KR200263626Y1 - Sturcture NAIL for Constructing SOIL-NAIL - Google Patents

Sturcture NAIL for Constructing SOIL-NAIL Download PDF

Info

Publication number
KR200263626Y1
KR200263626Y1 KR2020010034203U KR20010034203U KR200263626Y1 KR 200263626 Y1 KR200263626 Y1 KR 200263626Y1 KR 2020010034203 U KR2020010034203 U KR 2020010034203U KR 20010034203 U KR20010034203 U KR 20010034203U KR 200263626 Y1 KR200263626 Y1 KR 200263626Y1
Authority
KR
South Korea
Prior art keywords
nail
grease layer
screw
hole
nailing method
Prior art date
Application number
KR2020010034203U
Other languages
Korean (ko)
Inventor
박정식
Original Assignee
박정식
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 박정식 filed Critical 박정식
Priority to KR2020010034203U priority Critical patent/KR200263626Y1/en
Application granted granted Critical
Publication of KR200263626Y1 publication Critical patent/KR200263626Y1/en

Links

Abstract

본 고안은 소일네일링공법용 네일구조에 관한 것으로 소일네일링공법용 네일구조에 있어서, 상기 네일(20)의 외주연에 형성시킨 나사(21)와, 상기 네일(20)의 표면에 형성시킨 그리스층(22)과, 상기 그리스층(22)의 표면에 형성시켜 그리스층(22)을 일정한 두께로 유지시키는 필름(23)과, 상기 네일(20)의 노출되는 단부에 형성시킨 구멍(24)으로 구성하므로 네일을 견고하게 고정시켜 지반의 거동에 적절하게 대응할 수 있을 뿐만 아니라 간편하게 네일을 회전시켜 네일의 외주연에 형성된 나사산과 그라우팅재의 경화로 형성되는 나사홈을 통하여 여기에 위치한 그리스로 원활하게 네일을 제거할 수 있도록 한 것이다.The present invention relates to a nail structure for a soil nailing method in the nail structure for a soil nailing method, the screw 21 formed on the outer periphery of the nail 20, and the surface of the nail 20 formed A grease layer 22, a film 23 formed on the surface of the grease layer 22 to keep the grease layer 22 at a constant thickness, and a hole 24 formed in the exposed end of the nail 20. Since the nail is firmly fixed, it can not only respond to the behavior of the ground properly, but also can be easily rotated by the grease located here through the screw groove formed by the screw thread formed on the outer periphery of the nail and the hardening of the grouting material. The nail can be removed.

Description

소일네일공법용 네일구조{Sturcture NAIL for Constructing SOIL-NAIL}Nail structure for small nail method {Sturcture NAIL for Constructing SOIL-NAIL}

본 고안은 소일네일공법용 네일구조에 관한 것으로, 상세하게는 인접건물 사이에서 터파기 공사 중 굴착면을 자립할 수 있도록 숏크리트로 표면보호면을 시공할 때 네일의 지지력을 극대화시키고 시공 후에 네일을 간편하게 제거할 수 있도록 하는 소일네일링공법용 네일구조에 관한 것이다.The present invention relates to a nail structure for a small nail method, and in detail, to maximize the bearing capacity of the nail when constructing the surface protection surface with shotcrete so that the excavation surface can stand freely during the excavation work between adjacent buildings. It relates to a nail structure for a soil nailing method that can be easily removed.

일반적으로 터파기, 흙막이, 철도 및 도로에 인접한 자연 및 인공사면의 보강, 지하구조물 및 터널 등과 같은 토목 관련 시설물 축조에 필요한 굴착 지보체계, 기존 옹벽의 보수 및 옹벽을 설치하는 공사에 사용되는 소일네일링(soil-nailing method)은 굴토 또는 절토 과정을 통하여 일련의 보강작업이 이루어지는 것으로 비탈면이나 터파기 굴착면을 자립할 수 있는 안정높이로 굴착함과 동시에 숏크리트(shotcrete; 뿜어 붙이기 콘크리트)로 표면보호면을 시공하고 굴착배면을 천공하여 네일(nail)을 삽입하며 이를 그라우팅하여 보강토체를 조성한다.In general, excavation support system required for construction of civil engineering-related facilities such as reinforcement of natural and artificial slopes adjacent to trenches, mudstones, railroads and roads, underground structures and tunnels, repair of existing retaining walls and construction of retaining walls The ring (nail-nailing method) is a series of reinforcement work through the process of excavation or cutting, and excavates to the stable height to independate the slope or trench excavation surface and at the same time protects the surface with shotcrete. Construct the surface and drill the excavation back surface to insert a nail and grout to form reinforcement soil.

즉, 보강철근인 네일을 굴착배면에 좁은 간격으로 삽입하여 전체적인 전단강도를 증대시켜 기존지반을 보강하여 중력식 옹벽처럼 일체로 작용하는 보강토체를 형성한다.In other words, by inserting the reinforcing bar nail into the excavation back at a narrow interval, the overall shear strength is increased to reinforce the existing ground to form a reinforcement soil that acts integrally like a gravity retaining wall.

상기와 같은 소일네일링공법의 시공방법을 살펴보면, 지정된 굴착심도 만큼 굴착하여 원지반이 자립하는지 확인한 후 굴착 즉시 원지반의 이완을 막기 위해 굴착면에 숏크리트를 타설하고, 요구심도까지 천공하여 네일을 삽입하며, 보강 콘크리트로 그라우팅함으로써 원지반과의 부착면을 향상시키도록 한다.Looking at the construction method of the soil nailing method as described above, after excavation by the specified excavation depth to determine whether the ground is self-reliant, in order to prevent loosening of the ground immediately after excavation, shotcrete on the excavation surface, and drilled to the required depth to insert the nail In addition, grouting with reinforced concrete improves the attachment surface with the base.

이때, 반영구적인 벽체를 형성하도록 철근콘크리트를 형성할 수 도 있고, 가시설용으로 이용할 수 있는데 이 경우에는 와이어 메시 및 횡방향 철근을 설치한 후 숏크리트 층과 네일을 고정체로 고정하고 2차 숏크리트 타설하여 벽체를 형성하고 원지반의 부착력을 증대시키기 위하여 2차 그라우팅을 실시하여 시공을 완료한다.In this case, the reinforced concrete can be formed to form a semi-permanent wall, or can be used for a temporary facility. In this case, after installing the wire mesh and the transverse reinforcing bars, the shotcrete layer and the nail are fixed with a fixed body, and the second shotcrete is poured. Secondary grouting is performed to form walls and to increase the adhesion of the base.

여기서 네일과 숏크리트 층을 토사의 압력으로부터 지지하기 위하여 노출된 네일의 일단부에 고정체를 체결한다.The fasteners are fastened to one end of the exposed nail to support the nail and shotcrete layers from the pressure of the soil.

도 1 은 종래의 소일네일링공법에서 네일설치상태를 나타낸 단면도이고, 도 2 는 종래의 소일네일링공법에서 제거식 네일설치상태를 나타낸 단면도이다.1 is a cross-sectional view showing a nail installation state in the conventional soil nailing method, Figure 2 is a cross-sectional view showing a removable nail installation state in the conventional soil nailing method.

도 1 에 나타낸 바와 같이, 종래의 네일(20)은 고강도 보강철근으로 지반(1)의 천공홀(2)에 삽입하고 그라우팅재(70)를 투입한 후 라이너스크류(30)와 플레이트(40) 및 너트(50)로 외부로 노출된 네일(20)의 단부를 고정하였다.As shown in Figure 1, the conventional nail 20 is inserted into the drilled hole 2 of the ground (1) with high-strength reinforcing steel, and after the grouting material 70 is injected into the liner screw 30 and the plate 40 And an end of the nail 20 exposed to the outside with the nut 50.

그러나 이러한 종래의 네일(20)은 네일(20)이 대지경계선을 지나 설치되는 경우 타인의 재산권을 침해하게되므로 공사 후 이를 제거하여야 하나 그라우팅으로 인하여 네일의 제거가 매우 불편하고 까다로울 뿐만 아니라 제거가 거의 불가능한 문제점이 있었다.However, such a conventional nail 20 has to be removed after construction because the nail 20 infringes the property rights of others when the nail 20 is installed through the earth boundary line, but the removal of the nail is very inconvenient and difficult due to grouting and is almost impossible to remove. There was an impossible problem.

도 2 에 나타낸 바와 같이, 상기의 문제점을 해소하기 위하여 천공홀(2)에 가이드관(80)을 삽입한 후 가이드관(80)에 네일(20)을 삽입하고 가이드관(80)의 외부에 그라우팅재(70)를 충진하여 고정시켰다.As shown in FIG. 2, in order to solve the above problem, the guide tube 80 is inserted into the drilling hole 2, and then the nail 20 is inserted into the guide tube 80 and the outside of the guide tube 80. The grouting material 70 was filled and fixed.

그러나, 이러한 종래의 네일(20)은 견고하게 고정되지 못하고 가이드관(80)에 삽입되어 있으므로 토압이나 수압으로 인한 지반의 거동에 적절하게 대응하지 못할 뿐만 아니라 이로 인하여 안전사고의 우려가 높은 문제점이 있었다.However, since the conventional nail 20 is not firmly fixed and is inserted into the guide tube 80, the nail 20 may not properly respond to the ground behavior due to earth pressure or water pressure, and therefore, a high risk of safety accident is caused. there was.

따라서, 본 고안의 주 목적은 소일네일링공법에서 네일을 마찰저항력을 극대화시켜 견고하게 고정시켜 지반의 거동에 적절하게 대응할 수 있도록 하는 하는데 있다.Therefore, the main purpose of the present invention is to maximize the frictional resistance of the nail in the soil nailing method to securely firmly to respond to the behavior of the ground.

본 고안의 다른 목적은 설치된 네일을 필요에 따라 간편하게 제거할 수 있도록 하여 타인의 재산권을 침해하지 않도록 하는 데 있다.Another object of the present invention is to make it easy to remove the installed nail as needed so as not to infringe the property rights of others.

본 고안의 다른 목적은 네일을 제거하므로 인하여 이를 재생 재 사용할 수 있도록 하는 데 있다.Another object of the present invention is to remove the nail so that it can be reused.

도 1 은 종래의 소일네일링공법에서 네일설치상태를 나타낸 단면도.1 is a cross-sectional view showing a nail installation state in the conventional soil nailing method.

도 2 는 종래의 소일네일링공법에서 제거식 네일설치상태를 나타낸 단면도.Figure 2 is a cross-sectional view showing a removable nail installation state in the conventional soil nailing method.

도 3 은 본 고안에 따른 소일네일공법에서 사용되는 나선형 네일구조를 나타낸 사시도.Figure 3 is a perspective view showing a spiral nail structure used in the small nail method according to the present invention.

도 4 는 본 고안에 따른 나선형 네일을 설치한 소일네일링공법에서의 제거식 네일설치상태를 나타낸 단면도.Figure 4 is a cross-sectional view showing a removable nail installation state in the small nailing method installed spiral nail according to the present invention.

*도면의 주요부분에 대한 부호의 설명** Description of the symbols for the main parts of the drawings *

1; 지반 2; 천공홀One; Ground 2; Drill hole

10; 숏크리트 20; 네일10; Shotcrete 20; Nail

21; 나사 22; 그리스층21; Screw 22; Grease layer

23; 필름 24; 구멍23; Film 24; hole

30; 라이너스크류 40; 플레이트30; Liner screw 40; plate

41; 구멍 42; 돌출부41; Hole 42; projection part

50; 너트 51; 반구부50; Nut 51; Hemisphere

60; 간격유지구 61; 지지편60; Spacing 61; Support

62; 밴드 70; 그라우팅재62; Band 70; Grouting material

위와 같은 목적을 달성하기 위하여 본 고안의 소일네일공법용 네일구조는 네일의 외주연에 형성시킨 나사와, 상기 네일의 표면에 형성시킨 그리스층과, 상기 그리스층을 일정한 두께로 유지시키는 필름으로 구성함을 그 기술적 구성상의 기본 특징으로 한다.In order to achieve the above object, the nail structure for nail method of the present invention comprises a screw formed on the outer circumference of the nail, a grease layer formed on the surface of the nail, and a film for maintaining the grease layer at a constant thickness. The basic features of the technical construction.

위와 같이 구성된 본 고안의 바람직한 실시 예를 첨부된 도면을 참조하면서 상세히 설명하면 다음과 같다.When described in detail with reference to the accompanying drawings a preferred embodiment of the present invention configured as described above are as follows.

도 3 은 본 고안에 따른 소일네일공법에서 사용되는 나선형 네일구조를 나타낸 사시도이고, 도 4 는 본 고안에 따른 나선형 네일을 설치한 소일네일링공법에서의 제거식 네일설치상태를 나타낸 단면도이다.Figure 3 is a perspective view showing a spiral nail structure used in the small nail method according to the present invention, Figure 4 is a cross-sectional view showing a removable nail installation state in the small nailing method installed spiral nail according to the present invention.

도 3 과 도 4 에 나타낸 바와 같이, 본 고안의 소일네일링공법용 네일구조는 네일(20)의 외주연에 형성시킨 나사(21)와, 상기 네일(20)의 표면에 형성시킨 그리스층(22)과, 상기 그리스층(22)을 일정한 두께로 유지시키는 필름(23)과, 상기 네일(20)의 노출되는 단부에 형성시킨 구멍(24)으로 구성한다.3 and 4, the nail structure for the soil nailing method of the present invention is a screw 21 formed on the outer periphery of the nail 20, and a grease layer formed on the surface of the nail 20 ( 22), a film 23 for maintaining the grease layer 22 at a constant thickness, and a hole 24 formed in the exposed end of the nail 20.

여기서 네일(20)은 고강도 철근으로 제조됨이 바람직하다.Here, the nail 20 is preferably made of high strength rebar.

나아가, 네일(20)은 지반(1)의 천공홀(2)에 삽입한 후 외부에 노출되는 부분에 구멍(24)을 형성하여 네일(20)을 제거할 때 구멍(24)을 이용하여 손쉽게 네일(20)을 회전시켜 제거할 수 있도록 함이 바람직하다.Furthermore, the nail 20 is inserted into the boring hole 2 of the ground 1, and then forms a hole 24 in a portion exposed to the outside to easily remove the nail 20 by using the hole 24. Preferably, the nail 20 can be rotated and removed.

상기 그리스층(22)은 나사(21)가 형성된 네일의 전체 표면에 묻어있는 정도만으로도 만족하다.The grease layer 22 is satisfied only to the extent that it is buried on the entire surface of the nail on which the screw 21 is formed.

상기 필름(23)은 네일(20) 철근을 감싸는 원통으로 형성하여 네일(20)에 끼워 사용함이 바람직하나 테이핑하여 형성할 수 도 있다.The film 23 is preferably formed in a cylinder to wrap the reinforcing nail (20) to be used in the nail 20, but may be formed by taping.

한편, 네일(20)의 노출부분에는 구멍(24)을 형성하여 여기에 바 등을 끼워 네일(20)을 손쉽게 돌릴 수 있도록 한다.On the other hand, the exposed portion of the nail 20 to form a hole 24 so that it is easy to turn the nail 20 by inserting a bar or the like.

이러한 본 고안의 작용을 설명하면 다음과 같다.Referring to the operation of the present invention is as follows.

먼저, 지정된 굴착심도 만큼 굴착하여 원지반이 자립하는지 확인한 후 굴착 즉시 원지반의 이완을 막기 위해 굴착면에 숏크리트(10)를 타설한 다음 요구심도까지 지반(1)을 천공하여 천공홀(2)을 형성시킨다.First, excavate by the designated excavation depth and check whether the ground is self-supporting, and in order to prevent loosening of the ground immediately after excavation, place shotcrete 10 on the excavation surface, and then drill the ground (1) to the required depth to form the perforation hole (2). Let's do it.

이렇게 형성된 천공홀(2)에 네일(20)을 삽입하고, 시멘트 밀크로 그라우팅한다.The nail 20 is inserted into the drill hole 2 thus formed and grouted with cement milk.

이러한 상태에서 천공홀(2)에 삽입되어 고정된 네일(20)의 외부 노출부분에 플레이트(40)를 끼운 다음 네일(20)에 너트(50)를 결합하여 네일(20)을 견고하게 지지하도록 한다.In this state, the plate 40 is inserted into the external exposed portion of the nail 20 fixed and inserted into the drilling hole 2, and then the nut 50 is coupled to the nail 20 to firmly support the nail 20. do.

너트(50)를 결합할 때 라이너스크류(30)를 이용하여 네일(20)에 결합시킬 수 도 있다.When the nut 50 is coupled, it may be coupled to the nail 20 using the liner screw 30.

한편, 네일(20)은 외주연에 형성된 나사(21)에 의하여 나사식의 그라우팅재(70)와 결합되므로 마찰저항력이 극대화되어 견고하게 결합상태를 유지하게 된다.On the other hand, since the nail 20 is coupled to the threaded grouting material 70 by the screw 21 formed on the outer periphery, the frictional resistance is maximized to maintain a firmly coupled state.

이렇게 견고하게 고정된 네일(20)은 공사 완료 또는 일정 공정이 진행 후 대지경계선 등을 침범하여 타인의 재산권 침해 등이 우려 될 때 네일(20)에 형성된 구멍(24)에 바 등을 끼워 네일(20)을 회전시킨다.The nail 20 firmly fixed in this way is inserted into the hole 24 formed in the nail 20 when the construction is completed or a certain process is infringed on the land boundary line and the like, thereby causing an infringement of property rights of others. Rotate 20).

이때 경화된 그라우팅재(70)는 네일(20)의 나사(21)에 의하여 암나사가 형성되어 있게 되고 따라서 네일(20)이 손쉽게 회전할 수 있게 되므로 제거작업이 용이하다.At this time, the hardened grouting material 70 has a female thread formed by the screw 21 of the nail 20, and thus the nail 20 can be easily rotated so that the removal operation is easy.

나아가 그라우팅재(70)의 암나사와 네일(20)의 나사(21) 사이에 그리스층(22) 형성되어 더욱 더 원활하게 회전되므로 네일(20)을 손쉽게 회전시켜 제거할 수 있다.Furthermore, since the grease layer 22 is formed between the female screw of the grouting material 70 and the screw 21 of the nail 20, the grease layer 22 is rotated even more smoothly, so that the nail 20 can be easily rotated and removed.

더불어 네일(20)이 천공홀(2)에 삽입된 상태에서 지반(1)이 토압이나 수압 등으로 거동하더라도 나사(21)에 의하여 결합되어 있어 마찰저항력이 극대화되고 이로 인하여 종래의 고정식과 같이 견고하게 굴착면을 지지하게 된다.In addition, even when the ground (1) behaves by earth pressure or hydraulic pressure in the state in which the nail 20 is inserted into the drilling hole (2), the frictional resistance is maximized because of the combination of screws (21). Support the excavation surface.

한편 네일(20)의 제거가 완료되면 네일(20)의 제거로 생성되는 구멍에 그라우팅재(70)를 충진함이 바람직하다.Meanwhile, when the removal of the nail 20 is completed, it is preferable to fill the grouting material 70 in the hole created by the removal of the nail 20.

이상에서 살펴본 바와 같이, 본 고안의 소일네일링공법용 네일구조는 소일네일링공법용 네일구조에 있어서, 상기 네일(20)의 외주연에 형성시킨 나사(21)와, 상기 네일(20)의 표면에 형성시킨 그리스층(22)과, 상기 그리스층(22)의 표면에 형성시켜 그리스층(22)을 일정한 두께로 유지시키는 필름(23)과, 상기 네일(20)의 노출되는 단부에 형성시킨 구멍(24)으로 구성하므로 네일을 견고하게 고정시켜 지반의 거동에 적절하게 대응할 수 있을 뿐만 아니라 간편하게 네일을 회전시켜 네일의 외주연에 형성된 나사산과 그라우팅재의 경화로 형성되는 나사홈을 통하여 여기에 위치한 그리스로 원활하게 네일을 제거할 수 있는 효과가 있다.As described above, the nail structure for the nailing method of the present invention is a nail structure for the nailing method, the screw 21 formed on the outer periphery of the nail 20 and the nail 20 A grease layer 22 formed on the surface, a film 23 formed on the surface of the grease layer 22 to maintain the grease layer 22 at a constant thickness, and an exposed end portion of the nail 20. It is composed of the holes 24, so that the nail is firmly fixed to cope with the behavior of the ground, and the screw is formed by hardening the thread and grouting material formed on the outer periphery of the nail by simply rotating the nail. With grease in place, you can remove nails smoothly.

Claims (1)

소일네일링공법용 네일구조에 있어서,In the nail structure for the soil nailing method, 상기 네일(20)의 외주연에 형성시킨 나사(21)와,A screw 21 formed on an outer circumference of the nail 20, 상기 네일(20)의 표면에 형성시킨 그리스층(22)과,A grease layer 22 formed on the surface of the nail 20, 상기 그리스층(22)의 표면에 형성시켜 그리스층(22)을 일정한 두께로 유지시키는 필름(23)과,A film 23 formed on the surface of the grease layer 22 to maintain the grease layer 22 at a constant thickness; 상기 네일(20)의 노출되는 단부에 형성시킨 구멍(24)으로 구성한 것을 특징으로 하는 소일네일링공법용 네일구조.Soil nailing method nail structure, characterized in that consisting of a hole 24 formed in the exposed end of the nail (20).
KR2020010034203U 2001-11-08 2001-11-08 Sturcture NAIL for Constructing SOIL-NAIL KR200263626Y1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR2020010034203U KR200263626Y1 (en) 2001-11-08 2001-11-08 Sturcture NAIL for Constructing SOIL-NAIL

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR2020010034203U KR200263626Y1 (en) 2001-11-08 2001-11-08 Sturcture NAIL for Constructing SOIL-NAIL

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
KR1020010032742A Division KR20020094172A (en) 2001-06-12 2001-06-12 Sturcture NAIL for Constructing SOIL-NAIL

Publications (1)

Publication Number Publication Date
KR200263626Y1 true KR200263626Y1 (en) 2002-02-09

Family

ID=73111786

Family Applications (1)

Application Number Title Priority Date Filing Date
KR2020010034203U KR200263626Y1 (en) 2001-11-08 2001-11-08 Sturcture NAIL for Constructing SOIL-NAIL

Country Status (1)

Country Link
KR (1) KR200263626Y1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100482977B1 (en) * 2002-10-28 2005-04-15 주식회사 아키덤엔지니어링건축사사무소 Removable Soil-Nail Using Screw Type Rebar and Manufacturing Method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100482977B1 (en) * 2002-10-28 2005-04-15 주식회사 아키덤엔지니어링건축사사무소 Removable Soil-Nail Using Screw Type Rebar and Manufacturing Method

Similar Documents

Publication Publication Date Title
KR100740200B1 (en) Tunnelling method using pre-support concept and an adjustable apparatus thereof
US6939084B2 (en) Soil nailing system
KR100820642B1 (en) Anchor-nail device for slope-reinforcement-construction and slope stabilization method
KR101696916B1 (en) Construction method of permanent wall with retaining wall combined PHC pile and steel pipe
KR100966148B1 (en) Ground adhering soil nailing structure and ground reinforcement method using the same
KR200426634Y1 (en) Structure of Permanent Anchor
KR101191289B1 (en) The method of a dual helical pile according to the subsidence for decreasing negative friction
KR100978629B1 (en) Soil nailing for reinforce slope and method for reinforce slope using thereof
KR20140013497A (en) Method for constructing block type reinforced retaining wall in cut site
KR100697003B1 (en) Removable Pre-Tension Soil nail Fixing Head
KR100697001B1 (en) Multi-Protector System
KR20030028518A (en) apparatus and method for retaining wall using ground anchor
WO2005064088A1 (en) Round rod-type and bundle-type soil nails
KR200263626Y1 (en) Sturcture NAIL for Constructing SOIL-NAIL
JP2000220142A (en) Nailing device
KR101000569B1 (en) Slope reinforcement nailing for road and housing area and method which uses them
KR100795849B1 (en) Nature stone engineering method use self drilling nail
KR20180006791A (en) Construction method of enlarged bulb type prefabricated pile
JP4485006B2 (en) Construction method for underground structures
KR100862387B1 (en) Tensional kit for top-down constructing of acupressure lasting anchor and top-down constructing method of acupressure lasting anchor using this
KR200308379Y1 (en) Dismemberment removal type nail composition
KR20020094172A (en) Sturcture NAIL for Constructing SOIL-NAIL
KR100667183B1 (en) Method of high grouting and that of packer
KR100992597B1 (en) The support material for a tunnel and tunnel support
KR100266391B1 (en) Nail removal type nailling method in digging work

Legal Events

Date Code Title Description
U107 Dual application of utility model
REGI Registration of establishment
T201 Request for technology evaluation of utility model
T701 Written decision to grant on technology evaluation
G701 Publication of correction
J204 Request for invalidation trial [patent]
J301 Trial decision

Free format text: TRIAL DECISION FOR INVALIDATION REQUESTED 20090818

Effective date: 20100727

EXTG Extinguishment