KR102072889B1 - Construction method of smallcaliber composite pile wall using small drilling rig at adjacent building proximity section - Google Patents
Construction method of smallcaliber composite pile wall using small drilling rig at adjacent building proximity section Download PDFInfo
- Publication number
- KR102072889B1 KR102072889B1 KR1020170095213A KR20170095213A KR102072889B1 KR 102072889 B1 KR102072889 B1 KR 102072889B1 KR 1020170095213 A KR1020170095213 A KR 1020170095213A KR 20170095213 A KR20170095213 A KR 20170095213A KR 102072889 B1 KR102072889 B1 KR 102072889B1
- Authority
- KR
- South Korea
- Prior art keywords
- pile
- small
- steel pipe
- adjacent
- wall
- Prior art date
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D17/00—Excavations; Bordering of excavations; Making embankments
- E02D17/02—Foundation pits
- E02D17/04—Bordering surfacing or stiffening the sides of foundation pits
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D29/00—Independent underground or underwater structures; Retaining walls
- E02D29/045—Underground structures, e.g. tunnels or galleries, built in the open air or by methods involving disturbance of the ground surface all along the location line; Methods of making them
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/20—Bulkheads or similar walls made of prefabricated parts and concrete, including reinforced concrete, in situ
Landscapes
- Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Mining & Mineral Resources (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Environmental & Geological Engineering (AREA)
- Bulkheads Adapted To Foundation Construction (AREA)
Abstract
본 발명은 인접건물과 근접된 구간에서 작용토압을 지지할 수 있는 합성파일이 시공된 벽체를 형성할 수 있도록 한 소형 천공장비를 이용한 인접건물 근접구간 소구경 합성파일 벽체 및 이의 시공방법을 제공한다.
본 발명의 적절한 실시 형태에 따른 소형 천공장비를 이용한 인접건물 근접구간 소구경 합성파일 벽체의 시공방법은, (a) 인접건물과 최소의 이격거리 30cm 이내를 두고 소형 천공장비를 이용하여 강관말뚝에 의해 공벽을 유지하면서 천공작업을 시행하는 단계와; (b) 강관말뚝을 남겨둔 상태에서 천공장비를 이동시킨 후 강관말뚝 내부에 규격이 작은 보강재를 근입시키는 단계와; (c) 강관말뚝의 내부에 몰탈을 주입 양생시켜 합성단면에 의해 강성을 크게 하여 작용토압을 지지할 수 있는 합성파일을 형성하는 단계와; (d) 합성파일의 상단에 캡 콘크리트를 타설하고, 중간말뚝을 설치하며, 침출수가 굴착 영역으로 유입되지 못하도록 합성파일의 사이마다 배면측에서 배면 차수 그라우팅을 실시하는 단계와; (e) 목표하는 굴착 심도까지 단계마다 지하 굴착을 실시하고, 매 단계에서 띠장 및 지보재를 설치하는 단계;를 포함하여 시공되는 것을 특징으로 한다.The present invention provides a small diameter composite pile wall adjacent to an adjacent building using a small perforation equipment to form a wall constructed with a composite pile capable of supporting the working earth pressure in a section adjacent to the adjacent building and a construction method thereof. .
The construction method of the small-diameter composite pile wall of adjacent building adjacent section using the small drilling equipment according to the preferred embodiment of the present invention, (a) to the steel pipe pile by using the small drilling equipment with a minimum distance of 30cm away from the adjacent building Performing perforation work while maintaining an empty wall; (b) moving the perforation equipment in the state of leaving the steel pipe pile and incorporating a small reinforcement into the steel pipe pile; (c) injecting and curing mortar into the inside of the steel pipe pile to form a synthetic pile capable of supporting the working earth pressure by increasing the rigidity by the synthetic cross section; (d) placing cap concrete on the top of the composite pile, installing an intermediate pile, and performing back order grouting on the rear side between the composite piles to prevent leachate from entering the excavation area; (e) performing underground excavation for each step up to the target excavation depth, and installing the strip and the support material at every step; and is constructed.
Description
본 발명은 지반 굴착에 필요한 흙막이 벽체 및 이의 시공방법에 관한 것으로, 특히 인접건물과 근접된 구간에서 작용토압을 지지할 수 있는 합성파일이 시공된 벽체를 형성할 수 있도록 한 소형 천공장비를 이용한 인접건물 근접구간 소구경 합성파일 벽체 및 이의 시공방법에 관한 것이다.The present invention relates to a retaining wall required for the ground excavation and its construction method, in particular adjacent to using a small perforation equipment to form a wall with a synthetic pile to support the working earth pressure in the section adjacent to the adjacent building The present invention relates to a small-diameter composite pile wall and a construction method thereof.
최근 토지의 이용률을 극대화하기 위하여 지하공간의 활용에 대한 중요성이 크게 대두되고 있다. 특히 도심지 지가가 크게 상승함에 따라 대지공간을 최대한 이용하고자 하는 필요성이 요구되고 있다. 그러나 대부분의 지하공사가 도심지에 집중되어 있어 인접부지에 건축물이 형성되어 있는 경우, 일반적으로 인접구조물의 장애로 인하여 지하굴착공사를 위한 흙막이 벽체공사가 매우 어렵거나 불가능한 경우가 많이 발생하고 있다.In recent years, the importance of the utilization of underground space has emerged to maximize the utilization of land. In particular, as urban district prices have risen significantly, the necessity for making the most of the land space is required. However, when most of the underground construction is concentrated in the downtown area and the building is formed in the adjacent site, it is generally difficult or impossible to construct the wall for the underground excavation due to the obstacle of the adjacent structure.
따라서 인접구조물과 근접된 공간에서 인접구조물에 영향을 주지 않으면서 흙막이 벽체를 형성하기 위한 시공법의 개발에 대한 필요성이 요구된다.Therefore, there is a need for the development of a construction method for forming the retaining wall without affecting the adjacent structure in the space adjacent to the adjacent structure.
본 발명의 배경이 되는 기술로는 한국 등록특허 등록번호 제10-0782007호로서, '흙막이 벽 시공방법'이 제안되어 있다. 이는 지반에 수직으로 시공되는 콘크리트 기둥을 서로 중첩되면서 연결시켜 흙막이 벽을 형성하므로 그 내구성과 차수성이 증대되어 별도의 차수시설을 설치할 필요가 없고, 그 시공과정이 간단하여 시공비용이 저렴하고 시공기간을 줄일 수 있는 효과가 있도록 한 것이다.As a background technology of the present invention, Korean Registered Patent Registration No. 10-0782007 has been proposed, 'soil wall construction method'. It connects concrete pillars constructed vertically on the ground and connects them to form an earthen wall so that its durability and abundance are increased, so there is no need to install a separate water-repellent facility. The effect is to reduce the period.
그러나 상기 배경기술은 내,외부 케이싱이 300mm 이상의 대직경으로, 대형 장비를 사용해야 하므로, 천공시 진동 및 소음 커 인접건물에 미치는 영향이 크고, 외부케이싱의 삽입과 분리, 간격유지구의 설치, 내부케이싱으로의 콘크리트 타설, 내부케이싱의 삽입 및 분리 등 작업과정이 복잡하여 공기가 길어지는 단점이 있다.However, in the background art, the inner and outer casing has a large diameter of 300 mm or more, so that large equipment must be used, and thus, the impact of vibration and noise on the adjacent building is large when drilling, inserting and separating the outer casing, and installing the gap retaining zone, and the inner casing. There is a disadvantage in that the air is long due to the complicated work process such as concrete pouring into and inserting and removing the inner casing.
본 발명의 다른 배경이 되는 기술로는 한국 공개특허 공개번호 제10-2017-0005991호로서, 'PHC 파일을 이용한 흙막이 벽체 및 그 시공방법'이 제안되어 있다. 이는 PHC 파일을 이용하여 흙막이 벽체의 시공시 PHC 파일의 구조를 변경함이 없이 PHC 파일 3~4개 간격으로 원형 강관을 설치하는 것에 의해, 그 원형 강관에 브라켓과 띠장 및 지보를 용접 고정할 수 있도록 한 것이나, PHC 파일과 원형 강관을 시공하기 위한 천공작업으로 인전건물에 소음 및 진동의 영향을 주게 되는 단점이 있다.As a background art of the present invention, Korean Laid-Open Patent Publication No. 10-2017-0005991 has been proposed, 'soil wall and construction method using a PHC file'. It is possible to weld and fix brackets, strips and gibs to the circular steel pipe by installing circular steel pipes at intervals of 3 to 4 PHC files without changing the structure of the PHC file when constructing the wall using the PHC file. However, the drilling work for constructing the PHC pile and the circular steel pipe has the disadvantage of affecting the noise building and the vibration in the building.
본 발명은 인접건물과 근접된 구간에서 작용토압을 지지할 수 있는 합성파일이 시공된 벽체를 형성할 수 있도록 한 소형 천공장비를 이용한 인접건물 근접구간 소구경 합성파일 벽체 및 이의 시공방법을 제공함에 그 목적이 있다.The present invention provides a small diameter composite pile wall adjacent to an adjacent building using a small perforation equipment to form a wall constructed with a composite pile capable of supporting working earth pressure in a section adjacent to an adjacent building, and a construction method thereof. The purpose is.
본 발명의 적절한 실시 형태에 따른 소형 천공장비를 이용한 인접건물 근접구간 소구경 합성파일 벽체의 시공방법은, (a) 인접건물과 최소의 이격거리 30cm 이내를 두고 소형 천공장비를 이용하여 강관말뚝에 의해 공벽을 유지하면서 천공작업을 시행하는 단계와; (b) 강관말뚝을 남겨둔 상태에서 천공장비를 이동시킨 후 강관말뚝 내부에 규격이 작은 보강재를 근입시키는 단계와; (c) 강관말뚝의 내부에 몰탈을 주입 양생시켜 합성단면에 의해 강성을 크게 하여 작용토압을 지지할 수 있는 합성파일을 형성하는 단계와; (d) 합성파일의 상단에 캡 콘크리트를 타설하고, 중간말뚝을 설치하며, 침출수가 굴착 영역으로 유입되지 못하도록 합성파일의 사이마다 배면측에서 배면 차수 그라우팅을 실시하는 단계와; (e) 목표하는 굴착 심도까지 단계마다 지하 굴착을 실시하고, 매 단계에서 띠장 및 지보재를 설치하는 단계;를 포함하여 시공되는 것을 특징으로 한다.The construction method of the small-diameter composite pile wall of adjacent building adjacent section using the small drilling equipment according to the preferred embodiment of the present invention, (a) to the steel pipe pile by using the small drilling equipment with a minimum distance of 30cm away from the adjacent building Performing perforation work while maintaining an empty wall; (b) moving the perforation equipment in the state of leaving the steel pipe pile and incorporating a small reinforcement into the steel pipe pile; (c) injecting and curing mortar into the inside of the steel pipe pile to form a synthetic pile capable of supporting the working earth pressure by increasing the rigidity by the synthetic section; (d) placing cap concrete on the top of the composite pile, installing an intermediate pile, and performing back order grouting on the rear side between the composite piles to prevent leachate from entering the excavation area; (e) performing underground excavation for each step up to the target excavation depth, and installing the strip and the support material at every step; and is constructed.
또한, 상기 (b) 단계에서, 보강재는 H형강, 강봉, 철근망 중 어느 하나인 것을 특징으로 한다.In addition, in the step (b), the reinforcing material is characterized in that any one of the H-shaped steel, steel bar, rebar network.
또한, 상기 (e) 단계에서, 철판을 강관말뚝에 접합시켜 토류판용으로 사용되는 것을 특징으로 한다.In addition, in the step (e), the iron plate is characterized in that it is used for earth plate by joining the steel pipe pile.
또한, 상기 (e) 단계에서, 강관말뚝에 접합된 H형 토류판 가이드에 토류판용으로 철판을 끼워넣는 것을 특징으로 한다.In addition, in the step (e), it characterized in that the iron plate for the earth plate into the H-type earth plate guide bonded to the steel pipe pile.
한편, 본 발명의 적절한 실시 형태에 따른 소형 천공장비를 이용한 인접건물 근접구간 소구경 합성파일 벽체는, 인접건물로부터 최소 근거리를 두고 일정 간격마다 지반에 관입되어 있는 강관말뚝과, 강관말뚝의 내부에 위치되어 있는 보강재와, 합성파일을 형성하기 위해 강관말뚝의 내부에 채움 양생되어 보강재와 합성되어 있는 몰탈과, 강관말뚝의 사이 배면쪽에서 차수 그라우팅이 이루어진 차수층 굴착시마다 토류판용으로 강관말뚝측에 설치되어 있는 철판으로 이루어진 것을 특징으로 한다.On the other hand, the small-diameter composite pile wall adjacent to the adjacent building using a small drilling equipment according to an appropriate embodiment of the present invention, the steel pipe piles and the steel pipe piles are inserted into the ground at regular intervals at a minimum distance from the adjacent building It is installed on the steel pipe pile side for earth plate at every excavation of the reinforcement which is located, the mortar which is cured inside the steel pipe pile to form the composite pile, and the mortar compounded with the reinforcement, and the order grouting is made on the back side between the steel pipe piles. Characterized in that made of iron plate.
또한, 상기 강관말뚝에 철판을 설치하기 위해 H형 토류판 가이드가 설치되어 있는 것을 특징으로 한다.In addition, in order to install the iron plate on the steel pipe pile, characterized in that the H-type earth plate guide is installed.
본 발명의 소형 천공장비를 이용한 인접건물 근접구간 소구경 합성파일 벽체의 시공방법에 따르면, 소형 천공장비를 사용함에 따라 인접건물과의 최소이격거리가 20cm인 경우에도 시공이 가능하다. 강관 말뚝과 내부 보강재 및 속채움 몰탈에 의한 복합파일로 강성이 큰 흙막이 벽체가 시공되어 안정성을 확보할 수 있다. 또한 소형장비에 의한 천공작업으로 소음 및 진동이 작아 인접건물에 미치는 영향을 최소화할 수 있다.According to the construction method of the small-diameter composite pile wall of the adjacent building adjacent section using the small drilling equipment of the present invention, the construction is possible even when the minimum distance from the adjacent building is 20cm by using the small drilling equipment. The steel pile pile, internal reinforcement, and the pile pile mortar can be used to secure the stability due to the construction of a large stiff wall. In addition, due to the drilling work by the small equipment can be minimized the impact on the adjacent buildings because the noise and vibration is small.
본 명세서에서 첨부되는 다음의 도면들은 본 발명의 바람직한 실시 예를 예시하는 것이며, 발명의 상세한 설명과 함께 본 발명의 기술사상을 더욱 이해시키는 역할을 하는 것이므로, 본 발명은 첨부한 도면에 기재된 사항에만 한정되어서 해석되어서는 아니 된다.
도 1 내지 도 10은 본 발명에 따른 소형 천공장비를 이용한 인접건물 근접구간 소구경 합성파일 벽체의 시공방법에 관련된 것으로,
도 1은 강관말뚝의 시공상태도이고,
도 2는 도 1의 강관말뚝에 보강재를 설치하는 시공상태도이고,
도 3은 도 2의 강관말뚝에 몰탈을 주입하는 시공상태도이고,
도 4a 및 도 4b는 본 발명에 따른 배면측 차수그라우팅을 보여주는 시공상태도의 종단면도 및 평면도이고,
도 5는 1차 굴착을 보여주는 시공상태도이고,
도 6은 1단계로 띠장과 지보재를 설치한 상태도이고,
도 7은 본 발명에 따른 2단계의 굴착 시공을 나타낸 상태도이고,
도 8은 2단계에서의 띠장과 지보재를 설치한 상태도이고,
도 9는 토류판용으로 철판을 강관말뚝에 시공한 상태도이고,
도 10은 토류판용으로 철판을 강관말뚝에 다른 방법으로 설치된 상태를 나타내는 사시도이다.The following drawings, which are attached in this specification, illustrate the preferred embodiments of the present invention, and together with the detailed description thereof, serve to further understand the technical spirit of the present invention. It should not be construed as limited.
1 to 10 are related to the construction method of the small-diameter composite pile wall adjacent to the adjacent building using a small drilling equipment according to the present invention,
1 is a construction state diagram of the steel pipe pile,
Figure 2 is a construction state installation of the reinforcement to the steel pipe pile of Figure 1,
Figure 3 is a construction state injecting mortar into the steel pipe pile of Figure 2,
4a and 4b is a longitudinal sectional view and a plan view of a construction state diagram showing the back side order grouting according to the present invention,
Figure 5 is a construction state showing the first excavation,
6 is a state diagram in which the strip and the support material installed in one step,
7 is a state diagram showing a two-stage excavation construction according to the present invention,
8 is a state diagram in which the strips and the support material is installed in the second step,
9 is a state diagram in which the iron plate for the earth plate construction on the steel pipe pile,
10 is a perspective view showing a state in which an iron plate is installed in a steel pipe pile for another earth plate.
본 발명의 소형 천공장비를 이용한 인접건물 근접구간 소구경 합성파일 벽체의 시공방법은 작업공간이 협소하고 인접구조물과의 이격거리가 약 30cm 이내에서 시공이 가능한 소형 천공장비(110)를 이용하여 강관말뚝(10)에 의해 공벽을 유지하면서 천공작업을 시행하고, 강관말뚝(10)을 남겨둔 상태에서 천공장비를 이동시킨 후 강관말뚝(10) 내부에 규격이 작은 보강재(12)를 근입시키고 내부를 몰탈(16)로 채워 양생시켜 합성파일을 형성하므로써 합성단면에 의해 강성을 크게 하여 작용토압을 지지할 수 있는 흙막이 벽체를 형성한다.The construction method of the small-diameter composite pile wall of the adjacent building adjacent section using the small drilling equipment of the present invention is a steel pipe by using a
아래에서 본 발명은 첨부된 도면에 제시된 실시 예를 참조하여 상세하게 설명이 되지만 제시된 실시 예는 본 발명의 명확한 이해를 위한 예시적인 것으로 본 발명은 이에 제한되지 않는다.In the following the present invention will be described in detail with reference to the embodiments shown in the accompanying drawings, but the embodiments presented are exemplary for a clear understanding of the present invention is not limited thereto.
천공boring
먼저, 도 1과 같이 인접건물(100)과 최소의 이격거리를 두고 소형 천공장비(110)를 이용하여 강관말뚝(10)을 관입하여 공벽을 유지하면서 천공작업을 시행한다. 여기서, 최소의 이격거리는 30cm 이내로서 지하공간(굴착 공간)을 최대한 활용할 수 있다.First, as shown in FIG. 1, a small distance from the
이때 소형 천공장비(110)는 소음 및 진동이 작아 인접건물(100)에 미치는 영향을 최소화시킬 수 있다. 본 실시 예에서 강관말뚝(10)은 직경 216.5mm, 두께 4.5mm를 사용하였다.
강관말뚝(10)에는 후 공정의 토류판 대용으로 철판(50)을 설치하기 위해 H형 토류판 가이드(60)가 접합되어 있다.At this time, the
The H-type
보강재 reinforcement 근입Rooting
그 다음, 도 2와 같이 강관말뚝(10)을 남겨둔 상태에서 소형 천공장비(110)를 이동시킨 후 강관말뚝(10) 내부에 규격이 작은 보강재(12)를 근입시키는 놓는다.Then, after moving the
본 시공 예에서 보강재(12)는 H형강을 사용하였으나 강봉 또는 철근망이 될 수도 있다. 본 실시 예에서 H형강은 100×100×6×8을 사용하였다.In this construction example, the reinforcing
합성파일 형성Compound pile formation
그 다음, 도 3과 같이 강관말뚝(10)의 내부에 몰탈(16)을 주입 양생시켜 합성파일을 형성한다. 따라서 보강재(12), 몰탈(16) 및 강관말뚝(10)이 합체되어 하나의 합성단면을 이루어 강성이 증가된 합성파일(18)을 이루게 됨으로써 작용토압을 충분히 지지할 수 있다.Next, as shown in FIG. 3, the
배면 차수 그라우팅 실시Back-order grouting
그 다음, 도 4a 및 도 4b와 같이 합성파일(18)의 상단에 캡 콘크리트를(19) 타설하고, 중간말뚝(21)을 설치한다.Next, as shown in Fig. 4a and 4b, the
이후, 침출수가 굴착 영역으로 유입되지 못하도록 도 4b와 같이 합성파일(18)의 사이마다 배면측에서 배면 차수 그라우팅을 실시한다. 따라서 이웃한 합성파일(18과 18)의 사이에 차수층(25)이 형성되고 공극이 없어져 차수가 실현된다.Then, back order grouting is performed on the back side between the
굴착, 띠장 및 지보재 설치Excavation, stripping and supporting materials installation
그 다음, 도 5과 같이 굴착기(200)로 1단계 지하 굴착 공사를 실시한 후, 도 6과 같이 1단계로 H형 토류판 가이드(60)에 토류판용으로 철판(50)을 끼워넣고, 띠장(31) 및 지보재(32)를 설치한다.Then, after performing a step 1 underground excavation construction with the
그 다음 도 7과 같이 2단계 지하 굴착 공사를 실시한 후, 도 8과 같이 2단계로 철판(50), 띠장(31) 및 지보재(32)를 설치한다.Then, after performing a two-stage underground excavation work as shown in FIG. 7, the
이같이 목표하는 굴착 심도까지 매 단계마다 지하 굴착을 실시하고, 매 단계에서 추가적으로 철판(50), 띠장(31) 및 지보재(32)를 설치한다. 이같이 본 공법에서 철판(50)을 용접작업 없이 H형 토류판 가이드(60)의 양측 가이드 홈에 끼워져 설치되므로 설치 뿐만아니라 벽체 시공 후 제거가 용이해진다.As such, underground drilling is carried out every step up to the target drilling depth, and additionally, the
이같은 소형 천공장비를 이용한 인접건물 근접구간 소구경 합성파일 벽체의 시공방법에 따르면, 소형 천공장비(110)를 사용함에 따라 인접건물(100)과의 최소이격거리가 20cm인 경우에도 시공이 가능하다. 또한 강관 말뚝(10)과 내부 보강재(12) 및 속채움 몰탈(16)에 의한 합성파일(18)로 강성이 커 흙막이 벽체로서 안정성을 확보할 수 있다. 또한 소형 천공장비(110)에 의한 천공작업으로 소음 및 진동이 작아 인접건물(100)에 미치는 영향을 최소화시킬 수 있다.According to the construction method of the small-diameter composite pile wall adjacent to the adjacent building using such a small drilling equipment, the construction is possible even when the minimum distance from the
지금까지 본 발명은 제시된 실시 예를 참조하여 상세하게 설명이 되었지만 이 분야에서 통상의 지식을 가진 자는 제시된 실시 예를 참조하여 본 발명의 기술적 사상을 벗어나지 않는 범위에서 다양한 변형 및 수정 발명을 만들 수 있을 것이다. 본 발명은 이와 같은 변형 및 수정 발명에 의하여 제한되지 않으며 다만 아래에 첨부된 청구범위에 의하여 제한된다. So far, the present invention has been described in detail with reference to the presented embodiments, but those skilled in the art may make various modifications and modifications without departing from the technical spirit of the present invention with reference to the presented embodiments. will be. The invention is not limited by the invention as such variations and modifications but only by the claims appended below.
10: 강관 말뚝
12: 보강재
16: 몰탈
18: 합성파일
25: 차수층
50: 철판
60: H형 토류판 가이드
110: 소형 천공장비10: steel pipe pile
12: stiffener
16: mortar
18: Composite file
25: order layer
50: iron plate
60: H type earth guide
110: small punching equipment
Claims (6)
(b) 강관말뚝(10)을 남겨둔 상태에서 천공장비를 이동시킨 후 강관말뚝(10) 내부에 규격이 작은 보강재(12)를 근입시키는 단계와;
(c) 강관말뚝(10)의 내부에 몰탈(16)을 주입 양생시켜 합성단면에 의해 강성을 크게 하여 작용토압을 지지할 수 있는 합성파일(18)을 형성하는 단계와;
(d) 합성파일(18)의 상단에 캡 콘크리트(19)를 타설하고, 중간말뚝(21)을 설치하며, 침출수가 굴착 영역으로 유입되지 못하도록 합성파일(18)의 사이마다 배면측에서 배면 차수 그라우팅을 실시하는 단계와;
(e) 목표하는 굴착 심도까지 단계마다 지하 굴착을 실시하고, 매 단계에서 H형 토류판 가이드(60)에 토류판용으로 철판(50)을 끼워넣고 띠장(31) 및 지보재(32)를 설치하는 단계;를 포함하여 시공되는 것을 특징으로 하는 소형 천공장비를 이용한 인접건물 근접구간 소구경 합성파일 벽체의 시공방법.(a) The steel pipe while maintaining the vacant wall by injecting the steel pipe pile 10 to which the H-type earth plate guide 60 is bonded using the small drilling equipment 110 within a minimum distance of 30 cm from the adjacent building 100. Performing internal drilling of the pile 10;
(b) moving the drilling rig in the state of leaving the steel pipe pile 10, and incorporating a small reinforcement member 12 into the steel pipe pile 10;
(c) injecting and curing mortar 16 into the inside of the steel pipe pile 10 to form a synthetic pile 18 capable of supporting the working earth pressure by increasing the rigidity by the synthetic cross section;
(d) Placing the cap concrete 19 on the top of the composite pile 18, install the intermediate pile 21, the back order from the back side between the composite pile 18 to prevent leachate from entering the excavation area Performing grouting;
(e) performing underground excavation for each step up to the target drilling depth, and inserting the iron plate 50 into the H-type earth plate guide 60 for the earth plate at each step, and installing the strip 31 and the support 32; Construction method of the small-diameter composite pile wall adjacent to the adjacent building using a small drilling equipment, characterized in that the construction including;
상기 (b) 단계에서, 보강재(12)는 H형강, 강봉, 철근망 중 어느 하나인 것을 특징으로 하는 소형 천공장비를 이용한 인접건물 근접구간 소구경 합성파일 벽체의 시공방법.The method of claim 1,
In the step (b), the reinforcing member 12 is a construction method of a small diameter composite pile wall adjacent to the adjacent section using a small drilling equipment, characterized in that any one of H-shaped steel, steel bar, rebar network.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020170095213A KR102072889B1 (en) | 2017-07-27 | 2017-07-27 | Construction method of smallcaliber composite pile wall using small drilling rig at adjacent building proximity section |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020170095213A KR102072889B1 (en) | 2017-07-27 | 2017-07-27 | Construction method of smallcaliber composite pile wall using small drilling rig at adjacent building proximity section |
Publications (2)
Publication Number | Publication Date |
---|---|
KR20190012368A KR20190012368A (en) | 2019-02-11 |
KR102072889B1 true KR102072889B1 (en) | 2020-02-03 |
Family
ID=65369725
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR1020170095213A KR102072889B1 (en) | 2017-07-27 | 2017-07-27 | Construction method of smallcaliber composite pile wall using small drilling rig at adjacent building proximity section |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR102072889B1 (en) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR102118098B1 (en) * | 2019-11-14 | 2020-06-02 | 강문기 | Construction method of retaining wall and apparatus thereof |
CN116065633B (en) * | 2023-02-17 | 2023-09-15 | 山东建大工程鉴定加固设计有限公司 | Combined isolation protection method for subway station support pile construction close to electric power pipe ditch |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100477357B1 (en) * | 2002-08-20 | 2005-03-22 | 김창근 | Construction method for retaining of earth |
KR100957599B1 (en) * | 2010-01-20 | 2010-05-13 | (주)힐건설 | Basement-structure construction method to use temporary earth retaining structure |
Family Cites Families (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20060110138A (en) * | 2005-04-19 | 2006-10-24 | 박종수 | H pile use wall constitution structure and construction process |
KR100782007B1 (en) | 2006-08-21 | 2007-12-06 | 주식회사 삼보기술단 | Construction method of a earth-protection walls |
KR20170005991A (en) | 2015-07-07 | 2017-01-17 | 김형민 | soil retaining wall using PHC pile and its construction method |
-
2017
- 2017-07-27 KR KR1020170095213A patent/KR102072889B1/en active IP Right Grant
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100477357B1 (en) * | 2002-08-20 | 2005-03-22 | 김창근 | Construction method for retaining of earth |
KR100957599B1 (en) * | 2010-01-20 | 2010-05-13 | (주)힐건설 | Basement-structure construction method to use temporary earth retaining structure |
Also Published As
Publication number | Publication date |
---|---|
KR20190012368A (en) | 2019-02-11 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR101205783B1 (en) | The complex execution method which dismantling work of existing underground structure and constructs of new building simultaneously | |
KR100957599B1 (en) | Basement-structure construction method to use temporary earth retaining structure | |
KR20080026014A (en) | Establishment method of soil guard structure | |
KR102009077B1 (en) | Earth retaining wall construction method using castinplace concrete pile of impermeable peristyle type | |
KR20100068597A (en) | A shoring method using arch plate pile and h-pile | |
KR20140055639A (en) | A execution method of architecture beam | |
KR101041274B1 (en) | Retaining wall grouting structure and method for constructing thereof | |
KR101674656B1 (en) | CIP retaining wall with steel tube | |
KR102072889B1 (en) | Construction method of smallcaliber composite pile wall using small drilling rig at adjacent building proximity section | |
KR101021915B1 (en) | A method for constructing cut-off temporary structure for sheathing work | |
KR20100065521A (en) | A shoring method using arch plate pile and h-pile | |
KR101324231B1 (en) | Soil cement wall structure and method for constructing thereof | |
JP2017096063A (en) | Earth retaining excavation method and skeleton construction method | |
KR100849226B1 (en) | C.i.p temporary wall and method for constructing thereof | |
CN105421488B (en) | The construction method of sole plate support replacement in the combined fender construction system of underground | |
KR20110052321A (en) | Steel pipe pile for sheet pile wall and construction method using that | |
KR102113291B1 (en) | Soil retaining wall using phc pile and construction method thererof | |
KR102082495B1 (en) | Low part cast in place pile construction method | |
KR200362565Y1 (en) | Earth Retaining Wall Structure Using Precast Concrete Pile and Construction Method Thereof | |
KR102021496B1 (en) | Retaining wall construction method and retaining wall structure by the method | |
KR102325623B1 (en) | Construction method of retaining wall | |
KR101021913B1 (en) | A method for constructing cut-off temporary structure for sheathing work | |
KR102289576B1 (en) | Top-down type underground structure construction method using earth support plate | |
KR101487312B1 (en) | underground excavation plate and its underground excavation construction method | |
KR101151052B1 (en) | The deepened sheet plate made of an iron reinforcing rod and the method of installation |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A201 | Request for examination | ||
E902 | Notification of reason for refusal | ||
E701 | Decision to grant or registration of patent right | ||
GRNT | Written decision to grant |