KR101187434B1 - Height adjustable device for perfabricated form panel using plate combined with bolt - Google Patents

Height adjustable device for perfabricated form panel using plate combined with bolt Download PDF

Info

Publication number
KR101187434B1
KR101187434B1 KR1020120040791A KR20120040791A KR101187434B1 KR 101187434 B1 KR101187434 B1 KR 101187434B1 KR 1020120040791 A KR1020120040791 A KR 1020120040791A KR 20120040791 A KR20120040791 A KR 20120040791A KR 101187434 B1 KR101187434 B1 KR 101187434B1
Authority
KR
South Korea
Prior art keywords
bolt
plate
nut
integral
height adjustment
Prior art date
Application number
KR1020120040791A
Other languages
Korean (ko)
Inventor
이상수
Original Assignee
이상수
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 이상수 filed Critical 이상수
Priority to KR1020120040791A priority Critical patent/KR101187434B1/en
Application granted granted Critical
Publication of KR101187434B1 publication Critical patent/KR101187434B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/12Grating or flooring for bridges; Fastening railway sleepers or tracks to bridges
    • E01D19/125Grating or flooring for bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges

Abstract

PURPOSE: A height adjusting device for a prefabricated form panel using a bolt integrated plate is provided to control the height of a prefabricated form panel depending on construction conditions by controlling a bolt integrated plate and a nut coupling type bolt. CONSTITUTION: A height adjusting device for a prefabricated form panel using a bolt integrated plate comprises a bolt integrated plate(100) and a nut coupling type bolt(200). The bolt integrated plate has a plate portion, a plate upper bolt portion, and a plate lower bolt portion. The plate upper bolt portion is formed on the top of the plate portion and is coupled to a bridge deck. The plate lower bolt portion is formed on the bottom of the plate portion and is coupled to a nut portion of the nut coupling type bolt. The nut coupling type bolt has the nut portion and a bolt portion. The bolt portion is formed on the bottom of the nut portion and is inserted into a hole formed in a steel square pipe girder(500).

Description

볼트일체형 플레이트를 이용한 교량 슬라브 거푸집용 높이조절장치{HEIGHT ADJUSTABLE DEVICE FOR PERFABRICATED FORM PANEL USING PLATE COMBINED WITH BOLT.}Height adjustment device for bridge slab formwork using integral bolt plate {HEIGHT ADJUSTABLE DEVICE FOR PERFABRICATED FORM PANEL USING PLATE COMBINED WITH BOLT.}

본 발명은 볼트일체형 플레이트를 이용한 교량 슬라브 거푸집용 높이조절장치에 관한 것으로서, 더욱 상세하게는 콘크리트를 타설하기 위한 거푸집 형성시 현장의 다양한 설계환경 및 시공환경에 따라 부속자재인 플레이트 또는 특수규격 볼트를 주문 제작할 필요없이 볼트일체형플레이트와 너트결합형볼트의 조작을 통해 설계 환경에 맞춰 원하는 높낮이를 임의대로 조정할 수 있으며, 볼트일체형플레이트 상단에 결합되는 좌우 이동이 가능한 썽크플레이트를 조작하여 스터드볼트 위치가 다양한 현장에 하나의 썽크플레이트로 적용이 가능하며, 볼트일체형플레이트 최상단에 결합되는 높이조절용너트를 조작하여 현장 상황에 맞게 높이 오차를 보정할 수 있는 볼트일체형 플레이트를 이용한 교량 슬라브 거푸집용 높이조절장치에 관한 것이다.
The present invention relates to a height adjustment device for bridge slab formwork using a bolt-integral plate, and more specifically, to form a formwork for placing concrete according to the various design environment and construction environment of the site, the plate or special specification bolt It is possible to adjust the desired height according to the design environment by manipulating the bolt integrated plate and the nut-coupled bolt without the need for custom-made. It is applicable to a single thunk plate on the site, and the height adjustment device for the bridge slab formwork using the bolt integrated plate that can correct the height error according to the site situation by operating the height adjusting nut coupled to the top of the bolt integrated plate. will be.

도 1은 종래의 썽크플레이트 방식을 도시한 것으로서, 일반적으로 스틸박스 교량의 콘크리트 타설을 위한 거푸집 시공 시 거푸집의 단면 구성은 최상단에 합판(30)이 자리하며 합판 하단에 합판을 지지하기 위한 각재(40)가 등간격으로 배치되며 최하단에 철재 각관 거더(50)가 배치된다. Figure 1 shows a conventional thunk plate method, generally when the formwork for the concrete pouring of the steel box bridge cross-section configuration of the plywood 30 is located at the top of the corner material for supporting the plywood at the bottom of the plywood ( 40 is disposed at equal intervals and the steel tube girder 50 is disposed at the lowermost end.

교량(10)과 거푸집의 연결구조는 각관 거더의 양단에 형성된 홀에 볼트를 삽입하여 삽입된 볼트와 강교 거더(10) 상단의 스터드볼트(20)에 체결된 썽크플레이트를 체결하여 각관 거더가 슬라브 거푸집을 지지하는 구조이다.The connection structure of the bridge 10 and the formwork is made by inserting bolts into the holes formed at both ends of the pipe girder and fastening the thunk plate fastened to the stud bolt 20 of the upper end of the steel bridge girder 10 by means of the slab. It is a structure that supports the formwork.

도로 교량은 교량이 시공되는 토목현장 상황에 따라 교량 종단면상의 교량 진입부와 교량 종점부의 고저 차이가 발생하며, 교량의 곡선화에 따라 교량 횡단면 상의 고저 차이가 발생한다. In the road bridge, the height difference between the bridge entrance and the end point of the bridge occurs depending on the civil construction site where the bridge is constructed, and the height difference on the cross section of the bridge occurs as the bridge is curved.

이러한 교량설계환경의 고유한 특성으로 인해 거푸집의 단면 형상이 현장별로 상이하므로 투입되는 핵심부속자재인 특수규격볼트(60)나 썽크플레이트를 현장의 해당 수치에 맞춰 별도 주문하여 사용하고 있는 실정이다. Due to the unique characteristics of the bridge design environment, since the cross-sectional shape of the formwork varies from site to site, special specification bolts 60 and thunk plates, which are the core accessory materials, are separately ordered and used according to the corresponding values of the site.

이러한 문제로 인해 공기 내 시공의 어려움이 발생할 수 있으며, 기성제품이 아닌 현장별 맞춤제품이 요구되므로 원가 관리의 문제가 발생한다. These problems may cause difficulties in construction in the air, and cost management problems arise because the site-specific customized products are required rather than ready-made products.

한편, 썽크플레이트 방식 이외에 도 2에 도시한 바와 같이, 스터드볼트(20)가 형성된 강교 거더(10) 상단에 천공을 한 후, 특수규격볼트를 해당 천공에 삽입후 결합시키는 천공 방식을 사용하고 있다.On the other hand, in addition to the thunk plate method, as shown in Figure 2, after drilling on the top of the steel bridge girders 10, the stud bolt 20 is formed, a special standard bolt is inserted into the corresponding drilling and then using a drilling method. .

이 또한, 썽크플레이트 방식과 동일한 문제점을 가지고 있었다.This also had the same problem as the thunk plate method.

요약하자면, 교량 슬라브 거푸집의 단면 형상이 상이함에 따라 가설 자재인 철재 각관 거더의 높이 또한 현장별로 설계값에 맞춰 높이를 조정하여야 하므로 철재 각관 거더를 교량 거더에 체결하는 부속자재인 특수규격볼트를 주문 제작하거나 기성제품을 후 가공하여 현장에서 사용하고 있거나, 교량 거더 상단의 스터드 볼트의 위치가 표준화되어 있지 않아 볼트와 마찬가지로 현장별로 썽크플레이트를 별도 제작하여 사용하고 있었다.In summary, as the cross-sectional shape of bridge slab formwork differs, the height of the steel pipe girder girder, which is a temporary material, must also be adjusted according to the design value for each site, so order a special specification bolt that is an accessory to fasten the steel pipe girder to the bridge girder. The fabricated or ready-made products were used in the field after being used, or because the location of the stud bolts on the top of the bridge girder was not standardized, the thunk plates were made separately for each site, just like bolts.

상기와 같은 방식들은 시공의 어려움, 공기지연, 원가상승의 문제가 발생한다.
Such methods cause problems of construction difficulty, air delay, and cost increase.

없음.none.

따라서, 본 발명은 상기 종래의 문제점을 해소하기 위해 안출된 것으로,SUMMARY OF THE INVENTION Accordingly, the present invention has been made keeping in mind the above problems occurring in the prior art,

본 발명의 목적은 콘크리트를 타설하기 위한 거푸집 형성시 현장의 다양한 설계환경 및 시공환경에 따라 부속자재인 플레이트 또는 특수규격 볼트를 주문 제작할 필요없이 볼트일체형플레이트와 너트결합형볼트의 조작을 통해 설계 환경에 맞춰 원하는 높낮이를 임의대로 조정할 수 있도록 하는데 있다.An object of the present invention is to design the environment through the operation of the bolt integral plate and the bolt coupling bolt without the need to order the plate or special specification bolt as an accessory according to the various design environment and construction environment of the site when forming the formwork for placing concrete It is to allow you to adjust the height you want.

본 발명의 다른 목적은 볼트일체형플레이트 상단에 썽크플레이트를 결합시켜 좌우 이동이 가능한 썽크플레이트를 조작하여 스터드볼트 위치가 다양한 현장에 하나의 썽크플레이트로 적용이 가능하도록 하는데 있다. Another object of the present invention is to combine the thunk plate on the top of the bolt-integrated plate to operate the thunk plate to move left and right, so that the stud bolt position can be applied as a single thunk plate in various sites.

본 발명의 또 다른 목적은 너트부에 삽입되는 플레이트하부볼트부의 삽입 길이를 조절하여 높낮이를 조절할 수 있으며, 너트결합형볼트를 철재 각관 거더에 삽입하여 나비너트로 체결시에 나비너트를 조작하여 철재 각관 거더의 높이를 조절할 수 있도록 하는데 있다.Another object of the present invention can adjust the height by adjusting the insertion length of the plate bottom bolt portion inserted into the nut portion, inserting the nut-coupled bolt into the steel tube girder to operate the butterfly nut when tightened with the butterfly nut The height of the square girder can be adjusted.

본 발명의 또 다른 목적은 볼트일체형플레이트 최상단에 결합되는 높이조절용너트를 조작하여 현장 상황에 맞게 높이 오차를 보정할 수 있도록 하는데 있다.Another object of the present invention to manipulate the height adjustment nut coupled to the top end of the bolt-integrated plate to be able to correct the height error according to the site situation.

본 발명의 또 다른 목적은 플레이트부를 납작한 형상으로 제조하고, 양측면에 다수의 절단홈을 형성시켜 플레이트부의 소정 위치를 절단할 경우에 플레이트상부볼트부가 콘크리트에 매몰되어 콘크리트의 빈공간 발생을 제거하며, 동시에 플레이트하부볼트부가 체결된 너트결합형볼트를 회수할 수 있도록 하는데 있다.
Another object of the present invention is to manufacture a flat plate shape, and when forming a plurality of cutting grooves on both sides to cut a predetermined position of the plate portion bolt upper plate is buried in concrete to eliminate the occurrence of empty space in the concrete, At the same time, it is possible to recover the nut-coupled bolt to the lower plate bolt portion.

본 발명이 해결하고자 하는 과제를 달성하기 위하여,In order to achieve the object of the present invention,

본 발명인 볼트일체형 플레이트를 이용한 교량 슬라브 거푸집용 높이조절장치는,Height adjustment device for bridge slab formwork using the present invention bolted integral plate,

중앙 부위에 플레이트부(110)가 형성되며, 플레이트부의 상부에는 교량 상판(10)에 결합되는 플레이트상부볼트부(120)가 형성되며, 플레이트부의 하부에는 너트결합형볼트의 너트부에 결합되는 플레이트하부볼트부(130)가 형성되어 있는 볼트일체형플레이트(100)와;The plate portion 110 is formed in the center portion, the upper plate portion bolt portion 120 is formed on the upper portion of the plate coupled to the bridge top plate 10, the plate coupled to the nut portion of the nut coupling bolt at the lower portion of the plate portion A bolt integral plate 100 having a lower bolt portion 130 formed thereon;

상부에는 상기 볼트일체형플레이트의 플레이트하부볼트부가 삽입되기 위한 너트부(210)가 형성되며, 너트부의 하부에는 철재 각관 거더(50)에 형성된 홀에 삽입되는 볼트부(220)가 형성되어 있는 너트결합형볼트(200);를 포함하여 구성되어 본 발명의 과제를 해결하게 된다.
A nut part 210 is formed at an upper part to insert a plate lower bolt part of the bolt integrated plate, and a nut part formed at a lower part of the nut part is formed with a bolt part 220 inserted into a hole formed in the steel tube girder 50. Type bolt 200; is configured to include to solve the problems of the present invention.

본 발명에 따른 볼트일체형 플레이트를 이용한 교량 슬라브 거푸집용 높이조절장치는,Height adjustment device for bridge slab formwork using the integral bolt plate according to the present invention,

콘크리트를 타설하기 위한 거푸집 형성시 현장의 다양한 설계환경 및 시공환경에 따라 부속자재인 플레이트 또는 특수규격 볼트를 주문 제작할 필요없이 볼트일체형플레이트와 너트결합형볼트의 조작을 통해 설계 환경에 맞춰 원하는 높낮이를 임의대로 조정할 수 있는 효과를 제공하게 된다.When forming the formwork for placing concrete, you can adjust the desired height according to the design environment by manipulating the bolt integrated plate and nut-coupled bolts without the need to order the plate or special size bolts as the subsidiary materials according to various design and construction environment of the site. The effect can be adjusted arbitrarily.

또한, 볼트일체형플레이트 상단에 썽크플레이트를 결합시켜 좌우 이동이 가능한 썽크플레이트를 조작하여 스터드볼트 위치가 다양한 현장에 하나의 썽크플레이트로 적용이 가능하도록 하는 효과를 제공하게 된다.In addition, by combining the thunk plate on the top of the bolt-integrated plate to operate the thunk plate that can be moved left and right to provide the effect that the stud bolt position can be applied to a single thunk plate in a variety of sites.

즉, 스터드볼트의 위치에 따라 볼트일체형플레이트를 좌우로 이동시켜 고정하게 되므로 이동의 유동성을 제공하게 된다.That is, since the bolt integral plate is fixed to the left and right according to the position of the stud bolt to provide the fluidity of the movement.

또한, 너트부에 삽입되는 플레이트하부볼트부의 삽입 길이를 조절하여 높낮이를 조절할 수 있으며, 너트결합형볼트를 철재 각관 거더에 삽입하여 나비너트로 체결시에 나비너트를 조작하여 철재 각관 거더의 높이를 조절할 수 있도록 함으로써, 높이 조절의 다양성을 제공하게 된다.In addition, it is possible to adjust the height by adjusting the insertion length of the plate bottom bolt inserted into the nut part, and insert the nut coupling bolt into the steel tube girder to operate the butterfly nut when tightening with the butterfly nut to increase the height of the steel tube girder By being adjustable, this provides a variety of height adjustments.

또한, 볼트일체형플레이트 최상단에 결합되는 높이조절용너트를 조작하여 현장 상황에 맞게 높이 오차를 보정할 수 있도록 함으로써, 현장작업자에게 너트 조작을 통한 손쉬운 오차 보정 작업을 제공하게 된다.In addition, by operating the height adjustment nut coupled to the top of the bolt-integrated plate to be able to correct the height error according to the site situation, to provide a field operator easy error correction work through the operation of the nut.

또한, 플레이트부를 납작한 형상으로 제조하고, 양측면에 다수의 절단홈을 형성시켜 플레이트부의 소정 위치를 절단할 경우에 플레이트상부볼트부가 콘크리트에 매몰되어 콘크리트의 빈공간 발생을 제거하며, 동시에 플레이트하부볼트부가 체결된 너트결합형볼트를 회수할 수 있도록 함으로써, 구조적 안정성과 콘크리트에 매몰되는 부위를 최소화하여 회수된 플레이트하부볼트부가 체결된 너트결합형볼트를 재활용할 수 있어 원가 절감 효과를 동시에 제공하게 된다.
In addition, when the plate portion is manufactured in a flat shape, and a plurality of cutting grooves are formed on both sides to cut a predetermined position of the plate portion, the upper bolt part of the plate is buried in concrete to remove the void space of the concrete, and at the same time the lower plate bolt part By recovering the fastened nut-type bolt, the structurally stable and minimized the buried part in the concrete can be recovered and the bolt-type bolt fastened to the plate lower bolt portion is recovered to provide a cost reduction effect at the same time.

도 1은 종래의 썽크플레이트 방식을 도시한 예시도이다.
도 2는 종래의 천공 방식을 도시한 예시도이다.
도 3a는 본 발명의 일실시예에 따른 볼트일체형 플레이트를 이용한 교량 슬라브 거푸집용 높이조절장치의 분해 사시도이다.
도 3b는 본 발명의 일실시예에 따른 볼트일체형 플레이트를 이용한 교량 슬라브 거푸집용 높이조절장치의 플레이트부 사시도이다.
도 4는 본 발명의 다른 일실시예에 따른 볼트일체형 플레이트를 이용한 교량 슬라브 거푸집용 높이조절장치의 분해 사시도이다.
도 5a는 본 발명의 일실시예에 따른 볼트일체형 플레이트를 이용한 교량 슬라브 거푸집용 높이조절장치의 썽크플레이트 사시도이다.
도 5b는 본 발명의 다른 일실시예에 따른 볼트일체형 플레이트를 이용한 교량 슬라브 거푸집용 높이조절장치의 썽크플레이트 사시도이다.
도 5c는 본 발명의 다른 일실시예에 따른 볼트일체형 플레이트를 이용한 교량 슬라브 거푸집용 높이조절장치의 썽크플레이트의 스터드볼트 위치에 따라 체결 부위 조정이 가능함을 나타낸 예시도이다.
도 6은 본 발명의 일실시예에 따른 볼트일체형 플레이트를 이용한 교량 슬라브 거푸집용 높이조절장치의 현장 적용 예를 나타낸 예시도이다.
도 7은 본 발명의 일실시예에 따른 볼트일체형 플레이트를 이용한 교량 슬라브 거푸집용 높이조절장치의 공정도이다.
1 is an exemplary view showing a conventional thunk plate method.
Figure 2 is an exemplary view showing a conventional drilling method.
Figure 3a is an exploded perspective view of the height adjustment device for the bridge slab formwork using the integral bolt plate according to an embodiment of the present invention.
Figure 3b is a perspective view of the plate portion of the height adjustment device for bridge slab formwork using the integral bolt plate according to an embodiment of the present invention.
Figure 4 is an exploded perspective view of the height adjustment device for the bridge slab formwork using the bolt integral plate according to another embodiment of the present invention.
Figure 5a is a perspective view of the thunk plate of the height adjustment device for the bridge slab formwork using the integral bolt plate according to an embodiment of the present invention.
Figure 5b is a perspective view of the thunk plate of the height adjustment device for the bridge slab formwork using the integral bolt plate according to another embodiment of the present invention.
Figure 5c is an exemplary view showing that the fastening site can be adjusted according to the stud bolt position of the thunk plate of the height adjustment device for bridge slab formwork using the bolt integral plate according to another embodiment of the present invention.
6 is an exemplary view showing a field application example of the height adjustment device for the bridge slab formwork using the integral bolt plate according to an embodiment of the present invention.
Figure 7 is a process chart of the height adjustment device for the bridge slab formwork using the integral bolt plate according to an embodiment of the present invention.

상기 과제를 달성하기 위한 본 발명의 일실시예에 따른 볼트일체형 플레이트를 이용한 교량 슬라브 거푸집용 높이조절장치는,Height adjustment device for bridge slab formwork using the bolt integral plate according to an embodiment of the present invention for achieving the above object,

중앙 부위에 플레이트부(110)가 형성되며, 플레이트부의 상부에는 교량 상판(10)에 결합되는 플레이트상부볼트부(120)가 형성되며, 플레이트부의 하부에는 너트결합형볼트의 너트부에 결합되는 플레이트하부볼트부(130)가 형성되어 있는 볼트일체형플레이트(100)와;The plate portion 110 is formed in the center portion, the upper plate portion bolt portion 120 is formed on the upper portion of the plate coupled to the bridge top plate 10, the plate coupled to the nut portion of the nut coupling bolt at the lower portion of the plate portion A bolt integral plate 100 having a lower bolt portion 130 formed thereon;

상부에는 상기 볼트일체형플레이트의 플레이트하부볼트부가 삽입되기 위한 너트부(210)가 형성되며, 너트부의 하부에는 철재 각관 거더(50)에 형성된 홀에 삽입되는 볼트부(220)가 형성되어 있는 너트결합형볼트(200);를 포함하여 구성되는 것을 특징으로 한다.A nut part 210 is formed at an upper part to insert a plate lower bolt part of the bolt integrated plate, and a nut part formed at a lower part of the nut part is formed with a bolt part 220 inserted into a hole formed in the steel tube girder 50. Type bolt 200; characterized in that comprises a.

한편, 다른 일실시예에 따른 볼트일체형 플레이트를 이용한 교량 슬라브 거푸집용 높이조절장치는,On the other hand, the height adjustment device for the bridge slab formwork using the integral bolt plate according to another embodiment,

중앙 부위에 플레이트부(110)가 형성되며, 플레이트부의 상부에는 교량 상판(10)에 결합되는 플레이트상부볼트부(120)가 형성되며, 플레이트부의 하부에는 너트결합형볼트의 너트부에 결합되는 플레이트하부볼트부(130)가 형성되어 있는 볼트일체형플레이트(100)와;The plate portion 110 is formed in the center portion, the upper plate portion bolt portion 120 is formed on the upper portion of the plate coupled to the bridge top plate 10, the plate coupled to the nut portion of the nut coupling bolt at the lower portion of the plate portion A bolt integral plate 100 having a lower bolt portion 130 formed thereon;

상부에는 상기 볼트일체형플레이트의 플레이트하부볼트부가 삽입되기 위한 너트부(210)가 형성되며, 너트부의 하부에는 철재 각관 거더(50)에 형성된 홀에 삽입되는 볼트부(220)가 형성되어 있는 너트결합형볼트(200)와;A nut part 210 is formed at an upper part to insert a plate lower bolt part of the bolt integrated plate, and a nut part formed at a lower part of the nut part is formed with a bolt part 220 inserted into a hole formed in the steel tube girder 50. A type bolt 200;

교량 상판에 형성된 스터드볼트(20)를 삽입하기 위한 스터드볼트삽입공(310)이 일측에 형성되어 있으며, 타측에 상기 볼트일체형플레이트의 플레이트상부볼트부를 삽입하기 위한 플레이트상부볼트부삽입공(320)이 형성되어 있는 썽크플레이트(300);를 포함하여 구성되는 것을 특징으로 한다.Stud bolt insertion hole 310 for inserting the stud bolt 20 formed in the bridge top plate is formed on one side, the plate upper bolt portion insertion hole 320 for inserting the upper plate bolt portion of the bolt integral plate on the other side It is characterized in that it comprises a; thunk plate 300 is formed.

한편, 또 다른 일실시예에 따른 볼트일체형 플레이트를 이용한 교량 슬라브 거푸집용 높이조절장치는,On the other hand, the height adjustment device for the bridge slab formwork using a bolt integral plate according to another embodiment,

중앙 부위에 플레이트부(110)가 형성되며, 플레이트부의 상부에는 교량 상판(10)에 결합되는 플레이트상부볼트부(120)가 형성되며, 플레이트부의 하부에는 너트결합형볼트의 너트부에 결합되는 플레이트하부볼트부(130)가 형성되어 있는 볼트일체형플레이트(100)와;The plate portion 110 is formed in the center portion, the upper plate portion bolt portion 120 is formed on the upper portion of the plate coupled to the bridge top plate 10, the plate coupled to the nut portion of the nut coupling bolt at the lower portion of the plate portion A bolt integral plate 100 having a lower bolt portion 130 formed thereon;

상부에는 상기 볼트일체형플레이트의 플레이트하부볼트부가 삽입되기 위한 너트부(210)가 형성되며, 너트부의 하부에는 철재 각관 거더(50)에 형성된 홀에 삽입되는 볼트부(220)가 형성되어 있는 너트결합형볼트(200)와;A nut part 210 is formed at an upper part to insert a plate lower bolt part of the bolt integrated plate, and a nut part formed at a lower part of the nut part is formed with a bolt part 220 inserted into a hole formed in the steel tube girder 50. A type bolt 200;

교량 상판에 형성된 스터드볼트(20)를 삽입하기 위한 스터드볼트삽입공(310)이 일측에 형성되어 있으며, 타측에 상기 볼트일체형플레이트의 플레이트상부볼트부를 삽입하기 위한 플레이트상부볼트부삽입공(320)이 형성되어 있는 썽크플레이트(300)와;Stud bolt insertion hole 310 for inserting the stud bolt 20 formed in the bridge top plate is formed on one side, the plate upper bolt portion insertion hole 320 for inserting the upper plate bolt portion of the bolt integral plate on the other side The thunk plate 300 is formed;

상기 너트결합형볼트에 형성된 볼트부에 결합되어 회전시킴으로써 상단에 위치한 철재 각관 거더를 상하로 이동시키기 위한 나비너트(400)와;A butterfly nut 400 for moving up and down the steel square tube girders positioned at the top by rotating by being coupled to the bolts formed on the nut coupling bolts;

상기 볼트일체형플레이트에 형성된 플레이트상부볼트부에 결합되어 회전시킴으로써 높이 오차를 보정하기 위한 높이조정용너트(500);를 포함하여 구성되는 것을 특징으로 한다.It is characterized in that it comprises a; height adjustment nut 500 for correcting the height error by rotating coupled to the upper plate bolt portion formed in the bolt integral plate.

이때, 상기 썽크플레이트(300)는,At this time, the thunk plate 300,

스터드볼트삽입공(310)과 연이어 수평가이드홀(330)을 형성하여 플레이트상부볼트부를 좌우 이동시킬 수 있도록 하는 것을 특징으로 한다.The stud bolt insertion hole 310 is connected to the horizontal guide hole 330 so as to move the upper bolt portion to the plate.

이때, 상기 너트부에 삽입되는 플레이트하부볼트부의 삽입 길이를 조절하여 높낮이를 조절하는 것을 특징으로 한다.At this time, it is characterized in that the height is adjusted by adjusting the insertion length of the plate lower bolt portion inserted into the nut portion.

이때, 상기 너트결합형볼트를,At this time, the nut coupling bolt,

철재 각관 거더에 삽입하여 나비너트로 체결시에 나비너트를 조작하여 철재 각관 거더의 높이를 조절하는 것을 특징으로 한다.Inserting into the steel tube girder is characterized by adjusting the height of the steel tube girder by operating the butterfly nut when tightened with the butterfly nut.

이때, 상기 플레이트부(110)는,At this time, the plate unit 110,

납작한 형상을 가지고 있으며, 양측면에 다수의 절단홈(110a)을 형성하고 있는 것을 특징으로 한다.It has a flat shape and is characterized by forming a plurality of cutting grooves (110a) on both sides.

이때, 상기 플레이트부의 소정 위치를 절단할 경우에,At this time, when cutting the predetermined position of the plate portion,

플레이트상부볼트부가 콘크리트에 매몰되고 플레이트하부볼트부가 체결된 너트결합형볼트를 회수할 수 있는 것을 특징으로 한다.The upper plate bolt portion is embedded in the concrete, it is characterized in that the nut-type bolt can be recovered that the plate lower bolt portion is fastened.

이하, 첨부된 도면을 참조하여 본 발명인 볼트일체형 플레이트를 이용한 교량 슬라브 거푸집용 높이조절장치의 바람직한 실시예를 상세하게 설명한다.Hereinafter, with reference to the accompanying drawings will be described in detail a preferred embodiment of the height adjustment device for the bridge slab formwork using the integral bolt plate of the present invention.

상기의 배경기술에서 언급한 문제점을 기술적으로 극복하기 위해서는 일차적으로 슬라브 거푸집의 최하단 지지구조물인 철재 각관 거더의 높이가 임의조절 가능해야 하므로 본 발명에서는 높이를 조절할 수 있는 부분을 3가지로 설정할 수 있다.In order to technically overcome the problems mentioned in the background art, the height of the steel tube girder, which is the lowermost supporting structure of the slab formwork, should be arbitrarily adjustable, so in the present invention, three height adjustable parts can be set. .

첫째, 볼트일체형플레이트와 너트결합형볼트의 체결시 너트결합형볼트에 삽입되는 볼트일체형플레이트의 삽입 길이를 조정하여 높낮이를 조정할 수 있다.first, The height can be adjusted by adjusting the insertion length of the bolt-integrated plate inserted into the nut-coupled bolt when the bolt-integral plate and nut-coupled bolt are fastened.

둘째, 너트결합형볼트를 철재 각관 거더에 삽입하여 나비 너트로 체결시 나비 너트를 조작하여 높낮이를 조정할 수 있다.Second, the nut can be adjusted by adjusting the butterfly nut when the bolt is inserted into the steel tube girder by tightening the butterfly nut.

셋째, 볼트일체형플레이트 상측에 결합되는 높이조절용너트를 조작하여 높이를 조정할 수 있다. Third, the height can be adjusted by operating the height adjustment nut coupled to the upper side of the bolt integrated plate.

상기 셋째의 높이조절용너트 조작을 통한 높이 조정은 현장 작업자가 오차를 보정하기 위한 작업이다.Height adjustment through the third height adjustment nut operation is a job for the field operator to correct the error.

결국, 본 발명은 상기의 3가지 조작방법의 조합을 통하여 거푸집용 높이조절장치의 총높이를 조정할 수 있게 되는 것이다.As a result, the present invention is to be able to adjust the total height of the formwork height adjusting device through a combination of the three operation methods described above.

도 3a는 본 발명의 일실시예에 따른 볼트일체형 플레이트를 이용한 교량 슬라브 거푸집용 높이조절장치의 분해 사시도이다.Figure 3a is an exploded perspective view of the height adjustment device for the bridge slab formwork using the integral bolt plate according to an embodiment of the present invention.

도 3b는 본 발명의 일실시예에 따른 볼트일체형 플레이트를 이용한 교량 슬라브 거푸집용 높이조절장치의 플레이트부 사시도이다.Figure 3b is a perspective view of the plate portion of the height adjustment device for bridge slab formwork using the integral bolt plate according to an embodiment of the present invention.

도 3a에 도시한 바와 같이, 본 발명의 높이조절장치는,As shown in Figure 3a, the height adjusting device of the present invention,

중앙 부위에 플레이트부(110)가 형성되며, 플레이트부의 상부에는 교량 상판(10)에 결합되는 플레이트상부볼트부(120)가 형성되며, 플레이트부의 하부에는 너트결합형볼트의 너트부에 결합되는 플레이트하부볼트부(130)가 형성되어 있는 볼트일체형플레이트(100)와;The plate portion 110 is formed in the center portion, the upper plate portion bolt portion 120 is formed on the upper portion of the plate coupled to the bridge top plate 10, the plate coupled to the nut portion of the nut coupling bolt at the lower portion of the plate portion A bolt integral plate 100 having a lower bolt portion 130 formed thereon;

상부에는 상기 볼트일체형플레이트의 플레이트하부볼트부가 삽입되기 위한 너트부(210)가 형성되며, 너트부의 하부에는 철재 각관 거더(50)에 형성된 홀에 삽입되는 볼트부(220)가 형성되어 있는 너트결합형볼트(200);를 포함하여 구성되게 된다.A nut part 210 is formed at an upper part to insert a plate lower bolt part of the bolt integrated plate, and a nut part formed at a lower part of the nut part is formed with a bolt part 220 inserted into a hole formed in the steel tube girder 50. Type bolt 200; will be configured to include.

상기 볼트일체형플레이트(100)는 중앙 부위에 플레이트부(110)가 형성되게 되는데, 상기 플레이트부는 도 3b에 도시한 바와 같이, 납작한 형상을 가지고 있으며, 양측면에 다수의 절단홈(110a)을 형성하고 있는 것을 특징으로 한다.The bolt integrated plate 100 has a plate portion 110 is formed in the center portion, the plate portion has a flat shape, as shown in Figure 3b, and forms a plurality of cutting grooves (110a) on both sides and It is characterized by being.

즉, 원기둥 형상의 볼트 중앙 부위를 압착하게 되면 납작한 형태가 되게 되며, 양측면에 절삭을 하여 절단홈을 생성하는 것이다.In other words, when the center portion of the cylindrical bolt is pressed, a flat shape is formed, and both sides are cut to generate cutting grooves.

그렇게 되면 점선으로 표시된 부위에 힘을 가하게 되면 절단이 가능하게 된다.In this case, cutting is possible when a force is applied to the area indicated by the dotted line.

구체적으로 콘크리트 타설 공정이 마무리된 후 거푸집을 해체하기 위해 철재 각관 거더에 체결된 높이조절장치를 분리하기 위해서는 볼트일체형플레이트의 절단홈 라인을 따라 형성된 가상의 점선에 연직의 힘을 가하여 절단할 수 있게 되며, 홈라인을 적어도 2개 이상 형성시켜 높이조정의 여유 길이를 부여할 수도 있다.Specifically, in order to separate the height adjusting device fastened to the steel square girder to dismantle the form after the concrete placing process is finished, it is possible to cut by applying a vertical force to the virtual dotted line formed along the cutting groove line of the bolt integral plate. In addition, at least two groove lines may be formed to provide a clearance length for height adjustment.

또한, 상기 플레이트부의 상부에는 교량 상판(10)에 결합되는 플레이트상부볼트부(120)가 형성되는데, 교량 상판과의 결합은 일반적인 썽크플레이트 방식 혹은 천공 방식을 이용하게 된다.In addition, the upper plate portion is formed on the upper plate bolt portion 120 is coupled to the bridge top plate 10, the coupling with the bridge top plate is to use a conventional thunk plate method or perforation method.

그리고, 상기 플레이트부의 하부에는 너트결합형볼트의 너트부에 결합되는 플레이트하부볼트부(130)가 형성되게 된다.Then, the lower plate portion bolt portion 130 is coupled to the nut portion of the nut coupling bolt is formed in the lower portion.

한편, 상기 너트결합형볼트(200)는 상부에 상기 볼트일체형플레이트의 플레이트하부볼트부가 삽입되기 위한 너트부(210)가 형성되며, 너트부의 하부에는 철재 각관 거더(50)에 형성된 홀에 삽입되는 볼트부(220)가 형성되게 된다. On the other hand, the nut coupling bolt 200 is formed with a nut portion 210 for inserting the lower plate plate portion of the bolt integral plate, the lower portion of the nut is inserted into the hole formed in the steel tube girder 50 The bolt portion 220 is formed.

결국, 상기와 같은 구성을 통해 너트부에 삽입되는 플레이트하부볼트부의 삽입 길이를 조절하여 높낮이를 조절할 수 있게 되는 것이다.As a result, it is possible to adjust the height by adjusting the insertion length of the plate lower bolt portion inserted into the nut through the configuration as described above.

또한, 부가적인 양상에 따라 본 발명의 장치는 교량 상판에 형성된 스터드볼트(20)를 삽입하기 위한 스터드볼트삽입공(310)이 일측에 형성되어 있으며, 타측에 상기 볼트일체형플레이트의 플레이트상부볼트부를 삽입하기 위한 플레이트상부볼트부삽입공(320)이 형성되어 있는 썽크플레이트(300);를 포함하여 구성되게 된다.In addition, according to an additional aspect, the device of the present invention has a stud bolt insertion hole 310 for inserting the stud bolt 20 formed in the bridge top plate is formed on one side, the plate upper bolt portion of the bolt integral plate on the other side Thunk plate 300 is formed, the upper plate portion bolt insertion hole 320 for insertion; is configured to include.

즉, 썽크플레이트(300)는 도 5a에 도시한 바와 같이, 교량 상판에 형성된 스터드볼트(20)를 삽입하기 위한 스터드볼트삽입공(310)이 일측에 형성되어 있으며, 타측에 상기 볼트일체형플레이트의 플레이트상부볼트부를 삽입하기 위한 플레이트상부볼트부삽입공(320)이 형성되게 된다.That is, the thunk plate 300, as shown in Figure 5a, the stud bolt insertion hole 310 for inserting the stud bolt 20 formed on the bridge top plate is formed on one side, the other side of the bolt integrated plate Plate upper bolt portion insertion hole 320 for inserting the plate upper bolt portion is formed.

그러나, 상기의 구조는 현장마다 스터드볼트의 위치가 달라지므로 유동성 있게 현장 상황에 따라 이동이 가능한 방식은 아니므로 사용상에 제약을 받을 수도 있기 때문에 도 5b에 도시한 바와 같이, 썽크플레이트(300)에 스터드볼트삽입공(310)과 연이어 수평가이드홀(330)을 형성하여 플레이트상부볼트부를 좌우 이동시킬 수 있도록 형성하게 된다.However, since the structure of the stud bolt is different from site to site, it is not a method that can be moved depending on the situation of the site fluidly, so it may be restricted in use, as shown in FIG. 5B, to the thunk plate 300. The stud bolt insertion hole 310 and the horizontal guide hole 330 are formed in succession so as to move the upper bolt portion to the left and right.

즉, 도 5c의 좌측 도면과 같이 썽크플레이트와 플랜지 단부 간의 간격이 넓은 경우와, 도 5c의 우측 도면과 같이 썽크플레이트와 플랜지 단부 간의 간격이 좁을 경우에도 결합이 가능한 유동성을 제공할 수 있게 되는 것이다.That is, when the distance between the thunk plate and the flange end is wide as shown in the left side of FIG. 5C and when the distance between the thunk plate and the flange end is narrow as shown in the right side of FIG. .

도 4는 본 발명의 다른 일실시예에 따른 볼트일체형 플레이트를 이용한 교량 슬라브 거푸집용 높이조절장치의 분해 사시도이다.Figure 4 is an exploded perspective view of the height adjustment device for the bridge slab formwork using the bolt integral plate according to another embodiment of the present invention.

도 4에 도시한 바와 같이, 높이조절장치는,As shown in Figure 4, the height adjustment device,

중앙 부위에 플레이트부(110)가 형성되며, 플레이트부의 상부에는 교량 상판(10)에 결합되는 플레이트상부볼트부(120)가 형성되며, 플레이트부의 하부에는 너트결합형볼트의 너트부에 결합되는 플레이트하부볼트부(130)가 형성되어 있는 볼트일체형플레이트(100)와;The plate portion 110 is formed in the center portion, the upper plate portion bolt portion 120 is formed on the upper portion of the plate coupled to the bridge top plate 10, the plate coupled to the nut portion of the nut coupling bolt at the lower portion of the plate portion A bolt integral plate 100 having a lower bolt portion 130 formed thereon;

상부에는 상기 볼트일체형플레이트의 플레이트하부볼트부가 삽입되기 위한 너트부(210)가 형성되며, 너트부의 하부에는 철재 각관 거더(50)에 형성된 홀에 삽입되는 볼트부(220)가 형성되어 있는 너트결합형볼트(200)와;A nut part 210 is formed at an upper part to insert a plate lower bolt part of the bolt integrated plate, and a nut part formed at a lower part of the nut part is formed with a bolt part 220 inserted into a hole formed in the steel tube girder 50. A type bolt 200;

교량 상판에 형성된 스터드볼트(20)를 삽입하기 위한 스터드볼트삽입공(310)이 일측에 형성되어 있으며, 타측에 상기 볼트일체형플레이트의 플레이트상부볼트부를 삽입하기 위한 플레이트상부볼트부삽입공(320)이 형성되어 있는 썽크플레이트(300)와;Stud bolt insertion hole 310 for inserting the stud bolt 20 formed in the bridge top plate is formed on one side, the plate upper bolt portion insertion hole 320 for inserting the upper plate bolt portion of the bolt integral plate on the other side The thunk plate 300 is formed;

상기 너트결합형볼트에 형성된 볼트부에 결합되어 회전시킴으로써 상단에 위치한 철재 각관 거더를 상하로 이동시키기 위한 나비너트(400)와;A butterfly nut 400 for moving up and down the steel square tube girders positioned at the top by rotating by being coupled to the bolts formed on the nut coupling bolts;

상기 볼트일체형플레이트에 형성된 플레이트상부볼트부에 결합되어 회전시킴으로써 높이 오차를 보정하기 위한 높이조정용너트(500);를 포함하여 구성되게 된다.It is configured to include; height adjustment nut 500 for correcting the height error by rotating coupled to the upper plate bolt portion formed in the bolt integral plate.

일실시예와의 차이점은 나비너트와 높이조정용너트가 구성되는 것이다.The difference from one embodiment is that the butterfly nut and the height adjustment nut is configured.

즉, 너트결합형볼트를 철재 각관 거더에 삽입하여 나비너트로 체결시에 나비너트를 조작하여 철재 각관 거더의 높이를 조절할 수 있으며, 높이조정용너트가 볼트일체형플레이트에 형성된 플레이트상부볼트부에 결합되어 회전시킴으로써 높이 오차를 보정할 수 있는 것이다.That is, the nut coupling bolt is inserted into the steel tube girder to adjust the height of the steel tube girder by operating the butterfly nut when tightened with the butterfly nut, and the height adjusting nut is coupled to the upper plate bolt formed on the bolt integral plate. By rotating, the height error can be corrected.

도 6은 본 발명의 일실시예에 따른 볼트일체형 플레이트를 이용한 교량 슬라브 거푸집용 높이조절장치의 현장 적용 예를 나타낸 예시도이다.6 is an exemplary view showing a field application example of the height adjustment device for the bridge slab formwork using the integral bolt plate according to an embodiment of the present invention.

도 6에 도시한 바와 같이, 교량 상판에 형성된 스터드볼트(20)썽크플레이트에 삽입되고 타측에 볼트일체형플레이트의 플레이트상부볼트부를 삽입되게 되며, 하측에 철재 각관 거더(50)를 결합시킨 후, 나비너트로 높이 조절하게 된다.As shown in Figure 6, the stud bolt 20 formed on the bridge top plate is inserted into the thunk plate and the other side of the plate upper bolt portion of the bolt-integrated plate is inserted, and after combining the steel tube girder 50 on the lower side, the butterfly The height is adjusted with a nut.

도 7은 본 발명의 일실시예에 따른 볼트일체형 플레이트를 이용한 교량 슬라브 거푸집용 높이조절장치의 공정도이다.Figure 7 is a process chart of the height adjustment device for the bridge slab formwork using the integral bolt plate according to an embodiment of the present invention.

도 7에 도시한 바와 같이, 볼트일체형플레이트, 너트결합형볼트, 썽크플레이트, 사각와샤(410), 나비너트, 원형와샤(510), 높이조정용너트를 준비(S100)한 후, 볼트일체형플레이트, 너트결합형볼트를 체결(S110)하게 된다.As shown in FIG. 7, after the bolt integrated plate, the nut coupling bolt, the thunk plate, the square washer 410, the butterfly nut, the round washer 510, and the height adjusting nut are prepared (S100), the bolt integral plate, The nut coupling bolt is fastened (S110).

이후, 사각와샤를 체결(S120)한 후, 나비너트를 체결(S130)하고, 철재 각관 거더에 형성된 홀에 체결(S140)하게 된다.Thereafter, after fastening the square washer (S120), and fastening the butterfly nut (S130), and is fastened to the hole formed in the steel square tube girder (S140).

이후, 썽크플레이트를 준비(S150)하고, 썽크플레이트의 일측에 스터드볼트를 타측에 볼트일체형플레이트의 플레이트상부볼트부(120)를 체결(S160)한 후, 원형와샤를 플레이트상부볼트부에 체결(S170)하고, 원형와샤 상부에 높이조절용너트를 체결(S180)한 후, 각재를 철재 각관 거더 상단에 거치(S190)하고, 합판을 각재 상부에 거치(S200)하여 마무리하게 되는 것이다.After that, prepare the thunk plate (S150), and fasten the stud bolt to one side of the thunk plate to the plate upper bolt portion 120 of the bolt-integrated plate on the other side (S160), and then fasten the round washer to the plate upper bolt ( S170), and then fastening the height adjustment nut on the top of the round washer (S180), it is mounted on the top of the steel tube pipe girder (S190), and the plywood is mounted on the top of the timber (S200) will be finished.

이후, 콘크리트를 양생하게 되며, 양생이 마무리되면, 볼트일체형플레이트의 플레이트부의 소정 위치를 절단하게 된다.Then, curing the concrete, and when the curing is finished, the predetermined position of the plate portion of the bolt integral plate is cut.

이때, 플레이트상부볼트부가 콘크리트에 매몰되고 플레이트하부볼트부가 체결된 너트결합형볼트를 회수할 수 있게 된다.At this time, the plate upper bolt portion is buried in the concrete, it is possible to recover the nut-coupled bolt fastened to the plate lower bolt portion.

종래의 경우에는 특수규격볼트를 사용한 후 회수하게 되는데, 회수시 콘크리트에 빈 공간이 발생하여 구조적으로 취약할 수 밖에 없었으며, 양생된 콘크리트가 노출된 특수규격볼트 부위를 덮고 있으므로 추후 볼트 회수시 마모가 심한 상태로 회수되어 재활용성이 떨어지고 어려운 작업 과정을 거치게 된다.In the conventional case, it is recovered after using a special specification bolt, but when recovering, empty space occurs in the concrete, which is inevitably structurally weak, and since the cured concrete covers the exposed part of the special specification bolt, it is worn out after the bolt is recovered. Are recovered in severe conditions, making them less recyclable and going through a difficult process.

상기와 같이 회수하여 재활용하는 이유는 특수규격볼트의 가격이 비싸기 때문이며, The reason for the collection and recycling as above is that the price of the special specification bolt is expensive.

그러나, 본 발명의 경우에는 회수시 볼트일체형플레이트의 플레이트부를 절단하여 회수하므로 콘크리트에 빈공간이 발생하지 않아 구조적으로 안전할 수 있다.However, in the case of the present invention, since the plate portion of the bolt-integrated plate is recovered by recovery, the empty space does not occur in the concrete and thus may be structurally safe.

구체적으로 볼트일체형플레이트가 절단된 후 플레이트상부볼트부와 플레이트부의 일부만 콘크리트에 매몰되고 플레이트부 일부와 플레이트하부볼트부는 너트결합형볼트에 체결된 채 회수되어 콘크리트에 매몰되는 부분을 최소화하여 콘크리트 구조물의 구조적 안정성을 저해하지 않으며 원가 절감의 효과를 동시에 제공할 수 있다.Specifically, after the bolt-integral plate is cut, only the upper plate part and the plate part are buried in concrete, and the part of the plate part and the lower part of the plate part are recovered while being fastened to the nut coupling bolt to minimize the part buried in concrete. It can provide cost savings without compromising structural stability.

요약하자면, 기존의 볼트 체결방식은 거푸집 설치시나 해체시 임팩을 이용하여 설치하므로 작업성이 저하되며 볼트의 나사부의 마모가 심해져 볼트의 재활용에 문제가 발생함에 비해 본 발명은 간단히 임팩없이 설치와 해체가 가능하므로 조절장치의 마모를 막고 재활용성을 높일 수 있게 된다. In summary, the existing bolt fastening method is installed by using impact when installing or dismantling formwork, the workability is lowered and the wear of the screw of the bolt is aggravated, the problem of bolt recycling occurs, the present invention is simply installed and dismantled without impact This prevents abrasion of the regulator and increases recyclability.

상기와 같은 구성 및 동작을 통해 콘크리트를 타설하기 위한 거푸집 형성시 현장의 다양한 설계환경 및 시공환경에 따라 부속자재인 플레이트 또는 특수규격 볼트를 주문 제작할 필요없이 볼트일체형플레이트와 너트결합형볼트의 조작을 통해 설계 환경에 맞춰 원하는 높낮이를 임의대로 조정할 수 있는 효과를 제공하게 된다.When forming formwork for placing concrete through the construction and operation as described above, it is possible to operate the bolt-integrated plate and nut-coupled bolt without the need for customizing the plate or special size bolt as an accessory according to various design environment and construction environment of the site. This provides the effect of arbitrarily adjusting the desired height according to the design environment.

또한, 볼트일체형플레이트 상단에 썽크플레이트를 결합시켜 좌우 이동이 가능한 썽크플레이트를 조작하여 스터드볼트 위치가 다양한 현장에 하나의 썽크플레이트로 적용이 가능하도록 하는 효과를 제공하게 된다.In addition, by combining the thunk plate on the top of the bolt-integrated plate to operate the thunk plate that can be moved left and right to provide the effect that the stud bolt position can be applied to a single thunk plate in a variety of sites.

이상에서와 같은 내용의 본 발명이 속하는 기술분야의 당업자는 본 발명의 기술적 사상이나 필수적 특징을 변경하지 않고서 다른 구체적인 형태로 실시될 수 있다는 것을 이해할 수 있을 것이다. 그러므로 이상에서 기술한 실시 예들은 모든 면에서 예시된 것이며 한정적인 것이 아닌 것으로서 이해해야만 한다. It will be appreciated by those skilled in the art that the present invention may be embodied in other specific forms without departing from the spirit or essential characteristics thereof. Therefore, the above-described embodiments are to be understood as illustrative in all respects and not restrictive.

본 발명의 범위는 상기 상세한 설명보다는 후술하는 특허청구범위에 의하여 나타내어지며, 특허청구 범위의 의미 및 범위 그리고 그 등가 개념으로부터 도출되는 모든 변경 또는 변형된 형태가 본 발명의 범위에 포함되는 것으로 해석되어야 한다.
The scope of the invention is indicated by the following claims rather than the above description, and all changes or modifications derived from the meaning and scope of the claims and their equivalents should be construed as being included in the scope of the invention. do.

100 : 볼트일체형플레이트
110 : 플레이트부
120 : 플레이트상부볼트부
130 : 플레이트하부볼트부
200 : 너트결합형볼트
210 : 너트부
220 : 볼트부
300 : 썽크플레이트
310 : 스터드볼트삽입공
320 : 플레이트상부볼트부삽입공
330 : 수평가이드홀
400 : 나비너트
500 : 높이조정용너트
100: integral bolt plate
110: plate portion
120: plate upper bolt portion
130: plate lower bolt portion
200: nut coupling bolt
210: nut part
220: bolt part
300: thunk plate
310: stud bolt insertion hole
320: upper plate bolt insertion hole
330: horizontal guide hole
400: Butterfly Nut
500: Height adjusting nut

Claims (8)

교량 슬라브 거푸집용 높이조절장치에 있어서,
중앙 부위에 플레이트부(110)가 형성되며, 플레이트부의 상부에는 교량 상판(10)에 결합되는 플레이트상부볼트부(120)가 형성되며, 플레이트부의 하부에는 너트결합형볼트의 너트부에 결합되는 플레이트하부볼트부(130)가 형성되어 있는 볼트일체형플레이트(100)와;
상부에는 상기 볼트일체형플레이트의 플레이트하부볼트부가 삽입되기 위한 너트부(210)가 형성되며, 너트부의 하부에는 철재 각관 거더(50)에 형성된 홀에 삽입되는 볼트부(220)가 형성되어 있는 너트결합형볼트(200);를 포함하여 구성되는 것을 특징으로 하는 볼트일체형 플레이트를 이용한 교량 슬라브 거푸집용 높이조절장치.
In the height adjustment device for bridge slab formwork,
The plate portion 110 is formed in the center portion, the upper plate portion bolt portion 120 is formed on the upper portion of the plate coupled to the bridge top plate 10, the plate coupled to the nut portion of the nut coupling bolt at the lower portion of the plate portion A bolt integral plate 100 having a lower bolt portion 130 formed thereon;
A nut part 210 is formed at an upper part to insert a plate lower bolt part of the bolt integrated plate, and a nut part formed at a lower part of the nut part is formed with a bolt part 220 inserted into a hole formed in the steel tube girder 50. Type bolt 200; height adjustment device for the bridge slab formwork using the integral bolt plate, characterized in that comprising a.
교량 슬라브 거푸집용 높이조절장치에 있어서,
중앙 부위에 플레이트부(110)가 형성되며, 플레이트부의 상부에는 교량 상판(10)에 결합되는 플레이트상부볼트부(120)가 형성되며, 플레이트부의 하부에는 너트결합형볼트의 너트부에 결합되는 플레이트하부볼트부(130)가 형성되어 있는 볼트일체형플레이트(100)와;
상부에는 상기 볼트일체형플레이트의 플레이트하부볼트부가 삽입되기 위한 너트부(210)가 형성되며, 너트부의 하부에는 철재 각관 거더(50)에 형성된 홀에 삽입되는 볼트부(220)가 형성되어 있는 너트결합형볼트(200)와;
교량 상판에 형성된 스터드볼트(20)를 삽입하기 위한 스터드볼트삽입공(310)이 일측에 형성되어 있으며, 타측에 상기 볼트일체형플레이트의 플레이트상부볼트부를 삽입하기 위한 플레이트상부볼트부삽입공(320)이 형성되어 있는 썽크플레이트(300);를 포함하여 구성되는 것을 특징으로 하는 볼트일체형 플레이트를 이용한 교량 슬라브 거푸집용 높이조절장치.
In the height adjustment device for bridge slab formwork,
The plate portion 110 is formed in the center portion, the upper plate portion bolt portion 120 is formed on the upper portion of the plate coupled to the bridge top plate 10, the plate coupled to the nut portion of the nut coupling bolt at the lower portion of the plate portion A bolt integral plate 100 having a lower bolt portion 130 formed thereon;
A nut part 210 is formed at an upper part to insert a plate lower bolt part of the bolt integrated plate, and a nut part formed at a lower part of the nut part is formed with a bolt part 220 inserted into a hole formed in the steel tube girder 50. A type bolt 200;
Stud bolt insertion hole 310 for inserting the stud bolt 20 formed in the bridge top plate is formed on one side, the plate upper bolt portion insertion hole 320 for inserting the upper plate bolt portion of the bolt integral plate on the other side The thunk plate 300 is formed; height adjustment device for the bridge slab formwork using the integral bolt plate, characterized in that comprising a.
교량 슬라브 거푸집용 높이조절장치에 있어서,
중앙 부위에 플레이트부(110)가 형성되며, 플레이트부의 상부에는 교량 상판(10)에 결합되는 플레이트상부볼트부(120)가 형성되며, 플레이트부의 하부에는 너트결합형볼트의 너트부에 결합되는 플레이트하부볼트부(130)가 형성되어 있는 볼트일체형플레이트(100)와;
상부에는 상기 볼트일체형플레이트의 플레이트하부볼트부가 삽입되기 위한 너트부(210)가 형성되며, 너트부의 하부에는 철재 각관 거더(50)에 형성된 홀에 삽입되는 볼트부(220)가 형성되어 있는 너트결합형볼트(200)와;
교량 상판에 형성된 스터드볼트(20)를 삽입하기 위한 스터드볼트삽입공(310)이 일측에 형성되어 있으며, 타측에 상기 볼트일체형플레이트의 플레이트상부볼트부를 삽입하기 위한 플레이트상부볼트부삽입공(320)이 형성되어 있는 썽크플레이트(300)와;
상기 너트결합형볼트에 형성된 볼트부에 결합되어 회전시킴으로써 상단에 위치한 철재 각관 거더를 상하로 이동시키기 위한 나비너트(400)와;
상기 볼트일체형플레이트에 형성된 플레이트상부볼트부에 결합되어 회전시킴으로써 높이 오차를 보정하기 위한 높이조정용너트(500);를 포함하여 구성되는 것을 특징으로 하는 볼트일체형 플레이트를 이용한 교량 슬라브 거푸집용 높이조절장치.
In the height adjustment device for bridge slab formwork,
The plate portion 110 is formed in the center portion, the upper plate portion bolt portion 120 is formed on the upper portion of the plate coupled to the bridge top plate 10, the plate coupled to the nut portion of the nut coupling bolt at the lower portion of the plate portion A bolt integral plate 100 having a lower bolt portion 130 formed thereon;
A nut part 210 is formed at an upper part to insert a plate lower bolt part of the bolt integrated plate, and a nut part formed at a lower part of the nut part is formed with a bolt part 220 inserted into a hole formed in the steel tube girder 50. A type bolt 200;
Stud bolt insertion hole 310 for inserting the stud bolt 20 formed in the bridge top plate is formed on one side, the plate upper bolt portion insertion hole 320 for inserting the upper plate bolt portion of the bolt integral plate on the other side The thunk plate 300 is formed;
A butterfly nut 400 for moving up and down the steel square tube girders positioned at the top by rotating by being coupled to the bolts formed on the nut coupling bolts;
Height adjustment device for the bridge slab formwork using a bolt-integral plate, characterized in that it comprises a; height adjustment nut (500) for correcting the height error by rotating coupled to the upper plate bolt portion formed in the bolt-integral plate.
제 2항 또는 제 3항에 있어서,
상기 썽크플레이트(300)는,
스터드볼트삽입공(310)과 연이어 수평가이드홀(330)을 형성하여 플레이트상부볼트부를 좌우 이동시킬 수 있도록 하는 것을 특징으로 하는 볼트일체형 플레이트를 이용한 교량 슬라브 거푸집용 높이조절장치.
4. The method according to claim 2 or 3,
The thunk plate 300,
Height adjustment device for the bridge slab formwork using a bolt-integral plate, characterized in that to form the horizontal guide hole 330 in succession with the stud bolt insertion hole 310 to move the upper bolt portion.
제 1항 내지 제 3항 중 어느 한 항에 있어서,
상기 너트부에 삽입되는 플레이트하부볼트부의 삽입 길이를 조절하여 높낮이를 조절하는 것을 특징으로 하는 볼트일체형 플레이트를 이용한 교량 슬라브 거푸집용 높이조절장치.
4. The method according to any one of claims 1 to 3,
Height adjustment device for the bridge slab formwork using a bolt-integral plate, characterized in that for adjusting the height by adjusting the insertion length of the lower plate plate portion inserted into the nut portion.
제 3항에 있어서,
상기 너트결합형볼트를,
철재 각관 거더에 삽입하여 나비너트로 체결시에 나비너트를 조작하여 철재 각관 거더의 높이를 조절하는 것을 특징으로 하는 볼트일체형 플레이트를 이용한 교량 슬라브 거푸집용 높이조절장치.
The method of claim 3,
The nut coupling bolt,
Height adjustment device for bridge slab formwork using a bolt-integral plate, characterized in that by inserting the steel tube girder to adjust the height of the steel tube girder by operating the butterfly nut when tightened with the butterfly nut.
제 1항 내지 제 3항 중 어느 한 항에 있어서,
상기 플레이트부(110)는,
납작한 형상을 가지고 있으며, 양측면에 다수의 절단홈(110a)을 형성하고 있는 것을 특징으로 하는 볼트일체형 플레이트를 이용한 교량 슬라브 거푸집용 높이조절장치.
4. The method according to any one of claims 1 to 3,
The plate unit 110,
Height adjustment device for bridge slab formwork using a bolt-integral plate, characterized in that it has a flat shape and forms a plurality of cutting grooves (110a) on both sides.
제 1항 내지 제 3항 중 어느 한 항에 있어서,
상기 플레이트부의 소정 위치를 절단할 경우에,
플레이트상부볼트부가 콘크리트에 매몰되고 플레이트하부볼트부가 체결된 너트결합형볼트를 회수할 수 있는 것을 특징으로 하는 볼트일체형 플레이트를 이용한 교량 슬라브 거푸집용 높이조절장치.
4. The method according to any one of claims 1 to 3,
When cutting the predetermined position of the plate portion,
Height adjustment device for bridge slab formwork using a bolt-integral plate, characterized in that the upper bolt portion is buried in concrete and the nut-bolt type bolt to which the lower bolt portion is fastened can be recovered.
KR1020120040791A 2012-04-19 2012-04-19 Height adjustable device for perfabricated form panel using plate combined with bolt KR101187434B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020120040791A KR101187434B1 (en) 2012-04-19 2012-04-19 Height adjustable device for perfabricated form panel using plate combined with bolt

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020120040791A KR101187434B1 (en) 2012-04-19 2012-04-19 Height adjustable device for perfabricated form panel using plate combined with bolt

Publications (1)

Publication Number Publication Date
KR101187434B1 true KR101187434B1 (en) 2012-10-02

Family

ID=47287306

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020120040791A KR101187434B1 (en) 2012-04-19 2012-04-19 Height adjustable device for perfabricated form panel using plate combined with bolt

Country Status (1)

Country Link
KR (1) KR101187434B1 (en)

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100334257B1 (en) 2000-11-13 2002-04-25 권영수 Formwork method using no prop for the floor concrete of the bridge

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100334257B1 (en) 2000-11-13 2002-04-25 권영수 Formwork method using no prop for the floor concrete of the bridge

Similar Documents

Publication Publication Date Title
CN102510927B (en) Adjustable metal formwork system for concrete structures
KR101227715B1 (en) Structure for SRC structured high rise building
CN103397701B (en) Adjustable positioning structure for pre-buried bolt double-layered positioning plate and construction method
CN207227968U (en) T beam beams bottom steel plate supertronic device
CN104878924A (en) Stair step concrete pouring-molded template and stair cast-in-situ construction method
JP5596876B1 (en) Precast floor slab manufacturing apparatus and precast floor slab manufacturing method
KR20190008053A (en) An assembly type supporting beam mold using form-panel, and method for constructing this same
KR100770006B1 (en) Vertical connection steel-bar reinforcing structure of precast concreate column
KR101759710B1 (en) Supporting beam formwork method for forming a beam of buildings
KR101941942B1 (en) Integrated form structure for constructing cantilever slab and protective wall of bridge, and construction method using the same
US10494815B2 (en) Adjustable dap assembly
KR102080492B1 (en) Construction method for cantilever in steel composite girder bridge
KR101572245B1 (en) Support for a upper reinforcing bar of footings
KR101187434B1 (en) Height adjustable device for perfabricated form panel using plate combined with bolt
CN107354874A (en) T beam beams bottom steel plate supertronic device
US20190194942A1 (en) Prefabricated building panel
JP6055212B2 (en) Reinforced earth wall construction method
KR102339400B1 (en) Combined structure for slab and girder
JP2011202486A (en) Building
EP2834440B1 (en) Adjustable support device for a frame member and installation method
KR20130001192A (en) Lateral auxiliary bar for continuously reinforced concrete pavements
JP5345238B1 (en) Construction method of base-isolated base structure and base-isolated base structure
US20120117892A1 (en) All metal leave N place armor joint form with joint fill retention
CN104878926A (en) Suspended template system construction method and turnover brackets
CN204781953U (en) Stair concrete placement shaping template of marking time

Legal Events

Date Code Title Description
A201 Request for examination
A302 Request for accelerated examination
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20150930

Year of fee payment: 4

FPAY Annual fee payment

Payment date: 20160926

Year of fee payment: 5

FPAY Annual fee payment

Payment date: 20170725

Year of fee payment: 6

FPAY Annual fee payment

Payment date: 20200115

Year of fee payment: 8