KR100931628B1 - 사상 압연에 있어서 조작성 이상 진단 장치 및 방법 - Google Patents
사상 압연에 있어서 조작성 이상 진단 장치 및 방법 Download PDFInfo
- Publication number
- KR100931628B1 KR100931628B1 KR1020020077708A KR20020077708A KR100931628B1 KR 100931628 B1 KR100931628 B1 KR 100931628B1 KR 1020020077708 A KR1020020077708 A KR 1020020077708A KR 20020077708 A KR20020077708 A KR 20020077708A KR 100931628 B1 KR100931628 B1 KR 100931628B1
- Authority
- KR
- South Korea
- Prior art keywords
- intervention
- abnormality
- value
- plate thickness
- thickness
- Prior art date
Links
Images
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21B—ROLLING OF METAL
- B21B37/00—Control devices or methods specially adapted for metal-rolling mills or the work produced thereby
- B21B37/16—Control of thickness, width, diameter or other transverse dimensions
- B21B37/165—Control of thickness, width, diameter or other transverse dimensions responsive mainly to the measured thickness of the product
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21B—ROLLING OF METAL
- B21B37/00—Control devices or methods specially adapted for metal-rolling mills or the work produced thereby
- B21B37/48—Tension control; Compression control
- B21B37/52—Tension control; Compression control by drive motor control
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21B—ROLLING OF METAL
- B21B37/00—Control devices or methods specially adapted for metal-rolling mills or the work produced thereby
- B21B37/58—Roll-force control; Roll-gap control
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21B—ROLLING OF METAL
- B21B37/00—Control devices or methods specially adapted for metal-rolling mills or the work produced thereby
- B21B37/74—Temperature control, e.g. by cooling or heating the rolls or the product
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21B—ROLLING OF METAL
- B21B2261/00—Product parameters
- B21B2261/02—Transverse dimensions
- B21B2261/04—Thickness, gauge
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21B—ROLLING OF METAL
- B21B2265/00—Forming parameters
- B21B2265/12—Rolling load or rolling pressure; roll force
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21B—ROLLING OF METAL
- B21B2271/00—Mill stand parameters
- B21B2271/02—Roll gap, screw-down position, draft position
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21B—ROLLING OF METAL
- B21B2275/00—Mill drive parameters
- B21B2275/02—Speed
- B21B2275/04—Roll speed
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Control Of Metal Rolling (AREA)
Abstract
Description
Claims (4)
- 사상 압연에서 조작성 이상 원인을 추정하여 압연판의 품질 정도를 높이기 위한 사상 압연 조작성 이상 진단 장치에 있어서,목표 두께, 목표 하중, 롤 속도 및 롤 갭의 목표 설정값을 결정하는 SCC(Supervisory Control Computer) 설정부(210);판 두께 편차가 수요가의 관리 공차보다 크고, 운전자의 갭 개입량을 상기 SCC 설정부(210)에서 설정된 설정치와 비교하여 갭 개입량이 크면, 두께 변동량을 연산하여 상기 갭 개입량과 두께 변동량을 비교함으로써, 운전자의 롤 개입 이상 여부를 판단하는 운전자 개입 진단부;상기 판 두께 편차와 비교하여 판 두께 편차가 줄어드는 (-)값 이면, 스탠드 간 장력을 연산하고 연산한 장력 연산치와 상기 SCC 설정부(210)에서 설정된 장력 설정치의 비교를 수행함으로써, 롤 속도 개입 이상 유무를 판단하는 속도 개입 진단부; 및임의의 스탠드 하중을 이용하여 판 두께값을 연산하고, 상기 연산된 판 두께값과 실측 판 두께값을 비교하여 두 값이 비슷하면 두께 변화의 형태와 출측 온도 변화가 일치하는지 여부를 판단하여 일치하면 스프레이 개입 이상으로 판정하는 스프레이 개입 진단부;를 포함하는 것을 특징으로 하는 사상 압연 조작성 이상 진단 장치.
- 제 1 항에 있어서,상기 운전자 개입 진단부, 속도 개입 진단부 및 스프레이 개입 진단부에 공정과 관련된 실측 데이터를 수집하여 제공하는 실측 데이터 수집부;를 더 포함하는 것을 특징으로 하는 사상 압연 조작성 이상 진단 장치.
- 사상 압연에서 조작성 이상 원인을 추정하여 압연판의 품질 정도를 높이기 위한 사상 압연 조작성 이상 진단 방법에 있어서,목표 두께, 목표 하중, 롤 속도 및 롤 갭의 목표 설정값을 결정하는 제 1 단계;판 두께 편차가 수요가의 관리 공차보다 크고, 운전자의 갭 개입량을 상기 제 1 단계에서 설정된 설정치와 비교하여 갭 개입량이 크면, 두께 변동량을 연산하여 상기 갭 개입량과 두께 변동량을 비교함으로써, 운전자의 롤 개입 이상 여부를 판단하는 제 2 단계;상기 판 두께 편차와 비교하여 판 두께 편차가 줄어드는 (-)값 이면, 스탠드 간 장력을 연산하고 연산한 장력 연산치와 상기 제 1 단계에서 설정된 장력 설정치의 비교를 수행함으로써, 롤 속도 개입 이상 유무를 판단하는 제 3 단계; 및임의의 스탠드 하중을 이용하여 판 두께값을 연산하고, 상기 연산된 판 두께값과 실측 판 두께값을 비교하여 두 값이 비슷하면 두께 변화의 형태와 출측 온도 변화가 일치하는지 여부를 판단하여 일치하면 스프레이 개입 이상으로 판정하는 제 4 단계;를 포함하는 것을 특징으로 하는 사상 압연 조작성 이상 진단 방법.
- 제 3 항에 있어서,압연되는 판의 두께, 입측 온도, 출측 온도, 압연 하중 및 롤 갭의 실측 데이터를 측정함으로써, 실측 데이터를 수집하는 단계;를 더 포함하는 것을 특징으로 하는 사상 압연 조작성 이상 진단 방법.
Priority Applications (4)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020020077708A KR100931628B1 (ko) | 2002-12-09 | 2002-12-09 | 사상 압연에 있어서 조작성 이상 진단 장치 및 방법 |
CN200310115226.8A CN1267215C (zh) | 2002-11-20 | 2003-11-20 | 带钢热精轧中的故障诊断设备和方法 |
US10/718,489 US6839605B2 (en) | 2002-11-20 | 2003-11-20 | Apparatus and method for diagnosing faults in hot strip finishing rolling |
JP2003431275A JP4348177B2 (ja) | 2002-11-20 | 2003-11-20 | 仕上圧延異常診断装置及び方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020020077708A KR100931628B1 (ko) | 2002-12-09 | 2002-12-09 | 사상 압연에 있어서 조작성 이상 진단 장치 및 방법 |
Publications (2)
Publication Number | Publication Date |
---|---|
KR20040050017A KR20040050017A (ko) | 2004-06-14 |
KR100931628B1 true KR100931628B1 (ko) | 2009-12-14 |
Family
ID=37344282
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR1020020077708A KR100931628B1 (ko) | 2002-11-20 | 2002-12-09 | 사상 압연에 있어서 조작성 이상 진단 장치 및 방법 |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR100931628B1 (ko) |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100931631B1 (ko) * | 2002-12-10 | 2009-12-14 | 주식회사 포스코 | 사상 압연 이상 진단 확신도 판정 장치 |
KR100919423B1 (ko) * | 2002-11-20 | 2009-09-29 | 주식회사 포스코 | 사상 압연 이상 진단 장치 및 방법 |
CN116809652B (zh) * | 2023-03-28 | 2024-04-26 | 材谷金带(佛山)金属复合材料有限公司 | 一种热轧机控制系统的异常分析方法及系统 |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH0320610A (ja) * | 1989-03-14 | 1991-01-29 | Kobe Steel Ltd | 金属圧延目標形状調整装置 |
JPH11129030A (ja) * | 1997-10-29 | 1999-05-18 | Sumitomo Metal Ind Ltd | 金属板圧延品質監視システム |
JPH11347614A (ja) * | 1998-06-05 | 1999-12-21 | Mitsubishi Electric Corp | 異常診断装置及び異常診断方法 |
KR20010027829A (ko) * | 1999-09-16 | 2001-04-06 | 이구택 | 압연기 이상진단장치 |
US6839605B2 (en) * | 2002-11-20 | 2005-01-04 | Posco Co., Ltd. | Apparatus and method for diagnosing faults in hot strip finishing rolling |
-
2002
- 2002-12-09 KR KR1020020077708A patent/KR100931628B1/ko active IP Right Grant
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH0320610A (ja) * | 1989-03-14 | 1991-01-29 | Kobe Steel Ltd | 金属圧延目標形状調整装置 |
JPH11129030A (ja) * | 1997-10-29 | 1999-05-18 | Sumitomo Metal Ind Ltd | 金属板圧延品質監視システム |
JPH11347614A (ja) * | 1998-06-05 | 1999-12-21 | Mitsubishi Electric Corp | 異常診断装置及び異常診断方法 |
KR20010027829A (ko) * | 1999-09-16 | 2001-04-06 | 이구택 | 압연기 이상진단장치 |
US6839605B2 (en) * | 2002-11-20 | 2005-01-04 | Posco Co., Ltd. | Apparatus and method for diagnosing faults in hot strip finishing rolling |
Also Published As
Publication number | Publication date |
---|---|
KR20040050017A (ko) | 2004-06-14 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US6839605B2 (en) | Apparatus and method for diagnosing faults in hot strip finishing rolling | |
CN109996615B (zh) | 轧制设备的异常诊断方法及装置 | |
CN107949813B (zh) | 制造设备诊断辅助装置及制造设备诊断辅助方法 | |
CN107541597B (zh) | 连续退火机组均热炉的带钢跑偏监测与诊断方法及系统 | |
CN112041771A (zh) | 异常判定辅助装置 | |
JP3397726B2 (ja) | 圧延機の異常診断方法および装置 | |
KR100931628B1 (ko) | 사상 압연에 있어서 조작성 이상 진단 장치 및 방법 | |
JP3811124B2 (ja) | 圧延機の異常診断方法 | |
KR100328939B1 (ko) | 온라인롤편심진단방법및장치 | |
KR100931630B1 (ko) | 사상 압연에 있어서 제어성 이상 진단 장치 | |
KR100950958B1 (ko) | 사상 압연에 있어서 설비성 이상 진단 장치 및 방법 | |
KR100931631B1 (ko) | 사상 압연 이상 진단 확신도 판정 장치 | |
CN115081798A (zh) | 基于pls算法的板带热精轧过程分机架联合监控与诊断方法 | |
KR100919423B1 (ko) | 사상 압연 이상 진단 장치 및 방법 | |
KR100919424B1 (ko) | 사상 압연에 있어서 두께 불량 인자 판단 장치 및 그 방법 | |
CN110523781B (zh) | 推定装置、推定系统、推定方法及程序 | |
JP6036857B2 (ja) | 圧延機の制御方法、圧延機の制御装置、及び圧延材の製造方法 | |
KR100931629B1 (ko) | 사상 압연에 있어서 소재성 이상 진단 장치 및 방법 | |
JPH11129030A (ja) | 金属板圧延品質監視システム | |
JP3268588B2 (ja) | 圧延用ロールの研削方法及び使用方法 | |
KR101840419B1 (ko) | 조질압연기 및 형상교정기 설비장애 예지 정비 시스템 및 방법 | |
JP7461798B2 (ja) | 設備監視支援装置、方法及びプログラム | |
JP2000315111A (ja) | 設備及び製品プロセス異常状態の診断方法及び装置 | |
CN116060455A (zh) | 一种轧机秒流量厚度控制方法、装置及电子设备 | |
JP2000263113A (ja) | 圧延機における異常圧延状態修正方法および装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
N231 | Notification of change of applicant | ||
A201 | Request for examination | ||
E902 | Notification of reason for refusal | ||
E701 | Decision to grant or registration of patent right | ||
GRNT | Written decision to grant | ||
FPAY | Annual fee payment |
Payment date: 20121203 Year of fee payment: 4 |
|
FPAY | Annual fee payment |
Payment date: 20131202 Year of fee payment: 5 |
|
FPAY | Annual fee payment |
Payment date: 20141128 Year of fee payment: 6 |
|
FPAY | Annual fee payment |
Payment date: 20151125 Year of fee payment: 7 |
|
FPAY | Annual fee payment |
Payment date: 20161123 Year of fee payment: 8 |
|
FPAY | Annual fee payment |
Payment date: 20171204 Year of fee payment: 9 |
|
FPAY | Annual fee payment |
Payment date: 20181204 Year of fee payment: 10 |