KR100970457B1 - Block for wall and method for constructing wall using the same - Google Patents
Block for wall and method for constructing wall using the same Download PDFInfo
- Publication number
- KR100970457B1 KR100970457B1 KR1020100030197A KR20100030197A KR100970457B1 KR 100970457 B1 KR100970457 B1 KR 100970457B1 KR 1020100030197 A KR1020100030197 A KR 1020100030197A KR 20100030197 A KR20100030197 A KR 20100030197A KR 100970457 B1 KR100970457 B1 KR 100970457B1
- Authority
- KR
- South Korea
- Prior art keywords
- block
- lug
- horizontal axis
- fence
- row
- Prior art date
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B2/00—Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
- E04B2/02—Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls built-up from layers of building elements
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B2/00—Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
- E04B2/02—Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls built-up from layers of building elements
- E04B2/42—Walls having cavities between, as well as in, the elements; Walls of elements each consisting of two or more parts, kept in distance by means of spacers, at least one of the parts having cavities
- E04B2/44—Walls having cavities between, as well as in, the elements; Walls of elements each consisting of two or more parts, kept in distance by means of spacers, at least one of the parts having cavities using elements having specially-designed means for stabilising the position; Spacers for cavity walls
- E04B2/46—Walls having cavities between, as well as in, the elements; Walls of elements each consisting of two or more parts, kept in distance by means of spacers, at least one of the parts having cavities using elements having specially-designed means for stabilising the position; Spacers for cavity walls by interlocking of projections or inserts with indentations, e.g. of tongues, grooves, dovetails
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04C—STRUCTURAL ELEMENTS; BUILDING MATERIALS
- E04C1/00—Building elements of block or other shape for the construction of parts of buildings
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04C—STRUCTURAL ELEMENTS; BUILDING MATERIALS
- E04C1/00—Building elements of block or other shape for the construction of parts of buildings
- E04C1/39—Building elements of block or other shape for the construction of parts of buildings characterised by special adaptations, e.g. serving for locating conduits, for forming soffits, cornices, or shelves, for fixing wall-plates or door-frames, for claustra
- E04C1/395—Building elements of block or other shape for the construction of parts of buildings characterised by special adaptations, e.g. serving for locating conduits, for forming soffits, cornices, or shelves, for fixing wall-plates or door-frames, for claustra for claustra, fences, planting walls, e.g. sound-absorbing
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Fencing (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
Abstract
Description
The present invention relates to a block for a fence and a method for constructing a fence using the same, and more particularly, to a fence block and a method for constructing a fence using the same, which can construct a fence quickly, firmly and environmentally.
In general, a fence is a construction-related work, such as a continuous wall covering a perimeter of a building, a site boundary, a predetermined area, etc., and is divided into a ground wall, a stone wall, a brick wall, a block wall, and a concrete wall according to the material to be constructed.
The applicant of the present application is to propose a fence construction method that can give a more eco-friendly feeling while being able to build more quickly and concisely with the present invention.
It is an object of the present invention to enable a flexible stacking of blocks while maintaining a tightly coupled state between blocks, so that fences can be built more quickly and robustly according to the conditions of the ground, and a fence construction method using the same In providing.
SUMMARY OF THE INVENTION An object of the present invention is to provide a fence block and a method of constructing a fence using the same, in which a half hole and another half hole are combined to match a center hole and complete a through hole in a vertical direction when an edge of a block and a neighboring block meet. have.
The present invention provides a block for a fence that can emphasize natural and traditional beauty, and a method for constructing a fence using the same.
Fence construction method using the fence block according to the present invention for achieving the above object,
The upper center of the first longitudinal axis and the second longitudinal axis adjacent to the center hole while completing the center hole by blocking mortar so as to maintain a structure in which the first and second horizontal axes and the first and second longitudinal axes face each other. Protruding the first lug and the second lug into the first lug, and forming the first lug groove and the second lug groove in the horizontal direction at the lower centers of the first longitudinal axis and the second longitudinal axis, and both ends of the first horizontal axis and the second horizontal axis. Column block construction that stacks blocks in a row on the ground so that each edge meets each other by providing an edge having an inclined surface that obliquely contacts the first longitudinal axis and the second longitudinal axis while making the outer side longer. Steps,
A second column block construction step of stacking blocks in a row on the first row block such that the respective edges meet each other at the center of the first horizontal axis and the second horizontal axis;
An nth column block construction step of stacking blocks in a row on the second row block such that the respective edges meet each other at the center of the first and second horizontal axes;
And an n + 1th column block building step of stacking blocks in a row on the nth row block so that each edge meets each other at the center of the first horizontal axis and the second horizontal axis,
The blocks are stacked straight or bent in the longitudinal direction of the ground,
The first lug and the second lug can be changed in the horizontal direction along the first lug groove and the second lug groove when the blocks are bent in the longitudinal direction of the ground.
Fence block according to the present invention for achieving the above object,
The upper center of the first longitudinal axis and the second longitudinal axis adjacent to the center hole while completing the center hole by blocking mortar so as to maintain a structure in which the first and second horizontal axes and the first and second longitudinal axes face each other. Protruding the first lug and the second lug into the first lug, and forming the first lug groove and the second lug groove in the horizontal direction at the lower centers of the first longitudinal axis and the second longitudinal axis, and both ends of the first horizontal axis and the second horizontal axis. It is a technical feature of the technical configuration that is made to complete the half-hole by giving an edge having an inclined surface inclined to abut the first longitudinal axis and the second longitudinal axis while longer in the outward direction.
The present invention relates to a first column block and a second column block. When the nth row block and the n + 1th row block are stacked flexibly in the longitudinal direction of the ground, the first lug and the second lug are changed in the horizontal direction along the first lug groove and the second lug groove, By maintaining the engagement state firmly, there is an effect that can build the fence more quickly and actively according to the ground conditions (straight section or curved section).
In the present invention, the first lug and the second lug are engaged with the first lug groove and the second lug groove, and the first stopper and the second stopper are brought into contact with the inclined surface of the upper block, thereby changing the position of the block due to external impact. When the block is to be mounted at the vehicle after the factory is completed at the factory, that is, when the block is to be stacked in the vertical direction for transport, the first stopper and the second stopper allow the first stopper groove and the second stopper of the upper block. Being able to fit into the groove has the effect of maintaining a more solid lamination state.
According to the present invention, when the edges of a block and a neighboring block meet each other, a half hole and another half hole are combined to coincide with a center hole, thereby completing a vertical through hole, and filling the through hole with crushed stone. Engagement has the effect of maintaining the block construction state more firmly.
The present invention has the effect of ensuring the build state of the more solid block by inserting the support shaft between the crushed stone.
According to the present invention, the vertical beam is placed on the n + 1 row block by joining the vertical beams, and the horizontal beams are assembled to assemble the horizontal beams, so that the fences can be easily installed on the fence according to the surrounding environment.
The present invention has the effect of emphasizing natural and traditional beauty by mounting a bench or tile on the n + 1th block.
Figure 1a and Figure 1b is a perspective view of the fence block according to the invention viewed from the top and bottom, respectively.
Figure 2 is a perspective view showing a fence constructed by the fence construction method according to the present invention.
Figure 3 is a perspective view of the main incision showing the fence constructed by the fence construction method according to the present invention.
Figure 4 is a front sectional view including a fence showing the fence constructed by the fence construction method according to the present invention.
Figure 5 is a front sectional view including a plant showing a fence constructed by the fence construction method according to the present invention.
Figure 6 is a front sectional view including a bench showing the fence constructed by the fence construction method according to the present invention.
Figure 7 is a front sectional view including a tile showing the fence constructed by the fence construction method according to the present invention.
8 is a conceptual diagram showing a fence constructed by the fence construction method according to the present invention.
9 to 20 is a structural diagram for explaining a method for constructing a fence according to an embodiment of the present invention.
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS A preferred embodiment of a fence block and a fence construction method using the same according to the present invention will be described with reference to the drawings, and a plurality of the embodiments may exist, and through these embodiments, the objects, features and You will be able to better understand these advantages.
The fence block B according to the present invention has a first
More specifically, the fence construction method according to the present invention as shown in Figure 1a to 8, the first row of stacking the blocks (B) in a row on the ground so that each edge (E) of the blocks (B) meet each other Block B1 is stacked on the first row block B1 in a row so that each edge E meets each other at the center of the first
At this time, the blocks (B) may be stacked in a straight line or bent in the longitudinal direction of the ground, and when the blocks (B) are stacked in the longitudinal direction of the ground, the first lug (21a) and the second lug (22a) is made of The position can be changed in the horizontal direction along the
That is, the
At this time, the block B is the first stopper so that the inclined surface (A) of the upper block (B) abuts on the upper center of the first
The
In addition, the first column block B1, the second column block B2,. According to the construction of the nth column block Bn and the nth + 1th column block Bn + 1, the center hole CH and the half hole HH are combined with each other to complete the through hole TH in the vertical direction. The through hole TH may be filled with the crushed
When each edge E of the block B and the neighboring block B meet, the half hole HH and the other half hole HH are combined to coincide with the center hole CH and the through-hole in the vertical direction ( TH) can be completed, and the crushed
And, as shown in Figure 4 can be inserted into the
On the other hand, the
In addition, the support shaft (GG) is joined to the
Furthermore, the earth and sand T1 may be filled in the center hole CH of the n + 1th row block Bn + 1, and the plant P may be planted between the earth and sand T1 to give an environmentally friendly feeling. As shown in FIG. 5, a
In addition, as shown in FIG. 6, the
As can be seen from the above object, structure and effect of the present invention, the
The operation and utilization of the above configuration will be described as an embodiment of FIGS. 9 to 20 as follows.
Figure 9 after laying the gravel on the floor and laminated reinforcement retaining wall block filling the crushed stone (51) while stacking the block (B) of the present invention to build the fence more firmly by interlocking the
FIG. 10 illustrates the construction of the fence more firmly by filling the crushed
FIG. 11 shows a road in which a vehicle is driven and a bicycle road is built, and blocks 10 of the present invention are stacked on both sides to construct a fence and plant plants P. FIG.
FIG. 12 shows a block 10 of the present invention on both sides of a road on which a vehicle is driven to construct a fence, and a
FIG. 13 shows a state in which the
FIG. 14 illustrates a block of a fence-type fence, that is, a seat that can sit for a while and share a conversation by mounting an n + 1th block Bn + 1 marble after stacking the block B of the present invention. .
15 is a block (B) of the present invention stacked on the height of the human chest and then mounted marble on the n + 1th row block (Bn + 1) to be a kind of prospective fence, that is, chin for a while to look away and At the same time, a block (B) is sometimes omitted, allowing children to look outside.
FIG. 16 fills the earth and sand T1 in the center hole CH of the n + 1th row block Bn + 1, planting the plant P between the earth and sand T1, or the n + 1th block Bn + 1. In the center hole (CH) of the) is mounted a pot-shaped
17 shows a first column block B1, a second column block B2; According to the construction of the nth column block Bn and the nth + 1th column block Bn + 1, the center hole CH and the half hole HH are combined with each other to complete the through hole TH in the vertical direction. Inserting the
18 and 19 show a state in which the soil T2 is stacked on the n + 1th block Bn + 1 and the
20 shows a first column block B1, a second column block B2; According to the construction of the nth column block Bn and the nth + 1th column block Bn + 1, the center hole CH and the half hole HH are combined with each other to complete the through hole TH in the vertical direction. Inserting the
The present invention can be used in the construction field, that is, a fence constructed in the perimeter of the building, the boundary of the ground or the bicycle road.
B: block 11: first horizontal axis
11a:
12: 2nd
12b: second stopper groove 21: first longitudinal axis
21a:
22: 2nd
22b: 2nd lug groove CH: Center hole
HH: Half Hole TH: Through Hole
E: Edge A: Slope
B1: first row block B2: second row block
Bn: nth column block Bn + 1: nth + 1 column block
51: crushed stone 52: support shaft
61: vertical beam 62: fence
T1: Tosa P: Plant
70: potted block 71: outlet
72: projection 73: storage space
80: bench T2: soil
90: tile GG: support
CM: Wire Mesh
Claims (13)
A second row block for stacking the blocks B in a row on the first row block B1 such that the respective edges E meet each other at the center of the first horizontal axis 11 and the second horizontal axis 12 ( B2) building step,
An nth column block stacking the blocks B in a row on the second row block B2 so that the respective edges E meet each other at the center of the first horizontal axis 11 and the second horizontal axis 12 ( Bn) construction step,
An n + 1th row in which blocks B are stacked in a row on the nth row block Bn so that the respective edges E meet each other at the centers of the first and second horizontal axes 11 and 12. A block (Bn + 1) construction step,
The block (B) is stacked in a straight line or bent in the longitudinal direction of the ground,
When the block B is stacked in the longitudinal direction of the ground, the first lug 21a and the second lug 22a are transversely along the first lug groove 21b and the second lug groove 22b. Wall building method characterized in that the position can be changed.
The block (B) is
The first stopper 11a and the inclined surface A of the upper block B to contact the upper center of the first horizontal axis 11 and the second horizontal axis 12 adjacent to the center hole CH when constructing the fence. The second stopper 12a protrudes,
The first stopper groove 11b and the first stopper 11a and the second stopper 12a of the lower block B are joined to the lower centers of the first and second horizontal axes 11 and 12 when stacked. A fence construction method, characterized in that the second stopper groove (12b) is formed.
The first column block B1, the second column block B2. According to the construction of the nth row block Bn and the n + 1th row block Bn + 1, the center hole CH and the half hole HH are combined with each other to complete the through hole TH in the vertical direction. ,
Crushed stone construction method characterized in that the through hole (TH) is filled with crushed stone (51).
A fence construction method characterized in that the support shaft 52 is inserted between the crushed stone (51).
The vertical beam 61 is joined to the support shaft 52 to be erected above the n + 1th row block Bn + 1, and the fence 62 for weaving the vertical beam 61 in the horizontal direction is assembled. Wall building method characterized in that.
The support shaft (GG) is joined to the support shaft (52) to stand over the n + 1th row block (Bn + 1), characterized in that it comprises a wire mesh (CM) for weaving the support (GG) to each other How to build a fence.
Filling the earth and sand (T1) in the center hole (CH) of the n + 1th block (Bn + 1), planting the plant (P) between the soil (T1).
Potted block 70 having a projection portion 72 having a discharge port 71 formed in the center hole CH of the n + 1th row block Bn + 1 and a storage space 73 filled with earth and sand T1. Mounting, and the planting method of the fence, characterized in that to plant the plant (P) in the soil (T1).
A fence construction method comprising mounting a bench (80) on the n + 1th block (Bn + 1).
Wall building method characterized in that the soil (T2) is stacked on the n + 1th row block (Bn + 1) to raise the tile (90).
A first stopper 11a and a second stopper 12a protrude from an upper center of the first horizontal axis 11 and the second horizontal axis 12 adjacent to the center hole CH,
Wall block (B), characterized in that the first stopper groove (11b) and the second stopper groove (12b) is formed in the lower center of the first horizontal axis (11) and the second horizontal axis (12).
The first lug groove 21b and the second lug groove 22b are formed on the lower center of the first longitudinal axis 21 and the second longitudinal axis 22 in a transverse direction. .
Priority Applications (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020100030197A KR100970457B1 (en) | 2010-04-02 | 2010-04-02 | Block for wall and method for constructing wall using the same |
JP2011072245A JP2011220101A (en) | 2010-04-02 | 2011-03-29 | Fence block and fence building method using the same |
CN2011100853833A CN102220797A (en) | 2010-04-02 | 2011-04-02 | Block for wall and method for constructing wall using the same |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020100030197A KR100970457B1 (en) | 2010-04-02 | 2010-04-02 | Block for wall and method for constructing wall using the same |
Publications (1)
Publication Number | Publication Date |
---|---|
KR100970457B1 true KR100970457B1 (en) | 2010-07-16 |
Family
ID=42645644
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR1020100030197A KR100970457B1 (en) | 2010-04-02 | 2010-04-02 | Block for wall and method for constructing wall using the same |
Country Status (3)
Country | Link |
---|---|
JP (1) | JP2011220101A (en) |
KR (1) | KR100970457B1 (en) |
CN (1) | CN102220797A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20190006117A (en) * | 2017-07-06 | 2019-01-17 | (합)강산건업 | Wall substructure of detached house and there of building method |
CN116044085A (en) * | 2022-12-09 | 2023-05-02 | 南京久鼎环境科技股份有限公司 | Combined type ice rink movement boundary wall |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20030024520A (en) * | 2001-09-19 | 2003-03-26 | 홍사열 | a rank bar of a prop |
KR20030045935A (en) * | 2001-12-03 | 2003-06-12 | 주식회사 하이닉스반도체 | Method for fabricating semiconductor device |
KR200324520Y1 (en) | 2003-04-11 | 2003-08-25 | 오승섭 | Retaining well Block |
KR200345935Y1 (en) | 2003-12-17 | 2004-03-24 | 주식회사 삼성산업 | A environment-friendly retaining wall block for reinforcement |
KR100778066B1 (en) | 2006-11-23 | 2007-11-21 | 조재훈 | Construction structure making for breast wall |
KR20100002491A (en) * | 2008-06-30 | 2010-01-07 | 덕산콘크리트(주) | The apparatus of the retaining wall-block with vegetaion have a good environment |
Family Cites Families (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS5348316A (en) * | 1976-10-14 | 1978-05-01 | Akira Kishida | Construction method of concrete block and its concrete block |
JPS59177660U (en) * | 1983-05-16 | 1984-11-28 | 段谷産業株式会社 | Armored fence |
CN1189565A (en) * | 1996-12-11 | 1998-08-05 | 托尼·J·阿扎 | Concrete building blocks |
JP2972635B2 (en) * | 1997-03-13 | 1999-11-08 | 勇八郎 金澤 | Building blocks |
AUPP647298A0 (en) * | 1998-10-13 | 1998-11-05 | Keystone Retaining Wall Systems, Inc. | Retaining wall block |
JP2001025323A (en) * | 1999-07-14 | 2001-01-30 | Uni Sogo Keikaku:Kk | Wall-forming planter |
JP2001320965A (en) * | 2000-05-17 | 2001-11-20 | Freehand:Kk | Product of concrete block |
JP2003161055A (en) * | 2001-11-26 | 2003-06-06 | Ichiro Asada | Multifunctional composite body attached block |
JP3621939B2 (en) * | 2002-08-22 | 2005-02-23 | 株式会社トッコン | Retaining wall block |
-
2010
- 2010-04-02 KR KR1020100030197A patent/KR100970457B1/en not_active IP Right Cessation
-
2011
- 2011-03-29 JP JP2011072245A patent/JP2011220101A/en active Pending
- 2011-04-02 CN CN2011100853833A patent/CN102220797A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20030024520A (en) * | 2001-09-19 | 2003-03-26 | 홍사열 | a rank bar of a prop |
KR20030045935A (en) * | 2001-12-03 | 2003-06-12 | 주식회사 하이닉스반도체 | Method for fabricating semiconductor device |
KR200324520Y1 (en) | 2003-04-11 | 2003-08-25 | 오승섭 | Retaining well Block |
KR200345935Y1 (en) | 2003-12-17 | 2004-03-24 | 주식회사 삼성산업 | A environment-friendly retaining wall block for reinforcement |
KR100778066B1 (en) | 2006-11-23 | 2007-11-21 | 조재훈 | Construction structure making for breast wall |
KR20100002491A (en) * | 2008-06-30 | 2010-01-07 | 덕산콘크리트(주) | The apparatus of the retaining wall-block with vegetaion have a good environment |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20190006117A (en) * | 2017-07-06 | 2019-01-17 | (합)강산건업 | Wall substructure of detached house and there of building method |
KR101985278B1 (en) | 2017-07-06 | 2019-06-05 | (합)강산건업 | Wall substructure of detached house and there of building method |
CN116044085A (en) * | 2022-12-09 | 2023-05-02 | 南京久鼎环境科技股份有限公司 | Combined type ice rink movement boundary wall |
CN116044085B (en) * | 2022-12-09 | 2024-03-15 | 南京久鼎环境科技股份有限公司 | Combined type ice rink movement boundary wall |
Also Published As
Publication number | Publication date |
---|---|
CN102220797A (en) | 2011-10-19 |
JP2011220101A (en) | 2011-11-04 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US20130149037A1 (en) | Retaining wall construction system for preventing tsunamis and flood damages and construction method thereof | |
KR101246268B1 (en) | Structure of gabion wall with vegetation steel frame and constructing method thereof | |
KR100990517B1 (en) | A prefabricated vegetation block | |
KR101807504B1 (en) | Retaining wall block assembly for plants with easy installation | |
US9725871B2 (en) | Retaining wall kit having interconnecting units | |
KR101331840B1 (en) | Plantable block | |
KR102135594B1 (en) | Retaining Wall Block System | |
KR100970457B1 (en) | Block for wall and method for constructing wall using the same | |
KR101633853B1 (en) | An eco-friendly gabibolck for retaining wall with modular retaining wall | |
KR101598148B1 (en) | Block unit for vertical retaining wall | |
KR100402843B1 (en) | Afforestation Retaining-Wall laying Concrete-block | |
KR200442371Y1 (en) | retaining wall block | |
KR100644795B1 (en) | the revetment of prefabricated panel | |
KR102287339B1 (en) | Multipurpose block | |
KR100827783B1 (en) | Retaining wall using blocks and constructing method thereof | |
KR101204308B1 (en) | Log stone basket | |
KR100593181B1 (en) | A terrace-revetment unit and a process of construction unsing the same | |
KR101331826B1 (en) | Plantable block | |
KR20060082388A (en) | Fabricate block for constructing breast wall | |
KR200235107Y1 (en) | Afforestation Retaining-Wall laying Concrete-block | |
KR102399378B1 (en) | Stone wall structure for artificial hill | |
KR100993505B1 (en) | a prefabricated panel for fence including planting space and construction method using the same | |
KR102238975B1 (en) | Terrace type planting block for slope recovery and reinforce | |
KR200372001Y1 (en) | fabricate block for constructing breast wall | |
JP3774459B2 (en) | Assembly fence |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A201 | Request for examination | ||
A302 | Request for accelerated examination | ||
E902 | Notification of reason for refusal | ||
E701 | Decision to grant or registration of patent right | ||
GRNT | Written decision to grant | ||
FPAY | Annual fee payment |
Payment date: 20130709 Year of fee payment: 4 |
|
LAPS | Lapse due to unpaid annual fee |