KR100895336B1 - 지반 보강 공법 - Google Patents
지반 보강 공법 Download PDFInfo
- Publication number
- KR100895336B1 KR100895336B1 KR1020080092871A KR20080092871A KR100895336B1 KR 100895336 B1 KR100895336 B1 KR 100895336B1 KR 1020080092871 A KR1020080092871 A KR 1020080092871A KR 20080092871 A KR20080092871 A KR 20080092871A KR 100895336 B1 KR100895336 B1 KR 100895336B1
- Authority
- KR
- South Korea
- Prior art keywords
- casing
- monitor
- rod
- injection material
- injection
- Prior art date
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
- E02D5/34—Concrete or concrete-like piles cast in position ; Apparatus for making same
- E02D5/46—Concrete or concrete-like piles cast in position ; Apparatus for making same making in situ by forcing bonding agents into gravel fillings or the soil
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D17/00—Excavations; Bordering of excavations; Making embankments
- E02D17/13—Foundation slots or slits; Implements for making these slots or slits
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D3/00—Improving or preserving soil or rock, e.g. preserving permafrost soil
- E02D3/12—Consolidating by placing solidifying or pore-filling substances in the soil
- E02D3/123—Consolidating by placing solidifying or pore-filling substances in the soil and compacting the soil
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
- E02D5/62—Compacting the soil at the footing or in or along a casing by forcing cement or like material through tubes
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D9/00—Removing sheet piles bulkheads, piles, mould-pipes or other moulds or parts thereof
- E02D9/02—Removing sheet piles bulkheads, piles, mould-pipes or other moulds or parts thereof by withdrawing
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2300/00—Materials
- E02D2300/0004—Synthetics
- E02D2300/0018—Cement used as binder
- E02D2300/0021—Mortar
Landscapes
- Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Agronomy & Crop Science (AREA)
- Environmental & Geological Engineering (AREA)
- Soil Sciences (AREA)
- Earth Drilling (AREA)
Abstract
Description
Claims (12)
- 천공기를 이용하여 케이싱을 지하로 박아주는 과정,천공기를 이용하여 로드가 연결된 모니터로 케이싱의 내측에서 지하의 빈공간까지 천공을 하는 과정,모니터로 천공층까지 천공을 한 후 로드를 풀고 케이싱과 로드 사이의 밀봉을 위한 밀봉장치를 끼우고 다시 로드를 연결하는 과정,모니터를 일정 길이만큼 빼내고 밀봉장치를 밀어 케이싱과 로드 사이의 밀봉을 행하는 과정,밀봉장치의 밀봉 후 로드와 모니터에 형성된 몰타르 주입로를 통하여 공사 현장에 구할 수 있는 재질의 주입재를 천공구멍과 지하의 빈공간에 채우는 과정,다시 모니터를 일정 길이로 들어 올린 후 주입재를 채우는 작업을 반복한 후 천공구멍에 주입재가 채워지면 모니터와 케이싱을 빼내는 과정을 수행하여 이루어지는 것을 특징으로 하는 지반 보강 공법.
- 제1항에 있어서, 파이프 형태를 갖고 하부에 천공날이 고정되는 케이싱은 비트나 햄머비트가 결합되는 모니터의 하부 컨넥터에 결합되고, 상기 모니터에 결합된 케이싱은 천공기로 지면에 박아주는 것을 특징으로 하는 지반 보강 공법.
- 제1항에 있어서, 로드를 분리한 후 로드에는 내측으로 링 형태의 고무가 끼 워진 누름 플렌지를 외삽되게 하는 한편 케이싱의 상측에는 받침플렌지를 체결하고, 케이싱은 홀더로 고정시킨 후 로드를 잡아주는 홀더로 받침 플렌지를 눌러주어 받침 플렌지가 누름 플렌지의 고무를 압착시켜 고무가 벌어지면서 로드와 케이싱 사이가 밀봉되게 하는 것을 특징으로 하는 지반 보강 공법.
- 제1항에 있어서, 밀봉장치에 의해 케이싱과 로드사이가 밀봉되게 되면 로드와 모니터의 몰타르 주입로를 통하여 공사현장에서 구할 수 있는 주입재를 밀어 넣고, 상기 주입재는 모니터의 Y자형 배출구를 통하여 천공구멍과 지하의 빈공간으로 배출되며, 상기 배출구 쪽으로 에어 주입로에서 에어가 배출되게 하는 것을 특징으로 하는 지반 보강 공법.
- 제1항에 있어서, 주입재는 공사현장에서 구할 수 있는 흙, 모래, 자갈, 뻘 등의 재료를 혼합하여 주입하거나 보강재를 혼합하여 사용하는 것을 특징으로 하는 지반 보강 공법.
- 제1항에 있어서, 천공구멍에 채우는 주입재는 시멘트 몰타르 또는 현장에서 구할 수 있는 주입재를 사용하되 지하에 빈공간 많은 곳에서는 저압주입이 이루어지게 하고, 연약지반과 단층부위에서는 압력을 가하며 몰타르가 지하 틈새로 채워져 지수층을 형성하는 것을 특징으로 하는 지반 보강 공법.
- 제1항에 있어서, 천공구멍에 채워지는 시멘트 몰타르와 주입재는 단독 또는 혼합되어 주입되는 것을 특징으로 하는 지반 보강 공법.
- 삭제
- 삭제
- 삭제
- 삭제
- 삭제
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020080092871A KR100895336B1 (ko) | 2008-09-22 | 2008-09-22 | 지반 보강 공법 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020080092871A KR100895336B1 (ko) | 2008-09-22 | 2008-09-22 | 지반 보강 공법 |
Related Child Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR1020090006220A Division KR101110218B1 (ko) | 2009-01-23 | 2009-01-23 | 지반 보강 공법 |
Publications (1)
Publication Number | Publication Date |
---|---|
KR100895336B1 true KR100895336B1 (ko) | 2009-05-07 |
Family
ID=40861596
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR1020080092871A KR100895336B1 (ko) | 2008-09-22 | 2008-09-22 | 지반 보강 공법 |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR100895336B1 (ko) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101148175B1 (ko) * | 2011-12-27 | 2012-05-24 | 서정엔지니어링 주식회사 | 폐광산용 지중 가압식 갱도 충전 장치 및 이를 이용한 지중 가압식 모래 충전공법 |
KR101561214B1 (ko) * | 2013-06-27 | 2015-10-20 | 한국광해관리공단 | 광산 채굴공동 충전 장치 |
CN105464086A (zh) * | 2015-12-31 | 2016-04-06 | 宗超 | 楔形插头l桩成桩机 |
JP2021188445A (ja) * | 2020-06-03 | 2021-12-13 | 株式会社大阪防水建設社 | 造成ロッド及び流体吐出装置 |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH06341132A (ja) * | 1991-08-14 | 1994-12-13 | Nit Co Ltd | 全角度地盤改良体造成工法及びその装置 |
KR20020046834A (ko) * | 2000-12-15 | 2002-06-21 | 전기표 | 그라우팅 연속주입공법 및 연속주입선단장치 |
JP2005139863A (ja) | 2003-11-10 | 2005-06-02 | Shigehito Kaji | 地盤改良体造成工法およびその装置 |
KR100787612B1 (ko) * | 2006-12-27 | 2007-12-21 | 원용문 | 몰타르 및 밀크 분사용 선단장치 |
-
2008
- 2008-09-22 KR KR1020080092871A patent/KR100895336B1/ko active IP Right Grant
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH06341132A (ja) * | 1991-08-14 | 1994-12-13 | Nit Co Ltd | 全角度地盤改良体造成工法及びその装置 |
KR20020046834A (ko) * | 2000-12-15 | 2002-06-21 | 전기표 | 그라우팅 연속주입공법 및 연속주입선단장치 |
JP2005139863A (ja) | 2003-11-10 | 2005-06-02 | Shigehito Kaji | 地盤改良体造成工法およびその装置 |
KR100787612B1 (ko) * | 2006-12-27 | 2007-12-21 | 원용문 | 몰타르 및 밀크 분사용 선단장치 |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101148175B1 (ko) * | 2011-12-27 | 2012-05-24 | 서정엔지니어링 주식회사 | 폐광산용 지중 가압식 갱도 충전 장치 및 이를 이용한 지중 가압식 모래 충전공법 |
KR101561214B1 (ko) * | 2013-06-27 | 2015-10-20 | 한국광해관리공단 | 광산 채굴공동 충전 장치 |
CN105464086A (zh) * | 2015-12-31 | 2016-04-06 | 宗超 | 楔形插头l桩成桩机 |
JP2021188445A (ja) * | 2020-06-03 | 2021-12-13 | 株式会社大阪防水建設社 | 造成ロッド及び流体吐出装置 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP3839149A1 (en) | Grouting consolidation method for full casing borehole guide prefabricated pile and prefabricated pile therefor | |
JPH10325138A (ja) | 山留め壁の施工方法およびアースオーガー装置 | |
JPH0791930B2 (ja) | 地下穿孔機のセメントソイル装置 | |
CN104963346A (zh) | 复杂地质的深基坑围护施工方法 | |
KR101527723B1 (ko) | 복합형 지반개량장치 및 이를 이용한 지반개량공법 | |
KR100895336B1 (ko) | 지반 보강 공법 | |
Brown | Practical considerations in the selection and use of continuous flight auger and drilled displacement piles | |
KR101868086B1 (ko) | 천공 및 그라우팅 로드장치 | |
CA2617432C (en) | Method and device for producing a cased string bore | |
KR100956880B1 (ko) | 마이크로파일의 케이싱제거식 스탭그라우팅에 의한지지력보강방법 | |
KR101057487B1 (ko) | 기초보강 확공압밀 인발주입공법 | |
JP4358207B2 (ja) | 掘削底盤の地盤強化工法 | |
KR20100095066A (ko) | 시멘트 그라우팅에 의한 지반 개량 강화 공법 및 장치 | |
JP5721331B2 (ja) | 汚染土壌浄化方法 | |
KR102287362B1 (ko) | 저유동 몰탈을 이용한 phc파일의 선단 확대 보강 방법 | |
CN106049467A (zh) | 复杂地质下冲击钻钻孔灌注桩漏浆处理方法 | |
KR100573083B1 (ko) | 에어해머가 장착된 굴착장치를 이용한 해상 지반 개량공법 | |
KR101110218B1 (ko) | 지반 보강 공법 | |
KR101057481B1 (ko) | 기초보강 확공압밀 인발주입장치를 이용한 기초보강 확공압밀 인발주입공법 | |
KR100418366B1 (ko) | 터널형성용 터널구조물 시공방법 및 터널구조물 구조 | |
KR20180045950A (ko) | 시멘트 주입식 지반 보강시스템 및 지반 보강방법 | |
KR101337223B1 (ko) | 이중케이싱 수직배수재 타입장치 및 그 시공방법 | |
KR200337877Y1 (ko) | 지반 보강을 위한 압력식 그라우팅 장치 | |
WO2009139510A1 (en) | Construction method for continuous cut-off wall using overlap casing | |
KR101015555B1 (ko) | 쐐기형 밀봉장치 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A201 | Request for examination | ||
A302 | Request for accelerated examination | ||
E902 | Notification of reason for refusal | ||
A107 | Divisional application of patent | ||
E701 | Decision to grant or registration of patent right | ||
GRNT | Written decision to grant | ||
FPAY | Annual fee payment |
Payment date: 20130328 Year of fee payment: 5 |
|
FPAY | Annual fee payment |
Payment date: 20140326 Year of fee payment: 6 |
|
FPAY | Annual fee payment |
Payment date: 20150420 Year of fee payment: 7 |
|
FPAY | Annual fee payment |
Payment date: 20160418 Year of fee payment: 8 |
|
FPAY | Annual fee payment |
Payment date: 20170424 Year of fee payment: 9 |
|
FPAY | Annual fee payment |
Payment date: 20180405 Year of fee payment: 10 |
|
FPAY | Annual fee payment |
Payment date: 20190415 Year of fee payment: 11 |