slab Processing, can effectively ensure that the stability of entire temporary steel aqueduct, the setting of sealed rubber plate is so that temporary steel aqueduct water flow is close Envelope property is greatly improved.
Detailed description of the invention
It, below will be to specific in order to illustrate more clearly of the specific embodiment of the invention or technical solution in the prior art Embodiment or attached drawing needed to be used in the description of the prior art be briefly described, it should be apparent that, it is described below Attached drawing is some embodiments of the present invention, for those of ordinary skill in the art, before not making the creative labor It puts, is also possible to obtain other drawings based on these drawings.
Fig. 1 is the structural schematic diagram in the span centre cross section that water installations are walked in open cut provided in an embodiment of the present invention of crossing the river;
Fig. 2 is the structural schematic diagram across end cross section that water installations are walked in open cut provided in an embodiment of the present invention of crossing the river;
Fig. 3 is the longitudinal plane structure schematic diagram that water installations are walked in open cut provided in an embodiment of the present invention of crossing the river.
In figure: 1- span centre bracket;2- span centre Two bors d's oeuveres I-steel;3- span centre lattice column;4- main longitudinal grider;5- distribution beam; 6- aqueduct bottom steel plate;The corner 7- steel plate;8- is to drawing fining twisted steel;9- sidewall steel plate;10- side wall reinforces channel steel;11- End concrete pedestal;12- rubber water-proof plate;13- is across end bracket.
Specific embodiment
Technical solution of the present invention is clearly and completely described below in conjunction with attached drawing, it is clear that described implementation Example is a part of the embodiment of the present invention, instead of all the embodiments.Based on the embodiments of the present invention, ordinary skill Personnel's every other embodiment obtained without making creative work, shall fall within the protection scope of the present invention.
In the description of the present invention, it should be noted that term " center ", "upper", "lower", "left", "right", "vertical", The orientation or positional relationship of the instructions such as "horizontal", "inner", "outside" be based on the orientation or positional relationship shown in the drawings, merely to Convenient for description the present invention and simplify description, rather than the system of indication or suggestion meaning or element must have a particular orientation, It is constructed and operated in a specific orientation, therefore is not considered as limiting the invention.In addition, term " first ", " second ", " third " is used for descriptive purposes only and cannot be understood as indicating or suggesting relative importance.
In the description of the present invention, it should be noted that unless otherwise clearly defined and limited, term " installation ", " phase Even ", " connection " shall be understood in a broad sense, for example, it may be being fixedly connected, may be a detachable connection, or be integrally connected;It can To be mechanical connection, it is also possible to be electrically connected;It can be directly connected, can also indirectly connected through an intermediary, it can be with It is the connection inside two elements.For the ordinary skill in the art, it can understand that above-mentioned term exists with concrete condition Concrete meaning in the present invention.
Fig. 1 is the structural schematic diagram in the span centre cross section that water installations are walked in open cut provided in an embodiment of the present invention of crossing the river;Fig. 2 is The structural schematic diagram across end cross section of water installations is walked in open cut provided in an embodiment of the present invention of crossing the river;Fig. 3 is the embodiment of the present invention The longitudinal plane structure schematic diagram of water installations is walked in the open cut of crossing the river provided.
As shown in Figure 1-Figure 3, the embodiment of the present invention provides one kind open cut of crossing the river and walks water installations, comprising: groove body, groove body connect It is connected to support construction, and the both ends of groove body are fixed in the support construction of two sides;Also, groove body uses temporary steel aqueduct.
Compared with the existing technology, open cut of crossing the river described in the embodiment of the present invention is walked water installations and is had the advantage that
Open cut provided in an embodiment of the present invention of crossing the river is walked in water installations, as shown in Figure 1-Figure 3, comprising: groove body, the groove body It is connected with support construction, and the both ends of groove body are fixed in the support construction of two sides;Also, groove body uses temporary steel aqueduct.By This analysis is it is found that water installations are walked in open cut provided in an embodiment of the present invention of crossing the river, since steel construction aqueduct is crossed compared to armored concrete Slot structure own wt is effectively reduced, therefore construction is more convenient;Also, related material can be carried out by welding manner Connection, speed of application is fast, is convenient for daily maintenance, and used steel are recyclable to be recycled, so that cost is effectively reduced, and Steel construction has certain flexibility, is more in line with the condition of construction at scene.
When practical application, open cut provided in an embodiment of the present invention of crossing the river is walked in water installations, as shown in Figure 1-Figure 3, above-mentioned branch Support structure may include: span centre lattice column 3, which can connect span centre Two bors d's oeuveres I-steel 2, span centre Two bors d's oeuveres work Word steel 2 can connect multiple main longitudinal griders 4, and multiple main longitudinal griders 4 can connect distribution beam 5, to be risen by span centre lattice column 3 To supporting role well;Span centre Two bors d's oeuveres I-steel 2 is by being welded to connect on the span centre lattice column 3 of two sides, as temporary steel The span centre of aqueduct supports.
Specifically, open cut provided in an embodiment of the present invention of crossing the river is walked in water installations, as shown in Figure 1-Figure 3, above-mentioned multiple masters Stringer 4 can be preferably to be uniformly distributed along the span centre cross-sectional direction interval of support construction, be spaced equally distributed support effect More preferably.
Wherein, open cut provided in an embodiment of the present invention of crossing the river is walked in water installations, as shown in Figure 1-Figure 3, above-mentioned span centre lattice Can connect between column 3 and span centre Two bors d's oeuveres I-steel 2 span centre bracket 1 and across end bracket 13, thus pass through multiple span centre brackets 1 With multiple support stability for effectively improving support construction across end bracket 13.
Also, open cut provided in an embodiment of the present invention of crossing the river is walked in water installations, and above-mentioned span centre Two bors d's oeuveres I-steel 2 can use Double-layer two-splice I45 I-steel.
It should be added that, the edge of a wing of I-steel is gradually thinning on side from root herein, there is certain angle, The model of I-steel is indicated with the Arabic numerals of the high bentimeters of its waist, web, edge of a wing thickness and flange width it is different its Specification is indicated with the millimeter of high (the h) × leg of waist wide (b) × waist thick (d).Such as " I-steel 160 × 88 × 6 ", that is, indicate that waist is a height of 160 millimeters, leg width is 88 millimeters, the I-steel that waist thickness is 6 millimeters.Also available model indicates the specification of I-steel, and model indicates The high bentimeters of waist, such as I45 (I represents I-steel, 45 represent waist 45 centimetres high), also known as I-steel 45#.The high identical work of waist Word steel need to be on the right of model plus a, b, c are distinguished if any several different legs are wide and waist is thick, as I-steel 45#a (I45a), 45#b (I45b), 45#c (I45c) etc..
Specific data may refer to following table:
Specification Highly Leg is wide Waist is thick Theoretical weight
45#a 450 150 11.5 80.42
45#b 450 152 13.5 87.485
45#c 450 154 15.5 94.55
Specifically, open cut provided in an embodiment of the present invention of crossing the river is walked in water installations, as shown in Figure 1-Figure 3, above-mentioned temporary steel Aqueduct may include: the aqueduct bottom steel plate 6 connecting with distribution beam 5, which can connect sidewall steel plate 9, and side Wall steel plate 9 can connect to fining twisted steel 8 is drawn, and support so that temporary steel aqueduct is used as entirely through aqueduct bottom steel plate 6, and Both ends are supported on the crown beam top for having poured and having finished;Two sides sidewall steel plate 9 can carry out to drawing drawing fining twisted steel 8 by this It reinforces.
Further, open cut provided in an embodiment of the present invention of crossing the river is walked in water installations, as shown in Figure 1-Figure 3, above-mentioned aqueduct It can be attached by corner steel plate 7 between bottom steel plate 6 and sidewall steel plate 9.
Further, open cut provided in an embodiment of the present invention of crossing the river is walked in water installations, above-mentioned aqueduct bottom steel plate 6, side wall Steel plate 9 can integrally improve jail to pass through and reinforce steel plate using steel plate is reinforced to drawing fining twisted steel 8 and corner steel plate 7 Solidity.
Still further, open cut provided in an embodiment of the present invention of crossing the river is walked in water installations, and as shown in Figure 1-Figure 3, above-mentioned side Wall steel plate 9 can also be connected with side wall and reinforce channel steel 10, so that two sides sidewall steel plate 9 can be by this to drawing fining twisted steel 8 Channel steel 10 is reinforced with side wall reinforce drawing.
When practical application, open cut provided in an embodiment of the present invention of crossing the river is walked in water installations, as shown in Figure 1-Figure 3, above-mentioned branch Support structure can also include: end concrete pedestal 11;The both ends of temporary steel aqueduct can be connect with end concrete pedestal 11, And the gap of junction can be blocked using rubber water-proof plate 12.The effect of rubber water-proof plate 12 is to increase aqueduct sealing Property, it is allowed to relatively reliable in the construction process.
Wherein, open cut provided in an embodiment of the present invention of crossing the river is walked in water installations, and above-mentioned rubber water-proof plate 12 can select plant Muscle glue, to guarantee aqueduct leakproofness.
It should be added that, anchoring adhesive has adhesive strength height, as pre-buried, normal temperature cure, hardening process herein Shrink small, heat resistance is good, can weld after burying muscle, durability, good weatherability, anti-aging, media-resistant (acid, alkali, water) performance Good, toughness, impact resistance are excellent after solidification, are free of volatile solvent, asepsis environment-protecting, A, the B component wide, construction party with glue ratio Just the features such as.
Specifically, open cut provided in an embodiment of the present invention of crossing the river is walked in water installations, between above-mentioned groove body and support construction It can be attached by the way of welding, so that speed of application is fast, be convenient for daily maintenance.
The embodiment of the present invention also provides one kind open cut of crossing the river and walks water system, comprising: it is as described in any one of the above embodiments cross the river it is bright Scoop away water installations.
Open cut provided in an embodiment of the present invention of crossing the river is leaked water apparatus and system, since steel construction aqueduct compares armored concrete Analysis on aqueduct structure own wt is effectively reduced, therefore construction is more convenient;Also, related material can by welding manner into Row connection, speed of application is fast, is convenient for daily maintenance, and used steel are recyclable to be recycled, so that cost is effectively reduced, And steel construction has certain flexibility, is more in line with the condition of construction at scene.
In addition, open cut provided in an embodiment of the present invention of crossing the river is leaked water in apparatus and system, steel aqueduct groove body is welded using steel plate It connects, reinforcing is carried out shaping with channel steel and fining twisted steel, the gap that groove body both ends and support construction generate uses rubber slab It is sealed processing, can effectively ensure that the stability of entire temporary steel aqueduct, the setting of sealed rubber plate is so that temporary steel is crossed Slot water flow leakproofness is greatly improved.
To sum up, the purpose of the present invention is to provide a kind of construction is simple, function is reliable, and span can according to the actual situation freely The open cut of crossing the river of selection is leaked water apparatus and system.
The foregoing is merely illustrative of the preferred embodiments of the present invention, is not intended to limit the invention, all in essence of the invention Within mind and principle, any modification, equivalent replacement, improvement and so on be should all be included in the protection scope of the present invention.

Claims (10)

1. one kind crosses the river, water installations are walked in open cut characterized by comprising groove body, the groove body are connected with support construction, and described The both ends of groove body are fixed in the support construction of two sides;
Also, the groove body uses temporary steel aqueduct.
2. water installations are walked in open cut according to claim 1 of crossing the river, which is characterized in that the support construction includes: span centre lattice Structure column, the span centre lattice column are connected with span centre Two bors d's oeuveres I-steel, and the span centre Two bors d's oeuveres I-steel is connected with multiple main longitudinal griders, more A main longitudinal grider is connected with distribution beam.
3. water installations are walked in open cut according to claim 2 of crossing the river, which is characterized in that the span centre lattice column and the span centre Span centre bracket is connected between Two bors d's oeuveres I-steel and across end bracket.
4. water installations are walked in open cut according to claim 2 or 3 of crossing the river, which is characterized in that the temporary steel aqueduct include: with The aqueduct bottom steel plate of distribution beam connection, aqueduct bottom steel plate are connected with sidewall steel plate, and the sidewall steel plate is connected with pair Draw fining twisted steel.
5. water installations are walked in open cut according to claim 4 of crossing the river, which is characterized in that aqueduct bottom steel plate and the side wall It is attached between steel plate by corner steel plate.
6. water installations are walked in open cut according to claim 5 of crossing the river, which is characterized in that aqueduct bottom steel plate, the side wall Steel plate, described pair of drawing fining twisted steel and the corner steel plate are all made of reinforcement steel plate.
7. water installations are walked in open cut according to claim 4 of crossing the river, which is characterized in that the sidewall steel plate is also connected with side wall Reinforce channel steel.
8. water installations are walked in open cut according to claim 2 of crossing the river, which is characterized in that the support construction further include: end Concrete pedestal;
The both ends of the temporary steel aqueduct are connect with the end concrete pedestal, and the gap of junction uses rubber water-proof plate It is blocked.
9. water installations are walked in open cut according to claim 8 of crossing the river, which is characterized in that the rubber water-proof plate selects bar planting Glue.
10. one kind crosses the river, water system is walked in open cut characterized by comprising such as above-mentioned of any of claims 1-9 Water installations are walked in open cut of crossing the river.
CN201811186562.4A 2018-10-11 2018-10-11 Open cut of crossing the river is leaked water apparatus and system Pending CN109112951A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811186562.4A CN109112951A (en) 2018-10-11 2018-10-11 Open cut of crossing the river is leaked water apparatus and system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811186562.4A CN109112951A (en) 2018-10-11 2018-10-11 Open cut of crossing the river is leaked water apparatus and system

Publications (1)

Publication Number Publication Date
CN109112951A true CN109112951A (en) 2019-01-01

Family

ID=64857961

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811186562.4A Pending CN109112951A (en) 2018-10-11 2018-10-11 Open cut of crossing the river is leaked water apparatus and system

Country Status (1)

Country Link
CN (1) CN109112951A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110725282A (en) * 2019-09-04 2020-01-24 清华大学 Structure and construction method of steel-concrete composite structure aqueduct

Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2228494Y (en) * 1995-04-29 1996-06-05 武汉水利电力大学 Large rigid frame type water conservancy launder
KR20050070229A (en) * 2003-12-30 2005-07-07 조항웅 Protection of corrosion open channel
CN202227319U (en) * 2011-09-10 2012-05-23 中国十七冶集团有限公司 Temporary aqueduct formed by steel pipe support
KR20140112186A (en) * 2013-03-13 2014-09-23 강원대학교산학협력단 Reinforcing method of open conduit tensile side for aqueduct bridge
CN205134295U (en) * 2015-08-12 2016-04-06 河北可耐特玻璃钢有限公司 Glass steel aqueduct equipment
CN106702901A (en) * 2015-08-10 2017-05-24 宏润建设集团股份有限公司 Temporary support
CN206220111U (en) * 2016-11-21 2017-06-06 中建八局第四建设有限公司 A kind of catch pit fixing templates
CN206298823U (en) * 2016-12-27 2017-07-04 中国水电建设集团十五工程局有限公司 Pass horse
CN206768570U (en) * 2017-03-22 2017-12-19 深圳市福田建安建设集团有限公司 A kind of foundation ditch assembled steel trestle
KR101847902B1 (en) * 2017-10-20 2018-04-11 대영스틸산업주식회사 Steel type aqueduct bridge
KR101886661B1 (en) * 2018-02-08 2018-08-08 대영스틸산업주식회사 Steel Aqueduct and Construction Methods thereof
CN209508795U (en) * 2018-10-11 2019-10-18 中铁六局集团有限公司 Open cut of crossing the river is leaked water apparatus and system

Patent Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2228494Y (en) * 1995-04-29 1996-06-05 武汉水利电力大学 Large rigid frame type water conservancy launder
KR20050070229A (en) * 2003-12-30 2005-07-07 조항웅 Protection of corrosion open channel
CN202227319U (en) * 2011-09-10 2012-05-23 中国十七冶集团有限公司 Temporary aqueduct formed by steel pipe support
KR20140112186A (en) * 2013-03-13 2014-09-23 강원대학교산학협력단 Reinforcing method of open conduit tensile side for aqueduct bridge
CN106702901A (en) * 2015-08-10 2017-05-24 宏润建设集团股份有限公司 Temporary support
CN205134295U (en) * 2015-08-12 2016-04-06 河北可耐特玻璃钢有限公司 Glass steel aqueduct equipment
CN206220111U (en) * 2016-11-21 2017-06-06 中建八局第四建设有限公司 A kind of catch pit fixing templates
CN206298823U (en) * 2016-12-27 2017-07-04 中国水电建设集团十五工程局有限公司 Pass horse
CN206768570U (en) * 2017-03-22 2017-12-19 深圳市福田建安建设集团有限公司 A kind of foundation ditch assembled steel trestle
KR101847902B1 (en) * 2017-10-20 2018-04-11 대영스틸산업주식회사 Steel type aqueduct bridge
KR101886661B1 (en) * 2018-02-08 2018-08-08 대영스틸산업주식회사 Steel Aqueduct and Construction Methods thereof
CN209508795U (en) * 2018-10-11 2019-10-18 中铁六局集团有限公司 Open cut of crossing the river is leaked water apparatus and system

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110725282A (en) * 2019-09-04 2020-01-24 清华大学 Structure and construction method of steel-concrete composite structure aqueduct

Similar Documents

Publication Publication Date Title
CN206554120U (en) Underground pipe gallery with steel construction catch pit
CN104110012A (en) Low-permeability rock-fill material concrete panel rock-fill dam
CN208280170U (en) Assembled steel structure piping lane
CN109339087A (en) A kind of foundation structure system of low-rise building
CN209508795U (en) Open cut of crossing the river is leaked water apparatus and system
CN109112951A (en) Open cut of crossing the river is leaked water apparatus and system
CN208486165U (en) A kind of concrete circular stub and girder steel consolidate connecting structure
CN102660965B (en) Construction method for post-pouring settlement belt with simply supported fully-enclosed plate retainer structure
CN209523198U (en) A kind of underpinning structure supporting lattice column
CN209084167U (en) Cross a river segment pipe aerial construction
CN209243959U (en) A kind of bolt assembly grouting joint steel pipe concrete joint
CN207717504U (en) A kind of support construction for ultra-large type bifurcated pipe group's water pressure test
CN207267962U (en) The general telescopic sustaining wall of assembly of disk button cat ladder
CN208183773U (en) Building foundation pit water blocking platform
CN105129636A (en) Large-basement baseboard tower-crane installation apparatus
CN110397064A (en) A kind of separable ring cylinder jacket frame foundation structure and its construction method
CN208309578U (en) A kind of novel foundation pit enclosure stake
CN209025015U (en) A kind of median of ecological, environmental protective
CN209011443U (en) Regular concrete wafts board and aluminum plate combination's cornice structure
CN211395931U (en) Mounting structure of water delivery culvert pipe exit end and absorption basin
CN208379593U (en) A kind of engineering framework for the pumping of multistage deep foundation ditch concrete
CN202451974U (en) Anti-floating structure of buried pipeline
CN208251112U (en) A kind of detachable structural steel combination crown beam
CN207452908U (en) A kind of subway station goes along with sb. to guard him support construction
CN208965707U (en) Single side formwork system and outer wall of basement

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
TA01 Transfer of patent application right

Effective date of registration: 20181225

Address after: 100036 Wanshou Road, Haidian District, Beijing, No. 2

Applicant after: The Sixth Engineering Bureau Group Co., Ltd., China Railway

Applicant after: Guangzhou Railway Group Engineering Co. Ltd.

Address before: 511400 Unit 101, Building 18, Tian'an Headquarters Center, 555 North Panyu Avenue, Donghuan Street, Panyu District, Guangzhou City, Guangdong Province

Applicant before: Guangzhou Railway Group Engineering Co. Ltd.

TA01 Transfer of patent application right
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination