KR101000552B1 - 콘크리트가 보강된 보강토 옹벽 및 그 시공방법 - Google Patents
콘크리트가 보강된 보강토 옹벽 및 그 시공방법 Download PDFInfo
- Publication number
- KR101000552B1 KR101000552B1 KR1020100030638A KR20100030638A KR101000552B1 KR 101000552 B1 KR101000552 B1 KR 101000552B1 KR 1020100030638 A KR1020100030638 A KR 1020100030638A KR 20100030638 A KR20100030638 A KR 20100030638A KR 101000552 B1 KR101000552 B1 KR 101000552B1
- Authority
- KR
- South Korea
- Prior art keywords
- reinforcement
- support frame
- soil
- concrete
- reinforced
- Prior art date
Links
- 239000002689 soil Substances 0.000 title claims abstract description 103
- 238000010276 construction Methods 0.000 title claims abstract description 28
- 239000011150 reinforced concrete Substances 0.000 title description 9
- 230000002787 reinforcement Effects 0.000 claims abstract description 134
- 239000004567 concrete Substances 0.000 claims abstract description 57
- 230000003014 reinforcing Effects 0.000 claims abstract description 57
- 239000000463 material Substances 0.000 claims abstract description 38
- 239000004575 stone Substances 0.000 claims description 53
- 238000009415 formwork Methods 0.000 claims description 7
- 229910000831 Steel Inorganic materials 0.000 abstract description 10
- 239000010959 steel Substances 0.000 abstract description 10
- 239000000835 fiber Substances 0.000 description 16
- 239000004746 geotextile Substances 0.000 description 8
- 230000000694 effects Effects 0.000 description 7
- 238000000034 method Methods 0.000 description 7
- 238000009434 installation Methods 0.000 description 3
- 238000005056 compaction Methods 0.000 description 2
- 239000004745 nonwoven fabric Substances 0.000 description 2
- 230000003416 augmentation Effects 0.000 description 1
- 238000005452 bending Methods 0.000 description 1
- 230000015572 biosynthetic process Effects 0.000 description 1
- 238000005266 casting Methods 0.000 description 1
- 238000007906 compression Methods 0.000 description 1
- 230000000875 corresponding Effects 0.000 description 1
- 230000001808 coupling Effects 0.000 description 1
- 238000010168 coupling process Methods 0.000 description 1
- 238000005859 coupling reaction Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 239000000945 filler Substances 0.000 description 1
- 238000005755 formation reaction Methods 0.000 description 1
- 230000005484 gravity Effects 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000006011 modification reaction Methods 0.000 description 1
- 230000000149 penetrating Effects 0.000 description 1
- 229920000098 polyolefin Polymers 0.000 description 1
- 229920002635 polyurethane Polymers 0.000 description 1
- 239000004814 polyurethane Substances 0.000 description 1
- 229920000915 polyvinyl chloride Polymers 0.000 description 1
- 239000004800 polyvinyl chloride Substances 0.000 description 1
- 238000002360 preparation method Methods 0.000 description 1
- 230000003252 repetitive Effects 0.000 description 1
- 229920005989 resin Polymers 0.000 description 1
- 239000011347 resin Substances 0.000 description 1
- 238000000926 separation method Methods 0.000 description 1
- 239000000126 substance Substances 0.000 description 1
- 230000000576 supplementary Effects 0.000 description 1
- 230000001629 suppression Effects 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances data:image/svg+xml;base64,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 data:image/svg+xml;base64,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 O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
- 239000002759 woven fabric Substances 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D29/00—Independent underground or underwater structures; Retaining walls
- E02D29/02—Retaining or protecting walls
- E02D29/0225—Retaining or protecting walls comprising retention means in the backfill
- E02D29/0241—Retaining or protecting walls comprising retention means in the backfill the retention means being reinforced earth elements
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B3/00—Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
- E02B3/04—Structures or apparatus for, or methods of, protecting banks, coasts, or harbours
- E02B3/12—Revetment of banks, dams, watercourses, or the like, e.g. the sea-floor
- E02B3/14—Preformed blocks or slabs for forming essentially continuous surfaces; Arrangements thereof
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D17/00—Excavations; Bordering of excavations; Making embankments
- E02D17/20—Securing of slopes or inclines
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2250/00—Production methods
- E02D2250/0007—Production methods using a mold
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2250/00—Production methods
- E02D2250/0023—Cast, i.e. in situ or in a mold or other formwork
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2300/00—Materials
- E02D2300/0026—Metals
- E02D2300/0029—Steel; Iron
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2300/00—Materials
- E02D2300/0085—Geotextiles
Abstract
Description
도 2는 상기 도 1의 보강토 옹벽이 국부 파손된 모습을 개략적으로 나타낸 도면;
도 3은 종래 일반적인 콘크리트가 보강된 보강토 옹벽의 구축과정들을 단계적으로 나타낸 도면;
도 4는 상기 도 3에서 지지틀에 토목섬유가 설치된 모습을 나타낸 도면;
도 5는 도 4에서 시간이 지남에 따라 토목섬유가 이동하는 모습을 나타낸 도면;
도 6은 종래 교량 등을 지지하기 위한 보강토 옹벽이 구축된 후 보강토체와 콘크리트 벽체가 분리되어 손상된 모습을 나타낸 도면;
도 7는 본 발명에 따른 콘크리트가 보강된 보강토 옹벽의 단면도;
도 8은 본 발명에 따른 콘크리트가 보강된 보강토 옹벽의 시공과정을 단계적으로 나타낸 도면; 및
도 9는 본 발명의 다른 실시예에 따른 콘크리트가 보강된 보강토 옹벽의 단면도이다.
102...기초터 다짐부 103...지지틀
104...지지핀 105...보조보강재
106...쇄석 107...뒤채움흙
103...배수로 110...계획보강토체
110a~110d...보강토체 120...전면 콘크리트 벽체
121...철근 122...거푸집
123...콘크리트 130...결착부재
131...와이어
Claims (5)
- 삭제
- 삭제
- 삭제
- 원지반을 다지는 단계와, 상기 다져진 원지반에 주보강재를 설치하는 단계와, 상기 주보강재의 상부로 지지틀을 설치하는 단계와, 상기 지지틀의 상부로 보조보강재를 설치하는 단계와, 상기 설치된 보조보강재의 상부로 쇄석을 포설한 후 상기 보조보강재의 전단을 상기 포설된 쇄석의 외부를 밀착된 상태로 감싸도록 회전시키되, 회전된 상기 보조보강재에 있어 쇄석에 밀착되지 않은 부분이 상기 지지틀의 후방측으로 길이방향을 따라 지지틀의 상부에 놓이도록 하는 단계와, 상기 주보강재의 전단을 상기 쇄석이 상기 지지틀의 전방에 밀착되게 위치된 상태를 유지하도록 함과 동시에 상기 보조보강재와 함께 상기 쇄석의 외부를 밀착된 상태로 감싸도록 하며, 회전된 상기 주보강재에 있어 쇄석에 밀착되지 않은 부분이 상기 지지틀의 후방측으로 길이방향을 따라 지지틀의 상부에 놓이도록 하는 단계와, 상기 지지틀의 후방측으로 길이방향을 따라 밀착되도록 설치된 상기 주보강재 및 보조보강재를 상기 지지틀에 고정시키는 단계와, 상기 쇄석이 상기 지지틀의 전방에 밀착되게 설치된 상태를 유지한 채로 상기 쇄석이 설치된 후방측으로 뒤채움흙이 포설되는 단계를 포함하여 구성된 보강토체를 완성하는 단계;
상기 완성된 보강토체를 계획고까지 다층으로 축조하여 계획보강토체를 구축하는 단계; 및
상기 계획보강토체의 구축이 완료된 후 상기 원지반을 이용하여 상기 계획보강토체의 전방에 철근을 배근하는 단계와, 후크부가 구비된 결착부재를 상기 주보강재 및 상기 지지틀에 거는 방식으로 상기 배근된 철근과 상기 지지틀을 결착시키는 단계와, 내부에 상기 철근이 배근되도록 거푸집을 설치하는 단계와, 거푸집 안에 콘크리트를 타설하여 전면 콘크리트 벽체를 구축하는 단계를 포함하여 구성된 전면 콘크리트 벽체의 구축 단계;
를 포함하여 구성됨을 특징으로 하는 콘크리트가 보강된 보강토 옹벽의 시공방법. - 삭제
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020100030638A KR101000552B1 (ko) | 2010-04-02 | 2010-04-02 | 콘크리트가 보강된 보강토 옹벽 및 그 시공방법 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020100030638A KR101000552B1 (ko) | 2010-04-02 | 2010-04-02 | 콘크리트가 보강된 보강토 옹벽 및 그 시공방법 |
Publications (1)
Publication Number | Publication Date |
---|---|
KR101000552B1 true KR101000552B1 (ko) | 2010-12-14 |
Family
ID=43512761
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR1020100030638A KR101000552B1 (ko) | 2010-04-02 | 2010-04-02 | 콘크리트가 보강된 보강토 옹벽 및 그 시공방법 |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR101000552B1 (ko) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101235826B1 (ko) | 2012-07-30 | 2013-02-21 | 주식회사 이파그리드코리아 | 보강토 옹벽블록 시공방법 |
KR101469881B1 (ko) * | 2012-08-10 | 2014-12-08 | 한국철도기술연구원 | 토공 접속부의 보강 및 수직-수평 변위의 억제를 위한 일체화 시공 구조물 및 그 방법 |
KR101738316B1 (ko) * | 2016-12-12 | 2017-05-22 | 이호명 | 벽체 보강구조물 시공방법 |
KR20180019322A (ko) * | 2016-08-16 | 2018-02-26 | 한국토지주택공사 | 일체식 교량구조물 및 그 시공방법 |
KR102027480B1 (ko) * | 2019-03-06 | 2019-11-04 | 지반이엔씨 주식회사 | 보강토 옹벽의 전면벽체를 활용한 라멘교 구축 방법 |
KR102063701B1 (ko) * | 2019-04-05 | 2020-01-09 | 지반이엔씨 주식회사 | 보강토 옹벽과 어프로치 슬래브를 활용한 라멘교 구축 방법 |
-
2010
- 2010-04-02 KR KR1020100030638A patent/KR101000552B1/ko active IP Right Grant
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101235826B1 (ko) | 2012-07-30 | 2013-02-21 | 주식회사 이파그리드코리아 | 보강토 옹벽블록 시공방법 |
KR101469881B1 (ko) * | 2012-08-10 | 2014-12-08 | 한국철도기술연구원 | 토공 접속부의 보강 및 수직-수평 변위의 억제를 위한 일체화 시공 구조물 및 그 방법 |
KR20180019322A (ko) * | 2016-08-16 | 2018-02-26 | 한국토지주택공사 | 일체식 교량구조물 및 그 시공방법 |
KR101896403B1 (ko) * | 2016-08-16 | 2018-09-07 | 한국토지주택공사 | 일체식 교량구조물 및 그 시공방법 |
KR101738316B1 (ko) * | 2016-12-12 | 2017-05-22 | 이호명 | 벽체 보강구조물 시공방법 |
KR102027480B1 (ko) * | 2019-03-06 | 2019-11-04 | 지반이엔씨 주식회사 | 보강토 옹벽의 전면벽체를 활용한 라멘교 구축 방법 |
KR102063701B1 (ko) * | 2019-04-05 | 2020-01-09 | 지반이엔씨 주식회사 | 보강토 옹벽과 어프로치 슬래브를 활용한 라멘교 구축 방법 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR101000552B1 (ko) | 콘크리트가 보강된 보강토 옹벽 및 그 시공방법 | |
KR100971004B1 (ko) | 벽체를 이루는 패널과 강성 벽체구조를 이용한 보강토 옹벽 | |
KR102159832B1 (ko) | 건축물의 기초공사 시공방법 | |
JP2007530833A (ja) | 補強土擁壁システム及び構築方法 | |
KR101331261B1 (ko) | 피씨 지중연속벽을 활용하여 스트럿구조나 어스앙카 구조에서 시공가능한 지하조립식 피씨 저류조 및 이의 시공 방법 | |
KR100756680B1 (ko) | 프리캐스트 콘크리트 부재를 이용한 후인장 콘크리트 옹벽및 그 시공방법 | |
KR100890828B1 (ko) | 보강토 rc옹벽 | |
KR20090096055A (ko) | 연속 그리드에 의한 보강토옹벽의 옹벽지지구조 및 이를적용한 보강토옹벽 시공방법 | |
KR100822265B1 (ko) | 자연석 옹벽구조물과 그 시공방법 | |
CN109235490A (zh) | 挡土墙及其施工方法 | |
KR101677431B1 (ko) | 대용량 콘크리트 옹벽 | |
KR102178399B1 (ko) | 내진성능이 우수한 보강지지구조를 구비한 보강토 옹벽블록 및 그 시공방법 | |
KR101210368B1 (ko) | 커플러와 볼트를 활용하여 가설 흙막이벽과 지하실 외벽을 일체화하는 공법 | |
KR101102435B1 (ko) | 흙막이용 합성 토류판과 이의 제작방법 및 이를 이용한 흙막이 재사용 시공방법 | |
KR101226223B1 (ko) | 토목섬유 튜브를 이용한 연약지반 보강토 옹벽 구조물 및 이의 시공방법 | |
KR100889257B1 (ko) | 옹벽 전면의 녹화를 이용한 조립식 보강토 옹벽 | |
KR102027480B1 (ko) | 보강토 옹벽의 전면벽체를 활용한 라멘교 구축 방법 | |
KR20090069480A (ko) | Pc블록과 스틸파이프에 프리스트레싱을 도입한 안벽 및그 시공방법 | |
KR20140037658A (ko) | 보강노반 지지용 강성복합벽체 및 그 시공방법 | |
KR100383460B1 (ko) | 블록식 보강토 앵커공법과 이에 사용되는 옹벽 축조용 블록 | |
JP5021526B2 (ja) | アンダーパスの造成方法及び上部工桁と地中壁との結合構造 | |
KR20100090179A (ko) | 팽이파일을 이용한 연약지반 보강방법 | |
KR100976277B1 (ko) | 파이프앵커와 pc블록을 통한 친환경 생태옹벽 시공방법 | |
KR100884391B1 (ko) | 옹벽 상단의 배수기능을 보강한 보강토 옹벽 및 이 시공방법 | |
KR100885909B1 (ko) | 토목 섬유망을 이용한 자립식 가시설 옹벽 및 이 시공 방법 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A201 | Request for examination | ||
A302 | Request for accelerated examination | ||
E902 | Notification of reason for refusal | ||
E701 | Decision to grant or registration of patent right | ||
GRNT | Written decision to grant | ||
FPAY | Annual fee payment |
Payment date: 20131212 Year of fee payment: 4 |
|
FPAY | Annual fee payment |
Payment date: 20150915 Year of fee payment: 6 |
|
FPAY | Annual fee payment |
Payment date: 20161024 Year of fee payment: 7 |
|
FPAY | Annual fee payment |
Payment date: 20171123 Year of fee payment: 8 |
|
FPAY | Annual fee payment |
Payment date: 20181203 Year of fee payment: 9 |
|
FPAY | Annual fee payment |
Payment date: 20191202 Year of fee payment: 10 |