Prior art keywords
boats
tree
wall
making timber
mould
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610811574.6A
Other languages
Chinese (zh)
Inventor
毛远富
杨明升
李延臣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
MCC5 Group Shanghai Corp Ltd
Original Assignee
MCC5 Group Shanghai Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by MCC5 Group Shanghai Corp Ltd filed Critical MCC5 Group Shanghai Corp Ltd
Priority to CN201610811574.6A priority Critical patent/CN106284985A/en
Publication of CN106284985A publication Critical patent/CN106284985A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G13/00Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The invention discloses the Formwork Installation Method of a kind of reserved post-cast strip, it comprises the steps: A, install the first side wall form and body of wall vertically carries on the back a tree, used in making timber for boats;B, boring;C, installation Screw arbor with nut at both-ends;D, the second side wall form is installed and body of wall vertically carries on the back a tree, used in making timber for boats;E, wall transversal is installed supports or opposes a tree, used in making timber for boats;F, installation end mould: the breach of two pieces of end moulds is through wall steel bar symmetrically placed with steel plate for sealing water, and described end mould gap opened is towards steel plate for sealing water, and is close to steel plate for sealing water;G, installation are sealed mould and vertically carry on the back a tree, used in making timber for boats: envelope mould is close to hold the outside of mould;A tree, used in making timber for boats is laterally carried on the back in H, installation;I, installation support bar: support bar is fixed with laterally back of the body a tree, used in making timber for boats.The present invention has easy to operate, quick for the model sheetinstallat reserving post-cast strip, and template is not easy " quick-fried mould ", and post-cast strip shapes rule, and steel plate for sealing water can be protected well without damage, indeformable, it is ensured that the advantages such as the position of steel plate for sealing water and perpendicularity.

Description

A kind of Formwork Installation Method of reserved post-cast strip
Technical field
The present invention relates to the Formwork Installation Method of a kind of architectural engineering, particularly reserve the Formwork Installation Method of post-cast strip.
Background technology
In recent years, along with the fast development of China's economy, skyscraper is on the increase, and post-cast strip is high-building construction Important component part.Arranging post-cast strip and can efficiently reduce the generation of distress in concrete, the contraction of differentiation large area concrete should Power, thus effectively solve the problems such as flexible, the sedimentation of skyscraper.
At present, the method for obligating of basement wall of high-rising buildings post-cast strip generally uses the method for metal binding wire net, but should There is a lot of drawback in method: one is fixing insecure, and along with the increase of concreting height, lateral pressure increases, and steel wire goes out Existing obscission;Two is that steel plate for sealing water position easily offsets;Three is bad sealing, is mainly reflected in concrete in steel wire mesh Flow out, steel wire and concrete bonding form rough interface after solidification, affect outward appearance, cut that workload is big, affect Construction speed.
The most known basement wall is reserved the method to set up of post-cast strip and be there is above-mentioned all inconvenience and problem.
Summary of the invention
The technical problem to be solved in the present invention is to provide the Formwork Installation Method of a kind of reserved post-cast strip, can go by template Substitute steel wire, it is ensured that tight-closed and fixation, and steel plate for sealing water can be fixed make it not offset.
In order to solve above-mentioned technical problem, the invention provides the Formwork Installation Method of a kind of reserved post-cast strip, it includes Following steps:
A, installing the first side wall form and body of wall vertically carries on the back a tree, used in making timber for boats, described vertical back of the body a tree, used in making timber for boats is close to the outside of wall form, and with Fixing;
B, boring: hold up the second side wall form, electricity consumption is drilled in the first side wall body template mark position boring, drills rear level side To continuing brill the second side wall form, until pore-forming;
C, installation Screw arbor with nut at both-ends: set level the second side wall form, one end of Screw arbor with nut at both-ends is penetrated the first side form plate hole, makes drawing The body of wall of screw rod is reserved counterbore device end face and is close to inside wall form;
D, the second side wall form is installed and body of wall vertically carries on the back a tree, used in making timber for boats: hold up the second side wall form, be directed at pattern hole to drawing spiral shell The other end level of bar penetrates, and makes the body of wall being close to Screw arbor with nut at both-ends inside template reserve counterbore device end face, installs body of wall vertical Back of the body a tree, used in making timber for boats, and fix with wall form;
E, wall transversal is installed supports or opposes a tree, used in making timber for boats: described wall transversal a tree, used in making timber for boats of supporting or opposing is close to body of wall and vertically carries on the back the outside of a tree, used in making timber for boats, passes through Screw arbor with nut at both-ends Fixing;
F, installation end mould: end mould through wall steel bar symmetrically placed centered by steel plate for sealing water, described end mould gap opened court To steel plate for sealing water, and it is close to steel plate for sealing water;
G, envelope mould and vertically carry on the back a tree, used in making timber for boats is installed: envelope mould is close to hold the outside of mould, vertical back of the body a tree, used in making timber for boats to be close to hold the outside of mould, and therewith Fixing, thickness of wall body direction arranges multiple tracks, and middle twice are close to steel plate for sealing water;
A tree, used in making timber for boats is laterally carried on the back in H, installation: laterally back of the body a tree, used in making timber for boats is close to vertically carry on the back the outside of a tree, used in making timber for boats, and fixed thereto;
I, installation support bar: one end presses closer envelope mould, the wedging other end and another side seal mould fixed support and laterally carries on the back a tree, used in making timber for boats;
Further, before installation form, also need snap the line, release basement wall sideline, post-cast strip and steel plate for sealing water with equipment The position line, and eject with ink fountain;
Further, remove in accordance with the following steps after also including having poured concrete:
J: remove support bar: take out the fixing of wedge block, releasing and horizontal back of the body a tree, used in making timber for boats and take off support bar;
K: remove and laterally carry on the back a tree, used in making timber for boats: releasing laterally back of the body a tree, used in making timber for boats is fixed with vertical back of the body a tree, used in making timber for boats and takes off;
L: remove envelope mould and vertically carry on the back a tree, used in making timber for boats: release it and hold the fixing of mould and take off;
M: remove end mould: extract the end mould of steel plate for sealing water both sides out;
N: remove wall transversal and support or oppose a tree, used in making timber for boats: screw off the nut of Screw arbor with nut at both-ends, takes off wall transversal and supports or opposes a tree, used in making timber for boats;
O: remove both sides wall form and body of wall vertically carries on the back a tree, used in making timber for boats: take off wall form along Screw arbor with nut at both-ends and releasing is vertically carried on the back with body of wall Fixing of a tree, used in making timber for boats;
Further, the process of Screw arbor with nut at both-ends in body of wall is also included: pound out Screw arbor with nut at both-ends body of wall with instrument and reserve counterbore device, go Except dew screw rod head, then with mixed with extender cement mortar block pit;
Further, described end mould gap width is distributed spacing and wall steel bar spacing phase more than wall steel bar diameter and breach With;
Further, described end mould notch geometry is U-shaped;
Further, described end mould and envelope mould are steel, wood, plastics or steel wood composite material;
Further, it is fixed as iron nail described in fix;
Further, described Screw arbor with nut at both-ends is made by plain bar, and two ends car has screw thread, centre to be welded with one seal ring, both sides Being welded with limiting plate, and placement body of wall reserves counterbore device outside it, it is ground that described body of wall reserves the distance between counterbore device The thickness of lower room body of wall;
Further, described wall transversal a tree, used in making timber for boats of supporting or opposing is made up of two steel pipes arranged side by side, described outer diameter of steel pipes 48mm, wall thickness 3.5mm.
Employing beneficial effects of the present invention:
1, installation method is simple, easy to operate, quick;
2, template stationary state is good, it is not easy to cause " quick-fried mould " phenomenon, reduces engineering cost and duration cost allowance;
3, template is reusable;
4, post-cast strip shapes rule, and size meets the requirement of design and inspection of quality specification;
5, can well protect steel plate for sealing water without damage, indeformable, and can guarantee that position and the perpendicularity of steel plate for sealing water;
6, pit at cement mortar closure Screw arbor with nut at both-ends head so that Screw arbor with nut at both-ends non-corrosive in body of wall, it is to avoid ooze at Screw arbor with nut at both-ends The phenomenon of water.
Accompanying drawing explanation
Fig. 1 is the post-cast strip position view of the embodiment of the present invention;
Fig. 2 is the snap the line schematic diagram of the embodiment of the present invention;
Fig. 3 is the alter-pouring strips mould plate mounting plane schematic diagram of the embodiment of the present invention;
Fig. 4 is the alter-pouring strips mould plate mounting vertical plane schematic diagram of the embodiment of the present invention;
Fig. 5 is the A-A sectional view in Fig. 3;
Fig. 6 is the B-B sectional view in Fig. 3;
Fig. 7 is the end mould schematic diagram of the embodiment of the present invention;
Fig. 8 is the Screw arbor with nut at both-ends schematic diagram of the embodiment of the present invention.
In figure: h1 is reserved post-cast strip, z1 is sealing plate centre line, 1 end mould, and 2 vertically carry on the back a tree, used in making timber for boats, and 3 envelope moulds, 4 is horizontal Back of the body a tree, used in making timber for boats, 5 support bars, 6 iron nails, 7 steel plate for sealing water, 8 wall forms, 9 bodies of wall vertically carry on the back a tree, used in making timber for boats, and 10 wall transversals are supported or opposed a tree, used in making timber for boats, and 11 to drawing spiral shell Bar, 111 seal rings, 112 limiting plates, 113 rubber cushions, 114 steel plates, 12 wall steel bars, 13 timber wedges.
Detailed description of the invention
The invention will be further described with specific embodiment below in conjunction with the accompanying drawings, so that those skilled in the art is permissible It is more fully understood that the present invention and can be practiced, but illustrated embodiment is not as a limitation of the invention.
Embodiment one: the present embodiment specifically describes basement wall and reserves model sheetinstallat and the demolishing process of post-cast strip.
For ease of describing, installation direction is defined as follows: vertical wall be outside away from wall direction, its opposite direction For inner side.
In embodiment, concrete part dimension and installing space can adjust according to actual requirement of engineering.
Specific construction step is as follows:
A, snap the line: release basement wall sideline, post-cast strip and the position line of steel plate for sealing water with total powerstation, and eject with ink fountain, Seeing Fig. 1, width of wall body 400mm in figure, dash area h1 is reserved position, post-cast strip, the long 700mm in post-cast strip;Till seeing Fig. 2, z1 Water plate centre line, steel plate for sealing water width 300mm.
B, the first side wall form 8 is installed and body of wall vertically carries on the back a tree, used in making timber for boats 9: seeing Fig. 3 and Fig. 4, body of wall vertically carries on the back a tree, used in making timber for boats 9 by wood a tree, used in making timber for boats system Make, long 1.5m, wide 80mm, thick 50mm, be close to the outside of wall form 8, and fixed thereto with iron nail, horizontal-direction pitch 600mm。
C, boring: hold up the second side wall form (described first side, the second side are the two sides of body of wall), (lengthen with electric drill Drill bit) the first side wall form 8 mark position hole, drill rear horizontal direction continue bore the second side wall form, until Pore-forming.
D, installation Screw arbor with nut at both-ends 11: seeing Fig. 3 and Fig. 4, Screw arbor with nut at both-ends 11 is made by φ 10mm plain bar, and centre is welded with one Road seal ring 111, both sides are welded with limiting plate 112, and outside it, placement body of wall reserves counterbore device, is rubber cushion in the present embodiment 113, it is possible to for wooden unit, the distance between two rubber cushions is the thickness of basement wall, two ends are provided with steel plate 114, thickness 10mm, peace Setting level the second side wall form during dress, one end of Screw arbor with nut at both-ends 11 penetrates the first side form plate hole, the rubber cushion making Screw arbor with nut at both-ends is tight Inside patch template, Screw arbor with nut at both-ends 11 horizontal-direction pitch 600m, vertical direction spacing 800mm.
E, the second side wall form 8 is installed and body of wall vertically carries on the back a tree, used in making timber for boats 9: hold up the second side wall form, pattern hole be directed at The other end level of Screw arbor with nut at both-ends 11 penetrates, and makes to be close to inside template the rubber cushion 11-3 of Screw arbor with nut at both-ends, installs body of wall and vertically carries on the back a tree, used in making timber for boats 9, and fixed thereto.
F, wall transversal be installed support or oppose a tree, used in making timber for boats 10: see Fig. 3 and Fig. 4, laterally back of the body a tree, used in making timber for boats be external diameter 48mm, the double steel pipe of wall thickness 3.5mm, tightly It is attached to body of wall and vertically carries on the back the outside of a tree, used in making timber for boats 9, vertical direction spacing 800mm, be symmetrically installed the steel plate 114 of Screw arbor with nut at both-ends 11, tighten spiral shell Mother makes it fix.
G, installation end mould 1: end mould 1 structure as it is shown in fig. 7, end mould 1 made by plank, material also can be selected for steel, plastics or Steel wood is combined, long 1.8m, wide 215mm, and thick 18mm, (notch geometry can select other shapes as required to be interval with " u "-shaped breach Shape), notch geometry purpose of design is wall steel bar of fitting as much as possible, reduces the gap of end mould and wall steel bar, in comb shape, Breach spacing 150mm, the long 190mm of breach, width 25mm.As shown in Figure 6, gap width design principle is more than wall steel bar 12 diameters are also reduced as far as the gap holding mould 1 with wall steel bar 12;Two pieces of end mould 1 symmetries centered by steel plate for sealing water 7 set Putting, end mould 1 gap opened is towards wall water seal steel plate 7, and is close to water steel plate 7.
H, installation envelope mould 3 and vertical back of the body a tree, used in making timber for boats 2: seeing that Fig. 3 and Fig. 5, envelope mould 3 are made by plank, material also can be selected for steel, moulds Material, steel wood are combined, long 1.8m, wide 50mm, thick 18mm, are close to hold the outside of mould 1, and vertical back of the body a tree, used in making timber for boats 2 is made by wood a tree, used in making timber for boats, long 1.5m, wide 80mm, thick 50mm, it is close to hold the outside of mould 1, and fixed thereto, thickness of wall body direction arranges four roads, middle twice It is close to steel plate for sealing water 7, the position of fixing steel plate for sealing water 7.
I, laterally back of the body a tree, used in making timber for boats 4 is installed: laterally back of the body a tree, used in making timber for boats 4 is made by wood a tree, used in making timber for boats, is close to vertically carry on the back the outside of a tree, used in making timber for boats 2, and with iron nail 6 and Fixing, vertical direction spacing 800mm.
J, installation support bar 5: see Fig. 3 and Fig. 4, support bar 5 is made by wood a tree, used in making timber for boats, long 564mm, wide 80mm, thick 50mm, peace During dress, one end presses closer envelope mould 3, the other end and gap timber wedge 13 wedging of another side seal mould, solid with laterally back of the body a tree, used in making timber for boats 4 with iron nail 6 Fixed, twice, vertical direction spacing 800mm are set.
K, dismounting: tear open afterwards according to first propping up, rear the principle first torn open is removed;
K1: remove support bar: take out timber wedge, nail puller is extracted and is laterally carried on the back the fixing iron nail 6 of a tree, used in making timber for boats and take off support bar;
K2: remove and laterally carry on the back a tree, used in making timber for boats: nail puller is extracted the iron nail 6 fixing with vertically back of the body a tree, used in making timber for boats and takes off and laterally carry on the back a tree, used in making timber for boats;
K3: remove envelope mould and vertically carry on the back a tree, used in making timber for boats: nail puller is extracted it and is fixed the 6 of iron nail with end mould and take off;
K4: remove end mould: extract the end mould of steel plate for sealing water both sides out;
K5: remove wall transversal and support or oppose a tree, used in making timber for boats: screw off the nut of Screw arbor with nut at both-ends, takes off wall transversal and supports or opposes a tree, used in making timber for boats;
K6: remove both sides wall form and body of wall vertically carries on the back a tree, used in making timber for boats: taking off wall form along Screw arbor with nut at both-ends, iron nail 6 extracted by nail puller And take off body of wall and vertically carry on the back a tree, used in making timber for boats.
L, Screw arbor with nut at both-ends head block: after basement wall form removable completes, pound out Screw arbor with nut at both-ends rubber cushion with chisel, use gas Slice off the screw rod head exposed, then block pit by the cement mortar mixed with extender.
M, cleaning body of wall: after basement wall template and reserved alter-pouring strips mould plate are removed, remove the mortar that body of wall exposes, and Polish flat with hand grinding tool.
Embodiment described above is only the preferred embodiment lifted by absolutely proving the present invention, the protection model of the present invention Enclose and be not limited to this.The equivalent that those skilled in the art are made on the basis of the present invention substitutes or conversion, all in the present invention Protection domain within.Protection scope of the present invention is as the criterion with claims.

Claims (10)

1. the Formwork Installation Method of a reserved post-cast strip, it is characterised in that:
Comprise the steps:
A, the first side wall form is installed and body of wall vertically carries on the back a tree, used in making timber for boats: described vertical back of the body a tree, used in making timber for boats is close to the outside of wall form, and with Fixing;
B, boring: hold up the second side wall form, electricity consumption is drilled in the first side wall body template mark position boring, drills rear level Direction continues to bore the second side wall form, until pore-forming;
C, installation Screw arbor with nut at both-ends: set level the second side wall form, one end of Screw arbor with nut at both-ends is penetrated the first side form plate hole, makes drawing The body of wall of screw rod is reserved counterbore device end face and is close to inside wall form;
D, the second side wall form is installed and body of wall vertically carries on the back a tree, used in making timber for boats: hold up the second side wall form, be directed at pattern hole to drawing spiral shell The other end level of bar penetrates, and makes the body of wall being close to the other end of Screw arbor with nut at both-ends inside template reserve counterbore device end face, installs Body of wall vertically carries on the back a tree, used in making timber for boats, and fixes with wall form;
E, wall transversal is installed supports or opposes a tree, used in making timber for boats: described wall transversal a tree, used in making timber for boats of supporting or opposing is close to body of wall and vertically carries on the back the outside of a tree, used in making timber for boats, passes through Screw arbor with nut at both-ends Fixing;
F, installation end mould: end mould through wall steel bar symmetrically placed centered by steel plate for sealing water, described end mould gap opened court To steel plate for sealing water, and it is close to steel plate for sealing water;
G, envelope mould and vertically carry on the back a tree, used in making timber for boats is installed: envelope mould is close to hold the outside of mould, vertical back of the body a tree, used in making timber for boats to be close to hold the outside of mould, and therewith Fixing, thickness of wall body direction arranges multiple tracks, and middle twice are close to steel plate for sealing water;
A tree, used in making timber for boats is laterally carried on the back in H, installation: laterally back of the body a tree, used in making timber for boats is close to vertically carry on the back the outside of a tree, used in making timber for boats, and fixed thereto;
I, installing support bar: one end presses closer envelope mould, the wedging other end and another side seal mould also make support bar fix with horizontal a tree, used in making timber for boats of carrying on the back.
The Formwork Installation Method of reserved post-cast strip the most according to claim 1, it is characterised in that: before installation form, also Need snap the line, release basement wall sideline, post-cast strip and the position line of steel plate for sealing water with equipment, and eject with ink fountain.
The Formwork Installation Method of reserved post-cast strip the most according to claim 1, it is characterised in that: also include having poured coagulation Remove in accordance with the following steps after soil:
J: remove support bar: take out the fixing of wedge block, releasing and horizontal back of the body a tree, used in making timber for boats and take off support bar;
K: remove and laterally carry on the back a tree, used in making timber for boats: releasing laterally back of the body a tree, used in making timber for boats is fixed with vertical back of the body a tree, used in making timber for boats and takes off;
L: remove envelope mould and vertically carry on the back a tree, used in making timber for boats: release it and hold the fixing of mould and take off;
M: remove end mould: extract the end mould of steel plate for sealing water both sides out;
N: remove wall transversal and support or oppose a tree, used in making timber for boats: screw off the nut of Screw arbor with nut at both-ends, takes off wall transversal and supports or opposes a tree, used in making timber for boats;
O: remove both sides wall form and body of wall vertically carries on the back a tree, used in making timber for boats: take off wall form along Screw arbor with nut at both-ends and releasing is vertically carried on the back with body of wall Fixing of a tree, used in making timber for boats.
The Formwork Installation Method of reserved post-cast strip the most according to claim 3, it is characterised in that: also include in body of wall drawing The process of screw rod: the body of wall pounding out Screw arbor with nut at both-ends with instrument reserves counterbore device, removes the screw rod head exposed, then with mixed with expansion The cement mortar closure pit of agent.
The template dress method of reserved post-cast strip the most according to claim 1, it is characterised in that: described end mould gap width is big It is distributed spacing identical with wall steel bar spacing in wall steel bar diameter and breach.
The template dress method of reserved post-cast strip the most according to claim 1, it is characterised in that: described end mould notch geometry is U-shaped.
The template dress method of reserved post-cast strip the most according to claim 1, it is characterised in that: described end mould and envelope mould are Steel, wood, plastics or steel wood composite material.
The template dress method of reserved post-cast strip the most according to claim 1, it is characterised in that be fixed as iron nail described in: solid Fixed.
The Formwork Installation Method of reserved post-cast strip the most according to claim 1, it is characterised in that: described Screw arbor with nut at both-ends is by light Round bar makes, and two ends car has screw thread, centre to be welded with one seal ring, and both sides are welded with limiting plate, and place body of wall outside it Reserved counterbore device, described body of wall reserves the thickness that distance is basement wall between counterbore device end face.
The Formwork Installation Method of reserved post-cast strip the most according to claim 1, it is characterised in that: described wall transversal is supported or opposed A tree, used in making timber for boats is made up of two steel pipes arranged side by side, described outer diameter of steel pipes 48mm, wall thickness 3.5mm.
CN201610811574.6A 2016-09-09 2016-09-09 A kind of Formwork Installation Method of reserved post-cast strip Pending CN106284985A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610811574.6A CN106284985A (en) 2016-09-09 2016-09-09 A kind of Formwork Installation Method of reserved post-cast strip

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610811574.6A CN106284985A (en) 2016-09-09 2016-09-09 A kind of Formwork Installation Method of reserved post-cast strip

Publications (1)

Publication Number Publication Date
CN106284985A true CN106284985A (en) 2017-01-04

Family

ID=57711174

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610811574.6A Pending CN106284985A (en) 2016-09-09 2016-09-09 A kind of Formwork Installation Method of reserved post-cast strip

Country Status (1)

Country Link
CN (1) CN106284985A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109057323A (en) * 2018-09-04 2018-12-21 广东蕉岭建筑工程集团有限公司 Post-cast strip closing-in mould component and post-cast strip closing method
CN109457979A (en) * 2018-12-25 2019-03-12 上海建工五建集团有限公司 Prefabricated board lifts rock-steady structure and method
CN111424725A (en) * 2020-04-27 2020-07-17 浙江天苑景观建设有限公司 Basement post-cast strip erecting prefabricated template with protection structure

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201605801U (en) * 2010-02-09 2010-10-13 广东浩和建筑有限公司 Fair-faced concrete wall template system
CN103711309A (en) * 2014-01-14 2014-04-09 成都市第四建筑工程公司 Shear wall turnable internal support structure and use method thereof
CN204266583U (en) * 2014-11-28 2015-04-15 中国建筑第五工程局有限公司 Side, the ater-casting formwork system of shear wall or floor
CN204676608U (en) * 2015-04-23 2015-09-30 五冶集团上海有限公司 A kind of template-setup structure reserving ater-casting for basement wall
CN105178597A (en) * 2015-07-20 2015-12-23 中厦建设有限公司 Floorslab post-cast strip template and template installing method
CN205296841U (en) * 2016-01-19 2016-06-08 中建四局第三建筑工程有限公司 A stagnant water structure that is used for in floor and wall body drawing screw rod hole

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201605801U (en) * 2010-02-09 2010-10-13 广东浩和建筑有限公司 Fair-faced concrete wall template system
CN103711309A (en) * 2014-01-14 2014-04-09 成都市第四建筑工程公司 Shear wall turnable internal support structure and use method thereof
CN204266583U (en) * 2014-11-28 2015-04-15 中国建筑第五工程局有限公司 Side, the ater-casting formwork system of shear wall or floor
CN204676608U (en) * 2015-04-23 2015-09-30 五冶集团上海有限公司 A kind of template-setup structure reserving ater-casting for basement wall
CN105178597A (en) * 2015-07-20 2015-12-23 中厦建设有限公司 Floorslab post-cast strip template and template installing method
CN205296841U (en) * 2016-01-19 2016-06-08 中建四局第三建筑工程有限公司 A stagnant water structure that is used for in floor and wall body drawing screw rod hole

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109057323A (en) * 2018-09-04 2018-12-21 广东蕉岭建筑工程集团有限公司 Post-cast strip closing-in mould component and post-cast strip closing method
CN109457979A (en) * 2018-12-25 2019-03-12 上海建工五建集团有限公司 Prefabricated board lifts rock-steady structure and method
CN111424725A (en) * 2020-04-27 2020-07-17 浙江天苑景观建设有限公司 Basement post-cast strip erecting prefabricated template with protection structure

Similar Documents

Publication Publication Date Title
CN100572710C (en) The non-net polyphenyl plate cast-in-place concrete exterior wall heat-preserving job practices
CN104631512A (en) Post-cast strip beam and slab construction method adopting formwork hanging method
CN106150523B (en) A kind of Railway Tunnel ditch cable trench integral mold plate construction
CN110821156A (en) Sinking type toilet hanging die structure and construction method thereof
CN104947719A (en) Basement roof post-cast strip hanging support formwork structure and post-cast strip construction method thereof
CN106284985A (en) A kind of Formwork Installation Method of reserved post-cast strip
CN110439266A (en) Waterproof reverse-edge aluminum alloy hanging die and method for constructing waterproof reverse edge by using same
CN110439265A (en) Bilateral column or wall method for synchronously constructing at a kind of narrow expansion joint
CN107191006B (en) Dismantling and repairing method for refractory concrete layer of diversion trench
CN110700319A (en) Comprehensive pipe gallery is with unilateral formwork frock
CN107059922B (en) A kind of construction method of pipe gallery deformation joint
CN212336719U (en) Sinking type toilet hanging mould structure
CN206769180U (en) A kind of shaped steel hole prefabricated section through walls
CN105696796A (en) Cantilever scaffold steel girder anchoring method
CN104032865B (en) In building heat preservation contrary sequence method infilled wall cast-in-place foamed concrete use keel component and construction method
CN209620278U (en) Concrete anti-bank template structure with can have enough to meet need reinforcing bar inside lining
CN204690801U (en) Formwork erecting structure is hung in basement roof ater-casting
CN106639099B (en) Plant-fibre type heat preservation dismounting-free formwork formwork system surface smoothness control method
CN203846613U (en) Multifunctional ceiling embedded part
CN203285056U (en) Stair formwork supporting base
CN206001126U (en) A kind of floor sealing hole sizing gasifying device
CN206408924U (en) Reusable cantilever frame embedded ring
CN211057855U (en) Comprehensive pipe gallery is with unilateral formwork frock
CN208965558U (en) Support component, foundation pit outer support system and foundation pit
CN108316308B (en) Method for dismantling large-section multi-channel temporary middle partition wall

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20170104