CN113802788A - Construction method - Google Patents

Construction method Download PDF

Info

Publication number
CN113802788A
CN113802788A CN202111150694.3A CN202111150694A CN113802788A CN 113802788 A CN113802788 A CN 113802788A CN 202111150694 A CN202111150694 A CN 202111150694A CN 113802788 A CN113802788 A CN 113802788A
Authority
CN
China
Prior art keywords
protective film
building construction
frame
wall surface
sliding
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202111150694.3A
Other languages
Chinese (zh)
Inventor
刘庆祝
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202111150694.3A priority Critical patent/CN113802788A/en
Publication of CN113802788A publication Critical patent/CN113802788A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F13/00Coverings or linings, e.g. for walls or ceilings
    • E04F13/02Coverings or linings, e.g. for walls or ceilings of plastic materials hardening after applying, e.g. plaster
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/24Safety or protective measures preventing damage to building parts or finishing work during construction
    • E04G21/30Safety or protective measures preventing damage to building parts or finishing work during construction against mechanical damage or dirt, e.g. guard covers of stairs

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Coating Apparatus (AREA)

Abstract

The invention relates to the technical field of building construction, in particular to a building construction method, which comprises the following steps: the method comprises the following steps: before the building construction device is fixed on a construction wall surface, spraying cement or painting pigment on the wall surface; step two: leveling cement sprayed on the wall surface; step three: protecting the constructed wall surface through a protective film after each construction; step four: after cement or paint on the wall surface is solidified, all the protective films are uniformly rolled, and the method can protect the constructed wall surface through the protective films after cement coating or pigment coating is carried out on the wall surface.

Description

Construction method
Technical Field
The invention relates to the technical field of building construction, in particular to a building construction method.
Background
When normally carrying out building construction, often need carry out the application of cement or the applying paint with a brush of pigment to the wall, and cement or the coating on the wall that has just paintd cement or coating need the time to solidify, and debris or rubbish that are blown by wind-force very easily in the solidification process touch, lead to cement or coating on the wall to receive the damage before solidifying, influence holistic pleasing to the eye, still need the manpower to repair and lead to wasting time and energy.
Disclosure of Invention
The invention aims to provide a building construction method which can protect a wall surface after construction.
The purpose of the invention is realized by the following technical scheme:
a method of building construction, the method comprising the steps of:
the method comprises the following steps: before the building construction device is fixed on a construction wall surface, spraying cement or painting pigment on the wall surface;
step two: leveling cement sprayed on the wall surface;
step three: protecting the constructed wall surface through a protective film after each construction;
step four: and all the protective films are uniformly rolled after the cement or the paint on the wall surface is solidified.
The building construction device comprises a support frame, sliding frames, fixing rods, protective film frames, protective film rollers, limiting rods, driving slide rods, roller cores, a matching square groove, a matching square rod and a limiting hook, wherein the two sliding frames are connected to the support frame in a sliding manner, the fixing rods are connected to the support frame in a sliding manner, springs are arranged between the fixing rods and the support frame, a plurality of protective film frames are connected between the two sliding frames in a sliding manner, a plurality of protective film rollers are respectively connected to a plurality of protective film frames in a rotating manner, the limiting rods are respectively fixedly connected to the left end and the right end of each protective film frame, a plurality of driving slide rods are respectively connected to the plurality of protective film frames in a sliding manner, springs are respectively arranged between the plurality of driving slide rods and the plurality of protective film frames, two round holes are respectively arranged on the plurality of driving slide rods, the plurality of roller cores are respectively connected to the plurality of protective film rollers in a sliding manner, and springs are respectively arranged between the plurality of roller cores and the plurality of protective film rollers, the upper ends of the roll cores are provided with matching square grooves, the lower ends of the roll cores are provided with matching square rods, the matching square rods can be inserted into the matching square grooves respectively, the limiting hooks are fixedly connected to the left end and the right end of the supporting frame, and the limiting hooks can limit the limiting rods to move in the horizontal direction respectively.
The building construction device comprises a driving frame, a connecting frame II and a driving square rod, the driving frame is connected to the supporting frame in a sliding mode, the connecting frame is fixedly connected to the driving frame, the connecting frame II is installed on the connecting frame through a hydraulic cylinder, the driving square rod is connected to the connecting frame II in a rotating mode, and the driving square rod can be inserted into the matching square groove at the uppermost end.
Building construction device includes the sliding plate, the connecting plate, the dead lever, the lead screw, the stripper plate, scribble brush and brush yoke, sliding plate sliding connection is on the leading-out frame, two equal sliding connection of dead lever are on the sliding plate, two equal fixed connection of dead lever are on the connecting plate, two lead screws all rotate to be connected on the leading-out frame, through belt transmission between two lead screws, screw drive between sliding plate and two lead screws, the stripper plate passes through bolt demountable installation on the sliding plate, brush yoke sliding connection is on the stripper plate, be equipped with the spring between brush yoke and the stripper plate, scribble the brush and rotate to be connected on the brush yoke.
Building construction equipment is including dismantling board II, cement shower nozzle, flattening roller and roller frame, dismantles board II and passes through bolt demountable installation on the sliding plate, and cement shower nozzle fixed connection is on dismantling board II, and the flattening roller rotates to be connected on the roller frame, and roller frame sliding connection is equipped with the spring on dismantling board II, between roller frame and the dismantlement board II.
Drawings
The invention is described in further detail below with reference to the accompanying drawings and specific embodiments.
FIG. 1 is a flow chart of a method of construction of a building of the present invention;
FIG. 2 is a schematic view of a support frame of the construction equipment of the present invention;
FIG. 3 is a schematic view of a protective film frame for a construction device according to the present invention;
FIG. 4 is a cross-sectional view of a protective film roll of the construction device of the present invention;
FIG. 5 is a schematic view of a roller core of the construction apparatus according to the present invention;
FIG. 6 is a schematic view of a driving frame of the construction apparatus according to the present invention;
FIG. 7 is a schematic view of a driving square bar of the construction equipment of the present invention;
FIG. 8 is a schematic view of a slide plate of the construction device of the present invention;
FIG. 9 is a schematic view of a cement head of the construction apparatus according to the present invention;
fig. 10 is a general schematic view of the construction device of the present invention.
In the figure: a support frame 1; a carriage 11; a fixing rod 12; a protective film frame 13; a protective film roll 14; a stopper rod 15; driving the slide bar 16; a roll core 17; a mating square groove 171; a mating square bar 172; a limiting hook 18; a drive frame 21; a connecting frame 22; a connecting frame II 23; a driving square bar 24; a slide plate 31; a connecting plate 32; a fixing lever 33; a lead screw 34; the detaching plate 41; a daubing brush 42; a brush holder 43; disassembling the plate II 51; a cement nozzle 52; a flattening roller 53; a roller housing 54.
Detailed Description
The present invention will be described in further detail with reference to the accompanying drawings.
As shown in fig. 1;
a method of building construction, the method comprising the steps of:
the method comprises the following steps: before the building construction device is fixed on a construction wall surface, spraying cement or painting pigment on the wall surface;
step two: leveling cement sprayed on the wall surface;
step three: protecting the constructed wall surface through a protective film after each construction;
step four: and all the protective films are uniformly rolled after the cement or the paint on the wall surface is solidified.
As shown in fig. 2-5;
the building construction method also uses a building construction device which comprises a support frame 1, sliding frames 11, a fixed rod 12, protective film frames 13, protective film rollers 14, a limiting rod 15, driving slide rods 16, roller cores 17, a matching square groove 171, a matching square rod 172 and a limiting hook 18, wherein the two sliding frames 11 are connected to the support frame 1 in a sliding manner, the fixed rod 12 is connected to the support frame 1 in a sliding manner, a spring is arranged between the fixed rod 12 and the support frame 1, the protective film frames 13 are connected between the two sliding frames 11 in a sliding manner, the protective film rollers 14 are respectively connected to the protective film frames 13 in a rotating manner, the limiting rods 15 are respectively fixedly connected to the left end and the right end of the protective film frames 13, the driving slide rods 16 are respectively connected to the protective film frames 13 in a sliding manner, the springs are respectively arranged between the driving slide rods 16 and the protective film frames 13, and the driving slide rods 16 are respectively provided with two round holes, the plurality of roller cores 17 are respectively connected to the plurality of protective film rollers 14 in a sliding manner, springs are arranged between the plurality of roller cores 17 and the plurality of protective film rollers 14, the upper ends of the plurality of roller cores 17 are respectively provided with a matching square groove 171, the lower ends of the plurality of roller cores 17 are respectively provided with a matching square rod 172, the plurality of matching square rods 172 can be respectively inserted into the plurality of matching square grooves 171, the plurality of limiting hooks 18 are uniformly and fixedly connected to the left end and the right end of the support frame 1, and the plurality of limiting hooks 18 can respectively limit the movement of the plurality of limiting rods 15 in the horizontal direction;
the device can be used for laying a layer of protective film to protect the wall surface which is just processed, so that the cement or the coating on the wall surface which is just coated with the cement or the coating is prevented from being not dried, and the cement or the coating on the wall surface is prevented from being damaged before solidification due to the fact that sundries such as wind-blown stones are touched, so that the whole appearance is influenced, and time and labor are wasted due to the fact that manual repair is needed;
the protective film is rolled on the protective film roller 14, the tail end of the protective film is fixed on the fixed rod 12, the support frame 1 is fixed in front of a wall surface to be processed, the fixed rod 12 is driven to move to be close to the wall surface through the action force of the spring, gaps between the protective film and the wall surface are reduced, unnecessary loss caused by pollution of foreign matters to the wall surface through the gaps is avoided, the protective film roller 14 is driven to rotate through pulling the protective film frame 13, the protective film roller 14 rotates to pull open the protective film, and the wall surface is protected through covering the protective film on the wall surface;
further, in order to avoid the position change of the protective film frame 13 caused by external force, when the protective film frame 13 does not work or the protective film is spread out, the protective film frame 13 moves, so that the protective film is scattered or the protective film cannot be fully protected on the wall surface, when the protective film frame 13 does not work, the limiting rod 15 at the right end is clamped by the limiting hook 18 at the right end, so that the protective film frame 13 is fixed, when the protective film frame 13 is used, the limiting rod 15 at the right end is separated from the limiting hook 18 at the right end by driving the driving slide rod 16 to move downwards, after the protective film frame 13 moves to the leftmost end, the driving slide rod 16 moves upwards by the spring acting force to drive the limiting rod 15 at the left end to move upwards and clamp the limiting hook 18 at the left end, so that the protective film frame 13 is fixed and cannot move in the horizontal direction, and the protective film is fixed to fully protect the wall surface which has just been constructed, meanwhile, the plurality of protective film frames 13 enable the plurality of protective films to work independently, can protect the constructed wall surface immediately after a row of wall surfaces are constructed, can protect the constructed wall surface under the condition of not influencing subsequent processing, and can effectively avoid the influence on the constructed wall surface during the subsequent construction, thereby improving the working efficiency and saving the construction raw materials;
furthermore, after the material on the wall surface is solidified, a plurality of protective films can be quickly and simultaneously wound, so that manpower and material resources are saved, and the working efficiency is improved, the uppermost driving slide bar 16 is moved downwards, so that the upper driving slide bar 16 is inserted into the sliding groove on the lower protective film frame 13, and the plurality of protective film frames 13 are connected together from top to bottom, so that one protective film frame 13 is moved to drive all the protective film frames 13 to move, a plurality of protective films are conveniently and simultaneously collected, and meanwhile, in the process of downward movement of the plurality of driving slide bars 16, the plurality of driving slide bars 16 can drive the plurality of limiting rods 15 at the left ends to move downwards, so that the plurality of limiting rods 15 at the left ends move downwards to be respectively separated from the plurality of limiting hooks 18 at the left ends, and the plurality of protective film frames 13 can move;
further, still need make a plurality of protection film rollers 14 rotate simultaneously in the process of carrying out the rolling to a plurality of protection films, make a plurality of protection films be rolled simultaneously, thereby make the protection film after the rolling clean and tidy, through the roll core 17 downstream that makes the top, the cooperation square bar 172 of top inserts in the cooperation square groove 171 of lower extreme, make a plurality of roll cores 17 be connected to together, roll core 17 through the top rotates and drives all roll cores 17 and rotate, thereby drive all protection film rollers 14 and rotate simultaneously, thereby roll a plurality of protection films simultaneously, and the work efficiency is improved.
As shown in fig. 6-7;
the building construction device further comprises a driving frame 21, a connecting frame 22, a connecting frame II 23 and a driving square rod 24, wherein the driving frame 21 is connected to the support frame 1 in a sliding mode, the connecting frame 22 is fixedly connected to the driving frame 21, the connecting frame II 23 is installed on the connecting frame 22 through a hydraulic cylinder, the driving square rod 24 is connected to the connecting frame II 23 in a rotating mode, and the driving square rod 24 can be inserted into the matching square groove 171 at the uppermost end;
the driving frame 21 is driven by a driving assembly, the driving assembly consists of a screw II and a speed reducing motor II, the screw II is rotationally connected to the supporting frame 1, the speed reducing motor II is fixedly connected to the supporting frame 1, the screw II is fixedly connected to an output shaft of the speed reducing motor II, and the driving frame 21 and the screw II are in threaded transmission;
the connecting frame II 23 is driven by a hydraulic cylinder to move longitudinally;
the driving square rod 24 is driven by a speed reducing motor to rotate, the speed reducing motor is fixedly connected to the connecting frame II 23, and the driving square rod 24 is fixedly connected to an output shaft of the speed reducing motor;
remove drive link 22 through drive frame 21 and remove, link 22 removes and drives link II 23 and remove, link II 23 removes and drives drive square bar 24 and removes, make drive square bar 24 aim at the square groove 171 of cooperation of the uppermost end, drive square bar 24 moves down and inserts in the square groove 171 of cooperation of the uppermost end, drive square bar 24 promotes the roll core 17 of the uppermost end and moves down simultaneously and the combination of the roll core 17 of the uppermost end, remove drive square bar 24 through drive frame 21 and remove, drive square bar 24 drives a plurality of protective film frame 13 and removes, make drive square bar 24 rotate simultaneously and drive a plurality of roll cores 17 and rotate, make a plurality of protective film rollers 14 rotate in the removal, thereby neatly quick rolling all protective films.
As shown in fig. 8;
the building construction device further comprises a sliding plate 31, a connecting plate 32, fixing rods 33, lead screws 34, a dismounting plate 41, a smearing brush 42 and a brush holder 43, wherein the sliding plate 31 is connected to the driving frame 21 in a sliding mode, the two fixing rods 33 are connected to the sliding plate 31 in a sliding mode, the two fixing rods 33 are fixedly connected to the connecting plate 32, the two lead screws 34 are connected to the driving frame 21 in a rotating mode, the two lead screws 34 are in transmission through belts, the sliding plate 3 and the two lead screws 34 are in threaded transmission, the dismounting plate 41 is detachably mounted on the sliding plate 31 through bolts, the brush holder 43 is connected to the dismounting plate 41 in a sliding mode, a spring is arranged between the brush holder 43 and the dismounting plate 41, and the smearing brush 42 is connected to the brush holder 43 in a rotating mode;
the two lead screws 34 are driven by a speed reducing motor III to rotate, the speed reducing motor III is fixedly connected to the driving frame 21, and one lead screw 34 is fixedly connected to an output shaft of the speed reducing motor III;
the connecting plate 32 is driven by a hydraulic cylinder III to move transversely, the hydraulic cylinder III is fixedly connected to the sliding plate 31, and the connecting plate 32 is fixedly connected to the hydraulic cylinder III;
in order to facilitate the individual driving of the plurality of protective film frames 13, the sliding plate 31 is aligned with the protective film frame 13 to be moved by moving the sliding plate 31 and the driving frame 21, the connecting plate 32 drives the two fixing rods 33 to move, the two fixing rods 33 are inserted into the two round holes on the corresponding protective film frame 13 after moving, at this time, the sliding plate 31 is moved to drive the protective film frame 13 to move, so that the plurality of protective film frames 13 are driven individually, the driving slide rod 16 is driven to move downwards, and the limiting rods 15 are locked and unlocked;
further, in order to facilitate the construction of the wall surface, two sliding frames 11 are respectively moved to two ends before the protective film is laid, so as not to influence the painting of the coating, the protective film is prevented from being damaged by a painting brush 42, the detaching plate 41 is fixed on the sliding plate 31 when the painting brush 42 works, the detaching plate 41 can be detached when the protective film is laid, the detaching plate 41 is moved by the sliding plate 31, the detaching plate 41 is moved to drive the painting brush 42 to move, the painting brush 42 adhered with the coating is moved, and the wall surface is painted.
As shown in fig. 9-10;
the building construction device further comprises a disassembly plate II 51, a cement spray nozzle 52, a flattening roller 53 and a roller frame 54, wherein the disassembly plate II 51 is detachably arranged on the sliding plate 31 through bolts, the cement spray nozzle 52 is fixedly connected to the disassembly plate II 51, the flattening roller 53 is rotatably connected to the roller frame 54, the roller frame 54 is slidably connected to the disassembly plate II 51, and a spring is arranged between the roller frame 54 and the disassembly plate II 51;
further, except can carrying out the application of coating to the wall, can also carry out the spraying of cement to the wall, can take off dismantlement board 41, will dismantle II 51 of board and install sliding plate 31, connect cement shower nozzle 52 and cement bucket, through cement shower nozzle 52 with cement spraying to the wall on, dismantle II 51 of board afterwards and remove drive roller frame 54 and remove, roller frame 54 removes and drives the flattening roller 53 and remove, through flattening roller 53 with the cement of spraying on the wall floating, spring action force drives roller frame 54 and removes simultaneously, roller frame 54 removes and drives flattening roller 53 and remove, make flattening roller 53 remove abundant and wall contact, thereby improve floating effect.

Claims (10)

1. The building construction method is characterized in that: the method comprises the following steps:
the method comprises the following steps: before the building construction device is fixed on a construction wall surface, spraying cement or painting pigment on the wall surface;
step two: leveling cement sprayed on the wall surface;
step three: protecting the constructed wall surface through a protective film after each construction;
step four: and all the protective films are uniformly rolled after the cement or the paint on the wall surface is solidified.
2. The building construction method according to claim 1, characterized in that: the building construction device comprises a support frame (1), two sliding frames (11), a fixing rod (12), a protective film frame (13) and protective film rollers (14), wherein the two sliding frames (11) all slide on the support frame (1), the fixing rod (12) slides on the support frame (1), the protective film rollers (14) rotate on the protective film frames (13) respectively, and the protective film frames (13) all slide on the two sliding frames (11).
3. The building construction method according to claim 2, characterized in that: the supporting frame (1) is provided with a plurality of limiting hooks (18), two limiting rods (15) are fixed on the protective film frames (13), and the limiting hooks (18) can limit the movement of the limiting rods (15) in the horizontal direction respectively.
4. The building construction method according to claim 2, characterized in that: a plurality of drive slide bars (16) are arranged on the protective film frames (13) in a sliding manner, sliding grooves are formed in the protective film frames (13), and the drive slide bars (16) can be inserted into the sliding grooves respectively.
5. The building construction method according to claim 2, characterized in that: it is a plurality of all slip in protective film roller (14) have roller core (17), and the upper end of a plurality of roller cores (17) all is equipped with cooperation square groove (171), and the lower extreme of a plurality of roller cores (17) all is equipped with cooperation square bar (172), a plurality of cooperation square groove (171) and a plurality of cooperation square bar cooperation.
6. The building construction method according to claim 2, characterized in that: the building construction device further comprises a driving frame (21), the driving frame (21) slides on the support frame (1), a connecting frame (22) is fixed on the driving frame (21), a connecting frame II (23) is installed on the connecting frame (22) through a hydraulic cylinder, and a driving square rod (24) rotates on the connecting frame II (23).
7. The building construction method according to claim 6, wherein; the building construction device further comprises a sliding plate (31), the sliding plate (31) longitudinally slides on the driving frame (21), two fixing rods (33) slide on the sliding plate (31), two round holes are formed in the plurality of driving sliding rods (16), and the two fixing rods (33) can be inserted into the round holes respectively.
8. The building construction method according to claim 7, characterized in that: the building construction device further comprises a dismounting plate (41), the dismounting plate (41) is installed on the sliding plate (31) through bolts, a brush holder (43) slides on the dismounting plate (41), and a smearing brush (42) rotates on the brush holder (43).
9. The building construction method according to claim 7, characterized in that: the building construction device further comprises a disassembly plate II (51), and a cement spray nozzle (52) is fixed on the disassembly plate II (51).
10. The building construction method according to claim 9, characterized in that: a roller frame (54) slides on the disassembling plate II (51), and a flattening roller (53) rotates on the roller frame (54).
CN202111150694.3A 2021-09-29 2021-09-29 Construction method Pending CN113802788A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202111150694.3A CN113802788A (en) 2021-09-29 2021-09-29 Construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202111150694.3A CN113802788A (en) 2021-09-29 2021-09-29 Construction method

Publications (1)

Publication Number Publication Date
CN113802788A true CN113802788A (en) 2021-12-17

Family

ID=78897081

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202111150694.3A Pending CN113802788A (en) 2021-09-29 2021-09-29 Construction method

Country Status (1)

Country Link
CN (1) CN113802788A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115045471A (en) * 2022-07-15 2022-09-13 陕西建工集团股份有限公司 House building coating construction method

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101538928A (en) * 2009-04-17 2009-09-23 柯干兴 Multi-purpose wall machine
CN106256970A (en) * 2016-08-15 2016-12-28 邹学辉 A kind of spray plaster technique
CN107489250A (en) * 2017-09-02 2017-12-19 广东省第二建筑工程有限公司 Wall basic unit plastering construction engineering method
CN212603741U (en) * 2020-04-24 2021-02-26 上海大松瓦楞辊有限公司 Series connection splicing type corrugated roller
CN112761370A (en) * 2020-12-13 2021-05-07 芜湖小白葱信息科技有限公司 Laminating machine for maintaining cast-in-place concrete wall surface
CN113266155A (en) * 2021-07-02 2021-08-17 高轩 Building site is top laying device for building

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101538928A (en) * 2009-04-17 2009-09-23 柯干兴 Multi-purpose wall machine
CN106256970A (en) * 2016-08-15 2016-12-28 邹学辉 A kind of spray plaster technique
CN107489250A (en) * 2017-09-02 2017-12-19 广东省第二建筑工程有限公司 Wall basic unit plastering construction engineering method
CN212603741U (en) * 2020-04-24 2021-02-26 上海大松瓦楞辊有限公司 Series connection splicing type corrugated roller
CN112761370A (en) * 2020-12-13 2021-05-07 芜湖小白葱信息科技有限公司 Laminating machine for maintaining cast-in-place concrete wall surface
CN113266155A (en) * 2021-07-02 2021-08-17 高轩 Building site is top laying device for building

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115045471A (en) * 2022-07-15 2022-09-13 陕西建工集团股份有限公司 House building coating construction method

Similar Documents

Publication Publication Date Title
CN201437247U (en) Robot capable of crawling cable
CN113802788A (en) Construction method
CN107425477B (en) A kind of automatic removing foreign matter device on transmission line of electricity
CN109013120B (en) Bridge bottom surface coating device and construction method thereof
CN111677247B (en) Waterproof engineering waterproof paint brushing construction method
CN214132421U (en) Steel construction paint spraying apparatus
CN113304924A (en) Spraying device with coating recovery structure
CN111960684A (en) Coating equipment for producing coated glass
CN107905077A (en) A kind of magnesium cement concrete road surface intelligence repair robot
CN114472013A (en) Dull and glossy lacquer spraying machine in panel surface
CN207105636U (en) A kind of FFF printers double shower nozzles of pneumatic type
CN213683085U (en) Environment-friendly material-saving type brushing device
CN104259148A (en) Automatic dust removing device and method for surface of steel wire
CN210675661U (en) Cold-rolled strip steel spraying device
CN205439566U (en) Printing machine
DE29502234U1 (en) Surface processing device for elongated, stationary bodies, in particular for suspension cables on bridges
CN203091670U (en) Sand ejection nozzle online cleaning device of cold box core shooter
CN113231381A (en) High-efficient cleaning device of cylindrical support column for building engineering
CN106984474B (en) Steel structural bridge beam bridge floor spray-painting plant and its construction method
CN104453976A (en) Roller shutter type dust collecting net device
CN112934569A (en) Paint spraying device and method for plates for constructional engineering
CN110607746B (en) Bridge external maintenance device and use method thereof
CN103846238A (en) Online cleaning device for straightening rolls of multi-roll straightening machine
CN218360256U (en) Cable on-line spraying insulating material device
CN220390738U (en) Ink recycling structure of ink jet printer

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination