KR101209408B1 - A prefabricated house construction device - Google Patents
A prefabricated house construction device Download PDFInfo
- Publication number
- KR101209408B1 KR101209408B1 KR1020100101893A KR20100101893A KR101209408B1 KR 101209408 B1 KR101209408 B1 KR 101209408B1 KR 1020100101893 A KR1020100101893 A KR 1020100101893A KR 20100101893 A KR20100101893 A KR 20100101893A KR 101209408 B1 KR101209408 B1 KR 101209408B1
- Authority
- KR
- South Korea
- Prior art keywords
- roof structure
- vertical
- bar
- frame
- guide
- Prior art date
Links
Images
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
Abstract
The present invention relates to a prefabricated building construction apparatus, and in view of its features, in the prefabricated building construction apparatus for elevating a prefabricated roof structure from an upper part of a foundation floor, the roof structure 1 and the foundation floor 2 are constituted. Upper and lower guide members 10 and 10 'having one end fastened on the frame frame 3 and 3' and the other end protruding outside the roof structure 1 to form a vertical hole 12; It is inserted into the vertical hole 12 of the upper and lower guide members 10 and 10 'to connect the roof structure 1 and the foundation floor 2, and to guide the vertical transfer of the roof structure 1. Vertical guide bar 20; And a clamp 32 at one end thereof to be fastened on the vertical guide bar 20, and the other end of the support bar 30 formed to be fastened on the frame frame 3 ′ of the base bottom 2. It is characterized by comprising.
Accordingly, the present invention is simple structure of the prefabricated building construction device including the upper and lower guide member and the vertical guide bar, the assembly operation is performed quickly and easily without being restricted by the construction location and the work space, in particular the vertical guide bar is a roof structure As it is supported from the outside, the safety of the lifting and lowering of the roof structure is secured, and additional processes such as finishing the cut roof for the installation of the vertical guide bar after construction are excluded, which improves workability and greatly shortens the construction period. There is this.
Description
The present invention relates to a prefabricated building construction apparatus, and more particularly, to a prefabricated building construction apparatus for elevating the prefabricated roof structure from the floor when the prefabricated building construction.
In general, prefabricated buildings are constructed by assembling finishing panels (for example, panels having insulation, soundproofing, and windproof function) manufactured to a standard size. After construction, panels are assembled to form walls and roofs.
For example, in the construction of a prefabricated building, first, the concrete floor is formed after flattening the floor, and then the supporting frame is welded and bolted to construct the wall frame, and then the finishing panel is assembled on the frame to construct the wall structure. Next, the roof structure manufactured in a separate space from the wall structure is transported and assembled on the wall structure.
However, a separate space for assembling the roof structure must be secured, and a large transportation equipment including a crane must be prepared to transport the roof structure, thereby increasing the construction cost.
In addition, as the preference for clean air and eco-friendly places are influenced by the well-being culture, the construction location of prefabricated buildings is expanding to mountainous areas where vehicles are difficult to enter, but it is difficult to enter large equipment including cranes. This impossible closure followed.
Therefore, the present applicant lifts the roof structure preassembled on the foundation floor step by step using the roof lifting device and the guide member in Patent Application No. 10-2009-0069099, and then constructs the wall structure between the roof structure and the foundation floor. In order to build a prefabricated building in order to increase the space utilization of the work site, in particular, it has been filed for the technology to enable the construction without the support of large transport equipment, including cranes.
However, as the bearing capacity of the roof structure through the guide member is limited, the guide members are arranged at a narrow interval to compensate for this, and as the number of installations increases, the guide member not only hinders the transport of the panel in the subsequent wall construction step. Work is delayed when dismantling.
In addition, in order to secure the vertical installation space of the vertical guide rods supported by the guide tube of the guide member, the roof panels of the roof guides corresponding to the vertical guide rods need to be partially cut to finish the incision after the construction of the roof structure is completed. The post-process must be accompanied, and even after finishing, there was a problem that caused the construction defect due to leakage as well as appearance.
The present invention has been made to solve the above problems, and relates to a prefabricated building construction apparatus for constructing a prefabricated building quickly and safely without being limited by the construction location and the work space.
In order to achieve this object, a feature of the present invention is a prefabricated building construction apparatus which is pre-assembled on an upper part of a foundation floor and lifts a roof structure by a lift apparatus, the frame constituting the
At this time, the upper and
In addition, the upper and lower guide members (10, 10 ') is characterized in that the pair of
In addition, the
According to the above configuration and action, the present invention is a simple structure of the prefabricated building construction device including the upper and lower guide member and the vertical guide bar, the assembly operation is carried out quickly and easily without being restricted by the construction position and the work space, in particular vertical As the guide bar is supported at the outside of the roof structure, the safety of the lifting and lowering of the roof structure is secured and additional processes such as finishing the cut roof for the installation of the vertical guide bar after construction are excluded. There is an advantage that is greatly shortened.
1 is a front view as a whole showing a prefabricated building factory factory according to the present invention.
Figure 2 is a plan view of the prefabricated building factory factory according to the invention as a whole.
Figure 3 is a perspective view showing an enlarged main portion of the prefabricated building factory factory according to the present invention.
Figure 4 is an enlarged perspective view of the upper and lower guide members of the prefabricated building construction apparatus according to the present invention.
Hereinafter, preferred embodiments of the present invention will be described in detail with reference to the accompanying drawings.
The present invention relates to a prefabricated building construction device, wherein the prefabricated building
Upper and lower guide members (10) (10 '), vertical guides, which are pre-assembled at the top of the base (2) to lift and lift the roof structure (1) more safely and quickly by a lift device including a hydraulic / pneumatic cylinder.
The upper and
3 to 4 show a state in which the
The upper and
At this time, the
The upper and
In addition, since the
At this time, the upper and
Accordingly, when the
In addition, the
At this time, the
In addition, the
Here, the
In addition, the
10, 10 ': upper and lower guide member 20: vertical guide bar
30: support bar
Claims (4)
As long as a fastening bar 14 is formed at one end and a vertical hole 12 is formed at one end thereof so as to be inserted into an end of the frame frame 3, 3 ′ constituting the roof structure 1 and the foundation floor 2. A pair of guide frames (11) provided at an inclination angle of 30 to 90 degrees from the fastening bar (14) to protrude outward from the roof structure (1) (10, 10 ');
It is inserted into the vertical hole 12 of the upper and lower guide members 10 and 10 'to connect the roof structure 1 and the foundation floor 2, and to guide the vertical transfer of the roof structure 1. A pair of vertical guide bars 20; And
A clamp 32 is provided at one end to be fastened on the vertical guide bar 20, and the other end is a support bar 30 formed to be fastened on the frame frame 3 'of the base bottom 2; Prefabricated building construction device characterized in that made.
The vertical guide bar 20 installed on the pair of guide frames 11 is supported by the respective support bars 30, and the support bars 30 guide frames supporting the corresponding vertical guide bars 20. Prefabricated building construction apparatus, characterized in that arranged in the longitudinal direction of the (11) to cross each other.
Priority Applications (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020100101893A KR101209408B1 (en) | 2010-10-19 | 2010-10-19 | A prefabricated house construction device |
JP2011207409A JP5492852B2 (en) | 2010-10-19 | 2011-09-22 | Assembly type building construction equipment |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020100101893A KR101209408B1 (en) | 2010-10-19 | 2010-10-19 | A prefabricated house construction device |
Publications (2)
Publication Number | Publication Date |
---|---|
KR20120040457A KR20120040457A (en) | 2012-04-27 |
KR101209408B1 true KR101209408B1 (en) | 2012-12-06 |
Family
ID=46140345
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR1020100101893A KR101209408B1 (en) | 2010-10-19 | 2010-10-19 | A prefabricated house construction device |
Country Status (2)
Country | Link |
---|---|
JP (1) | JP5492852B2 (en) |
KR (1) | KR101209408B1 (en) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114635548B (en) * | 2022-02-18 | 2024-04-05 | 中铁五局集团建筑工程有限责任公司 | Rapid and accurate assembling device and method for hyperbolic space inverted triangle steel truss |
Family Cites Families (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH0427049A (en) * | 1990-05-22 | 1992-01-30 | Power Daisetsuto Kk | Lift-up building method |
JP2723431B2 (en) * | 1992-10-15 | 1998-03-09 | クボタハウス株式会社 | Construction method of steel framed house |
JPH08184101A (en) * | 1994-12-28 | 1996-07-16 | Kubota House Corp | Architectural method of building |
-
2010
- 2010-10-19 KR KR1020100101893A patent/KR101209408B1/en active IP Right Grant
-
2011
- 2011-09-22 JP JP2011207409A patent/JP5492852B2/en not_active Expired - Fee Related
Also Published As
Publication number | Publication date |
---|---|
JP2012087612A (en) | 2012-05-10 |
JP5492852B2 (en) | 2014-05-14 |
KR20120040457A (en) | 2012-04-27 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
WO2021142958A1 (en) | Premade building unit, connect-type building, connect-type building with roof, and construction method | |
KR100937196B1 (en) | Unit module using light weight panel and modular structure using the same | |
JPH102018A (en) | Building unit, unit building, and its constructing method | |
CN106930401A (en) | A kind of assembled industrialization steel structure house | |
US11339562B2 (en) | Area-covering structure module | |
JP5362310B2 (en) | Unit building | |
KR101422789B1 (en) | Prefabricated Korean House frame and it's construction methods | |
RU2467134C2 (en) | System of panel construction and appropriate method | |
KR101209408B1 (en) | A prefabricated house construction device | |
JP5756000B2 (en) | Spiral staircase mounting structure | |
JP6773502B2 (en) | Elevator pit, elevator pit construction method and building | |
CN203066239U (en) | Multi-storey moving combined building | |
JP2013092006A (en) | New/old building integrated building-movement method | |
JP2008214932A (en) | Construction method for building | |
KR20110011444A (en) | A prefabricated house construction method and the construction device | |
JP6464459B2 (en) | Column base bracket, building unit including column base bracket, and installation method thereof | |
TWM472088U (en) | Modular elevator hoistway | |
JP6306921B2 (en) | Building wall structure and building manufacturing method | |
CN219316194U (en) | Steel-concrete structure assembled house structure | |
CN214195062U (en) | Prefabricated light single wallboard and connecting node | |
JP2010163747A (en) | Unit building | |
JP2011032747A (en) | Bay window fixing structure and construction method of bay window | |
JP6393117B2 (en) | Exterior wall structure | |
JP6386855B2 (en) | Exterior wall mounting structure | |
JP6541107B2 (en) | Building unit and installation method thereof |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A201 | Request for examination | ||
E902 | Notification of reason for refusal | ||
E701 | Decision to grant or registration of patent right | ||
GRNT | Written decision to grant | ||
FPAY | Annual fee payment |
Payment date: 20150917 Year of fee payment: 4 |
|
FPAY | Annual fee payment |
Payment date: 20170217 Year of fee payment: 5 |
|
FPAY | Annual fee payment |
Payment date: 20171107 Year of fee payment: 6 |
|
FPAY | Annual fee payment |
Payment date: 20181029 Year of fee payment: 7 |
|
FPAY | Annual fee payment |
Payment date: 20190919 Year of fee payment: 8 |