KR100334257B1 - Formwork method using no prop for the floor concrete of the bridge - Google Patents

Formwork method using no prop for the floor concrete of the bridge Download PDF

Info

Publication number
KR100334257B1
KR100334257B1 KR1020000067156A KR20000067156A KR100334257B1 KR 100334257 B1 KR100334257 B1 KR 100334257B1 KR 1020000067156 A KR1020000067156 A KR 1020000067156A KR 20000067156 A KR20000067156 A KR 20000067156A KR 100334257 B1 KR100334257 B1 KR 100334257B1
Authority
KR
South Korea
Prior art keywords
formwork
concrete
bridge
deck
nuts
Prior art date
Application number
KR1020000067156A
Other languages
Korean (ko)
Other versions
KR20010021482A (en
Inventor
김용만
Original Assignee
권영수
(주)신성엔지니어링
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 권영수, (주)신성엔지니어링 filed Critical 권영수
Priority to KR1020000067156A priority Critical patent/KR100334257B1/en
Publication of KR20010021482A publication Critical patent/KR20010021482A/en
Application granted granted Critical
Publication of KR100334257B1 publication Critical patent/KR100334257B1/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/12Grating or flooring for bridges; Fastening railway sleepers or tracks to bridges
    • E01D19/125Grating or flooring for bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

본 발명은 교량이나 도로 육교의 상판 콘크리트를 타설할 때 동바리를 설치하지 않고 거푸집을 설치할 수 있는 거푸집 설치공법에 관한 것이다. 즉,The present invention relates to a formwork installation method that can install the formwork without installing the club when placing the concrete of the bridge or road overpass. In other words,

본 발명은 교량의 교각(1)에 설치되는 다수개의 상자형 거더(2′)의 상부 날개에 다수개의 구멍을 뚫는 단계; 상기 구멍 상부에 다수개의 너트(12)를 설치하는 단계; 상기 다수개의 너트(12)에, 헌치철판(31,31′)을 관통하여 다수개의 레벨너트(14)가 체결된 볼트(13)를 체결하는 단계; 상기 다수개의 헌치철판(31,31′) 상부에 다수개의 데크플레이트(21)를 설치하는 단계; 상기 다수개의 데크플레이트(21) 상부에 거푸집 널(17)을 까는 단계; 상기 거푸집 널(17) 상부에 교량 상판 콘크리트를 타설하는 단계; 및, 상기 교량 상판 콘크리트가 양생되어 경화된 후, 상기 레벨 너트(14)를 풀고, 상기 헌치 철판(31,31′), 데크플레이트(21) 및 거푸집 널(17)을 해체하는 단계로 이루어지는 것을 특징으로 하는 동바리를 받히지 않는 교량상판 콘크리트용 거푸집공사방법에 관한 것이다.The present invention comprises the steps of drilling a plurality of holes in the upper wing of the plurality of box girders (2 ') installed in the bridge piers (1); Installing a plurality of nuts (12) on the holes; Fastening bolts 13 to which the plurality of level nuts 14 are fastened by passing through the haunch iron plates 31 and 31 'to the plurality of nuts 12; Installing a plurality of deck plates (21) on top of the plurality of haunting iron plates (31, 31 '); Covering form boards 17 on the plurality of deck plates; Placing bridge deck concrete on top of the formwork board (17); And, after the bridge deck concrete is cured and hardened, the level nut 14 is loosened, and the haunch iron plate (31, 31 '), the deck plate 21 and the form board 17 to dismantle The present invention relates to a formwork for bridge deck concrete, which does not receive copper bars.

Description

동바리를 받히지 않는 교량 상판 콘크리트용 거푸집 공사방법{Formwork method using no prop for the floor concrete of the bridge}Formwork method using no prop for the floor concrete of the bridge}

본 발명은 거푸집 설치 공법에 관한 것이다. 더욱 구체적으로 교량을 축조할 때 교량의 상판 콘크리트를 타설할 때 거푸집을 설치하는 공법에 관한 것이다.The present invention relates to a formwork installation method. More specifically, the present invention relates to a construction method for installing formwork when placing concrete on a bridge when constructing a bridge.

교량 공사, 도로의 육교부분을 건설할 때 교각을 세우고 교각의 상부에 피씨 빔(prestressed concrete girder)이나 철제로 만든 상자형 거더(box girder)를 교각 사이에 걸치고 피씨 빔이나 상자형 거더의 상부에 콘크리트를 타설하여 합성구조를 형성하여 도로면을 만든다. 이를 피씨 합성형교(composite girder bridge)라 한다. 본 공법은 합성형교를 구축할 때 도로 상면의 콘크리트를 타설하기 위한 거푸집 설치공법에 관한 것이다.In the construction of bridges, roads and overpasses, the bridges are erected, and a beam of prestressed concrete girder or a box girder made of steel is placed between the bridges, The concrete is made by pouring concrete to form a road surface. This is called composite girder bridge. This construction method relates to the formwork installation method for placing concrete on the road surface when constructing composite bridge.

통상 피씨 빔은 단면이 I형상을 사용한다. 종래에는 현장에서 도로면을 위한 콘크리트를 타설하기 위하여 피씨 빔 하단의 돌출부에 버팀목을 대고, 버팀 목 위에 동바리를 설치하고 그리고 동바리 위에 거푸집을 설치한 다음 콘크리트를 타설하였다. 종래의 공법은 버팀목과 동바리의 설치하는데 인력 투입이 많고 콘크리트를 타설한 후 해체하는데 역시 인력 투입이 많으며, 해체작업 중 자재가 많이 훼손되기 때문에 해체한 자재를 재사용하는 비율이 낮았다. 높은 곳에서 작업하는 시간이 많으므로 그 만큼 작업 중 안전사고가 생길 위험이 높을 뿐 아니라 자재의 소모량이 많아 원가가 높고, 자재의 소모량이 많으므로 발생하는 폐기물의 량도 많아 환경을 오염시키는 원인이 되기도 하였다.Normally, the PC beam uses an I shape in cross section. Conventionally, in order to pour concrete for the road surface in the site, the support on the bottom of the PC beam was placed on the support bar, the copper bar was installed on the support bar, and the formwork was installed on the copper bar, and then concrete was poured. The conventional method has a lot of manpower input to install the shoring and dongbari, and also a lot of manpower input to dismantle after pouring concrete, and the rate of reuse of the dismantled materials was low because many materials are damaged during the dismantling work. Since there is a lot of time to work in high places, not only is there a high risk of safety accidents during work, but also the cost is high due to the high consumption of materials, and the amount of waste generated due to the high consumption of materials causes pollution to the environment. It also became.

발명자는 종래 공법이 안고 있는 문제점을 해결할 수 있는 새로운 거푸집 공법을 개발하게 되었다.The inventor has developed a new formwork method that can solve the problems of the conventional method.

본 발명의 목적은 교량이나 도로의 육교에서 상판 콘크리트를 타설하기 위한 거푸집 공법을 제공하는 것이다.It is an object of the present invention to provide a formwork for pouring top concrete in bridges or overpasses on roads.

본 발명의 다른 목적은 교량이나 도로 육교의 상판 콘크리트를 타설할 때 동바리를 설치하지 않고 거푸집을 설치할 수 있는 거푸집 설치공법을 제공하는 것이다.Another object of the present invention is to provide a formwork installation method that can install the formwork without installing a copper bar when placing the concrete of the bridge or road overpass.

본 발명의 또 다른 목적은 설치와 해체가 쉽고 폐기물이 적게 발생하여 환경오염을 줄일 수 있는 거푸집 설치공법을 제공하는 것이다.Yet another object of the present invention is to provide a formwork installation method that can be easily installed and dismantled and generates less waste, thereby reducing environmental pollution.

제1도는 본 발명이 적용되는 분야를 보여 주는 도면이다.1 is a view showing the field to which the present invention is applied.

제2도는 제1도의 A-A 단면도 및 그 상세도이다.2 is a cross-sectional view taken along line A-A of FIG.

제3도는 교량의 피씨 빔(2)에 거푸집이 설치되는 상태를 보인 본 발명의 입체도이다.3 is a three-dimensional view of the present invention showing a state in which formwork is installed on the PC beam 2 of the bridge.

제4도는 본 발명으로 공사할 때 거푸집 널(17)을 설치하기 위한 하부 구조(framing)를 보인 평면도이다.4 is a plan view showing a framing for installing the formwork board 17 when constructing with the present invention.

제5도는 본 발명의 다른 구체예를 보인 단면도이다.5 is a cross-sectional view showing another embodiment of the present invention.

제6도와 제7도는 상자형 거더에 이용되는 본 발명의 구체예이다.6 and 7 show embodiments of the invention for use in box girders.

<도면의 주요 부호에 대한 설명><Description of Major Symbols in Drawing>

1: 교각 2: 피씨 빔1: pier 2: PC beam

2′: 상자형 거더 3: 상판2 ': box girder 3: top plate

4: 전단연결재 11: 띠쇠4: Shear connector 11: String

12: 너트 13: 볼트12: nut 13: bolt

14: 레벨 너트 15: ㄱ-형강14: level nut 15: a-beam

16: ㄷ-형강 17: 거푸집 널16: c-beam 17: formwork board

18: 긴 구멍 21: 데크플레이트18: long hole 21: deck plate

31, 31′: 헌치 철판 40:거푸집 널 지지대31, 31 ': Haunting iron plate 40: Formwork board support

본 발명의 구체예를 도시한 도면에 따라 본 발명을 상세히 설명한다.DETAILED DESCRIPTION OF THE INVENTION The present invention will be described in detail with reference to the drawings showing embodiments of the invention.

제1도는 본 발명이 적용되는 공사부위를 나타내는 도면이다.1 is a view showing a construction site to which the present invention is applied.

교각(1) 위에 미리 제작한 피씨 빔(2)을 여러 개 걸치고 피씨 빔의 상부에 현장에서 콘크리트를 타설하여 상판(3)을 만들어 도로가 완성된다. 본 발명은 상판(3)을 구축하기 위한 거푸집 공법에 관한 것이다.A plurality of PC beams (2) prefabricated on the pier (1) and the concrete is poured on the site of the PC beam in the field to make the top plate (3) is completed. The present invention relates to a formwork method for constructing the top plate (3).

제2도는 제1도의 A-A 단면도 및 그 부분 상세도이다.2 is a cross-sectional view taken along line A-A of FIG.

피씨 빔(2)과 피씨 빔 사이의 상부에는 상판을 만들기 위하여 현장에서 콘크리트를 타설한다. 콘크리트를 타설하기 위하여 종래에는 피씨 빔 하단의 돌출부에 버팀목을 설치하고 버팀목 위에 동바리를 세우고 동바리 위에 거푸집 널을 깔고 콘크리트를 타설하였다. 종래의 공법으로 공사할 경우 버팀목 설치, 동바리 설치에 인력이 많이 투입되었었다.In the upper part between the PC beam 2 and the PC beam, concrete is poured in the field to make a top plate. Conventionally, in order to pour concrete, a crutch is installed in the protrusion of the bottom of the PC beam, the club is erected on the crutch, and the formboard is laid on the club and the concrete is poured. In case of construction by the conventional construction method, a lot of manpower was put into the installation of the shoring and the installation of the club.

본 발명은 피씨 빔(2) 상부에 돌출되어 있는 전단연결재(4)에 띠쇠(11)를 용접하여 연장시키고 띠쇠(11)가 전단연결재와 용접된 반대쪽에는 너트(12)를 용접 접합한다. 상기 전단연결재(4)는 피씨 빔(2)과 상판(3)이 분리되지 않도록 일체화시키는 기능을 하기 위하여 피씨 빔(2)을 제작할 때 돌출시켜 두는 것으로 통상 철근을 연장시키고 있다.The present invention extends by welding the strip 11 to the shear connector 4 protruding above the PC beam (2), and the nut (12) is welded to the opposite side where the strip 11 is welded with the shear connector. The shear connector 4 is generally protruded when the PC beam 2 is made to protrude in order to integrate the PC beam 2 and the upper plate 3 so as not to be separated.

상기 너트(12)에는 볼트(13)를 끼우고, 상기 볼트(13)의 중간에는 높이 조절용 레벨 너트(14)를 하나 더 끼워 둔다. 상기 레벨 너트(14)는 나중에 거푸집 널(17)의 높이를 조절하고, 콘크리트 양생 후 해체할 때에는 레벨 너트(14)를 풀어 내리면 공간이 생겨 쉽게 거푸집 널 등을 해체할 수 있도록 한다.A bolt 13 is inserted into the nut 12, and a height adjusting level nut 14 is fitted in the middle of the bolt 13. The level nut 14 later adjusts the height of the formwork board 17, and when dismantling after concrete curing releases the level nut 14 so that the space can be easily dismantled formwork board and the like.

볼트(13)에는 긴 구멍(18)이 뚫려 있는 ㄱ-형강(15)이 설치하고, 상기 ㄱ-형강(15) 위에는 거푸집 널 지지대(40)의 하나로서 이용되는 ㄷ-형강(16)을 일정 간격으로 배치하고 상기 ㄷ-형강(16) 위에는 거푸집 널(17)을 깐다. 거푸집 널(17) 위에는 철근을 배근하고 콘크리트를 타설하면 상판(제1도에서 3)이 완성된다. 즉 동바리를 설치하지 않고 거푸집 공사를 할 수 있다.The bolt 13 is provided with an a-beam 15 through which a long hole 18 is drilled, and a c-beam 16 used as a formwork support 40 is fixed on the a-beam 15. Placed at intervals and the die board 17 is placed on the c-beam (16). Reinforcing the reinforcing bar on the formwork board 17 and the concrete is poured, the top plate (3 in Fig. 1) is completed. In other words, the formwork can be done without installing a copper bar.

제3도는 교량의 피씨 빔(2)에 거푸집이 설치되는 상태를 보인 본 발명의 입체도이다.3 is a three-dimensional view of the present invention showing a state in which formwork is installed on the PC beam 2 of the bridge.

피씨 빔에서 돌출된 전단연결재(4)에 용접된 띠쇠(11)와 상기 띠쇠에 용접된 너트(12), 상기 너트(12)에 끼워진 볼트(13), 상기 볼트(13)의 중간에 더 설치된 레벌 너트(14)가 거푸집을 매달 수 있는 수단이 된다.A bolt 11 welded to the shear connector 4 protruding from the PC beam, a nut 12 welded to the strap 12, a bolt 13 fitted to the nut 12, and a bolt 13 further installed in the middle. The level nut 14 is a means for hanging the formwork.

상기 볼트(13)를 긴 구멍(18)이 뚫린 ㄱ-형강(15)을 관통하여 끼우고, 레벨 너트(14)를 조절하여 상기 ㄱ-형강(15)의 높이와 수평을 조절하고, 상기 ㄱ-형강(15) 위에 ㄷ-형강(16)을 소정의 간격으로 배치하고, 상기 ㄷ-형강(16) 위에 거푸집 널(17)을 깔아 거푸집 공사를 완료한다. 여기서 사용하는 거푸집 널(17)은 철판, 알루미늄판, 또는 합판 등 판상의 재료는 구조물의 여건에 따라 다양하게 선택하여 사용할 수 있다.The bolt 13 is inserted through the a-beam 15 through which the long hole 18 is drilled, and the level nut 14 is adjusted to adjust the height and horizontality of the a-beam 15, and the a The c-beams 16 are arranged on the beams 15 at predetermined intervals, and the formwork board 17 is laid on the c-beams 16 to complete the formwork. The form board 17 used here can be used to select a variety of plate-like materials such as iron plate, aluminum plate, or plywood depending on the conditions of the structure.

제4도는 본 발명으로 공사할 때 거푸집 널(17)을 설치하기 위한 하부 구조(framing)를 보인 평면도이다. ㄱ-형강(15)에 뚫린 긴 구멍(18)을 통하여 볼트(13)를 끼워 ㄱ-형강(15)을 매달게 된다.4 is a plan view showing a framing for installing the formwork board 17 when constructing with the present invention. The a-beam 15 is suspended by inserting a bolt 13 through a long hole 18 drilled in the a-beam 15.

제5도는 본 발명의 다른 구체예를 보인 단면도이다.5 is a cross-sectional view showing another embodiment of the present invention.

제2도의 B-B 단면은 제5도와 같이 처리할 수 있다. 즉 ㄱ-형강(15) 위에 ㄷ-형강을 설치하면 부재 수가 많아 번거롭고, 휨강성이 약할 우려가 있으므로제2,3,4도의 ㄷ-형강(16) 대신에 거푸집 널 지지대(40)로서 데크플레이트(21)를 사용하는 것이다. 데크플레이트는 철판을 접어 효과적인 구조 성능을 가지도록 만든 구조재이다. 즉 ㄱ-형강(15) 위에 데크플레이트(21)를 깔고, 상기 데크플레이트(21) 위에 거푸집 널(17)을 깔고 콘크리트를 타설한다.B-B cross section of FIG. 2 can be processed as FIG. That is, if the c-shaped steel is installed on the a-beam 15, it is cumbersome because of the large number of members, and there is a possibility that the flexural rigidity may be weak. Thus, instead of the c-shaped steel 16 of the second, third and fourth degrees, the deck plate (40) 21). Deck plate is a structural material made by folding the steel plate to have an effective structural performance. That is, the deck plate 21 is laid on the a-beam 15, the formwork board 17 is laid on the deck plate 21, and the concrete is poured.

데크플레이트의 구조적 성능을 이용하여 합성 구조를 형성할 수도 있다. 합성구조를 형성할 때에는 데크플레이트 위에 거푸집 널(17)을 생략하고 직접 데크플레이트 위에 철근을 배근하여 데크플레이트와 콘크리트를 일체구조로 하는 것이다. 이 경우 볼트(13)를 풀고 ㄱ-형강(15)만 해체하면 된다.The structural performance of deckplates can also be used to form composite structures. When forming the composite structure, the formwork board 17 is omitted on the deck plate and the reinforcing bars are directly arranged on the deck plate to form a deck plate and concrete. In this case, loosen the bolt 13 and only dismantle the a-beam (15).

제6도와 제7도는 본 발명의 또 다른 구체예를 나타낸 도면이다.6 and 7 show another embodiment of the present invention.

교각(2) 위에 통상 많이 사용하는 피씨 빔(2) 대신 철제로 만든 상자형 거더(2′, box girder)를 사용할 경우에 본 발명을 적용하는 것을 보인 것이다. 제6도는 입체도이고 제7도는 제6도의 C-C 단면도와 그 부분 상세도이다.It is shown that the present invention is applied to the case where a box girder 2 'made of iron is used instead of the PC beam 2 which is commonly used on the bridge 2. FIG. 6 is a three-dimensional view and FIG. 7 is a sectional view taken along line C-C of FIG. 6 and a partial detail thereof.

상자형 거더(2′)에는 끝 부분에 날개가 돌출되어 있으므로 이 날개에 레벨 너트(14)가 달린 볼트(13)로 헌치 철판(haunch철판, 31 & 31′)을 고정시켜 데크플레이트(21)를 지지한다. 데크플레이트(21)를 사용할 경우 데크플레이트의 산과 산 사이의 공간에 콘크리트가 스며드는 것을 막기 위해 막음 철판(closure steel plate)으로 막는다.The box girders 2 'have their wings protruding at the ends, so the bolts 13 with level nuts 14 are fixed to the wings to fix the haunch plates 31 and 31' to the deck plate 21. Support. If the deck plate 21 is used to prevent the concrete from seeping into the space between the mountain and the deck plate (closure steel plate) is blocked.

헌치 철판(31, 31′)은 상자형 거더의 높이가 서로 다를 경우에 각각 다른 모양을 사용한다.The haunch grids 31 and 31 'use different shapes when the heights of the box girders are different.

제3도에 따라 본 발명의 공사방법을 설명한다.The construction method of this invention is demonstrated according to FIG.

피씨 빔(2)의 전단연결재(4)에 한 쪽에 너트(12)를 용접 부착한 띠쇠(11)를 용접설치하고, 긴 구멍(18)이 뚫린 ㄱ-형강(15)을 상기 긴 구멍(18)을 관통하여 레벨 너트(14)가 끼워진 볼트(13)를 상기 너트(12)에 결합하고, 상기 레벨 너트(14)를 돌려 상기 ㄱ-형강(15)의 높이와 수평을 조절하고, 상기 ㄱ-형강(15) 위에 거푸집 널 지지대(40)로서 ㄷ-형강(16) 또는 데크플레이트(21)를 설치한다. 상기 ㄷ-형강(16) 또는 데크플레이트(21) 위에 거푸집 널(17)을 깔고 콘크리트를 타설한다.Weld and install the strip 11 welded with the nut 12 on one side of the shear connector 4 of the PC beam 2, and the a-shaped steel 15 having the long hole 18 drilled into the long hole 18 The bolt 13, through which the level nut 14 is fitted, is coupled to the nut 12, and the level nut 14 is rotated to adjust the height and horizontality of the a-beam 15, and The c-beam 16 or the deck plate 21 is installed as a formwork support 40 on the beam 15. The formwork board 17 is laid on the c-shaped steel 16 or the deck plate 21 and concrete is poured.

상기 콘크리트가 양생되면 상기 레벨 너트(14)를 풀고 상기 ㄱ-형강(15)과 상기 ㄷ-형강(16) 또는 데크플레이트(21)와 상기 거푸집 널(17)을 해체하고, 볼트(13)를 제거하고 남는 구멍은 코킹재로 메우는 과정으로 공사한다.When the concrete is cured, the level nut 14 is loosened and the a-beam 15 and the c-beam 16 or the deck plate 21 and the form board 17 are dismantled, and the bolt 13 is removed. The remaining hole is removed by filling with caulking material.

제6도와 제7도와 같이 교량의 거더가 상자형 거더(2′)인 경우에는 ㄱ-형강(15)을 이용하지 않고 헌치철판(31,31′)을 이용하고, 거푸집 널 지지대(40)로서 데크플레이트(21)을 이용하다는 점에 차이가 있을 뿐 상기와 동일한 방법으로 교량을 완성한다.When the girder of the bridge is a box-shaped girder (2 ') as shown in FIG. 6 and 7 (7'), the demolition plate (31, 31 ') is used without using the a-beam (15), and as the formwork support (40). The difference is that the deck plate 21 is used, and the bridge is completed in the same manner as described above.

본 발명으로 교량이나 도로의 육교에서 상판 콘크리트를 타설하기 위한 거푸집 공법을 제공하여, 교량이나 도로 육교의 상판 콘크리트를 타설할 때 동바리를 설치하지 않고 거푸집을 설치할 수 있고, 거푸집의 설치와 해체가 쉽고 폐기물이 적게 발생하여 환경오염을 줄일 수 있게 되었다.The present invention provides a formwork method for placing top plate concrete on bridges or road viaducts, and when installing the top concrete of bridges or road viaducts, it is possible to install formwork without installing clubs, and it is easy to install and dismantle formwork. Less waste has resulted in less environmental pollution.

Claims (1)

교량의 교각(1)에 설치되는 다수개의 상자형 거더(2′)의 상부 날개에 다수개의 구멍을 뚫는 단계;Drilling a plurality of holes in the upper wings of the plurality of box girders 2 'installed in the bridge piers 1; 상기 구멍 상부에 다수개의 너트(12)를 설치하는 단계;Installing a plurality of nuts (12) on the holes; 상기 다수개의 너트(12)에, 헌치철판(31,31′)을 관통하여 다수개의 레벨너트(14)가 체결된 볼트(13)를 체결하는 단계;Fastening bolts 13 to which the plurality of level nuts 14 are fastened by passing through the haunch iron plates 31 and 31 'to the plurality of nuts 12; 상기 다수개의 헌치철판(31,31′) 상부에 다수개의 데크플레이트(21)를 설치하는 단계;Installing a plurality of deck plates (21) on top of the plurality of haunting iron plates (31, 31 '); 상기 다수개의 데크플레이트(21) 상부에 거푸집 널(17)을 까는 단계;Covering form boards 17 on the plurality of deck plates; 상기 거푸집 널(17) 상부에 교량 상판 콘크리트를 타설하는 단계; 및,Placing bridge deck concrete on top of the formwork board (17); And, 상기 교량 상판 콘크리트가 양생되어 경화된 후, 상기 레벨 너트(14)를 풀고, 상기 헌치 철판(31,31′), 데크플레이트(21) 및 거푸집 널(17)을 해체하는 단계;After the bridge deck concrete is cured and hardened, loosening the level nuts (14) and dismantling the haunch iron plates (31, 31 '), the deck plate (21) and the form board (17); 를 포함하는 것을 특징으로 하는 동바리를 받히지 않는 교량상판 콘크리트용 거푸집공사방법.Formwork method for bridge deck concrete do not receive a copper bar, characterized in that it comprises a.
KR1020000067156A 2000-11-13 2000-11-13 Formwork method using no prop for the floor concrete of the bridge KR100334257B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020000067156A KR100334257B1 (en) 2000-11-13 2000-11-13 Formwork method using no prop for the floor concrete of the bridge

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020000067156A KR100334257B1 (en) 2000-11-13 2000-11-13 Formwork method using no prop for the floor concrete of the bridge

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
KR1019990013771A Division KR100324704B1 (en) 1999-04-19 1999-04-19 Formwork method using no prop for the floor concrete of the bridge

Publications (2)

Publication Number Publication Date
KR20010021482A KR20010021482A (en) 2001-03-15
KR100334257B1 true KR100334257B1 (en) 2002-04-25

Family

ID=19698632

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020000067156A KR100334257B1 (en) 2000-11-13 2000-11-13 Formwork method using no prop for the floor concrete of the bridge

Country Status (1)

Country Link
KR (1) KR100334257B1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101187434B1 (en) 2012-04-19 2012-10-02 이상수 Height adjustable device for perfabricated form panel using plate combined with bolt

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20020082966A (en) * 2001-04-24 2002-11-01 손석환 The construction method and device for slab panel which can instal psc bridge beam
KR101229086B1 (en) * 2012-04-10 2013-02-01 주식회사 다원종합건축사사무소 Mold board of slab opening that i do not need short pillar
CN106835989B (en) * 2017-02-10 2019-02-05 中交路桥华南工程有限公司 The method that floorings installation is carried out using truss-like assistance platform

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101187434B1 (en) 2012-04-19 2012-10-02 이상수 Height adjustable device for perfabricated form panel using plate combined with bolt

Also Published As

Publication number Publication date
KR20010021482A (en) 2001-03-15

Similar Documents

Publication Publication Date Title
RU2375523C1 (en) Formwork for constructing reinforcing covering of construction made from corrugated steel plates
KR102597084B1 (en) Steel Ccomposite Rahmen Bridge Structure and its Construction Method
JP2004092078A (en) Structure and construction method for bridge
KR101263370B1 (en) Precast end-block with girder connection member and bridge construction method using ths same
KR101389285B1 (en) Pc girder shift of the chest wall with a block end integrated method
CN108589507B (en) Full-assembled precast concrete beam bridge superstructure and construction method thereof
JP2734987B2 (en) Existing bridge repair method
KR100324704B1 (en) Formwork method using no prop for the floor concrete of the bridge
KR100334257B1 (en) Formwork method using no prop for the floor concrete of the bridge
JP3737475B2 (en) Box girder bridge structure and construction method
KR100565384B1 (en) Structure of continuous PSC beam with connection member and steel cross beam and bridge construction method using the same
JP6889010B2 (en) Bridge construction method
KR100403988B1 (en) Method for forming continuous p.s.c beams with steel plate girder splice and apparatus thereof
KR200420261Y1 (en) Truss-web girder with reinforced support
KR100623996B1 (en) Bridge construction method using truss-web girder with reinforced support
KR100499976B1 (en) Prestressed reinforced concrete using prestressed concrete wire and T-shaped steel plate and method for constructing bridge using the same
KR100609825B1 (en) Preflexed rigid- frame bridge installed using prestressed upper structure and constructing method thereof
JP2536376B2 (en) Foundation structure of shed for road protection
JPS6059210A (en) Replacing method of bridge reinforced concrete floor panel
KR910007423B1 (en) Method for construction p.c - beam on the bridge
KR102670768B1 (en) Steel composite ramen bridge reinforced with section steel supports and crossing rebars and its construction method
CN217839722U (en) Supporting mechanism and whole box girder erection device
KR20000063515A (en) Pier Structure Construction Method Utilizing Precast Contrete Block And Pier Thereof
KR102543539B1 (en) Settlement support system in which the steel bar and support block of the composite ramen bridge are integrated
CN217298631U (en) Pier side assembly type construction platform

Legal Events

Date Code Title Description
A107 Divisional application of patent
A201 Request for examination
N231 Notification of change of applicant
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
N231 Notification of change of applicant
FPAY Annual fee payment

Payment date: 20070328

Year of fee payment: 6

LAPS Lapse due to unpaid annual fee