CN105178597B - Floor slab back casting band template and mold method - Google Patents
Floor slab back casting band template and mold method Download PDFInfo
- Publication number
- CN105178597B CN105178597B CN201510427368.0A CN201510427368A CN105178597B CN 105178597 B CN105178597 B CN 105178597B CN 201510427368 A CN201510427368 A CN 201510427368A CN 105178597 B CN105178597 B CN 105178597B
- Authority
- CN
- China
- Prior art keywords
- formwork
- template
- caster
- cascaded surface
- male
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
Abstract
本发明公开了一种楼板后浇带模板以及支模方法,所述该模板由若干块子模板拼接构成,子模板包括公模板与母模板,公模板和母模板交替拼接,所述母模板靠近两条侧边处均设有向同一侧凹陷的阶梯面,所述公模板靠近两条侧边处均设有与阶梯面适配的拼接部,拼接部贴合阶梯面设置,所述阶梯面与拼接部之间设有可实现两者固定或分离的固定件;所述方法运用于上述模板。更加方便楼板后浇带模板的支设,且方便模板的回收利用,节约施工成本。
The invention discloses a post-pouring belt formwork for a floor slab and a method for supporting the formwork. The formwork is composed of several sub-formworks spliced together. The sub-formworks include male formworks and female formworks. The two sides are provided with stepped surfaces that are sunken to the same side, and the male formwork is provided with splicing parts that are adapted to the stepped surfaces near the two sides, and the spliced parts are arranged to fit the stepped surfaces, and the stepped surfaces There is a fixing part between the splicing part and the fixing or separation of the two parts; the method is applied to the above-mentioned template. It is more convenient for the support of the post-casting formwork of the floor slab, and it is convenient for the recycling of the formwork, saving construction costs.
Description
技术领域technical field
本发明涉及楼板后浇带施工领域,更具体地说它涉及一种楼板后浇带模板以及支模方法。The invention relates to the construction field of the post-casting belt of the floor slab, and more specifically relates to a formwork of the post-casting belt of the floor slab and a method for supporting the formwork.
背景技术Background technique
后浇带是在建筑施工中为防止现浇钢筋混凝土结构由于自身收缩不均或沉降不均可能产生的有害裂缝,按照设计或施工规范要求,在基础底板、墙、梁相应位置留设的临时施工缝。后浇带的宽度一般在700mm-2000mm之间。后浇带施工时需要支设模板,即在后浇带宽度两侧安装模板将两侧的混凝土隔开。对于楼板的后浇带施工,板面通常捆扎有两层钢筋,传统模板的支设与钢筋的捆扎同步进行,至少在下层钢筋捆扎完成后就必须支设后浇带模板,参照图1至图2所示,现有模板通常为复合材料制成的木质模板,模板一体设置,模板上开设若干用于嵌设楼板钢筋的卡槽,支设模板时,将模板下方的卡槽卡于钢筋,同时绑扎上层钢筋时,将上层钢筋嵌入模板上方的卡槽内,在施加一些辅助固定措施。传统的楼板后浇带模板的支设较为麻烦,且当模板拆卸时,将模板敲下,模板跨度太长,敲下后模板无法取出,且由于模板跨度长敲击时对模板的施力不均,模板敲落后损毁严重,无法再继续利用,增加施工成本。The post-pouring belt is a temporary part set at the corresponding positions of the foundation floor, wall and beam in order to prevent the harmful cracks that may occur in the cast-in-place reinforced concrete structure due to uneven shrinkage or uneven settlement during construction. construction joints. The width of the post-casting tape is generally between 700mm-2000mm. The formwork needs to be supported during the construction of the post-casting belt, that is, the formwork is installed on both sides of the width of the post-casting belt to separate the concrete on both sides. For the post-cast construction of the floor slab, two layers of steel bars are usually bundled on the slab surface. The support of the traditional formwork is carried out simultaneously with the binding of the steel bars. At least the post-cast belt formwork must be supported after the binding of the lower layer of steel bars is completed. Refer to Fig. 1 to Fig. As shown in 2, the existing formwork is usually a wooden formwork made of composite materials, and the formwork is integrated, and several slots are provided on the formwork for embedding steel bars on the floor. At the same time, when binding the upper layer of steel bars, insert the upper layer of steel bars into the slot above the formwork, and apply some auxiliary fixing measures. The support of the traditional floor post-casting belt formwork is cumbersome, and when the formwork is disassembled, the formwork is knocked down, the formwork span is too long, and the formwork cannot be taken out after knocking down, and because of the long formwork span, the force exerted on the formwork is not enough All, the formwork is severely damaged after being knocked out, and cannot be used any more, which increases the construction cost.
发明内容Contents of the invention
针对现有技术存在的不足,本发明的目的在于提供一种楼板后浇带模板以及支模方法,更加方便楼板后浇带模板的支设,且方便模板的回收利用,节约施工成本。In view of the deficiencies in the prior art, the purpose of the present invention is to provide a post-casting belt formwork for floor slabs and a formwork support method, which is more convenient for the support of post-casting belt formwork for floors, facilitates the recycling of the formwork, and saves construction costs.
为实现上述目的,本发明提供了如下技术方案:一种楼板后浇带模板,所述该模板由若干块子模板拼接构成,子模板包括公模板与母模板,公模板和母模板交替拼接,所述母模板靠近两条侧边处均设有向同一侧凹陷的阶梯面,所述公模板靠近两条侧边处均设有与阶梯面适配的拼接部,拼接部贴合阶梯面设置,所述阶梯面与拼接部之间设有可实现两者固定或分离的固定件。In order to achieve the above object, the present invention provides the following technical solutions: a post-cast strip formwork for floor slabs, said formwork is formed by splicing several sub-formworks, the sub-formworks include male formwork and female formwork, and the male formwork and female formwork are spliced alternately, The female template is provided with a stepped surface that is sunken to the same side near the two sides, and the male template is provided with a splicing part that is adapted to the stepped surface near the two sides, and the spliced part is set on the stepped surface , There is a fixing piece between the step surface and the splicing part, which can realize the fixing or separation of the two.
进一步的,所述阶梯面设有螺纹孔槽,所述拼接部设有与螺纹孔槽重合的通孔,所述固定件为螺栓,所述公模板与母模板借助螺栓穿过通孔并螺纹连接于螺纹孔槽进行固定。Further, the stepped surface is provided with threaded hole grooves, the splicing part is provided with through holes coincident with the threaded hole grooves, the fixing parts are bolts, and the male template and the female template are passed through the through holes by means of bolts and threaded. Attached to the threaded hole for fixing.
进一步的,所述阶梯面凸起设置有n型框,n型框的两端均固定连接于阶梯面,所述拼接部设有供n型框通过的通槽;还包括一端呈楔形的插销,所述母模板与公模板借助n型框穿过通槽再通过插销插入n形框构成的销口达到固定。Further, the protruding surface of the step is provided with an n-shaped frame, both ends of the n-shaped frame are fixedly connected to the stepped surface, and the splicing part is provided with a through groove for the passage of the n-shaped frame; it also includes a wedge-shaped latch at one end , the female template and the male template are fixed by passing through the through slot with the help of the n-shaped frame and then inserting the pin into the pin opening formed by the n-shaped frame.
为实现上述目的,本发明提供了如下技术方案:一种楼板后浇带支模方法,模板为拼接而成,所述该模板由若干块子模板构成,子模板包括公模板与母模板,公模板和母模板交替拼接,所述母模板靠近两条侧边处均设有向同一侧凹陷的阶梯面,所述公模板靠近两条侧边处均设有与阶梯面适配的拼接部,拼接部与阶梯面形成贴合,所述阶梯面与拼接部之间设有可实现两者固定或分离的固定件;安装时由后浇带的边沿开始安装,将子模板由垂直模板设置的纵向钢筋间放入上层钢筋与下层钢筋之间并将子模板上的卡槽卡于该纵向钢筋进行固定;依次交替拼接公模板与母模板,将公模板的拼接部贴合母模板的阶梯面并通过固定件将公模板与母模板固定,重复多次操作,直至将模板支设完毕。In order to achieve the above object, the present invention provides the following technical solutions: a post-casting belt formwork method for floor slabs. The template and the female template are spliced alternately, the female template is provided with a stepped surface that is sunken to the same side near the two sides, and the male template is provided with a splicing portion adapted to the stepped surface near the two sides, The splicing part is bonded to the stepped surface, and there is a fixing piece between the stepped surface and the splicing part to realize the fixing or separation of the two; when installing, the installation starts from the edge of the post-casting tape, and the sub-formwork is set by the vertical formwork Put the longitudinal steel bars between the upper steel bar and the lower steel bar and fix the slot on the sub-formwork to the longitudinal steel bar; alternately splice the male formwork and the female formwork, and fit the splicing part of the male formwork to the stepped surface of the female formwork The male formwork and the female formwork are fixed by the fixing parts, and the operation is repeated many times until the formwork is fully supported.
模板支设之前还包括在后浇带部分预留供子模板放入上下两层钢筋之间的空隙,该空隙通过先不对后浇带部分的横向钢筋进行绑扎构成,横向钢筋即平行模板设置的钢筋,待模板拆除后再进行此处横向钢筋的捆扎。Before the formwork is set up, there is also a space reserved in the post-casting belt for the sub-formwork to be placed between the upper and lower layers of steel bars. The gap is formed by not binding the horizontal steel bars in the post-casting belt part. The horizontal steel bar is set parallel to the formwork Steel bars, after the formwork is removed, the horizontal steel bars here will be bundled.
所述模板支设前还包括于模板上刷涂脱模剂。Before the formwork is supported, it also includes brushing a release agent on the formwork.
还包括在后浇带部分贴紧模板表面绑扎横向钢筋,用于对模板起辅助固定,该横向钢筋拆模时先取下。It also includes tying transverse steel bars close to the surface of the formwork on the post-casting belt part for auxiliary fixing of the formwork, and the transverse steel bars are removed first when the formwork is demolished.
本发明的效果在于,通过将模板设置为拼接结构,并由若干子模板构成,每块子模板可单独拆卸。通过该方式,由于模板的跨度被大大降低,更加方便模板放入上下两层钢筋之间固定,同理亦更加方便取出,简化了模板的支设,降低了支设难度;同时由于其为拼接式,并且其拼接的结构为平面的贴合进行拼接。母模板的阶梯面靠近其两条侧边处的阶梯面为向同一侧凹陷,使得公模板上的拼接部与该阶梯面贴合拼接时,母模板两边的公模板相对于母模板的阶梯面均处于同一侧,即模板拆卸时,将母模板两边的公模板拆卸即可将母模板拆卸,阶梯面与拼接部之间设置有固定件,固定件可实现公模板与母模板的固定以及分离,拆模时,通过固定件将公模板与母模板分离,从而实现单块子模板的逐一拆卸,由于模板为拼接结构,单个子模板的跨度较小,对其进行敲落时,单个子模板的受力更加均匀,敲落后不易损坏,因此可回收再次利用,通过该方式,有效节省了施工的成本,且符合可持续发展的理念。The effect of the present invention is that, by setting the formwork as splicing structure and composed of several sub-templates, each sub-template can be disassembled separately. In this way, since the span of the formwork is greatly reduced, it is more convenient for the formwork to be fixed between the upper and lower layers of steel bars, and it is also more convenient to take it out, which simplifies the support of the formwork and reduces the difficulty of support; at the same time, because it is spliced formula, and its splicing structure is spliced by plane fit. The stepped surface of the female formwork near its two sides is recessed towards the same side, so that when the splicing part on the male formwork is attached to the stepped surface, the male formwork on both sides of the female formwork will be opposite to the stepped surface of the female formwork. They are all on the same side, that is, when the formwork is disassembled, the female formwork can be disassembled by removing the male formwork on both sides of the female formwork. There are fixing parts between the step surface and the splicing part. The fixing parts can realize the fixing and separation of the male formwork and the female formwork. , when removing the formwork, the male formwork is separated from the mother formwork through the fixing parts, so as to realize the disassembly of the single sub-formwork one by one. Since the formwork is a spliced structure, the span of a single sub-formwork is small. The force is more uniform, and it is not easy to be damaged after being knocked down, so it can be recycled and reused. Through this method, the construction cost is effectively saved, and it is in line with the concept of sustainable development.
附图说明Description of drawings
图1为现有技术中模板支设的结构示意图;Fig. 1 is the structural representation of formwork support in the prior art;
图2为现有技术的模板结构示意图;Fig. 2 is the template structure schematic diagram of prior art;
图3为本发明第一实施例模板支设的结构示意图;Fig. 3 is a schematic structural view of the formwork support of the first embodiment of the present invention;
图4为图3的A部分放大图;Fig. 4 is an enlarged view of part A of Fig. 3;
图5为本发明第一实施例模板安装的结构示意图;Fig. 5 is a structural schematic diagram of template installation in the first embodiment of the present invention;
图6为本发明第一实施例模板的爆炸示意图一;Fig. 6 is an explosion schematic diagram 1 of the template of the first embodiment of the present invention;
图7为本发明第一实施例模板的爆炸示意图二;Fig. 7 is the explosion schematic diagram II of the template of the first embodiment of the present invention;
图8为本发明第二实施例模板安装的结构示意图;Fig. 8 is a structural schematic diagram of the template installation of the second embodiment of the present invention;
图9为本发明第二实施例模板的爆炸示意图。Fig. 9 is an exploded schematic view of the template of the second embodiment of the present invention.
附图标记说明:1、模板;2、后浇带部分;11、卡槽;12、母模板;13、公模板;121、阶梯面;122、螺纹孔槽;123、n型框;124、插销;131、拼接部;132、通孔;133、通槽。Explanation of reference signs: 1. Template; 2. Post-pouring tape part; 11. Card slot; 12. Female template; 13. Male template; 121. Step surface; 122. Threaded hole groove; 123. Latch; 131, splicing part; 132, through hole; 133, through groove.
具体实施方式detailed description
参照图1至图9对本发明实施例做进一步说明。The embodiment of the present invention will be further described with reference to FIG. 1 to FIG. 9 .
本发明所述的楼板后浇带模板,所述该模板由若干块子模板拼接构成,子模板包括公模板13与母模板12,公模板13和母模板12交替拼接,所述母模板12靠近两条侧边处均设有向同一侧凹陷的阶梯面121,所述公模板13靠近两条侧边处均设有与阶梯面121适配的拼接部131,拼接部131贴合阶梯面121设置,所述阶梯面121与拼接部131之间设有可实现两者固定或分离的固定件。The post-casting belt formwork for floor slabs according to the present invention is composed of several sub-formworks spliced together, the sub-formworks include male formwork 13 and female formwork 12, the male formwork 13 and female formwork 12 are spliced alternately, and the female formwork 12 is close to Both sides are provided with a stepped surface 121 that is sunken to the same side, and the male template 13 is provided with a splicing portion 131 that is adapted to the stepped surface 121 near the two sides, and the spliced portion 131 fits the stepped surface 121 It is provided that there is a fixing member between the stepped surface 121 and the splicing portion 131 to realize the fixing or separation of the two.
结合以下两个实施例进行具体说明,并给出固定件的两种优选方式。The following two embodiments are used for specific description, and two preferred ways of fixing parts are given.
本发明的实施例一,参照图3至图7,所述阶梯面121设有螺纹孔槽122,所述拼接部131设有与螺纹孔槽122重合的通孔132,所述固定件为螺栓,所述公模板13与母模板12借助螺栓穿过通孔132并螺纹连接于螺纹孔槽122进行固定。Embodiment 1 of the present invention, referring to Fig. 3 to Fig. 7, said stepped surface 121 is provided with threaded hole groove 122, said splicing part 131 is provided with through hole 132 coincident with threaded hole groove 122, and said fixing member is a bolt , the male template 13 and the female template 12 pass through the through hole 132 with bolts and are screwed into the threaded hole groove 122 for fixing.
通过该方式,不但可对公模板13与母模板12实现有效的固定,且安装和拆卸均十分方便,上述方式的螺纹孔槽122非贯穿母模板12,以防止混凝土渗入螺纹孔槽122。 通过螺栓连接,由于固定件体积小,且方便生产加工,故该方式为首选方案。In this way, not only can the male formwork 13 and the female formwork 12 be effectively fixed, but also the installation and disassembly are very convenient. Through bolt connection, due to the small size of the fixing parts and the convenience of production and processing, this method is the preferred solution.
本发明的实施例二,参照图8至图9可清楚表示,所述阶梯面121凸起设置有n型框123,n型框123的两端均固定连接于阶梯面121,所述拼接部131设有供n型框123通过的通槽133;还包括一端呈楔形的插销124,所述母模板12与公模板13借助n型框123穿过通槽133再通过插销124插入n形框构成的销口达到固定。Embodiment 2 of the present invention can be clearly shown with reference to FIGS. 131 is provided with a through slot 133 for the n-shaped frame 123 to pass through; it also includes a wedge-shaped plug 124 at one end, the female template 12 and the male template 13 pass through the through slot 133 by means of the n-shaped frame 123 and then insert the n-shaped frame through the plug 124 The formed pin mouth is fixed.
通过该方式,避免了实施例一中工人逐个的拧紧螺栓而产生的麻烦,通过该插销124的方式工人只需通过榔头将楔形的插销124敲入n型框123穿出通槽133所构成的销口即可。楔形的插销124可达到预紧的目的。In this way, the trouble caused by the workers tightening the bolts one by one in the first embodiment is avoided. With the bolt 124, the worker only needs to use a hammer to knock the wedge-shaped bolt 124 into the n-shaped frame 123 and pass through the groove 133. Just sell it. The wedge-shaped pin 124 can achieve the purpose of pre-tightening.
上述两种方式中,模板除木质材质外也可采用工程塑料等材料制作。In the above two methods, the formwork can also be made of materials such as engineering plastics in addition to wooden materials.
本发明还提供了一种楼板后浇带支模方法,模板为拼接而成,所述该模板由若干块子模板构成,子模板包括公模板13与母模板12,公模板13和母模板12交替拼接,所述母模板12靠近两条侧边处均设有向同一侧凹陷的阶梯面121,所述公模板13靠近两条侧边处均设有与阶梯面121适配的拼接部131,拼接部131与阶梯面121形成贴合,所述阶梯面121与拼接部131之间设有可实现两者固定或分离的固定件;安装时由后浇带的边沿开始安装,参照图3、图4所示,将子模板由垂直模板设置的纵向钢筋间放入上层钢筋与下层钢筋之间并将子模板上的卡槽11卡于该纵向钢筋进行固定;依次交替拼接公模板13与母模板12,将公模板13的拼接部131贴合母模板12的阶梯面121并通过固定件将公模板13与母模板12固定,重复多次操作,直至将模板支设完毕。The present invention also provides a method for supporting formwork with post-casting strips for floor slabs. The formwork is spliced. The formwork is composed of several sub-formworks. The sub-formworks include a male formwork 13 and a female formwork 12. The male formwork 13 and the female formwork 12 Alternate splicing, the female template 12 is provided with a stepped surface 121 that is sunken to the same side near the two sides, and the male template 13 is provided with a splicing part 131 that is adapted to the stepped surface 121 near the two sides , the splicing part 131 and the stepped surface 121 form a bond, and there is a fixing piece between the stepped surface 121 and the splicing part 131, which can realize the fixing or separation of the two; the installation starts from the edge of the post-casting tape during installation, refer to Figure 3 , as shown in Figure 4, the sub-formwork is placed between the upper reinforcement and the lower reinforcement between the longitudinal reinforcements set by the vertical formwork, and the slot 11 on the sub-formwork is stuck in the longitudinal reinforcement to fix; alternately splicing the male formwork 13 and For the female formwork 12, fit the splicing part 131 of the male formwork 13 to the stepped surface 121 of the female formwork 12 and fix the male formwork 13 and the female formwork 12 through the fixing piece, and repeat the operation several times until the formwork is fully supported.
进一步优化的,模板支设之前还包括在后浇带部分2预留供子模板放入上下两层钢筋之间的空隙,该空隙通过先不对后浇带部分2的横向钢筋进行绑扎构成,横向钢筋即平行模板设置的钢筋,待模板拆除后再进行此处横向钢筋的捆扎。具体的参照图4中所示,图4中后浇带部分2的横向钢筋未进行捆扎,该方案主要考虑到当后浇带部分2的横向钢筋距离模板间的间距较小时,则容易导致模板不便放入上下两层钢筋之间,因此当考虑到上述间距过小时,可在捆扎钢筋时将后浇带部分2的横向钢筋留置先不捆扎,以方便模板的支设,待模板拆除,需要浇注后浇带部分2时,再进行此处钢筋的捆扎,从而更方便模板的支设和拆除。Further optimization, before the formwork is supported, it also includes a space reserved in the post-casting belt part 2 for the sub-formwork to be placed between the upper and lower layers of steel bars. The steel bar is the steel bar set parallel to the formwork. After the formwork is removed, the horizontal reinforcement here will be bundled. Specifically, as shown in Figure 4, the transverse reinforcement of the post-casting belt part 2 in Figure 4 has not been bundled. It is inconvenient to be placed between the upper and lower layers of steel bars, so when considering that the above-mentioned distance is too small, you can leave the horizontal steel bars of the post-casting belt part 2 without binding when binding the steel bars, so as to facilitate the support of the formwork. After the formwork is removed, it is necessary After pouring, when the part 2 is poured, the steel bars here are bundled, so that the support and removal of the formwork are more convenient.
所述模板支设前还包括于模板上刷涂脱模剂。脱模剂可在模板与混凝土之间形成一道隔层,方便后期拆模时模板的拆卸,使得模板不易损坏。脱模剂优选采用废机油和肥皂水,废物利用成本低。Before the formwork is supported, it also includes brushing a release agent on the formwork. The release agent can form a barrier between the formwork and the concrete, which facilitates the disassembly of the formwork when the formwork is removed later, making the formwork less likely to be damaged. The release agent is preferably waste engine oil and soapy water, and the cost of waste utilization is low.
进一步如图3至图4所示,还包括在后浇带部分2贴紧模板表面绑扎横向钢筋,用于对模板起辅助固定,该横向钢筋拆模时先取下。为了更清楚的表示,图中用阴影示出。Further as shown in Fig. 3 to Fig. 4, it also includes tying transverse steel bars close to the surface of the formwork on the post-casting belt part 2, which is used for auxiliary fixing of the formwork, and the transverse steel bars are removed first when the formwork is demolished. For a clearer representation, it is shaded in the figure.
本发明的效果在于,通过将模板设置为拼接结构,并由若干子模板构成,每块子模板可单独拆卸。通过该方式,由于模板的跨度被大大降低,更加方便模板放入上下两层钢筋之间固定,同理亦更加方便取出,简化了模板的支设,降低了支设难度;同时由于其为拼接式,并且其拼接的结构为平面的贴合进行拼接。母模板12的阶梯面121靠近其两条侧边处的阶梯面121为向同一侧凹陷,使得公模板13上的拼接部131与该阶梯面121贴合拼接时,母模板12两边的公模板13相对于母模板12的阶梯面121均处于同一侧,即模板拆卸时,将母模板12两边的公模板13拆卸即可将母模板12拆卸,阶梯面121与拼接部131之间设置有固定件,固定件可实现公模板13与母模板12的固定以及分离,拆模时,通过固定件将公模板13与母模板12分离,从而实现单块子模板的逐一拆卸,由于模板为拼接结构,单个子模板的跨度较小,对其进行敲落时,单个子模板的受力更加均匀,敲落后不易损坏,因此可回收再次利用,通过该方式,有效节省了施工的成本,且符合可持续发展的理念。The effect of the present invention is that, by setting the formwork as splicing structure and composed of several sub-templates, each sub-template can be disassembled separately. In this way, since the span of the formwork is greatly reduced, it is more convenient for the formwork to be fixed between the upper and lower layers of steel bars, and it is also more convenient to take it out, which simplifies the support of the formwork and reduces the difficulty of support; at the same time, because it is spliced formula, and its splicing structure is spliced by plane fit. The stepped surface 121 of the female template 12 near its two sides is recessed toward the same side, so that when the splicing portion 131 on the male template 13 is fitted to the stepped surface 121, the male template on both sides of the female template 12 will 13 is on the same side with respect to the stepped surface 121 of the female template 12, that is, when the template is disassembled, the male template 13 on both sides of the female template 12 can be disassembled to disassemble the female template 12. The fixing parts can realize the fixing and separation of the male formwork 13 and the female formwork 12. When removing the formwork, the male formwork 13 and the female formwork 12 are separated through the fixing parts, so as to realize the disassembly of the single sub-formwork one by one. Since the formwork is a spliced structure , the span of a single sub-formwork is small, when it is knocked down, the force of a single sub-formwork is more uniform, and it is not easy to be damaged after being knocked down, so it can be recycled and reused. The concept of sustainable development.
以上所述仅为本发明的较佳实施例,并不用于限制本发明,凡在本发明的设计构思之内,所作的任何修改、等同替换、改进等,均应包含在本发明的保护范围之内。The above descriptions are only preferred embodiments of the present invention, and are not intended to limit the present invention. Any modifications, equivalent replacements, improvements, etc. made within the design concept of the present invention shall be included in the protection scope of the present invention within.
Claims (7)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201510427368.0A CN105178597B (en) | 2015-07-20 | 2015-07-20 | Floor slab back casting band template and mold method |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201510427368.0A CN105178597B (en) | 2015-07-20 | 2015-07-20 | Floor slab back casting band template and mold method |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN105178597A CN105178597A (en) | 2015-12-23 |
| CN105178597B true CN105178597B (en) | 2017-06-13 |
Family
ID=54900977
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201510427368.0A Expired - Fee Related CN105178597B (en) | 2015-07-20 | 2015-07-20 | Floor slab back casting band template and mold method |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN105178597B (en) |
Families Citing this family (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN105696631B (en) * | 2016-04-20 | 2017-12-29 | 宝业湖北建工集团有限公司 | A kind of erection method of post-cast strip baffle plate, baffle plate support system and support system |
| CN106284985A (en) * | 2016-09-09 | 2017-01-04 | 五冶集团上海有限公司 | A kind of Formwork Installation Method of reserved post-cast strip |
| CN107035141B (en) * | 2017-06-02 | 2019-04-23 | 温州神光建设工程有限公司 | A formwork support method for post-casting belt of floor slab |
| CN107313787B (en) * | 2017-07-12 | 2024-02-06 | 济南城建集团有限公司 | Tunnel lining trolley end die and construction method |
| CN111206746B (en) * | 2020-01-09 | 2021-05-11 | 海达建设集团有限公司 | Construction method of large-area terrace |
| CN112900871A (en) * | 2021-01-25 | 2021-06-04 | 江苏中康建设有限公司 | Tool type construction joint rapid setting construction method |
| CN113503017A (en) * | 2021-08-01 | 2021-10-15 | 尹杰 | Floor post-cast strip formwork device |
Family Cites Families (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US5946881A (en) * | 1997-12-01 | 1999-09-07 | Chatelain; Paul J. | Form for casting a concrete fence post in situ and process for its use |
| JP2002242430A (en) * | 2001-02-19 | 2002-08-28 | Bungo Ishida | Form stopper for formwork |
| CN201588401U (en) * | 2010-01-02 | 2010-09-22 | 王祥瑞 | Improved construction template |
| CN202467176U (en) * | 2012-03-12 | 2012-10-03 | 中天建设集团有限公司 | Post-cast strip isolation template |
| CN202519977U (en) * | 2012-03-12 | 2012-11-07 | 中国三冶集团有限公司建筑安装工程公司 | Floor concrete post-poured strip template installation device |
| CN103572784B (en) * | 2013-11-21 | 2015-09-30 | 中建二局第三建筑工程有限公司 | A kind of super thick raft board post poured band formwork bracing system and construction method thereof |
| CN204435858U (en) * | 2014-12-11 | 2015-07-01 | 中冶天工集团有限公司 | Cast-in-place structure post-cast strip shaping template |
-
2015
- 2015-07-20 CN CN201510427368.0A patent/CN105178597B/en not_active Expired - Fee Related
Also Published As
| Publication number | Publication date |
|---|---|
| CN105178597A (en) | 2015-12-23 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN105178597A (en) | Floorslab post-cast strip template and template installing method | |
| CN106836568A (en) | A kind of glass fiber cement non-dismantling formwork system, connecting structure and its construction method | |
| CN202706536U (en) | Lateral support formwork applied to post-cast strip or construction joint | |
| CN205242683U (en) | Shear wall structure is connected to combined type | |
| CN109441098A (en) | A kind of early-dismantling formwork system and its construction method | |
| CN105965672B (en) | A kind of fabricated shear wall model structure unitary mould | |
| CN204418680U (en) | A kind of concrete wall template bracing reinforcement assembly | |
| CN110284704A (en) | A prefabricated floor slab post-casting strip formwork joint structure and its construction method | |
| CN209228042U (en) | A kind of corner constructional column erecting device | |
| CN108381730B (en) | Manufacturing device and manufacturing method of hybrid beam | |
| CN206752763U (en) | A kind of glass fiber cement non-dismantling formwork system and its connecting structure | |
| CN106113230A (en) | For the prefabricated non-type of bench, template system and construction method thereof can be had enough to meet the need | |
| CN108005255A (en) | A method of building a wall | |
| CN202509764U (en) | Template bracing structure for constructional column | |
| CN204001723U (en) | The detachable combined steel tool of a kind of shear wall reserved opening | |
| CN206158172U (en) | Entrance to a cave template | |
| CN109162449A (en) | A kind of protectiveness rib template for building | |
| CN201901941U (en) | Building system combining precast concrete member and cast-in-place concrete template | |
| CN105804396B (en) | A kind of non-type, template system precast stair bench and construction can be had enough to meet the need | |
| CN210239119U (en) | A support structure for post-casting strip of floor slab | |
| CN204186068U (en) | Scissors wall building iron wood gang form | |
| CN117266451B (en) | Construction method and construction structure of top preformed bar planting-free constructional column | |
| CN219235618U (en) | Concrete mold for easy demoulding of concrete | |
| CN209163167U (en) | A prefabricated floor connecting node structure | |
| CN201225001Y (en) | Composite die for casting building frame |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C06 | Publication | ||
| PB01 | Publication | ||
| C10 | Entry into substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170613 |
|
| CF01 | Termination of patent right due to non-payment of annual fee |