KR101123036B1 - Method for installing waterproofing steel plate and soil-drop preventing plate in construction of undergound tunnel - Google Patents

Method for installing waterproofing steel plate and soil-drop preventing plate in construction of undergound tunnel Download PDF

Info

Publication number
KR101123036B1
KR101123036B1 KR1020090064756A KR20090064756A KR101123036B1 KR 101123036 B1 KR101123036 B1 KR 101123036B1 KR 1020090064756 A KR1020090064756 A KR 1020090064756A KR 20090064756 A KR20090064756 A KR 20090064756A KR 101123036 B1 KR101123036 B1 KR 101123036B1
Authority
KR
South Korea
Prior art keywords
plate
steel pipe
earth
waterproof
installing
Prior art date
Application number
KR1020090064756A
Other languages
Korean (ko)
Other versions
KR20110007301A (en
Inventor
김정윤
Original Assignee
주식회사 엔티에스이앤씨
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 주식회사 엔티에스이앤씨 filed Critical 주식회사 엔티에스이앤씨
Priority to KR1020090064756A priority Critical patent/KR101123036B1/en
Publication of KR20110007301A publication Critical patent/KR20110007301A/en
Application granted granted Critical
Publication of KR101123036B1 publication Critical patent/KR101123036B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/02Driving inclined tunnels or galleries
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/14Lining predominantly with metal
    • E21D11/15Plate linings; Laggings, i.e. linings designed for holding back formation material or for transmitting the load to main supporting members
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/38Waterproofing; Heat insulating; Soundproofing; Electric insulating
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/005Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries by forcing prefabricated elements through the ground, e.g. by pushing lining from an access pit
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/02Foundation pits
    • E02D17/04Bordering surfacing or stiffening the sides of foundation pits

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Structural Engineering (AREA)
  • Environmental & Geological Engineering (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

본 발명은 터널 굴착부의 토사를 미리 파내지 않고 먼저 지중에 터널형성용 구조물을 설치하여 사전에 충분히 응력에 견디도록 한 다음 구조물 내측을 굴착하여 지하터널을 형성하도록 하는 지하터널 형성용 구조물 설치방법에 있어서, 특히 구조물을 형성하기 위한 강관을 압입한 후 측벽을 형성하기 위해 강관의 상하를 연결하는 토류방지판 및 방수철판을 설치하는 방법에 관한 것으로,The present invention provides a method for installing underground tunnels to form underground tunnels by first installing tunnel-forming structures in the ground without having to excavate the earth and sand of the tunnel-excavated portion to endure sufficiently stress in advance and then excavating the inside of the structures. In particular, the present invention relates to a method of installing a earth-proof plate and a waterproof steel plate for connecting the upper and lower portions of the steel pipe to press the steel pipe for forming the structure and then to form the sidewalls.

필요위치에 압입된 상하 강관의 내측 토사를 굴착하고 절개를 하기 위한 강관 보강용 임시 토압지지대를 설치하는 공정과, 상측강관의 하측부와 하측강관의 상측부에 방수철판 및 토류방지판 압입을 위한 절개홈을 각각 형성하는 공정과, 강관의 절개홈을 따라 방향유도판, 간격유지판, 토류방지판으로 구성된 가이드판을 반력대에 의해 지지되는 유압잭에 의해 추진방향으로 압입하는 공정과, 하측강관내에 굴착토사 이동장치를 설치하고 양측 가이드판의 내측공간에 해당하는 하측강관의 상측 일부분을 절취하고 양측가이드판 사이의 공간을 굴착하여 측벽공간을 굴착하는 공정과, 양측가이드판 사이의 굴착된 측벽공간 부분에 상하 강관을 수직으로 연결하는 토압지지대용 빔을 설치하고 그 빔에 토류방지판과 방수판을 설치하는 공정과, 토류방지판과 방수판이 설치된 공간내에서 반력대를 추진방향측으로 옮기고 유압잭에 의해 다시 가이드판을 추진방향으로 압입하는 공정과, 전기한 굴착공정, 토류방지판 및 방수판 설치공정을 반복시행하는 공정으로 되는 것으로,Installing temporary earth pressure support for reinforcing steel pipe to excavate and cut inner soil of the upper and lower steel pipes pressed in the required position, and to press-fit waterproof steel plate and earthproof plate on the lower part of upper steel pipe and the upper part of lower steel pipe. A process of forming each of the incision grooves, and a step of press-ining the guide plate composed of a direction guide plate, a gap maintaining plate, and an earth leakage prevention plate in the propulsion direction by a hydraulic jack supported by a reaction table along the cut groove of the steel pipe, and a lower steel pipe Installing the excavated soil moving device in the inside and cutting the upper part of the lower steel pipe corresponding to the inner space of the two guide plates and excavating the space between the two guide plates to excavate the side wall space, and the excavated side walls between the two guide plates. The process of installing the earth pressure support beam that vertically connects the upper and lower steel pipes to the space part, and the earth prevention plate and waterproof plate on the beam, In the space where the plate and waterproof plate are installed, the reaction table is moved to the direction of propulsion and presses the guide plate in the direction of propulsion again by the hydraulic jack, and the process of repeatedly performing the above excavation process, earth prevention plate and waterproof plate installation process In that,

토사유실과 공사기간 지연 등 문제점이 발생하던 종래 방식과는 달리 압입된 양측 가이드판의 내측에서 굴착하므로 토사 유실이 없고 공정의 단순화와 공사기간의 단축으로 공사원가가 절감되는 효과가 있을 뿐 아니라 가이드판의 방향 유도판과 유압잭의 이동설치로 곡선상의 커브 형성구간에도 공사 적용이 가능하여 커브 구간에서도 토사유실 없이 안전한 시공과 공사 원가절감을 절감할 수 있는 것이다.Unlike the conventional method that caused problems such as soil loss and delay of construction period, excavation is carried out inside the press-fitted guide plates, so there is no soil loss, and the cost of construction can be reduced by simplifying the process and shortening the construction period. The plate can be applied to curved curve forming section by moving the guide plate and hydraulic jack. Therefore, it is possible to reduce construction cost and safe construction without soil loss in curve section.

강관압입, 지하터널, 측벽, 토류방지판, 방수철판 Steel pipe press-in, underground tunnel, side wall, earth prevention plate, waterproof steel plate

Description

강관압입식 지하터널 구조물 형성공법에 있어서의 측벽형성용 토류방지판 및 방수철판의 설치방법{Method for installing waterproofing steel plate and soil-drop preventing plate in construction of undergound tunnel}Method for installing waterproofing steel plate and soil-drop preventing plate in construction of undergound tunnel}

본 발명은 터널 굴착부의 토사를 미리 파내지 않고 먼저 지중에 터널형성용 구조물을 설치하여 사전에 충분히 응력에 견디도록 한 다음 구조물 내측을 굴착하여 지하터널을 형성하도록 하는 지하터널 형성용 구조물 설치방법에 있어서, 특히 구조물을 형성하기 위한 강관을 압입한 후 측벽을 형성하기 위해 강관의 상하를 연결하는 토류방지판 및 방수철판을 설치하는 방법에 관한 것이다.The present invention provides a method for installing underground tunnels to form underground tunnels by first installing tunnel-forming structures in the ground without having to excavate the earth and sand of the tunnel-excavated portion to endure sufficiently stress in advance and then excavating the inside of the structures. In particular, the present invention relates to a method of installing a earthproof plate and a waterproof steel plate for connecting the upper and lower sides of the steel pipe to form sidewalls after pressing the steel pipe for forming a structure.

기존의 지하터널 형성용 구조물 설치방법은, 공사의 종류에 따라 약간의 공정의 차이는 있으나 대부분 터널시공 예정면을 따라 정확한 위치를 측량하여 강관 압입준비를 완료하는 강관 압입 위치 측량 및 선로관 설치공정과,Existing underground tunnel formation structure installation method has a slight process difference depending on the type of construction, but most of the steel pipe press position measurement and track pipe installation process to complete the steel pipe press preparation by surveying the exact position along the planned tunnel construction surface and,

강관을 압입할 위치에 강관을 위치시키고 유압잭과 추진보조관 등을 이용하여 강관을 단계적으로 압입시키는 강관압입 공정과,Steel pipe press-in process of placing the steel pipe in the position to press the steel pipe and press-fitting the steel pipe step by step using the hydraulic jack and the propulsion auxiliary pipe;

강관압입공정에서 선도관에 형성된 토류방지판 투입구를 통하여 흙을 파내고 토류방지판을 설치하는 공정과,Digging soil and installing the earth prevention plate through the earth prevention plate inlet formed in the leading pipe in the steel pipe press-in process;

토류방지판 주변에 시멘트 그라우팅을 하여 토사유출을 방지하는 갱외 그라우팅 공정과,An out-of-gang grouting process that prevents soil leakage by cement grouting around the earth barrier;

강관의 측면을 소정폭으로 절개하여 강관과 강관 사이를 철판으로 연결하는 강관연결 공정과,Steel pipe connection process of cutting the side of the steel pipe to a predetermined width and connecting between the steel pipe and the steel pipe with an iron plate,

측벽 형성이 필요한 경우 측벽 형성용 토류판과 토압지지대를 설치하면서 방수철판을 설치하는 공정과,When the side wall formation is necessary, the process of installing the waterproof steel plate while installing the earth plate and the earth pressure support for forming the side wall,

강관 등의 공간내 거푸집을 설치하는 공정과,The process of installing formwork in space such as steel pipe,

강관 및 거푸집내에 철근을 배근하는 공정과,Process of reinforcing steel bars in steel pipes and formwork,

강관 및 거푸집내에 콘크리트를 타설하는 공정과,The process of pouring concrete in steel pipes and formwork,

콘크리트 양생 후 구조물 내측의 터널면을 굴착하는 공정으로 지하터널 형성용 구조물을 설치하였다.After curing the concrete, the tunnel tunnel inside the structure was excavated and the underground tunnel formation was installed.

그 공정 중에서 상하 강관을 이어서 측벽을 형성하기 위해 방수철판을 설치하는 공정을 더욱 자세히 보면,Looking more closely at the process of installing a waterproof steel plate to form a side wall followed by a vertical steel pipe,

측벽을 형성키 위해 압입된 상하 강관내에서 강관의 바닥을 일정 간격으로 절개하여 절개된 부분에서 하측에 토류판을 설치하면서 하측 강관까지 굴착하고 토압지지대를 설치한 후 굴착부의 외측면에 방수철판을 설치하고 그 내부 공간에 철근배근 후 콘크리트를 타설하여 일정 간격으로 부분 측벽을 설치한 후, 부분적으로 남겨진 나머지 부분을 다시 절개하여 그 절개부분에 상기와 동일한 방법으로 토류 판과 방수철판을 설치하여 측벽을 연속적으로 형성하므로서 상하 강관이 서로 연결된 측벽을 형성하였다.The bottom of the steel pipe is cut at regular intervals in the pressurized upper and lower steel pipes to form the side wall, and the earth plate is installed at the lower part, excavating to the lower steel pipe and installing earth pressure support, and then installing waterproof steel plate on the outer side of the excavation part. After installing reinforcement in the inner space, install concrete sidewalls at regular intervals by placing concrete, and then incise the remaining parts again and install the earth plate and waterproof steel plate in the same way as above. By forming continuously, the upper and lower steel pipes formed sidewalls connected to each other.

이러한 측벽의 형성방식은 부분적인 절개와 설치의 반복과 토류판과 토압지지대 역시 좁은 토류판을 반복하여 연결 설치하여야 되므로 그 시공방법이 복잡하고 1차 콘크리트 타설 양생 후 다시 2차 콘크리트를 타설하여야 되므로 시공 시간이 많이 소요되어 공사기간의 연장으로 공사비용이 증가되는 문제가 야기될 뿐 아니라 부분적 시공과정에서 토압의 유실이 잦은 문제가 있다.The construction method of the side wall is to repeat the partial incision and installation, and the earth plate and the earth pressure support must also be installed by repeating the narrow earth plate repeatedly. Therefore, the construction method is complicated and the secondary concrete must be poured again after curing the primary concrete. Due to the large amount of work, the increase of the construction cost causes not only the problem of increasing the construction cost but also the loss of earth pressure during the partial construction process.

전기한 문제점을 제거코저 본 발명 출원인은 측벽을 형성함에 있어서 특허출원 제2009-55321호와 같은 방수철판의 연속 압입에 의한 측벽 형성방법 즉, 상하 강관에 방수철판 삽입을 위한 삽입홈을 형성하고 이에 방수철판 및 토류방지판을 연속 압입하고 그 내측공간을 굴착하여 그 사이를 토압지지대로 지지하는 방법으로 측벽형성용 방수철판을 설치하는 방법을 발명하기도 하였다.In order to eliminate the above-mentioned problems, the applicant of the present invention forms a sidewall by continuous press-fitting of a waterproof steel plate, such as Patent Application No. 2009-55321, that is, forming an insertion groove for inserting a waterproof steel plate in upper and lower steel pipes. It has been invented a method of installing a waterproof steel plate for sidewall formation by continuously indenting the waterproof steel plate and the earth prevention plate, and excavating the inner space thereof and supporting them with a earth pressure support therebetween.

그러나 이러한 방수철판의 연속압입 방식은 유압에 의해 방수철판을 후측에서 밀어 넣는 방식으로 삽입홈을 따라 연속 압입하는 것이므로 직선구간에 대하여는 매우 효율적인 방식이나 터널이 곡선상으로 커브를 형성하는 구간에서는 후측에서의 압입력이 곡선상의 선단에 미치지 아니하므로 그 방식을 적용하기 어려운 문제가 있다.However, the continuous press-fit method of the waterproof steel sheet is a method of continuously press-fitting the insertion groove along the insertion groove by pushing the waterproof steel plate from the rear side by hydraulic pressure, so it is very efficient for the straight section, but in the section where the tunnel forms a curved curve in the rear side Since the pressure input does not reach the tip of the curve, it is difficult to apply the method.

본 발명은 강관압입식 지하터널 구조물 형성공법에 있어서 강관의 상하를 연결하는 방수철판 및 토류방지판을 설치하여 측벽을 형성할시에 전기한 바와 같은 문제점을 제거코저 상하 강관에 절개홈을 전체적으로 연속형성하여 이에 가이드판을 추진하면서 그 가이드판의 내측공간에서 방수철판 및 토류방지판을 순차적으로 설치되게 한 후 다시 가이드판을 추진하고 추진된 공간내에서 토류방지판을 설치하는 방법을 반복하여 토압에 의한 유실을 막고 공정의 단순화로 공기를 단축하여 공사비용을 줄일 수 있으면서도 곡선의 커브구간에도 적용할 수 있게 한 측벽형성용 방수철판 및 토류방지판 설치방법을 제공함에 발명의 목적이 있다.The present invention eliminates the problems as described above when the side wall is formed by installing a waterproof steel plate and an earth leakage prevention plate connecting the upper and lower steel pipes in the steel pipe pressurized underground tunnel structure forming method, and continuously cutting the grooves in the upper and lower steel pipes as a whole After forming and promoting the guide plate, the waterproof steel plate and the earth prevention plate are installed in the inner space of the guide plate in sequence, and then the guide plate is again pushed and the earth prevention plate is installed in the pushed space. It is an object of the present invention to provide a method for installing a side wall forming waterproofing iron plate and an earthquake preventing plate, which can be applied to a curved curve section while preventing air loss and shortening the air by simplifying the process.

전기한 발명의 목적을 이루기 위한 기술적 수단으로서는,As a technical means for achieving the above object,

필요위치에 압입된 상하 강관의 내측 토사를 굴착하고 절개를 하기 위한 강관 보강용 임시 토압지지대를 설치하는 공정과,Installing a temporary earth pressure support for steel pipe reinforcement to excavate and cut the inner soil of the upper and lower steel pipes pressed into the required position;

상측강관의 하측부와 하측강관의 상측부에 방수철판 및 토류방지판 압입을 위한 절개홈을 각각 형성하는 공정과,Forming a cutout groove for press-fitting the waterproof steel plate and the earth prevention plate at the lower side of the upper steel pipe and the upper side of the lower steel pipe, respectively;

강관의 절개홈을 따라 방향유도판, 간격유지판, 토류방지판으로 구성된 가이드판을 반력대에 의해 지지되는 유압잭에 의해 추진방향으로 압입하는 공정과,A step of press-fitting the guide plate composed of a direction guide plate, a gap maintaining plate, and an earth leakage prevention plate in the propulsion direction by a hydraulic jack supported by a reaction table along the cut groove of the steel pipe;

하측강관내에 굴착토사 이동장치를 설치하고 양측 가이드판의 내측공간에 해 당하는 하측강관의 상측 일부분을 절취하고 양측가이드판 사이의 공간을 굴착하여 측벽공간을 굴착하는 공정과,Installing an excavated soil moving device in the lower steel pipe, cutting the upper portion of the lower steel pipe corresponding to the inner space of the two guide plates, and excavating the space between the two guide plates to excavate the side wall space;

양측가이드판 사이의 굴착된 측벽공간 부분에 상하 강관을 수직으로 연결하는 토압지지대용 빔을 설치하고 그 빔에 토류방지판과 방수판을 설치하는 공정과,Installing a beam for earth pressure support that vertically connects the upper and lower steel pipes to the excavated side wall space between the guide plates on both sides and installing an earth leakage prevention plate and a waterproof plate on the beam;

토류방지판과 방수판이 설치된 공간내에서 반력대를 추진방향측으로 옮기고 유압잭에 의해 다시 가이드판을 추진방향으로 압입하는 공정과, 전기한 굴착공정, 토류방지판 및 방수판 설치공정을 반복시행하는 공정으로,The process of moving the reaction table to the direction of propulsion in the space where the earth prevention plate and the waterproof plate are installed, pressing the guide plate back into the pushing direction by the hydraulic jack, and repeating the previous excavation process, installation of the earth prevention plate and the waterproof plate to,

측벽형성용 토류방지판과 방수철판의 설치가 완료되게 하는 것이다.It is to complete the installation of the earth barrier plate and the waterproof steel plate for forming the side wall.

본 발명의 의한 측벽형성용 방수철판 및 토류방지판의 설치방법은 일부 부분적 설치 후 여타 나머지 부분을 2차 설치하므로서 토사유실과 공사기간 지연 등 문제점이 발생하던 종래 방식과는 달리 압입된 양측 가이드판의 내측에서 굴착하므로 토사 유실이 없고 공정의 단순화와 공사기간의 단축으로 공사원가가 절감되는 효과가 있을 뿐 아니라 가이드판의 방향 유도판과 유압잭의 이동설치로 곡선상의 커브 형성구간에도 공사 적용이 가능하여 커브 구간에서도 토사유실 없이 안전한 시공과 공사 원가절감을 절감할 수 있는 효과가 있다.The installation method of the side wall forming waterproof steel plate and the earth prevention plate according to the present invention by installing a second part after the partial installation of the second part, unlike the conventional method that caused problems such as soil loss and construction period delayed both side guide plate Excavation from the inside of the building eliminates the loss of soil and reduces the cost of construction by simplifying the process and shortening the construction period. Also, the construction can be applied to the curved curve section by moving the guide plate's direction guide plate and the hydraulic jack. Thus, even in the curve section, there is an effect that can reduce the cost of safe construction and construction without loss of soil.

이하, 본 발명의 실시예를 첨부도면에 의하여 상세히 설명한다.Hereinafter, embodiments of the present invention will be described in detail by the accompanying drawings.

도 1a 내지 도 1g는 본 발명 측벽성형용 방수철판 및 토류방지판의 설치방법의 공정별 설명도이다.1A to 1G are explanatory diagrams for each process of the installation method of the waterproof steel plate and the earth leakage prevention plate for sidewall molding according to the present invention.

강관의 압입은 기존 지하터널 형성용 구조물의 설치 방법시와 동일한 즉 터널 시공 예정면을 따라 정확한 위치에 강관을 위치시키고 유압잭과 추진보조관 등을 이용하여 강관을 단계적으로 연속 압입하여 도 1a와 같이 터널의 측벽이 형성된 부분에 상하강관(10)(10')을 압입하고 강관 내부를 굴착한다.Indentation of the steel pipe is the same as the existing method of installing the underground tunnel forming structure, that is, the steel pipe is positioned at the correct position along the tunnel construction plan and continuously presses the steel pipe using the hydraulic jack and the propulsion auxiliary pipe as shown in FIG. 1A. The upper and lower steel pipes 10 and 10 'are pressed into the portion where the side wall of the tunnel is formed, and the inside of the steel pipe is excavated.

여기서 강관은 설계사항에 따라 단면상 원형관이나 4각관을 선택 사용할 수 있으며 그 추진방향은 직선 또는 곡선상으로 압입이 가능하다.Here, the steel pipe can be selected and used round or square tube on the cross-section according to the design, and the propulsion direction can be press-fitted in a straight line or curve.

굴착된 강관 내부에 도 1b의 도시와 같이 강관 보강용 임시 토압 지지대(20)(20')를 설치하여 강관에 미치는 토압에 대하여 내력을 갖게 한다.Inside the excavated steel pipe as shown in Figure 1b by installing a temporary earth pressure support (20, 20 ') for reinforcing the steel pipe to have a load capacity against the earth pressure on the steel pipe.

이때 다음 공정에 형성될 절개홈의 사이를 철판부분 지지용바(30)를 형성하여 절취 철판(40)과 용접시켜 절개홈 형성으로 인한 철판의 분리를 방지한다.At this time, between the cutting grooves to be formed in the next process to form a steel plate portion support bar 30 to weld with the cutting iron plate 40 to prevent separation of the iron plate due to the formation of the cutting grooves.

임시 토압지지대(20)(20')가 설치된 상하강관(10)(10')의 내측에서 도 1c의 도시와 같이 방수철판 및 토류방지판이 위치할 부분에 해당하는 상측강관(10)의 하부면과 하측강관(10')의 상부면에 각각 좌우를 절개하여 전후 방향으로 연속 형성되게 한 절개홈(50)(50')을 형성한다.The lower surface of the upper steel pipe 10 corresponding to the portion where the waterproof steel plate and the earth prevention plate are to be positioned as shown in FIG. 1C inside the upper and lower steel pipes 10 and 10 'provided with the temporary earth pressure support 20, 20'. Cut the left and right in each of the upper surface of the lower steel pipe (10 ') and forms the incision grooves 50, 50' to be continuously formed in the front and rear directions.

절개홈(50)(50')이 형성된 상하강관(10)(10')의 전면부에서 도 1d의 도시와 같이 가이드판(60)(60')을 절개홈(50)(50')에 끼워 절개홈(50)(50')을 따라 압입한다.In the front portion of the upper and lower steel pipes 10 and 10 'formed with the cutting grooves 50 and 50', guide plates 60 and 60 'are inserted into the cutting grooves 50 and 50' as shown in FIG. Press-fit along the incision grooves 50, 50 '.

여기서 가이드판(60)(60')은 도 2의 도시와 같이 방향유도판(61)과 간격유지 판(62), 토류방지판(63)이 용접에 의해 결합되어 있고, 그 하부에 압입용 빔(64)에 용착되어 있는 것으로, 압입용 빔(64)에 유압잭(70)을 설치하여 추진방향으로 압입시키는 것인데, Here, the guide plate 60, 60 'is a direction guide plate 61, the gap maintaining plate 62, the earth prevention plate 63 is joined by welding, as shown in Figure 2, for pressing in It is welded to the beam 64, and the hydraulic jack 70 is installed on the press-fit beam 64 to press in the pushing direction.

방향유도판(61)은 절개홈(50)(50')에 끼워진 상태로 절개홈(50)(50')을 따라 직선 또는 곡선상으로 가이드판(60)의 추진방향을 유도한다.The direction guide plate 61 guides the propulsion direction of the guide plate 60 in a straight or curved line along the cut grooves 50 and 50 'while being inserted into the cut grooves 50 and 50'.

간격유지판(62)은 방향유도판(61)과 토류방지판(63) 사이에서 간격을 유지한채 서로를 결합 유지하는 것으로 토류방지판(63)이 간격유지판(62)의 두께 만큼 강관(10)의 절개홈(50)으로부터 외측에 위치하게 되므로 차후 공정에서 강관(10)의 절개홈(50) 외측에 토압지지용 빔(80)을 설치할 수 있는 공간을 확보할 수 있는 것이며,The gap maintaining plate 62 maintains the gap between the direction guide plate 61 and the earth prevention plate 63 to hold each other. The earth prevention plate 63 is a steel pipe having the thickness of the gap maintaining plate 62. Since it is located on the outside from the cutting groove 50 of 10) will be able to secure a space for installing the earth pressure supporting beam 80 on the outside of the cutting groove 50 of the steel pipe 10 in a subsequent process,

토류방지판(63)은 절개홈(50)(50')의 외측에서 상하강관(10)(10')의 사이에서 맞닿아 있으므로 양 가이드판(60)(60')의 외측에서 내측으로 받는 토압에 버티면서 굴착되는 내측공간으로 유실될 수 있는 토사의 토류방지 역할을 하는 것이다.The earth prevention plate 63 abuts between the upper and lower steel pipes 10 and 10 'at the outside of the incision grooves 50 and 50' and receives the inside of the guide plate 60 and 60 'from the outside. It is to prevent the earth and sand to be lost to the inner space that is excavated while supporting the earth pressure.

이와 같은 가이드판(60)(60')의 역할에 의해 반력대(71)에 지지되어 있는 유압잭(70)을 작동시켜 도 3의 도시와 같이 압입용 빔(64)을 추진방향으로 전진시키므로서 압입용 빔(64)과 고정된 가이드판(60)(60')이 절개홈(50)(50')을 따라 직선 또는 곡선상의 추진방향으로 압입되는 것이다.By operating the hydraulic jack 70 supported on the reaction table 71 by the role of the guide plates 60, 60 'as shown in FIG. 3 while advancing the press-fit beam 64 in the pushing direction. The press-fit beam 64 and the fixed guide plates 60 and 60 'are press-fitted in a straight or curved propulsion direction along the cutouts 50 and 50'.

이와 같이 가이드판(60)(60')이 그 전후 폭만큼 전진이 완료된 상태에서 도 1e의 도시와 같이 하측 강관 내에는 굴착토사 이동장치(90)를 설치하고 압입된 가이드판(60)(60')의 전후 폭에 해당하는 만큼 하측 강관(10')의 일부를 절취한 후, 양측 가이드판(60)(60')의 사이의 토사를 굴착하여 측벽이 형성될 공간을 형성한다.As described above, in the state where the guide plates 60 and 60 'are advanced by the front and rear width thereof, the excavated soil moving device 90 is installed and press-fitted in the lower steel pipe as shown in FIG. 1E. After cutting a portion of the lower steel pipe (10 ') corresponding to the front and rear width of'), excavation of soil between the two guide plates (60, 60 ') to form a space in which the side wall is to be formed.

굴착에 의해 양측 가이드판(60)(60') 사이에 형성된 측벽공간 내에서 도 1f 및 도 4a의 도시와 같이 가이드판(60)(60')의 토류방지판(63) 내측으로 돌출된 상하 강관(10)(10')의 절취단부에 일정간격으로 토압지지대(83)(83')를 좌우로 용접 연결하여 지지하고 그 좌우단부에 토압지지용 빔(80)(80')에 의해 상하 강관(10)(10')을 수직방향으로 용접 연결하여 토압에 내력을 갖게 한 후 도 4b의 도시와 같이 그 빔(80)(80')의 사이에 삽입식 토류방지판(81)(81')을 끼워 설치하고 터널을 기준으로 측벽의 외측에 해당하는 부분의 면에 도 4c의 도시와 같이 방수판(82)(82')을 맞대어 용접 설치한다.Up and down protruding into the earth prevention plate 63 of the guide plate 60, 60 'in the side wall space formed between the two guide plates 60, 60' by excavation as shown in Figs. 1F and 4A. The earth pressure support members 83 and 83 'are welded to the left and right ends at the cutting ends of the steel pipes 10 and 10' and are supported by the earth pressure support beams 80 and 80 'at the left and right ends thereof. The steel pipes 10 and 10 'are welded in the vertical direction to provide a load resistance to earth pressure, and the earth-blocking plate 81 and 81 are inserted between the beams 80 and 80' as shown in FIG. 4B. ') Is inserted and installed on the surface of the portion corresponding to the outside of the side wall with respect to the tunnel as shown in Figure 4c to weld to the waterproof plate 82, 82'.

토류방지판(81)(81')과 방수판(82)(82')의 설치가 완료된 후에는 도 4d의 도시와 같이 반력대(71)의 위치를 추진방향을 기준으로 앞쪽으로 옮겨 하부 강관(10')의 표면에 장착한 후에 그 지지력으로 다시 유압잭(70)을 작동시키면서 전기한 압입공정과 동일하게 가이드판(60)(60')을 다시 절개홈(50)(50')을 따라 지중의 추진 방향으로 압입하는 것이다.After the installation of the earth leakage prevention plates 81, 81 'and the waterproof plates 82, 82' is completed, the position of the reaction force 71 is moved forward based on the propulsion direction as shown in FIG. 4D. After mounting on the surface of 10 ', the guide plates 60 and 60' are again along the incision grooves 50 and 50 'in the same manner as the press-fitting process described above while operating the hydraulic jack 70 again with the support force thereof. It presses in the direction of underground propulsion.

전기한 압입공정과, 굴착공정, 토류방지판 및 설치공정을 반복시행케 되면 도 1g의 도시와 같이 상하 강관(10)(10')을 토류방지판(81)(81')과 방수판(82)(82')에 의해 관통 연결한 상태로 설계된 터널 시공구간의 측벽공간은 직선 또는 곡선방향으로 형성되는 것이다.If the repeated indentation process, excavation process, earth prevention plate and installation process are repeated, the upper and lower steel pipes 10 and 10 'are connected to the earth prevention plate 81, 81' and the waterproof plate (as shown in FIG. 1g). The side wall space between the tunnel construction sections designed in the state of through connection by 82 and 82 'is formed in a straight or curved direction.

이와 같은 시공방법에 의한 측벽형성용 방수철판 및 토류방지판의 설치방법 은 일부 부분적 설치 후 여타 나머지 부분을 2차 설치하므로서 토사유실과 공사기간 지연 등 문제점이 발생하던 종래 방식과는 달리 가이드판의 내측에서 굴착하므로 토사 유실이 없고 공정의 단순화와 공사기간의 단축으로 공사원가가 절감되는 효과가 있을 뿐 아니라 가이드판의 방향 유도판과 유압잭의 이동설치로 곡선상의 커브 형성구간에도 공사 적용이 가능하여 커브 구간에서도 토사유실 없이 안전한 시공과 공사 원가절감을 절감할 수 있는 것이다.The installation method of the side wall forming waterproof steel plate and the earth leakage prevention plate by the construction method is different from the conventional method in which the problems such as soil loss and construction period delay are caused by installing the second part after the partial installation. Excavation from the inside, there is no loss of soil, and the cost of construction is reduced by simplifying the process and shortening the construction period. In addition, the construction can be applied to the curved curve section by moving the guide plate's direction guide plate and hydraulic jack. Even in the curve section, it is possible to reduce the cost of safe construction and construction without losing soil.

도 1a 내지 도 1g는 본 발명의 측벽형성용 토류방지판 및 방수판의 설치방법의 공정 설명도.1A to 1G are process explanatory diagrams of a method of installing a sidewall forming earth barrier plate and a waterproof plate of the present invention;

도 1a는 상하강관 설명도1A is an explanatory view of the upper and lower pipes

도 1b는 상하강관 내부에 토압지지대를 설치한 사시도.Figure 1b is a perspective view of the earth pressure support is installed inside the upper and lower pipes.

도 1c는 상하강관에 절개홈을 형성한 사시도 및 일부 상세 설명도.Figure 1c is a perspective view and some detailed description of the incision groove formed in the upper and lower pipes.

도 1d는 상하강관의 절개홈에 방수판 및 토류방지판을 압입하는 상태의 사시도 및 일부 상세설명도.Figure 1d is a perspective view and a partial detailed view of the state in which the waterproof plate and the earth leakage prevention plate in the incision groove of the upper and lower pipes.

도 1e는 가이드판 사이의 측벽공간 굴착상태의 사시도 및 측단면 설명도.1E is a perspective view and a side cross-sectional view of a side wall space excavation state between guide plates;

도 1f는 토류방지판과 방수판을 설치하는 상태의 사시도와 일부상세도 및 측단면 설명도.Figure 1f is a perspective view and a partial detail and side cross-sectional view of the state in which the earth prevention plate and the waterproof plate is installed.

도 1g는 토류방지판과 방수판이 설치 완료된 상태의 사시도Figure 1g is a perspective view of the earth prevention plate and the waterproof plate is installed

도 2는 본 발명 가이드판의 상세 설명도.Figure 2 is a detailed explanatory view of the guide plate of the present invention.

도 3은 본 발명 가이드판 압입상태의 상세설명도.Figure 3 is a detailed explanatory view of the guide plate indentation state of the present invention.

도 4a 내지 도 4d는 본 발명 토류방지판 및 방수판 설치상태의 상세 설명도로서,Figure 4a to 4d is a detailed explanatory view of the installation of the earth prevention plate and waterproof plate of the present invention,

도 4a는 토압지지용 빔을 설치한 상태의 설명도.4A is an explanatory diagram of a state in which a earth pressure supporting beam is installed;

도 4b는 토압지지용 빔에 토류방지판을 끼운 상태 설명도.Figure 4b is a state explanatory diagram sandwiched in the earth pressure prevention plate to the earth pressure supporting beam.

도 4c는 토류방지판에 방수판을 결합한 상태의 설명도.Figure 4c is an explanatory diagram of a state in which the waterproof plate coupled to the earth leakage prevention plate.

도 4d는 유압잭 및 반력구를 이동 설치한 상태의 설명도.4D is an explanatory diagram of a state in which the hydraulic jack and the reaction force port are moved and installed.

<도면의 주요 부분에 대한 부호의 설명><Explanation of symbols for the main parts of the drawings>

10,10' : 강관 20,20' : 임시 토압지지대10,10 ': Steel pipe 20,20': Temporary earth pressure support

30,30' : 지지용 바 40 : 절취철판30,30 ': Supporting bar 40: Cutting iron plate

50,50' : 절개홈 60,60' : 가이드판50,50 ': Incision groove 60,60': Guide plate

61 : 방향유도판 62 : 간격유지판61: direction guide plate 62: gap maintaining plate

63 : 토류방지판 64 : 압입용 빔63: earth prevention plate 64: press-fit beam

70 : 유압잭 71 : 반력대70: hydraulic jack 71: reaction table

80 : 토압지지용 빔 81,81' : 토류방지판80: earth pressure supporting beam 81,81 ': earth prevention plate

82,82' : 방수판 90 : 굴착토사 이동장치82,82 ': Waterproof plate 90: Excavation soil moving device

83,83' : 토압지지대83,83 ': Earth Pressure Support

Claims (2)

삭제delete 필요위치에 압입된 상하 강관의 내측 토사를 굴착하고 절개를 하기 위한 강관 보강용 임시 토압지지대를 설치하는 공정과, 상측강관의 하측부와 하측강관의 상측부에 방수철판 및 토류방지판 압입을 위한 절개홈을 각각 형성하는 공정과, 강관의 절개홈을 따라 가이드판을 반력대에 의해 지지되는 유압잭에 의해 추진방향으로 압입하는 공정과, 하측강관 내에 굴착토사 이동장치를 설치하고 양측 가이드판의 내측공간에 해당하는 하측강관의 상측 일부분을 절취하고 양측가이드판 사이의 공간을 굴착하여 측벽공간을 굴착하는 공정과, 양측가이드판 사이의 굴착된 측벽공간 부분의 상하 강관의 절취단부를 토압지지대에 의해 좌우로 용접 연결하고 그 토압지지대의 좌우단부에 상하 강관을 수직으로 연결하는 토압지지대용 빔을 설치하고 그 빔에 토류방지판과 방수판을 설치하는 공정과, 토류방지판과 방수판이 설치된 공간내에서 반력대를 추진방향측으로 옮기고 유압잭에 의해 다시 가이드판을 추진방향으로 압입하는 공정과, 전기한 굴착공정, 토류방지판 및 방수판 설치공정을 반복시행하는 공정으로 됨을 특징으로 하는 강관압입식 지하터널 구조물 형성공법에 있어서의 측벽형성용 토류방지판 및 방수철판의 설치방법에 있어서, Installing temporary earth pressure support for reinforcing steel pipe to excavate and cut inner soil of the upper and lower steel pipes pressed in the required position, and to press-fit waterproof steel plate and earthproof plate on the lower part of upper steel pipe and the upper part of lower steel pipe. Forming the cutting grooves, pressing the guide plate along the cutting groove of the steel pipe in the pushing direction by the hydraulic jack supported by the reaction table, and installing the excavated soil moving device in the lower steel pipe and Cutting the upper part of the lower steel pipe corresponding to the space and excavating the side wall space by excavating the space between the two guide plates, and the cutting end of the upper and lower steel pipes of the excavated side wall space portion between the two guide plates by earth pressure support. Welded to the left and right, and the earth pressure support beam is installed at the left and right ends of the earth pressure support vertically to connect the upper and lower steel pipes. The process of installing the prevention plate and the waterproof plate, the process of moving the reaction table to the propulsion direction in the space where the earth prevention plate and the waterproof plate are installed, and pressing the guide plate back to the propulsion direction by the hydraulic jack, electrical excavation process, prevention of the earth In the installation method of the sidewall forming earth barrier plate and waterproofing steel plate in the steel pipe pressurized underground tunnel structure forming method characterized in that the process of repeating the plate and waterproof plate installation process, 상기 가이드판은, 추진방향을 유도하는 방향유도판과, 상하 강관의 사이에서 토사의 유실을 방지하는 토류방지판과, 전기한 방향유도판과 토류방지판의 사이에서 간격을 유지한 채 서로를 결합해 주는 간격유지판을 결합하고 하부에는 압입용 빔을 용착하여 유압잭이 설치되게 하여 그 유압잭에 의해 추진방향으로 압입되게 함을 특징으로 하는 강관압입식 지하터널 구조물 형성공법에 있어서의 측벽형성용 토류방지판 및 방수철판의 설치방법.The guide plate is a direction guide plate for guiding the propulsion direction, the earth prevention plate for preventing the loss of soil between the upper and lower steel pipes, and the space between the aforementioned direction guide plate and the earth prevention plate to each other Side wall formation in steel pipe press-type underground tunnel structure forming method, characterized in that the gap retaining plate to be coupled and the lower part is welded to the press-fitting beam to install the hydraulic jack is pressed in the pushing direction by the hydraulic jack. Installation method of earth prevention plate and waterproof steel plate.
KR1020090064756A 2009-07-16 2009-07-16 Method for installing waterproofing steel plate and soil-drop preventing plate in construction of undergound tunnel KR101123036B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020090064756A KR101123036B1 (en) 2009-07-16 2009-07-16 Method for installing waterproofing steel plate and soil-drop preventing plate in construction of undergound tunnel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020090064756A KR101123036B1 (en) 2009-07-16 2009-07-16 Method for installing waterproofing steel plate and soil-drop preventing plate in construction of undergound tunnel

Publications (2)

Publication Number Publication Date
KR20110007301A KR20110007301A (en) 2011-01-24
KR101123036B1 true KR101123036B1 (en) 2012-03-15

Family

ID=43613766

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020090064756A KR101123036B1 (en) 2009-07-16 2009-07-16 Method for installing waterproofing steel plate and soil-drop preventing plate in construction of undergound tunnel

Country Status (1)

Country Link
KR (1) KR101123036B1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101616505B1 (en) * 2015-07-27 2016-04-29 원화코퍼레이션(주) Side wall structure using retaining member and sub-concrete structure construction method therewith

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR102388841B1 (en) * 2020-06-19 2022-04-19 이미경 Structural installation method for forming underground tunnels for easy intrusion of steel pipes and installation of waterproof steel plates in straight and curved sections

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20040069295A (en) * 2004-06-14 2004-08-05 신창섭 Direction adjusting device for pipe-jacking
KR200417598Y1 (en) * 2006-03-14 2006-06-02 이병택 Curved Tunnel Construction Apparatus
KR100881021B1 (en) * 2008-03-21 2009-01-30 주식회사 동호 Unit structure of steel plate and apparatus excavating underground by unit structure and method constructing the underground passageway

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20040069295A (en) * 2004-06-14 2004-08-05 신창섭 Direction adjusting device for pipe-jacking
KR200417598Y1 (en) * 2006-03-14 2006-06-02 이병택 Curved Tunnel Construction Apparatus
KR100881021B1 (en) * 2008-03-21 2009-01-30 주식회사 동호 Unit structure of steel plate and apparatus excavating underground by unit structure and method constructing the underground passageway

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101616505B1 (en) * 2015-07-27 2016-04-29 원화코퍼레이션(주) Side wall structure using retaining member and sub-concrete structure construction method therewith

Also Published As

Publication number Publication date
KR20110007301A (en) 2011-01-24

Similar Documents

Publication Publication Date Title
KR101069705B1 (en) Method for installing waterproofing steel plate in construction of undergound tunnel
KR101179778B1 (en) Method for constructing underground structure
KR101040066B1 (en) Method of constructing non-excavation type tunnel
KR101018282B1 (en) Method for constructing fabric for undergound tunnel
KR100895881B1 (en) Underground tunnel formation infrastructure establishment method
KR101069702B1 (en) Method for installing waterproofing steel plate and soil-drop preventing plate in construction of undergound tunnel
KR101479267B1 (en) Method for constructing tunnel by using pipe
KR101123036B1 (en) Method for installing waterproofing steel plate and soil-drop preventing plate in construction of undergound tunnel
KR101721579B1 (en) Excavation Propulsion Apparatus of Underground Concrete Structure on Segement Construction Base
KR101858223B1 (en) Friction reduction apparatus for reducing friction of non-open cut structure and construction method using friction reduction apparatus
KR101431623B1 (en) Mehod for constructing underground wall in extension of undergound parking lot
KR102388843B1 (en) Wall forming method using U-type bending steel plate in the structure for underground tunnel formation
KR102310086B1 (en) Waterproof steel plate installation method using waterproof steel plate propulsion set and method of forming underground composite structure using the same
KR20200091114A (en) Construction method of underground tunnel forming structure
JP5498295B2 (en) Construction method for underground structures
KR20140008207A (en) Precast box equipped with plate for decreasing friction and non open cut tunneling method thereof
KR20060037213A (en) Structure main pipe form of construction work and the space-time to establish tunnel formation tunnel structrue
JP2010150809A (en) Thrust transfer member for caisson, and method for constructing underground structure using the same
KR20220028563A (en) Method for forming a two-way girder using press-fit steel pipes in underground structure construction
JP4394097B2 (en) Connection method of concrete box
KR101879602B1 (en) Construction method for underground structure
KR200417399Y1 (en) Pipe roof structures
KR20130008159A (en) Method for constructing upper roof of undergound tunnel
KR101858224B1 (en) Steel pipe reinforced multi-step grouting and construction method using Steel pipe reinforced multi-step grouting
KR101479266B1 (en) Construction method for non open cut tunnel by using of roll type roof plate

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
LAPS Lapse due to unpaid annual fee