CN106256970A - A kind of spray plaster technique - Google Patents

A kind of spray plaster technique Download PDF

Info

Publication number
CN106256970A
CN106256970A CN201610671580.6A CN201610671580A CN106256970A CN 106256970 A CN106256970 A CN 106256970A CN 201610671580 A CN201610671580 A CN 201610671580A CN 106256970 A CN106256970 A CN 106256970A
Authority
CN
China
Prior art keywords
module
metope
plastering
thickness
rib
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610671580.6A
Other languages
Chinese (zh)
Other versions
CN106256970B (en
Inventor
邹学辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HUNAN RUIJIDA TECHNOLOGY CO.,LTD.
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201610671580.6A priority Critical patent/CN106256970B/en
Publication of CN106256970A publication Critical patent/CN106256970A/en
Application granted granted Critical
Publication of CN106256970B publication Critical patent/CN106256970B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F13/00Coverings or linings, e.g. for walls or ceilings
    • E04F13/02Coverings or linings, e.g. for walls or ceilings of plastic materials hardening after applying, e.g. plaster
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F13/00Coverings or linings, e.g. for walls or ceilings
    • E04F13/02Coverings or linings, e.g. for walls or ceilings of plastic materials hardening after applying, e.g. plaster
    • E04F13/04Bases for plaster
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F13/00Coverings or linings, e.g. for walls or ceilings
    • E04F13/02Coverings or linings, e.g. for walls or ceilings of plastic materials hardening after applying, e.g. plaster
    • E04F13/04Bases for plaster
    • E04F13/06Edge-protecting borders
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F13/00Coverings or linings, e.g. for walls or ceilings
    • E04F13/02Coverings or linings, e.g. for walls or ceilings of plastic materials hardening after applying, e.g. plaster
    • E04F13/04Bases for plaster
    • E04F13/06Edge-protecting borders
    • E04F2013/063Edge-protecting borders for corners

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Building Environments (AREA)

Abstract

A kind of spray plaster technique of the present invention, including base treatment;Get rid of slurry lapping, lay steel wire, brushing interfacial agents in region to be plastered at different materials matrix intersection;Metope floating screed, arranges rib on metope;Die-filling, the position forming external corner at metope arranges module, a wherein side wall of the external corner that module is close to metope is calibrated rear fixing, and makes one end of module protrude to opposite side metope side, and the thickness of this protrusion is the depth of plastering of the another side of external corner;It is layered process of plastering, controls the perpendicularity of wall plastering, flatness and depth of plastering using rib, module as benchmark;Form removal processes.The spray plaster technique of the present invention ensure that plastering quality, it is ensured that efficiency of plastering, it is possible to reduces mason's skill set requirements.

Description

A kind of spray plaster technique
Technical field
The present invention relates to architectural construction technology field, be specifically related to a kind of spray plaster technique.
Background technology
In traditional architecture construction, the construction mainly dependence to metope is manually plastered, and mortar is manually transported by needs of manually plastering Deliver to different floor, then by manually smearing on metope by certain technique by mortar, not only labor intensity is big, and efficiency is low.Due to Everyone technical merit is different with strength, it is impossible to ensure the degree of compaction of coat of plaster, and the metope mass discrepancy smeared out is relatively big, some Metope easily cause metope hollowing, ftracture, the quality problems such as come off, cause and do over again or increase later period maintenance workload.
And along with the progress of society, mechanically spraying plastering technique will gradually substitute and manually plaster.Mechanically spraying is plastered and is exactly The mortar being stirred, enter mortar conveying pump through vibrosieve hypsokinesis, by pipeline, relend the pressure helping air compressor, Mortar is continuously and uniformly sprayed on metope and ceiling, then rubs with the hands in fact through levelling, completes floated finish.Although mechanically spraying is plastered It is to instead of manpower by mechanically spraying device, therefore, it is possible to be substantially reduced the labor intensity of workman, shortens the engineering time, with Time ensure that the degree of compaction of coat of plaster, but still need to combine rational plastering technique and could realize the guarantee of quality.
Chinese patent literature CN103821252A discloses the technological process of a kind of wall plastering, including: remove metope Floating ash → moistening basic unit → brushing interfacial agents of correction filling-in jointing → watering → do ash cake → 1:1 cement mortar or gluewater in use for construction Mud plucking metope → necessary part linked network processes → smears bottom ash → exterior wall and is completely plated in and sets alkali-proof glass fiber mesh → smear Surface layer ash → overlay film maintenance → cleaning.
Owing to metope forms the edge that the position of external corner is often body of wall, or the privileged sites such as door opening, window opening, this A little positions are not suitable for being provided as the rib of benchmark, therefore, when plastering, formed external corner position depth of plastering, hang down The Personal Skills that straight degree and flatness are entirely by mason ensures, therefore, the Personal Skills of mason is required height, According to above-mentioned technological process, employing machine sprays when plastering mode, depth of plastering, perpendicularity, and flatness is difficult to ensure, usually goes out Existing efficiency there is not quality, has the problem that quality there is not efficiency.
Summary of the invention
Therefore, the technical problem to be solved in the present invention is that the wall plastering technique overcoming prior art is in employing machine spray side When formula is plastered, depth of plastering, perpendicularity, and flatness be difficult to ensure, usually have efficiency and do not have quality, have quality not have efficiency Defect, thus provide one to ensure that plastering quality, it is ensured that efficiency of plastering, it is possible to reduce the spray to mason's skill set requirements It is coated with plastering technique.
For solving above-mentioned technical problem, a kind of spray plaster technique of the present invention, including
Base treatment;
Get rid of slurry lapping, lay steel wire, brushing interfacial agents in region to be plastered at different materials matrix intersection;
Metope floating screed, arranges rib on metope;
Die-filling, the position forming external corner at metope arranges module, and module is close to a wherein side wall of the external corner of metope Fixing after calibrated, and make one end of module protrude to opposite side metope side, the thickness of this protrusion is the another of external corner The depth of plastering of one side;
It is layered process of plastering, controls the perpendicularity of wall plastering, flatness and thickness of plastering using rib, module as benchmark Degree, carries out process of plastering between rib and rib or between rib and module;
Form removal processes.
In the spray plaster technique of the present invention, the inner side metope of same body of wall, outside metope are both needed to plaster, with this Inner side metope, outside metope are respectively formed on the end metope of external corner and use bilateral die-filling, and two modules are all close to end metope and are arranged, The wherein protrusion of the inside side wall in one end of a module side, one end of another module metope side laterally is convex Going out, module fixing construction is between two modules, and two modules share or have the most independent module fixing construction.
In the spray plaster technique of the present invention, module fixing construction is: along the length direction of module, be close to module Metope at least provided with two holes, and squeeze into stopper in each hole, each stopper squeezed into the iron-plate nail with iron plate, logical Cross iron plate to coordinate with metope and be clamped fixing by module.
In the spray plaster technique of the present invention, the metope of the module being close to vertical direction is provided with upper and lower two holes, For the module that height be vertical direction setting on the door opening of 2.1-2.5 rice or window opening, lower opening overhead 40cm, lower opening is with upper Distance between hole is 130cm;For the module that height be vertical direction setting on the door opening of 2.5-3.2 rice or window opening, under Hole overhead 60cm, between upper hole and lower opening for distance 140cm.
In the spray plaster technique of the present invention, described module is corrected relative to metope by laser.
In the spray plaster technique of the present invention, region of plastering is narrow space, or corner is many or door and window is many or area is few, Or during constructing operation one-shot forming region slowly, the thickness of module protrusion and the consistency of thickness of rib.
In the spray plaster technique of the present invention, described layering is plastered, and process includes plastering successively, floating rule, polishing, essence are smeared.
In the spray plaster technique of the present invention, region of plastering is that space is relatively big, or wall area is relatively big, constructing operation side During post forming region just, the thickness that module is protruded is higher than the thickness of rib, and rib thickness constitutes scratch coat thickness, mould The thickness that block protrudes constitutes finish coat thickness with the thickness difference of rib.
In the spray plaster technique of the present invention, the thickness that module is protruded exceeds the thickness 5mm of rib.
In the spray plaster technique of the present invention, described layering is plastered to process and is included scratch coat, bottom floating rule, face successively Layer is plastered, surface layer floating rule, polishing, essence are smeared.
In the spray plaster technique of the present invention, the door and window not installing module of width≤1.2 meter, two vertical bars are installed Bar, straight channel ceiling;The door and window of width >=1.4 meter, its top and bottom are both needed to lay vertical rib.
In the spray plaster technique of the present invention, being layered the mode of plastering processed in step of plastering is machine spray.
In the spray plaster technique of the present invention, between nozzle and metope angle keep 90-95 °, nozzle and metope distance At about 20cm.
In the spray plaster technique of the present invention, described interfacial agents is by the plain-water slurry that weight proportion is 2:1 and interior water mixing Weigh the 801 glue compositions of 25%.
Technical solution of the present invention, has the advantage that
1, in the present invention, the position forming external corner at metope arranges module, module is close to the external corner of metope wherein Fixing after one side wall is calibrated, and make one end of module protrude to opposite side metope side, the thickness of this protrusion is The depth of plastering of the another side of external corner.Make the metope to be plastered at external corner can control wall at external corner using module as benchmark Perpendicularity, flatness and the depth of plastering plastered in face, thus still machine spray of the most manually plastering all can be lowered mason The requirement of technical ability, improves plastering quality, it is ensured that efficiency of construction, sprays mode especially with machine. and plastering quality, efficiency of plastering have It is greatly improved.
2, in the present invention, region of plastering is divided into one-shot forming region targetedly, post forming region, and to once Forming area, post forming region uses different modes of plastering, it is possible to increase while speed of plastering, it is ensured that plastering quality.
Accompanying drawing explanation
In order to be illustrated more clearly that the specific embodiment of the invention or technical scheme of the prior art, below will be to specifically In embodiment or description of the prior art, the required accompanying drawing used is briefly described, it should be apparent that, in describing below Accompanying drawing is some embodiments of the present invention, for those of ordinary skill in the art, before not paying creative work Put, it is also possible to obtain other accompanying drawing according to these accompanying drawings.
Fig. 1 is the flow chart of the spray plaster technique of the present invention.
Detailed description of the invention
Below in conjunction with accompanying drawing, technical scheme is clearly and completely described, it is clear that described enforcement Example is a part of embodiment of the present invention rather than whole embodiments.Based on the embodiment in the present invention, ordinary skill The every other embodiment that personnel are obtained under not making creative work premise, broadly falls into the scope of protection of the invention.
Before implementing the spray plaster technique of the present invention, also include pan feeding, feeding, the big step of sub-material three.Wherein pan feeding In step, use 325R composite Portland cement, mean diameter be the Machine-made Sand of 2.0-2.5mm and mineral additive by than Example configures.In feeding step, mixing plant open blender, raw material is stirred 2 minutes when dry powder, accomplish and starch and Time, quality is good, and without thin pulp, dry pulp phenomenon, in time, the tank car time on the way can not enter pump mortar more than 4 hours in transport simultaneously Denseness >=95mm, water retention >=94%.Sub-material step need to accomplish that flavoring agent is timely, and sub-material is well-balanced, without flush coater idle running phenomenon.
As it is shown in figure 1, the spray plaster technique of the present invention includes
Base treatment → get rid of slurry lapping → metope floating screed, die-filling → layering are plastered processs → form removal process.
The most in the present invention, base treatment step includes: 1, chipping basic unit protruding parts, wherein protruding parts is permissible Pass through infrared detection;2, cleaning main body construction residue, such as nail, unit's silk, tongue ash etc.;3, cleaning substrate surface grieshoch, Dirt, oil stain etc., and moistening in construction watering the previous day.
After base treatment step, come into effect and get rid of slurry lapping process, be specially and lay at different materials matrix intersection Steel wire, brushing interfacial agents in region to be plastered;The laying of steel wire is prevented from plaster and crack, interfacial agents occurs Brushing can the bonding of reinforced cement mortar and body of wall.Wherein during lapping, steel wire and the lap-joint >=15cm of each matrix;Steel Silk screen is preferably used the square steel wire of the length of side≤20mm, and mesh diameter >=0.4mm.Interfacial agents is generally brushed at concrete coagulation Cob wall face, the beam column built from concrete in region of plastering, adds and lays bricks.In the present embodiment, described interfacial agents is 2:1 by weight proportion Plain-water slurry and interior water mixing weigh 25% 801 glue constitute, interfacial agents brushing thickness is 0.5 millimeter.
After getting rid of slurry lapping process terminates, starting metope is implemented floating screed step and die-filling step, floating screed step is generally used In the metope that area of plastering is big, particularly as follows: first pass through laser to determine the bottoming depth of plastering of metope, generally this thickness≤1.5cm, Make rib clay point the most at a certain distance, and make one or several ash by rib clay point continuation mortar Muscle, to control depth of plastering and flatness.In the present embodiment, preferably rib clay point >=11, adjacent 2 rib clay points Between spacing be preferably about 18cm, and clay point in two ends is from rib end≤1cm.For the inner corner trim rib palpus at inner corner trim " gigantic " is arranged, and arranges from the linea angulata of the inner corner trim nearest inner corner trim rib linea angulata 5cm away from inner corner trim, adjacent two inner corner trim ribs Between spacing≤1.4 meter.And for the door and window not installing module of width≤1.2 meter, two ribs are installed, through to top Canopy;Door and window top, width >=1.4 meter and bottom are both needed to lay rib.The place of infrared ray patch wall occur, cut rib, bottom is not Plaster, prevent away mould phenomenon to occur.
Die-filling step is to arrange module at the position of metope formation external corner, and module is close to the wherein side of the external corner of metope Fixing after metope is calibrated, and make one end of module protrude to opposite side metope side, the thickness of this protrusion is external corner The depth of plastering of another side.The position being usually formed external corner has at the bottom of door opening, window opening, beam, and two metopes are crossed to form External corner etc..For door opening, the end face of door opening, left and right side is provided with module respectively;For window opening, the end face of window opening, bottom surface, Left and right side is provided with module the most respectively.
The inner side metope of same body of wall, outside metope are both needed to plaster, and inside with this, metope, outside metope are respectively formed sun Using bilateral die-filling on the end metope at angle, two modules are all close to end metope and are arranged, and wherein one end of a module is to inside wall The protrusion of face side, one end of another module metope side laterally protrusion, module fixing construction is in two modules Between, two modules share or have the most independent module fixing construction.Generally preferable two module shared module fixed structures, this Sample can be cost-effective.
Module fixing construction can have multiple, is preferably in the present embodiment: along the length direction of module, tight with module At least provided with two holes on the metope of patch, and squeeze into stopper in each hole, each stopper squeezed into the iron-plate nail with iron plate, Coordinated with metope by iron plate and be clamped fixing by module.The number in the hole being preferably provided with on metope is two, the most both Reduce the destruction to metope, work efficiency can be improved simultaneously.
The stopper squeezed into requires non-bulging metope, and so after form removal, the metope squeezing into stopper can keep smooth.Iron plate Nail squeeze into requirement just, surely, the degree of depth be usually 2cm.Use bilateral die-filling time, punching be in two modules center, monolateral clamping hole The i.e. external corner linea angulata 7cm from wall limit;The monolateral die-filling and bilateral die-filling punching degree of depth is 6cm.
In construction, the module arranged for the vertical direction on the door opening of height 2.1-2.5 rice or window opening, lower opening is liftoff Face 40cm, the distance between lower opening and upper hole is 130cm;For the vertical direction on the door opening of height 2.5-3.2 rice or window opening The module arranged, lower opening overhead 60cm, between upper hole and lower opening for distance 140cm.
Die-filling satisfied standard is: perpendicularity >=89.7 ° of module, flatness error≤5mm;Module is installed and to be accorded with simultaneously Close detail design requirement, without " empty mould ", " mismatch ", " short mould " phenomenon.
The most described module is corrected relative to metope by laser.
After floating screed, die-filling step terminate, coming into effect layering and plaster process step, layering plasters process with rib, mould Block controls the perpendicularity of wall plastering, flatness and depth of plastering as benchmark, between rib and rib or rib and mould Process of plastering is carried out between block.Region of wherein plastering is narrow space, or corner is many or door and window is many or area is few, or constructing operation Region is one-shot forming region slowly, the thickness of this regions module protrusion and the consistency of thickness of rib.One-shot forming region Layering is plastered, and process step includes plastering successively, floating rule, polishing, essence are smeared.The mode of plastering in one-shot forming region is preferably machine spray (i.e. mechanically spraying), machine spray for the first time sprays for bottom machine, and the thickness of bottom machine spray is by room squareness, degree of plainness for wall surface, vertically Degree determines, the thickness of usual bottom machine spray is about 1.5cm, and machine spray for the second time is sprayed for surface layer machine, and the thickness of surface layer machine spray is About 0.5cm.First machine spray and second time machine spray midfeather time are that bottom machine spray metope does about 70%.
Region of plastering is that space is relatively big, or wall area is relatively big, and the convenient region of constructing operation is post forming region, should The thickness that the thickness module that regions module is protruded is protruded is higher than the thickness of rib, and rib thickness constitutes scratch coat thickness, mould The thickness that block protrudes with the thickness of thickness difference composition finish coat thickness module protrusion and the thickness difference of rib of rib is 5mm.The layering in post forming region process of plastering includes scratch coat, bottom floating rule, finish coat, surface layer floating rule successively, beats Mill, essence are smeared.
The mode of plastering in post forming region is preferably machine spray (i.e. mechanically spraying).Nozzle keeps 90-95 ° with metope angle Between, nozzle and metope distance are at about 20cm.Machine spray region is pressed from inside outwards, the sequence construction that metope gets on, get off, for No. one time machine sprays for getting on, get off, it is possible to make easy construction, controls well machine spray flatness, perpendicularity, and second time machine spray uses first It is to land ash to reduce under after on.Should spray in " s " type from top to bottom during spraying, hold spraying rate, accomplish to spray at the uniform velocity, Occur without ditch peak;
When 4, carrying out one-shot forming and the spray operation of bottom machine, a coating thickness, no more than mark muscle, treats floating rule person's floating rule Rear implementation later fills spray;
5, at rib and module, want side spray, and spray full;
6, to spray at negative and positive angle full, rifle head rest nearly corner 10cm.
7, during the spray of surface layer machine, coating thickness is with door and window module as elevation control.
Floating rule is divided into bottom floating rule and surface layer floating rule, and wherein bottom floating rule flatness, degree control are in 4mm, asperities Neatly, without protruding cohesion mortar solid, inner corner trim is straight;Surface layer floating rule flatness, degree control are within 3mm, and inner corner trim is straight; Surface layer is smooth.
The standard that polishing need to meet is: metope without hollowing, without water wave, without pitted skin, free from flaw, cleaning of wiping one's face, color even, The most attractive in appearance.
Ending standard: negative and positive angle is straight, upright, baseboard is neatly clean, smooth straight, in advance at toilet warterproof line interface Box out mouth, electric wire box periphery are repaired floating, and surrounding is upright;At the bottom of beam, door, hole, it is flat strikes off press polish, and metope, ceiling can not have Splash.
After layering is plastered process step terminated, come into effect form removal cleaning, form removal carrying cleaning standard:
1, angle-style, the line style that module is moulded can not be damaged during form removal, it is impossible to damage finished product;
2, according to " one_to_one corresponding " principle, after form removal, module is put to relevant position;
3, module cleaning wants clean, and smears discarded machine oil.
Carrying out finished product protection after form removal cleaning, finally carry out quality inspection examination, finished product reaches the senior standard of plastering of country.
Obviously, above-described embodiment is only for clearly demonstrating example, and not restriction to embodiment.Right For those of ordinary skill in the field, can also make on the basis of the above description other multi-form change or Variation.Here without also cannot all of embodiment be given exhaustive.And the obvious change thus extended out or Change among still in the protection domain of the invention.

Claims (14)

1. a spray plaster technique, it is characterised in that: include
Base treatment;
Get rid of slurry lapping, lay steel wire, brushing interfacial agents in region to be plastered at different materials matrix intersection;
Metope floating screed, arranges rib on metope;
Die-filling, the position forming external corner at metope arranges module, module is close to a wherein side wall of external corner of metope through school Fixing the most afterwards, and make one end of module protrude to opposite side metope side, the thickness of this protrusion is the opposite side of external corner The depth of plastering in face;
It is layered process of plastering, controls the perpendicularity of wall plastering, flatness and depth of plastering using rib, module as benchmark, Process of plastering is carried out between rib and rib or between rib and module;
Form removal processes.
Spray plaster technique the most according to claim 1, it is characterised in that the inner side metope of same body of wall, outside metope Being both needed to plaster, inside with this, metope, outside metope are respectively formed on the end metope of external corner and use bilateral die-filling, and two modules are equal Being close to end metope arrange, the wherein protrusion of the inside side wall in one end of a module side, one end of another module is outside Side wall side is protruded, and module fixing construction is between two modules, and two modules share or have the most independent module Fixed structure.
Spray plaster technique the most according to claim 1 and 2, it is characterised in that module fixing construction is: along the length of module Degree direction, at least provided with two holes on the metope being close to module, and squeezes into stopper in each hole, squeezes on each stopper With the iron-plate nail of iron plate, coordinated with metope by iron plate and be clamped fixing by module.
Spray plaster technique the most according to claim 3, it is characterised in that on the metope of the module being close to vertical direction Be provided with upper and lower two holes, for the module that height be vertical direction setting on the door opening of 2.1-2.5 rice or window opening, lower opening from Ground 40cm, the distance between lower opening and upper hole is 130cm;It is vertical on the door opening of 2.5-3.2 rice or window opening for height The module that direction is arranged, lower opening overhead 60cm, between upper hole and lower opening for distance 140cm.
Spray plaster technique the most according to claim 3, it is characterised in that described module passes through laser relative to metope school Just.
6. according to the spray plaster technique according to any one of claim 1-5, it is characterised in that region of plastering is that space is narrow Little, or corner is many or door and window is many or area is few, or during constructing operation one-shot forming region slowly, the thickness of module protrusion and muscle The consistency of thickness of bar.
Spray plaster technique the most according to claim 6, it is characterised in that described layering is plastered to process and included successively smearing Ash, floating rule, polishing, essence are smeared.
8. according to the spray plaster technique according to any one of claim 1-5, it is characterised in that region of plastering be space relatively Greatly, or wall area is relatively big, and during constructing operation convenient post forming region, the thickness that module is protruded is higher than the thickness of rib, And rib thickness constitutes scratch coat thickness, the thickness that module is protruded constitutes finish coat thickness with the thickness difference of rib.
Spray plaster technique the most according to claim 8, it is characterised in that the thickness that module is protruded exceeds the thickness of rib 5mm。
Spray plaster technique the most according to claim 8 or claim 9, it is characterised in that described layering is plastered to process and included successively Scratch coat, bottom floating rule, finish coat, surface layer floating rule, polishing, essence are smeared.
11. spray plaster techniques according to claim 1, it is characterised in that the door not installing module of width≤1.2 meter Window, installs two vertical ribs, straight channel ceiling;The door and window of width >=1.4 meter, its top and bottom are both needed to lay vertical bar Bar.
12. according to the spray plaster technique according to any one of claim 1-11, it is characterised in that is layered process step of plastering In the mode of plastering be machine spray.
13. spray plaster techniques according to claim 12, it is characterised in that nozzle and metope angle keep 90-95 ° it Between, nozzle and metope distance are at about 20cm.
14. spray plaster techniques according to claim 1, it is characterised in that described interfacial agents is 2:1's by weight proportion Plain-water slurry and interior water mixing weigh 801 glue of 25% and constitute.
CN201610671580.6A 2016-08-15 2016-08-15 A kind of spray plaster technique Active CN106256970B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610671580.6A CN106256970B (en) 2016-08-15 2016-08-15 A kind of spray plaster technique

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610671580.6A CN106256970B (en) 2016-08-15 2016-08-15 A kind of spray plaster technique

Publications (2)

Publication Number Publication Date
CN106256970A true CN106256970A (en) 2016-12-28
CN106256970B CN106256970B (en) 2019-04-26

Family

ID=57714021

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610671580.6A Active CN106256970B (en) 2016-08-15 2016-08-15 A kind of spray plaster technique

Country Status (1)

Country Link
CN (1) CN106256970B (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106906967A (en) * 2017-02-09 2017-06-30 广西绿地涂装工程有限公司 A kind of construction technology of composite mortar
CN109184104A (en) * 2018-11-05 2019-01-11 江苏东保装饰集团有限公司 A kind of building decoration plastering construction method
CN110206278A (en) * 2019-06-11 2019-09-06 王春雨 A kind of quick leveling method of wall plastering
CN110778050A (en) * 2019-12-04 2020-02-11 河南朴之原建筑肌理研究院有限公司 Method for presenting 25mm surface texture of super-strength ultrathin concrete imitation aged soil wall
CN110792210A (en) * 2019-11-21 2020-02-14 河南朴之原建筑肌理研究院有限公司 Construction method for high-strength thin rammed earth wall with thickness of 40mm-100mm
CN111677210A (en) * 2020-06-11 2020-09-18 贵州建工集团第四建筑工程有限责任公司 Gypsum mortar construction process
CN112647658A (en) * 2020-08-28 2021-04-13 海南深装实业有限公司 Construction process for building decoration by using reinforcement driving wall
CN113802788A (en) * 2021-09-29 2021-12-17 刘庆祝 Construction method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102644362A (en) * 2012-04-20 2012-08-22 深圳广田装饰集团股份有限公司 Architectural decoration plastering construction method
CN203961226U (en) * 2014-06-19 2014-11-26 江苏嘉明合达工程机械有限公司 External corner floating screed bar for wall plastering
CN105464341A (en) * 2014-08-21 2016-04-06 许德富 Corner protection scale strip
CN205224547U (en) * 2015-10-26 2016-05-11 王建华 Building white washed wall is plastered and is made level or ground guiding ruler of usefulness of making level
CN105715023A (en) * 2015-12-07 2016-06-29 李代桂 Wall-attached marker post for cement mortar pasting machine

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102644362A (en) * 2012-04-20 2012-08-22 深圳广田装饰集团股份有限公司 Architectural decoration plastering construction method
CN203961226U (en) * 2014-06-19 2014-11-26 江苏嘉明合达工程机械有限公司 External corner floating screed bar for wall plastering
CN105464341A (en) * 2014-08-21 2016-04-06 许德富 Corner protection scale strip
CN205224547U (en) * 2015-10-26 2016-05-11 王建华 Building white washed wall is plastered and is made level or ground guiding ruler of usefulness of making level
CN105715023A (en) * 2015-12-07 2016-06-29 李代桂 Wall-attached marker post for cement mortar pasting machine

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
熊丹安等: "《土木工程施工》", 31 January 2015, 华南理工大学出版社 *

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106906967A (en) * 2017-02-09 2017-06-30 广西绿地涂装工程有限公司 A kind of construction technology of composite mortar
CN109184104A (en) * 2018-11-05 2019-01-11 江苏东保装饰集团有限公司 A kind of building decoration plastering construction method
CN110206278A (en) * 2019-06-11 2019-09-06 王春雨 A kind of quick leveling method of wall plastering
CN110792210A (en) * 2019-11-21 2020-02-14 河南朴之原建筑肌理研究院有限公司 Construction method for high-strength thin rammed earth wall with thickness of 40mm-100mm
CN110778050A (en) * 2019-12-04 2020-02-11 河南朴之原建筑肌理研究院有限公司 Method for presenting 25mm surface texture of super-strength ultrathin concrete imitation aged soil wall
CN110778050B (en) * 2019-12-04 2021-05-07 河南朴之原建筑肌理研究院有限公司 Method for presenting 25mm surface texture of super-strength ultrathin concrete imitation aged soil wall
CN111677210A (en) * 2020-06-11 2020-09-18 贵州建工集团第四建筑工程有限责任公司 Gypsum mortar construction process
CN112647658A (en) * 2020-08-28 2021-04-13 海南深装实业有限公司 Construction process for building decoration by using reinforcement driving wall
CN113802788A (en) * 2021-09-29 2021-12-17 刘庆祝 Construction method

Also Published As

Publication number Publication date
CN106256970B (en) 2019-04-26

Similar Documents

Publication Publication Date Title
CN106256970B (en) A kind of spray plaster technique
CN106284706A (en) The construction method of external wall outer insulation rock cotton board
CN103343655B (en) Wall window construction method
CN101886460B (en) Press polishing method of plastered mesh cloth of inner wall
CN106193624A (en) A kind of wall of aerated concrete block cracking-proof construction technology of improvement
CN208934297U (en) A kind of hollowing cracking falls off maintenance and renovation renewing outer wall
CN110295697A (en) Facade hollow brick mounting structure and its mounting process
CN106284998A (en) Plastering on inner walls completely spreads fiberglass gridding cloth construction method
CN107035085A (en) A kind of indoor wall machine spray gypsum mortar is plastered one-time formed construction method
CN109797920A (en) A kind of interior covering with paint construction method
CN104405102A (en) Hollowing-resistant construction process of polished brick
CN112575979A (en) Construction method of plastering waterproof mortar for building exterior wall
CN106049780A (en) Plastering-free construction technique for high-precision brickwork
CN105178547A (en) Large-unit ceramic thin sheet back-suspending and gluing structure and construction method thereof
CN107574936B (en) A kind of heat preserving exterior wall construction technology
CN111608280A (en) External wall heat insulation construction method
CN101008192A (en) Construction method of outer wall insulation system adopting composite insulation surface tile
CN104652623B (en) A kind of composite thermal insulation mortar construction method
CN109184103A (en) Building masonry wall exempts from plastering construction technique
CN105625650B (en) A kind of parapet of roofing flashing protective layer construction method
CN102094494A (en) Construction process for paving S-shaped tiles on roof with slope of more than 60 degrees
CN116876690A (en) Facing brick construction method based on cement board base layer
CN203834826U (en) Novel staircase water drip tank
CN114059741B (en) Assembled ground structure of mating formation
CN205025042U (en) Big unit pottery sheet metal back of body kiss -coating bonds and constructs

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
C41 Transfer of patent application or patent right or utility model
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20170105

Address after: Tan Jia Cun Gan Tang Zhen Loudi city 417700 Hunan County of Shuangfeng Province

Applicant after: HUNAN RUIJIDA TECHNOLOGY CO.,LTD.

Address before: 417703 Loudi City, Hunan Province town of Gan Tang Shuangfeng County Yang Book gravel field

Applicant before: Zou Xuehui

GR01 Patent grant
GR01 Patent grant