KR101667024B1 - Tile construction method for building floor - Google Patents
Tile construction method for building floor Download PDFInfo
- Publication number
- KR101667024B1 KR101667024B1 KR1020160077209A KR20160077209A KR101667024B1 KR 101667024 B1 KR101667024 B1 KR 101667024B1 KR 1020160077209 A KR1020160077209 A KR 1020160077209A KR 20160077209 A KR20160077209 A KR 20160077209A KR 101667024 B1 KR101667024 B1 KR 101667024B1
- Authority
- KR
- South Korea
- Prior art keywords
- horizontal level
- tile
- floor
- modified
- level line
- Prior art date
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F15/00—Flooring
- E04F15/02—Flooring or floor layers composed of a number of similar elements
- E04F15/0215—Flooring or floor layers composed of a number of similar elements specially adapted for being adhesively fixed to an underlayer; Fastening means therefor; Fixing by means of plastics materials hardening after application
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F15/00—Flooring
- E04F15/02—Flooring or floor layers composed of a number of similar elements
- E04F15/02177—Floor elements for use at a specific location
- E04F15/02188—Floor elements for use at a specific location for use in wet rooms
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F15/00—Flooring
- E04F15/12—Flooring or floor layers made of masses in situ, e.g. seamless magnesite floors, terrazzo gypsum floors
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F21/00—Implements for finishing work on buildings
- E04F21/02—Implements for finishing work on buildings for applying plasticised masses to surfaces, e.g. plastering walls
- E04F21/04—Patterns or templates; Jointing rulers
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F21/00—Implements for finishing work on buildings
- E04F21/20—Implements for finishing work on buildings for laying flooring
Abstract
1. Technical Field
The present invention relates to a tile installation method for a floor of a building, and more particularly, to a tile installation method using a remitar, which can easily construct tiles horizontally and horizontally on the floor, The present invention relates to a method of constructing a tile.
2. Configuration and Effect
The method includes fixing a horizontal level point at a predetermined interval on a floor of a foundation, fixing a horizontal level line by applying remitr between the horizontal level points, The method comprising the steps of: filling the gun-beamed remidel with filler; spraying water after spraying the gun-beamed remidel and curing; and applying the adhesive agent for the tile to the gunbeamed remitar that has been cured, The construction time can be shortened by simple and simple construction, and tiles can be easily installed horizontally on the floor of the building, and a uniform construction quality can be obtained.
Description
The present invention relates to a tile installation method for a floor of a building, and more particularly, to a tile installation method using a remitar, which can easily construct tiles horizontally and horizontally on the floor, The present invention relates to a method of constructing a tile.
In general, the tile is applied to the inner wall, outer wall or floor surface of a building or the like, thereby protecting the base material applied to the building and improving the beauty of the building. In particular, walls or floors of swimming pools or bathrooms are often closed with tiles rather than rusty or perishable materials, as they can generate water vapor, water and mold.
The construction method of such a tile is a wet type construction method using mortar (cement) and a dry type construction method using standardized tile. In the dual wet type method, a mortar (cement) is applied over the entire surface of the floor, a tile is attached on the tile, and a joint is formed between the tiles. In order to construct the tile horizontally according to the construction, The construction is difficult and the construction quality is greatly changed depending on the skill of the operator and the working conditions, and the construction period is long.
SUMMARY OF THE INVENTION Accordingly, the present invention has been made in order to solve the problems of the prior art, and it is an object of the present invention to provide a method of constructing a tile for a floor of a building, which is capable of easily constructing a tile continuously horizontally, vertically, There is a purpose.
According to an aspect of the present invention, there is provided a method of fixing a horizontal level point, the method comprising: (a) (b) applying remitelal between the horizontal level points to fix a horizontal level line; (c) embedding and filling the entirety of the foundation floor with the modified tamidel with reference to a fixed horizontal level line; (d) spraying and curing the dry-beam-modified remicade; And (e) applying an adhesive agent for the tile to the gun beam-finished remicade having completed curing.
Preferably, the step (b) may be performed by mixing the remittance solution with an aqueous solution.
Preferably, in the step (c), the gunbeam-modified remidel is filled in the entirety of the foundation floor with reference to the fixed level line using a ruler.
According to another aspect of the present invention, there is provided a method of manufacturing a semiconductor device, comprising the steps of: (a) fixing a horizontal level point at a predetermined interval on a foundation floor; (b) fixing a horizontal level line between the horizontal level points using a pipe; (c) embedding and filling the entirety of the foundation floor with modified tamidel with reference to a fixed horizontal level line; (d) spraying and curing the dry-beam-modified remicade; And (e) applying the adhesive material for the tile to the gunbeam-coated remotely coated tile.
Preferably, in the step (c), the gunbeam-modified remidel is filled in the entirety of the foundation floor on the basis of the level line fixed using a ruler.
As described above, according to the present invention, there is provided a method of fixing a horizontal level line, comprising the steps of: fixing a horizontal level point at regular intervals on a foundation floor; applying a remitelal between the horizontal level points to fix a horizontal level line; The method of
BRIEF DESCRIPTION OF THE DRAWINGS Figure 1 is a process flow diagram illustrating a tile construction method for a building floor according to an embodiment of the present invention.
FIGS. 2 to 6 are flow charts of the respective steps shown in FIG. 1. FIG.
BRIEF DESCRIPTION OF THE DRAWINGS The advantages and features of the present invention, and how to accomplish them, will become apparent by reference to the embodiments described in detail below with reference to the accompanying drawings. However, the present invention is not limited to the embodiments described below, but may be embodied in various other forms.
The present embodiments are provided so that the disclosure of the present invention is thoroughly disclosed and that those skilled in the art will fully understand the scope of the present invention. And the present invention is only defined by the scope of the claims. Thus, in some embodiments, well known components, well known operations, and well-known techniques are not specifically described to avoid an undesirable interpretation of the present invention.
In addition, like reference numerals refer to like elements throughout the specification. Moreover, terms used herein (to be referred to) are intended to illustrate the embodiments and are not intended to limit the invention. In the present specification, the singular form includes plural forms unless otherwise specified in the specification. Also, components and acts referred to as " comprising (or comprising) " do not exclude the presence or addition of one or more other components and operations.
Unless defined otherwise, all terms (including technical and scientific terms) used herein may be used in a sense commonly understood by one of ordinary skill in the art to which this invention belongs. Also, commonly used predefined terms are not ideally or excessively interpreted unless they are defined.
Hereinafter, the technical features of the present invention will be described in detail with reference to the accompanying drawings.
FIG. 1 is a process flow chart for explaining a tile construction method for a building floor according to an embodiment of the present invention, and FIGS. 2 to 6 are process charts for each step shown in FIG.
Referring to FIGS. 1 and 2, in a tile construction method for a building floor according to an embodiment of the present invention, a
Thereafter, as shown in FIGS. 1 and 3, the
On the other hand, the horizontal level line may be fixed by arranging a pipe (not shown) in a grid pattern between the horizontal level points, rather than applying the
Thereafter, as shown in FIGS. 1 and 4, the
Thereafter, as shown in FIGS. 1 and 5, the water W is sprayed onto the gun beamed
Thereafter, as shown in FIGS. 1 and 6, the tile adhesive 14 (dry fix) is applied to the top of the cured
While the present invention has been particularly shown and described with reference to exemplary embodiments thereof, it is to be understood that the invention is not limited to the disclosed exemplary embodiments. It will be understood by those skilled in the art that various changes in form and details may be made therein without departing from the spirit and scope of the invention as defined by the appended claims.
10: foundation floor
11: Fixed chip
12: Remy Tal
13: Gun Beamed Remitals (Gun Remitr)
14: Adhesive for tiles
Claims (5)
(b) applying remitelal between the horizontal level points to fix a horizontal level line;
(c) embedding and filling the entirety of the foundation floor with the modified tamidel with reference to a fixed horizontal level line;
(d) spraying and curing the dry-beam-modified remicade; And
(e) applying an adhesive agent for the tile to the cured bamboam modified primer;
Wherein the tile is constructed of a plurality of tiles.
The step (b)
Wherein the remittance is mixed with a saponification solution.
The step (c)
Wherein the gun base is filled with the gun beam-modified remitr with respect to the fixed level line by using a ruler.
(b) fixing a horizontal level line between the horizontal level points using a pipe;
(c) embedding and filling the entirety of the foundation floor with modified tamidel with reference to a fixed horizontal level line;
(d) spraying and curing the dry-beam-modified remicade; And
(e) applying the adhesive material for the tile to the gunbeam-coated remytal;
Wherein the tile is constructed of a plurality of tiles.
The step (c)
Wherein the floor is filled with the gunbeam-modified remit on the basis of the level line fixed using a ruler.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020160077209A KR101667024B1 (en) | 2016-06-21 | 2016-06-21 | Tile construction method for building floor |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020160077209A KR101667024B1 (en) | 2016-06-21 | 2016-06-21 | Tile construction method for building floor |
Publications (1)
Publication Number | Publication Date |
---|---|
KR101667024B1 true KR101667024B1 (en) | 2016-10-17 |
Family
ID=57250355
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR1020160077209A KR101667024B1 (en) | 2016-06-21 | 2016-06-21 | Tile construction method for building floor |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR101667024B1 (en) |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR920012689A (en) | 1990-12-05 | 1992-07-27 | 김경환 | Tile adhesive construction method |
KR20040066230A (en) * | 2003-01-17 | 2004-07-27 | 금강하이텍주식회사 | Method of hypocaust and it's Apparatus for an apartment house |
KR20040083993A (en) | 2003-03-26 | 2004-10-06 | 현대산업개발 주식회사 | a method of tilesetting |
KR20060016675A (en) | 2004-08-18 | 2006-02-22 | 한광석 | Method construction of material floor tile form |
KR20090017101A (en) * | 2007-08-14 | 2009-02-18 | (주)아도니스글로벌 | Flooring structure and construction method using it |
KR20090017096A (en) * | 2007-08-14 | 2009-02-18 | (주)아도니스글로벌 | Flooring structure and construction method using it |
KR101395813B1 (en) | 2013-12-06 | 2014-05-15 | (주)우림엔지니어링건축사사무소 | Wet tile construction method for building |
-
2016
- 2016-06-21 KR KR1020160077209A patent/KR101667024B1/en active IP Right Grant
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR920012689A (en) | 1990-12-05 | 1992-07-27 | 김경환 | Tile adhesive construction method |
KR20040066230A (en) * | 2003-01-17 | 2004-07-27 | 금강하이텍주식회사 | Method of hypocaust and it's Apparatus for an apartment house |
KR20040083993A (en) | 2003-03-26 | 2004-10-06 | 현대산업개발 주식회사 | a method of tilesetting |
KR20060016675A (en) | 2004-08-18 | 2006-02-22 | 한광석 | Method construction of material floor tile form |
KR20090017101A (en) * | 2007-08-14 | 2009-02-18 | (주)아도니스글로벌 | Flooring structure and construction method using it |
KR20090017096A (en) * | 2007-08-14 | 2009-02-18 | (주)아도니스글로벌 | Flooring structure and construction method using it |
KR101395813B1 (en) | 2013-12-06 | 2014-05-15 | (주)우림엔지니어링건축사사무소 | Wet tile construction method for building |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP5576207B2 (en) | Installation foundation and its construction method | |
CN108589975A (en) | Assembling cladding and construction technology | |
JP5835390B2 (en) | Foundation structure | |
CN109138227A (en) | Without exterior sheathing exterior-wall heat insulation and structure-integrated pouring molding construction technology | |
CN206916972U (en) | A kind of external heat insulating wall | |
KR101667024B1 (en) | Tile construction method for building floor | |
JP2008127920A (en) | Foundation and manufacturing method thereof | |
KR100954725B1 (en) | Waterproofing and anticorrosion method of concrete structure | |
CN106759993A (en) | A kind of external heat insulating wall and construction method | |
CN106284735A (en) | Lightgage steel joist cement plate external wall construction method | |
KR20220060866A (en) | Construction method for building floor tiles using Remital | |
KR20160016350A (en) | The construction method of floor covering materials using concrete stain | |
KR20170040146A (en) | Maintenance method of detachment area by using a trowel combined with a trowel and a trowel brush for repairing a concrete detachment site on a building wall | |
KR101455318B1 (en) | Artificial Sculpture Having Waterproof Structure and Its Construction Method | |
KR102191532B1 (en) | Liquid waterproof agent and constructing method for waterproof by using the same | |
KR101590616B1 (en) | Building outer wall and construction method beauty treatment metal lath reinforcing | |
KR101074647B1 (en) | Fiber pipe and method of construction using the same | |
KR101593026B1 (en) | Basement wall drainage retardant formulations | |
KR20170065373A (en) | floor surface water proof structure and the method of construction of floor surface water proof structure | |
KR20220157070A (en) | Construction method of floor tiles that can improve construction quality and shorten the period | |
CN104929366A (en) | Construction method for arranging thermal insulation material on wall | |
KR101055784B1 (en) | Internal coating method of water tank | |
TWI539067B (en) | Waterproofing construction method for external wall | |
CN205857443U (en) | A kind of shaped steel fireproof construction of steel building | |
TW201621122A (en) | Object having cement coating structure and construction method thereof |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
E701 | Decision to grant or registration of patent right | ||
GRNT | Written decision to grant |