CN206001126U - A kind of floor sealing hole sizing gasifying device - Google Patents

A kind of floor sealing hole sizing gasifying device Download PDF

Info

Publication number
CN206001126U
CN206001126U CN201620981590.5U CN201620981590U CN206001126U CN 206001126 U CN206001126 U CN 206001126U CN 201620981590 U CN201620981590 U CN 201620981590U CN 206001126 U CN206001126 U CN 206001126U
Authority
CN
China
Prior art keywords
sealing hole
steel form
nut
bolt group
gasifying device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620981590.5U
Other languages
Chinese (zh)
Inventor
朱义铁
宗进营
李连科
于金燕
朱惠伟
邢俊杰
夏丽斐
祁威
杜林功
常欢欢
牛振宇
陈中伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Pingmei Shenma Construction and Engineering Group Co Ltd
Original Assignee
Pingmei Shenma Construction and Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Pingmei Shenma Construction and Engineering Group Co Ltd filed Critical Pingmei Shenma Construction and Engineering Group Co Ltd
Priority to CN201620981590.5U priority Critical patent/CN206001126U/en
Application granted granted Critical
Publication of CN206001126U publication Critical patent/CN206001126U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model is related to floor sealing hole sizing gasifying device, can easily there is running pulp in effectively solving existing apparatus, rise mould, the low problem of high cost, efficiency, its technical scheme for solving is that, including steel form, bolt group and nut, bolt group is welded and fixed by plate steel bar stress, steel form is hollow quadratic shape, through hole is arranged with corner, and steel form via through holes are sleeved in bolt group, and are fixed through nut.The utility model standardization level is high, can factorial praluction, be repeatedly used in turn, convenient to assemble and disassemble quick, change the mode that traditional sealing hole hangs mould, saved raw material, solid and reliable, guaranteed, the environmental protection of safety;While improving concrete aesthetic quality, it is ensured that construction quality, it is the innovation on floor sealing hole sizing gasifying device.

Description

A kind of floor sealing hole sizing gasifying device
Technical field
The utility model is related to building field, particularly a kind of floor sealing hole sizing gasifying device.
Background technology
When cast-in-place structural is constructed in the past, concrete dabbing.Before sealing hole, first by hole periphery dabbing, Hole periphery base cleaning is clean, and dabbing is shaped as tubaeform.The formwork erection that Normal practice is blocked to reserved opening is main Steel pipe jacking can be taken to support and hang two kinds of mould.Relatively low for story height, it is easy to carry out hanging hole as supporting using steel pipe, Can take this approach and be installed;Higher for story height, it is not easy to carry out hanging hole as supporting using steel pipe, can adopts It is taken at floor topping placement short steel pipes or reinforcing bar is connected using iron wire with floor slab bottoms template, formation is hung mould and constructed.
Easily there are the quality problems such as running pulp, the mould that rises in both the above constructing device, and the mould phenomenon that rises is serious even Needs are plastered just now after picking chisel and meet construction requirement;And may take off after not etc. not caused to plaster due to workman's construction level Fall, being normally carried out to operation under being unfavorable for;Then need to pick chisel during finishing, repair, cause structure and unnecessary waste is destroyed, How to make that floor sealing hole is convenient and swift, accelerating construction progress, ensure concrete while reduce labour intensity, save material Impression quality is extremely important.Therefore, the improvement of floor sealing hole sizing gasifying device and innovation are the problems of current urgent need to resolve.
Content of the invention
For above-mentioned situation, it is the defect for solving prior art, the purpose of the utility model is exactly to provide a kind of floor hole Mouthful closure sizing gasifying device, can easily there is running pulp in effectively solving existing apparatus, rise mould, the low problem of high cost, efficiency.
The technical scheme that the utility model is solved is that, including steel form, bolt group and nut, bolt group passes through plate stress steel Muscle is welded and fixed, and steel form is hollow quadratic shape, is arranged with through hole on corner, and steel form via through holes are sleeved in bolt group, And fix through nut.
The utility model standardization level is high, can factorial praluction, be repeatedly used in turn, convenient to assemble and disassemble quick, change Traditional sealing hole hangs the mode of mould, has saved raw material, solid and reliable, guaranteed, the environmental protection of safety;Improve coagulation While native aesthetic quality, it is ensured that construction quality, it is the innovation on floor sealing hole sizing gasifying device.
Description of the drawings
Fig. 1 is structural representation of the present utility model.
Fig. 2 is structure top view of the present utility model.
Fig. 3 is use state top view of the present utility model.
Fig. 4 is the 1-1 generalized section of the utility model Fig. 3.
Fig. 5 is the utility model bolt, nut, steel plate annexation schematic diagram.
Fig. 6 is the utility model partial schematic diagram.
Specific embodiment
Specific embodiment of the present utility model is described in further detail below in conjunction with accompanying drawing.
Be given by Fig. 1-6, the utility model includes steel form, bolt group and nut, bolt group 1 passes through plate steel bar stress 4 It is welded and fixed, steel form 3 is hollow quadratic shape, is arranged with through hole on corner, and 3 via through holes of steel form are sleeved in bolt group 1, And fix through nut 2.
In order to ensure using effect, described bolt specification is M14, and length is slab thickness+80mm;3 size of steel form For 300mm × 300mm, thickness is 6mm, wall thickness 100mm.
Described bolt group has 4 bolts per group, and the distance of bolt-center to 3 inwall of steel form is 50mm.
Described nut 2 is double nut.
Welded reinforcement 9 in described bolt group 1, reinforcing bar 9 are long 50mm, the HPB300 reinforcing bar of a diameter of 8mm, are arranged on spiral shell In the bolt group of female 2 top.
Pad 10 is provided between described steel form 3 and nut 2.
When the utility model is used, carry out according to the following steps:
1. perforate, pre-embedded bolt group 1, exposed bolt head plastic sheeting bag are shifted to an earlier date on request according to 8 position of live hole Firmly it is protected by;
2. steel form 3 shifts to an earlier date brushing releasing agent after perforate, and steel form 3 is enclosed within bolt group 1;
3. by nut 2 in bolt group 1;
4. the closure at unwrapping wire hole 8 requires construction in strict accordance with flooring antiseep process node, and formwork erection, reinforcing bar are extensive After the completion of multiple, notify mixing plant micro-expanding agent to be mixed according to the concrete of a grade higher than the concrete of former floor label and sealed Stifled, blocked in the area 5 of closure first, secondary plugging area 6 successively;
5., after concrete enters mould, should pour dense, afterwards mend reserved opening concrete should be slightly above original surface also can be with former table Face one is flat.Benefit concrete is combined with former concrete and is answered closely afterwards, and surface should be compacted floating.Treat that intensity reaches 1.2N mm2After water Maintenance or covering with plastic film maintenance;
6., after the dismounting of steel form 3,7 outside bolt head of floor is exposed to 7 absolute altitude of floor with angle grinder cutting;
7. cleaning surface dirt and rubbish, mend floor scope three times JS water-repellent paints of brushing rear.Should cover during application In former concrete 100mm, and brushing should be layered.Should treat during brushing second time that ground floor water-repellent paint dries that to form diaphragm laggard OK, and by parity of reasoning.Forbid that pedestrian tramples after water-repellent paint brushing, it is necessary to do appropriate maintenance.
Service condition of the present utility model is, first, when 7 template of floor is installed, in advance in the template for installing with red Paint is marked out and needs position of opening(That is 1 position of bolt group), needed before assembling reinforcement to output hole in advance reserved, broken after perforate Bits will be cleared up in time.After 3 size of steel form is determined, in advance steel form 3 is cut, and position of opening is indicated on steel form 3, Standby with bench drill perforate.Floor lower plane is installed on after the 3 brushing releasing agent of steel form that makes, nut 2 is tightened(Reach rule Model is required).Standby in the HPB300 reinforcing bar 9 of bolt appropriate position welding 50mm length, a diameter of 8mm, to ensure bolt absolute altitude. After the completion of 4 colligation of plate muscle, pre-embedded bolt group 1 need to be with 7 levels reinforcing bar spot welding of floor to guarantee Bolt sizes, position and mark High;During casting concrete, exposed bolt head beyond floor absolute altitude is protected with plastic sheeting in advance, in order to avoid concreting When uncertain factor to bolt screw thread pollute, cause follow-up nut install when go wrong.When hole need to block, bolt will be rolled in Plastic sheeting on head is removed;Casting concrete, when the age of concrete code requirement is reached, after removing steel form 3, is ground with angle Machine cuts off exposed bolt head beyond floor absolute altitude.
The utility model device is applied to the closure of 200mm*200mm reserved opening.Using this device construction, convenient fast Prompt, accelerating construction progress, it is ensured that while construction quality, improve concrete impression quality, can effectively meet specification quality will Ask and have preferable aesthetic quality.Can avoid hanging mould in conventional construction and running pulp occur, the quality problems such as the mould that rises.In addition Can achieve to improve the purpose of operating efficiency, steel form repeatedly can be used in turn, and be easy to operative, it is to avoid cause because rising by mould Pick chisel and secondary plaster;As hole area is less, pick that chisel gets up to be difficult, secondary plastering is more difficult to;Workman's construction level, It also avoid due to secondary plaster be likely to result in come off, hollowing etc., be the innovation on floor sealing hole sizing gasifying device, tool There is good economic and social benefit.

Claims (6)

1. a kind of floor sealing hole is shaped gasifying device, including steel form, bolt group and nut, it is characterised in that bolt group (1) It is welded and fixed by plate steel bar stress (4), steel form (3) is hollow quadratic shape, is arranged with through hole, steel form (3) on corner Via through holes are sleeved in bolt group (1), and fixing through nut (2).
2. floor sealing hole according to claim 1 is shaped gasifying device, it is characterised in that described bolt specification is M14, length are slab thickness+80mm;Steel form (3) a size of 300mm × 300mm, thickness are 6mm, wall thickness 100mm.
3. floor sealing hole according to claim 1 is shaped gasifying device, it is characterised in that described bolt group has per group 4 bolts, the distance of bolt-center to steel form (3) inwall is 50mm.
4. floor sealing hole according to claim 1 is shaped gasifying device, it is characterised in that described nut (2) is double Nut.
5. floor sealing hole according to claim 1 is shaped gasifying device, it is characterised in that in described bolt group (1) Reinforcing bar (9) is provided with, reinforcing bar (9) is long 50mm, the HPB300 reinforcing bar of a diameter of 8mm, the bolt group being arranged on above nut (2) On.
6. floor sealing hole according to claim 1 is shaped gasifying device, it is characterised in that described steel form (3) with Pad (10) is provided between nut (2).
CN201620981590.5U 2016-08-30 2016-08-30 A kind of floor sealing hole sizing gasifying device Expired - Fee Related CN206001126U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620981590.5U CN206001126U (en) 2016-08-30 2016-08-30 A kind of floor sealing hole sizing gasifying device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620981590.5U CN206001126U (en) 2016-08-30 2016-08-30 A kind of floor sealing hole sizing gasifying device

Publications (1)

Publication Number Publication Date
CN206001126U true CN206001126U (en) 2017-03-08

Family

ID=58194950

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620981590.5U Expired - Fee Related CN206001126U (en) 2016-08-30 2016-08-30 A kind of floor sealing hole sizing gasifying device

Country Status (1)

Country Link
CN (1) CN206001126U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110296278A (en) * 2019-06-28 2019-10-01 中国五冶集团有限公司 Plugging structure at floor pre-manufactured hole
CN113653355A (en) * 2021-08-03 2021-11-16 中国十七冶集团有限公司 Construction method for plugging reserved hole of lower laminate of closed space

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110296278A (en) * 2019-06-28 2019-10-01 中国五冶集团有限公司 Plugging structure at floor pre-manufactured hole
CN113653355A (en) * 2021-08-03 2021-11-16 中国十七冶集团有限公司 Construction method for plugging reserved hole of lower laminate of closed space
CN113653355B (en) * 2021-08-03 2023-03-10 中国十七冶集团有限公司 Construction method for plugging reserved hole of lower laminate of closed space

Similar Documents

Publication Publication Date Title
CN110821156A (en) Sinking type toilet hanging die structure and construction method thereof
CN203856202U (en) Simple pullable sizing device of reserved holes
CN107023162A (en) Shear wall formwork exempts from drilling construction method and its structure
CN201722927U (en) Drawable slat type stair template
CN103696359A (en) Prefabricated and cast-in-place bridge pier structure and construction method
CN206001126U (en) A kind of floor sealing hole sizing gasifying device
CN106049862A (en) Inflatable adjustable type construction mold for reserved hole in concrete structure plate, and construction method
CN110439265A (en) Bilateral column or wall method for synchronously constructing at a kind of narrow expansion joint
CN105952154B (en) A kind of concrete-pouring template stent
CN107191006B (en) Dismantling and repairing method for refractory concrete layer of diversion trench
CN105401580A (en) Concrete pouring construction method for underground gallery
CN206706844U (en) A kind of alter-pouring strips mould plate installs construction
CN112412013A (en) Construction method for plugging reserved hole of structural outer wall
CN202596148U (en) Reusable cantilever scaffold anchoring compression ring
CN107143146A (en) Secondary structure exempts from template and exempts from plastering construction device
CN204690801U (en) Formwork erecting structure is hung in basement roof ater-casting
CN208267360U (en) It is a kind of to prevent shear wall lower concrete rotten constructing device
CN209443765U (en) A kind of steel form of the pouring after settlement shear wall for banketing in advance
CN206769379U (en) Shear wall formwork exempts from drilling construction structure
CN205743005U (en) Inflatable adjustable concrete structural slab hole to be provided construction mould
CN205476491U (en) Outer wall post template bottom consolidates uses pre -cast screw
CN212336719U (en) Sinking type toilet hanging mould structure
WO2021142990A1 (en) Imprinting material, and roughening construction method for new and old concrete joint surface
CN210562268U (en) Portable grouting groove structure in fan anchor bolt foundation secondary grouting
CN209211892U (en) One kind can be used for overhanging the molding light instrument in i-beam structure hole

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170308

Termination date: 20200830