CN106284735A - Lightgage steel joist cement plate external wall construction method - Google Patents
Lightgage steel joist cement plate external wall construction method Download PDFInfo
- Publication number
- CN106284735A CN106284735A CN201510279411.3A CN201510279411A CN106284735A CN 106284735 A CN106284735 A CN 106284735A CN 201510279411 A CN201510279411 A CN 201510279411A CN 106284735 A CN106284735 A CN 106284735A
- Authority
- CN
- China
- Prior art keywords
- cement plate
- waterproof roll
- external wall
- steel joist
- wall construction
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Landscapes
- Floor Finish (AREA)
Abstract
The present invention relates to external wall construction method.A kind of lightgage steel joist cement plate external wall construction method, it comprises the following steps: lightgage steel joist and cement plate installation steps;Cleaning basic unit step, including waterproof roll paving and the cleaning on waterproof roll surface;Brushing interfacial agents step;Wire netting step is installed: wire netting need to select diamond-mesh and barbed;Not being close to waterproof roll during wire netting paving, use self threading pin to be fixed, self threading pin installing space 300-500mm, and blossom type layout, self threading pin mount point should make concave surface;Patch ash cake step;Scratch coat step, configures including the material parameter proportioning according to producer, and stirs, and selects and either manually or mechanically sprays, and covers wire netting;Finish coat step, its method is identical with scratch coat, but the thickness of finish coat must not exceed 20mm, uses batch cutter that surface is received light, and curing step after having plastered.The present invention is used on external wall construction, can be effectively improved work efficiency, reduces cost.
Description
Technical field
The present invention relates to wall construction, particularly relate to a kind of external wall construction method.
Background technology
Modern many time limit for project are nervous, and for undertaking of construction, profit is the lowest.Wherein the cost of the construction of brick body body of wall, casting reinforced concrete body of wall and steel construction wall is high, and the cycle is long, and some difficulty of construction are the biggest.
Lightgage steel joist cement plate walling system is currently mainly applied to indoor partition, but owing to exterior wall is different with the requirement of indoor partition, this type of body of wall is applied to external wall system and had not met report, but lightgage steel joist walling system is compared with other external wall system, reduction of erection time can reduce construction cost, it is necessary to find applicable construction method.
Summary of the invention
It is contemplated that overcome the defect of prior art, it is provided that a kind of lightgage steel joist cement plate external wall construction method.The present invention is used on external wall construction, can be effectively improved work efficiency, reduces cost.
In order to solve above-mentioned technical problem, a kind of lightgage steel joist cement plate external wall construction method, it comprises the following steps:
Lightgage steel joist and cement plate installation steps;
Cleaning basic unit step, including waterproof roll paving and the cleaning on waterproof roll surface;
Brushing interfacial agents step;
Wire netting step is installed: wire netting need to select diamond-mesh, and barbed;Not being close to waterproof roll during wire netting paving, wire netting uses self threading pin to be fixed, self threading pin installing space 300-500mm, and blossom type is arranged, self threading pin mount point should make concave surface so that with the spacing of waterproof roll at 7-9mm;
Patch ash cake step;
Scratch coat step, configures including the material parameter proportioning according to producer, and stirs, and selects and either manually or mechanically sprays, and selects depending on field condition;Scratch coat must not exceed 10mm, covers wire netting;
Finish coat step, its method is identical with scratch coat, but the thickness of finish coat must not exceed 20mm, uses batch cutter that surface is received light after having plastered,
And curing step.
Described lightgage steel joist cement plate external wall construction method, described waterproof roll selects the polyurethane water-proof coiled material of concave-convex surface, and coiled material is self-constriction;With broom or hairbrush, waterproof roll surface and oil contaminant etc. is cleaned out, and confirm coiled material and cement plate metope firm pasting.
Described lightgage steel joist cement plate external wall construction method, self threading pin when fixing wire netting need to penetrate waterproof roll and be fixed on cement plate basal plane, guaranteeing that the degree of depth that metope is shot in self threading pin and waterproof roll sealing and self threading pin must not be less than 25mm, singly nail pulling force cannot be less than 0.4KN..
Described lightgage steel joist cement plate external wall construction method, in described patch ash cake step, controls ash cake size, and ash cake must select material equal with body of wall and proportioning identical material when making.
Described lightgage steel joist cement plate external wall construction method, described scratch coat step also includes: must be by compacting of plastering, it is ensured that ash material fills full screening;Scratch coat uses standard tooth form scraper laterally to scrape regular teeth groove, to increase the cohesive force that next layer is plastered after completing;After bottom completes, curing time must not can be carried out next layer plaster less than 3 days after bottom condenses firmly.
Described lightgage steel joist cement plate external wall construction method, after curing time reaches, requires to carry out the decorative model work such as coating application according to designer.
By the method for the present invention, lightgage steel joist cement board wall system can be used on exterior wall, substantially increase work efficiency, meet owner's requirement to the duration;For construction enterprises, once owner allows to use lightgage steel joist cement plate exterior wall, just can reduce cost, increase the benefit.
Detailed description of the invention
Below, in conjunction with detailed description of the invention, the present invention is made a detailed description:
The main clear and definite lightgage steel joist external wall plastering construction technology of the present invention and technology requirement;As a example by 25mm solid cement is plastered, determine that corresponding plastering construction process sequence is: basic unit-brushing interfacial agents-installation metal mesh sheet-patch ash cake-scratch coat-finish coat-maintenance is installed-cleared up to lightgage steel joist.
Plastering construction flow process
Waterproof roll paving
The coiled material of concave-convex surface must be selected during polyurethane water-proof coiled material paving, to increase the adhesive force of surface plastering, and coiled material is self-constriction (self threading pin when fixing steel wire need to penetrate waterproof roll and be fixed on cement plate basal plane, it is ensured that self threading pin seals with waterproof roll).
Base treatment before plastering
With broom or hairbrush, waterproof roll surface and oil contaminant etc. need to be cleaned out, and confirm coiled material and cement backer board metope firm pasting.
Brushing interfacial agents
After web substrates has processed, before plastering, the interfacial agents that producer configures uniformly is painted on waterproof roll surface, in order to strengthen the adhesive force with coiled material of plastering.
Wire netting is installed
Wire netting need to select diamond-mesh, and has agnail (cement mortar free-falling when preventing vertical from plastering);Not being close to waterproof roll during wire netting paving, wire netting uses self threading pin to be fixed, and self threading pin installing space is advisable with 400mm, and blossom type is arranged, self threading pin mount point should make concave surface so that with the spacing of waterproof roll at about 8mm.And self threading pin shoots the degree of depth of metope and must not be less than 25mm, single nail pulling force cannot be less than 0.4KN.
Patch ash cake
Patch ash cake main purpose ensures depth of plastering and the control of surface smoothness, and ash cake is unsuitable excessive, and ash cake must select material equal with body of wall and proportioning identical material when making.
Scratch coat
During scratch coat, the material parameter proportioning according to producer configures, and stirs, and selects and either manually or mechanically sprays, and selects depending on field condition;Scratch coat must not exceed 10mm, is advisable covering wire netting, but no matter craft or machinery all must be by compactings of plastering, it is ensured that ash material fills full screening;Scratch coat uses standard tooth form scraper laterally to scrape regular teeth groove, to increase the cohesive force that next layer is plastered after completing;After bottom completes, curing time must not can be carried out next layer plaster less than 3 days after bottom condenses firmly.
Finish coat
Finish coat mode is essentially identical with bottom, but the thickness of finish coat must not exceed, and 20mm(is blocked up prevents cracking), use batch cutter that surface is received light after having plastered, after curing time reaches, can require to carry out coating application etc. according to designer.
Claims (6)
1. a lightgage steel joist cement plate external wall construction method, it is characterised in that it comprises the following steps:
Lightgage steel joist and cement plate installation steps;
Cleaning basic unit step, including waterproof roll paving and the cleaning on waterproof roll surface;
Brushing interfacial agents step;
Wire netting step is installed: wire netting need to select diamond-mesh, and barbed;Not being close to waterproof roll during wire netting paving, wire netting uses self threading pin to be fixed, self threading pin installing space 300-500mm, and blossom type is arranged, self threading pin mount point should make concave surface so that with the spacing of waterproof roll at 7-9mm;
Patch ash cake step;
Scratch coat step, configures including the material parameter proportioning according to producer, and stirs, and selects and either manually or mechanically sprays, and selects depending on field condition;Scratch coat must not exceed 10mm, covers wire netting;
Finish coat step, its method is identical with scratch coat, but the thickness of finish coat must not exceed 20mm, uses batch cutter that surface is received light after having plastered;
And curing step.
Lightgage steel joist cement plate external wall construction method the most according to claim 1, it is characterised in that described waterproof roll selects the polyurethane water-proof coiled material of concave-convex surface, and coiled material is self-constriction;With broom or hairbrush, waterproof roll surface and oil contaminant etc. is cleaned out, and confirm coiled material and cement plate metope firm pasting.
Lightgage steel joist cement plate external wall construction method the most according to claim 1, it is characterised in that
Self threading pin when fixing wire netting need to penetrate waterproof roll and be fixed on cement plate basal plane, it is ensured that the degree of depth of metope is shot in self threading pin and waterproof roll sealing and self threading pin must not be less than 25mm, and single nail pulling force cannot be less than 0.4KN.
Lightgage steel joist cement plate external wall construction method the most according to claim 1, it is characterised in that in described patch ash cake step, controls ash cake size, and ash cake must select material equal with body of wall and proportioning identical material when making.
Lightgage steel joist cement plate external wall construction method the most according to claim 1, it is characterised in that
Described scratch coat step also includes: must be by compacting of plastering, it is ensured that ash material fills full screening;Scratch coat uses standard tooth form scraper laterally to scrape regular teeth groove, to increase the cohesive force that next layer is plastered after completing;After bottom completes, curing time must not can be carried out next layer plaster less than 3 days after bottom condenses firmly.
Lightgage steel joist cement plate external wall construction method the most according to claim 1, it is characterised in that after curing time reaches, requires to carry out the decorative model work such as coating application according to designer.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510279411.3A CN106284735B (en) | 2015-05-28 | 2015-05-28 | Lightgage steel joist cement plate external wall construction method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510279411.3A CN106284735B (en) | 2015-05-28 | 2015-05-28 | Lightgage steel joist cement plate external wall construction method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106284735A true CN106284735A (en) | 2017-01-04 |
CN106284735B CN106284735B (en) | 2019-01-18 |
Family
ID=57634231
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510279411.3A Active CN106284735B (en) | 2015-05-28 | 2015-05-28 | Lightgage steel joist cement plate external wall construction method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106284735B (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106958305A (en) * | 2017-04-01 | 2017-07-18 | 南京锎巴新材料科技有限公司 | A kind of polyurethane-base high-strength light integrated wall and its spraying preparation method |
CN107190929A (en) * | 2017-05-31 | 2017-09-22 | 上海二十冶建设有限公司 | The method that waterproof roll mortar cover ftractures is prevented using mortar gunite method |
CN108149811A (en) * | 2018-01-16 | 2018-06-12 | 中铁建设集团有限公司 | A kind of construction safety system for shielding electromagnetic radiation |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101067314A (en) * | 2007-06-26 | 2007-11-07 | 蔡清华 | Building external wall waterproof and anticracking construction method |
CN201224933Y (en) * | 2008-05-30 | 2009-04-22 | 天津电力建设公司 | Frame beam preventing water seepage and crack and wall stuffing structure |
CN101608478A (en) * | 2009-07-07 | 2009-12-23 | 广东省第四建筑工程公司 | Waterproof heat-preserving wall and job practices thereof |
DE202010002354U1 (en) * | 2010-02-13 | 2010-07-15 | Truöl, Rainer | Internal insulation of exterior walls in a building for thermal insulation |
CN102071750A (en) * | 2011-01-20 | 2011-05-25 | 董阳军 | Dew formation-preventing building envelope structure for different thermal areas |
-
2015
- 2015-05-28 CN CN201510279411.3A patent/CN106284735B/en active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101067314A (en) * | 2007-06-26 | 2007-11-07 | 蔡清华 | Building external wall waterproof and anticracking construction method |
CN201224933Y (en) * | 2008-05-30 | 2009-04-22 | 天津电力建设公司 | Frame beam preventing water seepage and crack and wall stuffing structure |
CN101608478A (en) * | 2009-07-07 | 2009-12-23 | 广东省第四建筑工程公司 | Waterproof heat-preserving wall and job practices thereof |
DE202010002354U1 (en) * | 2010-02-13 | 2010-07-15 | Truöl, Rainer | Internal insulation of exterior walls in a building for thermal insulation |
CN102071750A (en) * | 2011-01-20 | 2011-05-25 | 董阳军 | Dew formation-preventing building envelope structure for different thermal areas |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106958305A (en) * | 2017-04-01 | 2017-07-18 | 南京锎巴新材料科技有限公司 | A kind of polyurethane-base high-strength light integrated wall and its spraying preparation method |
CN107190929A (en) * | 2017-05-31 | 2017-09-22 | 上海二十冶建设有限公司 | The method that waterproof roll mortar cover ftractures is prevented using mortar gunite method |
CN108149811A (en) * | 2018-01-16 | 2018-06-12 | 中铁建设集团有限公司 | A kind of construction safety system for shielding electromagnetic radiation |
Also Published As
Publication number | Publication date |
---|---|
CN106284735B (en) | 2019-01-18 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106284706A (en) | The construction method of external wall outer insulation rock cotton board | |
CN106284735A (en) | Lightgage steel joist cement plate external wall construction method | |
CN102852290A (en) | Roof parapet flashing place structure and construction method thereof | |
CN104120845A (en) | Construction method for outer wall inorganic thermal mortar coating decorative finishing | |
CN101736825A (en) | Method for construction of outer wall external heat preservation system | |
CN106256970A (en) | A kind of spray plaster technique | |
CN112267628A (en) | Construction method of plastering-free system for interior wall decoration of constructional engineering | |
CN106284998A (en) | Plastering on inner walls completely spreads fiberglass gridding cloth construction method | |
CN109750758A (en) | The construction method that prefabricated sandwich heat preservation shear wall exterior wall is laterally stitched and vertically stitched | |
CN108589975A (en) | Assembling cladding and construction technology | |
CN101545269B (en) | Method for rigid waterproof construction of beam and slab type basement | |
KR100906565B1 (en) | The remodeling method of structure with tiles | |
CN107761968A (en) | Exterior wall internal insulation mortar joins position construction method | |
CN105625589A (en) | Exterior wall insulation structure and manufacture method thereof | |
CN106836683A (en) | A kind of construction method of Machine-made Sand aggregate dry-mixed mortar coated building metope | |
CN110761529A (en) | Construction method of modeling plastic-stone structure | |
CN109881794A (en) | A kind of swimming pool waterproof construction | |
CN204401809U (en) | Surface has the skin insulation layer of simulated decorative effect | |
CN108951904A (en) | A kind of steel core concrete column outsourcing pea gravel concreten fireprotection layer construction | |
CN103291093A (en) | Stepped stand building surface layer laying method | |
WO2017177749A1 (en) | Building reinforcement structure and building reinforcement method | |
CN104060794B (en) | Crystal sand-finished sound transmission and sound absorption compound ceiling and construction method thereof | |
CN111677210A (en) | Gypsum mortar construction process | |
CN104895201A (en) | Construction method for external wall internal warming mortar connecting part | |
CN104481039A (en) | Building outer wall heat insulation layer with surface simulation decoration effect and construction technology of building outer wall heat insulation layer |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right |
Effective date of registration: 20190411 Address after: 2010 900 Luodian Development Zone, Baoshan District, Shanghai (No. 102 A-150, Shiyi Road) Patentee after: Shanghai Baoye construction decoration Co. Ltd Address before: No. 2457 Fuyuan Road, Baoshan District, Shanghai, 2004 Patentee before: Shanghai Baoye Group Corp., Ltd. |
|
TR01 | Transfer of patent right |