KR101199738B1 - Method of constructing for sheet file - Google Patents

Method of constructing for sheet file Download PDF

Info

Publication number
KR101199738B1
KR101199738B1 KR1020110119268A KR20110119268A KR101199738B1 KR 101199738 B1 KR101199738 B1 KR 101199738B1 KR 1020110119268 A KR1020110119268 A KR 1020110119268A KR 20110119268 A KR20110119268 A KR 20110119268A KR 101199738 B1 KR101199738 B1 KR 101199738B1
Authority
KR
South Korea
Prior art keywords
sheet pile
sheet
pile
casing
installation
Prior art date
Application number
KR1020110119268A
Other languages
Korean (ko)
Other versions
KR20110139176A (en
Inventor
양영신
Original Assignee
양영신
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 양영신 filed Critical 양영신
Priority to KR1020110119268A priority Critical patent/KR101199738B1/en
Publication of KR20110139176A publication Critical patent/KR20110139176A/en
Application granted granted Critical
Publication of KR101199738B1 publication Critical patent/KR101199738B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D11/00Methods or apparatus specially adapted for both placing and removing sheet pile bulkheads, piles, or mould-pipes
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D13/00Accessories for placing or removing piles or bulkheads, e.g. noise attenuating chambers
    • E02D13/04Guide devices; Guide frames
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/02Retaining or protecting walls
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/18Bulkheads or similar walls made solely of concrete in situ
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/66Mould-pipes or other moulds
    • E02D5/68Mould-pipes or other moulds for making bulkheads or elements thereof

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Abstract

본 발명은 호박돌층(전석층)이나 기반암(풍화암,연암, 경암)층 등과 같이 지반이 단단하고 조밀하여 직항타 공법이나 워터제트 공법으로는 시트파일을 설치할 수 없는 작업대상 지반에 시트파일을 설치하는 시트파일 설치 공법 및 그것에 사용되는 시트파일 설치용 가이드 고정틀에 관한 것으로서, 더욱 상세하게는 가로 방향으로 길게 상기 N개의 시트파일을 설치할 공간이 형성된 사각형상의 시트파일 설치용 가이드 고정틀을 사용하여 각 시트파일이 설치될 위치를 정확히 구획함과 동시에 시트파일을 설치하기 위한 위치를 천공함에 있어 시트파일 설치 위치를 1→3→2 순서대로 천공하여 직인접 천공으로 인한 기천공된 주변 및 그 내부에 흙 등이 붕괴되는 것을 방지하며, 주열상의 지중연속벽체를 형성하기 위한 시트파일 설치 위치가 모두 천공된 후에 시트파일을 일괄적으로 설치할 수 있도록 함으로써 공기 단축 및 경비를 점감할 수 있는 시트파일 설치 공법에 관한 것이다.According to the present invention, the sheet pile is installed on the work target ground where the ground pile is hard and dense, such as an amber stone layer (stone layer) or bedrock (weathered rock, soft rock, hard rock) layer. It relates to a sheet pile installation method and a guide fixing frame for seat file installation used therein, and more particularly, each sheet pile using a rectangular sheet file installation guide fixing frame formed with a space for installing the N sheet piles long in the horizontal direction In dividing the location to be installed correctly and drilling the position for installing the sheet pile, the sheet pile installation position is drilled in the order of 1 → 3 → 2, so that the perforated periphery and the inside of the perforation due to direct drilling To prevent collapse, and all the pile pile installation positions to form the main continuous column The present invention relates to a sheet pile installation method that can reduce the air shortage and cost by allowing the sheet pile to be collectively installed later.

Description

시트파일 설치 공법{METHOD OF CONSTRUCTING FOR SHEET FILE} Sheet file installation method {METHOD OF CONSTRUCTING FOR SHEET FILE}

본 발명은 호박돌층(전석층)이나 기반암(풍화암,연암, 경암)층과 같이 지반이 단단하고 조밀하여 직항타 공법이나 워터제트 공법으로는 시트파일을 설치할 수 없는 작업대상 지반에 시트파일을 설치하는 시트파일 설치 공법 및 그것에 사용되는 시트파일 설치용 가이드 고정틀에 관한 것으로서, 더욱 상세하게는 가로 방향으로 길게 상기 N개의 시트파일을 설치할 공간이 형성된 사각형상의 시트파일 설치용 가이드 고정틀을 사용하여 각 시트파일이 설치될 위치를 정확히 구획함과 동시에 시트파일을 설치하기 위한 위치를 천공함에 있어 시트파일 설치 위치를 1→3→2 순서대로 천공하여 직인접 천공으로 인한 기천공된 주변 및 그 내부에 흙 등이 붕괴되는 것을 방지하며, 주열상의 지중연속벽체를 형성하기 위한 시트파일 설치 위치가 모두 천공된 후에 시트파일을 일괄적으로 설치할 수 있도록 함으로써 공기 단축 및 경비를 점감할 수 있는 시트파일 설치 공법에 관한 것이다.
According to the present invention, the sheet pile is installed on the work target ground where the ground pile is hard and dense, such as an amber stone layer (stone layer) or bedrock (weathered rock, soft rock, hard rock) layer. It relates to a sheet pile installation method and a guide fixing frame for seat file installation used therein, and more particularly, each sheet pile using a rectangular sheet file installation guide fixing frame formed with a space for installing the N sheet piles long in the horizontal direction In dividing the location to be installed correctly and drilling the position for installing the sheet pile, the sheet pile installation position is drilled in the order of 1 → 3 → 2, so that the perforated periphery and the inside of the perforation due to direct drilling To prevent collapse, and after all of the seat pile installation positions for forming the continuous column of continuous wall The present invention relates to a seat pile installation method that can reduce the air shortage and cost by allowing the seat pile to be installed in a batch.

일반적으로 지하구조물을 건설할 때 주변의 흙 등이 파낸 곳으로 붕괴되거나 지하수 또는 하천수 등의 유입을 방지하기 위하여 시트파일을 박아 차수벽(차단벽)을 형성한다.Generally, when constructing an underground structure, a pile pile is formed to form a barrier wall (blocking wall) in order to prevent the inflow of groundwater or river water, or to collapse to surrounding areas.

상기 시트파일은 토사층이나 점토층, 실트층과 같이 입자가 작은 지반에는 직항타로 타입하여 설치하고, 직항타 수행이 불가능한 사력층 등에서는 고압수 분사를 통해 진입시키는 워터제트(Water jet) 공법을 사용하여 설치하고 있으나, 전석층(호박돌층)이나 조기반암(풍화암,연암,경암)층과 같이 조밀하고 단단한 지층에는 상기 직항타 공법이나 워터제트 공법으로는 불가능하므로, 천공과 함께 케이싱 삽입한 후 상기 케이싱 내부에 치환재(양질의 토사, 프라이애쉬, 벤토나이트, 직항타가 가능한 모든 그라우트재 등)를 채운 후 상기 케이싱을 인발하고, 그 자리에 시트파일을 설치하는 선천공 후 시트파일 설치공법을 사용하고 있다.The sheet pile is installed as a non-stop type in the ground with small particles such as soil layer, clay layer, silt layer, and using a water jet method that enters through high-pressure water injection in the sand layer, which can not perform non-stop. Although it is installed, dense and hard strata such as stone layer (amber stone layer) or rough bed (weathered rock, hard rock, hard rock) layer are not possible with the direct stroke method or water jet method. After the perforated sheet pile installation method is used to fill the casing and fill the casing and install the sheet pile in place after filling the inside with a substitute material (quality soil, frying ash, bentonite, all grout materials capable of direct hitting). .

상기 선천공 후 시트파일 설치공법은 특허등록 제348024호로 소개된 바 있으나, 상기 특허는 천공된 위치에서 바로 시트파일을 설치하고 주열상의 지중연속벽체를 형성하기 위하여 직인접 위치에 시트파일을 설치하여야 하는데 그 시트파일을 기설치된 시트파일의 단부에 수직으로 가이드빔을 가설치하여 직인접 위치를 천공하는 공법을 사용한 것으로서, 상기 가이드빔의 가설치 인발 등으로 인하여 공정이 복잡하여 작업공정이 더디게 진행되어 작업성 능률이 떨어지며 시간과 경비가 너무 많이 소요되는 문제점이 있었다.The method of installing the sheet pile after the perforation has been introduced as a patent registration No. 348024, but the patent should be installed the sheet pile directly in the perforated position, and the sheet pile should be installed in the direct adjacent position to form the underground continuous wall of the column However, the sheet pile is installed using a method of drilling a direct adjacent position by installing a guide beam perpendicularly to an end of a pre-installed sheet pile, and the work process is slow due to a complicated process due to provisional drawing of the guide beam. There was a problem that the work efficiency is reduced and takes too much time and expense.

이를 개선하기 위하여 제안된 것으로 케이싱 삽입 및 그 내부에 치환재을 삽입하지 않는 공법으로 특허등록 제507983호이 소개되고 있는데, 상기 특허는 케이싱 삽입 및 그 내부에 치환재를 삽입하지 않는 대신 천공 후 시트파일을 설치하고 주열상의 지중연속벽체를 형성하기 위하여 상기 기설치된 시트파일과 수직된 방향으로 보조 시트파일을 가설치하여 다시 인발하여 직인접 위치에 시트파일을 설치하는 공법으로서, 이 역시 공정이 복잡하여 작업공정이 더디게 진행되어 작업성 능률이 떨어지며 시간과 경비가 너무 많이 소요되는 문제점이 있었다.In order to improve this, a patent registration No. 507983 has been introduced as a method of inserting a casing and not inserting a substitution material therein. The patent does not insert a casing and inserts a substitution material therein. To install and install the auxiliary sheet pile in the direction perpendicular to the previously installed sheet pile in order to form the main continuous column wall, and to draw again to install the sheet pile in the direct adjacent position, which is also a complicated process There was a problem that the process is slow to work efficiency is reduced and takes too much time and expense.

또한, 상기 특허들은 작업 공정상 천공 및 케이싱을 삽입하기 위한 장비와 함께 시트파일을 설치하기 위한 바이브로 해머 등의 장비를 항상 대기시켜야 하나, 상기 천공 작업 중 예기치 못한 원인으로 특정 위치의 천공 작업이 늦어질 경우 상기 시트파일을 설치하기 위한 바이브로 해머 등의 장비는 시트파일 설치 작업도 하지 못한 채 그 장소에 그대로 대기하여야 하고 이로 인하여 장비 사용 효율이 저하되어 그에 따른 불필요한 경비가 많이 소요되는 문제점이 있었다.
In addition, the patents should always wait for the vibrating hammer and other equipment to install the seat pile together with the equipment for inserting the drilling and the casing in the work process, but the drilling at a specific position is an unexpected cause during the drilling. If it is late, the equipment such as a vibrator hammer and the like to install the sheet pile should be kept in the place without performing the sheet pile installation work. there was.

본 발명은 상기와 같은 종래기술의 문제점을 해소하기 위하여 연구개발된 것으로서, 본 발명은 호박돌층(전석층)이나 조밀한 자갈층 혹은 기반암(풍화암,연암, 경암) 등과 같이 지반이 단단하고 조밀한 지반에 시트파일을 설치하기 위하여 가로 방향으로 길게 상기 N개의 시트파일을 설치할 공간이 형성된 사각형상의 시트파일 설치용 가이드 고정틀을 사용하여 각 시트파일이 설치될 위치를 정확히 구획함으로써 시트파일의 설치에 있어서 오차를 대폭 줄일 수 있고, 상기 시트파일을 설치하기 위한 위치를 천공함에 있어 시트파일 설치 위치를 1→3→2 순서대로 천공하여 직인접 천공으로 인한 기천공된 주변 및 그 내부에 흙 등이 붕괴되는 것을 방지하며, 주열상의 지중연속벽체를 형성하기 위한 시트파일 설치 위치가 모두 천공된 후에 시트파일을 일괄적으로 설치할 수 있도록 함으로써 장비 효율을 극대화할 수 있는 시트파일 설치 공법을 제공하는데 그 목적이 있다.
The present invention has been researched and developed to solve the problems of the prior art as described above, the present invention is a solid and dense ground, such as amber stone (stone layer), dense gravel layer or bedrock (weathered rock, soft rock, hard rock), etc. In order to install the sheet pile in the horizontal direction by using a rectangular sheet pile installation guide fixing frame formed with a space for the installation of the N sheet piles to precisely partition the position where each sheet pile is to be installed in the error in the installation of the sheet pile It is possible to greatly reduce, and in drilling the position for installing the sheet pile, the sheet pile installation position is drilled in the order of 1 → 3 → 2 so that the soil and the like are collapsed in the perforated periphery due to direct drilling. Work on the sheet pile after all the installation positions of the sheet pile for forming the underground continuous wall The purpose is to provide a sheet pile installation method that can maximize the efficiency of the equipment by allowing a comprehensive installation.

상기와 같은 목적을 달성하기 위한 본 발명에 따른 시트파일 설치 공법은, 시트파일 설치용 가이드 고정틀을 이용하여 N개의 시트파일을 설치하는 공법에 있어서, N개의 시트파일이 설치될 부지에 수평을 유지하도록 지반을 정지하고, 상기 N개의 시트파일이 설치될 부지에 그 내부가 가로 방향으로 길게 상기 N개의 시트파일을 설치할 공간이 형성된 사각형상의 시트파일 설치용 가이드 고정틀을 설치하는 단계와, 상기 시트파일 설치용 가이드 고정틀 내부에서 제1 시트파일이 설치될 위치(상기 N개의 시트파일이 설치될 위치 중 맨 좌측 또는 맨 우측 위치)에 대하여 구획봉을 사용하여 구획하고 상기 구획된 제1 시트파일의 설치될 위치에서 설계심도까지 천공과 동시에 케이싱을 삽입하며 상기 제1 시트파일이 설치될 위치에 삽입된 케이싱 내부에 치환재를 채우고 상기 케이싱을 인발하는 것을 N-1번째 시트파일이 설치될 위치까지 반복하는 단계와, 상기 시트파일 설치용 가이드 고정틀에서 마지막(N번째) 시트파일을 설치할 위치까지 천공되어 케이싱이 삽입된 경우 그 케이싱을 인발하지 않고 그 케이싱을 중심축으로 하여 상기 시트파일 설치용 가이드 고정틀을 회전시켜 다음의 N개 시트파일을 설치할 위치로 이동시키는 단계를 포함하는 것을 특징으로 한다.Sheet file installation method according to the present invention for achieving the above object, in the method of installing the N sheet piles using a guide fixing frame for seat pile installation, so as to maintain a horizontal level on the site where the N sheet piles will be installed Stopping the ground and installing a rectangular sheet pile installation guide fixing frame having a space for installing the N sheet piles long in the horizontal direction at a site where the N sheet piles are to be installed, and the sheet pile installing guide In the fixing frame, the first sheet pile is to be installed (the leftmost or the rightmost position among the N sheet piles to be installed) by using a partition bar and at the position where the first sheet pile is to be installed. Insert the casing at the same time as drilling to the design depth and insert the casing into the casing inserted at the position where the first sheet pile is to be installed. Repeating filling the ash and drawing the casing to the position where the N-1th sheet pile is to be installed, and when the casing is inserted by drilling from the sheet fixing guide fixing frame to the position to install the last (Nth) sheet pile It characterized in that it comprises the step of moving the sheet pile installation guide fixing frame with the casing as the central axis without drawing the casing to move to the next N seat pile installation position.

또한 본 발명은 상기 제1 시트파일이 설치될 위치에 삽입된 케이싱 내부에 치환재를 채우고 상기 케이싱을 인발한 후에, 상기 시트파일 설치용 가이드 고정틀 내부에서 제3 시트파일이 설치될 위치(상기 제1 시트파일이 설치될 위치에서 다음다음의 시트파일 설치 위치)를 구획하고 상기 구획된 제3 시트파일의 설치위치에 대하여 설계심도까지 천공과 동시에 케이싱을 삽입하는 단계와, 상기 제3 시트파일이 설치될 위치에 삽입된 케이싱 내부에 치환재를 채우고 상기 케이싱을 인발하는 단계와, 상기 시트파일 설치용 가이드 고정틀 내부에서 제2 시트파일이 설치될 위치(상기 제1 시트파일 및 제3 시트파일이 설치될 위치 사이의 위치)를 구획하고 상기 구획된 제2 시트파일의 설치위치에 대하여 설계심도까지 천공과 동시에 케이싱을 삽입하는 단계를 포함하는 것을 특징으로 한다.In another aspect, the present invention after filling the casing is inserted into the casing inserted in the position where the first sheet pile is to be installed, and after drawing the casing, the position of the third sheet pile to be installed in the guide fixing frame for installing the sheet pile (the first Partitioning the next sheet pile installation position from the position where the sheet pile is to be installed) and inserting the casing at the same time as perforation to the design depth with respect to the installation position of the partitioned third sheet pile, and installing the third sheet pile. Filling the casing in the casing inserted in the position to be drawn and drawing the casing, and the position where the second sheet pile is to be installed inside the guide fixing frame for installing the sheet pile (the first sheet pile and the third sheet pile And positioning the casing at the same time as the drilling depth to the design depth with respect to the installation position of the partitioned second sheet pile Characterized in that it also.

또한, 본 발명은 다음의 제4 내지 제N 시트파일이 설치될 위치에 대하여, 제5 시트파일이 설치될 위치(상기 제3 시트파일이 설치될 위치의 다음다음 설치위치)를 구획하고 상기 구획된 제5 시트파일의 설치위치에 대하여 설계심도까지 천공과 동시에 케이싱을 삽입한 다음, 제4 시트파일이 설치될 위치(상기 제3 시트파일 및 제5 시트파일이 설치될 위치 사이의 위치)를 구획하고 상기 구획된 제4 시트파일의 설치위치에 대하여 설계심도까지 천공과 동시에 케이싱을 삽입하는 수순으로 제N 시트파일이 설치될 위치까지 천공과 동시에 케이싱을 삽입하는 것으로 한다.In addition, the present invention partitions the position (the next installation position next to the position where the third sheet file is to be installed) the fifth sheet file is to be installed with respect to the position where the next fourth to Nth seat pile is to be installed Insert the casing at the same time as the drilling depth with respect to the installation position of the fifth sheet pile, and then the position where the fourth sheet pile is to be installed (between the position where the third sheet pile and the fifth sheet pile are to be installed). The casing is inserted at the same time as the perforation to the position where the N-th sheet pile is to be installed in the order of drilling and inserting the casing simultaneously to the design depth with respect to the installation position of the partitioned fourth sheet pile.

삭제delete

또한, 본 발명은 상기 시트파일이 설치될 모든 위치가 천공되고 그 내부에 치환재가 채워진 다음, 그 위치에 대응되는 모든 시트파일을 일괄적으로 설치하는 것을 특징으로 한다.In addition, the present invention is characterized in that all the positions where the sheet pile is to be installed are perforated and filled with a substitute therein, and then all the sheet piles corresponding to the positions are collectively installed.

삭제delete

본 발명은 호박돌층(전석층)이나 기반암(풍화암,연암, 경암)층 등과 같이 지반이 단단하고 조밀한 지반에 시트파일을 설치하기 위하여 가로 방향으로 길게 상기 N개의 시트파일을 설치할 공간이 형성된 사각형상의 시트파일 설치용 가이드 고정틀을 사용하여 각 시트파일이 설치될 위치를 정확히 구획함으로써 시트파일의 설치에 있어서 오차를 대폭 줄일 수 있는 효과가 있다The present invention is a square formed with a space to install the N sheet piles in the horizontal direction in order to install the sheet pile on the hard and dense ground, such as amber stone layer (stone layer) or bedrock (weatherstone, soft rock, hard rock) layer By using the guide fixing frame for seat pile installation on the top, the position where each sheet pile is to be installed is precisely partitioned, thereby reducing the error in the installation of the sheet pile.

또한, 본 발명은 상기 시트파일을 설치하기 위한 위치를 천공함에 있어 시트파일 설치 위치를 1→3→2 순서대로 천공하여 직인접 천공으로 인한 기천공된 주변 및 그 내부에 흙 등이 붕괴되는 것을 방지할 수 있는 효과가 있다.In addition, the present invention is to perforate the position for installing the sheet pile in the order of the sheet pile installation position 1 → 3 → 2 in order that the soil and the like collapsed in the perforated periphery due to direct drilling There is an effect that can be prevented.

또한, 본 발명은 주열상의 지중연속벽체를 형성하기 위한 시트파일 설치 위치가 모두 천공된 후에 시트파일을 일괄적으로 설치할 수 있도록 함으로써 장비 효율을 극대화하여 공기 단축은 물론이고 경비를 대폭 절감할 수 있는 효과가 있다.
In addition, the present invention by maximizing the efficiency of the equipment by maximizing the equipment efficiency by allowing the sheet pile to be installed in a batch after all of the pile pile installation position for forming the underground continuous wall of the main row can be significantly reduced costs It works.

도 1은 본 발명에 따른 시트파일 설치용 가이드 고정틀의 사시도
도 2는 본 발명에 따른 시트파일 설치용 가이드 고정틀의 평면도
도 3은 본 발명에 따른 시트파일 설치 공법의 흐름도
도 4의 (a) 내지 (c)는 본 발명에 따른 시트파일 설치 공법에서 각 단계의 평면도
도 5는 본 발명에 따른 시트파일 설치 공법에서 마지막 단계를 설명하는 평면도
도 6은 본 발명에 따른 시트파일 설치 공법에서 시트파일이 시공된 예의 평면도
1 is a perspective view of a guide fixing frame for seat pile installation according to the present invention
Figure 2 is a plan view of the guide fixing frame for seat pile installation according to the present invention
3 is a flow chart of the seat pile installation method according to the present invention
Figure 4 (a) to (c) is a plan view of each step in the sheet pile installation method according to the present invention
5 is a plan view for explaining the last step in the sheet pile installation method according to the present invention
6 is a plan view of an example in which the sheet pile is constructed in the sheet pile installation method according to the present invention;

이하, 본 발명에 따른 시트파일 설치 공법 및 그것에 사용되는 시트파일 설치용 가이드 고정틀에 대하여 첨부된 도면을 참고로 구체적으로 설명하면 다음과 같다. Hereinafter, the sheet pile installation method according to the present invention and a sheet fixing guide guide frame for installing the sheet pile used therein will be described in detail with reference to the accompanying drawings.

도 1은 본 발명에 따른 시트파일 설치용 가이드 고정틀의 사시도이고, 도 2는 본 발명에 따른 시트파일 설치용 가이드 고정틀의 평면도이고, 도 3은 본 발명에 따른 시트파일 설치 공법의 흐름도이고, 도 4의 (a) 내지 (c)는 본 발명에 따른 시트파일 설치 공법에서 각 단계의 평면도이고, 도 5는 본 발명에 따른 시트파일 설치 공법에서 마지막 단계를 설명하는 평면도이며, 도 6은 본 발명에 따른 시트파일 설치 공법에서 시트파일이 시공된 예의 평면도이다.1 is a perspective view of a guide fixing frame for seat pile installation according to the present invention, Figure 2 is a plan view of the guide fixing frame for seat pile installation according to the present invention, Figure 3 is a flow chart of the seat pile installation method according to the present invention, (a) to (c) is a plan view of each step in the sheet pile installation method according to the present invention, Figure 5 is a plan view illustrating the last step in the sheet pile installation method according to the present invention, Figure 6 according to the present invention This is a plan view of an example where a sheet pile is constructed in the sheet pile installation method.

본 발명에 따른 시트파일 설치용 가이드 고정틀(100)은 호박돌층(전석층)이나 조밀한 자갈층 혹은 기반암(풍화암, 연암, 경암) 등과 같이 지반이 단단하고 조밀한 지반에 설치될 시트파일의 설치 위치를 정확하게 구획하기 위한 고정틀로서, 도 1 및 도 2에 도시된 바와 같이 한 쌍의 가로부재(10)와 한 쌍의 세로부재(20)로 구성되고 그 내부에 가로 방향으로 길게 다수개의 시트파일(60)을 설치할 위치가 형성된 사각형상의 틀로 되어 있다. 상기 내부공간은 일실시예로 가로 8000mm, 세로 480mm로 하고, 이때 상기 시트파일이 설치될 위치를 천공할 구멍의 크기는 480mm가 된다.. The guide fixing frame 100 for seat pile installation according to the present invention is an installation position of the seat pile to be installed on a hard and dense ground, such as amber stone layer (stone layer) or dense gravel layer or bedrock (weather rock, soft rock, hard rock) As a fixing frame for accurately partitioning, as shown in FIGS. 1 and 2, a pair of horizontal members 10 and a pair of vertical members 20 and a plurality of sheet piles 60 extending in the horizontal direction therein It has a rectangular frame with a place to install it. In one embodiment, the inner space is 8000 mm wide and 480 mm long. At this time, the size of the hole for drilling the position where the sheet pile is to be installed is 480 mm.

상기 한 쌍의 가로부재(10)는 각각 H 빔을 ‘H'자로 세운 형상이고, 상기 시트파일(60)의 설치위치(내부 공간)에 접하고 있는 상기 각각의 H 빔 일면 상부에는 상기 다수개의 구획홈(11)이 형성되어 있다.Each of the pair of horizontal members 10 has a shape in which the H beam is formed as 'H', and the plurality of partitions are disposed on an upper surface of each H beam that is in contact with the installation position (inner space) of the seat pile 60. The groove 11 is formed.

상기 구획홈(10)은 상기 시트파일이 설치되는 위치를 구획하기 위하여 구획봉(30)이 삽입되는 홈으로써, 상기 구획봉(30)이 상기 구획홈(10)에 삽입될 때 상기 구획봉(30)의 일면은 상기 시트파일이 설치되는 위치, 즉 시트파일을 설치하기 위하여 천공되는 원형공의 원주면의 접선 위치에 접하도록 되어 있다.The partition groove 10 is a groove into which a partition rod 30 is inserted to partition a position where the seat pile is installed. When the partition rod 30 is inserted into the partition groove 10, the partition rod ( One surface of 30) is in contact with the position where the sheet pile is installed, that is, the tangential position of the circumferential surface of the circular hole drilled for installing the sheet pile.

상기 세로부재(20)는 상기 가로부재(10)의 측면과 용접 고정된 것으로서, H 빔이 바람직하나 강판도 사용될 수 있다.The vertical member 20 is welded and fixed to the side surface of the horizontal member 10, the H beam is preferably a steel sheet may be used.

상기 가로부재(10)의 측면의 특정 위치에는 상기 사각형상의 틀이 천공작업 등으로 인하여 요동되는 것을 방지할 수 있도록 요동방지판(70)을 더 구비한다. 상기 요동방지판(70)은 상기 가로부재(10)의 측면 바닥면에 용접고정되어 일정 크기를 가지는 강판으로 된 것으로서, 시트파일 설치위치에 대하여 천공 및 케이싱을 삽입하기 위한 장비가 설치될 때 장비 설치 부지의 침하 등으로 인하여 상기 장비가 기우러짐 등을 방지하기 위하여 상기 장비 바닥에 설치한 철판의 하부에 놓이게 함으로써 상기 장비 등의 하중에 의하여 상기 요동방지판(70) 및 시트파일 설치용 가이드 고정틀(100)이 견고하게 고정하게 되는 것이다. 상기 요동방지판(70)은 상기 장비 바닥에 설치한 철판에 보다 견고히 고정되게 하기 위하여 상기 장비 바닥에 설치한 철판에 형성된 구명과 결합하기 위하여 돌출된 고정핀(71)을 더 구비할 수 있다.A specific position of the side surface of the horizontal member 10 is further provided with a rocking prevention plate 70 to prevent the rectangular frame from rocking due to the drilling operation. The rocking prevention plate 70 is made of a steel plate having a predetermined size by welding fixed to the side bottom surface of the horizontal member 10, when the equipment for inserting the perforations and casings for the seat pile installation position is installed In order to prevent the equipment from tilting due to settlement of the installation site, the equipment is placed under the iron plate installed at the bottom of the equipment, so that the rocking prevention plate 70 and the guide fixing frame for installing the sheet pile by the load of the equipment ( 100) is to be firmly fixed. The rocking prevention plate 70 may further include a fixing pin (71) protruding to engage with the life-form formed on the iron plate installed on the equipment bottom in order to be more firmly fixed to the iron plate installed on the equipment bottom.

다음으로 본 발명에 따른 시트파일 설치 공법을 도 3 및 도 6을 참고로 설명하면 다음과 같다.Next, the sheet pile installation method according to the present invention will be described with reference to FIGS. 3 and 6.

본 발명에 따른 시트파일 설치 공법은 도 3에 도시된 바와 같이, 먼저 N개의 시트파일이 설치될 부지에 최대한 수평을 유지할 수 있도록 지반을 정지하고(S10 단계), 상기 수평으로 정지된 부지에 상기 N개의 시트파일이 설치될 부지에 그 내부가 가로 방향으로 길게 상기 N개의 시트파일을 설치할 공간이 형성된 사각형상의 시트파일 설치용 가이드 고정틀(100)을 설치한다(S20 단계). In the seat pile installation method according to the present invention, as shown in FIG. 3, first, the ground is stopped so as to be as horizontal as possible on the site where the N sheet piles are to be installed (step S10). On the site where the N sheet piles are to be installed, a rectangular sheet pile installation guide fixing frame 100 having a space for installing the N sheet piles is formed in the horizontal direction (S20).

상기 시트파일을 설치할 공간에 상기 N개의 시트파일이 설치될 위치 중 맨 좌측 또는 우측(도 4에서는 맨 좌측으로 도시되어 있음, a 지점)에 최초의 시트파일(제1 시트파일)을 설치할 위치에 대하여 도 4(a)와 같이 상기 제1 시트파일이 설치될 위치에서 천공하여야 할 직경의 외주면과 접하는 부분에 구획봉(30)을 구획홈(11)에 삽입하여 상기 제1 시트파일의 설치위치를 구획한다(S30 단계). 상기 구획봉(30)은 상기 가로부재(10)의 외측면과 맞닿게 되는 길이로 하는 것이 바람직하다.Where the first sheet file (first sheet file) is to be installed at the left or right side (shown to the left in FIG. 4, point a) among the positions where the N sheet files are to be installed in the space for installing the sheet file. As shown in FIG. 4 (a), the partition bar 30 is inserted into the partition groove 11 at a position contacting the outer circumferential surface of the diameter to be drilled at the position where the first sheet pile is to be installed, thereby installing the first sheet pile. Partitioning step (S30). The partition bar 30 is preferably a length that is in contact with the outer surface of the horizontal member (10).

상기 구획된 제1 시트파일의 설치위치에 대하여 천공 장비를 이용하여 설계심도까지 천공과 동시에 케이싱(40)을 삽입한다(S40 단계). 이 때 상기 세로부재(20)의 일면과 상기 구획봉(30)에 의하여 천공되는 위치를 정확하게 결정되게 된다.With respect to the installation position of the partitioned first sheet pile, the casing 40 is inserted simultaneously with the drilling to the design depth using the drilling equipment (step S40). At this time, the position punched by one side of the vertical member 20 and the partition bar 30 is accurately determined.

상기 케이싱(40)이 삽입된 후 상기 구획봉(30)을 상기 구획홈(10)으로부터 제거한다.After the casing 40 is inserted, the partition rod 30 is removed from the partition groove 10.

상기 제1 시트파일의 설치위치에 천공되어 삽입된 케이싱 내부에 치환재(50. 양질의 토사, 프라이애쉬, 벤토나이트, 직항타가 가능한 모든 그라우트재 중 어느 하나)를 채운 후 상기 케이싱을 인발한다(S50 단계).The casing is drawn after filling the substitution material (50. any one of good quality earth and sand, frying ash, bentonite, and any grout material capable of direct hitting) into the casing inserted and drilled at the installation position of the first sheet pile (S50). step).

다음으로, 상기 제1 시트파일이 설치될 위치에서 다음다음의 시트파일(제3 시트파일) 설치위치(도 4에서 c 지점)에 대하여 상기 제3 시트파일이 설치될 위치에서 천공하여야 할 직경의 양 외주면과 접하는 부분에 2개의 구획봉(30)을 구획홈(11)에 삽입하여 상기 제3 시트파일의 설치위치를 구획한다(S60 단계).Next, at the position where the first sheet pile is to be installed, the diameter of the diameter to be drilled at the position where the third sheet pile is to be installed with respect to the next seat pile (third sheet pile) installation position (point c in FIG. 4). Two partition rods 30 are inserted into the partition grooves 11 at portions in contact with both outer circumferential surfaces to partition the installation position of the third sheet pile (step S60).

상기 구획된 제3 시트파일의 설치위치에 대하여 천공 장비를 이용하여 설계심도까지 천공과 동시에 케이싱(40)을 삽입하고(S70 단계), 상기 케이싱(40)이 삽입된 후 상기 구획봉(30)을 상기 구획홈(10)으로부터 제거한 뒤, 상기 제3 시트파일의 설치위치에 천공되어 삽입된 케이싱 내부에 상기 치환재(50)를 채운 후 상기 케이싱(40)을 인발한다(S80 단계).Inserting the casing 40 at the same time as the drilling depth to the design depth using the drilling equipment for the installation position of the partitioned third sheet pile (step S70), and the partition rod 30 after the casing 40 is inserted After removing it from the partition groove 10, the casing 40 is drawn after filling the replacement material 50 in the casing is inserted into the perforated and inserted position of the third sheet pile (step S80).

이 때 상기 제1 시트파일의 설치 위치에 삽입된 케이싱(40)은 S50 단계와 같이 제3 시트파일의 설치위치가 구획되기 전에 인발할 수도 있지만, 상기 제3 시트 파일의 설치위치에 케이싱(40)이 삽입된 이후에 제3 시트파일에 삽입된 케이싱(40)과 일괄적으로 인발하여도 무방하다.At this time, the casing 40 inserted into the installation position of the first sheet pile may be drawn before the installation position of the third sheet pile is partitioned as in step S50, but the casing 40 is installed at the installation position of the third sheet pile. ) May be drawn out collectively with the casing 40 inserted into the third sheet pile after insertion.

다음으로, 상기 제1 시트파일 및 제3 시트파일이 설치될 위치 사이인 제2 시트파일의 설치위치(도 4에서 b 지점)에 대하여 상기 제2 시트파일이 설치될 위치에서 천공하여야 할 직경의 양 외주면과 접하는 부분에 2개의 구획봉(30)을 구획홈(11)에 삽입하여 상기 제2 시트파일의 설치위치를 구획한다(S90 단계).Next, with respect to the installation position of the second sheet pile (point b in FIG. 4) between the position where the first sheet pile and the third sheet pile are to be installed, Two partition bars 30 are inserted into the partition grooves 11 at portions in contact with both outer circumferential surfaces to partition the installation position of the second sheet pile (step S90).

상기 구획된 제2 시트파일의 설치위치에 대하여 천공 장비를 이용하여 설계심도까지 천공과 동시에 케이싱(40)을 삽입하고(S100 단계), 상기 케이싱(40)이 삽입된 후 상기 구획봉(30)을 상기 구획홈(10)으로부터 제거한 뒤, 상기 제2 시트파일의 설치위치에 천공되어 삽입된 케이싱 내부에 상기 치환재(50)를 채운 후 상기 케이싱(40)을 인발한다(S110 단계).Inserting the casing 40 at the same time as the drilling depth to the design depth using the drilling equipment for the installation position of the partitioned second sheet pile (step S100), and the partition rod 30 after the casing 40 is inserted After removing it from the partition groove 10, the casing 40 is drawn after filling the replacement material 50 in the casing is inserted into the perforated and inserted in the installation position of the second sheet pile (step S110).

다음으로, 상기 제3 시트파일이 설치될 위치에서 다음다음의 시트파일(제5 시트파일) 설치위치(미도시)에 대하여 제2 및 제3 시트파일이 설치된 위치에서 구획, 천공 및 케이싱 삽입, 치환재 채움과 같은 방법으로 시공하고(S120 내지 S140 단계), 또한 상기 시트파일 설치용 가이드 고정틀(100)의 내부공간에서 맨 마지막인 시트파일(제N 시트파일)의 설치 위치까지 제2 및 제3 시트파일이 설치된 위치에서 구획, 천공 및 케이싱 삽입, 치환재 채움과 같은 방법으로 시공한다(S150 단계).Next, at the position where the third sheet file is to be installed, the compartments, perforations and casings are inserted at the positions where the second and third sheet files are installed with respect to the next sheet file (fifth sheet file) installation position (not shown). Constructed in the same manner as the filling of the substitution material (steps S120 to S140), and also the second and third to the installation position of the last sheet pile (N-th sheet pile) in the inner space of the guide pile frame for installing the sheet pile In the position where the seat pile is installed, the construction is performed in the same manner as the compartment, perforation and casing insertion, and filling the substitution material (step S150).

한편, 상기 시트파일 설치용 가이드 고정틀(100)의 내부공간에서 상기 제N 시트파일의 설치위치까지 케이싱(40)이 삽입된 상태에서 연속해서 지중연속벽체를 형성(시트파일을 설치)하여야 할 필요가 있을 경우, 상기 케이싱(40)을 인발하지 않고 상기 케이싱(40)을 중심축으로 하여 상기 시트파일 설치용 가이드 고정틀(100)을 회전시켜 다음의 N개 시트파일을 설치할 부지로 이동시키게 할 수 있다. 상기와 같이 함으로써 연속해서 지중연속벽체를 형성(시트파일을 설치)하는 경우에서 상기 시트파일 설치용 가이드 고정틀(100)을 효율적으로 사용할 수 있고 상기 지중연속벽체가 곡면 또는 경사면을 이루고 있을 때도 상기 시트파일 설치용 가이드 고정틀(100)의 회전 각도를 조절함으로써 용이하게 대응할 수 있는 이점이 있다.On the other hand, it is necessary to continuously form the continuous wall (seat pile) in the state in which the casing 40 is inserted from the inner space of the seat fixing guide 100 for the seat pile installation to the installation position of the N-th sheet pile. If there is, the casing 40 can be moved to the site where the next N sheet piles are to be installed by rotating the guide fixing frame 100 for seat pile installation with the casing 40 as a central axis without drawing the casing 40. As described above, the sheet filing guide fixing frame 100 can be efficiently used in the case of continuously forming the continuous wall (seat pile) and the sheet pile even when the underground continuous wall forms a curved surface or an inclined surface. There is an advantage that can be easily responded by adjusting the rotation angle of the guide fixing frame 100 for installation.

다음으로, 상기 시트파일이 설치될 모든 위치가 천공되고 그 내부에 치환재가 채워진 다음, 도 6과 같이 상기 시트파일(60)을 설치하기 위한 바이브로 해머 등의 장비를 투입하여 상기 천공되고 치환재가 채워진 모든 위치에 대하여 시트파일(60)을 일괄적으로 설치한다. 이와 같이 함으로써 장비 효율을 극대화하고 공기 단축은 물론이고 경비를 대폭 절감할 수 있게 되는 것이다.
Next, all the positions where the seat pile is to be installed are perforated and the replacement material is filled therein. Then, as shown in FIG. 6, the drill and the substitute material are put into the vibrator for installing the seat pile 60 as shown in FIG. 6. The sheet pile 60 is collectively installed for all the filled positions. By doing so, it is possible to maximize the efficiency of equipment and to reduce the cost as well as shorten the air.

상기에서는 본 발명의 바람직한 실시 예를 참조하여 설명하였지만, 해당 기술 분야의 숙련된 당업자는 아래의 특허 청구범위에 기재된 본 발명의 사상 및 영역으로부터 벗어나지 않는 범위 내에서 본 발명을 다양하게 수정 및 변경시킬 수 있음을 이해할 수 있을 것이다.
It will be apparent to those skilled in the art that various modifications and variations can be made in the present invention without departing from the spirit and scope of the invention as defined in the appended claims. It can be understood that it is possible.

100: 시트파일 설치용 가이드 고정틀
10: 가로부재 11: 구획홈
20: 세로부재 30: 구획봉
40: 케이싱 50: 치환재
60: 시트파일 70: 요동방지판
100: guide fixing frame for seat pile installation
10: horizontal member 11: compartment groove
20: vertical member 30: partition rod
40: casing 50: substitution material
60: seat pile 70: shaking plate

Claims (6)

시트파일 설치용 가이드 고정틀을 이용하여 N개의 시트파일을 설치하는 공법에 있어서,
N개의 시트파일이 설치될 부지에 수평을 유지하도록 지반을 정지하고, 상기 N개의 시트파일이 설치될 부지에 그 내부가 가로 방향으로 길게 상기 N개의 시트파일을 설치할 공간이 형성된 사각형상의 시트파일 설치용 가이드 고정틀을 설치하는 단계와,
상기 시트파일 설치용 가이드 고정틀 내부에서 제1 시트파일이 설치될 위치(상기 N개의 시트파일이 설치될 위치 중 맨 좌측 또는 맨 우측 위치)에 대하여 구획봉을 사용하여 구획하고 상기 구획된 제1 시트파일의 설치될 위치에서 설계심도까지 천공과 동시에 케이싱을 삽입하며 상기 제1 시트파일이 설치될 위치에 삽입된 케이싱 내부에 치환재를 채우고 상기 케이싱을 인발하는 것을 N-1번째 시트파일이 설치될 위치까지 반복하는 단계와,
상기 시트파일 설치용 가이드 고정틀에서 마지막(N번째) 시트파일을 설치할 위치까지 천공되어 케이싱이 삽입된 경우 그 케이싱을 인발하지 않고 그 케이싱을 중심축으로 하여 상기 시트파일 설치용 가이드 고정틀을 회전시켜 다음의 N개 시트파일을 설치할 위치로 이동시키는 단계
를 포함하는 것을 특징으로 하는 시트파일 설치 공법.
In the method of installing N sheet piles using the guide fixing frame for sheet pile installation,
For stopping the ground so as to be horizontal to the site on which the N sheet piles are to be installed, and for installing the rectangular sheet file having a space in which the space for installing the N sheet piles is formed in the horizontal direction in the site where the N sheet piles will be installed. Installing the guide fixing frame,
The partitioned first sheet pile is partitioned by using a partition bar with respect to a position where the first sheet pile is to be installed (the leftmost or the rightmost position among the positions where the N sheet piles are to be installed) within the guide fixing frame for installing the sheet pile. Insert the casing at the same time as the perforation from the installation position of the installation to the design depth, and filling the replacement material in the casing inserted in the position where the first sheet pile is to be installed and drawing the casing from the position where the N-1 th sheet pile is to be installed. Repeat steps until,
When the casing is inserted from the sheet fixing guide fixing frame for installing the last (Nth) sheet pile, the casing is inserted without rotating the casing. Steps to Move the Dog Sheet File to
Sheet pile installation method comprising a.
제1항에 있어서,
상기 제1 시트파일이 설치될 위치에 삽입된 케이싱 내부에 치환재를 채우고 상기 케이싱을 인발한 후에,
상기 시트파일 설치용 가이드 고정틀 내부에서 제3 시트파일이 설치될 위치(상기 제1 시트파일이 설치될 위치에서 다음다음의 시트파일 설치 위치)를 구획하고 상기 구획된 제3 시트파일의 설치위치에 대하여 설계심도까지 천공과 동시에 케이싱을 삽입하는 단계와
상기 제3 시트파일이 설치될 위치에 삽입된 케이싱 내부에 치환재를 채우고 상기 케이싱을 인발하는 단계와,
상기 시트파일 설치용 가이드 고정틀 내부에서 제2 시트파일이 설치될 위치(상기 제1 시트파일 및 제3 시트파일이 설치될 위치 사이의 위치)를 구획하고 상기 구획된 제2 시트파일의 설치위치에 대하여 설계심도까지 천공과 동시에 케이싱을 삽입하는 단계
를 더 포함하는 것을 특징으로 하는 시트파일 설치 공법.
The method of claim 1,
After filling the replacement material in the casing inserted in the position where the first sheet pile is to be installed and drawing the casing,
Inside the fixing sheet for the seat pile installation guide, the position where the third sheet pile is to be installed (the next seat pile installation position at the position where the first sheet pile is to be installed) is partitioned and the installation position of the partitioned third sheet pile Inserting the casing at the same time as drilling and design depth
Filling the casing and drawing the casing into the casing inserted in the position where the third sheet pile is to be installed;
The second sheet pile (position between the position of the first sheet pile and the third sheet pile) is to be installed in the guide fixing frame for installing the sheet pile and the installation position of the partitioned second sheet pile Inserting the casing at the same time as drilling to the design depth
Sheet file installation method characterized in that it further comprises a.
제2항에 있어서,
다음의 제4 내지 제N 시트파일이 설치될 위치에 대해서는,
제5 시트파일이 설치될 위치(상기 제3 시트파일이 설치될 위치의 다음다음 설치위치)를 구획하고 상기 구획된 제5 시트파일의 설치위치에 대하여 설계심도까지 천공과 동시에 케이싱을 삽입한 다음,
제4 시트파일이 설치될 위치(상기 제3 시트파일 및 제5 시트파일이 설치될 위치 사이의 위치)를 구획하고 상기 구획된 제4 시트파일의 설치위치에 대하여 설계심도까지 천공과 동시에 케이싱을 삽입하는 수순으로 제N 시트파일이 설치될 위치까지 천공과 동시에 케이싱을 삽입하는 것
를 더 포함하는 것을 특징으로 하는 시트파일 설치 공법.
The method of claim 2,
As for the position where the following fourth to Nth sheet piles are to be installed,
Partition the position where the fifth sheet pile is to be installed (the next installation position after the position where the third sheet pile is to be installed), and insert the casing at the same time as the drilling depth to the installation depth of the partitioned fifth sheet pile. ,
The position where the fourth sheet pile is to be installed (the position between the third sheet pile and the fifth sheet pile to be installed) is partitioned, and the casing is simultaneously drilled to the design depth with respect to the installation position of the partitioned fourth sheet pile. Inserting the casing at the same time as drilling to the position where the N-th sheet pile is to be installed
Sheet file installation method characterized in that it further comprises a.
삭제delete 제1항 내지 제3항 중 어느 한 항에 있어서,
상기 시트파일이 설치될 모든 위치가 천공되고 그 내부에 치환재가 채워진 다음, 그 위치에 대응되는 모든 시트파일을 일괄적으로 설치하는 것
을 특징으로 하는 시트파일 설치 공법.
4. The method according to any one of claims 1 to 3,
After all the positions where the sheet pile is to be installed are perforated and the replacement material is filled therein, then all sheet piles corresponding to the positions are collectively installed.
Sheet pile installation method characterized in that.
삭제delete
KR1020110119268A 2011-11-16 2011-11-16 Method of constructing for sheet file KR101199738B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020110119268A KR101199738B1 (en) 2011-11-16 2011-11-16 Method of constructing for sheet file

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020110119268A KR101199738B1 (en) 2011-11-16 2011-11-16 Method of constructing for sheet file

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
KR1020090102101A Division KR101146436B1 (en) 2009-10-27 2009-10-27 Guide fixing frame for constructing sheet file

Publications (2)

Publication Number Publication Date
KR20110139176A KR20110139176A (en) 2011-12-28
KR101199738B1 true KR101199738B1 (en) 2012-11-08

Family

ID=45504817

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020110119268A KR101199738B1 (en) 2011-11-16 2011-11-16 Method of constructing for sheet file

Country Status (1)

Country Link
KR (1) KR101199738B1 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101317006B1 (en) * 2012-07-17 2013-10-11 양영신 Guide fixing frame for constructing sheet file

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000319881A (en) 1999-05-12 2000-11-21 Fumio Hoshi Method for continuous lap drilling by leader auger machine and device used therefor
KR100348024B1 (en) 1999-07-30 2002-08-07 홍지기술산업주식회사 Method for sheet piling after pre-boring

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000319881A (en) 1999-05-12 2000-11-21 Fumio Hoshi Method for continuous lap drilling by leader auger machine and device used therefor
KR100348024B1 (en) 1999-07-30 2002-08-07 홍지기술산업주식회사 Method for sheet piling after pre-boring

Also Published As

Publication number Publication date
KR20110139176A (en) 2011-12-28

Similar Documents

Publication Publication Date Title
KR101205783B1 (en) The complex execution method which dismantling work of existing underground structure and constructs of new building simultaneously
KR20140055639A (en) A execution method of architecture beam
KR20160088059A (en) CFT pile Construction Method and the Shoring Method using the same file
KR20180124795A (en) An Earth Retaining Wall with Underground Buttresses and A Method of Constructing the same
KR20160144111A (en) Foundation block for retaining wall and reinforcing method of base ground using it
KR100375020B1 (en) a pole for mud wall and constrution method of fence for mud
KR101146436B1 (en) Guide fixing frame for constructing sheet file
KR102233572B1 (en) Inverse casing for perforating ground bore and inverse casing manufacturing method thereof
KR101190739B1 (en) Method of Constructing Underground Composite Outer Wall Structure and Underground Composite Outer Wall Structure Constructed by the Same
KR101199738B1 (en) Method of constructing for sheet file
JP2008280771A (en) Countermeasure construction method against liquefaction of under ground supporting existing structure
KR20170000551U (en) Foundation block for retaining wall
KR20080076015A (en) Retaining wall using pier unit having big h-beam
KR101462814B1 (en) Gravity type earth retaining wall constructing method
KR101317006B1 (en) Guide fixing frame for constructing sheet file
JP7115817B2 (en) Reinforced soil wall using large sandbags and retaining method using large sandbags
KR100507983B1 (en) Method for piling sheet in the base rock
KR20190012368A (en) Smallcaliber composite pile wall using small drilling rig at adjacent building proximity section and construction method of the same
KR101865075B1 (en) Method of Forming for Grouting Root
KR200463615Y1 (en) Height control way guide beam
JP5140515B2 (en) Installation method of underground floor pillar and construction method of underground structure
KR20110087175A (en) From first of all excavation reclamation methodof phc pickets will improve and the method will be able to the method
JP2009068203A (en) Earth retaining wall composed of horizontal sheathing with soldier beam, and cut-off structure, construction method and cut-off method for the earth retaining wall
JP2011157719A (en) Earth retaining method
KR20090084571A (en) Method for execution a wall engineering works construction concrete block structure

Legal Events

Date Code Title Description
A107 Divisional application of patent
A201 Request for examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20160623

Year of fee payment: 4

R401 Registration of restoration
FPAY Annual fee payment

Payment date: 20160920

Year of fee payment: 5

LAPS Lapse due to unpaid annual fee