JP2013092006A - New/old building integrated building-movement method - Google Patents

New/old building integrated building-movement method Download PDF

Info

Publication number
JP2013092006A
JP2013092006A JP2011235806A JP2011235806A JP2013092006A JP 2013092006 A JP2013092006 A JP 2013092006A JP 2011235806 A JP2011235806 A JP 2011235806A JP 2011235806 A JP2011235806 A JP 2011235806A JP 2013092006 A JP2013092006 A JP 2013092006A
Authority
JP
Japan
Prior art keywords
wall
building
new
frame
new building
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2011235806A
Other languages
Japanese (ja)
Other versions
JP5840914B2 (en
Inventor
Nobuhiro Ozaki
悦広 尾崎
Yukimasa Ogiwara
行正 荻原
Mitsuo Tada
光男 多田
Nobuyuki Seko
信之 世古
Toshikazu Isobe
寿一 磯部
Shigeaki Yamamoto
恵昭 山本
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kajima Corp
Original Assignee
Kajima Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kajima Corp filed Critical Kajima Corp
Priority to JP2011235806A priority Critical patent/JP5840914B2/en
Publication of JP2013092006A publication Critical patent/JP2013092006A/en
Application granted granted Critical
Publication of JP5840914B2 publication Critical patent/JP5840914B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

PROBLEM TO BE SOLVED: To reduce processes and costs by reducing the temporary reinforcement for overturn prevention and temporary reinforcement during movement of a storage external wall on the premise of moving(building-moving) the storage external wall in order to use the external wall of an existing building as a part of the external wall of a new building.SOLUTION: The skeleton construction of a new building is performed at a plane position prior to the movement of a storage external wall 1, and before the storage external wall 1 is moved, the storage external wall 1 is integrated with a structure frame 2 of the new building, and the storage external wall 1 and the structure frame 2 of the new building are simultaneously moved to the position of the new building by a building-movement method, and the structure frame 2 of the new building is integrated with a foundation.

Description

本発明は、既存構造物を構成する既存外壁を部分的に保存する既存構造物の保存方法に関するものであり、歴史的価値が高い既設建物の外壁を新築建物の外壁の一部として利用する場合などに適用できる新旧建物一体化曳き屋工法に関するものである。   The present invention relates to a method for preserving an existing structure that partially preserves an existing outer wall that constitutes an existing structure, and uses the outer wall of an existing building having a high historical value as part of the outer wall of a new building. It is related to the old- and new-building integrated thatched-house method applicable to the above.

近年、近代的な名建築物は、老朽化の進行や耐震性の問題等を理由に取り壊しを余儀なくされる場合が多いが、歴史的価値に着目して、建築物を構成する構造部材の一部を新築建物の外壁の一部として利用するなどして保存することが行われる。   In recent years, modern buildings are often demolished for reasons such as aging and earthquake resistance. However, focusing on historical value, one of the structural members that make up a building. The department is preserved by using it as part of the outer wall of a new building.

保存外壁を移動して、新築建物の外壁の一部として組み込む場合に、従来行われてきた技術では、下記の手順による。
(1)保存・移動する外壁が転倒しないように、仮設鉄骨フレーム等で構造補強する。
(2)保存しない内部の柱・梁・床などを解体する。
(3)保存・移動する外壁のみが、仮設鉄骨フレームに支えられる状態で板状に残る。
(4)移動時に保存外壁が壊れないように、移動のための更なる仮設補強(鉄板張り補強、炭素繊維補強、プレストレス補強など)を必要に応じ施す。
(5)新築建物の外壁位置まで、保存外壁を移動する。
(6)移動のための仮設補強材のうち、新築建物の工事に邪魔になるものを取り外す。
(7)新築建物の柱・梁などの工事を行い、保存外壁と新築建物を構造的に一体化させる。
(8)転倒防止用の仮設鉄骨フレーム等を解体する。
In the case of moving the preservation outer wall and incorporating it as a part of the outer wall of a new building, the following procedure is used in the conventional technique.
(1) Reinforce the structure with a temporary steel frame or the like so that the outer wall to be stored and moved does not fall.
(2) Dismantle internal pillars, beams, floors, etc. that are not preserved.
(3) Only the outer wall to be stored / moved remains in a plate shape in a state supported by the temporary steel frame.
(4) Further temporary reinforcement for moving (iron plate reinforcement, carbon fiber reinforcement, prestress reinforcement, etc.) is applied as necessary so that the storage outer wall does not break during movement.
(5) Move the preservation outer wall to the position of the outer wall of the new building.
(6) Remove the temporary reinforcement for movement that will interfere with the construction of the new building.
(7) Work on pillars and beams of the new building to structurally integrate the preservation outer wall and the new building.
(8) Dismantling the temporary steel frame and the like for preventing the fall.

また、下記特許文献には、保存したい既存外壁構造体が自立できるようにするものが提案され、既存外壁構造体の裏面側に近接して補強フレームを構築して支持部材を介して支持するとともに、該補強フレームの頂部近傍と前記新設構造物から補強フレームに向けて設けられた張出し床とを、水平移動及び回転の自在なピンローラー支承を備えたピンローラー支承付き連結部材を介して1点支持することにより、前記補強フレームに支持された既存外壁構造体の構造的な安全性を確保する。
特開2004−162474号公報
In addition, the following patent document proposes an existing outer wall structure to be stored so that it can stand on its own, constructs a reinforcing frame in the vicinity of the back side of the existing outer wall structure, and supports it through a support member. In addition, a point near the top of the reinforcing frame and an extended floor provided from the newly-constructed structure toward the reinforcing frame are connected through a connecting member with a pin roller support having a pin roller support capable of horizontal movement and rotation. By supporting, the structural safety of the existing outer wall structure supported by the reinforcing frame is ensured.
JP 2004-162474 A

この特許文献1によれば、保存したい既存外壁構造体は、その裏面側に所定の離間間隔をもって平行に配される補強フレームに支持されており、該補強フレームが、前記既存外壁と同様の大きさの鉛直面を有する補強フレーム本体と、該補強フレーム本体の一方の鉛直面に、高さ方向に所定の間隔をもって複数設けられ、前記既存外壁構造体に向けて水平に突出する支持部材とを備えてなり、該支持部材の端部が、前記既存外壁構造体の裏面に固定手段を介して固定されることから、補強フレームに支持されることにより前記既存外壁構造体の剛性が高まり過ぎることがないため、面外方向の力が作用し、面外の曲げ変形が生じた際にも、既存外壁構造体の下部で補強した既存基礎部との取り合い部近傍に、大きな曲げモーメントが生じることはなく、該既存外壁構造体の損傷を抑制することが可能となるとある。   According to Patent Document 1, an existing outer wall structure to be stored is supported by a reinforcing frame arranged in parallel on the back surface side with a predetermined separation interval, and the reinforcing frame is the same size as the existing outer wall. A reinforcing frame body having a vertical surface, and a plurality of support members provided on one vertical surface of the reinforcing frame body at predetermined intervals in the height direction and projecting horizontally toward the existing outer wall structure. Since the end of the support member is fixed to the back surface of the existing outer wall structure via a fixing means, the rigidity of the existing outer wall structure is excessively increased by being supported by the reinforcing frame. Therefore, even when an out-of-plane force is applied and an out-of-plane bending deformation occurs, a large bending moment is generated in the vicinity of the joint with the existing foundation reinforced at the bottom of the existing outer wall structure. Rather, there becomes possible to suppress damage of the existing outer wall structure.

さらに、下記特許文献は、敷地条件等に左右されない既存外壁構造体の保存方法として、既存構造物を構成する既存外壁及び該既存外壁の両側部各々に一体的に立設する対をなす第1の既存柱よりなる既存外壁構造体を、部分的に保存する既存外壁構造体の保存方法が提案されている。
特開2004−162473号公報
Furthermore, the following patent document is a first method of forming a pair that stands integrally on each of the existing outer wall constituting the existing structure and both sides of the existing outer wall as a method for preserving the existing outer wall structure that is not affected by site conditions or the like. The preservation method of the existing outer wall structure which preserve | saves the existing outer wall structure which consists of existing pillars of a part is proposed.
JP 2004-162473 A

この特許文献2は、保存したい既存外壁構造体の裏面に向かい合うとともに、前記第1の既存柱に対向する位置に立設する対をなす第2の既存柱と、隣り合う該第2の既存柱どうし及び第2の既存柱と第1の既存柱を各々連結する複数の既存梁により構成される既存ラーメン躯体を残して、前記既存構造物を解体し、次に、前記既存ラーメン躯体の内方に、前記既存外壁構造体を支持する仮設フレームを構築して、該仮設フレームで既存外壁構造体を支持させた後、前記既存ラーメン躯体を構成する対をなす第2の既存柱の地上部及び既存梁を解体する。   This Patent Document 2 is directed to the back surface of an existing outer wall structure that is desired to be preserved, and a second existing pillar that forms a pair standing upright at a position facing the first existing pillar, and the second existing pillar adjacent to the second existing pillar. The existing frame structure is dismantled by leaving the existing frame structure composed of a plurality of existing beams connecting the second existing column and the first existing column, and then the inside of the existing frame structure And constructing a temporary frame that supports the existing outer wall structure, and supporting the existing outer wall structure with the temporary frame, and then the ground portion of the second existing column that forms a pair constituting the existing ramen frame and Dismantle existing beams.

特許文献2によれば、既存外壁構造体を一時的に支持する仮設フレームを既存構造物の敷地内に構築するため、既存構造物周辺の敷地条件によることなく、汎用的に用いることが可能となる。   According to Patent Document 2, since a temporary frame that temporarily supports an existing outer wall structure is built in the site of the existing structure, it can be used universally without depending on site conditions around the existing structure. Become.

また、前記既存外壁構造体は、第2の既存柱及び既存梁とともに自立できる既存ラーメン躯体を構成し、該既存ラーメン躯体を残して他の既存構造物を解体した後、仮設フレームを構築することから、解体された既存構造物の跡地の新築工事と平行して仮設フレームを構築することができ、工期短縮を図れるとともに、新築工事に用いる重機等を利用して仮設フレームの構築作業を行うこともできるため、作業性を大幅に向上することが可能となる。   In addition, the existing outer wall structure constitutes an existing ramen frame that can be self-supported together with the second existing column and the existing beam, and after dismantling other existing structures leaving the existing ramen frame, a temporary frame is constructed. Therefore, a temporary frame can be constructed in parallel with the new construction of the site of the existing structure that has been demolished, the work period can be shortened, and the construction work of the temporary frame can be carried out using heavy machinery used for the new construction. Therefore, workability can be greatly improved.

前記保存外壁を移動して新築建物の外壁の一部として組み込む場合の従来技術では、工程数が多く、複雑な手順が必要となる。   In the conventional technique in which the preservation outer wall is moved and incorporated as a part of the outer wall of a new building, the number of processes is large and a complicated procedure is required.

前記特許文献1や2は、既存外壁構造体の保存方法を中心としたものであり、既存外壁構造体の損傷を抑制することや、敷地条件等に左右されない既存外壁構造体の保存を実現するなどであり、保存外壁を移動して新築建物の外壁の一部として組み込むものではない。   Patent Documents 1 and 2 focus on a method for preserving an existing outer wall structure, and suppress the damage to the existing outer wall structure and realize the preservation of the existing outer wall structure that is not affected by site conditions or the like. The preservation outer wall is not moved and incorporated as a part of the outer wall of the new building.

特に、保存外壁と新築建物の平面位置関係がずれている場合には、あるいは公開空地の確保や道路境界からの外壁セットバックの関係で、保存外壁を移動(曳き屋)することになるが、そのような場合に利用できるものではない。   In particular, if the plane position relationship between the preservation outer wall and the new building is shifted, or the preservation outer wall is moved (thatched) due to the securing of open space and the outer wall setback from the road boundary, It cannot be used in such a case.

本発明の目的は前記従来例の不都合を解消し、既設建物の外壁を新築建物の外壁の一部として利用するため、保存外壁を移動(曳き屋)することを前提に、保存外壁の転倒防止のための仮設的な補強と移動中の仮設的な補強を少なくでき、少ない工程で安価に実現できる新旧建物一体化曳き屋工法を提供することにある。   The object of the present invention is to eliminate the inconvenience of the conventional example, and to use the outer wall of an existing building as a part of the outer wall of a new building. It is an object of the present invention to provide a new and old building-integrated construction method that can reduce the temporary reinforcement for moving and the temporary reinforcement during the movement, and can be realized at low cost with few processes.

前記目的を達成するため請求項1記載の本発明は、保存外壁の移動前の平面位置で、新築建物の躯体工事を行い、保存外壁を移動させる前に新築建物の構造フレームとを一体化させ、保存外壁と新築建物の構造フレームを同時に新築建物位置まで曳き屋で移動させ、新築建物の構造フレームを基礎と一体化することを要旨とするものである。   In order to achieve the above object, the present invention as claimed in claim 1 is to construct a new building at a planar position before the preservation outer wall is moved, and to integrate the structure frame of the new building before moving the preservation outer wall. The gist is to move the preservation outer wall and the structural frame of the new building to the new building position at the same time by using a thatched house and integrate the structural frame of the new building with the foundation.

請求項1記載の本発明によれば、保存外壁の転倒防止のための仮設的な補強と移動中の仮設的な補強を少なくできるもので、新築建物の柱・梁・壁・スラブを転倒防止と移動のための保存外壁の補強材として利用し、保存外壁をRC補強(鉄筋コンクリート補強)することで、変形を抑制できるためクラック防止に効果がある。   According to the first aspect of the present invention, the temporary reinforcement for preventing the storage outer wall from falling and the temporary reinforcement during the movement can be reduced, and the column, beam, wall, and slab of the new building are prevented from falling. By using it as a reinforcing material for the preservation outer wall for movement and RC reinforcement (reinforced concrete reinforcement) for the preservation outer wall, deformation can be suppressed, which is effective in preventing cracks.

請求項2記載の本発明は、保存外壁の移動前の平面位置で、配置やスパン割りは、新築建物の柱・梁位置に合わせて仮設鉄骨材を組み立て、保存外壁を移動させる前に仮設鉄骨材と保存外壁を一体化させ、保存外壁と仮設鉄骨材を同時に新築建物位置まで曳き屋で移動させ、仮設鉄骨材を基礎等に固定し、新築構造フレーム内のコンクリートに打ち込むことを要旨とするものである。   The present invention according to claim 2 is a planar position before the movement of the preservation outer wall, and the arrangement and span splitting are performed by assembling the temporary steel frame according to the pillar / beam position of the new building, and before moving the preservation outer wall. The gist is to integrate the timber and the preservation outer wall, move the preservation outer wall and the temporary steel frame to the new building position at the same time, fix the temporary steel frame to the foundation etc., and drive it into the concrete in the new structure frame Is.

請求項2記載の本発明によれば、前記請求項1と同じく、保存外壁の転倒防止のための仮設的な補強と移動中の仮設的な補強を少なくできるものであり、仮設材の撤去手間が省ける。   According to the second aspect of the present invention, as in the first aspect, the temporary reinforcement for preventing the storage outer wall from toppling over and the temporary reinforcement during the movement can be reduced. Can be omitted.

以上述べたように本発明の新旧建物一体化曳き屋工法は、既設建物の外壁を新築建物の外壁の一部として利用するため、保存外壁を移動(曳き屋)することを前提に、保存外壁の転倒防止のための仮設的な補強と移動中の仮設的な補強を少なくでき、少ない工程で安価に実現できるものである。   As described above, the new and old building-integrated thatched roof method of the present invention uses the outer wall of the existing building as a part of the outer wall of the new building. Therefore, the temporary reinforcement for preventing overturning and the temporary reinforcement during the movement can be reduced, and it can be realized at low cost with a small number of processes.

以下、図面について本発明の実施の形態を詳細に説明する。図1は本発明の新旧建物一体化曳き屋工法の第1実施形態を示す平面図、図2は同上縦断側面図で、図中1は保存外壁を示す。この保存外壁1は例えば、歴史的価値が高い既設建物の外壁であり、これを新築建物の外壁の一部として利用する場合である。   Hereinafter, embodiments of the present invention will be described in detail with reference to the drawings. FIG. 1 is a plan view showing a first embodiment of a new and old building-integrated thatched-house method according to the present invention, FIG. This preservation | save outer wall 1 is a case where it is an outer wall of the existing building with high historical value, and uses this as a part of outer wall of a new building.

本発明は、新築建物の柱・梁・壁・スラブを転倒防止と移動のための保存外壁1の補強材として利用する。   In the present invention, columns, beams, walls, and slabs of a new building are used as a reinforcing material for the preservation outer wall 1 for preventing and moving over.

保存外壁1の移動前の平面位置で、新築建物の構造フレーム2として柱3・梁4・壁5・スラブ6を築造する躯体工事を行う。   At the plane position before the preservation outer wall 1 is moved, the frame construction for constructing the pillar 3, the beam 4, the wall 5, and the slab 6 as the structural frame 2 of the new building is performed.

保存外壁1と新築建物の構造フレーム2を一体化させる。この一体化は種々の方法が採択できるが図示の例では、新築建物の構造フレーム2からつなぎ用の横桟H鋼7を突出させ、これを保存外壁1に貫通させてつなぎボルト(φ16)8等で固定する。   The preservation outer wall 1 and the structural frame 2 of the new building are integrated. Various methods can be adopted for this integration. In the example shown in the figure, a cross beam H steel 7 for connection is projected from the structural frame 2 of the new building, and this is passed through the storage outer wall 1 to connect the connection bolt (φ16) 8. Fix with etc.

また、保存外壁1の高さが高い場合は、新築建物の構造フレーム2から立設するH形鋼による支柱9を保存外壁1に添わせ、この支柱9からも溶接により固定してつなぎ用の横桟H鋼7を突出させ、これを保存外壁1に貫通させてつなぎボルト(φ16)8等で固定する。   Further, when the storage outer wall 1 is high in height, a support 9 made of H-shaped steel standing from the structural frame 2 of the new building is attached to the storage outer wall 1 and is also fixed from the support 9 by welding. The horizontal beam H steel 7 is protruded, penetrated through the storage outer wall 1, and fixed with a connecting bolt (φ16) 8 or the like.

保存外壁1と新築構造フレーム2を同時に新築建物位置まで曳き屋で移動させる。曳き屋とは、既存建物をその存立に支障がない場所へ移動させるものであり、レール10と図示は省略するが、レール10を移動する移動機構と仮受け支持する仮受けジャッキ11とを使用する。   The preservation outer wall 1 and the new structure frame 2 are simultaneously moved to the new building position with a straw. The thatched house is to move an existing building to a place where there is no problem in its existence, and although the rail 10 and the illustration are omitted, a moving mechanism that moves the rail 10 and a temporary receiving jack 11 that supports the temporary receiving are used. To do.

移動機構としては、既往の曳き屋工法で種々知られ使用されているように、レール10上を滑る滑り機構、あるいはローラ等による転がり機構等が好適に使用される。   As the moving mechanism, a sliding mechanism that slides on the rail 10 or a rolling mechanism that uses a roller or the like is preferably used, as various known and used in the existing thatching method.

一体化した保存外壁1と新築建物の構造フレーム2を仮受けジャッキ11で支持させて荷重の盛り替えを行う。そして、保存外壁1と新築建物の構造フレーム2を下部構造および基礎から切り離し、レール10上へ、曳き屋工法の実施が可能な構造の移動機構を介して仮受け支持させる。   The integrated storage outer wall 1 and the structural frame 2 of the new building are supported by a temporary receiving jack 11 to perform load re-loading. And the preservation | save outer wall 1 and the structure frame 2 of a new building are cut off from a lower structure and a foundation, and are temporarily received and supported on the rail 10 via the moving mechanism of the structure which can implement thatched-house construction method.

このようにして曳き屋の準備が整うと、次には曳き屋用の水平ジャッキ(図示は省略した)を設置し、レール10に沿って移動させ、新築建物用基礎12上に既に用意しておいた仮受け用基礎構造の底盤上へ保存外壁1と新築建物の構造フレーム2を到達させ、新築建物の構造フレーム2を基礎12等と一体化し完成する。   After the preparation of thatched house in this way, next install a horizontal jack (not shown) for thatched shop, move it along the rail 10, and have already prepared on the foundation 12 for the new building The preservation outer wall 1 and the structure frame 2 of the new building are made to reach the bottom of the temporary receiving foundation structure, and the structure frame 2 of the new building is integrated with the foundation 12 and the like.

図3、図4は本発明の第2実施形態を示すもので、前記第1実施形態との相違は、新築建物の構造フレーム2の変わりに、仮設鉄骨材13を補強として使うことである。ただし、仮設材として撤去しなくてもよいように、新築構造フレームの柱・梁位置に合わせて仮設鉄骨材13を配置する。   3 and 4 show a second embodiment of the present invention. The difference from the first embodiment is that the temporary steel frame 13 is used as a reinforcement instead of the structural frame 2 of the new building. However, the temporary steel frame 13 is arranged in accordance with the positions of the columns and beams of the new structure frame so that it does not have to be removed as a temporary material.

保存外壁1の移動前の平面位置で、仮設鉄骨材13を組み立てる。仮設鉄骨材13は仮設鉄骨柱14、仮設鉄骨梁15等からなり、その配置やスパン割りは、新築建物の柱・梁位置に合わせる。   The temporary steel frame 13 is assembled at a planar position before the preservation outer wall 1 is moved. The temporary steel frame 13 is composed of a temporary steel column 14, a temporary steel beam 15, and the like, and the arrangement and span splitting are adjusted to the columns and beam positions of the new building.

仮設鉄骨材13と保存外壁1を一体化させることで補強する。この一体化は前記第1実施形態と同じく、つなぎ用の横桟H鋼7を突出させ、これを保存外壁1に貫通させてつなぎボルト(φ16)8等で固定する。   The temporary steel frame 13 and the storage outer wall 1 are integrated to be reinforced. In this integration, as in the first embodiment, the cross rail H steel 7 for connection is protruded, penetrated through the storage outer wall 1 and fixed with a connection bolt (φ16) 8 or the like.

保存外壁1と仮設鉄骨材13を同時に新築建物位置まで曳き屋で移動させる。曳き屋工法については、前記第1実施形態で説明した通りである。   The preservation outer wall 1 and the temporary steel frame 13 are simultaneously moved to the position of the new building by a thatched shop. About the thatched-house construction method, it is as having demonstrated the said 1st Embodiment.

保存外壁1と仮設鉄骨材13を到達させ、仮設鉄骨材13を基礎12等に固定し、この仮設鉄骨材13を新築構造フレーム内のコンクリートに打ち込む。   The preservation outer wall 1 and the temporary steel frame 13 are made to reach, the temporary steel frame 13 is fixed to the foundation 12 or the like, and this temporary steel frame 13 is driven into the concrete in the newly constructed frame.

新築建物が鉄筋コンクリート造の場合は、新築構造フレーム内のコンクリートに打ち込まれる仮設鉄骨材13は単に打ち込むだけのものである。また、新築建物が鉄骨鉄筋コンクリート造の場合は、仮設鉄骨材13は本設鉄骨として用いて鉄筋鉄骨コンクリート造の新築構造フレームを構築する。   When the new building is a reinforced concrete structure, the temporary steel frame 13 to be driven into the concrete in the new structure frame is simply driven. When the new building is a steel reinforced concrete structure, the temporary steel frame 13 is used as a permanent steel frame to construct a new structure frame of the reinforced steel concrete structure.

本発明の新旧建物一体化曳き屋工法の第1実施形態を示す平面図である。It is a top view which shows 1st Embodiment of the new and old building integrated thatched-house construction method of this invention. 本発明の新旧建物一体化曳き屋工法の第1実施形態を示す縦断側面図である。It is a vertical side view which shows 1st Embodiment of the old and new building integrated thatched-house construction method of this invention. 本発明の新旧建物一体化曳き屋工法の第2実施形態を示す平面図である。It is a top view which shows 2nd Embodiment of the old and new building integrated thatched-house method of this invention. 本発明の新旧建物一体化曳き屋工法の第2実施形態を示す縦断側面図である。It is a vertical side view which shows 2nd Embodiment of the new and old building integrated thatched-house construction method of this invention.

1…保存外壁 2…新築建物の構造フレーム
3…柱 4…梁
5…壁 6…スラブ
7…つなぎ用の横桟H鋼 8…つなぎボルト
9…支柱 10…レール
11…仮受けジャッキ 12…基礎
13…仮設鉄骨材 14…仮設鉄骨柱
15…仮設鉄骨梁
DESCRIPTION OF SYMBOLS 1 ... Preservation outer wall 2 ... Structural frame 3 of a new building 3 ... Pillar 4 ... Beam 5 ... Wall 6 ... Slab 7 ... Cross rail H steel 8 ... Connecting bolt 9 ... Post 10 ... Rail 11 ... Temporary receiving jack 12 ... Foundation 13 ... Temporary steel frame 14 ... Temporary steel column 15 ... Temporary steel beam

Claims (2)

保存外壁の移動前の平面位置で、新築建物の躯体工事を行い、保存外壁を移動させる前に新築建物の構造フレームとを一体化させ、
保存外壁と新築建物の構造フレームを同時に新築建物位置まで曳き屋で移動させ、
新築建物の構造フレームを基礎と一体化することを特徴とした新旧建物一体化曳き屋工法。
At the plane position before the movement of the preservation outer wall, we will construct the new building and integrate the structure frame of the new building before moving the preservation outer wall.
Move the preservation outer wall and the structural frame of the new building at the same time to the new building position with a straw shop,
New and old building-integrated thatched-house method, characterized by integrating the structural frame of a new building with the foundation.
保存外壁の移動前の平面位置で、配置やスパン割りは、新築建物の柱・梁位置に合わせて仮設鉄骨材を組み立て、保存外壁を移動させる前に仮設鉄骨材と保存外壁を一体化させ、
保存外壁と仮設鉄骨材を同時に新築建物位置まで曳き屋で移動させ、
仮設鉄骨材を基礎等に固定し、この仮設鉄骨材を鉄骨鉄筋コンクリート造としての新築構造フレーム内のコンクリートに打ち込むことを特徴とした新旧建物一体化曳き屋工法。
Placement and span splitting in the flat position before moving the preservation outer wall, assemble the temporary steel frame according to the pillar and beam position of the new building, integrate the temporary steel frame and the preservation outer wall before moving the preservation outer wall,
Move the preservation outer wall and temporary steel frame at the same time to the new building location with
A new and old building-integrated thatched-house method characterized by fixing temporary steel frames to the foundation, etc., and driving the temporary steel frames into concrete in a new structure frame as a steel-framed reinforced concrete structure.
JP2011235806A 2011-10-27 2011-10-27 New and old building thatched roof method Active JP5840914B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2011235806A JP5840914B2 (en) 2011-10-27 2011-10-27 New and old building thatched roof method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2011235806A JP5840914B2 (en) 2011-10-27 2011-10-27 New and old building thatched roof method

Publications (2)

Publication Number Publication Date
JP2013092006A true JP2013092006A (en) 2013-05-16
JP5840914B2 JP5840914B2 (en) 2016-01-06

Family

ID=48615339

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2011235806A Active JP5840914B2 (en) 2011-10-27 2011-10-27 New and old building thatched roof method

Country Status (1)

Country Link
JP (1) JP5840914B2 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103982054A (en) * 2014-05-26 2014-08-13 山东建筑大学 Assembly type steel underpinning device for concrete column underpinning and application thereof
JP2018087461A (en) * 2016-11-29 2018-06-07 株式会社竹中工務店 Support structure of existing exterior wall
CN112227759A (en) * 2020-09-30 2021-01-15 厦门闽园集团有限公司 Repair, reinforcement and migration method for historic building clean water wall

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH01268971A (en) * 1988-04-18 1989-10-26 Takenaka Komuten Co Ltd Transfer construction of masonry wall body of existing structure
JPH0681489A (en) * 1992-08-31 1994-03-22 Kumanotakeshi Kensetsu Kk Building moving method, and building detaching device therefor
JP2004162474A (en) * 2002-11-15 2004-06-10 Shimizu Corp Supporting structure of existing external-wall structure

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH01268971A (en) * 1988-04-18 1989-10-26 Takenaka Komuten Co Ltd Transfer construction of masonry wall body of existing structure
JPH0681489A (en) * 1992-08-31 1994-03-22 Kumanotakeshi Kensetsu Kk Building moving method, and building detaching device therefor
JP2004162474A (en) * 2002-11-15 2004-06-10 Shimizu Corp Supporting structure of existing external-wall structure

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103982054A (en) * 2014-05-26 2014-08-13 山东建筑大学 Assembly type steel underpinning device for concrete column underpinning and application thereof
JP2018087461A (en) * 2016-11-29 2018-06-07 株式会社竹中工務店 Support structure of existing exterior wall
CN112227759A (en) * 2020-09-30 2021-01-15 厦门闽园集团有限公司 Repair, reinforcement and migration method for historic building clean water wall

Also Published As

Publication number Publication date
JP5840914B2 (en) 2016-01-06

Similar Documents

Publication Publication Date Title
JP6289046B2 (en) Temporary stand
JP2008025125A (en) Column unit and construction method for building using it
JP2007239388A (en) Fitting for constructing dome and dome construction method
JP5840914B2 (en) New and old building thatched roof method
JPH102126A (en) Base isolated building
JP5645334B2 (en) Structure dismantling system
JP4550534B2 (en) Building basic structure
JP2018071080A (en) Protruding frame for temporary scaffold
KR200450609Y1 (en) Bracket Fixing Device for Concrete Filled Tube
JP6320242B2 (en) How to install temporary pillars
JP2007303105A (en) Aseismatic reinforcing structure
JP2000291031A (en) Construction method for base isolation structure
JPH11152928A (en) Base isolation building and method of base isolating construction of existing building
JP2018199933A (en) Structure body and construction method of structure constructed on top of tower-like building
JP3903315B2 (en) Preservation method of existing outer wall structure
JP2006241892A (en) Aseismatic structure of house and its construction method
JP4722560B2 (en) Building materials that effectively use the strength of reinforced steel
JP2015229857A (en) Base isolation method for existing building
JP5561707B2 (en) How to dismantle tower buildings
JP4432581B2 (en) Building structure that can change floor height
JP3981948B2 (en) Support structure of existing outer wall structure
JP2006037530A (en) Building structure skeleton and building structure making use thereof
JP2013181334A (en) Earthquake strengthening method of building
JP5759857B2 (en) Platform structure
KR101209408B1 (en) A prefabricated house construction device

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20140513

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20150227

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20150407

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20150604

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20151110

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20151112

R150 Certificate of patent or registration of utility model

Ref document number: 5840914

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250