CN106256970B - A kind of spray plaster technique - Google Patents

A kind of spray plaster technique Download PDF

Info

Publication number
CN106256970B
CN106256970B CN201610671580.6A CN201610671580A CN106256970B CN 106256970 B CN106256970 B CN 106256970B CN 201610671580 A CN201610671580 A CN 201610671580A CN 106256970 B CN106256970 B CN 106256970B
Authority
CN
China
Prior art keywords
module
plastering
metope
rib
thickness
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610671580.6A
Other languages
Chinese (zh)
Other versions
CN106256970A (en
Inventor
邹学辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hunan ruijida science and Technology Co Ltd
Original Assignee
Hunan Ruijida Science And Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hunan Ruijida Science And Technology Co Ltd filed Critical Hunan Ruijida Science And Technology Co Ltd
Priority to CN201610671580.6A priority Critical patent/CN106256970B/en
Publication of CN106256970A publication Critical patent/CN106256970A/en
Application granted granted Critical
Publication of CN106256970B publication Critical patent/CN106256970B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F13/00Coverings or linings, e.g. for walls or ceilings
    • E04F13/02Coverings or linings, e.g. for walls or ceilings of plastic materials hardening after applying, e.g. plaster
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F13/00Coverings or linings, e.g. for walls or ceilings
    • E04F13/02Coverings or linings, e.g. for walls or ceilings of plastic materials hardening after applying, e.g. plaster
    • E04F13/04Bases for plaster
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F13/00Coverings or linings, e.g. for walls or ceilings
    • E04F13/02Coverings or linings, e.g. for walls or ceilings of plastic materials hardening after applying, e.g. plaster
    • E04F13/04Bases for plaster
    • E04F13/06Edge-protecting borders
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F13/00Coverings or linings, e.g. for walls or ceilings
    • E04F13/02Coverings or linings, e.g. for walls or ceilings of plastic materials hardening after applying, e.g. plaster
    • E04F13/04Bases for plaster
    • E04F13/06Edge-protecting borders
    • E04F2013/063Edge-protecting borders for corners

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Building Environments (AREA)

Abstract

A kind of spray plaster technique of the invention, including base treatment;Slurry lapping is got rid of, is laid with steel wire, the brushing interfacial agents in wait region of plastering in different materials matrix intersection;Rib is arranged in metope screed on metope;It is die-filling, the position setup module of external corner is formed in metope, it is fixed after the wherein side wall that module is close to the external corner of metope is calibrated, and protrude one end of module to another side wall side, the thickness of the protrusion is the depth of plastering of the another side of external corner;It is layered plastering processing, verticality, flatness and the depth of plastering of wall plastering are controlled using rib, module as benchmark;Demoulding processing.Spray plaster technique of the invention can guarantee plastering quality, guarantee plastering efficiency, can reduce to mason's skill requirement.

Description

A kind of spray plaster technique
Technical field
The present invention relates to architectural construction technology fields, and in particular to a kind of spray plaster technique.
Background technique
To the construction of metope mainly by artificial plastering in traditional architecture construction, artificial plastering needs manually to transport mortar It send to different floors, then by manually smearing mortar on metope by certain technique, not only large labor intensity, low efficiency.Due to Everyone technical level and strength difference, not can guarantee the compactness of coat of plaster, and the metope quality difference smeared out is larger, some Metope easily causes metope hollowing, cracks, falls off and other issues, causes to do over again or increase later period maintenance workload.
And with the development of the society, mechanically spraying plastering technique will gradually substitute artificial plastering.Mechanically spraying is plastered The mortar being stirred, enter mortar conveying pump through vibrating screen hypsokinesis, by pipeline, then by means of the pressure of air compressor, Mortar is continuously and uniformly sprayed on metope and ceiling, real using levelling stranding, completes floated finish.Although mechanically spraying is plastered It is by mechanically spraying device instead of manpower, therefore, the labor intensity of worker can be substantially reduced, shorten the construction time, together When can guarantee the compactness of coat of plaster, but still need to that reasonable plastering technique is combined just to be able to achieve the guarantee of quality.
A kind of process flow of wall plastering is disclosed in Chinese patent literature CN103821252A, comprising: remove metope Floating ash → amendment filling-in jointing → watering moistens base → brushing interfacial agents → and does ash cake → 1:1 cement mortar or gluewater in use for construction Mud plucking metope → necessary part linked network is handled → is smeared bottom ash → exterior wall, which is completely plated in, sets alkali-proof glass fiber mesh → and is smeared Surface layer ash → overlay film maintenance → cleaning.
Since the position that metope forms external corner is often the privileged sites such as edge or door opening, the window opening of wall, this A little positions are not suitable for the rib for being provided as benchmark, and therefore, in plastering, the depth of plastering that is formed at the position of external corner hangs down Straight degree and flatness are entirely to be guaranteed by the Personal Skills of mason, therefore, require height to the Personal Skills of mason, According to above-mentioned process flow, when spraying plastering mode using machine, depth of plastering, verticality and flatness are not easy to guarantee, usually go out Existing efficiency there is not quality, has quality not have the problem of efficiency.
Summary of the invention
Therefore, the technical problem to be solved in the present invention is that the wall plastering technique of the prior art is overcome to use machine spray side When formula is plastered, depth of plastering, verticality and flatness are not easy to guarantee effective percentage usually occur and there be not quality, have quality there be not efficiency Defect guarantee plastering efficiency so that plastering quality can be guaranteed by providing one kind, can reduce the spray to mason's skill requirement Apply plastering technique.
In order to solve the above technical problems, a kind of spray plaster technique of the invention, including
Base treatment;
Slurry lapping is got rid of, is laid with steel wire, the brushing interfacial agents in wait region of plastering in different materials matrix intersection;
Rib is arranged in metope screed on metope;
It is die-filling, the position setup module of external corner is formed in metope, module is close to a wherein side wall for the external corner of metope It is fixed after calibrated, and protrude one end of module to another side wall side, the thickness of the protrusion is the another of external corner The depth of plastering of one side;
It is layered plastering processing, it is thick using the verticality, flatness and plastering of rib, module as benchmark control wall plastering Degree, carries out plastering processing between rib and rib or between rib and module;
Demoulding processing.
In spray plaster technique of the invention, inside metope, the outside metope of same wall be both needed to plastering, with this Inside metope, outside metope are respectively formed on the end metope of external corner using bilateral die-filling, and two modules are close to end metope and are arranged, The wherein protrusion of the inside side wall side in one end of a module, the outside side wall side in one end of another module are convex Out, module fixing construction is between two modules, and two modules share or have module fixing construction independent.
In spray plaster technique of the invention, module fixing construction are as follows: along the length direction of module, be close to module Metope at least provided with two holes, and in each hole squeeze into stopper, the iron-plate nail with iron plate is squeezed on each stopper, is led to It crosses iron plate and metope cooperation and module is clamped fixation.
In spray plaster technique of the invention, the metope for the module being close to vertical direction is equipped with upper and lower two holes, For the module that height is arranged for the vertical direction on 2.1-2.5 meter of door opening or window opening, lower opening 40cm from the ground, lower opening with it is upper The distance between hole is 130cm;It is the module of the vertical direction setting on 2.5-3.2 meters of door opening or window opening for height, under Hole 60cm from the ground, is distance 140cm between upper hole and lower opening.
In spray plaster technique of the invention, the module is corrected by laser with respect to metope.
In spray plaster technique of the invention, plastering region is narrow space or corner is more or door and window is more or area is few, Or when the slow one-pass molding region of constructing operation, the thickness of module protrusion and the consistency of thickness of rib.
In spray plaster technique of the invention, the layering plastering processing is successively smeared including plastering, floating rule, polishing, essence.
In spray plaster technique of the invention, plastering region is that space is larger or wall area is larger, constructing operation side When post forming region just, the thickness of module protrusion is higher than the thickness of rib, and rib thickness constitutes scratch coat thickness, mould The thickness of block protrusion and the thickness difference of rib constitute finish coat thickness.
In spray plaster technique of the invention, the thickness of module protrusion is higher by the thickness 5mm of rib.
In spray plaster technique of the invention, the layering plastering processing successively includes scratch coat, bottom floating rule, face Layer plastering, surface layer floating rule, polishing, essence are smeared.
In spray plaster technique of the invention, the door and window for not installing module of width≤1.2 meter installs two vertical bars Item, straight channel ceiling;The door and window of width >=1.4 meter, top and bottom are both needed to place vertical rib.
In spray plaster technique of the invention, the plastering mode in layering plastering processing step is machine spray.
In spray plaster technique of the invention, nozzle and metope angle are kept between 90-95 °, nozzle and metope distance In 20cm or so.
In spray plaster technique of the invention, the interfacial agents are by the plain-water slurry that weight proportion is 2:1 and interior water mixing Weigh 25% 801 glue composition.
Technical solution of the present invention has the advantages that
1, module is close to the external corner of metope wherein by the position setup module that external corner in the present invention, is formed in metope It is fixed after one side wall is calibrated, and protrude one end of module to another side wall side, the thickness of the protrusion is The depth of plastering of the another side of external corner.The metope to be plastered at external corner is allowed to control wall at external corner using module as benchmark Verticality, flatness and the depth of plastering of face plastering, so that either artificial plastering or machine spray can lower to mason The requirement of technical ability improves plastering quality, guarantees construction efficiency, has especially with machine spray mode plastering quality, plastering efficiency It is greatly improved.
2, in the present invention, plastering region is targetedly divided into one-pass molding region, post forming region, and to primary Forming area, post forming region use different plastering modes, while can be improved plastering speed, guarantee plastering quality.
Detailed description of the invention
It, below will be to specific in order to illustrate more clearly of the specific embodiment of the invention or technical solution in the prior art Embodiment or attached drawing needed to be used in the description of the prior art be briefly described, it should be apparent that, it is described below Attached drawing is some embodiments of the present invention, for those of ordinary skill in the art, before not making the creative labor It puts, is also possible to obtain other drawings based on these drawings.
Fig. 1 is the flow chart of spray plaster technique of the invention.
Specific embodiment
Technical solution of the present invention is clearly and completely described below in conjunction with attached drawing, it is clear that described implementation Example is a part of the embodiment of the present invention, instead of all the embodiments.Based on the embodiments of the present invention, ordinary skill Personnel's every other embodiment obtained without making creative work, shall fall within the protection scope of the present invention.
It further include pan feeding, feeding, the big step of sub-material three before implementing spray plaster technique of the invention.Wherein pan feeding In step, using 325R composite Portland cement, the Machine-made Sand and mineral additive that average grain diameter is 2.0-2.5mm press than Example configuration.In feeding step, mixing plant open blender, raw material is stirred 2 minutes in dry powder, accomplish and starch and When, high-quality, no thin pulp, dry pulp phenomenon, while transporting in time, on the way the time can not be more than 4 hours to tank car, enter to pump mortar Consistency >=95mm, water retention >=94%.Sub-material step need to accomplish that condiment is timely, and sub-material is well-balanced, no flush coater idle running phenomenon.
As shown in Figure 1, spray plaster technique of the invention includes
Base treatment → get rid of slurry lapping → metope screed, die-filling → layering plastering processing → demoulding processing.
Specifically in the present invention, base treatment step includes: 1, chipping base protruding parts, and wherein protruding parts can be with Pass through infrared detection;2, main body construction residue, such as nail, first silk, tongue ash are cleared up;3, clear up substrate surface grieshoch, Dirt, grease stain etc., and sprinkle water and moisten on the day before construction.
It after base treatment step, comes into effect and gets rid of slurry lapping process, be specially laid in different materials matrix intersection Steel wire, the brushing interfacial agents in wait region of plastering;The laying of steel wire can prevent plaster from crack, interfacial agents occur Brushing be capable of the bonding of reinforced cement mortar and wall.Wherein when lapping, lap-joint >=15cm of steel wire and each matrix;Steel Silk screen is it is preferable to use the square steel wire of side length≤20mm, and mesh diameter >=0.4mm.Interfacial agents are usually brushed in concrete coagulation Cob wall face, the beam column built from concrete in region of plastering add and lay bricks.In the present embodiment, the interfacial agents are 2:1 by weight proportion Plain-water slurry and interior water mixing weigh 25% 801 glue constitute, interfacial agents brushing is with a thickness of 0.5 millimeter or so.
After getting rid of slurry lapping process, starts to implement floating screed step to metope and die-filling step, floating screed step are usually used In the big metope of plastering area, specifically: the bottoming depth of plastering that laser determines metope is first passed through, the usual thickness≤1.5cm, Then it makes rib clay point at a certain distance on the wall, and continues to make one or several ash with mortar by rib clay point Muscle, to control depth of plastering and flatness.In the present embodiment, preferably rib clay point >=11, adjacent two ribs clay point Between spacing be preferably 18cm or so, and clay point in both ends is from rib end≤1cm.For the inner corner trim rib palpus at inner corner trim " gigantic " setting, and linea angulata 5cm setting of the inner corner trim rib nearest from the linea angulata of inner corner trim away from inner corner trim, adjacent two inner corner trims rib Between spacing≤1.4 meter.And for the door and window for not installing module of width≤1.2 meter, two ribs are installed, through to top Canopy;It is both needed to place rib at the top and bottom of the door and window of width >=1.4 meter.There is the place of infrared ray patch wall, cuts rib, bottom is not Plastering prevents away mould phenomenon from occurring.
Die-filling step is to form the position setup module of external corner in metope, and module is close to the wherein side of the external corner of metope It is fixed after metope is calibrated, and protrude one end of module to another side wall side, the thickness of the protrusion is external corner Another side depth of plastering.The position for being usually formed external corner has door opening, window opening, beam bottom and two metopes to be crossed to form External corner etc..For door opening, the top surface of door opening, left and right side is respectively arranged with module;For window opening, the top surface of window opening, bottom surface, Left and right side is also respectively arranged with module.
Inside metope, the outside metope of same wall are both needed to plastering, and metope, outside metope are respectively formed sun on the inside of with this Using bilateral die-filling on the end metope at angle, two modules are close to end metope and are arranged, wherein the inside side wall in one end of a module The protrusion of face side, the outside side wall side protrusion in one end of another module, module fixing construction are in two modules Between, two modules share or have module fixing construction independent.Generally preferable two modules shared module fixed structure, this Sample can save cost.
Module fixing construction can there are many, in the present embodiment preferably are as follows: along the length direction of module, tight with module At least provided with two holes on the metope of patch, and stopper is squeezed into each hole, the iron-plate nail with iron plate is squeezed on each stopper, Cooperated by iron plate and metope and module is clamped fixation.It is preferred that the number in the hole being equipped on metope is two, so both The destruction to metope is reduced, while can be improved working efficiency.
The non-bulging metope of stopper requirement squeezed into, in this way after demoulding, squeeze into stopper metope be able to maintain it is smooth.Iron plate Nail squeeze into requirement just, surely, depth be usually 2cm.Using it is bilateral die-filling when, punching in two modules hit exactly, unilateral clamping hole From wall side, that is, external corner linea angulata 7cm;Unilateral die-filling and bilateral die-filling punching depth is 6cm.
In construction, for the module of the vertical direction setting on 2.1-2.5 meters of height of door openings or window opening, lower opening is liftoff Face 40cm, the distance between lower opening and upper hole are 130cm;For the vertical direction on 2.5-3.2 meters of height of door openings or window opening The module of setting, lower opening 60cm from the ground, is distance 140cm between upper hole and lower opening.
The standard of die-filling satisfaction are as follows: verticality >=89.7 ° of module, flatness error≤5mm;Module installation simultaneously will accord with Detail design requirement is closed, without " empty mould ", " mismatch ", " short mould " phenomenon.
It is preferred that the module is corrected by laser with respect to metope.
After floating screed, die-filling step, layering plastering processing step is come into effect, layering plastering processing is with rib, mould Verticality, flatness and depth of plastering of the block as benchmark control wall plastering, between rib and rib or rib and mould Plastering processing is carried out between block.Wherein plastering region is that narrow space or corner be more or door and window is more or area is few or constructing operation Slow region is one-pass molding region, the thickness of regions module protrusion and the consistency of thickness of rib.One-pass molding region Layering plastering processing step successively includes that plastering, floating rule, polishing, essence are smeared.The plastering mode in one-pass molding region is preferably machine spray (i.e. mechanically spraying), the spray of first time machine are that bottom machine sprays, and the thickness of bottom machine spray is by room squareness, degree of plainness for wall surface, vertical Degree determines that the thickness of usual bottom machine spray is 1.5cm or so, and second of machine spray is that surface layer machine sprays, the spray of surface layer machine with a thickness of 0.5cm or so.The spray of first machine is that bottom machine spray metope is done to 70% or so with second of machine spray midfeather time.
Plastering region is that space is larger or wall area is larger, and the convenient region of constructing operation is post forming region, should The thickness of the thickness module protrusion of regions module protrusion is higher than the thickness of rib, and rib thickness constitutes scratch coat thickness, mould The thickness of block protrusion and the thickness of thickness difference composition finish coat thickness module protrusion of rib and the thickness difference of rib are 5mm.The layering plastering processing in post forming region includes successively scratch coat, bottom floating rule, finish coat, surface layer floating rule, beats Mill, essence are smeared.
The plastering mode in post forming region is preferably machine spray (i.e. mechanically spraying).Nozzle and metope angle are kept for 90-95 ° Between, nozzle and metope distance are in 20cm or so.Machine, which sprays region, to be pressed from inside outwards, the sequence construction that metope gets on, get off, for The spray of machine can make easy for construction to get on, get off, and control machine well and spray flatness, verticality, and second of machine spray is using first It is to reduce landing ash under after upper.It should from top to bottom be in the spraying of " s " type when spraying, hold spraying rate, accomplish spraying at the uniform velocity, Do not occur ditch peak;
4, when carrying out one-pass molding and the spray operation of bottom machine, a coating thickness is no more than mark muscle, to floating rule person's floating rule It carries out and later fills spray afterwards;
5, side spray is wanted along rib and module, and is sprayed full;
6, to spray full at yin-yang angle, pipette tips are close to corner 10cm.
7, when surface layer machine sprays, coating thickness is using door and window module as elevation control.
Floating rule is divided into bottom floating rule and surface layer floating rule, and wherein bottom floating rule flatness, degree control are in 4mm, asperities Neatly, mortar solid is agglomerated without protrusion, inner corner trim is straight;Within 3mm, inner corner trim is straight for surface layer floating rule flatness, degree control; Surface layer is smooth.
Polish the standard that need to meet are as follows: metope without hollowing, without water wave, without pitted skin, free from flaw, plastering is clean, and color is uniform, It is clear beautiful.
Ending standard: yin-yang angle is straight, upright, and baseboard is neatly clean, smooth straight at toilet warterproof line interface, in advance Box out mouth, the repairing of electric wire box periphery smooth out, and surrounding is upright;Beam bottom, door, hole, it is flat strikes off press polish, and metope, ceiling cannot have Splash.
After layering plastering processing step, demoulding cleaning is come into effect, cleaning standard is carried in demoulding:
1, angle-style, the line style that module is moulded cannot be damaged when demoulding, cannot damage finished product;
2, according to " one-to-one correspondence " principle, after demoulding, module is put to corresponding position;
3, module cleaning is clean, and smears discarded machine oil.
Finished product protection is carried out after demoulding cleaning, final to carry out quality inspection examination, finished product reaches the advanced plastering standard of country.
Obviously, the above embodiments are merely examples for clarifying the description, and does not limit the embodiments.It is right For those of ordinary skill in the art, can also make on the basis of the above description it is other it is various forms of variation or It changes.There is no necessity and possibility to exhaust all the enbodiments.And it is extended from this it is obvious variation or It changes still within the protection scope of the invention.

Claims (11)

1. a kind of spray plaster technique, it is characterised in that: including
Base treatment;
Slurry lapping is got rid of, is laid with steel wire, the brushing interfacial agents in wait region of plastering in different materials matrix intersection;
Rib is arranged in metope screed on metope;
It is die-filling, the position setup module of external corner is formed in metope, module is close to a wherein side wall for the external corner of metope through school It just fixes afterwards, and protrudes one end of module to another side wall side, the thickness of the protrusion is the other side of external corner The depth of plastering in face;
It is layered plastering processing, verticality, flatness and the depth of plastering of wall plastering are controlled using rib, module as benchmark, Plastering processing is carried out between rib and rib or between rib and module;
Demoulding processing;
When inside metope, the outside metope of same wall are both needed to plastering, metope, outside metope are respectively formed external corner on the inside of with this Using bilateral die-filling on the metope of end, two modules are close to end metope and are arranged, wherein the inside side wall institute in one end of a module Protrusion in side, the outside side wall side protrusion in one end of another module, module fixing construction are between two modules, Two modules share or have module fixing construction independent;
Module fixing construction are as follows: along the length direction of module, at least provided with two holes on the metope being close to module, and it is each Stopper is squeezed into hole, the non-bulging metope of stopper is squeezed into the iron-plate nail with iron plate on each stopper, matched by iron plate and metope It closes and module is clamped fixation;
Region of plastering is that space is larger or wall area is larger, when the convenient post forming region of constructing operation, module protrusion Thickness is higher than the thickness of rib, and rib thickness constitutes scratch coat thickness, the thickness of module protrusion and the thickness difference of rib Constitute finish coat thickness.
2. spray plaster technique according to claim 1, which is characterized in that on the metope for the module being close to vertical direction Equipped with upper and lower two holes, for the module that height is arranged for the vertical direction on 2.1-2.5 meter of door opening or window opening, lower opening from Ground 40cm, the distance between lower opening and upper hole are 130cm;It is vertical on 2.5-3.2 meters of door opening or window opening for height The module of direction setting, lower opening 60cm from the ground, is distance 140cm between upper hole and lower opening.
3. spray plaster technique according to claim 1, which is characterized in that the module is by laser with respect to metope school Just.
4. spray plaster technique according to claim 1, which is characterized in that plastering region is that narrow space or corner are more Or when door and window is more or area is few or constructing operation slow one-pass molding region, the thickness of module protrusion and the thickness one of rib It causes.
5. spray plaster technique according to claim 4, which is characterized in that the layering plastering processing successively includes smearing Ash, floating rule, polishing, essence are smeared.
6. spray plaster technique according to claim 1, which is characterized in that the thickness of module protrusion is higher by the thickness of rib 5mm。
7. spray plaster technique according to claim 1, which is characterized in that the layering plastering processing successively includes bottom Plastering, bottom floating rule, finish coat, surface layer floating rule, polishing, essence are smeared.
8. spray plaster technique according to claim 1, which is characterized in that the door for not installing module of width≤1.2 meter Window installs two vertical ribs, through to ceiling;The door and window of width >=1.4 meter, top and bottom are both needed to place vertical bar Item.
9. spray plaster technique according to claim 1 to 8, which is characterized in that in layering plastering processing step Plastering mode be machine spray.
10. spray plaster technique according to claim 9, which is characterized in that nozzle and metope angle keep 90 ° -95 ° it Between, nozzle and metope distance are in 20cm or so.
11. spray plaster technique according to claim 1, which is characterized in that the interfacial agents are 2:1's by weight proportion 801 glue that plain-water slurry and interior water mixing weigh 25% are constituted.
CN201610671580.6A 2016-08-15 2016-08-15 A kind of spray plaster technique Active CN106256970B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610671580.6A CN106256970B (en) 2016-08-15 2016-08-15 A kind of spray plaster technique

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610671580.6A CN106256970B (en) 2016-08-15 2016-08-15 A kind of spray plaster technique

Publications (2)

Publication Number Publication Date
CN106256970A CN106256970A (en) 2016-12-28
CN106256970B true CN106256970B (en) 2019-04-26

Family

ID=57714021

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610671580.6A Active CN106256970B (en) 2016-08-15 2016-08-15 A kind of spray plaster technique

Country Status (1)

Country Link
CN (1) CN106256970B (en)

Families Citing this family (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106906967B (en) * 2017-02-09 2018-12-11 广西绿地涂装工程有限公司 A kind of construction technology of composite mortar
CN109184104A (en) * 2018-11-05 2019-01-11 江苏东保装饰集团有限公司 A kind of building decoration plastering construction method
CN110206278A (en) * 2019-06-11 2019-09-06 王春雨 A kind of quick leveling method of wall plastering
CN110792210B (en) * 2019-11-21 2021-04-30 河南朴之原建筑肌理研究院有限公司 Construction method for high-strength thin rammed earth wall with thickness of 40mm-100mm
CN110778050B (en) * 2019-12-04 2021-05-07 河南朴之原建筑肌理研究院有限公司 Method for presenting 25mm surface texture of super-strength ultrathin concrete imitation aged soil wall
CN111677210A (en) * 2020-06-11 2020-09-18 贵州建工集团第四建筑工程有限责任公司 Gypsum mortar construction process
CN112647658A (en) * 2020-08-28 2021-04-13 海南深装实业有限公司 Construction process for building decoration by using reinforcement driving wall
CN113802788A (en) * 2021-09-29 2021-12-17 刘庆祝 Construction method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102644362A (en) * 2012-04-20 2012-08-22 深圳广田装饰集团股份有限公司 Method for architectural decoration plastering construction
CN203961226U (en) * 2014-06-19 2014-11-26 江苏嘉明合达工程机械有限公司 External corner floating screed bar for wall plastering
CN105464341A (en) * 2014-08-21 2016-04-06 许德富 Corner protection scale strip
CN205224547U (en) * 2015-10-26 2016-05-11 王建华 Building white washed wall is plastered and is made level or ground guiding ruler of usefulness of making level
CN105715023A (en) * 2015-12-07 2016-06-29 李代桂 Wall-attached marker post for cement mortar pasting machine

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102644362A (en) * 2012-04-20 2012-08-22 深圳广田装饰集团股份有限公司 Method for architectural decoration plastering construction
CN203961226U (en) * 2014-06-19 2014-11-26 江苏嘉明合达工程机械有限公司 External corner floating screed bar for wall plastering
CN105464341A (en) * 2014-08-21 2016-04-06 许德富 Corner protection scale strip
CN205224547U (en) * 2015-10-26 2016-05-11 王建华 Building white washed wall is plastered and is made level or ground guiding ruler of usefulness of making level
CN105715023A (en) * 2015-12-07 2016-06-29 李代桂 Wall-attached marker post for cement mortar pasting machine

Also Published As

Publication number Publication date
CN106256970A (en) 2016-12-28

Similar Documents

Publication Publication Date Title
CN106256970B (en) A kind of spray plaster technique
CN104018598B (en) A kind of external wall structure and construction installation method
CN101575899B (en) Construction process for internal wall surface of building wall body
CN101886460B (en) Press polishing method of plastered mesh cloth of inner wall
CN103572845B (en) A kind of insulation clay reflective heat-insulation paint exterior wall heat-preserving system and construction technology thereof
CN208934297U (en) A kind of hollowing cracking falls off maintenance and renovation renewing outer wall
CN107035085A (en) A kind of indoor wall machine spray gypsum mortar is plastered one-time formed construction method
CN109797920A (en) A kind of interior covering with paint construction method
CN106284998A (en) Plastering on inner walls completely spreads fiberglass gridding cloth construction method
CN102400525A (en) Thin-layer plastering method for autoclaved aerated concrete block wall bodies
CN112267628A (en) Construction method of plastering-free system for interior wall decoration of constructional engineering
CN109853760A (en) The ultra-thin heat-insulation vacuum board exterior wall outer thermal insulation thin limed construction method of STP
CN107574936B (en) A kind of heat preserving exterior wall construction technology
CN106049780A (en) Plastering-free construction technique for high-precision brickwork
CN105178547A (en) Large-unit ceramic thin sheet back-suspending and gluing structure and construction method thereof
CN107761968A (en) Exterior wall internal insulation mortar joins position construction method
CN101008192A (en) Construction method of outer wall insulation system adopting composite insulation surface tile
CN109138423A (en) External wall thermal insulation/decoration integration board construction technology
CN105888084A (en) Whole outer wall internal thermal insulation system construction method by using enhanced composite thermal insulation material
CN209243999U (en) A kind of sculpture cement exterior wall
CN203834826U (en) Novel staircase water drip tank
CN205025042U (en) Big unit pottery sheet metal back of body kiss -coating bonds and constructs
CN109184103A (en) Building masonry wall exempts from plastering construction technique
CN108585638A (en) A kind of interior wall thin limed construction technique
CN108083740A (en) Mortar and the two-in-one compound material of putty and preparation method thereof

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
C41 Transfer of patent application or patent right or utility model
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20170105

Address after: Tan Jia Cun Gan Tang Zhen Loudi city 417700 Hunan County of Shuangfeng Province

Applicant after: Hunan ruijida science and Technology Co Ltd

Address before: 417703 Loudi City, Hunan Province town of Gan Tang Shuangfeng County Yang Book gravel field

Applicant before: Zou Xuehui

GR01 Patent grant
GR01 Patent grant