KR101181619B1 - 어스앵커의 재인장을 통한 대규모 지하구조물 높은 옹벽의 축조 공법 - Google Patents
어스앵커의 재인장을 통한 대규모 지하구조물 높은 옹벽의 축조 공법 Download PDFInfo
- Publication number
- KR101181619B1 KR101181619B1 KR1020110102061A KR20110102061A KR101181619B1 KR 101181619 B1 KR101181619 B1 KR 101181619B1 KR 1020110102061 A KR1020110102061 A KR 1020110102061A KR 20110102061 A KR20110102061 A KR 20110102061A KR 101181619 B1 KR101181619 B1 KR 101181619B1
- Authority
- KR
- South Korea
- Prior art keywords
- earth anchor
- retaining wall
- underground structure
- tension
- tension member
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D29/00—Independent underground or underwater structures; Retaining walls
- E02D29/045—Underground structures, e.g. tunnels or galleries, built in the open air or by methods involving disturbance of the ground surface all along the location line; Methods of making them
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D29/00—Independent underground or underwater structures; Retaining walls
- E02D29/02—Retaining or protecting walls
- E02D29/0225—Retaining or protecting walls comprising retention means in the backfill
- E02D29/0233—Retaining or protecting walls comprising retention means in the backfill the retention means being anchors
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
- E02D5/34—Concrete or concrete-like piles cast in position ; Apparatus for making same
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
- E02D5/62—Compacting the soil at the footing or in or along a casing by forcing cement or like material through tubes
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D21/00—Anchoring-bolts for roof, floor in galleries or longwall working, or shaft-lining protection
- E21D21/008—Anchoring or tensioning means
Landscapes
- Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Mining & Mineral Resources (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Environmental & Geological Engineering (AREA)
- Geochemistry & Mineralogy (AREA)
- Geology (AREA)
- Underground Structures, Protecting, Testing And Restoring Foundations (AREA)
Abstract
Description
도 1 내지 도 15는 본 발명의 실시 예에 관련된 도면으로서,
도 1은 현장타설 CIP 말뚝의 시공 상태를 나타내는 도면이고
도 2는 현장타설 CIP 말뚝에 어스앵커가 설치된 도면이고,
도 3은 터파기 완료후 어스앵커가 모두 설치된 상태를 나타내는 도면이고,
도 4는 띠장이 제거되고 어스앵커가 해체된 상태를 나타내는 도면이고,
도 5는 현장타설 CIP 말뚝에 드레인매트가 시공된 상태를 나타내는 도면이고,
도 6은 인장재에 어스앵커 슬리브가 설치된 상태를 나타내는 도면이고,
도 7은 도 6에 철근 및 지수재가 부가적으로 설치된 상태를 나타내는 도면이고,
도 8은 거푸집 설치후 콘크리트를 타설 양생하는 과정을 나타내는 도면이고,
도 9는 거푸집을 해체한 후 어스앵커를 재인장하여 놓은 상태를 나타내는 도면이고,
도 10 및 도 11은 지하구조물의 옹벽을 순차적으로 상방으로 올려가면서 축조함과 동시에 재인장하여 놓은 상태를 나타내는 도면이고,
도 12는 지하구조물의 옹벽측 모든 어스앵커를 재인장 완료한 후 슬라브를 시공하여 놓은 상태를 나타내는 도면이고,
도 13은 옹벽에 위치된 어스앵커가 제거된 상태를 나타내는 도면이고,
도 14는 어스앵커 슬리브에 충진재가 주입되어 있는 상태를 나타내는 도면이고,
도 15는 지하구조물이 완성되어 지하대공간이 확보된 상태를 나타내는 도면이다.
도 16은 종래 지하구조물의 외벽 옹벽이 완성될 때까지 임시로 횡토압을 지지하기 위해 버팀보가 시공된 상태를 나타내는 도면이다.
17: 지수판
18: 드레인매트
14: 어스앵커
20: 인장재
30: 어스앵커 슬리브
35: 충진재
40: 거푸집
Claims (4)
- (a) 지하구조물이 위치될 지반에 현장타설 CIP 말뚝(10)을 시공한 후 소정 깊이로 이루어진 터파기와 병행하여 지반에 근입 정착시킨 인장재의 인장을 통해 어스 앵커를 순차적으로 시공하는 단계와;
(b) 상기 어스 앵커(14)의 인장재(20)에 가하여진 인장력을 제거한 후 인장재(20)로부터 띠장(12)을 해체하는 띠장 해체 단계와;
(c) 상기 인장재(20)의 상부측 노출단에 어스앵커 슬리브(30)를 삽입시켜 현장타설 CIP 말뚝(10)에 접촉시켜 놓는 단계와;
(d) 현장타설 CIP 말뚝(10)에서 일정 거리만큼 떨어진 위치에 거푸집(40)을 설치하고 그 사이에 콘크리트를 타설/양생하여 옹벽(50)을 형성시키는 단계와;
(e) 상기 거푸집(40)이 탈형된 옹벽(50)에 어스앵커(14)를 이용하여 인장재(20)를 재인장시켜 놓는 단계와;
(f) 상기 지반에 정착된 인장재(20)의 인장을 제거하고 어스 앵커(14)를 어스앵커 슬리브(30)에서 제거하는 단계; 및
(g) 상기 어스앵커 슬리브(30) 내로 침수 방지를 위해 충진재를 주입하는 단계를 거쳐서 축조되어지고;
상기 (f)단계는 상기 (b)단계로부터 상기 (e)단계까지를 순차적으로 반복하여 모든 어스 앵커(14)의 재인장이 완료된 후 후속으로 슬라브(60)를 시공한 후 진행되는 것을 특징으로 하는 어스앵커의 재인장을 통한 지하구조물 옹벽의 축조 공법. - 제 1항에 있어서,
상기 (b)단계와 (c)단계의 사이에 지하수 배수를 위한 드레인매트(18)를 현장타설 CIP 말뚝(10)의 전면에 설치하는 공정이 더 포함된 것을 특징으로 하는 어스앵커의 재인장을 통한 지하구조물 옹벽의 축조 공법. - 제 1항에 있어서,
상기 (d)단계에서 현장타설 CIP 말뚝(10)과 거푸집(40)의 사이에 철근(16) 및 지수판(17)이 더 설치되어 시공되는 것을 특징으로 하는 어스앵커의 재인장을 통한 지하구조물 옹벽의 축조 공법. - 제 1항에 있어서,
상기 (g)단계에서 무수축 콘코리트와 방수제가 혼합된 충진재로 시공되는 것을 특징으로 하는 어스앵커의 재인장을 통한 지하구조물 옹벽의 축조 공법.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| KR1020110102061A KR101181619B1 (ko) | 2011-10-06 | 2011-10-06 | 어스앵커의 재인장을 통한 대규모 지하구조물 높은 옹벽의 축조 공법 |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| KR1020110102061A KR101181619B1 (ko) | 2011-10-06 | 2011-10-06 | 어스앵커의 재인장을 통한 대규모 지하구조물 높은 옹벽의 축조 공법 |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| KR101181619B1 true KR101181619B1 (ko) | 2012-09-13 |
Family
ID=47113405
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| KR1020110102061A Active KR101181619B1 (ko) | 2011-10-06 | 2011-10-06 | 어스앵커의 재인장을 통한 대규모 지하구조물 높은 옹벽의 축조 공법 |
Country Status (1)
| Country | Link |
|---|---|
| KR (1) | KR101181619B1 (ko) |
Cited By (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN105421468A (zh) * | 2015-11-24 | 2016-03-23 | 叶长青 | 无混凝土对撑的地下室支护 |
| CN107130618A (zh) * | 2016-04-12 | 2017-09-05 | 叶长青 | 护坡支挡结构施工方法 |
| KR20190110713A (ko) * | 2018-03-21 | 2019-10-01 | 유기선 | 지중구조물벽체 및 그것을 구비한 지중구조물 및 그 시공방법 |
| KR102658393B1 (ko) * | 2023-07-27 | 2024-04-17 | 동일건설(주) | 지하차도 공사용 구조체 및 이의 시공 방법 |
Citations (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| KR101023660B1 (ko) | 2009-01-29 | 2011-03-25 | 심석래 | 앵커와 콘크리트패널을 이용한 옹벽 및 이를 이용한 시공방법 |
-
2011
- 2011-10-06 KR KR1020110102061A patent/KR101181619B1/ko active Active
Patent Citations (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| KR101023660B1 (ko) | 2009-01-29 | 2011-03-25 | 심석래 | 앵커와 콘크리트패널을 이용한 옹벽 및 이를 이용한 시공방법 |
Cited By (9)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN105421468A (zh) * | 2015-11-24 | 2016-03-23 | 叶长青 | 无混凝土对撑的地下室支护 |
| CN107012875A (zh) * | 2015-11-24 | 2017-08-04 | 叶长青 | 地下室支护 |
| CN107130608A (zh) * | 2015-11-24 | 2017-09-05 | 叶长青 | 无混凝土对撑的地下室支护施工方法 |
| CN107130609A (zh) * | 2015-11-24 | 2017-09-05 | 叶长青 | 无对撑的地下室支护 |
| CN107130607A (zh) * | 2015-11-24 | 2017-09-05 | 叶长青 | 建筑物地下室支护 |
| CN107130618A (zh) * | 2016-04-12 | 2017-09-05 | 叶长青 | 护坡支挡结构施工方法 |
| KR20190110713A (ko) * | 2018-03-21 | 2019-10-01 | 유기선 | 지중구조물벽체 및 그것을 구비한 지중구조물 및 그 시공방법 |
| KR102197091B1 (ko) * | 2018-03-21 | 2020-12-30 | 유기선 | 지중구조물벽체 및 그것을 구비한 지중구조물 및 그 시공방법 |
| KR102658393B1 (ko) * | 2023-07-27 | 2024-04-17 | 동일건설(주) | 지하차도 공사용 구조체 및 이의 시공 방법 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| KR101696916B1 (ko) | Phc 파일과 강관 파일을 혼용한 흙막이 겸 영구벽체의 시공 방법 | |
| KR101302743B1 (ko) | 벽체말뚝용 피에이치씨 파일과 이를 이용한 흙막이벽체의 시공방법 | |
| KR101840226B1 (ko) | 지반굴착기의 오거용 가이드홀 거푸집 | |
| KR102601694B1 (ko) | 지하건축물 신속 철거방법 | |
| KR20140055639A (ko) | 흙막이 겸용 건축빔 구조체의 시공방법 및 그 방법에 의하여 시공된 건축빔 구조체 | |
| KR102113291B1 (ko) | Phc 파일을 이용한 벽체 조성방법 및 벽체 | |
| JP6543176B2 (ja) | 躯体構築方法 | |
| KR20160144111A (ko) | 옹벽용 기초블록 및 이를 이용한 옹벽의 기초지반 보강공법 | |
| KR20180124795A (ko) | 지중 부벽을 구비한 흙막이 구조체 및 이의 시공 방법 | |
| KR101181619B1 (ko) | 어스앵커의 재인장을 통한 대규모 지하구조물 높은 옹벽의 축조 공법 | |
| KR101324231B1 (ko) | 소일 시멘트벽 가시설 구조 및 이의 시공 방법 | |
| KR20060092552A (ko) | 현장타설파일을 이용한 무지보 하향골조 시공방법 | |
| JP2008308945A (ja) | 引張杭併用コンクリート基礎及びその構築方法 | |
| KR102272494B1 (ko) | 지지력과 긴장력을 이용한 사면 보강 구조물 및 이의 시공 방법 | |
| KR101052641B1 (ko) | 본 벽체 형성에 활용되는 흙막이 벽체용 철골 구조체 및 이를 이용한 본 벽체 형성방법 | |
| KR102021496B1 (ko) | 하향식 계단형 흙막이 시공방법 및 이를 통해 시공된 흙막이 구조체 | |
| JP2015183366A (ja) | 盛土構造体の構造および構築方法 | |
| JP5016521B2 (ja) | アースアンカーおよびその撤去方法 | |
| JP2011157719A (ja) | 山留め工法 | |
| KR20040031451A (ko) | 혁신적 프리스트레스트 가시설 공법 | |
| KR102426192B1 (ko) | 흙막이 벽체 파일 및 시공방법 | |
| KR102078794B1 (ko) | 지중 부벽을 구비한 흙막이 구조체 및 이의 시공 방법 | |
| KR100673475B1 (ko) | 지하층 골조부의 골조용 피씨거더부재, 이를 이용한 지하층골조부의 조립구조 및 그 시공방법 | |
| KR101077242B1 (ko) | 흙막이 벽체와 철골 기둥을 이용한 지하 구조물 시공 방법 | |
| KR20100094139A (ko) | 옹벽 구조체 및 그 시공 방법 |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| A201 | Request for examination | ||
| PA0109 | Patent application |
St.27 status event code: A-0-1-A10-A12-nap-PA0109 |
|
| PA0201 | Request for examination |
St.27 status event code: A-1-2-D10-D11-exm-PA0201 |
|
| A302 | Request for accelerated examination | ||
| PA0302 | Request for accelerated examination |
St.27 status event code: A-1-2-D10-D17-exm-PA0302 St.27 status event code: A-1-2-D10-D16-exm-PA0302 |
|
| D13-X000 | Search requested |
St.27 status event code: A-1-2-D10-D13-srh-X000 |
|
| D14-X000 | Search report completed |
St.27 status event code: A-1-2-D10-D14-srh-X000 |
|
| E902 | Notification of reason for refusal | ||
| PE0902 | Notice of grounds for rejection |
St.27 status event code: A-1-2-D10-D21-exm-PE0902 |
|
| P11-X000 | Amendment of application requested |
St.27 status event code: A-2-2-P10-P11-nap-X000 |
|
| P13-X000 | Application amended |
St.27 status event code: A-2-2-P10-P13-nap-X000 |
|
| P11-X000 | Amendment of application requested |
St.27 status event code: A-2-2-P10-P11-nap-X000 |
|
| P13-X000 | Application amended |
St.27 status event code: A-2-2-P10-P13-nap-X000 |
|
| R15-X000 | Change to inventor requested |
St.27 status event code: A-3-3-R10-R15-oth-X000 |
|
| R16-X000 | Change to inventor recorded |
St.27 status event code: A-3-3-R10-R16-oth-X000 |
|
| E701 | Decision to grant or registration of patent right | ||
| PE0701 | Decision of registration |
St.27 status event code: A-1-2-D10-D22-exm-PE0701 |
|
| GRNT | Written decision to grant | ||
| PR0701 | Registration of establishment |
St.27 status event code: A-2-4-F10-F11-exm-PR0701 |
|
| PR1002 | Payment of registration fee |
St.27 status event code: A-2-2-U10-U11-oth-PR1002 Fee payment year number: 1 |
|
| PG1601 | Publication of registration |
St.27 status event code: A-4-4-Q10-Q13-nap-PG1601 |
|
| FPAY | Annual fee payment |
Payment date: 20150904 Year of fee payment: 4 |
|
| PR1001 | Payment of annual fee |
St.27 status event code: A-4-4-U10-U11-oth-PR1001 Fee payment year number: 4 |
|
| P22-X000 | Classification modified |
St.27 status event code: A-4-4-P10-P22-nap-X000 |
|
| PR1001 | Payment of annual fee |
St.27 status event code: A-4-4-U10-U11-oth-PR1001 Fee payment year number: 5 |
|
| FPAY | Annual fee payment |
Payment date: 20170828 Year of fee payment: 6 |
|
| PR1001 | Payment of annual fee |
St.27 status event code: A-4-4-U10-U11-oth-PR1001 Fee payment year number: 6 |
|
| FPAY | Annual fee payment |
Payment date: 20180830 Year of fee payment: 7 |
|
| PR1001 | Payment of annual fee |
St.27 status event code: A-4-4-U10-U11-oth-PR1001 Fee payment year number: 7 |
|
| P22-X000 | Classification modified |
St.27 status event code: A-4-4-P10-P22-nap-X000 |
|
| FPAY | Annual fee payment |
Payment date: 20190902 Year of fee payment: 8 |
|
| PR1001 | Payment of annual fee |
St.27 status event code: A-4-4-U10-U11-oth-PR1001 Fee payment year number: 8 |
|
| PR1001 | Payment of annual fee |
St.27 status event code: A-4-4-U10-U11-oth-PR1001 Fee payment year number: 9 |
|
| PR1001 | Payment of annual fee |
St.27 status event code: A-4-4-U10-U11-oth-PR1001 Fee payment year number: 10 |
|
| PR1001 | Payment of annual fee |
St.27 status event code: A-4-4-U10-U11-oth-PR1001 Fee payment year number: 11 |
|
| PR1001 | Payment of annual fee |
St.27 status event code: A-4-4-U10-U11-oth-PR1001 Fee payment year number: 12 |
|
| PR1001 | Payment of annual fee |
St.27 status event code: A-4-4-U10-U11-oth-PR1001 Fee payment year number: 13 |
|
| PR1001 | Payment of annual fee |
St.27 status event code: A-4-4-U10-U11-oth-PR1001 Fee payment year number: 14 |
|
| U11 | Full renewal or maintenance fee paid |
Free format text: ST27 STATUS EVENT CODE: A-4-4-U10-U11-OTH-PR1001 (AS PROVIDED BY THE NATIONAL OFFICE) Year of fee payment: 14 |