KR101317006B1 - Guide fixing frame for constructing sheet file - Google Patents

Guide fixing frame for constructing sheet file Download PDF

Info

Publication number
KR101317006B1
KR101317006B1 KR1020120077740A KR20120077740A KR101317006B1 KR 101317006 B1 KR101317006 B1 KR 101317006B1 KR 1020120077740 A KR1020120077740 A KR 1020120077740A KR 20120077740 A KR20120077740 A KR 20120077740A KR 101317006 B1 KR101317006 B1 KR 101317006B1
Authority
KR
South Korea
Prior art keywords
sheet pile
pile
sheet
fixing frame
installing
Prior art date
Application number
KR1020120077740A
Other languages
Korean (ko)
Inventor
양영신
Original Assignee
양영신
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 양영신 filed Critical 양영신
Priority to KR1020120077740A priority Critical patent/KR101317006B1/en
Application granted granted Critical
Publication of KR101317006B1 publication Critical patent/KR101317006B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D13/00Accessories for placing or removing piles or bulkheads, e.g. noise attenuating chambers
    • E02D13/04Guide devices; Guide frames
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D15/00Handling building or like materials for hydraulic engineering or foundations
    • E02D15/02Handling of bulk concrete specially for foundation or hydraulic engineering purposes
    • E02D15/04Placing concrete in mould-pipes, pile tubes, bore-holes or narrow shafts
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/02Retaining or protecting walls
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/02Sheet piles or sheet pile bulkheads
    • E02D5/03Prefabricated parts, e.g. composite sheet piles
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/18Bulkheads or similar walls made solely of concrete in situ

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • Chemical & Material Sciences (AREA)
  • Composite Materials (AREA)
  • Environmental & Geological Engineering (AREA)
  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Abstract

PURPOSE: A pre-boring and sheet-pile installable guide fixation frame is provided to easily move a guide fixing frame since the pre-boring and sheet-pile installable guide fixation frame which is installed with a sheet pile is movable in the width direction, thereby reducing the term of works and the construction costs. CONSTITUTION: A pre-boring and sheet-pile installable guide fixation frame comprises a pair of transverse members (10) and a longitudinal member (20). A vertical member (30) is formed on the ends of the pair of transverse members to be longer than the height of a part which is exposed over the ground from the sheet pile which is continuously installed. An opening is formed by installing a connection unit (31) which connects the pair of vertical members. The part of the installed sheet pile, which is exposed over the ground, passes through the inside of the opening for a square-shaped frame to be easily movable to a following contiguous section.

Description

선천공 및 시트파일 설치용 가이드 고정틀{GUIDE FIXING FRAME FOR CONSTRUCTING SHEET FILE} Guide fixing frame for installation of perforation and seat pile {GUIDE FIXING FRAME FOR CONSTRUCTING SHEET FILE}

본 발명은 호박돌층(전석층)이나 기반암(풍화암,연암, 경암)층과 같이 지반이 단단하고 조밀하여 직항타 공법이나 워터제트 공법으로는 시트파일을 설치할 수 없는 작업대상 지반 또는 해수면에서 시트파일을 설치하는 선천공 및 시트파일 설치용 가이드 고정틀에 관한 것으로서, 더욱 상세하게는 가로 방향으로 길게 상기 N개의 시트파일을 설치할 공간이 형성된 사각형상의 고정틀을 사용하여 각 시트파일이 설치될 위치를 정확히 구획함과 동시에 시트파일을 설치하기 위한 위치를 천공함에 있어 시트파일 설치 위치를 1→3→2 순서대로 천공하여 직인접 천공으로 인한 기천공된 내부에 치환재를 투입함으로써 주변 및 그 내부에 흙 등이 붕괴되는 것을 방지하고 주열상의 지중연속벽체를 형성하기 위한 시트파일 설치 위치가 모두 천공된 후에 시트파일을 일괄적으로 설치하기 용이하면서도, 상기 사각형상의 고정틀 내에서 시트파일이 설치가 완료된 후 다음 시트파일을 설치하기 위하여 상기 사각형상의 고정틀을 이동하여야 하는데, 상기 사각형상의 가이드 고정틀의 이동을 용이하게 함으로써 정밀 시공과 공기 단축 및 경비를 절감할 수 있는 선천공 및 시트파일 설치용 가이드 고정틀에 관한 것이다.
The present invention is a sheet pile in the work ground or sea surface where the ground pile is hard and dense, such as amber stone layer (stone layer) or bedrock (weathered rock, soft rock, hard rock) layer can not be installed by the non-stop method or water jet method A guide fixing frame for installing perforations and seat piles for installing the present invention, and more specifically, precisely partitioning a position where each sheet pile is to be installed using a rectangular fixing frame having a space for installing the N sheet piles extending in the horizontal direction. At the same time, in drilling the position for installing the sheet pile, the sheet pile installation position is drilled in the order of 1 → 3 → 2, and by inserting the substitution material into the perforated interior due to the direct perforation, soil, etc. Sheets are installed after all of the pile pile installation positions for preventing collapsing and forming underground continuous walls While it is easy to install the work in a batch, after the installation of the sheet pile in the rectangular fixing frame is completed, the rectangular fixing frame should be moved to install the next sheet pile, by facilitating the movement of the rectangular guide fixing frame. It relates to a guide fixing frame for the installation of perforated and seat piles that can reduce the precision construction and air shortening and cost.

일반적으로 지하구조물을 건설할 때 주변의 흙 등이 파낸 곳으로 붕괴되거나 지하수 또는 하천수 등의 유입을 방지하기 위하여 시트파일을 박아 차수벽(차단벽)을 형성한다.Generally, when constructing an underground structure, a pile pile is formed to form a barrier wall (blocking wall) in order to prevent the inflow of groundwater or river water, or to collapse to surrounding areas.

상기 시트파일은 토사층이나 점토층, 실트층과 같이 입자가 작은 지반에는 직항타로 타입하여 설치하고, 직항타 수행이 불가능한 사력층 등에서는 고압수 분사를 통해 진입시키는 워터제트(Water jet) 공법을 사용하여 설치하고 있으나, 전석층(호박돌층)이나 조기반암(풍화암, 연암, 경암)층과 같이 조밀하고 단단한 지층에는 상기 직항타 공법이나 워터제트 공법으로는 불가능하므로, 천공과 함께 케이싱 삽입한 후 상기 케이싱 내부에 치환재(양질의 토사, 프라이애쉬, 벤토나이트, 직항타가 가능한 모든 그라우트재 등)를 채운 후 상기 케이싱을 인발하고, 그 자리에 시트파일을 설치하는 선천공 후 시트파일 설치공법을 사용하고 있다.The sheet pile is installed as a non-stop type in the ground with small particles such as soil layer, clay layer, silt layer, and using a water jet method that enters through high-pressure water injection in the sand layer, which can not perform non-stop. Although it is installed, it is impossible to use the non-stop method or the water jet method in dense and hard strata such as stone bed (amber stone layer) or rough bedrock (weathered rock, soft rock, hard rock) layer. After the perforated sheet pile installation method is used to fill the casing and fill the casing and install the sheet pile in place after filling the inside with a substitute material (quality soil, frying ash, bentonite, all grout materials capable of direct hitting). .

상기 선천공 후 시트파일 설치공법은 특허등록 제348024호로 소개된 바 있으나, 상기 특허는 천공된 위치에서 바로 시트파일을 설치하고 주열상의 지중연속벽체를 형성하기 위하여 직인접 위치에 시트파일을 설치하여야 하는데 그 시트파일을 기설치된 시트파일의 단부에 수직으로 가이드빔을 가설치하여 직인접 위치를 천공하는 공법을 사용한 것으로서, 상기 가이드빔의 가설치 인발 등으로 인하여 공정이 복잡하여 작업공정이 더디게 진행되어 작업성 능률이 떨어지며 시간과 경비가 너무 많이 소요되는 문제점이 있었다.The method of installing the sheet pile after the perforation has been introduced as a patent registration No. 348024, but the patent should be installed the sheet pile directly in the perforated position, and the sheet pile should be installed in the direct adjacent position to form the underground continuous wall of the column However, the sheet pile is installed using a method of drilling a direct adjacent position by installing a guide beam perpendicularly to an end of a pre-installed sheet pile, and the work process is slow due to a complicated process due to provisional drawing of the guide beam. There was a problem that the work efficiency is reduced and takes too much time and expense.

이를 개선하기 위하여 제안된 것으로 케이싱 삽입 및 그 내부에 치환재을 삽입하지 않는 공법으로 특허등록 제507983호이 소개되고 있는데, 상기 특허는 케이싱 삽입 및 그 내부에 치환재를 삽입하지 않는 대신 천공 후 시트파일을 설치하고 주열상의 지중연속벽체를 형성하기 위하여 상기 기설치된 시트파일과 수직된 방향으로 보조 시트파일을 가설치하여 다시 인발하여 직인접 위치에 시트파일을 설치하는 공법으로서, 이 역시 공정이 복잡하여 작업공정이 더디게 진행되어 작업상 능률이 떨어지며 시간과 경비가 너무 많이 소요되는 문제점이 있었다.In order to improve this, a patent registration No. 507983 has been introduced as a method of inserting a casing and not inserting a substitution material therein. The patent does not insert a casing and inserts a substitution material therein. To install and install the auxiliary sheet pile in the direction perpendicular to the previously installed sheet pile in order to form the main continuous column wall, and to draw again to install the sheet pile in the direct adjacent position, which is also a complicated process There was a problem that the process is slow to work efficiency is slow and takes too much time and expense.

또한, 상기 특허들은 작업 공정상 천공 및 케이싱을 삽입하기 위한 장비와 함께 시트파일을 설치하기 위한 바이브로 해머 등의 장비를 항상 대기시켜야 하나, 상기 천공 작업 중 예기치 못한 원인으로 특정 위치의 천공 작업이 늦어질 경우 상기 시트파일을 설치하기 위한 바이브로 해머 등의 장비는 시트파일 설치 작업도 하지 못한 채 그 장소에 그대로 대기하여야 하고 이로 인하여 장비 사용 효율이 저하되어 그에 따른 불필요한 경비가 많이 소요되는 문제점이 있었다.In addition, the patents should always wait for the vibrating hammer and other equipment to install the seat pile together with the equipment for inserting the drilling and the casing in the work process, but the drilling at a specific position is an unexpected cause during the drilling. If it is late, the equipment such as a vibrator hammer and the like to install the sheet pile should be kept in the place without performing the sheet pile installation work. there was.

위와 같은 문제점을 해소하기 위하여 본 발명자는 특허출원 제2009-0102101호로 “시트파일 설치 공법 및 그것에 사용되는 시트파일 설치용 가이드 고정틀”을 제안한 바 있다.In order to solve the above problems, the present inventor has proposed a patent application No. 2009-0102101 "sheet file installation method and the guide fixing frame for seat file installation used for it".

상기 출원발명은 가로 방향으로 길게 상기 N개의 시트파일을 설치할 공간이 형성된 사각형상의 고정틀을 사용하여 각 시트파일이 설치될 위치를 정확히 구획함과 동시에 시트파일을 설치하기 위한 위치를 천공함에 있어 시트파일 설치 위치를 1→3→2 순서대로 천공하여 직인접 천공으로 인한 기천공된 내부에 치환재를 투입함으로써 주변 및 그 내부에 흙 등이 붕괴되는 것을 방지하고 주열상의 지중연속벽체를 형성하기 위한 시트파일 설치 위치가 모두 천공된 후에 시트파일을 일괄적으로 설치하기 용이한 점 등 시트파일의 설치 공법을 대폭 개선한 바 있다. The application of the present invention uses a rectangular fixing frame formed with a space for installing the N sheet piles in a horizontal direction to precisely partition the position where each sheet pile is to be installed and at the same time perforate the position for installing the sheet piles. Perforating the installation position in order of 1 → 3 → 2, and inserting the substitute material into the perforated inside due to direct perforation to prevent the soil and the like from collapsing and to form the main continuous underground wall. After the file installation locations are all drilled, the installation method of the sheet pile has been greatly improved, such as the ease of collectively installing the sheet pile.

그러나, 상기 출원발명은 해수면상에서 바지선을 이용하여 시트파일을 연속으로 설치할 경우 상기 사각형상의 고정틀을 수평으로 이동하여야 하는데 상기 사각형상의 고정틀의 수평 이동이 용이하지 않아 불편한 점이 발생하여 이에 대한 개선안이 필요하게 되었다.
However, the present invention has to move the rectangular fixing frame horizontally when the sheet pile is installed continuously using a barge on the sea surface, the horizontal movement of the rectangular fixing frame is not easy to cause an inconvenience, so an improvement is required. It became.

본 발명은 상기와 같은 종래기술의 문제점을 해소하기 위하여 연구개발된 것으로서, 본 발명은 한 쌍의 가로부재와, 상기 한 쌍의 가로부재의 일단부를 폐쇄하는 세로부재로 구성되고 그 내부에 가로 방향으로 길게 다수개의 시트파일을 설치할 공간이 형성된 사각형상의 틀에서 상기 한 쌍의 가로부재의 타단부에 설치가 완료된 시트파일이 지상에 노출되는 부분보다 높은 개구부를 형성하여 상기 설치가 완료된 시트파일이 있는 상태에서 가로 방향으로 이동이 가능하도록 함으로써, 상기 사각형상의 고정틀 내에서 시트파일이 설치가 완료된 후 다음 시트파일을 설치하기 위하여 상기 사각형상의 고정틀을 이동하여야 하는데, 상기 사각형상의 가이드 고정틀의 이동을 용이하게 함으로써 공기 단축 및 경비를 절감할 수 있는 선천공 및 시트파일 설치용 가이드 고정틀을 제공하는데 그 목적이 있다.
The present invention has been researched and developed in order to solve the problems of the prior art as described above, the present invention is composed of a pair of horizontal members, and a vertical member for closing one end of the pair of horizontal members and the horizontal direction therein In the rectangular frame in which the space for installing a plurality of sheet piles is formed, the opening of the sheet pile is formed at the other end of the pair of horizontal members so as to form an opening higher than the portion where the sheet pile is exposed to the ground. By moving in the horizontal direction in the state, after the installation of the sheet pile in the rectangular fixing frame is completed to move the rectangular fixing frame to install the next sheet pile, the movement of the rectangular guide fixing frame to facilitate Boring and sheet pile installation to reduce air and reduce expenses To provide a guide for the flange has its purpose.

상기와 같은 목적을 달성하기 위한 본 발명에 따른 선천공 및 시트파일 설치용 가이드 고정틀은, 한 쌍의 가로부재와, 상기 한 쌍의 가로부재의 일단부를 폐쇄하는 세로부재로 구성되고 그 내부에 가로 방향으로 길게 다수개의 시트파일을 연속해서 설치할 공간이 형성된 사각형상의 틀로 이루어진 시트파일 설치용 가이드 고정틀에 있어서, 상기 한 쌍의 가로부재에는 각각 다수개의 구획홈이 형성되어 상기 구획홈에 구획봉을 삽입하여 상기 시트파일의 설치위치를 구획하도록 하고, 상기 한 쌍의 가로부재의 타단부는 상기 사각형상의 틀 내부에 가로 방향으로 길게 연속해서 설치 완료된 시트파일에서 지상에 노출되는 부분의 높이보다 길이가 길게 형성된 수직부재를 수직으로 고정 설치하고 상기 한 쌍의 수직부재의 상부를 수평으로 연결하는 연결부재를 설치하여 개구부를 형성하게 하며, 상기 사각형상의 틀 내부에 시트파일이 전부 설치 완료된 후, 다음 인접구간에 시트파일을 연속 설치하기 위하여 상기 사각형상의 틀을 다음 인접구간으로 이동시킬 때, 상기 설치 완료된 시트파일에서 지상에 노출되는 부분이 상기 개구부 내부로 통과되어 상기 사각형상의 틀이 다음 인접구간으로 용이하게 이동 가능하도록 된 것을 특징으로 한다.Guide fixing frame for perforation and seat pile installation according to the present invention for achieving the above object is composed of a pair of horizontal members, and a vertical member for closing one end of the pair of horizontal members and the horizontal direction therein In the guide fixing frame for seat pile installation consisting of a rectangular frame formed with a space for continuously installing a plurality of sheet piles in a long way, a plurality of partition grooves are formed in each of the pair of horizontal members to insert the partition rod into the partition groove In order to partition the installation position of the sheet pile, the other end of the pair of horizontal member is formed vertically longer than the height of the portion exposed to the ground in the sheet pile completed in the horizontal direction in a continuous continuous direction inside the rectangular frame Fixing member installed vertically and connecting the upper part of the pair of vertical members horizontally When the binding member is installed to form an opening, and after the sheet pile is completely installed inside the rectangular frame, the rectangular frame is moved to the next adjacent section to continuously install the sheet pile in the next adjacent section. A portion exposed to the ground in the installed seat pile is passed through the opening, characterized in that the rectangular frame can be easily moved to the next adjacent section.

또한, 본 발명은 상기 한 쌍의 가로부재가 각각 H 빔을 ‘H'자로 세운 형상이고, 상기 시트파일의 설치위치에 접하고 있는 상기 각각의 H 빔 일면 상부에 상기 다수개의 구획홈이 형성된 것을 특징으로 한다.In addition, the present invention is characterized in that the pair of horizontal members are each formed in the shape of the H-beam 'H', the plurality of partition grooves formed on the upper surface of each of the H beam in contact with the installation position of the sheet pile It is done.

삭제delete

또한, 본 발명은 상기 시트파일이 타설 중 정해진 위치를 벗어나지 않도록 상기 시트파일의 가로면을 안내하는 시트파일 설치 안내부재를 설치하는 것을 특징으로 한다.In addition, the present invention is characterized in that the seat pile installation guide member for guiding the horizontal surface of the sheet pile so as not to deviate from the predetermined position during the placing.

또한, 본 발명은 상기 시트파일 설치 안내부재가 사각형상으로 구성되어 상기 사각형상의 일단부가 상기 시트파일의 가로면에 맞닿도록 하고, 삽입홈을 형성하여 상기 삽입홈을 상기 가로부재에 삽입하여 설치되게 하는 것을 특징으로 한다.In addition, the present invention is the sheet pile installation guide member is formed in a rectangular shape so that the one end of the square in contact with the horizontal surface of the sheet pile, to form an insertion groove to be inserted by inserting the insertion groove into the horizontal member. Characterized in that.

또한, 본 발명은 상기 시트파일 설치 안내부재는 상기 시트파일의 가로면 중 내측면과 외측면 모두에 설치하는 것을 특징으로 한다.In addition, the present invention is characterized in that the seat pile installation guide member is installed on both the inner side and the outer side of the horizontal surface of the sheet pile.

또한, 본 발명은 상기 시트파일 설치 안내부재는 이동 설치가 용이하게 상부면에 손잡이를 설치한 것을 특징으로 한다.
In addition, the seat pile installation guide member is characterized in that the handle is installed on the upper surface for easy installation.

본 발명에 따른 선천공 및 시트파일 설치용 가이드 고정틀은 한 쌍의 가로부재와, 상기 한 쌍의 가로부재의 일단부를 폐쇄하는 세로부재로 구성되고 그 내부에 가로 방향으로 길게 다수개의 시트파일을 설치할 공간이 형성된 사각형상의 틀에서 상기 한 쌍의 가로부재의 타단부에 설치가 완료된 시트파일이 지상에 노출되는 부분보다 높은 개구부를 형성하여 상기 설치가 완료된 시트파일이 있는 상태에서 가로 방향으로 이동이 가능하도록 함으로써, 상기 사각형상의 고정틀 내에서 시트파일이 설치가 완료된 후 다음 시트파일을 설치하기 위하여 상기 사각형상의 고정틀을 이동하여야 하는데, 상기 사각형상의 가이드 고정틀의 이동을 용이하게 함으로써 공기 단축 및 경비를 절감할 수 있는 효과가 있다.The guide fixing frame for installing the perforated and seat piles according to the present invention comprises a pair of horizontal members and a vertical member for closing one end of the pair of horizontal members, and a space for installing a plurality of sheet piles long in the horizontal direction therein. In the formed rectangular frame formed in the other end of the pair of horizontal members to form an opening higher than the portion of the sheet pile is completed to be exposed to the ground to move in the horizontal direction in the state where the installation is completed sheet pile By doing so, after the installation of the sheet pile is completed in the rectangular frame, the rectangular frame must be moved to install the next sheet pile, by reducing the air shortening and cost by facilitating the movement of the rectangular guide frame. It has an effect.

또한, 본 발명은 상기 시트파일을 상기 시트파일이 타설 중 정해진 위치를 벗어나지 않도록 상기 시트파일의 가로면을 안내하는 시트파일 설치 안내부재를 간편하게 설치할 수 있도록 함으로써, 보다 정밀도가 높은 시트파일을 시공할 수 있는 효과가 있다.
In addition, the present invention allows the sheet file can be easily installed by installing a sheet file installation guide member for guiding the horizontal surface of the sheet file so that the sheet file does not deviate from the predetermined position during the placing, it is possible to construct a higher precision sheet file It can be effective.

도 1은 본 발명에 따른 선천공 및 시트파일 설치용 가이드 고정틀의 사시도
도 2는 본 발명에 따른 선천공 및 시트파일 설치용 가이드 고정틀의 평면도
도 3은 본 발명에 따른 선천공 및 시트파일 설치용 가이드 고정틀을 이용하여 케이싱 및 치환재를 시공하는 과정을 설명하는 도면
도 4는 본 발명에 따른 선천공 및 시트파일 설치용 가이드 고정틀 내에서 시트파일을 설치하는 과정을 도시한 도면
도 5는 본 발명에서 시트파일 설치 안내부재의 상세도면
도 6은 본 발명에 따른 선천공 및 시트파일 설치용 가이드 고정틀을 이용하여 시트파일이 시공된 일예의 정면도
1 is a perspective view of a guide fixing frame for installing perforations and seat piles according to the present invention
Figure 2 is a plan view of the guide fixing frame for installing perforations and seat piles according to the present invention
Figure 3 is a view for explaining the process of constructing the casing and the replacement material using a guide fixing frame for installing perforations and seat piles according to the present invention
Figure 4 is a view showing a process of installing a sheet pile in the guide fixing frame for installing perforation and seat pile according to the present invention
Figure 5 is a detailed view of the seat pile installation guide member in the present invention
6 is a front view of an example in which the sheet pile is constructed using a guide fixing frame for installing the perforated and sheet piles according to the present invention;

이하, 본 발명에 따른 시트파일 설치용 가이드 고정틀에 대하여 첨부된 도면을 참고로 구체적으로 설명하면 다음과 같다. Hereinafter, with reference to the accompanying drawings with respect to the guide fixing frame for seat pile installation according to the present invention will be described in detail.

본 발명에 따른 선천공 및 시트파일 설치용 가이드 고정틀(100)은 도 1 및 도 2에 도시된 바와 같이 한 쌍의 가로부재(10)와, 상기 한 쌍의 가로부재(10)의 일단부를 폐쇄하는 세로부재(20)로 구성되고 그 내부에 가로 방향으로 길게 다수개의 시트파일(60)을 설치할 공간이 형성된 사각형상의 틀로 되어 있다.Guide fixing frame 100 for installing the perforated and seat piles according to the present invention is a pair of horizontal member 10 and one end of the pair of horizontal member 10 as shown in Figure 1 and 2 It is composed of a vertical member 20 and has a rectangular frame formed therein a space for installing a plurality of sheet piles 60 in the horizontal direction.

상기 내부공간은 일실시예로 가로 8000mm, 세로 480mm로 하고, 이때 상기 시트파일이 설치될 위치를 천공할 구멍의 크기는 480mm가 된다. In one embodiment, the inner space is 8000 mm wide and 480 mm long. At this time, the size of the hole for drilling the position where the sheet pile is to be installed is 480 mm.

상기 한 쌍의 가로부재(10)에는 각각 다수개의 구획홈(11)이 형성되어 상기 구획홈(11)에 구획봉(40)을 삽입하여 상기 시트파일(60)의 설치위치를 구획하고 있고, 상기 한 쌍의 가로부재(10)의 타단부는 설치가 완료된 시트파일(60)이 지상에 노출되는 부분보다 높은 개구부를 형성하여 상기 설치가 완료된 시트파일(60)이 있는 상태에서 가로 방향으로 이동이 가능하도록 되어 있다.A plurality of partition grooves 11 are formed in the pair of horizontal members 10 to insert partition bars 40 into the partition grooves 11 so as to partition the installation position of the sheet pile 60. The other end of the pair of horizontal members 10 forms an opening higher than a portion where the installed sheet pile 60 is exposed to the ground, and moves horizontally in the state where the sheet pile 60 is installed. This is made possible.

상기 한 쌍의 가로부재(10)의 일실시예로서 각각 H 빔을 ‘H'자로 세운 형상이고, 상기 시트파일의 설치위치에 접하고 있는 상기 각각의 H 빔 일면 상부에 상기 다수개의 구획홈이 형성되어 있으며, 상기 구획홈(11)은 상기 시트파일이 설치되는 위치를 구획하기 위하여 구획봉(40)이 삽입되는 홈으로써, 상기 구획봉(40)이 상기 구획홈(11)에 삽입될 때 상기 구획봉(40)의 일면은 상기 시트파일이 설치되는 위치, 즉 시트파일(60)을 설치하기 위하여 천공되는 원형공의 원주면의 접선 위치에 접하도록 되어 있다.As an embodiment of the pair of horizontal members 10, the H beams are formed in the form of 'H', respectively, and the plurality of partition grooves are formed on an upper surface of each H beam in contact with the installation position of the sheet pile. The partition groove 11 is a groove into which the partition rod 40 is inserted to partition a position where the seat pile is installed. When the partition rod 40 is inserted into the partition groove 11, One side of the partition bar 40 is in contact with the position where the seat pile is installed, that is, the tangential position of the circumferential surface of the circular hole drilled in order to install the seat pile 60.

상기 한 쌍의 가로부재(10)의 일단부를 폐쇄하는 세로부재(20)는 상기 가로부재(10)의 측면과 용접 고정된 것으로서, 강판을 사용한 것이나, H 빔도 사용될 수 있다.The vertical member 20 closing one end of the pair of horizontal members 10 is welded and fixed to the side surface of the horizontal member 10, but a steel plate may be used, or an H beam may be used.

상기 설치가 완료된 시트파일(60)이 지상에 노출되는 부분은 도 6에 도시된 바와 같은데, 상기 개구부는 상기 설치가 완료된 시트파일(60)이 지상에 노출되는 부분보다 길이가 길게 형성된 수직부재(30)를 수직으로 고정 설치하고, 상기 한 쌍의 수직부재의 상부를 수평으로 연결하는 연결부재(31)를 설치하여 상기 수직부재(30)와 연결부재(31)로 인해 형성된 공간, 즉 개구부 내로 상기 선천공 및 시트파일 설치용 가이드 고정틀(100)이 가로(수평)으로 이동시 상기 설치가 완료된 시트파일(60)이 통과 가능하도록 한다. The installation portion of the seat pile 60 is completed is exposed to the ground as shown in Figure 6, the opening is a vertical member formed longer than the portion of the seat pile 60 is installed on the ground ( 30) fixedly installed vertically, and a connecting member 31 for horizontally connecting the upper portions of the pair of vertical members to the space formed by the vertical member 30 and the connecting member 31, that is, into the opening When the guide fixing frame 100 for the perforation and seat pile installation moves horizontally (horizontally), the seat pile 60 after the installation is completed is allowed to pass.

이와 같이 개구부를 상기 설치가 완료된 시트파일(60)이 지상에 노출되는 부분보다 높게 형성함으로써, 상기 선천공 및 시트파일 설치용 가이드 고정틀(100) 내에서 시트파일이 설치가 완료된 후 다음 시트파일을 설치하기 위하여 상기 선천공 및 시트파일 설치용 가이드 고정틀(100)을 가로(수평)로 이동하여야 하는데, 지상에서는 세로부재 등을 중장비를 사용하여 상기 선천공 및 시트파일 설치용 가이드 고정틀(100)을 끌어 가로(수평)로 이동하기만 하면 되므로 다음 작업에 신속하게 대응할 수 있게 된다. Thus, by forming the opening higher than the portion where the installation is completed sheet pile 60 is exposed to the ground, the next sheet pile is installed after the sheet pile is installed in the guide fixing frame 100 for the perforation and sheet pile installation In order to move the guide fixing frame 100 for the perforated and sheet pile installation horizontally (horizontal), in the ground by dragging the guide fixing frame 100 for the perforated and sheet pile installation using heavy equipment such as vertical members. Just move it horizontally so you can quickly respond to the next task.

특히, 해수면에서 바지선을 이용하여 선천공하고 시트파일을 연속으로 설치할 경우 상기 선천공 및 시트파일 설치용 가이드 고정틀(100)을 이용하여 상기 고정틀 내에 시트파일(60)을 전부 설치한 경우, 상기 선천공 및 시트파일 설치용 가이드 고정틀(100)은 그대로 두고 바지선만 다음 작업 구간으로 이동하면 되므로, 다음 작업에 신속하게 대응할 수 있게 된다.
In particular, when the perforated using a barge in the sea surface and the seat pile is installed continuously, when the seat pile 60 is completely installed in the fixing frame by using the guide fixing frame 100 for the perforation and seat pile installation, And since the guide fixing frame 100 for seat pile installation is left as it is, only a barge needs to be moved to the next work section, so that it can quickly respond to the next work.

다음으로 본 발명에 따른 선천공 및 시트파일 설치용 가이드 고정틀(100)을 이용하여 시트파일을 설치하는 과정을 도 3을 참고로 설명하면 다음과 같다.Next, the process of installing the sheet pile using the guide fixing frame 100 for installing the perforated and sheet piles according to the present invention will be described with reference to FIG. 3.

상기 시트파일(60)을 설치할 공간에 상기 N개의 시트파일이 설치될 위치 중 맨 좌측 또는 우측(도 3에서는 맨 좌측으로 도시되어 있음)에 최초의 시트파일(제1 시트파일)을 설치할 위치에 대하여 도 3 (a)와 같이 상기 제1 시트파일이 설치될 위치에서 천공하여야 할 직경의 외주면과 접하는 양쪽 부분에 각각 구획봉(40)을 구획홈(11)에 삽입하여 상기 제1 시트파일의 설치위치를 구획한다. 이 때 상기 구획봉(40)은 상기 가로부재(10)의 외측면과 맞닿게 되는 길이로 하는 것이 바람직하다.At the position where the first sheet file (first sheet file) is to be installed at the far left or right side (shown to the left in FIG. 3) among the positions where the N sheet files are to be installed in the space where the sheet file 60 is to be installed. As shown in FIG. 3 (a), the partition bars 40 are respectively inserted into the partition grooves 11 at both portions contacting the outer circumferential surface of the diameter to be drilled at the position where the first sheet pile is to be installed, thereby Partition the installation location. At this time, it is preferable that the partition bar 40 has a length that is in contact with the outer surface of the horizontal member (10).

상기 구획된 제1 시트파일의 설치위치에 대하여 천공 장비를 이용하여 설계심도까지 천공과 동시에 케이싱(51)을 삽입한다. 이 때 상기 2개의 구획봉(40)에 의하여 천공되는 위치를 정확하게 결정되게 된다.With respect to the installation position of the partitioned first sheet pile, the casing 51 is inserted simultaneously with the drilling to the design depth using the drilling equipment. At this time, the position to be drilled by the two partition bars 40 is accurately determined.

상기 케이싱(51)이 삽입된 후 상기 구획봉(40)을 상기 구획홈(10)으로부터 치환재를 투입 후 제거한다.After the casing 51 is inserted, the partition rod 40 is removed from the partition groove 10 after the replacement of the replacement material.

상기 제1 시트파일의 설치위치에 천공되어 삽입된 케이싱(51) 내부에 치환재(52. 양질의 토사, 프라이애쉬, 벤토나이트, 직항타가 가능한 모든 그라우트재 중 어느 하나)를 채운 후 상기 케이싱(51)을 인발한다.The casing 51 after filling the substitution material (52. Any one of the high quality earth and sand, frying ash, bentonite, non-stop groutable material) into the casing 51 inserted and drilled at the installation position of the first sheet pile. Draw).

다음으로, 상기 제1 시트파일이 설치될 위치에서 다음다음의 시트파일(제3 시트파일) 설치위치에 대하여 상기 제3 시트파일이 설치될 위치에서 천공하여야 할 직경의 양 외주면과 접하는 부분에 2개의 구획봉(40)을 구획홈(11)에 삽입하여 상기 제3 시트파일의 설치위치를 구획한다(도 3의 (b) 참조).Next, at the position where the first sheet file is to be installed, the second sheet file (third sheet file) is installed at the position where the third sheet file is to be drilled at the position where the third sheet file is to be installed. Partition bars 40 are inserted into the partition grooves 11 to partition the installation position of the third sheet pile (see FIG. 3 (b)).

상기 구획된 제3 시트파일의 설치위치에 대하여 천공 장비를 이용하여 설계심도까지 천공과 동시에 케이싱(51)을 삽입하고, 상기 케이싱(51)이 삽입된 후 상기 구획봉(40)을 상기 구획홈(11)으로부터 제거한 뒤, 상기 제3 시트파일의 설치위치에 천공되어 삽입된 케이싱 내부에 상기 치환재(52)를 채운 후 상기 케이싱(51)을 인발한다.With respect to the installation position of the partitioned third sheet pile, the casing 51 is inserted at the same time as the drilling depth to the design depth using the drilling equipment, and the partition rod 40 is inserted into the partition groove after the casing 51 is inserted. After removing from (11), the casing 51 is drawn after filling the substitution material 52 in the casing which is drilled and inserted into the installation position of the third sheet pile.

이 때 상기 제1 시트파일의 설치 위치에 삽입된 케이싱(51)은 제3 시트파일의 설치위치가 구획되기 전에 인발할 수도 있지만, 상기 제3 시트 파일의 설치위치에 케이싱(51)이 삽입된 이후에 제3 시트파일에 삽입된 케이싱(51)과 일괄적으로 인발하여도 무방하다.At this time, the casing 51 inserted into the installation position of the first sheet pile may be drawn before the installation position of the third sheet pile is partitioned, but the casing 51 is inserted into the installation position of the third sheet pile. After this, the casing 51 inserted into the third sheet pile may be drawn out collectively.

다음으로, 상기 제1 시트파일 및 제3 시트파일이 설치될 위치 사이인 제2 시트파일의 설치위치에 대하여 상기 제2 시트파일이 설치될 위치에서 천공하여야 할 직경의 양 외주면과 접하는 부분에 2개의 구획봉(40)을 구획홈(11)에 삽입하여 상기 제2 시트파일의 설치위치를 구획한다(도 3의 (c) 참조).Next, 2 is placed in contact with both outer circumferential surfaces of a diameter to be punched at the position where the second sheet pile is to be installed, with respect to the installation position of the second sheet pile between the positions where the first sheet pile and the third sheet pile are to be installed. Two partition bars 40 are inserted into the partition grooves 11 to partition the installation positions of the second sheet piles (see FIG. 3 (c)).

상기 구획된 제2 시트파일의 설치위치에 대하여 천공 장비를 이용하여 설계심도까지 천공과 동시에 케이싱(51)을 삽입하고, 상기 케이싱(51)이 삽입된 후 상기 구획봉(40)을 상기 구획홈(11)으로부터 제거한 뒤, 상기 제2 시트파일의 설치위치에 천공되어 삽입된 케이싱 내부에 상기 치환재(52)를 채운 후 상기 케이싱(51)을 인발한다.Inserting the casing 51 at the same time as the drilling depth to the design depth using the drilling equipment for the installation position of the partitioned second sheet pile, and the partition rod 40 is inserted into the partition groove after the casing 51 is inserted. After removing from (11), the casing 51 is drawn after filling the substitution material 52 in the casing which is drilled and inserted into the installation position of the second sheet pile.

다음으로, 상기 제3 시트파일이 설치될 위치에서 다음다음의 시트파일(제5 시트파일) 설치위치(미도시)에 대하여 제2 및 제3 시트파일이 설치된 위치에서 구획, 천공 및 케이싱 삽입, 치환재 채움과 같은 방법으로 시공하고 또한 상기 선천공 및 시트파일 설치용 가이드 고정틀(100)의 내부공간에서 맨 마지막인 시트파일(제N 시트파일)의 설치 위치까지 제2 및 제3 시트파일이 설치된 위치에서 구획, 천공 및 케이싱 삽입, 치환재 채움과 같은 방법으로 시공한다.Next, at the position where the third sheet file is to be installed, the compartments, perforations and casings are inserted at the positions where the second and third sheet files are installed with respect to the next sheet file (fifth sheet file) installation position (not shown). Construct in the same manner as the filling of the substitution material, and the second and third sheet piles are installed from the inner space of the guide fixing frame 100 for installing the perforated and sheet piles to the installation position of the last sheet pile (N-th sheet pile). In place, construct such as compartments, perforations and casing inserts, and filler fills.

상기 치환재(52)가 채워진 천공에 시트파일을 타설할 때 상기 시트파일(60)이 타설 중 정해진 위치를 벗어나지 않도록 도 4에 도시된 바와 같이 상기 시트파일(60)의 가로면의 내측면 및 외측면에 시트파일을 지지 안내하는 제1 및 제2 시트파일 설치 안내부재(71, 72)를 설치한다. 상기 시트파일 설치 안내부재는 상기 시트파일(60)의 내측면 또는 외측면 중 어느 한 곳에 설치하게 할 수 있지만 바람직하게는 상기 시트파일(60)의 내측면 및 외측면에 모두 설치하게 하는 것이 좋다.Inner side of the horizontal surface of the sheet pile 60 as shown in Figure 4 so that the sheet pile 60 does not deviate from the predetermined position during the casting when the sheet pile is poured into the perforated filled with the substitution material 52 and The first and second sheet pile installation guide members 71 and 72 are provided on the outer side to support the sheet pile. The sheet pile installation guide member may be installed on any one of the inner side or the outer side of the sheet pile 60, but preferably, both the inner side and the outer side of the sheet pile 60 may be installed. .

상기 제1 및 제2 시트파일 설치 안내부재(71, 72)는 사각형상으로 구성되어 상기 사각형상의 일단부가 상기 시트파일의 내외측의 가로면에 맞닿도록 하고, 삽입홈(71b, 72b)을 형성하여 상기 삽입홈(71b, 72b)을 상기 가로부재(10)에서 돌출된 부분에 삽입하면 제1 및 제2 시트파일 설치 안내부재(71, 72)가 간단히 설치될 수 있다.The first and second sheet pile installation guide members 71 and 72 are formed in a quadrangular shape so that one end of the quadrilateral portion abuts on a horizontal surface of the inside and the outside of the sheet pile, and forms insertion grooves 71b and 72b. By inserting the insertion grooves 71b and 72b into the protruding portion of the horizontal member 10, the first and second sheet pile installation guide members 71 and 72 may be simply installed.

상기 제1 및 제2 시트파일 설치 안내부재(71, 72)가 상기 가로부재(10)과 직각으로 설치되면, 상기 제1 시트파일 설치 안내부재(71)와 상기 제2 시트파일 안내부재(72)가 마주보는 면 사이에 틈새가 생기고 그 틈새 사이로 상기 시트파일(60)을 타설하게 되면 상기 시트파일(60)의 가로면이 상기 제1 및 제2 시트파일 설치 안내부재(71, 72)에 의하여 지지안내 되어 상기 시트파일(60)이 타설 중 좌우로 흔들리지 않게 되어 정해진 위치에 타설이 기능하게 된다.When the first and second sheet pile installation guide members 71 and 72 are installed at right angles to the horizontal member 10, the first sheet pile installation guide member 71 and the second sheet pile guide member 72 are installed. When a gap is formed between the surfaces facing each other and the sheet pile 60 is placed between the gaps, the horizontal surface of the sheet pile 60 is formed on the first and second sheet pile installation guide members 71 and 72. It is guided by the support so that the seat pile 60 is not shaken from side to side during pouring, so that the casting function at a predetermined position.

또한, 상기 시트파일 설치 안내부재(71, 72)는 이동 및 휴대가 간편하고 설치가 용이하도록 상부면에 손잡이(71a, 72a)를 설치한다. 상기 손잡이(71a, 72a)는 상기 시트파일 설치 안내부재(71, 72)의 상부면에 2개의 설치공을 형성하고 2개의 설치공에 철근 등을 설치하여 사용하게 할 수 있다.
In addition, the seat pile installation guide members (71, 72) is provided with handles (71a, 72a) on the upper surface for easy movement and portability and easy installation. The handles 71a and 72a may form two installation holes on the upper surfaces of the sheet pile installation guide members 71 and 72 and install reinforcing bars in the two installation holes.

상기에서는 본 발명의 바람직한 실시 예를 참조하여 설명하였지만, 해당 기술 분야의 숙련된 당업자는 아래의 특허 청구범위에 기재된 본 발명의 사상 및 영역으로부터 벗어나지 않는 범위 내에서 본 발명을 다양하게 수정 및 변경시킬 수 있음을 이해할 수 있을 것이다.
It will be apparent to those skilled in the art that various modifications and variations can be made in the present invention without departing from the spirit and scope of the invention as defined in the appended claims. It can be understood that it is possible.

100: 시트파일 설치용 가이드 고정틀
10: 가로부재 11: 구획홈
20: 세로부재 30: 수직부재
31: 연결부재 40: 구획봉
51: 케이싱 52: 치환재
60: 시트파일 71: 제1 시트파일 설치 안내부재
72: 제2 시트파일 설치 안내부재 71a, 72a: 손잡이
71b, 72b: 삽입홈
100: guide fixing frame for seat pile installation
10: horizontal member 11: compartment groove
20: vertical member 30: vertical member
31: connecting member 40: partition rod
51: casing 52: substitution material
60: sheet pile 71: first sheet pile installation guide member
72: second sheet pile installation guide member 71a, 72a: handle
71b, 72b: Insertion groove

Claims (7)

한 쌍의 가로부재와, 상기 한 쌍의 가로부재의 일단부를 폐쇄하는 세로부재로 구성되고 그 내부에 가로 방향으로 길게 다수개의 시트파일을 연속해서 설치할 공간이 형성된 사각형상의 틀로 이루어진 시트파일 설치용 가이드 고정틀에 있어서,
상기 한 쌍의 가로부재에는 각각 다수개의 구획홈이 형성되어 상기 구획홈에 구획봉을 삽입하여 상기 시트파일의 설치위치를 구획하도록 하고,
상기 한 쌍의 가로부재의 타단부는 상기 사각형상의 틀 내부에 가로 방향으로 길게 연속해서 설치 완료된 시트파일에서 지상에 노출되는 부분의 높이보다 길이가 길게 형성된 수직부재를 수직으로 고정 설치하고 상기 한 쌍의 수직부재의 상부를 수평으로 연결하는 연결부재를 설치하여 개구부를 형성하게 하며,
상기 사각형상의 틀 내부에 시트파일이 전부 설치 완료된 후, 다음 인접구간에 시트파일을 연속 설치하기 위하여 상기 사각형상의 틀을 다음 인접구간으로 이동시킬 때, 상기 설치 완료된 시트파일에서 지상에 노출되는 부분이 상기 개구부 내부로 통과되어 상기 사각형상의 틀이 다음 인접구간으로 용이하게 이동 가능하도록 된 것
을 특징으로 하는 선천공 및 시트파일 설치용 가이드 고정틀.
A guide fixing frame for seat pile installation consisting of a pair of horizontal members and a vertical member for closing one end of the pair of horizontal members, and a rectangular frame having a space for continuously installing a plurality of sheet piles in a horizontal direction therein. To
A plurality of partition grooves are formed in each of the pair of horizontal members so as to partition the installation position of the seat pile by inserting a partition rod into the partition grooves.
The other end of the pair of horizontal members is vertically fixed and installed vertically formed vertical member formed longer than the height of the portion exposed to the ground in the sheet pile completed in the horizontal direction in the horizontal frame inside the rectangular frame vertically Install the connecting member for horizontally connecting the upper part of the vertical member of the to form an opening,
After the sheet pile is completely installed in the rectangular frame, when the rectangular frame is moved to the next adjacent section in order to continuously install the sheet pile in the next adjacent section, the portion exposed to the ground in the installed sheet pile is Passed into the opening so that the rectangular frame is easily movable to the next adjacent section
Guide fixing frame for installing perforations and seat piles, characterized in that.
제1항에 있어서,
상기 한 쌍의 가로부재는 각각 H 빔을 ‘H'자로 세운 형상이고, 상기 시트파일의 설치위치에 접하고 있는 상기 각각의 H 빔 일면 상부에 상기 다수개의 구획홈이 형성된 것
을 특징으로 하는 선천공 및 시트파일 설치용 가이드 고정틀.
The method of claim 1,
The pair of horizontal members each have a shape in which the H beam is formed as 'H', and the plurality of partition grooves are formed on an upper surface of each of the H beams in contact with the installation position of the sheet pile.
Guide fixing frame for installing perforations and seat piles, characterized in that.
삭제delete 제1항에 있어서,
상기 시트파일이 타설 중 정해진 위치를 벗어나지 않도록 상기 시트파일의 가로면을 안내하는 시트파일 설치 안내부재를 설치하는 것
을 특징으로 하는 선천공 및 시트파일 설치용 가이드 고정틀.
The method of claim 1,
Installing a sheet pile installation guide member for guiding the horizontal surface of the sheet pile so that the sheet pile does not deviate from a predetermined position during placing
Guide fixing frame for installing perforations and seat piles, characterized in that.
제4항에 있어서,
상기 시트파일 설치 안내부재는 사각형상으로 구성되어 상기 사각형상의 일단부가 상기 시트파일의 가로면에 맞닿도록 하고, 삽입홈을 형성하여 상기 삽입홈을 상기 가로부재에 삽입하여 설치되게 하는 것
을 특징으로 하는 선천공 및 시트파일 설치용 가이드 고정틀.
5. The method of claim 4,
The sheet pile installation guide member is configured to have a rectangular shape so that one end of the rectangular shape abuts on the horizontal surface of the sheet pile, and forms an insertion groove to insert the insertion groove into the horizontal member.
Guide fixing frame for installing perforations and seat piles, characterized in that.
제4항 또는 제5항에 있어서,
상기 시트파일 설치 안내부재는 상기 시트파일의 가로면 중 내측면과 외측면 모두에 설치하는 것
을 특징으로 하는 선천공 및 시트파일 설치용 가이드 고정틀.
The method according to claim 4 or 5,
The sheet pile installation guide member is to be installed on both the inner side and the outer side of the horizontal surface of the sheet pile
Guide fixing frame for installing perforations and seat piles, characterized in that.
제4항 또는 제5항에 있어서,
상기 시트파일 설치 안내부재는 이동 설치가 용이하게 상부면에 손잡이를 설치한 것
을 특징으로 하는 선천공 및 시트파일 설치용 가이드 고정틀.
The method according to claim 4 or 5,
The seat pile installation guide member is to install a handle on the upper surface for easy installation
Guide fixing frame for installing perforations and seat piles, characterized in that.
KR1020120077740A 2012-07-17 2012-07-17 Guide fixing frame for constructing sheet file KR101317006B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020120077740A KR101317006B1 (en) 2012-07-17 2012-07-17 Guide fixing frame for constructing sheet file

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020120077740A KR101317006B1 (en) 2012-07-17 2012-07-17 Guide fixing frame for constructing sheet file

Publications (1)

Publication Number Publication Date
KR101317006B1 true KR101317006B1 (en) 2013-10-11

Family

ID=49638165

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020120077740A KR101317006B1 (en) 2012-07-17 2012-07-17 Guide fixing frame for constructing sheet file

Country Status (1)

Country Link
KR (1) KR101317006B1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101851114B1 (en) * 2018-01-04 2018-05-30 이봉수 Auger crane for sheet file and perforated guide for using the same

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101068170B1 (en) * 2009-09-17 2011-09-27 진성토건 주식회사 A sheet pile pulling apparatus
KR20110139176A (en) * 2011-11-16 2011-12-28 양영신 Constructing for sheet file and guide fixing frame for constructing sheet file

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101068170B1 (en) * 2009-09-17 2011-09-27 진성토건 주식회사 A sheet pile pulling apparatus
KR20110139176A (en) * 2011-11-16 2011-12-28 양영신 Constructing for sheet file and guide fixing frame for constructing sheet file

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101851114B1 (en) * 2018-01-04 2018-05-30 이봉수 Auger crane for sheet file and perforated guide for using the same

Similar Documents

Publication Publication Date Title
KR100782007B1 (en) Construction method of a earth-protection walls
KR101676814B1 (en) CFT pile Construction Method and the Shoring Method using the same file
KR20140055639A (en) A execution method of architecture beam
KR20180133748A (en) Earth retaining wall construction method using castinplace concrete pile of impermeable peristyle type
KR101041274B1 (en) Retaining wall grouting structure and method for constructing thereof
JP2017186783A (en) Construction method of continuous underground wall
JP2017210787A (en) Aseismatic structure of cut-and-cover tunnel
JP5351125B2 (en) Open shield machine start method of open shield method
KR20000006650A (en) a pole for mud wall and constrution method of fence for mud
KR102072889B1 (en) Construction method of smallcaliber composite pile wall using small drilling rig at adjacent building proximity section
KR101317006B1 (en) Guide fixing frame for constructing sheet file
KR101146436B1 (en) Guide fixing frame for constructing sheet file
KR102494824B1 (en) CIP retaining wall and water barrier construction method using PHC-pile
KR20080076015A (en) Retaining wall using pier unit having big h-beam
JP2007291849A (en) Form block for wall, wall structure, and execution method of underground structure
JP2005068710A (en) Form block for wall, and wall structure, and method for constructing subterranean structure
KR101939892B1 (en) Apparatus of sheathing for easy dismantling sheathing walls using multistage sheathing rail and dismantling method thereof
KR101199738B1 (en) Method of constructing for sheet file
KR102299540B1 (en) Construction method of cross-sectional expansion type columnar barrier wall
KR200463615Y1 (en) Height control way guide beam
JP4407716B2 (en) Construction method of earth retaining wall
KR101733560B1 (en) Wall block for assemblage
JP4274898B2 (en) Groundwater flow conservation method
KR101220898B1 (en) Method for constructing the sheet pile using foaming block
KR102426192B1 (en) File fof retaining wall and construction method using file

Legal Events

Date Code Title Description
A201 Request for examination
A302 Request for accelerated examination
E902 Notification of reason for refusal
E90F Notification of reason for final refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20160623

Year of fee payment: 4

FPAY Annual fee payment

Payment date: 20180129

Year of fee payment: 5

FPAY Annual fee payment

Payment date: 20190319

Year of fee payment: 6

FPAY Annual fee payment

Payment date: 20190801

Year of fee payment: 7