Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01F—ADDITIONAL WORK, SUCH AS EQUIPPING ROADS OR THE CONSTRUCTION OF PLATFORMS, HELICOPTER LANDING STAGES, SIGNS, SNOW FENCES, OR THE LIKE
- E01F15/00—Safety arrangements for slowing, redirecting or stopping errant vehicles, e.g. guard posts or bollards; Arrangements for reducing damage to roadside structures due to vehicular impact
- E01F15/02—Continuous barriers extending along roads or between traffic lanes
- E01F15/04—Continuous barriers extending along roads or between traffic lanes essentially made of longitudinal beams or rigid strips supported above ground at spaced points
- E01F15/0461—Supports, e.g. posts
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04H—BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
- E04H12/00—Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
- E04H12/20—Side-supporting means therefor, e.g. using guy ropes or struts
Abstract
Description
본 발명은 블록 보와 보강 토압판을 이용한 지주 연속보강 구조물 및 그 지주 연속보강 구조물 설치방법에 관한 것으로, 더 구체적으로는 방호울타리가 설치되는 성토부 경사 부근에 연속 설치되어 지주의 지지력을 보강 및 확보함과 아울러, 기존 방호울타리와 간섭 없이 설치가 쉽고 해체와 조립이 용이하여 신속한 시공과 유지보수가 편리하도록 한 블록 보와 보강 토압판을 이용한 지주 연속보강 구조물 및 지주 연속보강 구조물 설치방법에 관한 것이다.
The present invention relates to a method for installing a continuous continuous reinforcing structure using a block beam and a reinforced earth pressure plate, and a method for installing the continuous continuous reinforcing structure therefor. More specifically, the present invention is continuously installed near a slope of an embankment where a protective fence is installed to reinforce and support a support. In addition, the method of installing continuous continuous reinforcement structure and continuous continuous reinforcement structure using block beams and reinforced earth pressure plate for easy installation and disassembly and assembly for easy installation and maintenance without interference with existing protective fences will be.
일반적으로 종래에는 차의 충돌 압력에 저항할 수 있도록 가드레일(방호울타리) 자체의 강성만을 개발하여 왔고, 지주에 대한 개발은 미진한 상태이다.In general, only the stiffness of the guardrail (protective fence) itself has been developed so as to resist the collision pressure of the car, and the development of the post is incomplete.
최근 도로에는 차량의 제한 속도가 현저히 증대되어 왔고 대형 차량도 상당히 증가 추세라 종래 도로 가에 설치된 가드레일은 차량 사고에 따른 안전성을 확보하기가 어려운 것이 사실이다.In recent years, the speed limit of vehicles has increased significantly and the number of large vehicles has increased considerably. Therefore, it is difficult to secure safety due to a vehicle accident in a guardrail installed on a conventional road.
현재도 안정성 확보 차원에서 가드레일 자체의 강성에 대한 노력은 지속하고 있으나 기술적 한계를 드러내고 있다.Although efforts are being made to stiffen the guardrail itself in order to secure stability, it is still showing technical limitations.
가드레일의 지주는 차량 하중으로 인한 수평력을 지지하는 것으로 가드레일 설계 시 견고한 지반에 설치되는 것이 당연한 일이지만, 실제 시공 시 성토부 지반, 옹벽 등의 구조물 상부 등에 설치되어 지반의 수동저항력을 충분히 발휘하지 못하는 경우도 있다. 또한 지반 조건이나 지반 형상에 따라 지지력의 차이가 크기 때문에 이를 해결하기 위한 것도 문제점으로 지적되고 있다.The guardrail supports the horizontal force due to the vehicle load, and it is natural that the guardrail is installed on a solid ground when designing the guardrail.However, it is installed on the upper part of the structure such as the embankment, retaining wall, etc., and fully demonstrates the passive resistance of the ground. Sometimes you can't. In addition, it is pointed out as a problem to solve this problem because the difference in bearing capacity is large depending on the ground conditions and ground shape.
또한 지주 단독 보강의 경우 기존에 설치된 지주에 여러 보강판을 설치하거나 지주 매입 깊이를 증가시켜야 하기 때문에 기존 방호울타리의 해체가 불가피 하는 등 문제점이 있었다.
In addition, in the case of prop reinforcement alone, there are problems such as dismantling the existing protective fence because it is necessary to install several reinforcement plates or increase the depth of purchase of the support.
참고로, 국토해양부의 “도로안전시설 설치 및 관리지침(2012)”을 살펴보면 관련하여 다음과 같이 규정하고 있다.For reference, the Ministry of Land, Transport and Maritime Affairs' "Guidelines for the Installation and Management of Road Safety Facilities (2012)" provides the following.
상기 표 1과 표 2를 참조하면, 성토부 경사 시작점(B.P: Break Point)부근에 설치하는 연성 방호울타리는 지주의 수평지지력(현장 지지력)을 측정하여야 하며 그 값이 실물충돌시험장에서 확인된 수평지지력의 90% 이상이어야 한다.
Referring to Table 1 and Table 2, the flexible protective fence installed near the break point (BP) of the fill part should measure the horizontal support force (site support force) of the shore and the value of which is confirmed at the actual collision test site. It should be at least 90% of the bearing capacity.
본 발명의 목적은 방호울타리가 설치되는 성토부 경사 부근에 연속 설치되어 지주의 횡 지지력을 확보하도록 하는 블록 보와 보강 토압판을 이용한 지주 연속보강 구조물을 제공하기 위함이다.An object of the present invention is to provide a continuous continuous reinforcement structure using a block beam and a reinforced earth pressure plate to be installed continuously in the vicinity of the slope of the fill portion in which the protective fence is installed to ensure the lateral support of the support.
본 발명의 다른 목적은 방호울타리가 설치되는 성토부 경사 부근에 설치되는 지주의 지지력을 보강함은 물론, 기존 방호울타리와 간섭 없이 설치가 쉽고 해체와 조립이 용이하면서 지주의 지지력 보강을 할 수 있도록 한 블록 보와 보강 토압판을 이용한 지주 연속보강 구조물을 제공하기 위함이다.Another object of the present invention is to reinforce the supporting force of the support pillar installed near the slope of the embankment in which the protective fence is installed, as well as easy to install and easy disassembly and assembly without interference with the existing protective fence, so as to reinforce the support force of the support pillar. It is to provide a continuous continuous reinforcement structure using a single block beam and reinforced earth pressure plate.
본 발명의 또 다른 목적은 지주의 연속 보강으로 지주와 같은 다양한 고정단의 지지력을 보강할 수 있도록 하는 블록 보와 보강 토압판을 이용한 지주 연속보강 구조물을 제공할 수 있다.Still another object of the present invention may be to provide a continuous strut reinforcing structure using a block beam and a reinforced earth pressure plate to reinforce the supporting force of various fixed ends such as the strut by continuous reinforcement of the strut.
본 발명의 또 다른 목적은 방호울타리가 설치되는 성토부 경사 부근에 설치되는 지주의 지지력을 보강함은 물론, 기존 방호울타리와 간섭 없이 설치가 쉽고 해체와 조립이 용이하여 신속한 시공과 유지보수가 편리하도록 한 블록 보와 보강 토압판을 이용한 지주 연속보강 구조물 설치방법을 제공하기 위함이다.
Still another object of the present invention is to reinforce the support force of the support which is installed near the slope of the embankment where the protective fence is installed, as well as easy installation and disassembly and assembly without interference with the existing protective fence, so that the construction and maintenance are convenient. This is to provide a method for installing a continuous continuous reinforcement structure using a block beam and a reinforced earth pressure plate.
본 발명은 상술한 목적을 달성하기 위하여, 지면에 매설되는 방호울타리 지주의 고정단을 지지하기 위한 블록 보와; 상기 블록 보에 결합되어 지지력을 보강하기 위한 보강 토압판을 포함하고, 방호울타리가 설치되는 성토부 경사 부근에서 지주의 횡 지지력을 확보하도록 이루어지는 것을 특징으로 하는 블록 보와 보강 토압판을 이용한 지주 연속보강 구조물을 제공한다.The present invention is a block beam for supporting the fixed end of the protective fence pillar embedded in the ground, in order to achieve the above object; Shoring continuous using a block beam and reinforcing earth pressure plate comprising a reinforcing earth pressure plate coupled to the block beam to secure the support force, and to ensure the lateral support of the support in the vicinity of the slope of the fill portion is installed protective fences Provide reinforcing structures.
본 발명은 상술한 목적을 달성하기 위하여, 상기 블록 보는 일정길이 방향으로 형성되는 블록몸체와; 상기 블록몸체의 좌우 양끝단부에 형성되어 상호 맞대응하도록 조립되기 위한 암수 연결부와; 상기 블록몸체를 따라 어느 한 곳에 홈으로 형성되어 상기 지주의 고정단을 받쳐주기 위한 지주 받침홈을 더 포함하여 구성되는 것을 특징으로 하는 블록 보와 보강 토압판을 이용한 지주 연속보강 구조물을 제공한다.The present invention is a block body formed in a predetermined length direction to see the block, in order to achieve the above object; A male and female connection part formed at left and right ends of the block body and assembled to correspond to each other; It is formed along any one of the grooves along the block body provides a continuous support structure for the strut using a block beam and reinforcement earth pressure plate, characterized in that it further comprises a support support groove for supporting the fixed end of the support.
본 발명은 상술한 목적을 달성하기 위하여, 상기 블록몸체의 좌우 양끝단부에 형성되는 암수 연결부에 의해 상기 블록 보가 좌우 연속적으로 조립이 이루어지고, 상기 암수 연결부는 보 연결핀으로 고정됨을 특징으로 하는 블록 보와 보강 토압판을 이용한 지주 연속보강 구조물을 제공한다.The present invention is to achieve the above object, the block beam is assembled by the left and right both ends of the block body is formed by the male and female connecting portions formed on both ends of the block body, the female and female connecting block is characterized in that the fixed fastening pin Provides continuous continuous reinforcement structures using beams and reinforced earth pressure plates.
본 발명은 상술한 목적을 달성하기 위하여, 상기 보강 토압판은 상기 블록 보의 상측에 밀착되기 위한 상부판과; 상기 상부판의 일측에서 일정길이 절곡되어 지면에 매설되기 위한 제1 토압판; 및 상기 상부판의 타측에서 일정길이 절곡되면서 좌우가 분리되도록 형성되어 지면에 매설되기 위한 제2 토압판을 포함하여 구성되는 것을 특징으로 하는 블록 보와 보강 토압판을 이용한 지주 연속보강 구조물을 제공한다.The present invention, in order to achieve the above object, the reinforcement earth pressure plate and the upper plate for being in close contact with the upper side of the block beam; A first earth pressure plate bent at one side of the upper plate and embedded in the ground; And a second earth pressure plate formed on the other side of the upper plate while being bent at a predetermined length to separate the left and right, and embedded in the ground. .
본 발명은 상술한 목적을 달성하기 위하여, 상기 제1 토압판과 상기 제2 토압판은 자체 보강력을 유지하도록 하는 복수의 보강리브를 가지도록 형성됨을 특징으로 하는 블록 보와 보강 토압판을 이용한 지주 연속보강 구조물을 제공한다.In order to achieve the above object, the first earth pressure plate and the second earth pressure plate are formed using a block beam and a reinforced earth pressure plate, characterized in that it has a plurality of reinforcing ribs to maintain their reinforcement force. Provide post continuous reinforcement structures.
본 발명은 상술한 목적을 달성하기 위하여, 상기 보강 토압판은 자체 보강력을 유지하기 위한 보강리브를 가지도록 형성되며, 상기 보강리브의 일측에는 지면에서 지지력 보강을 위한 다른 보강 토압판이 더 구비되도록 결합이 이루어짐을 특징으로 하는 블록 보와 보강 토압판을 이용한 지주 연속보강 구조물을 제공한다.The present invention, in order to achieve the above object, the reinforcement earth pressure plate is formed to have a reinforcement rib for maintaining its own reinforcement force, so that one side of the reinforcement rib is further provided with another reinforcement earth pressure plate for supporting force reinforcement in the ground Provides a strut continuous reinforcement structure using a block beam and reinforced earth pressure plate, characterized in that the coupling is made.
본 발명은 상술한 목적을 달성하기 위하여, 좌우 연속적으로 조립 및 해체할 수 있는 블록 보 및 상기 블록 보의 지지력을 보강하기 위한 보강 토압판을 준비하는 단계와; 지면에 매설되는 방호울타리 지주의 고정단을 밀착 고정하도록 좌우로 연속 조립되는 상기 블록 보를 지주에 설치하는 단계와; 상기 블록 보의 좌우 조립 부위를 보 연결핀으로 고정하는 단계와; 상기 블록 보에 등간격으로 결합되면서 상기 블록 보를 지면에서 고정 지지하기 위한 보강 토압판을 설치하는 단계를 포함하여 이루어지는 것을 특징으로 하는 블록 보와 보강 토압판을 이용한 지주 연속보강 방법을 제공한다.The present invention comprises the steps of preparing a block beam that can be assembled and disassembled left and right continuously and a reinforcement earth plate for reinforcing the bearing capacity of the block beam in order to achieve the above object; Installing the block beams which are continuously assembled from side to side to closely fix the fixed end of the protective fence pillar embedded in the ground; Fixing left and right assembly portions of the block beams with beam connecting pins; It is coupled to the block beam at equal intervals provides a continuous continuous reinforcement method using a block beam and a reinforced earth pressure plate comprising the step of installing a reinforcing earth pressure plate for fixedly holding the block beam on the ground.
본 발명은 상술한 목적을 달성하기 위하여, 상기 보강 토압판의 설치는 상기 블록 보의 좌우 조립 부위를 보 연결핀으로 고정하는 부위 상측에서 결합되어 조립 부위가 덮어지도록 설치됨을 특징으로 하는 블록 보와 보강 토압판을 이용한 지주 연속보강 방법을 제공한다.The present invention, in order to achieve the above object, the installation of the reinforcing earth pressure plate and the block beam, characterized in that the assembly is covered so as to cover the assembly site is coupled to the upper side of the site of fixing the left and right assembly portion of the block beam with a beam connecting pin Provides a method for continuous reinforcement of strut using reinforced earth pressure plate.
본 발명은 상술한 목적을 달성하기 위하여, 상기 블록 보와 보강 토압판을 이용한 지주 연속보강 방법으로 설치되는 지주 연속보강 구조물을 제공한다.
The present invention provides a strut continuous reinforcement structure which is installed by the strut continuous reinforcement method using the block beam and the reinforced earth pressure plate to achieve the above object.
본 발명은 지면에 매설되는 방호울타리 지주의 고정단을 지지하기 위한 블록 보와; 상기 블록 보에 결합되어 지지력을 보강하기 위한 보강 토압판을 포함하고, 방호울타리가 설치되는 성토부 경사 부근에서 지주의 횡 지지력을 확보하도록 이루어지는 것이므로, 방호울타리가 설치되는 성토부 경사 부근에 연속 설치되는 지주 연속 보강 구조물을 제공하여 지주의 횡 지지력을 확보할 수 있다.The present invention is a block beam for supporting the fixed end of the protective fence pillar embedded in the ground; It includes a reinforcement earth pressure plate coupled to the block beam for reinforcing the bearing force, and is configured to secure the lateral support of the support in the vicinity of the fill slope slope is installed protective fence, continuous installation near the slope of the fill section where the fence fence is installed It is possible to secure the lateral support of the support by providing a continuous continuous reinforcement structure.
또한, 본 발명은 기존 방호울타리와 간섭 없이 설치가 쉽고 해체와 조립이 용이하면서 지주의 지지력 보강을 극대화할 수 있다.In addition, the present invention can maximize the reinforcement of the support while easy to install and easy disassembly and assembly without interference with the existing protective fence.
또한, 본 발명은 지주의 연속 보강으로 지주와 같은 다양한 고정단의 지지력을 보강할 수도 있다.In addition, the present invention may reinforce the supporting force of various fixed ends such as the support by the continuous reinforcement of the support.
또한, 본 발명은 방호울타리가 설치되는 성토부의 다양한 경사면에 대하여 보의 위치를 잡아주는 보강 토압판의 숫자의 증가만으로 필요한 지주 지지력을 제공하지 못하는 경우에도 토량(토압 변화 인자) 확보에 유리하도록 경사면 시작점에서 멀리 떨어뜨려 설치되는 지지력 보강 토압판을 더 구비할 수 있다.
In addition, the present invention inclined surface to be advantageous to secure the soil volume (soil pressure change factor) even if the support holding force is not provided only by increasing the number of reinforcement earth pressure plate to hold the position of the beam with respect to the various inclined surface of the embankment in which the protective fence is installed It may further include a bearing reinforcement earth pressure plate is installed far away from the starting point.
도 1 내지 도 7은 본 발명에 의한 블록 보와 보강 토압판을 이용한 지주 연속보강 구조물의 일실시예를 보인 것으로,
도 1은 본 발명에 의한 블록 보와 보강 토압판을 이용한 지주 연속보강 구조물의 전체 설치된 상태 사시도,
도 2는 도 1의 지주 연속 보강 구조물을 보인 분해 사시도,
도 3은 도 1의 지주 연속 보강 구조물을 보인 정면도,
도 4는 도 1의 지주 연속 보강 구조물을 보인 평면도,
도 5는 본 발명에 의한 블록 보와 보강 토압판을 이용한 지주 연속보강 구조물에 따른 블록 보를 보인 사시도,
도 6은 본 발명에 의한 블록 보와 보강 토압판을 이용한 지주 연속보강 구조물에 따른 보강 토압판의 전후를 보여주는 사시도,
도 7은 도 1의 지주 연속 보강 구조물을 보인 설치 상태 측면도이다.1 to 7 shows an embodiment of the strut continuous reinforcement structure using a block beam and reinforcement earth plate according to the present invention,
1 is a perspective view of the entire installed state of the continuous strut structure of the strut using the block beam and the reinforced earth pressure plate according to the present invention,
Figure 2 is an exploded perspective view showing the strut continuous reinforcement structure of Figure 1,
3 is a front view showing the strut continuous reinforcement structure of FIG.
4 is a plan view showing the strut continuous reinforcement structure of FIG.
5 is a perspective view showing a block beam according to the strut continuous reinforcement structure using a block beam and a reinforced earth pressure plate according to the present invention;
Figure 6 is a perspective view showing the front and rear of the reinforcement earth pressure plate according to the continuous continuous structure of the strut using the block beam and reinforcement earth pressure plate according to the present invention,
7 is a side view of the installation state showing the post continuous reinforcement structure of FIG.
이하, 본 발명의 바람직한 실시예를 첨부한 도면을 참조로 하여 상세히 설명하다. 본 발명은 이하에서 개시되는 실시예에 한정되는 것이 아니라 서로 다른 다양한 형태로 구현될 수 있으며, 단지 본 실시예는 본 발명의 개시가 완전하도록 하며 통상의 지식을 가진 자에게 발명의 범주를 완전하게 알려주기 위하여 제공되는 것이다.
Hereinafter, with reference to the accompanying drawings, preferred embodiments of the present invention will be described in detail. It is to be understood that the present invention is not limited to the disclosed embodiments, but may be embodied in many different forms and should not be construed as limited to the embodiments set forth herein. Rather, these embodiments are provided so that this disclosure will be thorough and complete, It is provided to inform.
도 1 내지 도 7은 본 발명에 의한 블록 보와 보강 토압판을 이용한 지주 연속보강 구조물의 일실시예를 보인 것이다.1 to 7 shows an embodiment of the strut continuous reinforcement structure using a block beam and a reinforced earth pressure plate according to the present invention.
도 1 내지 도 6을 참조하면, 본 실시예에 따른 블록 보와 보강 토압판을 이용한 지주 연속보강 구조물은 방호울타리(100)의 지주(101)를 보강하기 위해 설치되는 블록 보(110)와, 상기 블록 보(110)를 보강하기 위한 보강 토압판(120)을 포함하여 구성된다.Referring to Figures 1 to 6, the strut continuous reinforcing structure using the block beam and the reinforcement earth plate according to the present embodiment is a
상기 방호울타리(100)는 도로 가장자리에 설치되는 가드레일 역할을 하는 것으로, 방호울타리(가드레일)는 차량 사고에 따른 안전성을 확보하기 위한 것으로, 지표면에 일정 깊이로 고정단(101a)이 매설되는 지주(101)와, 상기 지주(101)에 설치되는 연결 브래킷(102) 및 상기 연결 브래킷(102)에 의해 지주(101)에 차량 방호용 레일(103)을 고정하여 설치된다.The
바람직하게는, 상기 방호울타리(100)의 차량 방호용 레일(103)과 상기 블록 보(110)의 이격 거리는 최소 100mm 이상 유지함이 바람직하다. 이는 기존 방호울타리와의 간섭을 최소화할 수 있는 거리를 확보하기 위함이다.Preferably, the separation distance between the
상기 블록 보(110)는 지면에 매설되는 상기 지주(101)의 고정단(101a)을 지지하도록 형성된다.The
도 5를 참조하면, 상기 블록 보(110)는 일정길이 방향으로 형성되는 블록몸체(111)와; 상기 블록몸체(111)의 좌우 양끝단부에 형성되어 상호 맞대응하도록 조립되기 위한 암수 연결부(112)(113)와; 상기 블록몸체(111)를 따라 어느 한 곳에 홈으로 형성되어 상기 지주(101)의 고정단(101a)을 받쳐주기 위한 지주 받침홈(114)을 더 포함하여 구성된다.Referring to FIG. 5, the
또한 상기 블록몸체(111)의 좌우 양끝단부에 형성되는 암수 연결부(112)(113)에 의해 블록 보(110)가 좌우 연속적으로 조립이 이루어지도록 형성되고, 상기 암수 연결부(112)(113)는 보 연결핀(130)으로 고정됨을 바람직하다.In addition, the male and female connecting
한편 상기 지주 받침홈(114)은 지주의 원주 직경과 맞도록 형성됨이 바람직하며, 상기 암수 연결부(112)(113)의 일면에는 상기 보 연결핀(130)이 관통하는 관통공이 천공됨이 바람직하다.On the other hand, the
상기 보강 토압판(120)은 상기 블록 보(110)에 결합되어 지주의 지지력을 보강하도록 형성되어 설치된다. The reinforcement
상기 보강 토압판(120)은 상기 블록 보(110)의 상측에 밀착되기 위한 상부판(121)과; 상기 상부판(121)의 일측에서 일정길이 절곡되어 지면에 매설되기 위한 제1 토압판(122); 및 상기 상부판(121)의 타측에서 일정길이 절곡되면서 좌우가 분리되도록 형성되어 지면에 매설되기 위한 제2 토압판(123)을 포함하여 구성된다.The reinforcement
또한 상기 제1 토압판(122)과 상기 제2 토압판(123)은 자체 보강력을 유지하도록 하는 복수의 보강리브(124)를 더 가지도록 형성됨이 바람직하다.
In addition, the first
이하, 본 발명에 의한 블록 보와 보강 토압판을 이용한 지주 연속보강 구조물의 작용 효과를 설명하면 다음과 같다.Hereinafter, the operational effects of the strut continuous reinforcement structure using the block beam and the reinforced earth plate according to the present invention will be described.
도 7은 도 1의 지주 연속 보강 구조물을 보인 설치 상태 측면도이다.7 is a side view of the installation state showing the post continuous reinforcement structure of FIG.
먼저, 좌우 연속적으로 조립 및 해체 가능한 블록 보(110) 및 상기 블록 보(110)의 지지력을 보강하기 위한 보강 토압판(120)을 준비한다.First, prepare a
다음 기존 방호울타리가 설치된 지주 구조물에서 지표면에 매설된 지주(101)의 고정단(101a)의 바로 상측에 상기 블록 보(110)에 형성된 지주 받침홈(114) 부위를 밀착하여 설치한다.Next, in the support structure in which the existing protective fence is installed, the
그리고 상기 지주(101)의 고정단(101a)을 받쳐주는 블록 보(110)의 암수 연결부(112)(113)에 다른 블록 보 암수 연결부를 상호 맞대응하도록 보 연결핀(130)으로 연결 조립하면서 방호울타리의 길이방향을 따라 연속 조립하도록 설치할 수 있다.And protection by connecting and assembling the
끝으로 블록 보(110)와 다른 블록 보가 연속 설치된 연결부 상측으로 준비된 보강 토압판(120)을 결합하면서 보강 토압판(120)을 지표면에 꽂아 설치를 마무리할 수 있다.Finally, the reinforcing
여기서 아래 표 3 내지 표 5를 참조하면, 본 발명에 의한 블록 보와 보강 토압판을 이용한 지주 연속보강 구조물에 의해 지주 횡 지지력에 대한 보강력 증진 방법을 설명하면 다음과 같다.
Here, referring to Tables 3 to 5 below, the reinforcement method for the lateral lateral support by the strut continuous reinforcement structure using the block beam and the reinforcement earth plate according to the present invention will be described.
이하, 본 발명에 의한 블록 보와 보강 토압판을 이용한 지주 연속보강 설치 방법을 설명하면 다음과 같다.Hereinafter, a description will be given of a method for installing a continuous continuous reinforcement using a block beam and a reinforced earth pressure plate according to the present invention.
본 발명에 의한 블록 보와 보강 토압판을 이용한 지주 연속보강 설치 방법은 좌우 연속적으로 조립 및 해체할 수 있는 블록 보(100) 및 상기 블록 보(110)의 지지력을 보강하기 위한 보강 토압판(120)을 준비하는 단계와; 지면에 매설되는 방호울타리 지주(101)의 고정단(101a)을 밀착 고정하도록 좌우로 연속 조립되는 상기 블록 보(110)를 지주에 설치하는 단계와; 상기 블록 보(110)의 좌우 조립 부위를 보 연결핀(130)으로 고정하는 단계와; 상기 블록 보(110)에 등간격으로 결합되면서 상기 블록 보(110)를 지면에서 고정 지지하기 위한 보강 토압판(120)을 설치하는 단계를 포함하여 이루어진다.The continuous continuous reinforcement installation method using the block beam and the reinforcement earth pressure plate according to the present invention is a reinforcement
또한 상기 보강 토압판(120)의 설치는 상기 블록 보(110)의 좌우 조립 부위를 보 연결핀(130)으로 고정하는 부위 상측에서 결합되어 조립 부위가 덮어지도록 설치할 수 있다.In addition, the installation of the reinforcement
또한 상기 블록 보와 보강 토압판을 이용한 지주 연속보강 방법으로 설치되는 지주 연속보강 구조물을 제공하게 되는 것이다.In addition, it is to provide a continuous continuous reinforcement structure is installed by the continuous column reinforcement method using the block beam and reinforced earth pressure plate.
본 발명은 이상에서 살펴본 바와 같이 바람직한 실시예를 들어 도시하고 설명하였으나, 상기한 실시예에 한정되지 아니하며 본 발명의 정신을 벗어나지 않는 범위 내에서 당해 발명이 속하는 기술분야에서 통상의 지식을 가진 자에 의해 본 발명의 기술사상과 아래에 기재될 특허청구범위의 균등범위 내에서 다양한 수정 및 변형이 가능함은 물론이다.
While the present invention has been particularly shown and described with reference to exemplary embodiments thereof, it is clearly understood that the same is by way of illustration and example only and is not to be taken by way of limitation, It will be understood by those skilled in the art that various changes in form and details may be made therein without departing from the spirit and scope of the present invention as defined by the appended claims and their equivalents.
100 : 방호울타리 101 : 지주
110 : 블록 보 120 : 보강 토압판100: fence fence 101: prop
110: block beam 120: reinforced earth pressure plate
Claims (8)
상기 보강 토압판(120)은
상기 블록 보(110)의 상측에 밀착되기 위한 상부판(121)과;
상기 상부판(121)의 일측에서 일정길이 절곡되어 지면에 매설되기 위한 제1 토압판(122); 및
상기 상부판(121)의 타측에서 일정길이 절곡되면서 좌우가 분리되도록 형성되어 지면에 매설되기 위한 제2 토압판(123)을 포함하여,
방호울타리가 설치되는 성토부 경사 부근에서 지주(101)의 횡 지지력을 확보하도록 이루어지는 것을 특징으로 하는
블록 보와 보강 토압판을 이용한 지주 연속보강 구조물.
Block beam 110 for supporting the fixed end (101a) of the protective fence (100) strut 101 embedded in the ground; As a strut continuous reinforcement structure using a block beam and a reinforcing earth pressure plate coupled to the block beam 110, including a reinforcing earth pressure plate 120 for reinforcing a supporting force,
The reinforcement earth pressure plate 120
An upper plate 121 to be in close contact with the upper side of the block beam 110;
A first earth pressure plate 122 for bending a predetermined length at one side of the upper plate 121 to be embedded in the ground; And
Including the second earth pressure plate 123 is formed to be separated from the left and right while bending a predetermined length on the other side of the upper plate 121 is embedded in the ground,
Characterized in that the guard fence is installed to ensure the lateral support of the strut 101 in the vicinity of the fill section slope is installed
Continuous continuous reinforcement structure using block beam and reinforced earth plate.
상기 블록 보(110)는 일정길이 방향으로 형성되는 블록몸체(111)와;
상기 블록몸체(111)의 좌우 양끝단부에 형성되어 상호 맞대응하도록 조립되기 위한 암수 연결부(112)(113)와;
상기 블록몸체(111)를 따라 어느 한 곳에 홈으로 형성되어 상기 지주(101)의 고정단(101a)을 받쳐주기 위한 지주 받침홈(114)을 더 포함하여 구성되는 것을 특징으로 하는 블록 보와 보강 토압판을 이용한 지주 연속보강 구조물.
The method of claim 1,
The block beam 110 includes a block body 111 formed in a predetermined length direction;
Male and female connection parts 112 and 113 formed at left and right ends of the block body 111 and assembled to correspond to each other;
Block beam and reinforcement, characterized in that it further comprises a support support groove 114 is formed in any one along the block body 111 to support the fixed end 101a of the support (101) Continuous continuous reinforcement structure using earth pressure plate.
상기 블록몸체(111)의 좌우 양끝단부에 형성되는 암수 연결부(112)(113)에 의해 블록 보(110)가 좌우 연속적으로 조립이 이루어지고,
상기 암수 연결부(112)(113)는 보 연결핀(130)으로 고정됨을 특징으로 하는 블록 보와 보강 토압판을 이용한 지주 연속보강 구조물.
3. The method of claim 2,
Block beam 110 is assembled left and right continuously by the male and female connecting portions 112 and 113 formed at the left and right ends of the block body 111,
The male and female connection portion 112, 113 is a continuous continuous reinforcement structure using a block beam and reinforcement earth pressure plate, characterized in that is fixed to the beam connecting pin (130).
상기 제1 토압판(122)과 상기 제2 토압판(123)은 자체 보강력을 유지하도록 하는 복수의 보강리브(124)를 더 가지도록 형성됨을 특징으로 하는 블록 보와 보강 토압판을 이용한 지주 연속보강 구조물.The method of claim 1,
The first earth pressure plate 122 and the second earth pressure plate 123 are formed to have a plurality of reinforcing ribs 124 to maintain the self-reinforcement, characterized in that the strut using a block beam and reinforced earth pressure plate Continuous reinforcement structure.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020130077892A KR101355843B1 (en) | 2013-07-03 | 2013-07-03 | Guard fence reinforcing structure and method of installing thereof |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020130077892A KR101355843B1 (en) | 2013-07-03 | 2013-07-03 | Guard fence reinforcing structure and method of installing thereof |
Related Child Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR1020130120904A Division KR101518360B1 (en) | 2013-10-10 | 2013-10-10 | Guard fence reinforcing structure and method of installing thereof |
Publications (1)
Publication Number | Publication Date |
---|---|
KR101355843B1 true KR101355843B1 (en) | 2014-01-28 |
Family
ID=50146504
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR1020130077892A KR101355843B1 (en) | 2013-07-03 | 2013-07-03 | Guard fence reinforcing structure and method of installing thereof |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR101355843B1 (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101889308B1 (en) | 2017-04-11 | 2018-08-20 | 이승헌 | Safety fence of structure and establishment method for a use and Steel-concrete |
IT202000030929A1 (en) * | 2020-12-16 | 2022-06-16 | Stratec Rt Srl | ROAD SAFETY BARRIERS WITH REINFORCED GROUND LINKING AND RELATED INSTALLATION METHOD |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20120035538A (en) * | 2010-10-06 | 2012-04-16 | 동아에스텍 주식회사 | Reinforcement guardrail combines the guard beam and reinforcement guardrail construction method |
KR101198826B1 (en) * | 2012-07-17 | 2012-11-07 | 유한회사 이티아이 | Impact absorption intension guard fence |
KR20130013302A (en) * | 2011-07-28 | 2013-02-06 | 주식회사 성원안전 | A pillar support method for guardrail |
-
2013
- 2013-07-03 KR KR1020130077892A patent/KR101355843B1/en active IP Right Grant
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20120035538A (en) * | 2010-10-06 | 2012-04-16 | 동아에스텍 주식회사 | Reinforcement guardrail combines the guard beam and reinforcement guardrail construction method |
KR20130013302A (en) * | 2011-07-28 | 2013-02-06 | 주식회사 성원안전 | A pillar support method for guardrail |
KR101198826B1 (en) * | 2012-07-17 | 2012-11-07 | 유한회사 이티아이 | Impact absorption intension guard fence |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101889308B1 (en) | 2017-04-11 | 2018-08-20 | 이승헌 | Safety fence of structure and establishment method for a use and Steel-concrete |
IT202000030929A1 (en) * | 2020-12-16 | 2022-06-16 | Stratec Rt Srl | ROAD SAFETY BARRIERS WITH REINFORCED GROUND LINKING AND RELATED INSTALLATION METHOD |
WO2022130115A1 (en) * | 2020-12-16 | 2022-06-23 | Stratec Rt Srl | Road safety barriers with reinforced ground concatenation and installation method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR101633431B1 (en) | Expandable bridge sidewalk and it's construction method | |
KR101355841B1 (en) | Guard fence reinforcing structure | |
KR100948501B1 (en) | Extension footpath for retaining wall and it's construnction method | |
KR101638093B1 (en) | Rahmen using hinge type pc wall and method for constructing the same | |
KR101355843B1 (en) | Guard fence reinforcing structure and method of installing thereof | |
KR101506880B1 (en) | Shoring apparatus | |
KR101707170B1 (en) | Structure for connecting support | |
KR101020856B1 (en) | Underground steel pipe structure and constructing method thereof | |
KR101475777B1 (en) | Guard fence reinforcing structure | |
JP5762065B2 (en) | Separate structure of bicycle lane and pedestrian lane | |
KR101542602B1 (en) | Equipment of temporary earth protection for building works | |
KR100797185B1 (en) | Construction method and the apparatus of a ground retaining structures or walls | |
KR101518360B1 (en) | Guard fence reinforcing structure and method of installing thereof | |
KR101015610B1 (en) | Tunnel having inclined plate | |
KR101609760B1 (en) | Construction method for a sidewalk enlargement installation | |
KR101378097B1 (en) | Deck plate | |
JP7084798B2 (en) | Foundation members of road guard fences, road guard fences, and their construction methods | |
KR20130013300A (en) | A pillar support structure for guardrail | |
KR101909687B1 (en) | Earth retaining structure and constructionmethod thereof | |
JP3150984U (en) | Temporary protective fence for road | |
KR101803767B1 (en) | Assembly for reinforcing head part of steel tube pile and steel tubepile assembly including the same | |
JP4282507B2 (en) | Lightweight embankment structure and widening method for lighter embankment structure using the same | |
KR200396179Y1 (en) | Reinforcement armature inserted revet | |
KR102211286B1 (en) | Lane separator | |
KR20110083288A (en) | A post support for road-guide plate |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A201 | Request for examination | ||
A302 | Request for accelerated examination | ||
E902 | Notification of reason for refusal | ||
A107 | Divisional application of patent | ||
E701 | Decision to grant or registration of patent right | ||
GRNT | Written decision to grant | ||
FPAY | Annual fee payment |
Payment date: 20170111 Year of fee payment: 4 |
|
FPAY | Annual fee payment |
Payment date: 20180102 Year of fee payment: 5 |
|
FPAY | Annual fee payment |
Payment date: 20200218 Year of fee payment: 7 |