KR100978629B1 - Soil nailing for reinforce slope and method for reinforce slope using thereof - Google Patents

Soil nailing for reinforce slope and method for reinforce slope using thereof Download PDF

Info

Publication number
KR100978629B1
KR100978629B1 KR1020100051100A KR20100051100A KR100978629B1 KR 100978629 B1 KR100978629 B1 KR 100978629B1 KR 1020100051100 A KR1020100051100 A KR 1020100051100A KR 20100051100 A KR20100051100 A KR 20100051100A KR 100978629 B1 KR100978629 B1 KR 100978629B1
Authority
KR
South Korea
Prior art keywords
nail
rod
fixing
fixing head
bar
Prior art date
Application number
KR1020100051100A
Other languages
Korean (ko)
Inventor
김향란
송영현
심준원
이동현
오병호
이삼종
함건철
이종하
Original Assignee
(주)케이지엔지니어링
주식회사 보람
주식회사 대한콘설탄트
주식회사 대성지반산업
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by (주)케이지엔지니어링, 주식회사 보람, 주식회사 대한콘설탄트, 주식회사 대성지반산업 filed Critical (주)케이지엔지니어링
Priority to KR1020100051100A priority Critical patent/KR100978629B1/en
Application granted granted Critical
Publication of KR100978629B1 publication Critical patent/KR100978629B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/20Securing of slopes or inclines
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/74Means for anchoring structural elements or bulkheads
    • E02D5/80Ground anchors
    • E02D5/805Ground anchors with deformable anchoring members
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2200/00Geometrical or physical properties
    • E02D2200/14Geometrical or physical properties resilient or elastic
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2600/00Miscellaneous
    • E02D2600/30Miscellaneous comprising anchoring details
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2600/00Miscellaneous
    • E02D2600/40Miscellaneous comprising stabilising elements

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

PURPOSE: A slope reinforcing nailing for a road and a complex and a slope reinforcing method using the same are provided to efficiently reinforce the ground by securely installing a fixing head. CONSTITUTION: A slope reinforcing nailing for a road and a complex comprises a nail bar(10) of a reinforcing bar, a push bar(20), a fixing head(30), a fixing wing(40), and a push ring(50). The push bar is separably connected to the nail bar. The fixing head is fixed to the inner wall of the nail bar and guides the rotation of the push bar. The fixing wing is expanded by the push bar. The push ring pushes the fixing wing toward the fixing head when the push bar is rotated.

Description

도로 및 단지의 사면보강 네일링 및 이를 이용한 사면 보강 공법{SOIL NAILING FOR REINFORCE SLOPE AND METHOD FOR REINFORCE SLOPE USING THEREOF}Slope reinforcement nailing of roads and complexes and slope reinforcement method using the same {SOIL NAILING FOR REINFORCE SLOPE AND METHOD FOR REINFORCE SLOPE USING THEREOF}

본 발명은 네일링에 관한 것으로, 더욱 상세하게는 정착헤드를 견고하게 정착하여 네일링의 회전시 공회전을 방지함으로써 네일링에 의한 지반보강 작업성을 향상하고 지반의 안정력을 확보하고, 철근에 나사부를 가공하지 않고 철근 기성품을 이용하여 시공원가를 절감할 수 있는 도로 및 단지의 사면보강 네일링 및 이를 이용한 사면 보강 공법에 관한 것이다.
The present invention relates to a nailing, and more particularly, to firmly fix the fixing head to prevent idling during rotation of the nailing, thereby improving the ground reinforcement workability by nailing and securing the stability of the ground, The present invention relates to a slope reinforcement nailing of roads and complexes, and a slope reinforcement method using the same, which can reduce city park prices by using ready-made reinforcing bars without machining threads.

일반적으로 터파기, 흙막이, 철도 및 도로에 인접한 자연 및 인공사면의 보강, 지하구조물 및 터널 등과 같은 토목관련 시설물 축조에 필요한 굴착 지보체계, 기존 옹벽의 보수 및 옹벽을 설치하는 공사에 사용되는 소일네일링(soil-nailingIn general, excavation support system required for construction of civil engineering facilities such as reinforcement of natural and artificial slopes adjacent to trenches, muds, railroads and roads, underground structures and tunnels, repair of existing retaining walls and construction of retaining walls Ring-nailing

method)은 굴토 또는 절토 과정을 통하여 일련의 보강작업이 이루어지는 것으로, 비탈면이나 터파기 굴착면을 자립할 수 있는 안정높이로 굴착함과 동시에 숏크리-(shortcrete; 뿜어 붙이기 콘크리트)로 표면보호면을 시공하고 굴착배면을 천공하여 네일(nail)을 삽입하며 이를 그라우팅하여 보강토체를 조성한다.method) is a series of reinforcement work through the process of excavation or cutting, and excavation is performed at a stable height that can be independent of slope or excavation surface, and at the same time, the surface protection surface is made by shortcrete (shortcrete). Constructs and drills the back of the excavation to insert nails and grout them to form reinforcement.

종래 기술에 의한 네일링 장치는 복수의 수지제 소켓들에 의해 연결된 복수의 수지제 중공관체들 내에 강철제 봉이 삽입된 형태이다. 복수의 소켓들과 중공관체들은 교호로 연결되어 있다.The nailing device according to the prior art is a form in which a steel rod is inserted into a plurality of resin hollow tubes connected by a plurality of resin sockets. The plurality of sockets and the hollow tube are alternately connected.

네일링 장치가 굴착 측면에 시공되기 전에 굴착 측면에는 하향 경사진 방향으로 깊은 네일공이 천공되며, 이 네일공 내에는 네일링 장치가 삽입된다. 네일링 장치가 삽입된 다음에, 네일링 장치의 외면과 네일공의 내주면 사이에는 시멘트 페이스트, 시멘트 몰탈 등의 그라우트가 충전된다. 네일링 장치의 외면을 둘러싸는 그라우트는 경화되어 네일링 장치와 함께 콘크리트 파일을 형성한다. 그라우트가 굳은 다음에는 굴착 측면의 밖으로 돌출된 소일네일의 봉에 지압판이 끼워져 커플러와 볼트로 고정됨으로써 네일링 장치의 시공이 완료된다. 따라서, 네일링 장치에서 강철제 봉은 소켓 및 중공관체에 대하여 네일공의 길이방향으로 이동하지 않도록 소켓 또는 중공관체에 결합되어 있다.Before the nailing device is installed on the drilling side, a deep nail hole is drilled in the downwardly inclined direction, and the nailing device is inserted into the drilling side. After the nailing device is inserted, grout such as cement paste and cement mortar is filled between the outer surface of the nailing device and the inner circumferential surface of the nail hole. The grout surrounding the outer surface of the nailing device is cured to form a concrete pile with the nailing device. After the grout is hardened, the pressure plate is inserted into the bar of the nail nail protruding out of the excavation side, and the construction of the nailing device is completed by fixing with a coupler and a bolt. Therefore, the steel rod in the nailing device is coupled to the socket or the hollow tube so as not to move in the longitudinal direction of the nail hole with respect to the socket and the hollow tube.

그러나, 종래 기술에 따른 네일링 장치는 다음과 같은 문제점이 있다.However, the nailing apparatus according to the prior art has the following problems.

이러한 문제점을 해결하기 위하여 네일의 회전시 정착날개가 확장되어 지반에 정착되는 네일링이 제안된 바 있다. In order to solve this problem, a nailing has been proposed in which the fixing blade is expanded and the nail is fixed on the ground.

종래 기술에 의한 네일링은, 네일링의 회전시 정착날개가 네일봉이나 정착헤드와 함께 회전하지 않도록 정착헤드가 정착되는데, 상기 정착헤드의 정착을 위하여 네일봉을 가압할 때 정착헤드가 정착되기 전에 정착날개가 확장되어 견고한 정착이 이루어지지 못한다. 그리고, 네일봉을 무리하게 가압하여 네일봉과 기타 자재간의 연결부가 파손되는 문제점도 있다.In the nailing according to the prior art, the fixing head is fixed so that the fixing blade does not rotate together with the nail rod or the fixing head when the nail is rotated, and the fixing head is fixed when pressing the nail rod for fixing the fixing head. Previously, the anchoring blades were extended to prevent firm fixation. In addition, there is a problem in that the connection between the nail bar and other materials is broken by forcibly pressing the nail bar.

또한, 대개 철근을 네일봉으로 사용하는데, 철근을 사용하기 위해서는 철근의 외주면에 나사선을 가공하여야 하며, 나사선의 가공비용이 고가이기 때문에 시공원가가 비싸다.
In addition, rebar is usually used as a nail bar. In order to use reinforcing bars, a screw thread must be machined on the outer circumferential surface of the rebar.

본 발명은 전술한 바와 같은 문제점을 해결하기 위한 것으로, 철근 네일봉을 통해 정착날개를 정착시키는 것은 물론 일정폭만큼 이동이 가능하도록 하여 정착헤드를 지중에 견고하게 정착하고 자재의 연결부를 보호할 수 있는 도로 및 단지의 사면보강 네일링 및 이를 이용한 사면 보강 공법을 제공하려는데 목적이 있다.The present invention is to solve the problems as described above, it is possible to fix the fixing wing through the reinforcing nail bar as well as to move by a certain width to firmly fix the fixing head in the ground and protect the connection of the material The purpose of the present invention is to provide slope reinforcement nailing of roads and complexes and slope reinforcement methods using the same.

그리고, 본 발명의 다른 목적은 기성품인 철근을 그대로 사용하여 나사선이 형성된 철근의 사용 따른 비용을 절감하려는데 있다.
In addition, another object of the present invention is to use the ready-made reinforcing bar as it is to reduce the cost of using the threaded reinforcing bar.

전술한 바와 같은 목적을 달성하기 위한 본 발명에 따른 도로 및 단지의 사면 보강 네일링은, 외주면에 종횡방향으로 마디가 형성된 철근의 네일봉과; 상기 네일봉의 선단부에 연결 고정되며 제1나사부를 갖는 푸쉬봉과; 내주면에 상기 푸쉬봉의 제1나사부에 나사 체결되는 제2나사부가 형성되며 외주면에 제1경사부가 형성되고 네일공 안쪽의 지중에 정착되는 정착헤드와; 내주면에 상기 제1경사부에 슬라이딩 가능한 제2경사부가 형성되어 상기 정착헤드의 둘레부에 결합되는 2개 이상의 정착날개를 포함하고, 상기 푸쉬봉은, 원통형의 네일봉 연결통, 상기 네일봉 연결통에 고정되며 외주면에 상기 정착헤드의 제2나사부에 나사 체결되는 제1나사부가 형성되는 연결봉, 상기 네일봉이 삽입되면서 상기 네일봉 연결통에 나사 체결되며 내주면에 제1웨지경사면이 형성된 콘하우징, 상기 네일봉 연결통과 콘하우징 내부에 삽입되며 외주면에 상기 콘하우징의 제1웨지 경사면에 면접촉되는 제2웨지경사면이 구비되고 내주면이 요철구조인 철근체결콘, 상기 철근체결콘을 상기 콘하우징쪽으로 밀어 상기 네일봉과 상기 푸쉬봉을 고정하는 탄성부재를 포함하는 것을 특징으로 한다.
Slope reinforcement nailing of roads and complexes according to the present invention for achieving the object as described above, and the nail bar of the reinforcing bar formed in the longitudinal direction on the outer peripheral surface; A push rod connected to the distal end of the nail rod and having a first screw portion; A fixing head having a second screw portion screwed to the first screw portion of the push rod on an inner circumferential surface thereof, a first inclined portion formed on an outer circumferential surface thereof and fixed to the ground inside the nail hole; A second inclined portion that is slidable on the inner circumferential surface is formed to include two or more fixing wings coupled to the circumference of the fixing head, the push rod is a cylindrical nail bar connecting tube, the nail bar connecting tube A connecting rod fixed to the outer circumferential surface and having a first threaded portion screwed to a second screw portion of the fixing head, the nail rod being inserted into the nail rod connecting rod and the first wedge inclined surface formed on the inner circumferential surface of the conical housing, wherein Inserted into the nail bar connecting tube and the cone housing, the outer peripheral surface is provided with a second wedge inclined surface that is in surface contact with the first wedge inclined surface of the cone housing, and the inner fastening convex concave structure, push the reinforcing fastening cone toward the cone housing It characterized in that it comprises an elastic member for fixing the nail rod and the push rod.

본 발명에 의한 도로 및 단지의 사면보강 네일링 및 이를 이용한 사면 보강 공법에 의하면, 네일봉이 탄성부재를 통해 일정 폭만큼 전후진 가능하여 정착헤드를 가압하여 지중에 정착할 때 정착헤드가 지중에 견고하게 정착될 수 있고, 따라서, 네일링의 회전시 공회전을 방지할 수 있으므로 네일링에 의한 지반보강 작업성을 향상하고 지반의 안정력을 확보할 수 있고, 네일링과 푸쉬봉의 파손을 방지할 수 있다.According to the slope reinforcement nailing of roads and complexes according to the present invention, and the slope reinforcement method using the same, the nail rod can be moved forward and backward by a predetermined width through the elastic member, so that the fixing head is firmly grounded when the anchoring head is pressed to fix the ground. It can be settled, and thus, can prevent the idling during the rotation of the nail ring to improve the ground reinforcement workability by the nailing and to ensure the stability of the ground, it is possible to prevent the nailing and push rod breakage have.

그리고, 철근을 가공하지 않고 네일봉으로 사용하여 저렴한 철근을 사용하므로 시공원가를 절감할 수 있다.
In addition, since the inexpensive reinforcing bar is used as a nail bar without processing the reinforcing bar, the city park can be reduced.

도 1은 본 발명에 의한 도로 및 단지의 사면보강 네일링의 사시도.
도 2는 본 발명에 의한 도로 및 단지의 사면보강 네일링의 분해 사시도.
도 3은 본 발명에 의한 도로 및 단지의 사면보강 네일링의 단면도.
도 4는 본 발명에 의한 도로 및 단지의 사면보강 네일링의 작동 상태도.
1 is a perspective view of the slope reinforced nailing of the road and the complex according to the present invention.
Figure 2 is an exploded perspective view of the slope reinforcement nailing of the road and the complex according to the present invention.
3 is a cross-sectional view of the slope reinforced nailing of the road and the complex according to the present invention.
Figure 4 is an operational state diagram of the slope reinforcement nailing of the road and the complex according to the present invention.

도 1 내지 도 3에서 보이는 바와 같이, 본 발명에 의한 도로 및 단지의 사면 보강 네일링(100)은, 철근의 네일봉(10), 네일봉(10)에 분리 가능하게 연결 고정되는 푸쉬봉(20), 네일공(1)의 안쪽 벽면에 정착되며 푸쉬봉(20)의 회전을 유도하는 정착헤드(30), 푸쉬봉(20)에 의해 확장되어 네일공(1) 주변의 지반에 박혀 정착되는 정착날개(40)로 구성된다. 그리고, 푸쉬봉(20)의 회전시 정착날개(40)를 정착헤드(20)측으로 미는 푸쉬링(50)이 포함될 수 있다.As shown in Figures 1 to 3, the slope reinforcement nailing 100 of the road and the complex according to the present invention, the push rod that is detachably connected to the nail bar 10, nail bar 10 of the rebar ( 20) is fixed to the inner wall surface of the nail ball (1) is extended by the fixing head 30, the push rod (20) to induce the rotation of the push rod 20, nailed to the ground around the nail ball (1) It consists of a fixing wing 40 which is. In addition, a push ring 50 for pushing the fixing blade 40 toward the fixing head 20 may be included when the push rod 20 is rotated.

네일봉(10)은 철근이 사용되며, 특히, 철근의 외주면에 나사선을 가공하지 않고 철근 그대로를 사용한다. 따라서, 철근에 나사선을 가공하기 위한 고가의 비용을 절감할 수 있다.Nail bar 10 is used as a reinforcing bar, in particular, the steel bar is used as it is without processing the thread on the outer peripheral surface of the rebar. Therefore, it is possible to reduce the expensive cost for machining the thread on the rebar.

푸쉬봉(20)은 네일봉(10)의 회전력에 의해 네일봉(10)과 함께 회전하여 정착날개(40)를 확장하는 것으로, 네일봉(10)과 분리된 단품이기 때문에 네일봉(10)을 무리하게 길게 할 필요가 없고 철근을 그대로 사용할 수 있도록 한 구성이다. 후술하는 것처럼 연결봉에 나사부가 형성되지만 연결봉은 기성품일 수 있으므로 비용이 저렴하다.Push rod 20 is to extend the fixing wing 40 by rotating with the nail rod 10 by the rotational force of the nail rod 10, nail bar 10 because it is a single piece separated from the nail rod 10 It does not need to lengthen excessively and is a configuration that can be used as it is. Although the threaded portion is formed in the connecting rod as described below, the connecting rod may be a ready-made product and thus the cost is low.

이러한 푸쉬봉(20)은 원통형의 네일봉 연결통(21), 네일봉 연결통(21)에 고정되며 외주면에 정착헤드(30)의 제2나사부(31)에 나사 체결되는 제1나사부(22)가 형성되는 연결봉(23), 네일봉(10)이 삽입되면서 네일봉 연결통(21)에 나사 체결되며 내주면에 제1웨지경사면(24a)이 형성된 콘하우징(24)으로 구성된다.The push rod 20 is fixed to the cylindrical nail rod connecting rod 21, nail rod connecting rod 21 and the first screw portion 22 is screwed to the second screw portion 31 of the fixing head 30 on the outer peripheral surface The connecting rod 23 is formed, the nail rod 10 is inserted into the nail rod connecting rod 21 is screwed to the inner circumferential surface is formed of a cone housing 24 formed with a first wedge inclined surface (24a).

콘하우징(24)은 원통형 또는 2개의 반원형통의 결합으로 이루어질 수 있다. 여기서, 철근형 네일봉(10)과 콘하우징(24)의 견고한 결합을 통해 네일봉(10)이 공회전하지 않도록 콘하우징(24)의 내면에는 네일봉(10)의 둘레부에 형성된 마디(11)가 지지되는 이탈방지턱이 형성될 수 있다.
The cone housing 24 may consist of a cylindrical or a combination of two semicircular cylinders. Here, the node 11 formed on the periphery of the nail rod 10 on the inner surface of the cone housing 24 so that the nail rod 10 does not idle through the firm coupling of the reinforcing nail rod 10 and the cone housing 24. An anti-separation jaw may be formed.

네일봉(10)과 푸쉬봉(20)은 철근체결수단을 통해 결속된다. 상기 철근체결수단은 네일봉(10)이 푸쉬봉(20)에서 이탈되지 않고 공회전하지 않도록 구성되어야 하며, 예를 들어, 웨지콘(25) 및 탄성부재(26)로 구성될 수 있다.Nail rod 10 and push rod 20 is bound through the reinforcing bar fastening means. The rebar fastening means should be configured such that the nail rod 10 does not break away from the push rod 20 and does not idle, for example, may be composed of a wedge cone 25 and an elastic member 26.

웨지콘(25)은 네일봉 연결통(21)과 콘하우징(24) 내부에 삽입되며 외주면에 콘하우징(24)의 제1웨지 경사면(24a)에 면접촉되는 제2웨지경사면(25a)이 구비되고 내주면이 요철구조(예컨대 나사선)로 구성된다. 웨지콘(125)은 네일봉 연결통(21)과 콘하우징(24) 내부의 공간에 네일봉(10)의 축방향을 따라 이동 가능하게 설치되며 하나 또는 2개 이상이 네일봉(10)의 둘레를 따라 배치될 수 있다.The wedge cone 25 is inserted into the nail bar connecting tube 21 and the cone housing 24 and the second wedge inclined surface 25a which is in surface contact with the first wedge inclined surface 24a of the cone housing 24 on the outer circumferential surface thereof. The inner peripheral surface is provided with an uneven structure (for example, a screw thread). The wedge cone 125 is installed to be movable along the axial direction of the nail rod 10 in the space inside the nail bar connecting tube 21 and the cone housing 24, one or two or more of the nail rod 10 Can be disposed along the perimeter.

탄성부재(26)는 탄성력에 의해 웨지콘(25)을 콘하우징(24)측으로 전진시켜 웨지콘(25)이 제1,2웨지경사면(24a,25a)에 의해 네일봉(10)을 조임하도록 한다.The elastic member 26 advances the wedge cone 25 toward the cone housing 24 by the elastic force so that the wedge cone 25 tightens the nail rod 10 by the first and second wedge slopes 24a and 25a. do.

정착헤드(30)는 외주면에 제1경사부(31)가 형성되면서 내주면에 푸쉬봉(20)의 연결봉(23)의 제1나사부(22)가 나사 체결되는 제2나사부(32)가 형성된다.The fixing head 30 has a first screw portion 31 formed on the outer circumferential surface thereof, and a second screw portion 32 on which the first screw portion 22 of the connecting rod 23 of the push rod 20 is screwed is formed on the inner circumferential surface thereof. .

정착헤드(30)는 네일봉(10)의 회전시 네일봉(10)과 함께 회전하지 않도록 선단부에 하나 이상의 앵커돌기(33)가 구비된다. 앵커돌기(33)는 바람직하게 2개 이상으로 형성되며 지중에 박혀 정착헤드(30)의 회전을 방지한다.The fixing head 30 is provided with one or more anchor protrusions 33 at the tip portion thereof so as not to rotate together with the nail rod 10 when the nail rod 10 rotates. Anchor protrusions 33 are preferably formed of two or more and are embedded in the ground to prevent the rotation of the fixing head (30).

정착날개(40)는 정착헤드(30)의 둘레부에 원주방향을 따라 일렬로 배치되는 2개 이상으로 구성되며 정착헤드(30)의 제1경사부(31)를 타고 확장할 수 있도록 내주면에 제2경사부(41)가 구비된다. 다수의 정착날개(40)는 밴드 등을 통해 고정되어 사용되며, 상기 밴드는 정착날개(40)의 확장시 파단된다.The fixing wing 40 is composed of two or more arranged in a line in the circumferential direction on the circumferential portion of the fixing head 30, and on the inner circumferential surface so as to extend on the first inclined portion 31 of the fixing head 30. The second inclined portion 41 is provided. A plurality of fixing blades 40 are fixed and used through a band, etc., the band is broken when the fixing blade 40 is expanded.

푸쉬링(50)은 네일봉(10)의 회전시 정착날개(40)를 전진시키는 것이며, 연결봉(23)에 베어링 등을 통해 공회전 가능하게 설치될 수 있다. 또한, 네일봉 연결통(21)과의 사이에 베어링이 설치될 수도 있다. 따라서, 푸쉬링(50)은 네일봉(10)의 회전 및 회전으로 인한 전진시 네일봉(10)을 따라 전진하면서 정착날개(40)를 밀어낸다.The push ring 50 is to advance the fixing blades 40 during the rotation of the nail bar 10, it can be installed in the connecting rods 23 so as to be idling through the bearing. In addition, a bearing may be installed between the nail bar connecting cylinder 21. Therefore, the push ring 50 pushes the fixing blade 40 while advancing along the nail bar 10 when the nail bar 10 moves forward and rotates.

푸쉬링(50)과 정착헤드(40)의 대향면에는 제3,4경사부(51,42)가 형성될 수 있다. 제3,4경사부(51,42)는 정착날개(40)의 확장방향이면서 제1,2경사부(31,22)와 반대방향으로 경사지게 형성된다.
Third and fourth inclined portions 51 and 42 may be formed on opposing surfaces of the push ring 50 and the fixing head 40. The third and fourth inclined portions 51 and 42 are formed to be inclined in the direction opposite to the first and second inclined portions 31 and 22 while extending in the fixing blade 40.

본 발명에 의한 도로 및 단지의 사면 보강 네일링을 이용한 사면 보강 공법은 다음과 같다.Slope reinforcement method using the slope reinforcement nailing of roads and complexes according to the present invention is as follows.

(S10) 네일공 천공.(S10) Nail hole perforation.

사면의 보강이 필요한 곳에 천공기를 이용하여 일정 간격으로 다수의 네일공(1)을 천공한다.Where the reinforcement of the slope is required by using a punching machine to drill a plurality of nail holes (1) at regular intervals.

(S20) 네일링 설치.(S20) nailing installation.

네일공(1)의 내부에 네일링(100)을 삽입 설치한다.Insert the nail ring 100 into the interior of the nail ball (1).

다수의 정착날개(40)는 밴드를 통해 정착헤드(30)의 둘레부에 결합되어 네일링(100)을 네일공(1)에 삽입할 때 간섭이 일어나지 않으며, 정착헤드(30)의 앵커돌기(33)가 네일공(1)의 안쪽 지반에 박힐 때까지 네일링(100)을 삽입한다.A plurality of fixing blades 40 are coupled to the circumference of the fixing head 30 through the band does not occur when the nailing 100 is inserted into the nail hole (1), anchoring projection of the fixing head 30 Insert nailing 100 until 33 is lodged in the inner ground of nail ball 1.

(S30) 네일링 정착.(S30) Nailing settled.

네일봉(10)을 일방향으로 돌리면 네일봉(10)과 푸쉬봉(20)이 함께 회전하며, 푸쉬봉(20)은 제1,2나사부(22,32)를 통해 정착헤드(20)에 체결된다.When the nail rod 10 is turned in one direction, the nail rod 10 and the push rod 20 rotate together, and the push rod 20 is fastened to the fixing head 20 through the first and second screw parts 22 and 32. do.

정착헤드(30)는 앵커돌기(33)를 통해 네일공(1)에서 회전하지 못하게 된다. 구체적으로 설명하면, 네일봉(10)을 지중으로 가압하면 정착헤드(30)의 앵커돌기(33)가 지중에 박히게 되며, 이때, 네일봉(10)은 탄성부재(26)를 압축시키면서 정착헤드(30)를 가압하여 네일봉(10)과 푸쉬봉(20)간에 파손이 일어나지 않으며, 정착헤드(30)의 정착이 완료되어 네일봉(10)에 가한 힘을 없애면 탄성부재(26)의 탄성력에 의해 네일봉(10)이 후진하며 웨지콘(25)에 의해 네일봉(10)과 푸쉬링(20)이 견고하게 결속된다. The fixing head 30 may not rotate in the nail hole 1 through the anchor protrusion 33. In detail, when the nail bar 10 is pressed into the ground, the anchor protrusion 33 of the fixing head 30 becomes lodged in the ground, and at this time, the nail rod 10 compresses the elastic member 26 to fix the fixing head. No damage occurs between the nail rod 10 and the push rod 20 by pressing the 30, and the fixing force of the fixing member 30 is completed and the elastic force of the elastic member 26 is removed when the force applied to the nail rod 10 is removed. By the nail bar 10 is reversed by the wedge cone 25, the nail bar 10 and the push ring 20 is firmly bound.

네일봉(10)의 전진시 푸쉬봉(20)(또는 푸쉬링(50))이 함께 전진하며, 이에 따라 정착날개(40)가 제1,2경사부(31,41)에 의해 슬라이딩하면서 확장된다. 이때, 푸쉬링(50)과 정착헤드(40)의 제3,4경사부(51,42)에 의해 정착헤드(40)는 확장되는 방향의 힘을 받게 되고, 다르게 말하면, 제1,2경사부(31,22)와 제3,4경사부(51,42)는 서로 반대방향이면서 그들 사이의 정착헤드(40)를 향하는 방향이기 때문에 정착헤드(40)의 확장이 자연스럽고 신속하게 이루어질 수 있으며 정착력을 증대할 수 있다. 네일봉(10)이 웨지콘(25)을 통해 푸쉬봉(20)과 견고하게 결속되어 네일봉(10)의 회전시 콘하우징(24) - 푸쉬링(20)이 함께 회전할 수 있다.When the nail bar 10 is advanced, the push rod 20 (or the push ring 50) moves forward together, and thus the fixing blade 40 slides by the first and second inclined portions 31 and 41. do. At this time, the fixing head 40 receives the force in the extending direction by the third and fourth inclined portions 51 and 42 of the push ring 50 and the fixing head 40. In other words, the first and second slopes Since the portions 31 and 22 and the third and fourth inclined portions 51 and 42 are opposite to each other and are directed toward the fixing head 40 therebetween, the expansion of the fixing head 40 can be naturally and quickly made. And can increase anchorage. The nail rod 10 is firmly bound to the push rod 20 through the wedge cone 25 so that the cone housing 24-the push ring 20 may rotate together when the nail rod 10 rotates.

정착날개(40)는 확장되면서 네일공(1) 주변의 지반에 박히게 되어 정착력을 발생한다(도 4참고).As the fixing wing 40 expands, the fixing blade 40 gets stuck in the ground around the nail hole 1 to generate fixing force (see FIG. 4).

한편, 네일링(100)의 시공 이후 지반 침하나 토압 등에 의해 네일링(100)이 지상으로 인발되려는 경우 정착헤드(30)가 지상으로 이동(도면 기준 좌측)하려할 것이며, 이때, 정착날개(30)는 제1,2경사부(31,22)에 의해 더욱 확장되기 때문에 지반의 침하를 막거나 지연시킬 수 있다. On the other hand, if the nailing 100 is to be drawn to the ground by ground subsidence or earth pressure after the construction of the nailing 100, the fixing head 30 will try to move to the ground (left of the drawing reference), in this case, the fixing wing ( 30) is further extended by the first and second inclined portions 31 and 22, thereby preventing or delaying the settlement of the ground.

1 : 네일공, 10 : 네일봉
20 : 푸쉬봉, 21 : 네일봉 연결통
23 : 연결봉, 24 : 콘하우징
25 : 웨지콘, 26 : 탄성부재
30 : 정착헤드, 40 : 정착날개
50 : 푸쉬링,
1: nail ball, 10: nail stick
20: push rod, 21: nail rod connecting tube
23: connecting rod, 24: cone housing
25: wedge cone, 26: elastic member
30: fixing head, 40: fixing wing
50: push ring,

Claims (5)

외주면에 종횡방향으로 마디(11)가 형성된 철근의 네일봉(10)과;
상기 네일봉의 선단부에 연결 고정되며 제1나사부(22)를 갖는 푸쉬봉(20)과;
내주면에 상기 푸쉬봉의 제1나사부에 나사 체결되는 제2나사부(32)가 형성되며 외주면에 제1경사부(31)가 형성되고 네일공(1) 안쪽의 지중에 정착되는 정착헤드(30)와;
내주면에 상기 제1경사부에 슬라이딩 가능한 제2경사부(41)가 형성되어 상기 정착헤드의 둘레부에 결합되는 2개 이상의 정착날개(40)를 포함하고,
상기 푸쉬봉은, 원통형의 네일봉 연결통(21), 상기 네일봉 연결통에 고정되며 외주면에 상기 정착헤드의 제2나사부에 나사 체결되는 제1나사부(22)가 형성되는 연결봉(23), 상기 네일봉이 삽입되면서 상기 네일봉 연결통에 나사 체결되며 내주면에 제1웨지경사면(24a)이 형성된 콘하우징(24), 상기 네일봉 연결통과 콘하우징 내부에 삽입되며 외주면에 상기 콘하우징의 제1웨지 경사면에 면접촉되는 제2웨지경사면(25a)이 구비되고 내주면이 요철구조인 철근체결콘(25), 상기 철근체결콘을 상기 콘하우징쪽으로 밀어 상기 네일봉과 상기 푸쉬봉을 고정하는 탄성부재(26)를 포함하는 것을 특징으로 하는 도로 및 단지의 사면 보강 네일링.
Nail bar 10 of the reinforcing bar formed in the longitudinal and transverse direction on the outer circumferential surface;
A push rod 20 connected to and fixed to a distal end of the nail rod and having a first screw portion 22;
The second screw portion 32 is screwed to the first screw portion of the push rod is formed on the inner circumferential surface and the first inclined portion 31 is formed on the outer circumferential surface and the fixing head 30 is fixed to the ground inside the nail hole (1) and ;
A second inclined portion 41 slidable on the first inclined portion on an inner circumferential surface thereof and includes two or more fixing blades 40 coupled to the circumference of the fixing head,
The push rod is a connecting rod 23 having a cylindrical nail rod connecting rod 21, a first screw portion 22 fixed to the nail rod connecting cylinder and screwed to a second screw portion of the fixing head on an outer circumferential surface thereof, The nail rod is inserted into the nail housing connecting the screw rod and the first housing wedge slope (24a) formed on the inner circumferential surface, the first wedge of the cone housing on the outer circumferential surface is inserted into the nail housing and the cone housing The second wedge inclined surface 25a which is in surface contact with the inclined surface and the inner circumferential surface is a reinforcing bar cone 25 having an uneven structure, and an elastic member 26 for pushing the reinforcing bar cone toward the cone housing to fix the nail bar and the push bar. Slope reinforcement nailing of roads and complexes characterized in that it comprises a).
청구항 1에 있어서, 상기 푸쉬봉의 네일봉 연결통과 상기 정착날개의 사이에 개재되며 상기 네일봉과 푸쉬봉의 회전시 상기 정착날개를 상기 정착헤드측으로 미는 푸쉬링(50)이 포함된 것을 특징으로 하는 도로 및 단지의 사면 보강 네일링.The road of claim 1, wherein a push ring 50 is interposed between the nail rod connecting tube of the push rod and the fixing blade and pushes the fixing blade toward the fixing head when the nail rod and the push rod are rotated. Slope reinforcement nailing of the jar. 청구항 2에 있어서, 상기 푸쉬링과 상기 정착헤드의 대향면에는 제3,4경사부가 형성되어 상기 정착헤드가 상기 제3,4경사부(51,42)를 통해 확장되는 것을 특징으로 하는 도로 및 단지의 사면 보강 네일링.3. The road of claim 2, wherein third and fourth inclined portions are formed on opposing surfaces of the push ring and the fixing head so that the fixing head extends through the third and fourth inclined portions 51 and 42. Slope reinforcement nailing of the jar. 청구항 3에 있어서, 상기 콘하우징의 내주면에는 상기 네일봉의 마디를 지지하는 이탈방지턱이 형성되는 것을 특징으로 하는 도로 및 단지의 사면 보강 네일링.The slope reinforcement nailing of roads and complexes according to claim 3, wherein the inner circumferential surface of the cone housing is provided with a release preventing jaw supporting the nodes of the nail bar. 사면에 다수의 네일공을 일정간격으로 천공하는 제1단계;
청구항 1 내지 청구항 4 중 어느 하나에 의한 도로 및 단지의 사면 보강 네일링을 상기 제1단계에서 천공된 네일공에 각각 삽입하여 앵커돌기에 의해 상기 정착헤드를 고정하는 제2단계;
상기 도로 및 단지의 사면 보강 네일링의 네일봉을 회전시켜 상기 정착날개가 상기 정착헤드를 타고 확장되어 지중에 정착되도록 하는 제3단계;를 포함하는 것을 특징으로 하는 도로 및 단지의 사면 보강 네일링을 이용한 사면 보강 공법.
A first step of drilling a plurality of nail holes at a predetermined interval on the slope;
A second step of fixing the fixing head by anchoring projections by inserting the slope reinforcement nailing of the road and the complex according to any one of claims 1 to 4 into the nail holes drilled in the first step, respectively;
And a third step of rotating the nail rods of the slope reinforcing nailing of the road and the complex so that the fixing blades extend on the fixing head and settle in the ground. Slope reinforcement method
KR1020100051100A 2010-05-31 2010-05-31 Soil nailing for reinforce slope and method for reinforce slope using thereof KR100978629B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020100051100A KR100978629B1 (en) 2010-05-31 2010-05-31 Soil nailing for reinforce slope and method for reinforce slope using thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020100051100A KR100978629B1 (en) 2010-05-31 2010-05-31 Soil nailing for reinforce slope and method for reinforce slope using thereof

Publications (1)

Publication Number Publication Date
KR100978629B1 true KR100978629B1 (en) 2010-08-27

Family

ID=42760155

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020100051100A KR100978629B1 (en) 2010-05-31 2010-05-31 Soil nailing for reinforce slope and method for reinforce slope using thereof

Country Status (1)

Country Link
KR (1) KR100978629B1 (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101241404B1 (en) * 2012-06-21 2013-03-11 주식회사 대성방재기술 Compress and tensile rock bolt and method for reinforcing ground using thereof
KR101259902B1 (en) * 2011-03-10 2013-05-02 주식회사 장평건설 A shoe assembly for pile
KR101808171B1 (en) * 2017-02-24 2017-12-12 김성수 Nail Structure with Dual Spreading Structure
KR101808172B1 (en) * 2017-04-21 2017-12-12 김성수 Anchor Structure with Dual Spreading Structure, and Construction Method of the Anchor Structure
KR102430434B1 (en) 2021-09-03 2022-08-08 임월선 Ground reinforcement structure capable of passive and active reinforcement at the same time and its construction method
KR102594915B1 (en) 2023-07-21 2023-10-27 주식회사 지인건설 Rotational tip device of soil nail for installing into slope hole

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH06116953A (en) * 1992-10-06 1994-04-26 Shinjiyou Seisakusho:Yugen Sleeve driving wide-open anchor
JPH10169096A (en) * 1996-12-06 1998-06-23 Kfc Ltd Deformed joint bar anchor and its manufacture
KR20060131461A (en) * 2005-06-16 2006-12-20 이광영 E type reinforcing rod rock volt nut
KR100961284B1 (en) * 2009-09-10 2010-06-03 주식회사 건화 Soil nailing apparatus and constructing method thereof

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH06116953A (en) * 1992-10-06 1994-04-26 Shinjiyou Seisakusho:Yugen Sleeve driving wide-open anchor
JPH10169096A (en) * 1996-12-06 1998-06-23 Kfc Ltd Deformed joint bar anchor and its manufacture
KR20060131461A (en) * 2005-06-16 2006-12-20 이광영 E type reinforcing rod rock volt nut
KR100961284B1 (en) * 2009-09-10 2010-06-03 주식회사 건화 Soil nailing apparatus and constructing method thereof

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101259902B1 (en) * 2011-03-10 2013-05-02 주식회사 장평건설 A shoe assembly for pile
KR101241404B1 (en) * 2012-06-21 2013-03-11 주식회사 대성방재기술 Compress and tensile rock bolt and method for reinforcing ground using thereof
KR101808171B1 (en) * 2017-02-24 2017-12-12 김성수 Nail Structure with Dual Spreading Structure
KR101808172B1 (en) * 2017-04-21 2017-12-12 김성수 Anchor Structure with Dual Spreading Structure, and Construction Method of the Anchor Structure
KR102430434B1 (en) 2021-09-03 2022-08-08 임월선 Ground reinforcement structure capable of passive and active reinforcement at the same time and its construction method
KR102594915B1 (en) 2023-07-21 2023-10-27 주식회사 지인건설 Rotational tip device of soil nail for installing into slope hole

Similar Documents

Publication Publication Date Title
KR100978629B1 (en) Soil nailing for reinforce slope and method for reinforce slope using thereof
KR100820642B1 (en) Anchor-nail device for slope-reinforcement-construction and slope stabilization method
KR100934274B1 (en) Soil nail of a ground pressure type and constructing method thereof
KR100919821B1 (en) Ground enhansing apparatus with anchor rod and method thereof
KR100966148B1 (en) Ground adhering soil nailing structure and ground reinforcement method using the same
KR100720685B1 (en) A soil nail
KR20130095153A (en) A removable prestressing steel pipe soil nailing structure
KR20060100790A (en) The structure of screw anchor for slope reinforcement construction and the method using thereof
KR100908085B1 (en) Ground adhering soil nailing structure and ground reinforcement method using the same
KR101000569B1 (en) Slope reinforcement nailing for road and housing area and method which uses them
KR101241351B1 (en) The nail with high anchorage and the nailing construction method thereof
KR200370652Y1 (en) nailing nut for steel reinforcement
KR20130029906A (en) An expanding device of frictional force
KR100892322B1 (en) A soil-nail structure using bamboo
KR102022906B1 (en) Anchor and construction method thereof
KR101156501B1 (en) Rock bolt for base rock
KR100667183B1 (en) Method of high grouting and that of packer
KR200405546Y1 (en) Non-removable type nail of singel body using method of soil nailing
KR101132809B1 (en) Anchor body and construction method
KR101783439B1 (en) Stability apparatus for ground having prestressed stiffener
KR100612731B1 (en) Removable lock bolt serving as anchor
KR200400216Y1 (en) Method of high grouting using packer
KR200263626Y1 (en) Sturcture NAIL for Constructing SOIL-NAIL
KR200346125Y1 (en) Removable lock bolt serving as anchor
KR100526265B1 (en) Nailing method for removing nail without residual product and it's nail structure

Legal Events

Date Code Title Description
A201 Request for examination
A302 Request for accelerated examination
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20130701

Year of fee payment: 4

FPAY Annual fee payment

Payment date: 20140529

Year of fee payment: 5

FPAY Annual fee payment

Payment date: 20150715

Year of fee payment: 6

FPAY Annual fee payment

Payment date: 20160701

Year of fee payment: 7

FPAY Annual fee payment

Payment date: 20170628

Year of fee payment: 8

FPAY Annual fee payment

Payment date: 20180626

Year of fee payment: 9