KR101308043B1 - Form and exposed concrete constructing method using the same - Google Patents

Form and exposed concrete constructing method using the same Download PDF

Info

Publication number
KR101308043B1
KR101308043B1 KR1020130029570A KR20130029570A KR101308043B1 KR 101308043 B1 KR101308043 B1 KR 101308043B1 KR 1020130029570 A KR1020130029570 A KR 1020130029570A KR 20130029570 A KR20130029570 A KR 20130029570A KR 101308043 B1 KR101308043 B1 KR 101308043B1
Authority
KR
South Korea
Prior art keywords
concave
formwork
concave joint
cone
exposed concrete
Prior art date
Application number
KR1020130029570A
Other languages
Korean (ko)
Inventor
원종주
Original Assignee
(주)세정건설
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by (주)세정건설 filed Critical (주)세정건설
Priority to KR1020130029570A priority Critical patent/KR101308043B1/en
Application granted granted Critical
Publication of KR101308043B1 publication Critical patent/KR101308043B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G9/00Forming or shuttering elements for general use
    • E04G9/10Forming or shuttering elements for general use with additional peculiarities such as surface shaping, insulating or heating, permeability to water or air
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G19/00Auxiliary treatment of forms, e.g. dismantling; Cleaning devices

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

PURPOSE: A concave joint form and a construction method for the concave joint modularization of exposed mass concrete are provided to represent the regularity and external vividness of an exposed mass concrete wall by regularly arranging cone holes and concave joints. CONSTITUTION: A concave joint form comprises a plate-shaped form main body and a plurality of concave joint forming convex sticks. A concave joint forming convex stick is joined to a side of the form main body to correspond to the concave joint of an exposed mass concrete wall. One side of the concave joint forming convex stick which is in touch with the form main body is flat. The other side of the concave joint forming convex stick is rounded. The concave joint forms are separately arranged and the separated distance is secured using a sepa bolt. A D cone which forms a position for a cone hole is joined to both ends of the sepa bolt. A main body bolt is joined to the D cone after passing the concave joint form and is poured with concrete.

Description

오목줄눈용 거푸집 및 그를 이용한 노출 콘크리트 오목줄눈 모듈화 시공방법{Form and exposed concrete constructing method using the same}Formwork for concave joint and exposed concrete constructing method using the same

본 발명은, 오목줄눈용 거푸집 및 그를 이용한 노출 콘크리트 오목줄눈 모듈화 시공방법에 관한 것으로서, 보다 상세하게는, 콘구멍과 오목줄눈의 배치와 배열이 일정하게 되어 노출 콘크리트 벽체에 대한 생동감과 규칙성을 연출할 수 있는 오목줄눈용 거푸집 및 그를 이용한 노출 콘크리트 오목줄눈 모듈화 시공방법에 관한 것이다.
The present invention relates to a mold for concave joints and a method of modularized construction of exposed concrete concave joints using the same. More specifically, the arrangement and arrangement of the cone holes and concave joints become uniform, thereby providing a sense of vibrancy and regularity to the exposed concrete wall. The present invention relates to a formwork for concave joints that can be produced, and a method for modularized construction of exposed concrete concave joints using the same.

노출 콘크리트(exposed concrete) 공법은 건축물을 구성하는 기본 골조재인 콘크리트 물성을 그대로 드러나게 하는 건축의 마감 기법이다.Exposed concrete method is a finishing method of construction that reveals the concrete properties, which are the basic aggregates of the building.

다시 말해, 노출 콘크리트 공법은 콘크리트 자체가 갖고 있는 색상 및 질감으로 마감을 나타내는 형태의 공법으로서, 콘크리트 타설 후 거푸집을 탈형한 상태 그대로를 노출시켜 콘크리트 자체가 나타내는 독특한 미와 중후함을 강조하는 건축 형태이다.In other words, the exposed concrete method is a form that shows the finish with the color and texture of the concrete itself. The exposed concrete method is an architectural form that emphasizes the unique beauty and dignity of the concrete itself by exposing the formwork after it is cast. .

현재, 많은 건축가들이 노출 콘크리트 공법을 선호하고 있기는 하지만, 종래의 노출 콘크리트 공법을 수행할 때는 거푸집 탈거 후 고르지 못한 면이 발생되거나 줄눈이 일률적이지 못한 문제점이 야기되어 왔다.At present, although many architects prefer the exposed concrete method, when performing the conventional exposed concrete method, uneven surface is generated after removing the formwork or the joint is not uniform.

그러하기 때문에 표면 보수 작업을 반드시 수행해야 하는 번거로움과 불편함이 있었으며, 이로 인해 시간과 비용이 증가할 수밖에 없었다.As a result, the hassle and inconvenience of surface repair work must be performed, which inevitably increases time and cost.

이러한 단점을 극복하기 위하여 최근들어 개발되고 있는 공법이 PC 공법(Precast Concrete)이다.In order to overcome this drawback, the recently developed method is the PC method (Precast Concrete).

PC 공법은 현장 직접 타설이 아닌 다른 장소나 공장에서 미리 제작된 콘크리트 패널을 건축물의 골격이 되는 철골의 내/외벽에 마감재로서 붙이는 공법이다.The PC method is a method of attaching concrete panels made in advance in other places or factories to the inner and outer walls of the steel frame, which is the skeleton of the building, as a finishing material.

이 외에도 PC 공법과는 전혀 다른 개념으로 시멘트와 천연펄프를 압축 가공하여 일반 합판사이즈와 같이 생산된 시멘트 보드를 NC 조각기계로 가공하여 노출 콘크리트 보드라는 단위 제품을 미리 만든 후에, 이를 건축물의 골격이 되는 철골의 내/외벽에 마감재로서 붙이는 공법이다.In addition to the PC method, cement and natural pulp are compressed and processed into NC boards, and cement boards produced in the same way as general plywood sizes are processed by NC engraving machines. It is a method of attaching to the inner and outer walls of the steel frame as a finishing material.

하지만, 상기 공법들의 경우, 시공이 어렵고 유지보수가 빈번하며, 무엇보다도 단조롭거나 조잡할 수 있어 실제 소비자들이 생각하는 노출 콘크리트와 같은 느낌을 기대하기 어렵다.However, in the case of the above methods, the construction is difficult, and the maintenance is frequent, and most of all, it can be monotonous or crude, so it is difficult to expect a feeling like exposed concrete that consumers think.

따라서 근자에 들어서는 노출 콘크리트 공법에 대한 연구가 다시 지속되고 있으며, 주변에서 흔히 접할 수 있다.As a result, in the near future, research on exposed concrete methods is continuing, and it is common to see them around.

한편, 노출 콘크리트 공법에 따른 노출 콘크리트 벽체의 설계 시 점, 선, 면의 3가지 요소가 잘 어우러져야 하나의 건축 작품이 완성될 수 있다.On the other hand, when designing the exposed concrete wall according to the exposed concrete method, three elements of a point, a line, and a surface should be well combined to complete a construction work.

특히, 점과 선에 해당되는 콘구멍과 오목줄눈의 배치와 배열은 노출 콘크리트 벽체에 대한 생동감과 규칙성을 연출하는데 중요한 요소로 작용하기 때문에 노출 콘크리트 시공 시 이들에 대한 관리가 무엇보다도 중요하다.In particular, the arrangement and arrangement of cone holes and concave joints corresponding to points and lines play an important role in producing the liveliness and regularity of exposed concrete walls.

따라서 이에 대한 기술들이 대한민국특허청 출원번호 제10-2007-0064301호, 대한민국특허청 출원번호 제10-2007-0064302호, 대한민국특허청 출원번호 제10-2010-0028650호, 대한민국특허청 출원번호 제10-2011-0084125호 등에 개시되어 있다.Therefore, the techniques for this are Korean Patent Office Application No. 10-2007-0064301, Korean Patent Office Application No. 10-2007-0064302, Korean Patent Office Application No. 10-2010-0028650, Korean Patent Office Application No. 10-2011- 0084125 and the like.

하지만, 상기 문헌들의 기술을 비롯하여 종래기술에 따른 노출 콘크리트 공법을 단순 적용할 경우, 도 1 및 도 2에 나타난 이미지처럼 점과 선에 해당되는 콘구멍과 오목줄눈의 배치와 배열이 일정하지 않게 되어 노출 콘크리트 벽체에 대한 생동감과 규칙성을 연출하기 어려우며, 이로 인해 건축물의 완성도가 떨어지는 문제점이 있으므로 이러한 점을 감안한 새로운 방법이 요구된다.However, in the case of simply applying the exposed concrete method according to the prior art, including the technology of the above documents, the arrangement and arrangement of the cone hole and the concave joint corresponding to the point and the line as shown in the image shown in Figs. It is difficult to produce the liveliness and regularity of the exposed concrete wall, and this leads to a problem in that the completeness of the building is degraded.

또한, 종래의 거푸집은 콘구멍의 위치가 바뀌면 새로운 거푸집에 새로운 구멍을 뚫어 사용하여야 하므로 비경제적인 문제점이 있었다.
In addition, the conventional formwork has an uneconomical problem because the new formwork should be used by drilling a new hole when the position of the cone hole is changed.

대한민국특허청 출원번호 제10-2007-0064301호Korean Patent Office Application No. 10-2007-0064301 대한민국특허청 출원번호 제10-2007-0064302호Korean Patent Office Application No. 10-2007-0064302 대한민국특허청 출원번호 제10-2010-0028650호Korea Patent Office Application No. 10-2010-0028650 대한민국특허청 출원번호 제10-2011-0084125호Korean Patent Office Application No. 10-2011-0084125

본 발명의 목적은, 콘구멍과 오목줄눈의 배치와 배열이 일정하게 되어 노출 콘크리트 벽체에 대한 생동감과 규칙성을 연출할 수 있고, 반복 사용할 수 있는 오목줄눈용 거푸집 및 그를 이용한 노출 콘크리트 오목줄눈 모듈화 시공방법을 제공하는 것이다.
An object of the present invention, the arrangement and arrangement of the cone hole and the concave joint is constant, can produce the dynamic and regularity for the exposed concrete wall, and can be used repeatedly for the concave formwork and modular construction of the exposed concrete concave joint using the same To provide a way.

상기 목적은, 등간격을 가지고 규칙적으로 배치되는 다수의 콘구멍(101)과 오목줄눈(103)이 표면에 형성되는 노출 콘크리트 벽체(100)의 시공을 위하여 사용되는 것으로서, 거푸집 본체(111); 및 상기 노출 콘크리트 벽체(100)의 오목줄눈(103)에 대응되게 상기 거푸집 본체(111)의 일면에 결합되는 다수의 오목줄눈 성형용 볼록막대(113,113')를 포함하는 것을 특징으로 하는 오목줄눈용 거푸집(110)에 의해 달성된다.The object is to be used for the construction of the exposed concrete wall 100 is formed on the surface of the plurality of cone holes 101 and the concave joint 103 is regularly arranged at equal intervals, the form body 111; And a plurality of concave joint forming convex bars 113 and 113 ′ coupled to one surface of the form body 111 to correspond to the concave joint 103 of the exposed concrete wall 100. Achieved by the formwork 110.

상기 거푸집 본체(111)에 접하는 상기 오목줄눈 성형용 볼록막대(113,113')의 일면은 평평한 평면을 형성하고, 반대면은 둥글게 라운딩처리될 수 있다.One surface of the concave joint convex rods 113 and 113 ′ in contact with the form body 111 may form a flat plane, and the opposite surface may be rounded.

상기 오목줄눈 성형용 볼록막대(113,113')의 적어도 일단부는 4개가 상호간 교차 배치되면서 직선을 형성할 수 있도록 45도 각도로 경사진 경사면(113a)을 형성할 수 있다.At least one end of the convex forming convex rods 113 and 113 ′ may form an inclined surface 113a that is inclined at a 45 degree angle so that the four may cross each other and form a straight line.

상기 오목줄눈 성형용 볼록막대(113,113')는 상기 거푸집 본체(111)에 볼트(bolt) 결합되거나 본드(bond) 결합될 수 있으며, 상기 거푸집 본체(111)에는 상기 오목줄눈 성형용 볼록막대(113,113')가 자리 배치되는 자리홈(111a)이 더 형성될 수 있다.The concave joints convex rods 113 and 113 ′ may be bolted or bonded to the die body 111, and the concave joints convex bars 113 and 113 may be bonded to the form body 111. ') May be formed a seat groove (111a) is disposed.

한편, 상기 목적은, 거푸집 본체(111)와, 노출 콘크리트 벽체(100)의 오목줄눈(103)에 대응되게 상기 거푸집 본체(111)의 일면에 결합되는 다수의 오목줄눈 성형용 볼록막대(113,113')를 구비하는 오목줄눈용 거푸집(110)을 제작하여 준비하는 오목줄눈용 거푸집 준비단계; 상기 오목줄눈용 거푸집(110)들을 상호간 이격 배치하는 거푸집 배치단계; 세파 볼트(131)를 이용하여 상기 오목줄눈용 거푸집(110)들 간의 이격거리(L)를 확보하는 이격거리 확보단계; 상기 노출 콘크리트 벽체(100)에 형성되는 콘구멍(101)의 자리를 형성하는 D 콘(132)을 상기 세파 볼트(131)의 양단부에 결합시키는 D 콘 결합단계; 본체 볼트(133)를 상기 오목줄눈용 거푸집(110)들을 각각 통과하도록 한 후에 상기 본체 볼트(133)를 상기 D 콘(132)에 결합시키는 본체 볼트 결합단계; 상기 오목줄눈용 거푸집(110)들의 외측에서 상기 본체 볼트(133)에 끼워지게 주물 사각와셔(134)를 체결하는 주물 사각와셔 체결단계; 상기 주물 사각와셔(134)가 이탈되지 않도록 주물 너트(135)를 체결하는 주물 너트 체결단계; 상기 오목줄눈용 거푸집(110)들 사이로 콘크리트를 넣어 양생하는 콘크리트 양생단계; 및 상기 콘크리트가 완전히 굳기 전에 상기 오목줄눈용 거푸집(110)들, 상기 D 콘(132), 상기 본체 볼트(133), 상기 주물 사각와셔(134) 및 상기 주물 너트(135)를 제거하는 부품 제거단계를 포함하는 것을 특징으로 하는 노출 콘크리트 오목줄눈 모듈화 시공방법에 의해서도 달성된다.
On the other hand, the object is a plurality of concave joint forming convex rods 113, 113 'coupled to one surface of the formwork body 111 to correspond to the formwork body 111 and the concave joint 103 of the exposed concrete wall 100. A concave formwork preparing step of preparing and preparing a concave formwork 110 having a); A formwork disposing step of disposing the concave joint formwork 110 apart from each other; Separation distance securing step of securing the separation distance (L) between the concave joint formwork 110 using the three-wave bolt (131); A D-cone coupling step of coupling the D-cones 132, which form the seats of the cone holes 101 formed in the exposed concrete wall 100, to both ends of the swash bolt 131; A main body bolt coupling step of coupling the main body bolt 133 to the D cone 132 after passing the main body bolt 133 through the concave dies 110; A casting square washer fastening step of fastening the casting square washer 134 to be fitted to the main body bolt 133 at the outside of the concave joint dies 110; A casting nut fastening step of fastening the casting nut 135 so that the casting square washer 134 is not separated; Concrete curing step of curing the concrete between the concave formwork 110; And removing the parts for removing the concave formwork 110, the D cone 132, the body bolt 133, the casting square washer 134, and the casting nut 135 before the concrete is completely hardened. It is also achieved by an exposed concrete concave joint modular construction method comprising the step.

본 발명에 따르면, 콘구멍과 오목줄눈의 배치와 배열이 일정하게 되어 노출 콘크리트 벽체에 대한 생동감과 규칙성을 연출할 수 있는 효과가 있다.According to the present invention, the arrangement and arrangement of the cone hole and the concave joint are constant, and there is an effect that can produce the liveliness and regularity for the exposed concrete wall.

또한 본 발명에 따르면, 건축물의 완성도가 종래보다 훨씬 상승될 수 있어 건축물의 미적 아름다움을 드높일 수 있는 효과가 있다.In addition, according to the present invention, the completeness of the building can be much higher than the conventional, there is an effect that can enhance the aesthetic beauty of the building.

또한 본 발명에 따르면, 콘구멍의 위치가 달라지더라도 새롭게 콘구멍을 형성하지 않고 모듈화된 거푸집을 반복사용할 수 있는 장점을 가진다.
In addition, according to the present invention, even if the position of the cone hole is changed has the advantage that can be used repeatedly the modular formwork without forming a new cone hole.

도 1 및 도 2는 각각 노출 콘크리트 공법의 잘못된 사례를 나타내는 이미지들이다.
도 3은 본 발명의 일 실시예에 따른 노출 콘크리트 오목줄눈 모듈화 시공방법에 의해 시공된 잘된 사례를 나타내는 이미지이다.
도 4는 도 3의 요부 확대도이다.
도 5는 본 발명의 일 실시예에 따른 오목줄눈용 거푸집의 평면도이다.
도 6은 도 5의 확대 부분에 대한 이미지이다.
도 7은 도 5의 부분 분해 사시도이다.
도 8 내지 도 10은 각각 노출 콘크리트 오목줄눈 모듈화 시공방법을 단계적으로 도시한 도면들이다.
도 11은 본 발명의 일 실시예에 따른 노출 콘크리트 오목줄눈 모듈화 시공방법의 플로차트이다.
1 and 2 are images showing an incorrect example of the exposed concrete method, respectively.
Figure 3 is an image showing a good case of construction by the exposed concrete concave joint modular construction method according to an embodiment of the present invention.
4 is an enlarged view of the main part of Fig.
5 is a plan view of a concave formwork according to an embodiment of the present invention.
6 is an image of an enlarged portion of FIG. 5.
7 is a partially exploded perspective view of FIG. 5.
8 to 10 are diagrams illustrating stepwise construction methods of exposed concrete concave joint modularization, respectively.
Figure 11 is a flow chart of the exposed concrete concave joint modular construction method according to an embodiment of the present invention.

이하, 첨부도면을 참조하여 본 발명의 바람직한 실시예를 설명한다.Hereinafter, with reference to the accompanying drawings will be described a preferred embodiment of the present invention.

도 3은 본 발명의 일 실시예에 따른 노출 콘크리트 오목줄눈 모듈화 시공방법에 의해 시공된 잘된 사례를 나타내는 이미지이고, 도 4는 도 3의 요부 확대도이다.Figure 3 is an image showing a good case of construction by the exposed concrete concave joint modular construction method according to an embodiment of the present invention, Figure 4 is an enlarged view of the main portion of FIG.

이들 도면을 참조하면, 본 실시예에 따른 오목줄눈용 거푸집(110)을 이용하여 노출 콘크리트 오목줄눈 모듈화 시공방법을 통해 노출 콘크리트 벽체(100)를 형성할 경우, 노출 콘크리트 벽체(100)의 표면에 다수의 콘구멍(101)과 오목줄눈(103)이 등간격을 가지고 규칙적으로 배치되는 것을 알 수 있다.Referring to these drawings, when forming the exposed concrete wall 100 through the exposed concrete concave joint modular construction method using the concave formwork 110 according to the present embodiment, on the surface of the exposed concrete wall 100 It can be seen that the plurality of cone holes 101 and the concave joint 103 are regularly arranged at equal intervals.

앞서 기술한 것처럼 노출 콘크리트 벽체(100)의 표면에 형성되는 콘구멍(101)과 오목줄눈(103)은 노출 콘크리트 벽체(100)에 대한 생동감과 규칙성을 연출하는 요인이다.As described above, the cone hole 101 and the concave joint 103 formed on the surface of the exposed concrete wall 100 are factors that produce the liveliness and regularity of the exposed concrete wall 100.

그렇기 때문에 이들의 관리가 중요한데, 종래의 도 1 및 도 2와는 달리 본 실시예와 같은 도 3 및 도 4처럼 노출 콘크리트 벽체(100)의 표면에 콘구멍(101)과 오목줄눈(103)이 등간격을 가지고 규칙적으로 배치되는 경우, 노출 콘크리트 벽체(100)에 대한 생동감과 규칙성을 연출할 수 있으며, 이로 인해 건축물의 완성도가 종래보다 훨씬 상승될 수 있어 건축물의 미적 아름다움을 드높일 수 있게 된다.Therefore, their management is important, unlike the conventional Figs. 1 and 2, as shown in Figs. 3 and 4, such as the present embodiment, the cone hole 101 and the concave joint 103 on the surface of the exposed concrete wall 100, etc. When arranged at regular intervals, it is possible to produce the liveliness and regularity for the exposed concrete wall (100), which can increase the completeness of the building much higher than the conventional one can enhance the aesthetic beauty of the building.

특히, 도 3 및 도 4처럼 콘구멍(101)과 오목줄눈(103)이 등간격을 가지고 규칙적으로 배치되는 노출 콘크리트 벽체(100)는 종전처럼 후작업으로 별도 가공하거나 복잡한 방법이 요구되는 것이 아니기 때문에 작업 효율을 향상시키면서도 공기를 단축시킬 수 있는 이점이 있다.In particular, the exposed concrete wall 100 is regularly arranged at regular intervals with equal intervals as shown in Figs. 3 and 4 does not require a separate process or complicated method by post-work as before. Therefore, there is an advantage that can shorten the air while improving the work efficiency.

도 5는 본 발명의 일 실시예에 따른 오목줄눈용 거푸집의 평면도, 도 6은 도 5의 확대 부분에 대한 이미지, 그리고 도 7은 도 5의 부분 분해 사시도이다.5 is a plan view of a concave formwork according to an embodiment of the present invention, Figure 6 is an image of the enlarged portion of Figure 5, Figure 7 is a partially exploded perspective view of FIG.

이들 도면을 참조하면, 도 3 및 도 4처럼 노출 콘크리트 벽체(100)를 만들기 위한 수단으로서, 오목줄눈용 거푸집(110)이 요구된다.Referring to these figures, as a means for making the exposed concrete wall 100 as shown in Figs. 3 and 4, a formwork 110 for concave joints is required.

오목줄눈용 거푸집(110)은 도 5 및 도 7과 같은 단위 사이즈를 건축물의 외벽 사이즈에 맞게 측방향으로 연결시켜 사용할 수 있다.The concave formwork 110 can be used by connecting the unit size as shown in Figs. 5 and 7 in the lateral direction to match the outer wall size of the building.

이러한 오목줄눈용 거푸집(110)은 거푸집 본체(111)와, 노출 콘크리트 벽체(100)의 오목줄눈(103)에 대응되게 거푸집 본체(111)의 일면에 결합되는 다수의 오목줄눈 성형용 볼록막대(113,113')를 포함한다.The concave formwork 110 is a concave bar for forming a plurality of concave joints coupled to one surface of the formwork body 111 to correspond to the formwork body 111 and the concave joint 103 of the exposed concrete wall ( 113,113 ').

거푸집 본체(111)는 금속을 비롯하여 플라스틱 혹은 목재에 이르기까지 다양할 수 있다.Formwork body 111 may vary from metal to plastic or wood.

오목줄눈 성형용 볼록막대(113,113')는 거푸집 본체(111)의 표면에 결합되며, 콘크리트 양생 시 노출 콘크리트 벽체(100) 상에 오목줄눈(103)을 형성시킨다. 오목줄눈 성형용 볼록막대(113,113')들 간의 간격이 일정해야 노출 콘크리트 벽체(100) 상의 오목줄눈(103)들 사이의 간격이 규칙적이면서도 일률적으로 이루어질 수 있다.Convex bars for forming concave joints 113 and 113 ′ are coupled to the surface of the form body 111 and form concave joints 103 on the exposed concrete wall 100 during concrete curing. The gap between the concave joints 103 on the exposed concrete wall 100 may be regular and uniform only when the gap between the convex forming convex bars 113 and 113 ′ is constant.

본 실시예에서 거푸집 본체(111)에 접하는 오목줄눈 성형용 볼록막대(113,113')의 일면은 평평한 평면을 형성하고, 반대면은 둥글게 라운딩처리된다.In this embodiment, one surface of the convex forming convex bars 113 and 113 ′ in contact with the form body 111 forms a flat plane, and the opposite surface is rounded.

이때, 오목줄눈 성형용 볼록막대(113,113')의 적어도 일단부는 4개가 상호간 교차 배치되면서 직선을 형성할 수 있도록 45도 각도로 경사진 경사면(113a)을 형성할 수 있다.At this time, at least one end portion of the convex forming convex bars 113 and 113 ′ may form an inclined surface 113a which is inclined at an angle of 45 degrees so that the four may cross each other and form a straight line.

따라서 도 5 및 도 6처럼 오목줄눈 성형용 볼록막대(113,113') 4개가 상호 접할 경우, 정확한 십자가 형상을 이룰 수 있고, 이에 따라 노출 콘크리트 벽체(100) 상의 오목줄눈(103)들 사이의 간격과 모양을 곧고 일률적으로 형성할 수 있게 되는 것이다.Therefore, when four convex forming convex bars 113 and 113 ′ are in contact with each other, as shown in FIGS. 5 and 6, an accurate cross shape can be achieved, and thus the gap between the concave joints 103 on the exposed concrete wall 100 and The shape will be straight and uniform.

본 실시예의 경우, 양단부 모두에 경사면(113a)이 형성된 것을 참조부호 113으로, 그리고 한쪽 단부에만 경사면(113a)이 형성되고 나머지 단부는 일면으로 처리된 것을 참조부호 113'로 구별하고 있다.In the present embodiment, reference numeral 113 denotes that the inclined surface 113a is formed at both ends, and that the inclined surface 113a is formed only at one end and the other end is treated as one surface is 113 '.

한편, 본 실시예에서 오목줄눈 성형용 볼록막대(113,113')는 거푸집 본체(111)에 못, 타카핀, 볼트(bolt) 등에 의해 결합되거나 본드(bond) 결합될 수 있다. 전자의 방식이 좀 더 편리한 방식일 수 있는데, 볼트 대신에 일반 못이 사용될 수도 있다.Meanwhile, in the present embodiment, the convex joints 113 and 113 ′ for forming the concave joint may be coupled or bonded to the form body 111 by nails, takapins, bolts, or the like. The former method may be a more convenient method, but ordinary nails may be used instead of bolts.

반드시 그러한 것은 아니지만, 거푸집 본체(111)에는 도 7처럼 오목줄눈 성형용 볼록막대(113,113')가 자리 배치되는 자리홈(111a)이 더 형성될 수 있다.Although not necessarily, the die body 111 may further include a seat groove 111a in which the convex bars for forming concave joints 113 and 113 'are disposed as shown in FIG. 7.

만약, 자리홈(111a)이 형성되는 경우, 오목줄눈 성형용 볼록막대(113,113')의 위치가 틀어지지 않고, 정확한 위치에 고정될 수 있는 이점이 있다.If the seat groove 111a is formed, the position of the concave joint convex bars 113 and 113 'is not changed, and there is an advantage that it can be fixed at the correct position.

도 8 내지 도 10은 각각 노출 콘크리트 오목줄눈 모듈화 시공방법을 단계적으로 도시한 도면들, 그리고 도 11은 본 발명의 일 실시예에 따른 노출 콘크리트 오목줄눈 모듈화 시공방법의 플로차트이다.8 to 10 are diagrams illustrating stepwise construction methods of exposed concrete concave joint modularization, and FIG. 11 is a flowchart of a method of constructing exposed concrete concave joint modularized according to an embodiment of the present invention.

이들 도면을 참조하여 본 발명에 따른 노출 콘크리트 오목줄눈 모듈화 시공방법에 대해 설명한다.With reference to these drawings will be described the exposed concrete concave joint modular construction method according to the present invention.

본 실시예의 노출 콘크리트 오목줄눈 모듈화 시공방법은 오목줄눈용 거푸집 준비단계(S11), 거푸집 배치단계(S12), 이격거리 확보단계(S13), D 콘 결합단계(S14), 본체 볼트 결합단계(S15), 주물 사각와셔 체결단계(S16), 주물 너트 체결단계(S17), 콘크리트 양생단계(S18), 그리고 부품 제거단계(S19)를 포함할 수 있다.The exposed concrete concave joint modular construction method of the present embodiment is the concave formwork preparing step (S11), formwork arrangement step (S12), separation distance securing step (S13), D cone coupling step (S14), body bolt coupling step (S15) ), Casting square washer fastening step (S16), casting nut fastening step (S17), concrete curing step (S18), and may include a component removal step (S19).

오목줄눈용 거푸집 준비단계(S11)는 위에서 기술한 거푸집 본체(111)와, 노출 콘크리트 벽체(100)의 오목줄눈(103)에 대응되게 거푸집 본체(111)의 일면에 결합되는 다수의 오목줄눈 성형용 볼록막대(113,113')를 구비하는 오목줄눈용 거푸집(110)을 제작하여 준비하는 과정이다.Forming step for the concave joint (S11) is formed of a plurality of concave joints coupled to one surface of the formwork body 111 and the formwork body 111 to correspond to the concave joint 103 of the exposed concrete wall 100, described above. It is a process of manufacturing and preparing the concave joint formwork 110 having the convex rods 113 and 113 '.

건축물의 사이즈에 따라 오목줄눈용 거푸집(110)은 수십 개 내지 수백 개가 사용될 수 있다. 오목줄눈용 거푸집(110)은 철거 후 재사용이 가능하다.Depending on the size of the building concave formwork 110 may be used dozens to hundreds. The concave formwork 110 can be reused after demolition.

거푸집 배치단계(S12)는 도 8처럼 오목줄눈용 거푸집(110)들을 상호간 이격 배치하는 과정이다.Formwork arrangement step (S12) is a process of arranging the concave formwork 110, spaced apart from each other as shown in FIG.

이격거리 확보단계(S13)는 세파 볼트(131)를 이용하여 오목줄눈용 거푸집(110)들 간의 이격거리(L)를 확보하는 과정이다.Separation distance securing step (S13) is a process of securing the separation distance (L) between the concave joint formwork 110 using the three-wave bolt 131.

세파 볼트(131)는 노출 콘크리트 벽체(100) 내에 영구히 묻혀 고정된다. 세파 볼트(131)의 양쪽 끝에는 나사산을 통해 D 콘(132)이 결합된다.The cepha bolt 131 is permanently buried in the exposed concrete wall 100 and fixed. The D cone 132 is coupled to both ends of the cepha bolt 131 through a thread.

세파 볼트(131)의 길이에 따라 노출 콘크리트 벽체(100)의 두께가 결정될 수 있다. 세파 볼트(131)는 콘크리트 양생 시 오목줄눈용 거푸집(110)들이 좁아지는 현상을 예방하고 이들의 간격을 유지시키는 역할을 한다.The thickness of the exposed concrete wall 100 may be determined according to the length of the cepha bolt 131. Sepha bolt 131 serves to prevent the narrowing of the concave formwork 110 during the curing of the concrete and to maintain their spacing.

D 콘 결합단계(S14)는 노출 콘크리트 벽체(100)에 형성되는 콘구멍(101)의 자리를 형성하는 D 콘(132)을 세파 볼트(131)의 양단부에 결합시키는 과정이다.D-cone coupling step (S14) is a process of coupling the D-cone 132, which forms the seat of the cone hole 101 formed in the exposed concrete wall 100 to both ends of the swash bolt 131.

콘크리트가 완전히 굳기 전에 D 콘(132)이 해당 위치에서 제거되어 재사용되는데, 이처럼 D 콘(132)이 제거된 자리에 원형의 콘구멍(101)이 형성될 수 있다.Before the concrete is completely hardened, the D cone 132 is removed and reused at the corresponding position. Thus, a circular cone hole 101 may be formed at the position where the D cone 132 is removed.

본체 볼트 결합단계(S15)는 본체 볼트(133)를 오목줄눈용 거푸집(110)들을 각각 통과하도록 한 후에 본체 볼트(133)를 D 콘(132)에 결합시키는 과정이다.Body bolt coupling step (S15) is a process of coupling the body bolt 133 to the D cone 132 after passing the body bolt 133 through the concave formwork 110, respectively.

주물 사각와셔 체결단계(S16)는 오목줄눈용 거푸집(110)들의 외측에서 본체 볼트(133)에 끼워지게 주물 사각와셔(134)를 체결하는 과정이다.Casting square washer fastening step (S16) is a process of fastening the casting square washer 134 to be fitted to the body bolt 133 on the outside of the concave joint formwork 110.

주물 사각와셔(134)의 사이즈가 큰 이유는 오목줄눈용 거푸집(110)들을 관통하는 본체 볼트(133)의 구멍 주위로 배치되는 거푸집 보강용 각재 또는 철재(미도시) 등을 감싸기 위함이다.The reason for the large size of the casting square washer 134 is to wrap the formwork reinforcement or steel (not shown) disposed around the hole of the body bolt 133 passing through the concave formwork 110.

주물 너트 체결단계(S17)는 주물 사각와셔(134)가 이탈되지 않도록 주물 너트(135)를 체결하여 고정시키는 과정이다.Casting nut fastening step (S17) is a process of fastening the casting nut 135 so that the casting square washer 134 is not separated.

뿐만 아니라 주물 너트(135)를 체결하여 고정시킴으로써 콘크리트 타설시 측압을 버틸 수 있고, 이로 인해 노출 콘크리트 벽체(100)의 두께가 설계치보다 늘어나는 현상을 예방할 수 있다.In addition, by fastening and fixing the casting nut 135, it is possible to withstand the side pressure during concrete pouring, thereby preventing the increase in the thickness of the exposed concrete wall 100 than the design value.

콘크리트 양생단계(S18)는 도 9처럼 오목줄눈용 거푸집(110)들 사이로 콘크리트를 넣어 양생하는 과정이다.Concrete curing step (S18) is a process of curing the concrete put between the concave formwork 110, as shown in FIG.

부품 제거단계(S19)는 도 10처럼 콘크리트가 완전히 굳기 전에 오목줄눈용 거푸집(110)들, D 콘(132), 본체 볼트(133), 주물 사각와셔(134) 및 주물 너트(135)를 제거하는 과정이다. 필요에 따라 이들 부품들은 재사용될 수 있다.Part removal step (S19) is to remove the concave joint formwork 110, the D cone 132, the body bolt 133, the square washers 134 and the casting nut 135 before the concrete is completely solid as shown in FIG. That's the process. These parts can be reused as needed.

이상 설명한 바와 같이, 특별히 제작된 오목줄눈용 거푸집(110)들을 이격 배치한 상태에서, 세파 볼트(131), D 콘(132), 본체 볼트(133), 주물 사각와셔(134) 및 주물 너트(135) 등을 이용하여 오목줄눈용 거푸집(110)들을 이격 고정시킨 다음에, 이들 사이로 콘크리트를 넣어 양생한 후에 부품들을 제거함으로써 도 3, 도 4 및 도 10과 같은 형태의 노출 콘크리트 벽체(100)가 탄생할 수 있다.As described above, in the state in which the specially formed concave formwork 110 is spaced apart, the cepha bolt 131, the D cone 132, the body bolt 133, the casting square washer 134 and the casting nut ( 135) and then to secure the concave formwork 110 by space, and then put the concrete between them to cure after removing the parts of the exposed concrete wall 100 of the form as shown in Figures 3, 4 and 10 Can be born.

본 실시예의 경우, 오목줄눈용 거푸집(110)들을 양쪽에 배치하였기 때문에 노출 콘크리트 벽체(100)의 내면 혹은 외면 모두에 콘구멍(101)과 오목줄눈(103)이 형성되나 오목줄눈용 거푸집(110)들을 한쪽에만 배치하고 다른 거푸집을 사용할 경우, 노출 콘크리트 벽체(100)의 내면에만 혹은 외면에만 콘구멍(101)과 오목줄눈(103)이 형성되도록 할 수 있다.In this embodiment, since the concave formwork 110 is disposed on both sides, the cone hole 101 and the concave joint 103 are formed on both the inner surface or the outer surface of the exposed concrete wall 100, but the concave formwork 110 ) If only one side is disposed and the other formwork is used, the cone hole 101 and the concave joint 103 may be formed only on the inner surface or the outer surface of the exposed concrete wall 100.

이와 같은 구조와 방법을 갖는 본 실시예에 따르면, 콘구멍(101)과 오목줄눈(103)의 배치와 배열이 일정하게 되어 노출 콘크리트 벽체(100)에 대한 생동감과 규칙성을 연출할 수 있는 효과가 있게 된다.According to the present embodiment having such a structure and method, the arrangement and arrangement of the cone hole 101 and the concave joint 103 become constant so that the effect of producing the liveliness and regularity of the exposed concrete wall 100 can be produced. Will be.

또한 본 실시예에 따르면, 건축물의 완성도가 종래보다 훨씬 상승될 수 있어 건축물의 미적 아름다움을 드높일 수 있게 된다.In addition, according to this embodiment, the completeness of the building can be much higher than in the prior art can enhance the aesthetic beauty of the building.

특히, 본 실시예의 방법이 적용되는 경우, 노출 거푸집 시공에 있어 종전처럼 콘 배치 디자인을 별도로 하지 않아도 되기 때문에 노무비 및 부대비용의 절감 효과를 제공할 수 있다.In particular, when the method of the present embodiment is applied, it is possible to provide a reduction in labor costs and additional costs since the cone arrangement design does not have to be separately performed in the exposure formwork.

특히, 노출 콘크리트 벽체(100) 상에 오목줄눈(103)이 부드러우면서도 정교한 선으로 나타낼 수 있으며, 규칙적인 외관의 노출 콘크리트를 표현할 수 있다.In particular, the concave joint 103 on the exposed concrete wall 100 may be represented by smooth and sophisticated lines, it may represent the exposed concrete of a regular appearance.

또한 모듈화된 반복 작업으로 인해 시공 시 고려되어야 할 다양한 사항들을 단순화시킬 수 있다.In addition, modular repetitive work can simplify various aspects of construction.

이와 같이 본 발명은 기재된 실시예에 한정되는 것이 아니고, 본 발명의 사상 및 범위를 벗어나지 않고 다양하게 수정 및 변형할 수 있음은 이 기술의 분야에서 통상의 지식을 가진 자에게 자명하다. 따라서 그러한 수정예 또는 변형예들은 본 발명의 특허청구범위에 속한다 하여야 할 것이다.
It will be apparent to those skilled in the art that various modifications and variations can be made in the present invention without departing from the spirit or scope of the invention. Therefore, such modifications or variations will have to be belong to the claims of the present invention.

100 : 노출 콘크리트 벽체 101 : 콘구멍
103 : 오목줄눈 110 : 오목줄눈용 거푸집
111 : 거푸집 본체 113,133' : 오목줄눈 성형용 볼록막대
100: exposed concrete wall 101: cone hole
103: concave joint 110: formwork for concave joint
111: die body 113,133 ': convex rod for concave joint forming

Claims (5)

등간격을 가지고 규칙적으로 배치되는 다수의 콘구멍(101)과 오목줄눈(103)이 표면에 형성되는 노출 콘크리트 벽체(100)의 시공을 위하여 사용되는 것으로서,
판 상의 거푸집 본체(111); 및
상기 노출 콘크리트 벽체(100)의 오목줄눈(103)에 대응되게 상기 거푸집 본체(111)의 일면에 결합되는 다수의 오목줄눈 성형용 볼록막대(113,113')를 포함하는 것을 특징으로 하는 오목줄눈용 거푸집(110).
As used for the construction of the exposed concrete wall 100 is formed on the surface of a plurality of cone holes 101 and concave joint 103 are regularly arranged at equal intervals,
Formwork body 111 on the plate; And
Formwork for concave joints, characterized in that it comprises a plurality of concave joints for forming convex joints 113, 113 'coupled to one surface of the form body 111 to correspond to the concave joint 103 of the exposed concrete wall (100). (110).
제1항에 있어서,
상기 거푸집 본체(111)에 접하는 상기 오목줄눈 성형용 볼록막대(113,113')의 일면은 평평한 평면을 형성하고, 반대면은 둥글게 라운딩처리되는 것을 특징으로 하는 오목줄눈용 거푸집(110).
The method of claim 1,
One side of the concave forming convex rods 113 and 113 ′ in contact with the form body 111 forms a flat plane, and the opposite side is rounded round to form a concave joint form.
제1항에 있어서,
상기 오목줄눈 성형용 볼록막대(113,113')의 적어도 일단부는 4개가 상호간 교차 배치되면서 직선을 형성할 수 있도록 45도 각도로 경사진 경사면(113a)을 형성하는 것을 특징으로 하는 오목줄눈용 거푸집(110).
The method of claim 1,
At least one end of the concave forming convex rods 113 and 113 'forms concave joint formwork 110 which is inclined at an angle of 45 degrees to form a straight line while the four are arranged to cross each other. ).
제1항에 있어서,
상기 오목줄눈 성형용 볼록막대(113,113')는 상기 거푸집 본체(111)에 볼트(bolt) 결합되거나 본드(bond) 결합되며,
상기 거푸집 본체(111)에는 상기 오목줄눈 성형용 볼록막대(113,113')가 자리 배치되는 자리홈(111a)이 더 형성되는 것을 특징으로 하는 오목줄눈용 거푸집(110).
The method of claim 1,
The concave joint forming convex rods 113 and 113 ′ are bolted or bonded to the die body 111.
The formwork main body 111 is a concave joint formwork 110, characterized in that the concave joint forming convex rods 113, 113 'is further formed with a seat groove (111a) is placed.
판 상의 거푸집 본체(111)와, 노출 콘크리트 벽체(100)의 오목줄눈(103)에 대응되게 상기 거푸집 본체(111)의 일면에 결합되는 다수의 오목줄눈 성형용 볼록막대(113,113')를 구비하는 오목줄눈용 거푸집(110)을 제작하여 준비하는 오목줄눈용 거푸집 준비단계;
상기 오목줄눈용 거푸집(110)들을 상호간 이격 배치하는 거푸집 배치단계;
세파 볼트(131)를 이용하여 상기 오목줄눈용 거푸집(110)들 간의 이격거리(L)를 확보하는 이격거리 확보단계;
상기 노출 콘크리트 벽체(100)에 형성되는 콘구멍(101)의 자리를 형성하는 D 콘(132)을 상기 세파 볼트(131)의 양단부에 결합시키는 D 콘 결합단계;
본체 볼트(133)를 상기 오목줄눈용 거푸집(110)들을 각각 통과하도록 한 후에 상기 본체 볼트(133)를 상기 D 콘(132)에 결합시키는 본체 볼트 결합단계;
상기 오목줄눈용 거푸집(110)들의 외측에서 상기 본체 볼트(133)에 끼워지게 주물 사각와셔(134)를 체결하는 주물 사각와셔 체결단계;
상기 주물 사각와셔(134)가 이탈되지 않도록 주물 너트(135)를 체결하는 주물 너트 체결단계;
상기 오목줄눈용 거푸집(110)들 사이로 콘크리트를 넣어 양생하는 콘크리트 양생단계; 및
상기 콘크리트가 완전히 굳기 전에 상기 오목줄눈용 거푸집(110)들, 상기 D 콘(132), 상기 본체 볼트(133), 상기 주물 사각와셔(134) 및 상기 주물 너트(135)를 제거하는 부품 제거단계를 포함하는 것을 특징으로 하는 노출 콘크리트 오목줄눈 모듈화 시공방법.
It is provided with a formwork body 111 on a plate, and a plurality of convex bars for forming concave joints 113 and 113 'coupled to one surface of the formwork body 111 so as to correspond to the concave joint 103 of the exposed concrete wall 100. Concave formwork preparing step for preparing and preparing the concave formwork 110;
A formwork disposing step of disposing the concave joint formwork 110 apart from each other;
Separation distance securing step of securing the separation distance (L) between the concave joint formwork 110 using the three-wave bolt (131);
A D-cone coupling step of coupling the D-cones 132, which form the seats of the cone holes 101 formed in the exposed concrete wall 100, to both ends of the swash bolt 131;
A main body bolt coupling step of coupling the main body bolt 133 to the D cone 132 after passing the main body bolt 133 through the concave dies 110;
A casting square washer fastening step of fastening the casting square washer 134 to be fitted to the main body bolt 133 at the outside of the concave joint dies 110;
A casting nut fastening step of fastening the casting nut 135 so that the casting square washer 134 is not separated;
Concrete curing step of curing the concrete between the concave formwork 110; And
Removing the parts to remove the concave formwork 110, the D cone 132, the body bolt 133, the casting square washer 134 and the casting nut 135 before the concrete is completely hardened Exposed concrete concave joint modular construction method comprising a.
KR1020130029570A 2013-03-20 2013-03-20 Form and exposed concrete constructing method using the same KR101308043B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020130029570A KR101308043B1 (en) 2013-03-20 2013-03-20 Form and exposed concrete constructing method using the same

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020130029570A KR101308043B1 (en) 2013-03-20 2013-03-20 Form and exposed concrete constructing method using the same

Publications (1)

Publication Number Publication Date
KR101308043B1 true KR101308043B1 (en) 2013-09-12

Family

ID=49456041

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020130029570A KR101308043B1 (en) 2013-03-20 2013-03-20 Form and exposed concrete constructing method using the same

Country Status (1)

Country Link
KR (1) KR101308043B1 (en)

Cited By (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101765107B1 (en) 2017-02-28 2017-08-04 박철범 Building construction method using exposed concrete wall
KR101770172B1 (en) 2017-02-24 2017-09-05 조병구 Building construction method using exposed concrete process
KR101801270B1 (en) 2017-06-02 2017-12-20 손형호 Building construction method using exposed concrete wall
KR101812560B1 (en) 2017-08-21 2017-12-27 이태우 Building construction method
KR101812955B1 (en) 2017-05-17 2017-12-28 조병구 Building construction method using exposed concrete process
KR101812565B1 (en) 2017-07-27 2018-01-30 대화이앤씨건설 주식회사 Building construction method using exposed concrete wall
KR101854653B1 (en) * 2017-12-08 2018-05-04 박진순 Construction method of concrete structure based on exposed concrete method
KR101859406B1 (en) 2017-06-29 2018-05-18 김진무 Building construction method using exposed concrete wall
KR101871861B1 (en) * 2017-09-20 2018-06-27 조병구 Wall construction method
KR101859408B1 (en) 2017-09-29 2018-06-28 하태성 Wall construction method of exposed concrete method
KR101859398B1 (en) 2017-10-23 2018-06-28 김진무 Building construction method using exposed concrete wall
KR101877417B1 (en) 2017-11-28 2018-08-07 성석훈 Retaining wall construction method
KR102035221B1 (en) 2019-06-27 2019-10-22 주창종 Wood pattern exposed concrete surface processing method
KR102099365B1 (en) 2019-09-16 2020-04-09 나성민 Line forming apparatus for exposed concrete wall and panel of formwork including the same
KR102119106B1 (en) 2020-03-23 2020-06-04 나성민 Line forming apparatus for exposed concrete wall

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003181823A (en) * 2001-12-21 2003-07-02 Daiken Concrete Kk Concrete panel with jointing and its production method
KR200420401Y1 (en) * 2006-04-10 2006-07-04 조규헌 Colored Pattern Film Pattern Formwork
KR20130022988A (en) * 2011-08-26 2013-03-07 도준호 Wall finishing device and its constructing method

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003181823A (en) * 2001-12-21 2003-07-02 Daiken Concrete Kk Concrete panel with jointing and its production method
KR200420401Y1 (en) * 2006-04-10 2006-07-04 조규헌 Colored Pattern Film Pattern Formwork
KR20130022988A (en) * 2011-08-26 2013-03-07 도준호 Wall finishing device and its constructing method

Cited By (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101770172B1 (en) 2017-02-24 2017-09-05 조병구 Building construction method using exposed concrete process
KR101765107B1 (en) 2017-02-28 2017-08-04 박철범 Building construction method using exposed concrete wall
KR101812955B1 (en) 2017-05-17 2017-12-28 조병구 Building construction method using exposed concrete process
KR101801270B1 (en) 2017-06-02 2017-12-20 손형호 Building construction method using exposed concrete wall
KR101859406B1 (en) 2017-06-29 2018-05-18 김진무 Building construction method using exposed concrete wall
KR101812565B1 (en) 2017-07-27 2018-01-30 대화이앤씨건설 주식회사 Building construction method using exposed concrete wall
KR101812560B1 (en) 2017-08-21 2017-12-27 이태우 Building construction method
KR101871861B1 (en) * 2017-09-20 2018-06-27 조병구 Wall construction method
KR101859408B1 (en) 2017-09-29 2018-06-28 하태성 Wall construction method of exposed concrete method
KR101859398B1 (en) 2017-10-23 2018-06-28 김진무 Building construction method using exposed concrete wall
KR101877417B1 (en) 2017-11-28 2018-08-07 성석훈 Retaining wall construction method
KR101854653B1 (en) * 2017-12-08 2018-05-04 박진순 Construction method of concrete structure based on exposed concrete method
KR102035221B1 (en) 2019-06-27 2019-10-22 주창종 Wood pattern exposed concrete surface processing method
KR102099365B1 (en) 2019-09-16 2020-04-09 나성민 Line forming apparatus for exposed concrete wall and panel of formwork including the same
KR102119106B1 (en) 2020-03-23 2020-06-04 나성민 Line forming apparatus for exposed concrete wall

Similar Documents

Publication Publication Date Title
KR101308043B1 (en) Form and exposed concrete constructing method using the same
CN105178597B (en) Floor slab back casting band template and mold method
KR101765107B1 (en) Building construction method using exposed concrete wall
KR101801270B1 (en) Building construction method using exposed concrete wall
JP2016198909A (en) Method for manufacturing precast concrete member
KR101770172B1 (en) Building construction method using exposed concrete process
JP6701236B2 (en) Concrete formwork
KR101854653B1 (en) Construction method of concrete structure based on exposed concrete method
JP6998117B2 (en) How to build CFRP formwork integrated concrete columns and CFRP formwork integrated concrete columns
KR101859406B1 (en) Building construction method using exposed concrete wall
KR101900689B1 (en) Walls construction method using exposed concrete method
KR100927342B1 (en) Formwork wall finishes
KR101859398B1 (en) Building construction method using exposed concrete wall
JP6510377B2 (en) Method of manufacturing precast concrete plate having three-dimensional curved surface and formwork
KR101925362B1 (en) Construction method of reinforced concrete wall
KR101812955B1 (en) Building construction method using exposed concrete process
US20030146366A1 (en) Corner assembly
CN201225001Y (en) Composite die for casting building frame
KR101899860B1 (en) Construction method of concrete building wall
KR101859408B1 (en) Wall construction method of exposed concrete method
KR102227404B1 (en) Building Decorating Wall and Manufacturing Method Thereof
KR101906194B1 (en) Construction method of reinforced concrete wall
CN217998929U (en) Pouring mold for constructional column formwork
KR101915181B1 (en) Construction method of concrete structure
CN213174782U (en) Frame column wall

Legal Events

Date Code Title Description
A201 Request for examination
A302 Request for accelerated examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20160905

Year of fee payment: 4

FPAY Annual fee payment

Payment date: 20170905

Year of fee payment: 5

FPAY Annual fee payment

Payment date: 20180905

Year of fee payment: 6

FPAY Annual fee payment

Payment date: 20190906

Year of fee payment: 7