KR101851186B1 - Band clamp manufacturing apparatus equipped with turning means - Google Patents

Band clamp manufacturing apparatus equipped with turning means Download PDF

Info

Publication number
KR101851186B1
KR101851186B1 KR1020170025731A KR20170025731A KR101851186B1 KR 101851186 B1 KR101851186 B1 KR 101851186B1 KR 1020170025731 A KR1020170025731 A KR 1020170025731A KR 20170025731 A KR20170025731 A KR 20170025731A KR 101851186 B1 KR101851186 B1 KR 101851186B1
Authority
KR
South Korea
Prior art keywords
housing cover
band
ring
shuttle
screw
Prior art date
Application number
KR1020170025731A
Other languages
Korean (ko)
Inventor
이상우
Original Assignee
주식회사홍성엔지니어링
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 주식회사홍성엔지니어링 filed Critical 주식회사홍성엔지니어링
Priority to KR1020170025731A priority Critical patent/KR101851186B1/en
Application granted granted Critical
Publication of KR101851186B1 publication Critical patent/KR101851186B1/en

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23PMETAL-WORKING NOT OTHERWISE PROVIDED FOR; COMBINED OPERATIONS; UNIVERSAL MACHINE TOOLS
    • B23P19/00Machines for simply fitting together or separating metal parts or objects, or metal and non-metal parts, whether or not involving some deformation; Tools or devices therefor so far as not provided for in other classes
    • B23P19/04Machines for simply fitting together or separating metal parts or objects, or metal and non-metal parts, whether or not involving some deformation; Tools or devices therefor so far as not provided for in other classes for assembling or disassembling parts
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23PMETAL-WORKING NOT OTHERWISE PROVIDED FOR; COMBINED OPERATIONS; UNIVERSAL MACHINE TOOLS
    • B23P19/00Machines for simply fitting together or separating metal parts or objects, or metal and non-metal parts, whether or not involving some deformation; Tools or devices therefor so far as not provided for in other classes
    • B23P19/001Article feeders for assembling machines
    • B23P19/003Escapement mechanisms used therewith
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23PMETAL-WORKING NOT OTHERWISE PROVIDED FOR; COMBINED OPERATIONS; UNIVERSAL MACHINE TOOLS
    • B23P19/00Machines for simply fitting together or separating metal parts or objects, or metal and non-metal parts, whether or not involving some deformation; Tools or devices therefor so far as not provided for in other classes
    • B23P19/001Article feeders for assembling machines
    • B23P19/006Holding or positioning the article in front of the applying tool
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23PMETAL-WORKING NOT OTHERWISE PROVIDED FOR; COMBINED OPERATIONS; UNIVERSAL MACHINE TOOLS
    • B23P21/00Machines for assembling a multiplicity of different parts to compose units, with or without preceding or subsequent working of such parts, e.g. with programme control
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16BDEVICES FOR FASTENING OR SECURING CONSTRUCTIONAL ELEMENTS OR MACHINE PARTS TOGETHER, e.g. NAILS, BOLTS, CIRCLIPS, CLAMPS, CLIPS OR WEDGES; JOINTS OR JOINTING
    • F16B2/00Friction-grip releasable fastenings
    • F16B2/02Clamps, i.e. with gripping action effected by positive means other than the inherent resistance to deformation of the material of the fastening
    • F16B2/06Clamps, i.e. with gripping action effected by positive means other than the inherent resistance to deformation of the material of the fastening external, i.e. with contracting action
    • F16B2/065Clamps, i.e. with gripping action effected by positive means other than the inherent resistance to deformation of the material of the fastening external, i.e. with contracting action using screw-thread elements
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16BDEVICES FOR FASTENING OR SECURING CONSTRUCTIONAL ELEMENTS OR MACHINE PARTS TOGETHER, e.g. NAILS, BOLTS, CIRCLIPS, CLAMPS, CLIPS OR WEDGES; JOINTS OR JOINTING
    • F16B2/00Friction-grip releasable fastenings
    • F16B2/02Clamps, i.e. with gripping action effected by positive means other than the inherent resistance to deformation of the material of the fastening
    • F16B2/06Clamps, i.e. with gripping action effected by positive means other than the inherent resistance to deformation of the material of the fastening external, i.e. with contracting action
    • F16B2/08Clamps, i.e. with gripping action effected by positive means other than the inherent resistance to deformation of the material of the fastening external, i.e. with contracting action using bands
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L33/00Arrangements for connecting hoses to rigid members; Rigid hose connectors, i.e. single members engaging both hoses
    • F16L33/02Hose-clips
    • F16L33/08Hose-clips in which a worm coacts with a part of the hose-encircling member that is toothed like a worm-wheel

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Automatic Assembly (AREA)

Abstract

The present invention relates to a band clamp manufacturing apparatus equipped with a turning means and, more specifically, relates to a band clamp manufacturing apparatus equipped with a turning means, wherein a band is pre-processed in a ring shape to be prepared and arranged through a feeder. As provided is a simple loading structure for turning and supplying the band at 180°, a processing process continuously performed in order is significantly simplified into four steps. Moreover, the band clamp manufacturing apparatus comprises a feeding machine (32), a parallel rail (34), and a turning means (300) to improve productivity with operating time standardization in each part.

Description

터닝수단이 구비된 밴드클램프 제조장치{Band clamp manufacturing apparatus equipped with turning means}[0001] The present invention relates to a band clamp manufacturing apparatus equipped with turning means,

본 발명은 터닝수단이 구비된 밴드클램프 제조장치에 관련되며, 보다 상세하게는 밴드를 링형으로 선가공하여 피딩기를 통하여 정렬준비되면 이를 180°터닝공급하는 간단한 로딩구조를 가짐에 따라 순차적으로 연속 수행되는 가공공정이 4단계로 대폭 간소화됨과 더불어 각 파트별 작동타임 평준화로 생산성 향상을 도모하는 터닝수단이 구비된 밴드클램프 제조장치에 관한 것이다.More particularly, the present invention relates to a band clamp manufacturing apparatus having a turning means, and more particularly, to a band clamp manufacturing apparatus having a simple loading structure in which a band is linearly shaped through a feeding device, And a turning means for improving the productivity by leveling the working time of each part. [0002] The present invention relates to a band clamp manufacturing apparatus.

통상적으로 밴드클램프는 튜브관 및 파이프 등의 연결부를 체결하여 기밀을 유지하고 연결부가 분리되는 것을 방지하기 위해 사용되는 체결수단으로서, 하우징커버 내부로 밴드 일단을 고정하고, 밴드 다른 일단을 원형으로 밴딩하여 하우징커버 다른 일측으로 삽입한 후 하우징커버 내부에 구비된 스크류를 회전시키면 밴드에 형성된 나사홈이 스크류에 치합되어 위치이송되면서 체결력이 작용하게 된다.BACKGROUND ART [0002] Conventionally, a band clamp is a fastening means used for tightening a connection portion such as a tube tube and a pipe to keep the airtightness and preventing the connection portion from being separated. The band clamp has one end fixed to the inside of the housing cover, When the screw provided in the housing cover is rotated after the housing cover is inserted into the other side of the housing cover, the screw groove formed on the band is engaged with the screw and the position is transferred and the fastening force is applied.

하지만, 밴드클램프를 구성하는 하우징커버, 밴드 및 스크류 조립과정이 번거롭고, 특히 밴드를 원형으로 밴딩하여 스크류와 나사결합해야 하는 복잡한 조립과정으로 인해 제조공정 자동화에 어려움이 따랐다.However, the process of assembling the housing cover, the band and the screw constituting the band clamp is troublesome, and in particular, it is difficult to automate the manufacturing process due to the complicated assembly process in which the band is bent into a circular shape and screwed and screwed.

이에 종래에 개시된 등록번호 제10-1467733호에서, 다수의 체결쇠와 밴드 및 스크류를 선별하여 정렬된 상태로 연속공급하면서 상호간에 신속하고 정확하게 조립하며, 조립된 밴드를 견고하면서도 정형화된 상태로 롤링하고, 롤링된 밴드를 유지하도록 죄여주는 일련의 전 공정을 자동으로 수행함으로써 공수의 절감에 따른 생산성 향상과 함께 동일한 규격의 호스밴드를 생산하는 기술이 선등록된바 있다.Thus, in the conventional registration No. 10-1467733, a plurality of fastening screws, bands and screws are selectively and continuously supplied in an aligned state, quickly and precisely assembled with each other, and the assembled band is rolled in a rigid, And a series of preliminary processes for automatically maintaining the rolled band are automatically performed, thereby improving the productivity due to the reduction of airflow and registering a technique of producing the same standard hose band.

그러나, 상기 종래기술은 체결쇠공급부, 밴드로딩부, 1차 밴딩부, 2차 밴딩부, 스크류공급부, 3차 밴딩부, 롤링부, 배출부로 이루어진 각단계를 순차적으로 수행되는 기술이나, 각 가공단계의 다분화와 더불어 각 단계별 작동타임 편차가 크게 발생되어 전체 생산라인의 사이클타임이 지연되는 문제점이 따랐다.However, according to the conventional technique, the respective steps of the fastening metal part, the band loading part, the primary bending part, the secondary bending part, the screw feeding part, the tertiary bending part, the rolling part and the discharging part are sequentially performed, There is a problem that the operation time deviations of each step are largely accompanied with the differentiation of the steps and the cycle time of the entire production line is delayed.

예컨대, 롤링부는 90°로 상향 절곡된 밴드가 외측롤러와 인접하는 위치로 이송되면, 작동실린더의 작동으로 내측롤러가 밴드와 동일선상으로 진입하는 작동과, 이어서 작동실린더의 작동으로 우측으로 회전하여 밴드의 내주면을 가압하는 작동과, 보조실린더의 작동으로 지지바가 승강하여 밴드의 외주면이 지지되며, 롤링실린더의 작동으로 내외측롤러가 하강하여 밴드를 롤링하는 작동과, 이어서 작동실린더의 작동으로 밀대가 우측으로 돌출하여 밴드의 나사홈과 스크류의 나사산과 맞물리도록 삽입하는 작동과, 그리고 조임기구가 작동하여 스크류가 시계방향으로 회전하여 롤링된 밴드의 직경을 줄여 호스밴드를 완성하는 다분화된 복잡한 작동순서로 이루어짐에 따라, 롤링부에 의한 작동타임 지연으로 그외 공정이 대기상태로 함께 유지되면서 전체 공정의 사이클타임이 크게 지연되는 폐단이 따랐다.For example, when the band bent upwards at 90 [deg.] Is conveyed to a position adjacent to the outer roller, the rolling portion rotates to the right by the operation of the operating cylinder, An operation of pressing the inner peripheral surface of the band, an operation of supporting the outer peripheral surface of the band by lifting the support bar by the operation of the auxiliary cylinder, the operation of rolling the inner and outer rollers by the operation of the rolling cylinder to roll the band, And the tightening mechanism is activated to rotate the screw clockwise to reduce the diameter of the rolled band to complete the hose band. As the operation sequence is performed, the operation time delay due to the rolling unit causes the other process to be kept in the standby state together The evils that followed the cycle time significantly delay the entire process.

이에 따라 본 발명은 상기한 문제점을 해결하기 위해 착안 된 것으로서, 밴드를 링형으로 선가공하여 피딩기를 통하여 정렬준비되면 이를 180°터닝공급하는 간단한 로딩구조를 가짐에 따라 순차적으로 연속 수행되는 가공공정이 4단계로 대폭 간소화됨과 더불어 각 파트별 작동타임 평준화로 생산성 향상을 도모하는 터닝수단이 구비된 밴드클램프 제조장치를 제공하는 것에 그 목적이 있다.Accordingly, the present invention has been made to solve the above-mentioned problems, and it is an object of the present invention to provide a simple loading structure in which a band is linearly formed through a feeder and then aligned by a feeder, And it is an object of the present invention to provide a band clamp manufacturing apparatus provided with a turning means for improving the productivity by leveling the operation time of each part in addition to being greatly simplified in four steps.

이러한 목적을 달성하기 위해 본 발명의 특징은, According to an aspect of the present invention,

하우징커버(1)와, 하우징커버(1)에 삽입고정되는 스크류(3)와, 하우징커버(1)에 삽입되어 일단은 하우징커버에 고정되면서 타단은 스크류에 나사결합으로 체결되는 링형 밴드로 구성되는 소구경 밴드 클램프를 제조하는 터닝수단이 구비된 밴드클램프 제조장치에 있어서, The housing cover 1 is fixed to the housing cover 1 while the other end thereof is fastened to the screw by screwing. The housing cover 1 is fixed to the housing cover 1 by screws. The band clamp manufacturing apparatus includes a turning means for manufacturing a small-diameter band clamp,

상기 스크류(3)가 삽입된 하우징커버(1) 상으로 링형 밴드(2)를 삽입하고, 하우징커버(1) 상면을 가압 성형하는 밴드조립부(30)가 구비되고,A band assembly section 30 for inserting the ring-shaped band 2 onto the housing cover 1 into which the screw 3 is inserted and press-molding the upper surface of the housing cover 1,

상기 밴드조립부(30)는 양단부가 겹쳐지도록 링형으로 성형되면서 어느 일측 단부에 하우징커버(1)와 맞물리도록 스톱턱(2a)이 형성되는 링형 밴드(2)와, 링형 밴드(2)는 피딩기(32)에 의해 종방향으로 정렬공급되면서 한 쌍의 평행레일(34)에 의해 스톱턱(2a)이 걸려 상측을 향하도록 준비되고, 링형 밴드(2)는 터닝수단(300)에 의해 180°방향전환되어 이송수단(200)에 의해 하우징커버(1) 내부로 로딩되는 구성을 포함하여 이루어지는 것을 특징으로 한다.The band assembly (30) comprises a ring-shaped band (2) having a stop jaw (2a) formed at one end thereof so as to be engaged with the housing cover (1) while being formed into a ring shape so that both ends are overlapped with each other, And the ring-shaped band 2 is rotated 180 degrees by the turning means 300. The ring-shaped band 2 is rotated by the turning means 300 so that the stopping jaw 2a is hooked by the pair of parallel rails 34, And is configured to be loaded into the housing cover (1) by the transfer means (200).

이때, 상기 이송수단(200)은 일단에 집개(210)가 구비되고 다른 일단에 연결되는 편심암(220)의 회전력에 의해 x, y축 레일부(230)(240)를 타고 곡선 운동되는 작동암(250)으로 이루어지는 것을 특징으로 한다.At this time, the conveying means 200 is provided with a collecting unit 210 at one end, and is operated in a curved manner by riding on the x, y axis rail portions 230 and 240 by the rotational force of the eccentric arm 220 connected to the other end. And an arm (250).

또한, 상기 터닝수단(300)은 구동부(310)에 의해 180°선회운동되는 터닝수단(320)과, 터닝셔틀(320)은 평행레일(34) 상에 준비되는 링형 밴드(2) 상부를 클램핑하여 180°선회작동되면, 링형 밴드(2)가 180°방향전환되어 대기되는 것을 특징으로 한다.The turning means 300 includes a turning means 320 which is rotated by 180 degrees by the driving unit 310 and a turning shuttle 320 which clamps the upper portion of the ring- The ring-shaped band 2 is switched in the direction of 180 占 and is queued.

또한, 상기 밴드조립부(30)에서 하우징 커버(1) 내부로 링형 밴드(2)가 삽입되면 코킹부(36)에 의해 하우징 커버(1) 상부가 마감성형되고, 코킹부(36)는 셔틀(120) 양측에서 힌지를 축으로 선회운동되어 하우징 커버(1) 상부를 가압 성형하는 한 쌍의 코어(36a)를 포함하여 이루어지는 것을 특징으로 한다.When the ring-shaped band 2 is inserted into the housing cover 1 from the band assembly 30, the upper portion of the housing cover 1 is finished by the caulking portion 36, And a pair of cores 36a which are pivoted on both sides of the hinge 120 and press the upper portion of the housing cover 1.

그리고, 상기 밴드클램프 제조장치는 복수의 셔틀(120)이 등각배치되는 턴테이블(100); 상기 어느 일측 셔틀(120) 상으로 하우징커버(1)를 각개 공급하도록 구비되는 하우징커버 로딩부(10); The band clamp manufacturing apparatus includes a turntable 100 in which a plurality of shuttles 120 are equally arranged; A housing cover loading unit 10 provided to supply the housing cover 1 on either one of the shuttles 120;

상기 하우징커버(1) 내부로 스크류(3)를 삽입하도록 구비되는 스크류로딩부(20); A screw loading unit 20 installed to insert the screw 3 into the housing cover 1;

상기 스크류(3)가 삽입된 하우징커버(1) 상으로 링형 밴드(2)를 삽입하고, 하우징커버(1) 상면을 가압 성형하는 밴드조립부(30);A band assembling portion 30 for inserting the ring-shaped band 2 onto the housing cover 1 into which the screw 3 is inserted and press-molding the upper surface of the housing cover 1;

및 상기 셔틀(120)을 언클램핑하여 밴드조립체를 배출하는 언로딩부(40);를 포함하여 이루어지는 것을 특징으로 한다. And an unloading part (40) for unclamping the shuttle (120) and discharging the band assembly.

이때, 상기 셔틀(120)은 턴테이블(100)에 고정되는 고정바(122)와, 고정바(122)와 힌지(124)로 결합되어 집개운동되는 유동바(126)와, 턴테이블(100)과 인접하는 위치에서 유동바(126) 단부를 가압하는 밀편(128)을 포함하여 구성되는 것을 특징으로 한다.The shuttle 120 includes a fixed bar 122 fixed to the turntable 100, a movable bar 126 coupled to the fixed bar 122 and the hinge 124 to be moved in a splaying motion, And a mast 128 for pressing the end of the flow bar 126 at an adjacent position.

또한, 상기 턴테이블(100)은 구동부에 의해 등각회전되도록 구비되고, 상부에는 정지상태로 위치되어, 감지센서(S)를 포함하는 고정부품을 장착하도록 설치부(132)가 구비되는 고정플레이트(130)를 포함하여 구성되는 것을 특징으로 한다.The turntable 100 is rotatably rotated by a driving unit and is disposed in a stationary state at an upper portion of the turntable 100. The turntable 100 includes a fixing plate 130 having an installation portion 132 for mounting a fixing component including the sensing sensor S, ).

또한, 상기 하우징커버 로딩부(10)는 하우징커버(1)를 정렬공급하는 피딩기(12)와, 하우징 커버(1)를 셔틀(120)상으로 로딩하는 이송수단(200)으로 구비되고, 이송수단(200)은 일단에 집개(210)가 구비되고 다른 일단에 연결되는 편심암(220)의 회전력에 의해 x, y축 레일부(230)(240)를 타고 곡선 운동되는 작동암(250)으로 이루어지는 것을 특징으로 한다.The housing cover loading unit 10 is provided with a feeder 12 for aligning and feeding the housing cover 1 and a conveying unit 200 for loading the housing cover 1 onto the shuttle 120, The conveying means 200 includes an actuating arm 250 which is curved in the x and y axis directions 230 and 240 by the rotational force of the eccentric arm 220 provided at one end and connected to the other end, ).

또한, 상기 스크류로딩부(20)는 스크류(3)를 정렬공급하는 피딩기(22)와, 정렬대기되는 스크류(3) 이송을 제한하여 장전실(24)로 각개 공급하는 스톱퍼(26)와, 장전실(24)에 준비된 스크류(3)를 클램핑하여 하우징커버(1) 내부로 로딩하는 이송수단(200)으로 구성되고, 이송수단(200)은 일단에 집개(210)가 구비되고 다른 일단에 연결되는 편심암(220)의 회전력에 의해 x, y축 레일부(230)(240)를 타고 곡선 운동되는 작동암(250)으로 이루어지는 것을 특징으로 한다.The screw loading unit 20 includes a feeder 22 for aligning and feeding the screw 3 and a stopper 26 for restricting the feeding of the screw 3 to be aligned and supplying the screw 3 to the loading chamber 24, And a transfer means 200 for clamping the screw 3 prepared in the loading chamber 24 and loading the inside of the housing cover 1. The transfer means 200 is provided with a collecting unit 210 at one end, And an operating arm 250 that is curved in the x and y axis directions 230 and 240 by the rotational force of the eccentric arm 220 connected to the x and y axis rails 230 and 240.

이상의 구성 및 작용에 의하면, 본 발명은 밴드를 링형으로 선가공하여 피딩기를 통하여 정렬준비되면 이를 180°터닝공급하는 간단한 로딩구조를 가짐에 따라 순차적으로 연속 수행되는 가공공정이 4단계로 대폭 간소화됨과 더불어 각 파트별 작동타임 평준화로 생산성 향상을 도모하는 효과가 있다.According to the above-described structure and operation, since the band is linearly formed into a ring shape and is ready for alignment through the feeder, the present invention has a simple loading structure that turns and feeds it by 180 °, In addition, there is an effect of improving the productivity by leveling the operation time of each part.

도 1은 본 발명의 일실시예에 따른 터닝수단이 구비된 밴드클램프 제조장치의 밴드조립부 터닝수단을 나타내는 구성도.
도 2는 본 발명의 일실시예에 따른 터닝수단이 구비된 밴드클램프 제조장치를 전체적으로 나타내는 평면도.
도 3은 본 발명의 일실시예에 따른 터닝수단이 구비된 밴드클램프 제조장치 전체적으로 나타내는 구성도.
도 4는 본 발명의 일실시예에 따른 터닝수단이 구비된 밴드클램프 제조장치의 하우징커버로딩부를 나타내는 구성도.
도 5는 본 발명의 일실시예에 따른 터닝수단이 구비된 밴드클램프 제조장치의 스크류로딩부를 나타내는 구성도.
도 6은 본 발명의 일실시예에 따른 터닝수단이 구비된 밴드클램프 제조장치의 밴드조립부의 코킹부를 나타내는 구성도.
도 7 내지 9는 본 발명의 다른 실시예에 따른 소구경 밴드클램프 제조장치의 밴드조립부를 나타내는 구성도.
BRIEF DESCRIPTION OF THE DRAWINGS FIG. 1 is a view showing a band assembly turning unit of a band clamp manufacturing apparatus provided with a turning means according to an embodiment of the present invention; FIG.
[0001] The present invention relates to a band clamp manufacturing apparatus, and more particularly, to a band clamp manufacturing apparatus having a turning means according to an embodiment of the present invention.
FIG. 3 is a general view showing a band clamp manufacturing apparatus provided with a turning means according to an embodiment of the present invention. FIG.
4 is a view showing a housing cover loading unit of a band clamp manufacturing apparatus provided with a turning means according to an embodiment of the present invention.
5 is a view showing a screw loading unit of a band clamp manufacturing apparatus equipped with turning means according to an embodiment of the present invention.
6 is a view showing a caulking portion of a band assembly portion of a band clamp manufacturing apparatus provided with a turning means according to an embodiment of the present invention;
7 to 9 are views showing a band assembly unit of a small diameter band clamp manufacturing apparatus according to another embodiment of the present invention.

이하, 첨부된 도면을 참조하여 본 발명의 바람직한 실시예를 상세히 설명한다.Hereinafter, preferred embodiments of the present invention will be described in detail with reference to the accompanying drawings.

본 발명은 터닝수단이 구비된 밴드클램프 제조장치에 관련되며, 이때 터닝수단이 구비된 밴드클램프 제조장치는 밴드를 링형으로 선가공하여 피딩기를 통하여 정렬준비되면 이를 180°터닝공급하는 간단한 로딩구조를 가짐에 따라 순차적으로 연속 수행되는 가공공정이 4단계로 대폭 간소화됨과 더불어 각 파트별 작동타임 평준화로 생산성 향상을 도모하기 위해 피딩기(32), 평행레일(34), 터닝수단(300)을 포함하여 주요구성으로 이루어진다.The present invention relates to a band clamp manufacturing apparatus equipped with a turning means, wherein a band clamp manufacturing apparatus equipped with a turning means comprises a simple loading structure for turning the band into a ring shape and turning it through 180 ° A parallel rail 34 and a turning means 300 are included in order to improve the productivity by leveling the operation time of each part. .

본 발명에 따른 터닝수단이 구비된 밴드클램프 제조장치는 하우징커버(1)와, 하우징커버(1)에 삽입고정되는 스크류(3)와, 하우징커버(1)에 삽입되어 일단은 하우징커버에 고정되면서 타단은 스크류에 나사결합으로 체결되는 링형 밴드로 구성되는 소구경 밴드 클램프를 제조하는 터닝셔틀이 구비된 밴드클램프 제조장치에 있어서, 상기 스크류(3)가 삽입된 하우징커버(1) 상으로 링형 밴드(2)를 삽입하고, 하우징커버(1) 상면을 가압 성형하는 밴드조립부(30)가 구비되고, 상기 밴드조립부(30)는 양단부가 겹쳐지도록 링형으로 성형되면서 어느 일측 단부에 하우징커버(1)와 맞물리도록 스톱턱(2a)이 형성되는 링형 밴드(2)와, 링형 밴드(2)는 피딩기(32)에 의해 종방향으로 정렬공급되면서 한 쌍의 평행레일(34)에 의해 스톱턱(2a)이 걸려 상측을 향하도록 준비되고, 링형 밴드(2)는 터닝수단(300)에 의해 180°방향전환되어 이송수단(200)에 의해 하우징커버(1) 내부로 로딩되는 구성을 포함하여 이루어진다.A band clamp manufacturing apparatus provided with a turning means according to the present invention comprises a housing cover 1, a screw 3 inserted and fixed to the housing cover 1, and a fixing member 3 inserted into the housing cover 1, And the other end is a ring-shaped band which is fastened by screwing to a screw. The apparatus for manufacturing a band clamp with a turning shuttle is characterized in that the ring-shaped band is clamped on a housing cover (1) A band assembly 30 for inserting the band 2 and press-molding the upper surface of the housing cover 1 is provided. The band assembly 30 is formed in a ring shape so that both ends thereof overlap each other, And a ring-shaped band 2 in which the stop jaws 2a are formed so as to engage with the pair of parallel rails 34 while the ring-shaped bands 2 are aligned and fed in the longitudinal direction by the feeder 32, The stop jaw 2a is hooked and prepared so as to face upward, And the ring-shaped band 2 is configured to be turned 180 ° by the turning means 300 and loaded into the housing cover 1 by the conveying means 200.

이때, 상기 이송수단(200)은 일단에 집개(210)가 구비되고 다른 일단에 연결되는 편심암(220)의 회전력에 의해 x, y축 레일부(230)(240)를 타고 곡선 운동되는 작동암(250)으로 이루어지는바, 이에 따른 이송수단의 상세한 구성은 후술하는 하우징커버 로딩부(10)의 이송수단 설명을 참조한다.At this time, the conveying means 200 is provided with a collecting unit 210 at one end, and is operated in a curved manner by riding on the x, y axis rail portions 230 and 240 by the rotational force of the eccentric arm 220 connected to the other end. And the arm 250, and the detailed structure of the conveying means according to this will be described with reference to the description of the conveying means of the housing cover loading section 10 to be described later.

또한, 상기 터닝수단(300)은 구동부(310)에 의해 180°선회운동되는 터닝수단(320)과, 터닝셔틀(320)은 평행레일(34) 상에 준비되는 링형 밴드(2) 상부를 클램핑하여 180°선회작동되면, 링형 밴드(2)가 180°방향전환되어 대기된다. 터닝셔틀(320)은 일단이 구동부에 연결되어 도 1과 같이 평행레일(34) 측으로 선회시 평행레일(34) 상에 준비되는 링형 밴드(2) 상부를 클램핑하고, 이후 역방향으로 180°선회시 링형 밴드(2)가 180°방향전환되어 평행레일(34)상에 준비된 상태로 역방향으로 대기된다. The turning means 300 includes a turning means 320 which is rotated by 180 degrees by the driving unit 310 and a turning shuttle 320 which clamps the upper portion of the ring- The ring-shaped band 2 is switched in the 180 占 direction and waits. One end of the turning shuttle 320 is connected to the driving unit to clamp the upper portion of the ring-shaped band 2 prepared on the parallel rail 34 when turning toward the parallel rail 34 as shown in FIG. 1, The ring-shaped band 2 is switched in the direction of 180 DEG and is waiting in the reverse direction in a state ready on the parallel rail 34. [

이후, 상기 이송수단(200)의 작동에 의해 터닝셔틀(320)에 대기된 링형 밴드(2)가 클램핑되어 셔틀(120)에 로딩된 하우징 커버(1) 상면으로 투입되고, 이때 링형 밴드(2)의 스톱턱(2a)이 하우징 커버(1)에 맞물린 상태로 코킹부(36)에 의해 압착성형되어 조립상태가 유지된다.The ring type band 2 waiting in the turning shuttle 320 is clamped by the operation of the conveying means 200 and is introduced into the upper surface of the housing cover 1 loaded on the shuttle 120. At this time, Is engaged with the housing cover 1 and is press-formed by the caulking portion 36, so that the assembled state is maintained.

또한, 상기 밴드조립부(30)에서 하우징 커버(1) 내부로 링형 밴드(2)가 삽입되면 코킹부(36)에 의해 하우징 커버(1) 상부가 마감성형되고, 코킹부(36)는 셔틀(120) 양측에서 힌지를 축으로 선회운동되어 하우징 커버(1) 상부를 가압 성형하는 한 쌍의 코어(36a)를 포함하여 이루어진다. 코어(36a)는 도 7과 같이 'ㄱ'자 형으로 형성되어 선회작동력에 의해 하우징 커버(1) 상단부를 절곡하고, 이때 코어(36a) 단부에는 경질의 팁이 교체가능하게 설치되어 반복사용에 따른 마모발생시 유지관리에 편의성을 제공한다. 그리고 코어(36a)가 셔틀(120) 양측방향에서 진입하여 하우징커버(1) 상단부를 사선방향에서 서서히 가압하므로 하우징커버(1) 변형이 방지되고, 적은힘으로 성형성이 우수한 이점이 있다.When the ring-shaped band 2 is inserted into the housing cover 1 from the band assembly 30, the upper portion of the housing cover 1 is finished by the caulking portion 36, And a pair of cores 36a which are pivoted on both sides of the hinge 120 to press the upper portion of the housing cover 1. 7, the upper end of the housing cover 1 is bent by a swinging operation force. At this time, a hard tip is replaceably installed at the end of the core 36a, It provides convenience for maintenance in case of abrasion. Since the core 36a enters from both sides of the shuttle 120 and slowly presses the upper end of the housing cover 1 in the diagonal direction, the housing cover 1 is prevented from being deformed and the moldability is excellent with less force.

도 7 내지 9는 본 발명의 다른 실시예에 따른 소구경 밴드클램프 제조장치의 밴드조립부를 나타내는 구성도이다.7 to 9 are block diagrams showing a band assembly unit of a small diameter band clamp manufacturing apparatus according to another embodiment of the present invention.

상기 밴드조립부(30)에서 하우징 커버(1) 내부로 링형 밴드(2)가 삽입되면 코킹부(36)에 의해 하우징 커버(1) 상부가 마감성형되고, 코킹부(36)는 셔틀(120) 양측에서 경사레일(36b)과 캠롤러(36c)의 미끄럼운동에 의해 상호 역방향으로 이송되면서 하우징 커버(1)를 가압 성형하는 한 쌍의 코어(36a)를 포함하여 이루어진다. 도 7 내지 8과 같이 한 쌍의 코어(36a)은 가이드레일을 타고 서로 대향하는 방향으로 위치이동가능하도록 설치되면서 일단에 경사레일(36b)이 형성되고, 경사레일(36b)에 삽입되는 캠롤러(36c)는 실린더 작동에 의해 코어(36a) 이송방향과 직교하는 방향으로 직선이송되도록 구비된다.When the ring-shaped band 2 is inserted into the housing cover 1 from the band assembly 30, the upper portion of the housing cover 1 is finished by the caulking portion 36, and the caulking portion 36 is closed by the shuttle 120 And a pair of cores 36a for press-molding the housing cover 1 while being transported in mutually opposite directions by sliding movement of the inclined rail 36b and the cam roller 36c at both sides. As shown in FIGS. 7 to 8, the pair of cores 36a are mounted on the guide rails so as to be positionally movable in directions opposite to each other, and are provided with an inclined rail 36b at one end, (36c) is provided so as to be linearly fed in a direction orthogonal to the conveying direction of the core (36a) by cylinder operation.

그리고, 상기 코킹부(36)는 도 7 및 9와 같이 턴테이블(100) 상부에서 X축 구동부(37)에 의해 횡방향으로 위치조절되어 한 쌍의 코어(36a)를 셔틀(120) 양측 위치로 안내하고, 한 쌍의 코어(36a)와 대향하는 턴테이블(100) 하부에는 Y축 구동부(38)에 의해 종방향으로 이송되어 턴테이블(100) 저면을 가압지지하는 유동받침부(39)를 포함하여 이루어진다.7 and 9, the caulking portion 36 is horizontally positioned by the X-axis driving portion 37 at the upper portion of the turntable 100 to couple the pair of cores 36a to both sides of the shuttle 120 And a flow receiving portion 39 which is vertically conveyed by the Y-axis driving portion 38 and presses and supports the bottom surface of the turntable 100, below the turntable 100 facing the pair of cores 36a, .

이에 상기 한 쌍의 코어(36a)는 X축 구동부(37)에 의해 위치이동되어 셔틀(120) 양측에 대응하도록 위치되고, 이어서 축 구동부(38)에 의해 유동받침부(39)가 상방향이송되어 턴테이블(100) 저면을 가압지지한 후, 캠롤러(36c) 이송력에 의해 경사레일(36b)을 타고 한 쌍의 코어(36a)가 상호 역방향으로 이동하면서 커버(1) 상부 돌출편을 마감성형하게 된다.The pair of cores 36a are positioned by the X-axis driving portion 37 and positioned to correspond to both sides of the shuttle 120 and then the flow receiving portion 39 is moved upward by the shaft driving portion 38 A pair of cores 36a are moved in opposite directions while bearing the inclined rail 36b by the feed force of the cam roller 36c to finish the upper protruding piece of the cover 1 after the bottom surface of the turntable 100 is press- .

그리고, 본 발명에 따른 턴테이블(100)은 복수의 셔틀(120)이 등각배치된다. 상기 턴테이블(100)은 도 2 내지 3과 같이 원형판으로 형성되어, 구동부에 의해 등각회전되도록 구비되고, 상부에는 정지상태로 위치되어, 감지센서(S)를 포함하는 고정부품을 장착하도록 설치부(132)가 구비되는 고정플레이트(130)를 포함하여 구성된다.In the turntable 100 according to the present invention, a plurality of shuttles 120 are equally arranged. The turntable 100 is formed as a circular plate as shown in FIGS. 2 to 3 and is rotatably rotated by a driving unit. The turntable 100 is disposed in a stationary state at an upper portion thereof. And a fixing plate 130 having a fixing plate 132.

여기서, 상기 감지센서(S)는 셔틀(120) 정지위치와 인접하도록 배치되어, 셔틀(120)상에 하우징커버(1), 밴드(2), 스크류(3) 로딩여부를 검출하여 제어부로 전송하고, 제어부는 센서(S) 검출신호에 따라 다음 작동을 수행하도록 지령을 송출하게 된다.The detection sensor S is arranged adjacent to the stop position of the shuttle 120 to detect whether the housing cover 1, the band 2, and the screw 3 are loaded on the shuttle 120, And the control unit sends a command to perform the next operation according to the sensor S detection signal.

그리고, 상기 셔틀(120)는 도 4처럼 턴테이블(100)에 고정되는 고정바(122)와, 고정바(122)와 힌지(124)로 결합되어 집개운동되는 유동바(126)와, 턴테이블(100)과 인접하는 위치에서 유동바(126) 단부를 가압하는 밀편(128)을 포함하여 구성된다. 밀편(128)은 실린더 작동에 의해 직선 또는 선회작동되어 유동바(126) 단부를 가압하거나, 셔틀(120)이 정지되는 위치에 캠레일형태로 구비되고, 유동바(126) 단부에 캠롤러를 설치하여, 캠롤러가 캠레일을 타고 가압되면서 셔틀이 클램핑, 언클램핑작동되도록 구비되는 구성도 가능하다.The shuttle 120 includes a fixed bar 122 fixed to the turntable 100 as shown in FIG. 4, a flow bar 126 coupled with the fixed bar 122 and the hinge 124, and a turntable And a mast 128 for pressing the end of the flow bar 126 at a position adjacent to the flow bar 126. The piece 128 is provided in the form of a cam rail at a position where the shuttle 120 is stopped by pressing the end of the flow bar 126 by a linear or swiveling operation by a cylinder operation and a cam roller And the cam roller is pressed against the cam rail to clamp and unclamp the shuttle.

또한, 본 발명에 따른 하우징커버 로딩부(10)는 어느 일측 셔틀(120) 상으로 하우징커버(1)를 각개 공급하도록 구비된다. 도 4에서 하우징커버 로딩부(10)는 하우징커버(1)를 정렬공급하는 피딩기(12)와, 하우징 커버(1)를 셔틀(120)상으로 로딩하는 이송수단(200)으로 구비되고, 이송수단(200)은 일단에 집개(210)가 구비되고 다른 일단에 연결되는 편심암(220)의 회전력에 의해 x, y축 레일부(230)(240)를 타고 곡선 운동되는 작동암(250)으로 이루어진다.In addition, the housing cover loading unit 10 according to the present invention is provided to supply the housing cover 1 separately on one of the shuttles 120. [ 4, the housing cover loading unit 10 is provided with a feeding device 12 for aligning and feeding the housing cover 1 and a conveying means 200 for loading the housing cover 1 onto the shuttle 120, The conveying means 200 includes an actuating arm 250 which is curved in the x and y axis directions 230 and 240 by the rotational force of the eccentric arm 220 provided at one end and connected to the other end, ).

상기 피딩기(12)는 무작위로 투입되는 하우징커버(1)를 일정한 방향으로 정렬 준비하고, 이송수단(200)의 집개(210)를 통하여 하우징커버(1)를 1개씩 각개로 클램핑하여 셔틀(120) 측으로 로딩하는바, 이때 이송수단(200)은 작동암(250)을 y축 방향으로 이송 안내하는 y축 레일부(240)와, y축 레일부(240)와 작동암(250)을 함께 x축방향으로 안내하는 x축 레일부(230)와, 상기 작동암(250) 하단부에는 집개(210)가 설치되고, 상단부는 편심암(220)이 연결된다.The feeding device 12 arranges the housing cover 1 to be randomly inserted in a predetermined direction and clamps the housing cover 1 one by one through the collectors 210 of the conveying means 200, The transfer means 200 includes a y-axis rail portion 240 for guiding and conveying the operation arm 250 in the y-axis direction, a y-axis rail portion 240 for guiding the y-axis rail portion 240 and the operation arm 250 An x-axis rail 230 for guiding the x-axis along the x-axis direction, and a squeezer 210 at the lower end of the actuating arm 250 and an eccentric arm 220 at the upper end.

이에 상기 편심암(220)이 서보모터에 의해 회전하면, 편심암(220)에 연결된 작동암(250)이 편심암(220)의 회전반경을 따라 x, y축 레일부(230)(240)를 타고 도 3과 같이 곡선 운동되면서 피딩기(12)에 정렬대기된 하우징 커버(1)를 셔틀(120)상으로 신속 정확하게 운반하여 사이클 타임이 단축된다.When the eccentric arm 220 is rotated by the servomotor, the operation arm 250 connected to the eccentric arm 220 moves along the radius of rotation of the eccentric arm 220, 3, the housing cover 1, which is waiting to be aligned with the feeder 12, is quickly and accurately transported onto the shuttle 120, thereby shortening the cycle time.

또한, 본 발명에 따른 스크류로딩부(20)는 하우징커버(1) 내부로 스크류(3)를 삽입하도록 구비된다. 도 5에서 스크류로딩부(20)는 스크류(3)를 정렬공급하는 피딩기(22)와, 정렬대기되는 스크류(3) 이송을 제한하여 장전실(24)로 각개 공급하는 스톱퍼(26)와, 장전실(24)에 준비된 스크류(3)를 클램핑하여 하우징커버(1) 내부로 로딩하는 이송수단(200)으로 구성되고, 이송수단(200)은 일단에 집개(210)가 구비되고 다른 일단에 연결되는 편심암(220)의 회전력에 의해 x, y축 레일부(230)(240)를 타고 곡선 운동되는 작동암(250)으로 이루어진다. In addition, the screw loading part 20 according to the present invention is provided to insert the screw 3 into the housing cover 1. 5, the screw loading section 20 includes a feeder 22 for aligning and feeding the screw 3, a stopper 26 for restricting the feeding of the screw 3 to be aligned and feeding the same to the loading chamber 24, And a transfer means 200 for clamping the screw 3 prepared in the loading chamber 24 and loading the inside of the housing cover 1. The transfer means 200 is provided with a collecting unit 210 at one end, And an operating arm 250 which is curved in the x and y axis directions 230 and 240 by the rotational force of the eccentric arm 220 connected to the x and y axis rails 230 and 240.

여기서, 상기 스톱퍼(26)는 실린더 작동에 의해 스크류(3)가 정렬대기된 피딩기(22) 레일상으로 접근하여 스크류(3) 이송을 제한하므로, 1열로 정렬대기되는 스크류(3)가 1개씩 각개로 이송이 허용되어 장전실(24)에 준비되면, 상기 이송수단(200)에 의해 셔틀(120)에 로딩된 하우징 커버(1) 내부로 투입되는바, 이때 이송수단(200)은 상기 하우징커버 로딩부(10)의 이송수단(200)과 동일한 구조로 구성된다.Since the stopper 26 approaches the rail 22 on which the screw 3 is aligned by the operation of the cylinder and restricts the conveyance of the screw 3, the screw 3, which is waiting to be aligned in one row, The transfer means 200 is inserted into the housing cover 1 loaded on the shuttle 120 by the transfer means 200. At this time, And has the same structure as the conveying means 200 of the housing cover loading section 10. [

또한, 본 발명에 따른 밴드조립부(30)는 스크류(3)가 삽입된 하우징커버(1) 상으로 링형 밴드(2)를 삽입하고, 하우징커버(1) 상면을 가압 성형된다. 밴드조립부(30)는 양단부가 겹쳐지도록 링형으로 성형되면서 어느 일측 단부에 하우징커버(1)와 맞물리도록 스톱턱(2a)이 형성되는 링형 밴드(2)와, 링형 밴드(2)는 도 6의 확대도와 같이 피딩기(32)에 의해 종방향으로 정렬공급되면서 한 쌍의 평행레일(34)에 의해 스톱턱(2a)이 걸려 상측을 향하도록 준비되고, 링형 밴드(2)는 터닝수단(300)에 의해 180°방향전환되어 이송수단(200)에 의해 하우징커버(1) 내부로 로딩된다. 이때 상기 이송수단(200)은 상기 하우징커버 로딩부(10)의 이송수단(200)과 동일한 구조로 구성되어, 일단에 집개(210)가 구비되고 다른 일단에 연결되는 편심암(220)의 회전력에 의해 x, y축 레일부(230)(240)를 타고 곡선 운동되는 작동암(250)으로 이루어진다.The band assembly 30 according to the present invention is formed by pressing the upper surface of the housing cover 1 by inserting the ring-shaped band 2 onto the housing cover 1 into which the screw 3 is inserted. The band assembly 2 includes a ring type band 2 in which a stop jaw 2a is formed so as to engage with the housing cover 1 at one end while being formed into a ring shape so that both ends are overlapped with each other, While the ring-shaped band 2 is provided with turning means (not shown) such that the stop jaws 2a are hooked by the pair of parallel rails 34 while being vertically aligned and fed by the feeding device 32, 300 and is then loaded into the housing cover 1 by the conveying means 200. As shown in Fig. At this time, the conveying means 200 has the same structure as the conveying means 200 of the housing cover loading unit 10, and has a collecting unit 210 at one end and a rotational force of the eccentric arm 220 connected to the other end And an actuating arm 250 which is curved in the x, y axis direction by the x and y axis rails 230 and 240.

또한, 상기 터닝수단(300)은 구동부(310)에 의해 180°선회운동되는 터닝셔틀(320)과, 터닝셔틀(320)은 평행레일(34) 상에 준비되는 링형 밴드(2) 상부를 클램핑하여 180°선회작동되면, 링형 밴드(2)가 180°방향전환되어 대기된다. 터닝셔틀(320)은 일단이 구동부에 연결되어 도 6과 같이 평행레일(34) 측으로 선회시 평행레일(34) 상에 준비되는 링형 밴드(2) 상부를 클램핑하고, 이후 역방향으로 180°선회시 링형 밴드(2)가 180°방향전환되어 평행레일(34)상에 준비된 상태로 역방향으로 대기된다. The turning means 300 includes a turning shuttle 320 which is rotated 180 degrees by the driving unit 310 and a turning shuttle 320 which clamps the upper portion of the ring- The ring-shaped band 2 is switched in the 180 占 direction and waits. One end of the turning shuttle 320 is connected to the driving unit to clamp the upper portion of the ring-shaped band 2 prepared on the parallel rail 34 when turning toward the parallel rail 34 as shown in FIG. 6, The ring-shaped band 2 is switched in the direction of 180 DEG and is waiting in the reverse direction in a state ready on the parallel rail 34. [

이후, 상기 이송수단(200)의 작동에 의해 터닝셔틀(320)에 대기된 링형 밴드(2)가 클램핑되어 셔틀(120)에 로딩된 하우징 커버(1) 상면으로 투입되고, 이때 링형 밴드(2)의 스톱턱(2a)이 하우징 커버(1)에 맞물린 상태로 코킹부(36)에 의해 압착성형되어 조립상태가 유지된다.The ring type band 2 waiting in the turning shuttle 320 is clamped by the operation of the conveying means 200 and is introduced into the upper surface of the housing cover 1 loaded on the shuttle 120. At this time, Is engaged with the housing cover 1 and is press-formed by the caulking portion 36, so that the assembled state is maintained.

또한, 상기 밴드조립부(30)에서 하우징 커버(1) 내부로 링형 밴드(2)가 삽입되면 코킹부(36)에 의해 하우징 커버(1) 상부가 마감성형되고, 코킹부(36)는 셔틀(120) 양측에서 힌지를 축으로 선회운동되어 하우징 커버(1) 상부를 가압 성형하는 한 쌍의 코어(36a)를 포함하여 이루어진다. 코어(36a)는 도 7과 같이 'ㄱ'자 형으로 형성되어 선회작동력에 의해 하우징 커버(1) 상단부를 절곡하고, 이때 코어(36a) 단부에는 경질의 팁이 교체가능하게 설치되어 반복사용에 따른 마모발생시 유지관리에 편의성을 제공한다. 그리고 코어(36a)가 셔틀(120) 양측방향에서 진입하여 하우징커버(1) 상단부를 사선방향에서 서서히 가압하므로 하우징커버(1) 변형이 방지되고, 적은힘으로 성형성이 우수한 이점이 있다.When the ring-shaped band 2 is inserted into the housing cover 1 from the band assembly 30, the upper portion of the housing cover 1 is finished by the caulking portion 36, And a pair of cores 36a which are pivoted on both sides of the hinge 120 to press the upper portion of the housing cover 1. 7, the upper end of the housing cover 1 is bent by a swinging operation force. At this time, a hard tip is replaceably installed at the end of the core 36a, It provides convenience for maintenance in case of abrasion. Since the core 36a enters from both sides of the shuttle 120 and slowly presses the upper end of the housing cover 1 in the diagonal direction, the housing cover 1 is prevented from being deformed and the moldability is excellent with less force.

또한, 본 발명에 따른 언로딩부(40)는 언로딩하는 이송수단(200)으로 구비되고, 이송수단(200)은 일단에 집개(210)가 구비되고 다른 일단에 연결되는 편심암(220)의 회전력에 의해 x, y축 레일부(230)(240)를 타고 곡선 운동되는 작동암(250)으로 이루어지는 것을 특징으로 하는 이송수단 또는 실린더의 작동에 의해 밴드조립체를 밀어내거나 집어서 배출하게 된다.The unloading unit 40 according to the present invention is provided with the unloading means 200. The unloading unit 200 includes the eccentric arm 220 having the integrator 210 at one end and the other end connected to the other end, And an operating arm 250 which is curved in the y-axis direction by the rotational force of the x-axis and y-axis portions 230 and 240. The operation of the conveying means or cylinder pushes or pulls out the band assembly .

10: 하우징커버 로딩부 20: 스크류로딩부
30: 밴드조립부 40: 언로딩부
100: 턴테이블
10: Housing cover loading part 20: Screw loading part
30: Band assembly section 40: Unloading section
100: Turntable

Claims (11)

하우징커버(1)와, 하우징커버(1)에 삽입고정되는 스크류(3)와, 하우징커버(1)에 삽입되어 일단은 하우징커버에 고정되면서 타단은 스크류에 나사결합으로 체결되는 링형 밴드로 구성되는 소구경 밴드 클램프를 제조하는 터닝셔틀이 구비된 밴드클램프 제조장치에 있어서,
상기 스크류(3)가 삽입된 하우징커버(1) 상으로 링형 밴드(2)를 삽입하고, 하우징커버(1) 상면을 가압 성형하는 밴드조립부(30)가 구비되고,
상기 밴드조립부(30)는 양단부가 겹쳐지도록 링형으로 성형되면서 어느 일측 단부에 하우징커버(1)와 맞물리도록 스톱턱(2a)이 형성되는 링형 밴드(2)와, 링형 밴드(2)는 피딩기(32)에 의해 종방향으로 정렬공급되면서 한 쌍의 평행레일(34)에 의해 스톱턱(2a)이 걸려 상측을 향하도록 준비되고, 링형 밴드(2)는 터닝수단(300)에 의해 180°방향전환되어 이송수단(200)에 의해 하우징커버(1) 내부로 로딩되는 구성을 포함하여 이루어지고,
상기 밴드조립부(30)에서 하우징 커버(1) 내부로 링형 밴드(2)가 삽입되면 코킹부(36)에 의해 하우징 커버(1) 상부가 마감성형되고, 코킹부(36)는 셔틀(120) 양측에서 경사레일(36b)과 캠롤러(36c)의 미끄럼운동에 의해 상호 역방향으로 이송되면서 하우징 커버(1)를 가압 성형하는 한 쌍의 코어(36a)를 포함하여 이루어지는 것을 특징으로 하는 터닝수단이 구비된 밴드클램프 제조장치.
The housing cover 1 is fixed to the housing cover 1 while the other end thereof is fastened to the screw by screwing. The housing cover 1 is fixed to the housing cover 1 by screws. In a band clamp manufacturing apparatus equipped with a turning shuttle for manufacturing a small diameter band clamp,
A band assembly section 30 for inserting the ring-shaped band 2 onto the housing cover 1 into which the screw 3 is inserted and press-molding the upper surface of the housing cover 1,
The band assembly (30) includes a ring-shaped band (2) formed with a stop jaw (2a) to be engaged with the housing cover (1) at one end while being formed into a ring shape so that both ends are overlapped with each other, And the ring-shaped band 2 is rotated 180 degrees by the turning means 300. The ring-shaped band 2 is rotated by the turning means 300 so that the stopping jaw 2a is hooked by the pair of parallel rails 34, , And is loaded into the housing cover (1) by the conveying means (200)
When the ring-shaped band 2 is inserted into the housing cover 1 from the band assembly 30, the upper portion of the housing cover 1 is finished by the caulking portion 36, and the caulking portion 36 is closed by the shuttle 120 And a pair of cores (36a) for press-forming the housing cover (1) while being transported in mutually opposite directions by sliding movement of the inclined rail (36b) and the cam roller (36c) Wherein the band clamp device comprises:
제 1항에 있어서,
상기 이송수단(200)은 일단에 집개(210)가 구비되고 다른 일단에 연결되는 편심암(220)의 회전력에 의해 x, y축 레일부(230)(240)를 타고 곡선 운동되는 작동암(250)으로 이루어지는 것을 특징으로 하는 터닝수단이 구비된 밴드클램프 제조장치.
The method according to claim 1,
The conveying means 200 includes an operation arm 210 which is provided at one end with a scissors 210 and which is curved in the x and y axis directions 230 and 240 by the rotational force of the eccentric arm 220 connected to the other end 250). ≪ / RTI >
제 1항에 있어서,
상기 터닝수단(300)은 구동부(310)에 의해 180°선회운동되는 터닝셔틀(320)과, 터닝셔틀(320)은 평행레일(34) 상에 준비되는 링형 밴드(2) 상부를 클램핑하여 180°선회작동되면, 링형 밴드(2)가 180°방향전환되어 대기되는 것을 특징으로 하는 터닝수단이 구비된 밴드클램프 제조장치.
The method according to claim 1,
The turning means 300 clamps the upper portion of the ring-shaped band 2 prepared on the parallel rail 34 by the turning shuttle 320 and the turning shuttle 320 which are rotated by 180 ° by the driving unit 310, And the ring-shaped band (2) is switched in the direction of 180 ° when the turning operation is performed.
제 1항에 있어서,
상기 밴드조립부(30)에서 하우징 커버(1) 내부로 링형 밴드(2)가 삽입되면 코킹부(36)에 의해 하우징 커버(1) 상부가 마감성형되고, 코킹부(36)는 셔틀(120) 양측에서 힌지를 축으로 선회운동되어 하우징 커버(1) 상부를 가압 성형하는 한 쌍의 코어(36a)를 포함하여 이루어지는 것을 특징으로 하는 터닝수단이 구비된 밴드클램프 제조장치.
The method according to claim 1,
When the ring-shaped band 2 is inserted into the housing cover 1 from the band assembly 30, the upper portion of the housing cover 1 is finished by the caulking portion 36, and the caulking portion 36 is closed by the shuttle 120 And a pair of cores (36a) pivotally mounted on both sides of the housing cover (1) by press-forming the upper portion of the housing cover (1).
삭제delete 제 1항에 있어서,
상기 코킹부(36)는 턴테이블(100) 상부에서 X축 구동부(37)에 의해 횡방향으로 위치조절되어 한 쌍의 코어(36a)를 셔틀(120) 양측 위치로 안내하고, 한 쌍의 코어(36a)와 대향하는 턴테이블(100) 하부에는 Y축 구동부(38)에 의해 종방향으로 이송되어 턴테이블(100) 저면을 가압지지하는 유동받침부(39)를 포함하여 이루어지는 것을 특징으로 하는 터닝수단이 구비된 밴드클램프 제조장치.
The method according to claim 1,
The caulking portion 36 is horizontally positioned by the X-axis driving portion 37 at the upper portion of the turntable 100 to guide a pair of cores 36a to both sides of the shuttle 120, And a flow receiving portion 39 that is vertically transported by the Y-axis driving portion 38 and presses and supports the bottom surface of the turntable 100 is provided below the turntable 100 facing the turntable 100. [ Wherein the band clamp device comprises:
제 1항에 있어서,
상기 밴드클램프 제조장치는 복수의 셔틀(120)이 등각배치되는 턴테이블(100);
상기 어느 일측 셔틀(120) 상으로 하우징커버(1)를 각개 공급하도록 구비되는 하우징커버 로딩부(10);
상기 하우징커버(1) 내부로 스크류(3)를 삽입하도록 구비되는 스크류로딩부(20);
상기 스크류(3)가 삽입된 하우징커버(1) 상으로 링형 밴드(2)를 삽입하고, 하우징커버(1) 상면을 가압 성형하는 밴드조립부(30);
상기 셔틀(120)을 언클램핑하여 밴드조립체를 배출하는 언로딩부(40);를 포함하여 이루어지는 것을 특징으로 하는 터닝수단이 구비된 밴드클램프 제조장치.
The method according to claim 1,
The band clamp manufacturing apparatus includes a turntable (100) in which a plurality of shuttles (120) are equally arranged;
A housing cover loading unit 10 provided to supply the housing cover 1 on either one of the shuttles 120;
A screw loading unit 20 installed to insert the screw 3 into the housing cover 1;
A band assembling portion 30 for inserting the ring-shaped band 2 onto the housing cover 1 into which the screw 3 is inserted and press-molding the upper surface of the housing cover 1;
And an unloading unit (40) for unclamping the shuttle (120) and discharging the band assembly.
제 7항에 있어서,
상기 셔틀(120)은 턴테이블(100)에 고정되는 고정바(122)와, 고정바(122)와 힌지(124)로 결합되어 집개운동되는 유동바(126)와, 턴테이블(100)과 인접하는 위치에서 유동바(126) 단부를 가압하는 밀편(128)을 포함하여 구성되는 것을 특징으로 하는 터닝수단이 구비된 밴드클램프 제조장치.
8. The method of claim 7,
The shuttle 120 includes a fixed bar 122 fixed to the turntable 100, a movable bar 126 coupled with the fixed bar 122 and the hinge 124 to move the movable bar 126, And a lug (128) for pressing the end of the flow bar (126) at a position of the lug (126).
제 7항에 있어서,
상기 턴테이블(100)은 구동부에 의해 등각회전되도록 구비되고, 상부에는 정지상태로 위치되어, 감지센서(S)를 포함하는 고정부품을 장착하도록 설치부(132)가 구비되는 고정플레이트(130)를 포함하여 구성되는 것을 특징으로 하는 터닝수단이 구비된 밴드클램프 제조장치.
8. The method of claim 7,
The turntable 100 is rotatably rotated by a driving unit and is disposed in a stationary state at an upper portion of the turntable 100. The turntable 100 includes a fixing plate 130 having a mounting portion 132 for mounting a fixing component including the sensing sensor S Wherein the band clamping device is provided with the turning means.
제 7항 내지 제 9항 중 어느 한 항에 있어서,
상기 하우징커버 로딩부(10)는 하우징커버(1)를 정렬공급하는 피딩기(12)와, 하우징 커버(1)를 셔틀(120)상으로 로딩하는 이송수단(200)으로 구비되고, 이송수단(200)은 일단에 집개(210)가 구비되고 다른 일단에 연결되는 편심암(220)의 회전력에 의해 x, y축 레일부(230)(240)를 타고 곡선 운동되는 작동암(250)으로 이루어지는 것을 특징으로 하는 터닝수단이 구비된 밴드클램프 제조장치.
10. The method according to any one of claims 7 to 9,
The housing cover loading unit 10 is provided with a feeder 12 for aligning and feeding the housing cover 1 and a conveying means 200 for loading the housing cover 1 onto the shuttle 120, An operation arm 250 which is curved while riding on the x and y axis rail portions 230 and 240 by the rotational force of an eccentric arm 220 having an integrator 210 at one end and connected to the other end Wherein the band clamping device is provided with a turning means.
제 7항 내지 제 9항 중 어느 한 항에 있어서,
상기 스크류로딩부(20)는 스크류(3)를 정렬공급하는 피딩기(22)와, 정렬대기되는 스크류(3) 이송을 제한하여 장전실(24)로 각개 공급하는 스톱퍼(26)와, 장전실(24)에 준비된 스크류(3)를 클램핑하여 하우징커버(1) 내부로 로딩하는 이송수단(200)으로 구성되고, 이송수단(200)은 일단에 집개(210)가 구비되고 다른 일단에 연결되는 편심암(220)의 회전력에 의해 x, y축 레일부(230)(240)를 타고 곡선 운동되는 작동암(250)으로 이루어지는 것을 특징으로 하는 터닝수단이 구비된 밴드클램프 제조장치.
10. The method according to any one of claims 7 to 9,
The screw loading section 20 includes a feeder 22 for aligning and feeding the screws 3 and a stopper 26 for restricting the feeding of the screw 3 to be aligned and supplying the screws 3 to the loading chamber 24, And a conveying means 200 for clamping the screw 3 prepared in the chamber 24 and loading the inside of the housing cover 1 into the housing cover 1. The conveying means 200 is provided with a collecting unit 210 at one end, And an operating arm (250) curved in the x, y axis directions (230, 240) by the rotational force of the eccentric arm (220).
KR1020170025731A 2017-02-27 2017-02-27 Band clamp manufacturing apparatus equipped with turning means KR101851186B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020170025731A KR101851186B1 (en) 2017-02-27 2017-02-27 Band clamp manufacturing apparatus equipped with turning means

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020170025731A KR101851186B1 (en) 2017-02-27 2017-02-27 Band clamp manufacturing apparatus equipped with turning means

Publications (1)

Publication Number Publication Date
KR101851186B1 true KR101851186B1 (en) 2018-04-24

Family

ID=62084924

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020170025731A KR101851186B1 (en) 2017-02-27 2017-02-27 Band clamp manufacturing apparatus equipped with turning means

Country Status (1)

Country Link
KR (1) KR101851186B1 (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109108650A (en) * 2018-10-30 2019-01-01 上海蓝恩控制系统有限公司 A kind of full-automatic assembling equipment of casing cap assemblies
KR101931147B1 (en) * 2018-09-07 2019-03-13 이돈영 Apparatus and method for manufacturing a connection clamp for a vinyl rounding type vinyl greenhouse
CN109664097A (en) * 2018-12-06 2019-04-23 慈溪市智久自动化设备有限公司 A kind of full-automatic small American hose clamp assembly machine
CN117921349A (en) * 2024-03-22 2024-04-26 苏州可川电子科技股份有限公司 Assembling process of sheet wave-absorbing material processing jig
CN117921349B (en) * 2024-03-22 2024-06-07 苏州可川电子科技股份有限公司 Assembling process of sheet wave-absorbing material processing jig

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007061986A (en) * 2005-09-02 2007-03-15 Honda Motor Co Ltd Supply press-fitting device for part
KR20100006453A (en) * 2008-07-09 2010-01-19 노창현 Automatic assembly device of hose coupling band
KR101467733B1 (en) * 2014-05-15 2014-12-01 이상근 Apparatus for assembling hose-band automatically
KR20160138695A (en) * 2015-05-26 2016-12-06 이희혁 Hose band automated assembly systems

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007061986A (en) * 2005-09-02 2007-03-15 Honda Motor Co Ltd Supply press-fitting device for part
KR20100006453A (en) * 2008-07-09 2010-01-19 노창현 Automatic assembly device of hose coupling band
KR101467733B1 (en) * 2014-05-15 2014-12-01 이상근 Apparatus for assembling hose-band automatically
KR20160138695A (en) * 2015-05-26 2016-12-06 이희혁 Hose band automated assembly systems

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101931147B1 (en) * 2018-09-07 2019-03-13 이돈영 Apparatus and method for manufacturing a connection clamp for a vinyl rounding type vinyl greenhouse
CN109108650A (en) * 2018-10-30 2019-01-01 上海蓝恩控制系统有限公司 A kind of full-automatic assembling equipment of casing cap assemblies
CN109108650B (en) * 2018-10-30 2023-08-11 上海蓝恩控制系统有限公司 Full-automatic assembly equipment of sleeve cover assembly
CN109664097A (en) * 2018-12-06 2019-04-23 慈溪市智久自动化设备有限公司 A kind of full-automatic small American hose clamp assembly machine
CN117921349A (en) * 2024-03-22 2024-04-26 苏州可川电子科技股份有限公司 Assembling process of sheet wave-absorbing material processing jig
CN117921349B (en) * 2024-03-22 2024-06-07 苏州可川电子科技股份有限公司 Assembling process of sheet wave-absorbing material processing jig

Similar Documents

Publication Publication Date Title
KR101872715B1 (en) Large diameter band clamp manufacturing equipment
KR101851186B1 (en) Band clamp manufacturing apparatus equipped with turning means
KR101862173B1 (en) Small diameter band clamp manufacturing equipment
US7699087B2 (en) Method for mounting a pneumatic tire
KR101872716B1 (en) Large Diameter Band Clamp Manufacturing Device with Circular Bending
KR101828374B1 (en) Pipe bending machine
KR101517305B1 (en) Apparatus of Correction Bowing Bolt
CN110921280B (en) Pipe fitting material loading press-fitting mechanism
CN205257276U (en) Long and thin cylinder bar automatic feeding guiding mechanism
KR20120120999A (en) Bending device of pipe
CN205165610U (en) Combination close device
CN111167937A (en) Forming processing device and method for special-shaped parts
WO2015083310A1 (en) Processing unit and processing device
CN106946077B (en) A kind of guide plate servo fixed length feeding device
WO2012070108A1 (en) Roller hemming device
US20100243098A1 (en) Apparatus and method for manufacturing barrel coil spring
JP2003266127A (en) Composite device for bending pipe
CN204093879U (en) The automatic pre-bending device of roof bow
CN103949519A (en) Internal forward spinning nested process composite machine tool with dual metal tubes
CN104289565B (en) The automatic pre-bending device of roof bow
US5605068A (en) Apparatus for rolling a ring-shaped work
CN102152137A (en) Supporting device and method for processing part by using same
KR101775944B1 (en) Wire elongating machine and processing method of metal wire using the same
CN103934477B (en) A kind of turning bearings feed mechanism
KR101413099B1 (en) Welded pipe testing device and testing method

Legal Events

Date Code Title Description
E701 Decision to grant or registration of patent right
GRNT Written decision to grant