US20120117892A1 - All metal leave N place armor joint form with joint fill retention - Google Patents

All metal leave N place armor joint form with joint fill retention Download PDF

Info

Publication number
US20120117892A1
US20120117892A1 US12/927,399 US92739910A US2012117892A1 US 20120117892 A1 US20120117892 A1 US 20120117892A1 US 92739910 A US92739910 A US 92739910A US 2012117892 A1 US2012117892 A1 US 2012117892A1
Authority
US
United States
Prior art keywords
joint
armor
steel
sheet metal
attached
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Abandoned
Application number
US12/927,399
Inventor
Patrick Michael Smith
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to US12/927,399 priority Critical patent/US20120117892A1/en
Publication of US20120117892A1 publication Critical patent/US20120117892A1/en
Abandoned legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C11/00Details of pavings
    • E01C11/02Arrangement or construction of joints; Methods of making joints; Packing for joints
    • E01C11/04Arrangement or construction of joints; Methods of making joints; Packing for joints for cement concrete paving
    • E01C11/08Packing of metal
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C11/00Details of pavings
    • E01C11/02Arrangement or construction of joints; Methods of making joints; Packing for joints
    • E01C11/04Arrangement or construction of joints; Methods of making joints; Packing for joints for cement concrete paving
    • E01C11/12Packing of metal and plastic or elastic materials
    • E01C11/126Joints with only metal and prefabricated packing or filling

Definitions

  • this invention eliminates these steps by providing a one step set and alignment of the armor joint.
  • the form is left in place and requires no additional labor to remove conventional wooden forming materials.
  • the joint area is constantly exposed to fork lift traffic and continuous vibration of said traffic results in the joint filler compound being compromised and a settling effect takes place resulting with the joint fill dropping and leaving an exposed “gap” between the armor joints.
  • This invention provides a “slot” and “backstop” to capture the joint fill by filling the slot provided by the Leave N Place metal form work.
  • This invention eliminates wooden forming labor and material that is required for the installation of conventional steel armor joints.
  • This invention is a one step, set in place and leave in place product.
  • the armor joint is fully adjustable to compensate for undulations in the substrate or if used on an insulated freezer floor.
  • the base and uprights provide a “seat” for the joint filler that will be applied after the floors have cured and contracts and the armor joint separates with the concrete as it moves horizontally, thus providing a permanent base for the joint filler, therefore reducing the need to reapply the joint filler. No part of the form system requires removal or altered after the adjustment.
  • the dowels are placed in the provided pre drilled holes in the uprights and are left in place during the concrete placement, there is no need to remove and reset the dowels for the adjoining slab placement as there is no need to remove any wooden form work.
  • the Leave N Place form provides the option of a continuous pour application, while finishing one slab the adjacent or adjoining slab can start placement.
  • FIG. 1 shows a side view of the steel armor joint piece 3 which is a fabricated component that includes 1 ⁇ 2′′ headed studs piece 7 , pre-drilled holes marked 12 , rod couplings piece 9 , and leveling bolts piece 10 .
  • FIG. 2 shows an end view section of piece 3 FIG. 1 .
  • FIG. 3 depicts a side view of the upright piece 2 which will be attached to piece 1 base metal as depicted in FIG. 5 . There will be (2) two pieces 2 required for a complete assembly.
  • FIG. 4 shows a front view of piece 2 .
  • This view displays the slotted holes piece 13 that will be used to attach pieces 3 .
  • This view also shows the pre-drilled holes piece 14 to accommodate the dowels.
  • FIG. 5 shows the fully assembled components in a ready for use condition.
  • FIG. 6 depicts the Leave N Place form in the condition as it would be after the concrete has been placed and cured. This condition reflects the joint with the joint filler compound, piece 15 , placed after the contraction of the concrete floor slab.
  • piece 8 a self tapping, self drilling screw, or rivet.
  • Pieces 3 are then attached to piece 2 using neoprene bolts, nuts and washers, pieces 4 , 5 , 6 , as depicted on FIG. 5 , by inserting 4 thru the holes 12 in the pieces 7 and holes 13 in piece 2 as depicted FIG. 2 and FIG. 4 .
  • the neoprene bolts are designed to comprise during the concrete curing process and allow the armor joints to separate as the concrete floor cures.
  • Pieces 5 and 6 are then used to secure pieces 7 to piece 2 .
  • Pieces 3 is a fabricated assembly by attaching a stub, piece 7 at 30 degrees as depicted on FIG. 1 . by welding.
  • Piece 9 is a threaded coupling which is also attached by welding.
  • Piece 10 is a threaded bolt which is threaded thru piece 8 and provides an adjustment mechanism for height adjustment of pieces 7 . By turning piece 10 either in the up or down direction height adjustment is achieved to provide an even and level plane of top edges of piece 7 .
  • the invention is assembled and set in place as one assembly.
  • the adjustment of the height of the top plane of pieces 7 is achieved by setting these components to required elevation by way of a previously set benchmark elevation for the finished floor slab, then the adjustment bolts can be used to achieve the exact elevation required.
  • the forms are set and secured together by an overlapping condition at the end of each linear section and bolted together with neoprene bolts designed to compromise during contraction of the concrete. All elevations are checked and adjusted as required to provide a level and straight armor joint condition.
  • the form can either be secured by sand bag, staking or by a small portion of concrete once all alignments are achieved.

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Joining Of Building Structures In Genera (AREA)

Abstract

The objective of this invention is to provide ease of application for steel armored joints used in industrial concrete floor construction. It provides one step simple and precise installation. Provides a substrate for joint filler compression. Eliminates the need for wood forms and field welding that produces waste.
Elevation adjustment and the ease thereof are achieved by vertical slots cut in the upright. The neoprene bolts are to be tightened when the steel is at the desired elevation. Two part armored joints separate as the concrete contracts during the curing process. Then the joint filler product is applied and retained in a permanent encased condition.

Description

    CROSS-REFERENCE TO ALL RELATED APPLICATIONS
  • Not Applicable
  • STATEMENT REGARDING FEDERALLY SPONSORED RESEARCH OR DEVELOPMENT
  • Not Applicable.
  • NAMES OF PARTIES TO ADJOINT RESEARCH AGREEMENT
  • Not Applicable
  • REFERENCE TO SEQUENCE LISTING, A TABLE, OR COMPUTER PROGRAM LISTING COMPACT DISC APPENDIX
  • Not Applicable
  • BACKGROUND OF INVENTION
  • Due to the required labor and material required to form and place an armored joint with wooden forms in a concrete floor this invention eliminates these steps by providing a one step set and alignment of the armor joint. The form is left in place and requires no additional labor to remove conventional wooden forming materials.
  • The joint area is constantly exposed to fork lift traffic and continuous vibration of said traffic results in the joint filler compound being compromised and a settling effect takes place resulting with the joint fill dropping and leaving an exposed “gap” between the armor joints.
  • This invention provides a “slot” and “backstop” to capture the joint fill by filling the slot provided by the Leave N Place metal form work.
  • The result is less affect on the fork lift and driver and less maintenance on equipment.
  • BRIEF SUMMARY OF INVENTION
  • This invention eliminates wooden forming labor and material that is required for the installation of conventional steel armor joints.
  • This invention is a one step, set in place and leave in place product. The armor joint is fully adjustable to compensate for undulations in the substrate or if used on an insulated freezer floor. The base and uprights provide a “seat” for the joint filler that will be applied after the floors have cured and contracts and the armor joint separates with the concrete as it moves horizontally, thus providing a permanent base for the joint filler, therefore reducing the need to reapply the joint filler. No part of the form system requires removal or altered after the adjustment.
  • The dowels are placed in the provided pre drilled holes in the uprights and are left in place during the concrete placement, there is no need to remove and reset the dowels for the adjoining slab placement as there is no need to remove any wooden form work.
  • The Leave N Place form provides the option of a continuous pour application, while finishing one slab the adjacent or adjoining slab can start placement.
  • BRIEF DESCRIPTION OF THE SEVERAL VIEWS OF THE DRAWING
  • Particular embodiments of the invention will now be described with reference to the accompanying drawings wherein:
  • FIG. 1 shows a side view of the steel armor joint piece 3 which is a fabricated component that includes ½″ headed studs piece 7, pre-drilled holes marked 12, rod couplings piece 9, and leveling bolts piece 10.
  • FIG. 2 shows an end view section of piece 3 FIG. 1.
  • FIG. 3 depicts a side view of the upright piece 2 which will be attached to piece 1 base metal as depicted in FIG. 5. There will be (2) two pieces 2 required for a complete assembly.
  • FIG. 4 shows a front view of piece 2. This view displays the slotted holes piece 13 that will be used to attach pieces 3. This view also shows the pre-drilled holes piece 14 to accommodate the dowels.
  • FIG. 5 shows the fully assembled components in a ready for use condition.
  • FIG. 6 depicts the Leave N Place form in the condition as it would be after the concrete has been placed and cured. This condition reflects the joint with the joint filler compound, piece 15, placed after the contraction of the concrete floor slab.
  • DETAILED DESCRIPTION OF THE INVENTION
  • Referring to the drawing FIG. 5 this designates the metal base piece 1 to which will provide a support base for stabilization and to which the piece 2 as depicted in FIG. 3 shall be attached. This is accomplished by use of piece 8, a self tapping, self drilling screw, or rivet. Pieces 3 are then attached to piece 2 using neoprene bolts, nuts and washers, pieces 4, 5, 6, as depicted on FIG. 5, by inserting 4 thru the holes 12 in the pieces 7 and holes 13 in piece 2 as depicted FIG. 2 and FIG. 4. The neoprene bolts are designed to comprise during the concrete curing process and allow the armor joints to separate as the concrete floor cures. Pieces 5 and 6 are then used to secure pieces 7 to piece 2.
  • Pieces 3 is a fabricated assembly by attaching a stub, piece 7 at 30 degrees as depicted on FIG. 1. by welding. Piece 9 is a threaded coupling which is also attached by welding. Piece 10 is a threaded bolt which is threaded thru piece 8 and provides an adjustment mechanism for height adjustment of pieces 7. By turning piece 10 either in the up or down direction height adjustment is achieved to provide an even and level plane of top edges of piece 7.
  • The invention is assembled and set in place as one assembly. The adjustment of the height of the top plane of pieces 7 is achieved by setting these components to required elevation by way of a previously set benchmark elevation for the finished floor slab, then the adjustment bolts can be used to achieve the exact elevation required. When conditions required more than one section of form the forms are set and secured together by an overlapping condition at the end of each linear section and bolted together with neoprene bolts designed to compromise during contraction of the concrete. All elevations are checked and adjusted as required to provide a level and straight armor joint condition.
  • The form can either be secured by sand bag, staking or by a small portion of concrete once all alignments are achieved.

Claims (4)

1-11. (canceled)
12. The All Metal Leave N Place Armor Joint Form with Joint Fill Retention is utilized in the placement of concrete slabs and is a one step, set in place and leave in place armored joint form. The form provides a seating system which thereby captures the joint fill material. The form consists of a sheet metal base with two independent upright pieces attached to the base sheet metal. The uprights and base are attached together to form an inverted “T” Shape. The T Shaped sheet metal is fabricated to house the steel armored joint components. The armor joint steel is attached to the sheet metal form by means of neoprene bolts. The neoprene bolts are designed to compromise during the curing phase of the placement of the concrete slab. The act of compromising of said neoprene bolts allows for the separation of the steel armor joints due to the shrinkage factor of concrete. Once separation of the armor joint occurs, then the joint fill medium can be applied to fill the void created by the separation of the armor joint steel. Furthermore, the form includes a vertical adjustability of the steel armor joint that is independent of the sheet metal base and upright. This provides compensation for elevation inconsistencies in the sub-grade and/or insulated floor materials.
13. The armored joint form according to claim 12, consist of a sheet metal base attached to two sheet metal upright components of which the steel armor joints are attached. The fabricated steel armor joints are fitted with headed studs, to provide for anchoring in the concrete slab. The armor joint components and sheet metal upright will separate during the concrete curing process and therefore expose the metal strip which is attached to one side of the bottom portion of the steel armor joint. This separation will provide the seat (metal strip) to capture and retain the joint fill medium.
14. According to claim 12, the armored joint steel is fitted with threaded nuts and threaded studs (jack bolts) which provides the mechanism enabling the vertical adjustability feature. The jack bolts also provide horizontal stability to the armor joint steel during the placement of the concrete slabs.
US12/927,399 2010-11-15 2010-11-15 All metal leave N place armor joint form with joint fill retention Abandoned US20120117892A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
US12/927,399 US20120117892A1 (en) 2010-11-15 2010-11-15 All metal leave N place armor joint form with joint fill retention

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
US12/927,399 US20120117892A1 (en) 2010-11-15 2010-11-15 All metal leave N place armor joint form with joint fill retention

Publications (1)

Publication Number Publication Date
US20120117892A1 true US20120117892A1 (en) 2012-05-17

Family

ID=46046535

Family Applications (1)

Application Number Title Priority Date Filing Date
US12/927,399 Abandoned US20120117892A1 (en) 2010-11-15 2010-11-15 All metal leave N place armor joint form with joint fill retention

Country Status (1)

Country Link
US (1) US20120117892A1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20120102862A1 (en) * 2010-10-28 2012-05-03 Underwood Companies Holdings Pty Ltd. Metal edging for concrete slabs
US20150047271A1 (en) * 2013-08-13 2015-02-19 World Housing Solution Offset Adjustable Foundation Leg

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20120102862A1 (en) * 2010-10-28 2012-05-03 Underwood Companies Holdings Pty Ltd. Metal edging for concrete slabs
US8713877B2 (en) * 2010-10-28 2014-05-06 Underwood Companies Holdings Pty Ltd Metal edging for concrete slabs
US20150047271A1 (en) * 2013-08-13 2015-02-19 World Housing Solution Offset Adjustable Foundation Leg
US20150047289A1 (en) * 2013-08-13 2015-02-19 World Housing Solution Structural Insulated Composite Floor Panel System

Similar Documents

Publication Publication Date Title
US8826555B2 (en) Self-supporting story pole
US9909278B2 (en) Concrete wall stabilizing apparatus and method
KR102143636B1 (en) An assembly type supporting beam mold using form-panel, and method for constructing this same
US9637874B2 (en) Form assembly for paving materials
US8915038B1 (en) Dynamic concrete form
US20120124929A1 (en) Concrete armored joint form that provides one step installation and thermal transfer prevention as well as seating for joint filler
US20120117892A1 (en) All metal leave N place armor joint form with joint fill retention
KR101606439B1 (en) Spacer for fixing between truss girder and deck plate combine
EP3156554A1 (en) Fastening structure for a building with a parapet wall
KR200462716Y1 (en) Curbstone constructing equipment
JP6196454B2 (en) Wall construction panel and wall construction method
KR200468906Y1 (en) Foundation bolt mount with height adjustment
CN204645661U (en) Adjustable angle steel template
JP5912194B1 (en) Construction method of wooden building and basic member used in the construction method
EP2834440B1 (en) Adjustable support device for a frame member and installation method
JP2013104198A (en) L-shaped fitting and height position adjusting device using the same
JP2021085270A (en) Construction method of wall panel
US20060285922A1 (en) Expansion joint for concrete works
CN206000189U (en) One kind faces side hole adjustable protective guard
JP6593691B2 (en) Transparent temporary frame structure for forming reinforced concrete buildings
AU2012200336A1 (en) Screed Rail
KR101187434B1 (en) Height adjustable device for perfabricated form panel using plate combined with bolt
JP3132632U (en) Solid basic formwork
JP2019056282A (en) Leg-shaped part support structure and method for producing the same
JP7049609B2 (en) Construction method of earthquake-resistant memorial tower and earthquake-resistant memorial tower

Legal Events

Date Code Title Description
STCB Information on status: application discontinuation

Free format text: ABANDONED -- FAILURE TO RESPOND TO AN OFFICE ACTION