KR100971147B1 - Reinforce unit for grouting and soil nailing reinforce method using the same - Google Patents

Reinforce unit for grouting and soil nailing reinforce method using the same Download PDF

Info

Publication number
KR100971147B1
KR100971147B1 KR1020090092835A KR20090092835A KR100971147B1 KR 100971147 B1 KR100971147 B1 KR 100971147B1 KR 1020090092835 A KR1020090092835 A KR 1020090092835A KR 20090092835 A KR20090092835 A KR 20090092835A KR 100971147 B1 KR100971147 B1 KR 100971147B1
Authority
KR
South Korea
Prior art keywords
grouting
corrugated pipe
hole
reinforcing member
unit
Prior art date
Application number
KR1020090092835A
Other languages
Korean (ko)
Inventor
원명수
Original Assignee
원명수
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 원명수 filed Critical 원명수
Priority to KR1020090092835A priority Critical patent/KR100971147B1/en
Application granted granted Critical
Publication of KR100971147B1 publication Critical patent/KR100971147B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D3/00Improving or preserving soil or rock, e.g. preserving permafrost soil
    • E02D3/12Consolidating by placing solidifying or pore-filling substances in the soil
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/74Means for anchoring structural elements or bulkheads
    • E02D5/80Ground anchors
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2250/00Production methods
    • E02D2250/003Injection of material

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Agronomy & Crop Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Soil Sciences (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

PURPOSE: A grouting reinforcement unit and a soil nailing reinforcement method using the same are provided to improve ground reinforcement by securely attaching a grouting enforcement unit inside a perforated hole. CONSTITUTION: A grouting reinforcement unit(100) comprises a reinforcing member(110), a corrugated pipe(120), and an anchor member(130). The reinforcing member is inserted into the perforated hole formed on the ground. The corrugated pipe is formed to surround the outside of the reinforcing member. A through hole is formed in the corrugated pipe. The anchor member is inserted into the inside of the corrugated pipe. The reinforcing member passes through the anchor member.

Description

그라우팅 보강유닛 및 이를 이용한 쏘일 네일링 보강방법{Reinforce Unit For Grouting And Soil Nailing Reinforce Method Using The Same}Reinforce Unit For Grouting And Soil Nailing Reinforce Method Using The Same}

본 발명은 그라우팅 공법과 관련된 것으로서, 보다 상세하게는 지반보강을 위한 천공홀 내측에 균일하면서도 견고하게 밀착된 구조를 이루도록 하여 구조적 보강성을 향상시킨 그라우팅 보강유닛 및 이를 이용한 쏘일 네일링 보강방법에 관한 것이다.The present invention relates to a grouting method, and more particularly, to a grouting reinforcing unit which improves structural reinforcement by forming a structure that is uniformly and firmly adhered to the inside of a drilling hole for ground reinforcement, and a soil nailing reinforcement method using the same. will be.

일반적으로, 그라우팅(grouting)이라 함은 토목공사에서 누수방지나 토질안정 등의 목적으로 지반 내부에 시멘트 등과 같은 소정의 그라우팅재를 주입하여 지반을 안정화시키는 것을 말한다.In general, grouting refers to stabilizing the ground by injecting a predetermined grouting material such as cement into the ground for the purpose of preventing leakage or stabilizing soil in civil works.

산업화의 발달에 따라 도로의 건설이나 단지 조성 등의 목적으로 급경사지의 개발이나 터널의 굴착 등의 개발이 불가피한 실정인데, 이를 위해서는 시공의 안정성 및 경제성, 환경보전성 등을 충족시키기 위한 안정화 대책이 요구되고 있다.With the development of industrialization, the development of steep slopes and excavation of tunnels is inevitable for the purpose of road construction or complex construction, which requires stabilization measures to satisfy construction stability, economic feasibility and environmental conservation. have.

이를 위해, 사면 경사지 등이나 터널의 상측 등에는 강봉을 이용하여 보강을 행하는 그라우팅 공법이 널리 이용되고 있는데, 상기 그라우팅 공법은 경사면 등이나 터널의 상측 지반 부위에 다수개의 천공홀을 천공한 후, 그 내부에 강봉을 삽입 하고, 상기 천공홀에 그라우팅재를 주입하여 상기 천공홀 및 강봉 사이의 공간부에서 주입된 그라우팅재가 경화되면서 주변지반을 보강하도록 하게 된다.To this end, a grouting method for reinforcing using a steel bar is widely used on slopes or the upper side of a tunnel, and the grouting method is used after drilling a plurality of perforation holes in a slope or the upper ground of a tunnel. The steel rod is inserted into the inside, and the grouting material is injected into the boring hole to harden the grouting material injected from the space between the boring hole and the steel bar to reinforce the surrounding ground.

즉, 상기 그라우팅 공법은 천공홀 주변의 빈 공간에 그라우팅재가 얼마나 견고하고 균일하게 투입되느냐에 따라 그 보강성능의 효율성이 결정되는 것이다.That is, in the grouting method, the efficiency of the reinforcing performance is determined according to how firmly and uniformly the grouting material is injected into the empty space around the hole.

이에, 그라우팅 공법의 효율성을 높이기 위하여 다양한 구조의 강봉이 개발되어 보강작업 시에 사용되고 있다.Therefore, in order to increase the efficiency of the grouting method, steel rods of various structures have been developed and used in reinforcement work.

도 1 및 도 2는 종래 일반적인 그라우팅 공법을 나타낸 도면이며, 특히 경사면에 그라우팅 공법이 적용되는 것을 나타내 것이다.1 and 2 is a view showing a conventional general grouting method, in particular will show that the grouting method is applied to the inclined surface.

먼저, 도 1에 도시된 바와 같이, 경사면의 지반 보강을 위하여 지반 상측으로부터 다수개의 천공홀(1)을 천공한 후, 상기 천공홀(1) 각각에 강봉(2)을 삽입한다.First, as shown in FIG. 1, after drilling a plurality of drilling holes (1) from the upper side of the ground for reinforcing the ground of the inclined surface, the steel bar (2) is inserted into each of the drilling holes (1).

그리고, 도 2에 도시된 것처럼, 상기 천공홀(1)과 강봉(2) 사이의 공간부에 파이프(8) 등을 통하여 그라우팅재를 충진시키고 경화시킴으로써 지반을 보강하게 된다.As shown in FIG. 2, the ground is reinforced by filling and curing the grouting material through the pipe 8 or the like in the space between the drilling hole 1 and the steel bar 2.

이때, 소정 압력으로 그라우팅재를 주입하는 가압 그라우팅을 하는 경우에는 상기 천공홀(1) 주위의 미세한 틈(5)까지 그라우팅재가 삽입된 후 경화되어 보다 안정적인 지반보강이 가능하여 지게 된다.At this time, in the case of pressurized grouting to inject the grouting material at a predetermined pressure, the grouting material is inserted to the fine gap 5 around the perforation hole 1 and then hardened to allow more stable ground reinforcement.

또한, 경우에 따라서는, 상기 강봉에 인장력을 가한 후에 그라우팅함으로써 그라우팅이 경화작업까지 완전히 완료된 경우 지반에 상하로 압축력이 작용하도록 하여 보다 강화된 보강작업도 한다.In addition, in some cases, by applying a tensile force to the steel bar and grouting, when the grouting is completely completed until the hardening operation, the compressive force acts up and down on the ground to further strengthen the reinforcement work.

그런데, 상기 종래 그라우팅 공법의 경우에는, 강봉 중의 일부가 수분 등에 접촉하여 녹이 슬거나 심한 경우 끊어지는 경우도 발생하는 등 구조적 취약점이 있었다.By the way, in the conventional grouting method, there was a structural weakness such that some of the steel rods contacted with moisture or the like, and rusted or severely broken.

또한, 천공홀 내측 일부 구간에 암석이나 자갈 등이 존재하는 경우에는 그라우팅재가 암석이나 자갈이 존재한 부근 주위에는 일부 삽입되지 못하는 경우도 있었으며 결과적으로 그라우팅 작업이 완료된 후에 그 부분의 보강작업이 부실해진다는 문제점도 있었다.In addition, when rock or gravel is present in a portion of the inner side of the drilled hole, the grouting material may not be partially inserted around the vicinity of the rock or gravel, and consequently, the reinforcing work of the part becomes poor after the grouting is completed. There was also a problem.

나아가, 그라우팅재 자체도 일정 시간이 지난 후에는 소정의 수축률 등이 발생하여 강봉과 천공홀 내측 사이에 벌어지는 부분이 발생하는 문제점도 있었다.Furthermore, the grouting material itself also has a problem that a predetermined shrinkage occurs after a certain time, and a portion that occurs between the steel bar and the inside of the drilled hole occurs.

본 발명은 상술한 종래의 문제점 및 제결점을 해결하기 위하여 안출된 것으로서, 본 발명의 목적은 다음과 같다.The present invention has been made to solve the above-mentioned problems and disadvantages, the object of the present invention is as follows.

첫째, 그라우팅 보강유닛이 천공홀 내측에 보다 견고하게 밀착되도록 함으로써 전체적인 지반 보강이 보다 견고히 형성되도록 하는데 그 목적이 있다.First, the grouting reinforcing unit is to be more tightly adhered to the inside of the drilling hole is to make the overall ground reinforcement is formed more firmly.

둘째, 천공홀 내측에 자갈이나 암석 등의 장애물로 인하여 일부 구간에 그라우팅재의 주입이 이루어지지 못하는 문제점을 극복하는데 그 목적이 있다.Second, the purpose of overcoming the problem that the injection of grouting material is not made in some sections due to obstacles such as gravel or rock in the inner hole.

셋째, 그라우팅재의 주입 후에 일정 시간이 지난 후 그라우팅재의 일부 소실문제 및 수축률로 인한 천공홀 내측과의 밀착상태 불량 등의 문제점을 극복하는데 그 목적이 있다.Third, the purpose of the present invention is to overcome problems such as some loss of the grouting material and a poor contact state with the inside of the hole due to the shrinkage rate after a certain time after the injection of the grouting material.

넷째, 수분 등에 강봉이 닿아 녹이 스는 경우를 방지하는데 그 목적이 있다.Fourth, the purpose is to prevent the rust from contact with the steel bar moisture.

상기한 목적을 달성하기 위하여, 본 발명은 지반에 형성시킨 천공홀을 이용 그라우팅 작업을 하기 위한 보강유닛에 있어서, 상기 천공홀에 삽입되는 보강부재와 상기 보강부재의 외부를 둘러 감싸는 형태로 상기 천공홀에 삽입되며 내/외부가 관통되도록 형성된 관통홀이 구비되는 주름관과 상기 보강부재가 관통되며 상기 천공홀의 입구부에 설치되는 고정블록과 중앙으로부터 외측으로 외력을 가하는 경우 외측으로 휘어지도록 상기 보강부재의 일단부에 형성되는 복수 개의 절편부재 및 상기 복수 개의 절편부재 사이에 삽입되어 상기 보강부재가 상기 고정블록에 고정된 상태를 유지하도록 하는 고정편을 포함하여 구성되는 그라우팅 보강유닛을 제공한다.In order to achieve the above object, the present invention is a reinforcing unit for grouting work using a drilling hole formed in the ground, the perforation in the form of surrounding the outside of the reinforcing member and the reinforcing member inserted into the drilling hole A corrugated pipe inserted into the hole and having a through hole formed to penetrate the inside / outside and the reinforcing member penetrates and is fixed to the inlet of the drilling hole and is bent outward when external force is applied from the center to the outside. It provides a grouting reinforcement unit comprising a plurality of pieces formed in one end portion and the fixing piece is inserted between the plurality of pieces to maintain the reinforcing member fixed to the fixing block.

여기서, 상기 주름관에 삽입되며 상기 보강부재가 상기 주름관 내측의 정중앙에 위치되도록 하는 앵커부재를 더 포함하여 구성될 수 있다.Here, it may be configured to further include an anchor member which is inserted into the corrugated pipe so that the reinforcing member is located in the center of the inner corrugated pipe.

그리고, 상기 주름관 외측에 구비되어 상기 주름관의 외측에서 내측으로 가압 시에는 상기 관통홀을 폐쇄시키고, 상기 주름관의 내측에서 외측으로 가압 시에는 상기 관통홀이 개방되도록 하는 커버부를 더 포함하여 구성될 수 있다.And a cover part provided at an outer side of the corrugated pipe to close the through hole when pressed from the outside of the corrugated pipe, and to open the through hole when pressed from the inner side of the corrugated pipe to the outside. have.

한편, 본 발명은 지반에 천공홀을 천공하는 단계와 상기 천공홀에 상기 그라우팅 보강유닛을 삽입하는 단계와 상기 그라우팅 보강유닛의 주름관 외측으로 상기 천공홀에 그라우팅재를 주입하는 단계 및 상기 그라우팅 보강유닛의 주름관 내측으로 그라우팅재를 주입함으로써 상기 주름관 외측으로 그라우팅재를 주입 시 완전히 보강되지 못하였던 상기 주름관과 천공홀 사이가 보조적으로 충진되도록 그라우팅재를 주입하는 단계를 포함하여 이루어진 그라우팅 보강유닛을 이용한 쏘일 네일링 보강방법을 제공한다.On the other hand, the present invention comprises the steps of drilling a hole in the ground and the step of inserting the grouting reinforcing unit into the drilling hole and the step of injecting the grouting material into the hole in the perforated hole of the grouting reinforcing unit and the grouting reinforcing unit Soil using a grouting reinforcing unit comprising the step of injecting the grouting material so as to supplement the filling between the corrugated pipe and the perforation hole that was not fully reinforced when injecting the grouting material into the inner side of the corrugated pipe of the Provide nailing reinforcement method.

삭제delete

삭제delete

삭제delete

상기와 같이 구성된 본 발명 그라우팅 보강유닛 및 이를 이용한 그라우팅 보강방법의 효과에 대하여 설명하면 다음과 같다.Referring to the effects of the present invention grouting reinforcing unit configured as described above and the grouting reinforcement method using the same as follows.

첫째, 본 발명에 의하면 주름관을 사용함으로써 그라우팅재의 최종 응고 후 에 주름관과 천공홀 내벽 사이의 마찰력 증대를 통한 밀착력 향상을 가져올 수 있으며 수분 등으로부터 녹이 스는 것을 방지하는 효과가 있다.First, according to the present invention by using a corrugated pipe can be improved after the final solidification of the grouting material by the friction between the corrugated pipe and the inner wall of the drilled hole to increase the adhesion and prevent rust from moisture.

둘째, 주름관에 다수개의 관통홀을 구비하여 주름관의 외측으로 먼저 그라우팅재를 충진한 후, 주름관의 내측 충진 시 주름관의 외부 충진이 안된 부분은 물론 보조적 충진이 동시에 진행되도록 함으로써 전체적으로 보다 강화된 그라우팅재의 보강작업을 할 수 있게 되는 효과가 있다.Second, after filling the grouting material to the outside of the corrugated pipe with a plurality of through-holes in the corrugated pipe, the outer filling of the corrugated pipe as well as the auxiliary filling proceeds at the same time when the inner filling of the corrugated pipe is further strengthened as a whole. Reinforcement work is effective.

셋째, 보강부재의 일단 측이 탄성에 의하여 외측으로 벌어짐이 가능한 구조를 갖추도록 함으로써 보강부재의 고정 시 상기 보강부재의 일단 측을 이용 고정과 동시에 프리스트레스를 줄 수 있게 되는 효과가 있다.Third, the one end side of the reinforcing member having a structure that can be opened to the outside by elasticity has the effect of being able to give the pre-stress at the same time using the one end side of the reinforcing member when fixing the reinforcing member.

넷째, 자갈이나 암석 등이 주로 분포하는 지역 또는 수분이 포함된 지역만 주름관을 사용하여 상술한 효과와 동시에 시공상의 간편함 및 경제적 효과도 가져올 수 있다.Fourth, only the area where the gravel or rock, etc. are mainly distributed or the area containing water can be used to bring simplicity and economical effect at the same time as the above-described effect using the corrugated pipe.

이하 첨부된 도면들을 참조하여 본 발명의 바람직한 실시예들을 상세하게 설명하지만, 본 발명이 실시예들에 의해 제한되거나 한정되는 것은 아니다. 참고로, 이하 설명에서는 구성 및 기능이 거의 동일하여 동일하게 취급될 수 있는 요소는 동일한 참조번호로 특정될 수 있다.DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS Reference will now be made in detail to embodiments of the present invention, examples of which are illustrated in the accompanying drawings, wherein like reference numerals refer to the like elements throughout. Note that, in the following description, components that are substantially the same in structure and function and can be handled identically can be identified by the same reference numerals.

이하, 첨부된 도면을 참조하여 본 발명의 바람직한 일 실시예에 따른 구조를 설명하면 다음과 같다.Hereinafter, with reference to the accompanying drawings illustrating a structure according to a preferred embodiment of the present invention.

도 3은 본 발명의 일 실시예에 따른 그라우팅 보강유닛을 나타낸 단면도이 다.Figure 3 is a cross-sectional view showing a grouting reinforcement unit according to an embodiment of the present invention.

도시된 것처럼, 본 발명의 일 실시예에 따른 그라우팅 보강유닛(100)은 보강부재(110)와 주름관(120)을 포함하여 구성된다.As shown, the grouting reinforcing unit 100 according to an embodiment of the present invention is configured to include a reinforcing member 110 and the corrugated pipe (120).

상기 보강부재(110)는 소정의 길이를 가지는 철질 강봉 형태로 형성되며, 길이방향을 따라서 상기 천공홀(H)에 삽입된다.The reinforcing member 110 is formed in the form of an iron steel bar having a predetermined length, and is inserted into the drilling hole (H) along the longitudinal direction.

이때, 상기 보강부재(110)가 상기 천공홀(H)에 설치된 후에 외부로 노출되는 일측 끝단에는 중앙을 중심으로 길이방향을 따른 일정 구간에 걸쳐 원주를 따라 외측으로 탄성적으로 휘어짐이 가능한 복수 개의 절편부재(114)가 형성된다.At this time, the reinforcing member 110 is installed in the drilling hole (H) and the one end exposed to the outside a plurality of elastically bent outward along the circumference over a predetermined section along the longitudinal direction around the center The cutting member 114 is formed.

상기 절편부재(114)는 상기 보강부재(110)의 일단 끝단부의 일부 구간을 따라서 절개된 형태로 구성되며, 도시된 바와 같이, 상기 보강부재(110)의 중앙에는 중앙홈(112)이 구비되고, 상기 중앙홈(112)의 외측으로 상기 절편부재(114)가 형성됨이 바람직하다.The cutting member 114 is configured to be cut along a portion of one end portion of the reinforcing member 110, as shown, the center groove 112 is provided in the center of the reinforcing member 110 Preferably, the cutting member 114 is formed to the outside of the central groove 112.

상기 절편부재(114)는 보강부재(110)를 천공홀(H)에 설치 시에 상기 보강부재(110)에 소정의 인장력이 작용되는 상태를 유지하면서, 상기 천공홀(H)의 외부에 고정되도록 하기 위한 것으로서, 이에 대한 설명은 자세한 후술한다.The cutting member 114 is fixed to the outside of the drilling hole (H) while maintaining a state in which a predetermined tensile force is applied to the reinforcing member (110) when the reinforcing member (110) is installed in the drilling hole (H). In order to ensure that the description thereof will be described later in detail.

상기 주름관(120)은 상기 보강부재(110)의 외부를 둘러감싸는 형태로 소정의 길이를 가지고 형성된다. 이때, 상기 주름관(120)은 길이방향을 따라서 주름관(120)의 내/외부가 관통되도록 형성된 관통홀(123)이 복수 개 구비된다.The corrugated pipe 120 is formed to have a predetermined length in a form surrounding the exterior of the reinforcing member 110. At this time, the corrugated pipe 120 is provided with a plurality of through-holes 123 formed to penetrate the inside / outside of the corrugated pipe 120 along the longitudinal direction.

여기서, 첨부된 도 4 내지 도 6에 도시된 것처럼, 상기 관통홀(123)은 상기 주름관(120) 외측에 구비되어 상기 주름관(120)의 외측에서 내측으로 가압 시에는 상기 관통홀(123)이 폐쇄되고, 상기 주름관(120)의 내측에서 외측으로 가압 시에는 상기 관통홀(123)이 개방되도록 하는 커버부(124)를 구비함이 바람직하다.4 to 6, the through hole 123 is provided on the outer side of the corrugated pipe 120 so that the through hole 123 is pressed inward from the outer side of the corrugated pipe 120. Closed, it is preferable to have a cover portion 124 to open the through-hole 123 when pressed from the inner side to the outer side of the corrugated pipe (120).

도시된 것처럼, 상기 커버부(124)는 상기 관통홀(123)보다 더 크게 형성됨과 동시에 상기 커버부(124)의 일측이 상기 주름관(120)에 고정되도록 하여, 내측에서 외측으로 가압 시에는 상기 커버부(124)가 외측으로 폴딩되어 상기 관통홀(123)이 개방되도록 형성됨이 바람직하다.As shown, the cover portion 124 is formed larger than the through-hole 123 and at the same time one side of the cover portion 124 is fixed to the corrugated pipe 120, when pressing from the inside out It is preferable that the cover part 124 is folded outward so that the through hole 123 is opened.

그리고, 본 발명 그라우팅 보강유닛(100)은 상기 주름관(120) 내측에 일정 간격마다 삽입되며, 상기 보강부재(110)가 관통하는 앵커부재(130)가 구비된다.In addition, the present invention grouting reinforcement unit 100 is inserted into the corrugated pipe 120 at predetermined intervals, and the anchor member 130 through which the reinforcing member 110 penetrates is provided.

상기 앵커부재(130)는 원통형의 판상 부재로 구성되며, 중앙에 상기 보강부재(110)가 관통 및 고정되도록 하는 중앙홈(131)이 구비되며, 둘레부를 따라서는 요홈(132)이 형성된다.The anchor member 130 is composed of a cylindrical plate-like member, a central groove 131 is provided in the center so that the reinforcing member 110 penetrates and fixed, the groove 132 is formed along the circumference.

그리고, 상기 주름관(120)의 내부와 외부에는 시멘트 등의 그라우팅재를 주입하기 위한 파이프(181,183)가 설치되는데, 상기 파이프(181,183)는 상기 앵커부재(130)의 요홈(132)에 삽입되어 고정되도록 한다.In addition, pipes 181 and 183 for injecting grouting materials such as cement are installed inside and outside the corrugated pipe 120, and the pipes 181 and 183 are inserted into and fixed to the recesses 132 of the anchor member 130. Be sure to

보다 자세히 설명하면, 상기 주름관(120)의 외측에는 그라우팅재의 주입을 위한 제1파이프(181)와 주입된 그라우팅재가 천공홀(H) 내부에 채워짐을 확인하기 위한 제2파이프(182)가 구비되며, 상기 주름관(120)의 내측으로도 그라우팅재의 주입을 위한 제3파이프(183)와 주입된 그라우팅재가 주름관(120) 내부에 채워짐을 확인하기 위한 제4파이프(184)가 구비된다.In more detail, the outer side of the corrugated pipe 120 is provided with a first pipe 181 for injection of the grouting material and a second pipe 182 for confirming that the injected grouting material is filled in the drilling hole (H). Also, the third pipe 183 for the injection of the grouting material and the fourth pipe 184 for confirming that the injected grouting material is filled in the corrugated pipe 120 are provided inside the corrugated pipe 120.

여기서, 상기 제1파이프(181)와 제2파이프(182)는 상기 주름관(120)의 외측 에 별도의 결합부재(160)에 의하여 고정됨이 바람직하다.Here, the first pipe 181 and the second pipe 182 is preferably fixed to the outer side of the corrugated pipe 120 by a separate coupling member 160.

이때, 상기 결합부재(160)는 소정이 고무재질의 밴드 또는 일반 테이프 형태가 적용될 수 있으며, 차후 상기 제1파이프(181)와 제2파이프(182)가 길이방향을 따라 외력을 가하는 경우 이동하여 상기 각 파이프를 외부로 빼낼 수 있을 정도의 결합력을 지니도록 한다.At this time, the coupling member 160 may be a predetermined rubber band or a general tape form, and the first pipe 181 and the second pipe 182 is moved when the external force is applied along the longitudinal direction Each of the pipes to have a coupling force enough to pull out.

그리고, 상기 제3파이프(183)는 상술한 바와 같이 상기 앵커부재(130)의 요홈(132)이 끼워져 고정되며, 상기 요홈(132) 또한 상기 제3파이프(183)를 길이방향을 따라 외력을 가하는 경우 이동이 가능할 정도의 크기를 가진다.And, as described above, the groove 132 of the anchor member 130 is fitted into and fixed to the third pipe 183, and the groove 132 also exerts external force along the longitudinal direction of the third pipe 183. In this case, it is large enough to be moved.

한편, 상기 주름관(120)의 끝단측에는 상기 주름관(120)을 폐쇄시킬 수 있도록 하는 마개탭(128)이 구비된다.On the other hand, the end side of the corrugated pipe 120 is provided with a stopper tab 128 to close the corrugated pipe 120.

상기 마개탭(128)은 상기 주름관(120)의 끝단부에 나사(129)에 의하여 결합되도록 형성되며, 상기 나사결합된 부위를 덮어 외부의 그라우팅재나 수분 등으로부터 보호하도록 감싸는 커버밴드(127)가 구비됨이 바람직하다.The stopper tab 128 is formed to be coupled to the end of the corrugated pipe 120 by a screw 129, the cover band 127 is wrapped to cover the screwed portion to protect from external grouting material or moisture, etc. It is preferred to be provided.

상기와 같이 구성된 본 발명 그라우팅 보강유닛의 조립과정 및 이를 이용한 그라우팅 작업을 하는 과정을 설명하면 다음과 같다.Referring to the assembly process of the present invention grouting reinforcement unit configured as described above and the process of grouting using the same as follows.

첨부된 도 7은 본 발명 그라우팅 보강유닛을 설치하는 과정을 나타낸 순서도이고, 도 8 내지 도 13은 본 발명의 일 실시예에 따른 그라우팅 보강유닛을 설치하는 과정을 순차적으로 나타낸 도면들이다.7 is a flowchart illustrating a process of installing the grouting reinforcement unit of the present invention, and FIGS. 8 to 13 are views sequentially illustrating a process of installing the grouting reinforcement unit according to an embodiment of the present invention.

먼저, 도 8 및 도 9에 도시된 바와 같이, 지반에 천공홀(H)을 시공하는 단계를 수행한다(S10).First, as shown in FIGS. 8 and 9, a step of constructing a hole H in the ground is performed (S10).

다음으로는, 첨부된 도 10에 도시된 바와 같이, 상기 천공홀(H)에 상기 조립이 완료된 그라우팅 보강유닛(100)을 삽입하는 단계를 거치게 된다(S20).Next, as shown in FIG. 10, the step of inserting the grouting reinforcement unit 100, the assembly is completed in the drilling hole (H) (S20).

즉, 상술한 도 3에 도시된 바와 같이, 상기 보강부재(110)와 앵커부재(130) 및 각각의 파이프(181,182,183,184)를 상기 주름관(120)의 내부와 외부 등에 설치하여 모든 조립을 완료하여 이루어지는 그라우팅 보강유닛을 상기 천공홀(H)에 삽입시키는 것이다.That is, as shown in FIG. 3 described above, the reinforcing member 110 and the anchor member 130 and the respective pipes (181, 182, 183, 184) are installed on the inside and the outside of the corrugated pipe 120 to complete all the assembly The grouting reinforcing unit is inserted into the drilling hole (H).

이때, 상기 그라우팅 보강유닛(100)의 삽입이 완료된 천공홀(H)의 입구에는 작업의 편리를 위하여 레진 또는 급결 그라우팅재를 삽입하여 그라우팅 보강유닛을 임시 고정시키도록 함이 바람직하다(S30).At this time, it is preferable to temporarily fix the grouting reinforcing unit by inserting a resin or a quick grouting material to the entrance of the drilling hole (H) in which the insertion of the grouting reinforcing unit 100 is completed (S30).

그리고 난 후, 상기 제1파이프(181)를 통하여 상기 그라우팅 보강유닛(100)의 주름관(120) 외측으로 상기 천공홀(H)에 그라우팅재를 주입하는 단계를 거친다(S40).Then, the grouting material is injected into the drilling hole H through the first pipe 181 to the outer side of the corrugated pipe 120 of the grouting reinforcement unit 100 (S40).

상기 주름관(120) 외측으로 그라우팅재의 주입은 상기 제2파이프(182)를 통하여 주입된 정도를 확인할 수 있게 되며 이를 도시한 그림은 첨부된 도 11과 같다.The injection of the grouting material to the outside of the corrugated pipe 120 can confirm the degree of injection through the second pipe 182 is shown as shown in FIG.

한편, 상기 주름관(120) 외측으로 그라우팅재의 주입 시에는 상기 천공홀 내측에 일부 자갈이나 암석 등과 같은 장애물이 있는 구간에는 완전하게 그라우팅재가 주입이 되지 못하는 경우가 있다.On the other hand, when the grouting material is injected into the outer side of the corrugated pipe 120, the grouting material may not be completely injected in a section where obstacles such as some gravel or rock are present inside the drilling hole.

또한, 그라우팅재를 완전히 주입한 경우에도 시간이 지남에 따라서는 주입된 그라우팅재가 굳음에 따라 발생하는 수축 등이나 천공홀 주위의 틈으로 그라우팅재 가 일부 유출되어 그 크기가 변형되고 결국 주입된 그라우팅재가 완전히 굳은 후에는 천공홀에 완전히 밀착되지 못하는 구역도 발생할 수 있다.In addition, even when the grouting material is completely injected, the grouting material is partially leaked into the gap around the hole or the shrinkage caused by the hardening of the injected grouting material over time, and the size of the grouting material is deformed. Once fully hardened, areas that may not be completely in contact with the drill hole may occur.

이를 위해, 본 발명은 상기 제3파이프(183)를 통하여 상기 주름관(120) 내측으로 그라우팅재를 주입하는 과정을 더 포함하여 구성된다(S50).To this end, the present invention further comprises a step of injecting a grouting material into the corrugated pipe 120 through the third pipe 183 (S50).

즉, 첨부된 도 6 및 도 12에 도시된 바와 같이, 상기 주름관(120)의 내측으로 그라우팅재를 주입하면, 상기 주름관(120) 내측에 그라우팅재가 충진됨은 물론, 주입되는 압력에 의하여 상기 주름관(120)의 외부에 구비된 커버부(124)를 외측으로 밀면서 상기 관통홀(123)을 통하여 그라우팅재가 주름관(120)의 외측까지 유동이 가능하게 된다.That is, as shown in FIGS. 6 and 12, when the grouting material is injected into the corrugated pipe 120, the grouting material is filled into the corrugated pipe 120 as well as the corrugated pipe by the injected pressure. The grouting material is allowed to flow to the outside of the corrugated pipe 120 through the through hole 123 while pushing the cover part 124 provided outside the 120 to the outside.

상기와 같이 주름관(120)의 내부까지 모두 그라우팅재를 주입한 후에는, 첨부된 도 13에 도시된 바와 같이, 외부에 노출된 보강부재(110)의 일단을 외부 지반에 고정시킨 고정블록(177)에 관통하도록 한 후, 상기 보강부재(110)의 끝단부를 너트(197)에 의하여 상기 고정블록(177)상에 위치되도록 한 후에 상기 중앙홈(112)에 원추형의 고정편(195)을 삽입시킨다.After injecting the grouting material up to the inside of the corrugated pipe 120 as described above, as shown in FIG. 13, the fixing block 177 fixed to the external ground with one end of the reinforcing member 110 exposed to the outside. After penetrating), the end of the reinforcing member 110 is positioned on the fixing block 177 by a nut 197, and then a conical fixing piece 195 is inserted into the central groove 112. Let's do it.

이때, 상기 고정편(195)의 삽입되는 정도에 따라서 상기 보강부재(110)는 전체적으로 인장력이 작용하는 상태를 이루면서 절편부재(114: 도 3 참조)가 외측으로 벌어져 상기 고정블록(177)에 고정된 상태를 유지하게 된다.At this time, the reinforcing member 110 according to the degree of insertion of the fixing piece 195 forms a state in which the tensile force acts as a whole, the cutting member 114 (see FIG. 3) is opened to the outside fixed to the fixing block 177 Will remain intact.

즉, 본 발명에 의하면 상기 고정편(195)을 상기 절편부재(114) 사이로 가압하여 삽입함으로써 상기 보강부재(110)에 소정의 인장력이 걸리는 상태를 이룸과 동시에 상기 보강부재(110)가 상기 고정블록(177)에 고정된 상태를 유지할 수 있게 되므로, 지면의 보강에 보다 유리한 구조를 이룸과 동시에 이를 위한 작업 또한 매우 간편해지는 효과가 있게 된다.That is, according to the present invention by pressing and inserting the fixing piece 195 between the cutting member 114 to achieve a state in which a predetermined tensile force is applied to the reinforcing member 110 and at the same time the reinforcing member 110 is fixed to the Since it is possible to maintain a fixed state in the block 177, a more advantageous structure for the reinforcement of the ground and at the same time there is an effect that is very easy to work.

한편, 첨부된 도 14는, 본 발명의 다른 실시예에 따른 그라우팅 보강유닛이 설치된 모습을 나타낸 도면이다.On the other hand, Figure 14 is a view showing a state in which the grouting reinforcement unit is installed according to another embodiment of the present invention.

도시된 것처럼, 본 발명에 따른 그라우팅 보강유닛에 있어서의 주름관(120)은 보강부재(110)의 전체 영역에 걸쳐 구비되지 않고, 일정 영역에 있어서만 상기 주름관(120)이 구비되도록 구성될 수 있다.As shown, the corrugated pipe 120 in the grouting reinforcement unit according to the present invention is not provided over the entire area of the reinforcing member 110, the corrugated pipe 120 may be provided only in a predetermined area. .

즉, 자갈이나 암석 등의 장애물이 위치된 부분이거나, 지반이 취약하거나 또는 지반 내 잔여 수분이 많이 분포한 지역 등 보강부재(110)의 보호 및 그라우팅 작업을 보다 확실히 하여야 하는 부분에 중점적으로 상기 주름관(120)이 구비되도록 할 수도 있다.That is, the corrugated pipe is mainly focused on a portion where obstacles such as gravel or rock are located, or a part where the ground is vulnerable or where the residual moisture in the ground must be more securely protected and grouting of the reinforcing member 110. 120 may be provided.

이와 같이 주름관(120)을 일정 영역에만 구비되도록 하는 경우에는, 필요한 부분만 주름관(120)을 설치하면 되므로 작업이 편리하여 지게 됨은 물론 생산단가를 줄일 수 있어 경제적 효과도 얻을 수 있는 장점이 있게 된다.As such, when the corrugated pipe 120 is provided only in a predetermined area, the corrugated pipe 120 needs only to be installed, so that the work becomes more convenient and the production cost can be reduced. .

한편, 상술한 커버부(124) 대신에 관통홀(123)이 폐쇄된 상태를 이루도록 결합 테이프(미도시) 등을 이용할 수도 있다. Instead of the cover part 124 described above, a coupling tape (not shown) or the like may be used so that the through hole 123 is closed.

이 경우 상기 결합 테이프는 상기 주름관(120)의 내측에서 소정의 압력이 강해지는 경우 상기 관통홀(123)이 개방된 상태를 이루도록 찢어지는 형태 등으로 파손되거나 벗겨져야 함은 물론이다.In this case, when the predetermined pressure is increased inside the corrugated pipe 120, the coupling tape has to be broken or peeled off in a torn shape such that the through hole 123 is opened.

상술한 바와 같이 본 발명 그라우팅 보강유닛 및 이를 이용한 그라우팅 보강방법에 의하면, 주름관을 사용함으로써 보강부재와 주름관과의 부착을 보다 강화할 수 있게 되며, 주름관과 천공홀 내벽 사이의 마찰력 증대를 통한 부착력을 더 향상시킬 수 있게 되는 효과가 있게 된다.According to the present invention grouting reinforcement unit and the grouting reinforcement method using the same, as described above, it is possible to further strengthen the attachment of the reinforcing member and the corrugated pipe by using the corrugated pipe, and further increases the adhesion force by increasing the friction between the corrugated pipe and the inner wall of the drilled hole. There is an effect that can be improved.

또한, 주름관에 다수개의 관통홀을 구비하여 주름관의 외측을 먼저 그라우팅재를 충진한 후, 주름관의 내측 충진 시 주름관의 외부 충진이 안 된 부분 및 보강충진이 함께 진행되도록 함으로써 전체적으로 보다 강화된 그라우팅재의 보강작업을 할 수 있게 되는 효과가 있다.In addition, the grout pipe is provided with a plurality of through-holes to fill the grouting material on the outer side of the corrugated pipe first, and when the inner filling of the corrugated pipe is carried out together with the external filling of the corrugated pipe and the reinforcing filling, the overall strengthening of the grouting material Reinforcement work is effective.

이상과 같이 본 발명에 따른 바람직한 실시예를 살펴보았으며, 앞서 설명된 실시예 이외에도 본 발명이 그 취지나 범주에서 벗어남이 없이 다른 특정 형태로 구체화 될 수 있다는 사실은 해당 기술에 통상의 지식을 가진 이들에게는 자명한 것이다. 그러므로, 상술된 실시예는 제한적인 것이 아니라 예시적인 것으로 여겨져야 하고, 이에 따라 본 발명은 상술한 설명에 한정되지 않고 첨부된 청구항의 범주 및 그 동등 범위 내에서 변경될 수도 있다.As described above, the preferred embodiments of the present invention have been described, and the fact that the present invention can be embodied in other specific forms in addition to the above-described embodiments without departing from the spirit or scope thereof has ordinary skill in the art. It is obvious to them. Therefore, the above-described embodiments should be regarded as illustrative rather than restrictive, and thus, the present invention is not limited to the above description and may be modified within the scope of the appended claims and their equivalents.

도 1은 종래 기술에 따른 그라우팅 보강공법이 시행되는 터널을 개략적으로 나타낸 단면도;1 is a cross-sectional view schematically showing a tunnel in which the grouting reinforcement method according to the prior art is implemented;

도 2는 종래 기술에 따른 그라우팅 보강공법이 시행되는 모습을 설명하기 위한 확대도;Figure 2 is an enlarged view for explaining how the grouting reinforcement method according to the prior art is implemented;

도 3은 본 발명의 일 실시예에 따른 그라우팅 보강유닛을 나타낸 결합단면도;3 is a cross-sectional view showing a grouting reinforcing unit according to an embodiment of the present invention;

도 4는 상기 도 3의 분해사시도;4 is an exploded perspective view of FIG. 3;

도 5 및 도 6은 커버부가 구비된 주름관을 나타낸 사시도;5 and 6 are perspective views showing a corrugated pipe provided with a cover portion;

도 7은 본 발명 그라우팅 보강유닛을 설치하는 과정을 나타낸 순서도;7 is a flowchart showing a process of installing the present invention grouting reinforcement unit;

도 8 내지 도 13은 본 발명의 일 실시예에 따른 그라우팅 보강유닛을 설치하는 과정을 순차적으로 나타낸 도면들: 및8 to 13 are views sequentially showing the process of installing the grouting reinforcement unit according to an embodiment of the present invention:

도 14는 본 발명의 다른 실시예에 따른 그라우팅 보강유닛이 설치된 모습을 나타낸 단면도;14 is a cross-sectional view showing a state in which the grouting reinforcement unit is installed according to another embodiment of the present invention;

<도면의 주요부분에 대한 부호의 설명><Description of the symbols for the main parts of the drawings>

100: 그라우팅 보강유닛 110: 보강부재100: grouting reinforcing unit 110: reinforcing member

112: 중앙홈 114: 절편부재112: central groove 114: section member

120: 주름관 123: 관통홀120: corrugated pipe 123: through hole

124: 커버부 130: 앵커부재124: cover 130: anchor member

131: 중앙홈 132: 요홈131: center groove 132: groove

177: 고정블록 195: 고정편177: fixed block 195: fixed piece

Claims (7)

지반에 형성시킨 천공홀을 이용 그라우팅 작업을 하기 위한 보강유닛에 있어서,In the reinforcing unit for grouting work using the drilled hole formed in the ground, 상기 천공홀에 삽입되는 보강부재;Reinforcing members inserted into the drilling holes; 상기 보강부재의 외부를 둘러 감싸는 형태로 상기 천공홀에 삽입되며 내/외부가 관통되도록 형성된 관통홀이 구비되는 주름관; A corrugated pipe inserted into the drilling hole in a form surrounding the outside of the reinforcing member and having a through hole formed to penetrate the inside / outside; 상기 보강부재가 관통되며 상기 천공홀의 입구부에 설치되는 고정블록; A fixing block through which the reinforcing member penetrates and is installed at an inlet of the drilling hole; 중앙으로부터 외측으로 외력을 가하는 경우 외측으로 휘어지도록 상기 보강부재의 일단부에 형성되는 복수 개의 절편부재; 및A plurality of section members formed at one end of the reinforcing member to bend outward when an external force is applied from the center to the outside; And 상기 복수 개의 절편부재 사이에 삽입되어 상기 보강부재가 상기 고정블록에 고정된 상태를 유지하도록 하는 고정편; A fixing piece inserted between the plurality of cutting members to maintain the reinforcing member fixed to the fixing block; 을 포함하여 구성되는 그라우팅 보강유닛.Grouting reinforcement unit comprising a. 제1항에 있어서,The method of claim 1, 상기 주름관에 삽입되며 상기 보강부재가 상기 주름관 내측의 정중앙에 위치되도록 하는 앵커부재를 더 포함하여 구성되는 것을 특징으로 하는 그라우팅 보강유닛.Grouting reinforcement unit, characterized in that it further comprises an anchor member inserted into the corrugated pipe so that the reinforcing member is located in the center of the inner corrugated pipe. 제1항에 있어서,The method of claim 1, 상기 주름관 외측에 구비되어 상기 주름관의 외측에서 내측으로 가압 시에는 상기 관통홀을 폐쇄시키고, 상기 주름관의 내측에서 외측으로 가압 시에는 상기 관통홀이 개방되도록 하는 커버부를 더 포함하여 구성되는 것을 특징으로 하는 그라우팅 보강유닛.It is provided on the outer side of the corrugated pipe when the pressure inward from the outside of the corrugated pipe closes the through hole, and when pressed from the inner side of the corrugated pipe further comprises a cover to open the through hole. Grouting reinforcement unit. 삭제delete 삭제delete 삭제delete 제1항 내지 제3항 중 어느 한 항에 기재된 그라우팅 보강유닛을 이용하여 행하는 그라우팅 보강방법에 있어서,In the grouting reinforcement method performed using the grouting reinforcement unit according to any one of claims 1 to 3, 지반에 천공홀을 천공하는 단계;Drilling a hole in the ground; 상기 천공홀에 상기 그라우팅 보강유닛을 삽입하는 단계;Inserting the grouting reinforcement unit into the drilling hole; 상기 그라우팅 보강유닛의 주름관 외측으로 상기 천공홀에 그라우팅재를 주입하는 단계; 및Injecting a grouting material into the perforation hole to the outside of the corrugated pipe of the grouting reinforcing unit; And 상기 그라우팅 보강유닛의 주름관 내측으로 그라우팅재를 주입함으로써 상기 주름관 외측으로 그라우팅재를 주입 시 완전히 보강되지 못하였던 상기 주름관과 천공홀 사이가 보조적으로 충진되도록 그라우팅재를 주입하는 단계; Injecting the grouting material into the corrugated pipe of the grouting reinforcing unit by injecting the grouting material to assist the filling between the corrugated pipe and the perforation hole, which was not completely reinforced when the grouting material was injected into the corrugated pipe outside; 를 포함하여 이루어진 그라우팅 보강유닛을 이용한 쏘일 네일링 보강방법.Soil nailing reinforcement method using a grouting reinforcement unit comprising a.
KR1020090092835A 2009-09-30 2009-09-30 Reinforce unit for grouting and soil nailing reinforce method using the same KR100971147B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020090092835A KR100971147B1 (en) 2009-09-30 2009-09-30 Reinforce unit for grouting and soil nailing reinforce method using the same

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020090092835A KR100971147B1 (en) 2009-09-30 2009-09-30 Reinforce unit for grouting and soil nailing reinforce method using the same

Publications (1)

Publication Number Publication Date
KR100971147B1 true KR100971147B1 (en) 2010-07-20

Family

ID=42645787

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020090092835A KR100971147B1 (en) 2009-09-30 2009-09-30 Reinforce unit for grouting and soil nailing reinforce method using the same

Country Status (1)

Country Link
KR (1) KR100971147B1 (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101024604B1 (en) * 2010-08-27 2011-03-24 지반이엔씨 주식회사 Pressure type reinforced unit soil nailing using inclined member and wrinkle-pipe
KR101048628B1 (en) * 2010-12-13 2011-07-12 지반이엔씨 주식회사 Upper sealing cover and lower sealing cover for soli nailing unit, soil nailing unit having the same and soil nailing reinforce method using the same
KR101195204B1 (en) 2010-06-28 2012-10-29 지반이엔씨 주식회사 Prestressing soil-nailing unit and ground reinforcing method using the same
KR101293126B1 (en) * 2012-08-10 2013-08-12 황태현 Permanent anchor with tendon of artificial fiber
CN106351209A (en) * 2016-09-21 2017-01-25 成都启立辰智科技有限公司 Concrete pile
CN113006044A (en) * 2021-02-05 2021-06-22 中国一冶集团有限公司 Directional repeatable grouting method and directional repeatable grouting device

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20020012451A (en) * 2000-08-07 2002-02-16 이기웅 apparatus and method for removal anchor using double uneven pipe
KR20050079166A (en) * 2004-02-04 2005-08-09 한국법면보호(주) Support-pipe using method of soil nailing
KR100642063B1 (en) * 2005-06-22 2006-11-10 (주) 코리아에스이 Ground anchor having high strength concrete end
KR100721786B1 (en) * 2006-11-03 2007-06-04 주식회사 오륙개발 Anchor.nail execution method for the soft ground

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20020012451A (en) * 2000-08-07 2002-02-16 이기웅 apparatus and method for removal anchor using double uneven pipe
KR20050079166A (en) * 2004-02-04 2005-08-09 한국법면보호(주) Support-pipe using method of soil nailing
KR100642063B1 (en) * 2005-06-22 2006-11-10 (주) 코리아에스이 Ground anchor having high strength concrete end
KR100721786B1 (en) * 2006-11-03 2007-06-04 주식회사 오륙개발 Anchor.nail execution method for the soft ground

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101195204B1 (en) 2010-06-28 2012-10-29 지반이엔씨 주식회사 Prestressing soil-nailing unit and ground reinforcing method using the same
KR101024604B1 (en) * 2010-08-27 2011-03-24 지반이엔씨 주식회사 Pressure type reinforced unit soil nailing using inclined member and wrinkle-pipe
KR101048628B1 (en) * 2010-12-13 2011-07-12 지반이엔씨 주식회사 Upper sealing cover and lower sealing cover for soli nailing unit, soil nailing unit having the same and soil nailing reinforce method using the same
KR101293126B1 (en) * 2012-08-10 2013-08-12 황태현 Permanent anchor with tendon of artificial fiber
CN106351209A (en) * 2016-09-21 2017-01-25 成都启立辰智科技有限公司 Concrete pile
CN113006044A (en) * 2021-02-05 2021-06-22 中国一冶集团有限公司 Directional repeatable grouting method and directional repeatable grouting device

Similar Documents

Publication Publication Date Title
KR100971147B1 (en) Reinforce unit for grouting and soil nailing reinforce method using the same
KR100771904B1 (en) Earth Reinforcement System by Using Bamboo Reinforcement
JP5274145B2 (en) Cast-in-place pile and its construction method
KR100772684B1 (en) The ground reinforcement apparatus and ground reinforcement method grouting type using steel pipe
KR101048628B1 (en) Upper sealing cover and lower sealing cover for soli nailing unit, soil nailing unit having the same and soil nailing reinforce method using the same
EA031926B1 (en) Method for forming a pillar part and reinforcing adjacently constructed parallel tunnels with reinforcing rods
KR101402267B1 (en) Close juxtaposition tunnel pillar reinforcement structure and its construction methods
KR101079075B1 (en) Reinforce Unit For Grouting And Grouting Reinforce Method Using The Same
JP6872231B2 (en) Reinforcement structure of rock slope with long-term durability and its construction method
KR101024604B1 (en) Pressure type reinforced unit soil nailing using inclined member and wrinkle-pipe
KR20040110204A (en) Earth anchor including a duplex grouting pipe and the earth anchor construction method using the same
KR100862387B1 (en) Tensional kit for top-down constructing of acupressure lasting anchor and top-down constructing method of acupressure lasting anchor using this
KR101864857B1 (en) Construction method of foundation pile with reinforced casing structure
KR20110000458A (en) Reinforcement means for soft land and slope reinforcement methode using the same
KR20120115635A (en) Prestressed nail device for inclined reinforcement and inclined reinforcement of using the same
KR100984040B1 (en) Method of reinforced earth retaining wall for cutting face through double reinforcing execution
KR20190089284A (en) Reinforcement pile with fiber sheet for ground improvement and earthquake-proof
KR100776620B1 (en) Bar Type Anchor
KR100556668B1 (en) Structure of a slop reinforced of carrying out by physical environment
KR100869369B1 (en) The ground reinforcement apparatus and method grouting type using bundle steel pipe
JP4205827B2 (en) Reinforcement structure and reinforcement method for existing underground structures
KR20100010044A (en) A reinforced divice for grouting pipe therefor method
KR101175741B1 (en) Double grouting injection module and earth reinforcing method using the same
KR200409269Y1 (en) Earth Reinforcement System by Using Bamboo Reinforcement
KR200329151Y1 (en) Soil nailing by pressure grouting

Legal Events

Date Code Title Description
A201 Request for examination
A302 Request for accelerated examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20130710

Year of fee payment: 4

FPAY Annual fee payment

Payment date: 20140703

Year of fee payment: 5

FPAY Annual fee payment

Payment date: 20150616

Year of fee payment: 6

FPAY Annual fee payment

Payment date: 20160421

Year of fee payment: 7

FPAY Annual fee payment

Payment date: 20170619

Year of fee payment: 8

FPAY Annual fee payment

Payment date: 20180626

Year of fee payment: 9

FPAY Annual fee payment

Payment date: 20190626

Year of fee payment: 10