KR100892365B1 - Boundary stone setting method - Google Patents

Boundary stone setting method Download PDF

Info

Publication number
KR100892365B1
KR100892365B1 KR1020070074582A KR20070074582A KR100892365B1 KR 100892365 B1 KR100892365 B1 KR 100892365B1 KR 1020070074582 A KR1020070074582 A KR 1020070074582A KR 20070074582 A KR20070074582 A KR 20070074582A KR 100892365 B1 KR100892365 B1 KR 100892365B1
Authority
KR
South Korea
Prior art keywords
boundary stone
vertical
stay bar
formwork
panels
Prior art date
Application number
KR1020070074582A
Other languages
Korean (ko)
Other versions
KR20090011214A (en
Inventor
이경환
Original Assignee
이경환
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 이경환 filed Critical 이경환
Priority to KR1020070074582A priority Critical patent/KR100892365B1/en
Publication of KR20090011214A publication Critical patent/KR20090011214A/en
Application granted granted Critical
Publication of KR100892365B1 publication Critical patent/KR100892365B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C19/00Machines, tools or auxiliary devices for preparing or distributing paving materials, for working the placed materials, or for forming, consolidating, or finishing the paving
    • E01C19/52Apparatus for laying individual preformed surfacing elements, e.g. kerbstones
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C11/00Details of pavings
    • E01C11/22Gutters; Kerbs ; Surface drainage of streets, roads or like traffic areas
    • E01C11/221Kerbs or like edging members, e.g. flush kerbs, shoulder retaining means ; Joint members, connecting or load-transfer means specially for kerbs
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C19/00Machines, tools or auxiliary devices for preparing or distributing paving materials, for working the placed materials, or for forming, consolidating, or finishing the paving
    • E01C19/50Removable forms or shutterings for road-building purposes; Devices or arrangements for forming individual paving elements, e.g. kerbs, in situ
    • E01C19/502Removable forms or shutterings, e.g. side forms; Removable supporting or anchoring means therefor, e.g. stakes
    • E01C19/506Removable forms or shutterings, e.g. side forms; Removable supporting or anchoring means therefor, e.g. stakes for kerbs, gutters or similar structures, e.g. raised portions, median barriers

Abstract

본 발명은 건설분야 중 도로시설에 분야에 속하는 기술로서, 인도와 차도의 경계선에 설치되는 경계석 설치공법에 관한 것이다.The present invention is a technology belonging to the field of road facilities in the field of construction, and relates to a boundary stone installation method installed on the boundary between the sidewalk and the roadway.

본 발명은 상호 대향하는 양측 수직면 패널(110)과 상기 양측 수직면 패널(110) 사이를 연결, 고정시키는 스테이바(120)를 포함하여 구성되는 시스템 거푸집(100) 다수개를 경계석(20) 배치라인을 따라 연속적으로 연결, 설치하는 제1단계; 인접한 2개의 스테이바(120) 위에 경계석(20)을 거치시키는 제2단계; 양측 수직면 패널(110) 사이에 콘크리트를 타설, 양생하여 상기 경계석(20)을 고정시키는 기초부(30)를 형성하는 제3단계; 및 상기 시스템 거푸집(100)을 탈형하는 제4단계;로 이루어지되,The present invention includes a plurality of system formwork (100) comprising a stay bar (120) for connecting and fixing mutually opposing both side vertical panels (110) and the two vertical panels (110), the boundary stone (20) The first step of connecting and installing continuously along; A second step of placing the boundary stone 20 on two adjacent stay bars 120; A third step of forming and curing concrete between both vertical surface panels 110 to form a foundation portion 30 to fix the boundary stone 20; And a fourth step of demolding the system formwork 100,

상기 제1단계는 상기 스테이바(120)가 양측 수직면 패널(110)의 이격거리에 대응하는 길이를 갖는 파이프(200)를 관통하도록 설치하고, 상기 제4단계는 상기 스테이바(120)를 파이프(200)에서 빼낸 후 양측 수직면 패널(110)을 해체하는 과정으로 이루어지는 것을 특징으로 하는 도로 경계석 시공방법을 제공한다.The first step is installed so that the stay bar 120 penetrates the pipe 200 having a length corresponding to the separation distance between the two vertical panels 110, the fourth step is to pipe the stay bar 120 After removing from the (200) provides a road boundary stone construction method comprising the process of dismantling both side vertical panel 110.

도로, 경계석, 거푸집, 스테이바, 콘트롤바 Road, boundary stone, formwork, stay bar, control bar

Description

도로 경계석 시공방법{Boundary stone setting method}Boundary stone setting method

본 발명은 건설분야 중 도로시설에 분야에 속하는 기술로서, 인도와 차도의 경계선에 설치되는 경계석 설치공법에 관한 것이다.The present invention is a technology belonging to the field of road facilities in the field of construction, and relates to a boundary stone installation method installed on the boundary between the sidewalk and the roadway.

도로 경계석은 도1에 도시된 구조로 설치된다. The road boundary stone is installed in the structure shown in FIG.

차량의 인도(보도) 침범으로부터 보행자를 보호하기 위하여 인도(보도)를 차도보다 높게 설치하는 것이고, 경계석 설치의 주요 목적은 인도의 파손방지에 있으므로, 지반(땅) 위에 경계석을 단순히 배치하지 않고 도1에 도시된 바와 같이 콘크리트로 제작한 기초부(30)에 경계석(20)을 고정시키는 구조로 설치되는 것이다.In order to protect pedestrians from invading vehicles, the sidewalk is installed higher than the roadway, and the main purpose of the boundary stone installation is to prevent the damage of sidewalks. As shown in 1 is to be installed in a structure for fixing the boundary stone 20 to the base portion 30 made of concrete.

종래에는 도2에 도시된 순서에 따라 경계석이 설치되어 왔으며, 종래의 경계석 설치 순서는 경계석 설치라인에 받침부재(10)를 배치하는 단계; 받침부재(10) 위에 경계석(20)을 얹어 배치하는 단계; 기초부(30) 제작을 위해 측면거푸집(1)과 상기 측면거푸집(1)의 전도방지를 위한 버팀대(2)를 설치하는 단계; 측면거푸집 안 쪽으로 콘크리트를 타설, 양생하는 단계; 및 버팀대(2) 및 측면거푸집(1)을 해체하는 단계로 정리할 수 있다.Conventionally, the boundary stone has been installed according to the order shown in FIG. 2, and the conventional boundary stone installation order includes disposing a supporting member 10 on the boundary stone installation line; Placing the boundary stone 20 on the support member 10; Installing a brace (2) for preventing the fall of the side formwork (1) and the side formwork (1) for fabrication of the base portion (30); Pouring and curing concrete into the side formwork; And it can be arranged to dismantle the brace (2) and the side formwork (1).

다만, 경계석(20)을 기준으로 인도측의 기초부 시공은 시공상 번잡함을 이유로 생략하는 경우도 많았다.However, on the basis of the boundary stone 20, the construction of the foundation part on the side of the Indian side was often omitted due to the complexity of the construction.

상기한 바와 같은 종래의 경계석 설치방법을 시행하는 경우에는 다음과 같은 문제점이 있다.When implementing the conventional boundary stone installation method as described above has the following problems.

1. 경계석의 설치 높이를 받침부재의 높이로 조절했으므로 여러 사이즈의 받침부재가 필요하다는 문제.1. The problem is that the support members of different sizes are needed because the installation height of the boundary stone is adjusted to the height of the support members.

2. 기초부 시공을 위한 거푸집 및 버팀대 설치, 해체 작업은 숙련된 작업자가 수행하여야 하며, 작업이 번거로워 공기가 지연된다는 문제.2. Installation and dismantling of formwork and braces for foundation construction should be done by skilled workers, and the work is cumbersome and the air is delayed.

3. 경계석을 기준으로 인도측의 기초부 시공은 시공상 번잡함을 이유로 생략하는 경우가 많아 차도측에서 경계석에 충격이 가해질 때, 경계석의 기울어짐, 경계석과 접한 보도블럭의 들뜸 등이 발생한다는 문제.3. The construction of the foundation part on the side of the side of the sidewalk is often omitted due to the complexity of the construction. Therefore, when the boundary stone is impacted on the roadway side, the boundary stone is inclined and the sidewalk block facing the boundary stone occurs .

4. 경계석의 높이조절, 기초부의 폭조절, 경계석의 굴곡배치 등에 효과적으로 대응할 수 없어, 각 시공상황에 따른 거푸집을 새로 제작해야 한다는 문제. 4. The problem of having to manufacture new formwork according to each construction situation because it cannot cope effectively with height adjustment of the boundary stone, width adjustment of the foundation part, bending arrangement of the boundary stone.

본 발명은 위에서 열거한 종래의 경계석 설치방법의 문제점을 해결하여, 시공이 간편하면서도 시공품질이 향상된 경계석 시공방법을 제시함을 그 목적으로 한다.The present invention solves the problems of the above-mentioned conventional boundary stone installation method, the object of the present invention is to propose a boundary stone construction method with a simple construction and improved construction quality.

본 발명은 스테이바로 연결되는 시스템 거푸집을 활용하여, 스테이바 위에 경계석을 배치함으로써 경계석의 설치높이를 조절하고 별도의 버팀대 설치공정은 생략하며, 폭, 간격 및 연결각도를 조절할 수 있는 시스템 거푸집을 구성함으로서 시공현장의 다양한 요구를 수용하도록 하여 상기한 과제를 해결한다.The present invention utilizes the system formwork connected to the stay bar, by placing the boundary stone on the stay bar to adjust the installation height of the boundary stone and omit a separate brace installation process, to configure a system formwork that can adjust the width, spacing and connection angle This solves the above problems by accommodating the various needs of the construction site.

본 발명에 의하면 다음과 같은 효과가 있다.According to the present invention has the following effects.

1. 스테이바의 높이조절에 의해 경계석 높이를 다양하게 변화시킬 수 있다.1. By adjusting the height of the stay bar, the height of the boundary stone can be changed in various ways.

2. 스테이바가 양쪽 수직면 패널과 결합, 고정됨으로써 시스템 거푸집의 일체성이 확보되어 콘크리트 타설 중의 측압에 대항할 수 있으므로 별도의 버팀대 설치는 생략할 수 있다.2. As the staybar is combined with and fixed to both vertical panels, the integrity of the system formwork is secured and can be used to counteract the lateral pressure during concrete placement.

3. 한 번의 거푸집 설치와 콘크리트 타설로 기초부를 제작하므로 공기가 단축되고 시공능률이 향상된다.3. Since the foundation is made by one formwork and concrete pouring, the air is shortened and construction efficiency is improved.

4. 큰 어려움 없이 설계상 및 기준상의 요구조건에 따른 정교한 시공이 가능하므로 종래에 비해 시공품질이 향상된다.4. The construction quality can be improved according to the requirements of design and standard without great difficulty.

5. 유닛패널간 연결각도 조절, 수직면 패널간 이격거리 조절 및 수직면 거푸집의 폭조절이 가능한 시스템 거푸집은 다양한 시공현장에 활용할 수 있다.5. System formwork that can control the connection angle between unit panels, the distance between vertical panels and the width of vertical formwork can be used in various construction sites.

본 발명은 다음의 각 단계로 이루어지는 도로 경계석 시공방법을 제공한다.The present invention provides a road boundary stone construction method consisting of the following steps.

Ⅰ. 도로 경계석 시공방법에 대한 단계적 설명I. Step-by-step explanation of construction method of road boundary stone

1. 제1단계1. The first step

본 단계는 상호 대향하는 양측 수직면 패널(110)과 상기 양측 수직면 패널(110) 사이를 연결, 고정시키는 스테이바(120)를 포함하여 구성되는 시스템 거푸집(100) 다수개를 경계석(20) 배치라인을 따라 연속적으로 연결, 설치하는 단계이다. (도3의 (a) 참조)In this step, a plurality of system formwork (100) comprising a stay bar (120) for connecting and fixing the two vertical panels 110 and the two vertical panels (110) facing each other, the boundary line 20 arrangement line Follow the steps to connect and install continuously. (See Fig. 3 (a).)

이 때, 상기 스테이바(120)가 양측 수직면 패널(110)의 이격거리에 대응하는 길이를 갖는 파이프(200)를 관통하도록 설치하면, 후술할 제3단계에서 콘크리트에 매립되지 않으므로, 제4단계에서 회수하여 타 구간 시공시 재사용할 수 있게 된다.At this time, if the stay bar 120 is installed to penetrate the pipe 200 having a length corresponding to the separation distance between the two vertical surface panels 110, since it is not embedded in the concrete in the third step to be described later, the fourth step It can be recovered and reused when constructing other sections.

상기 시스템 거푸집(100)에 대한 상세한 설명은 후술하기로 한다.Detailed description of the system formwork 100 will be described later.

2. 제2단계2. Second Step

본 단계는 인접한 2개의 스테이바(120) 위에 경계석(20)을 거치시키는 단계이다. (도3의 (b) 참조)In this step, the boundary stone 20 is mounted on two adjacent stay bars 120. (See Figure 3 (b))

상기 스테이바(120)의 설치높이는 곧 경계석(20) 저면의 설치높이이므로, 본원발명에서는 상기 스테이바(120)의 설치높이를 조절하는 방법을 함께 제공한다.(이에 대한 자세한 내용은 후술하기로 한다.)Since the installation height of the stay bar 120 is the installation height of the bottom of the boundary stone 20, the present invention provides a method for adjusting the installation height of the stay bar 120. (The details of this will be described later. do.)

한편, 제1단계에서 상기 스테이바(120)를 파이프(200)에 끼워 시공한 경우라면 경계석(20)도 파이프(200) 위에 거치되는 것이다.On the other hand, in the case where the construction of the stay bar 120 is fitted to the pipe 200 in the first step, the boundary stone 20 is also mounted on the pipe 200.

3. 제3단계3. The third step

본 단계는 양측 수직면 패널(110) 사이에 콘크리트를 타설, 양생하여 상기 경계석(20)을 고정시키는 기초부(30)를 형성하는 단계이다. (도3의 (c) 참조)This step is to form the foundation 30 to fix the boundary stone 20 by placing and curing concrete between the two vertical panels 110. (See Fig. 3 (c).)

상기 기초부(30) 제작시에는 종래의 도로 경계석 설치방법에서와 같이, 콘크리트 타설면이 경계석(20)의 하단보다 위로 올라오게 하여, 기초부 콘크리트가 양생된 후에는 전체적으로 경계석(20)의 하단이 기초부(30)에 매립된 구조를 이루도록 제작함으로써, 경계석(20)에 작용하는 양측방향 하중에 대항할 수 있게 해야 한다.At the time of manufacturing the foundation part 30, as in the conventional road boundary stone installation method, the concrete placing surface is raised above the lower end of the boundary stone 20, after the foundation concrete is cured, the lower end of the boundary stone 20 as a whole By making the structure embedded in the base portion 30, it should be possible to counter the lateral loads acting on the boundary stone 20.

또한, 종래의 방법하에서는 콘크리트 측압에 대항하기 위해 거푸집의 배면에 별도의 버팀대 등의 설치가 필요했었는데, 본원발명에서는 상기 스테이바(120)가 양측의 수직면 패널(110)을 붙잡아 고정시키며 일체화되어 있으므로 별도의 버팀대는 불필요하게 된다. In addition, under the conventional method, it was necessary to install a separate brace on the back of the formwork in order to counteract the concrete side pressure. No extra braces are needed.

4. 제4단계4. Fourth Step

본 단계는 상기 시스템 거푸집(100)을 탈형하는 단계이다. (도3의 (d) 참조)This step is demolding the system formwork (100). (See Fig. 3 (d).)

제1단계에서 스테이바(120)를 파이프(200)에 끼워 시공한 경우에는 스테이바(120)를 먼저 회수한 후 양측면의 수직면 패널을 탈형한다. 이 후 상기 파이프 안쪽은 모르타르로 채울 수 있으나, 모르타르를 채우지 않은 상태로 놔두더라도 기초부(30)의 강도에는 큰 영향이 없을 것으로 보이며, 오히려 상기 파이프는 배수, 배선 등의 용도로 활용할 수 있다.In the first step, when the stay bar 120 is fitted into the pipe 200, the stay bar 120 is recovered first, and then the vertical panels on both sides are demolded. Thereafter, the inside of the pipe may be filled with mortar, but even if the mortar is left unfilled, the strength of the foundation 30 may not be significantly affected. Rather, the pipe may be used for drainage, wiring, and the like.

본 단계까지 마침으로서 인도와 차도의 경계석 시공은 완료된다.By the end of this phase, the construction of the boundary stone between the sidewalk and the driveway is completed.

Ⅱ. 시스템 거푸집의 활용에 대한 설명II. Explanation of the use of system formwork

상기 수직면 패널(110)은, 거푸집널(111) 및 상기 거푸집널(111)의 상하단에 결합하는 프레임부(112)로 구성되며, 길이방향을 따라 일정간격으로 다수개의 끼움홈(114)이 형성된 수직앵글(113)이 상기 거푸집널(111)의 양측에 결합된 유닛패널(110a)이 연결부(120)에 의해 횡방향으로 복수개 연결된 것이고, 상기 스테이바(120)는 길이방향을 따라 일정간격으로 끼움홈(121)이 형성된 것을 사용함으로써, 상기 제1단계에서는, 시스템 거푸집(100) 설치작업은 수직부(131)와 수평부(132)를 갖도록 절곡된 콘트롤바(130)를 이용하여 상기 스테이바(120)를 설치하되, 상기 수직부(131)는 상기 스테이바(120)의 끼움홈(121)에, 상기 수평부(132)는 인접하는 2개의 수직앵글(113)의 끼움홈(114)에 동시에 끼우며, 스테이바(120)의 설치높이와 수직면 패널(110)의 설치간격을 조절할 수 있다.The vertical panel 110 is composed of a formwork 111 and the frame portion 112 coupled to the upper and lower ends of the formwork 111, a plurality of fitting grooves 114 are formed at a predetermined interval along the longitudinal direction A plurality of vertical panel 113 is coupled to both sides of the formwork 111, the unit panel 110a is connected in the lateral direction by the connecting portion 120, the stay bar 120 at a predetermined interval along the longitudinal direction By using the fitting groove 121 is formed, in the first step, the system formwork 100 installation work using the control bar 130 bent to have a vertical portion 131 and a horizontal portion 132 the stay The bar 120 is installed, but the vertical portion 131 is fitted into the fitting groove 121 of the stay bar 120, and the horizontal portion 132 is fitting groove 114 of two adjacent vertical angles 113. At the same time, the installation height of the stay bar 120 and the installation interval of the vertical surface panel 110 can be adjusted.

도4는 위와 같은 시스템 거푸집(100)의 일 실시예를, 도5는 스테이바를, 도6은 콘트롤 바를 각각 도시하고 있고, 도4 내지 도6에 의해 상기 수직앵글(113), 스테이바(120) 및 콘트롤바(130)의 결합상태에 따라 상기 스테이바(120)의 설치높이 및 수직면 패널(100)의 배치간격이 달라짐을 파악할 수 있다.. 4 shows an embodiment of the system formwork 100 as described above, FIG. 5 shows a stay bar and FIG. 6 shows a control bar, respectively. The vertical angle 113 and the stay bar 120 are shown by FIGS. ) And the installation height of the stay bar 120 and the arrangement interval of the vertical surface panel 100 vary according to the coupling state of the control bar 130.

상기 스테이바(120)는, 콘크리트 타설중의 측압에 대항하여 상호 대향 배치된 수직면 패널(110)의 간격을 일정하게 유지시키는 역할과, 상기 경계석(20)을 받쳐주는 역할을 함께 수행하는 것으로서, 도5에 도시된 바와 같이 길이방향을 따라 일정간격으로 형성된 다수개의 끼움홈(121)을 구비하고 있다.The stay bar 120 serves to maintain a constant distance between the vertical surface panels 110 disposed to face each other against the side pressure during concrete pouring, and to support the boundary stone 20. As shown in FIG. 5, a plurality of fitting grooves 121 are formed at predetermined intervals along the longitudinal direction.

한편, 도6에 도시된 것과 같이 상기 콘트롤바(130)의 수직부(131)가 테이퍼(taper) 형태로 구비된 것을 사용할 수 있는데, 상기 콘트롤바(130)의 수평부(132)를 수직앵글(113) 끼움홈(114) 중 어디에 끼우느냐에 따라 상기 스테이바(120)의 설치 높이가 정해지지만, 테이퍼 형태로 구비된 상기 콘트롤바(130)의 수직부 높이 변화에 의해 스테이바(120) 설치높이의 미세한 조정까지 가능하게 된다.Meanwhile, as shown in FIG. 6, the vertical portion 131 of the control bar 130 may be provided in a taper shape. The horizontal portion 132 of the control bar 130 may be vertically angled. Although the installation height of the stay bar 120 is determined according to which of the fitting grooves 114 is fitted, the stay bar 120 is changed by the height of the vertical portion of the control bar 130 provided in a tapered shape. Fine adjustment of the installation height is possible.

도7은 유닛패널(110a)을 연결시키는 연결부(140)로서, 유닛패널(110a) 간의 연결각도가 조절되도록 구성된 예를 도시한 것이다.FIG. 7 illustrates an example in which the connection angle between the unit panels 110a is adjusted as the connection unit 140 connecting the unit panels 110a.

연결각도의 조절을 위해서는 일반적인 여닫이 문에 적용되는 경첩에 의한 결합을 생각할 수 있으나, 연결각도 조절뿐만 아니라 연결각도가 조절된 상태에서의 고정까지도 고려하여, 도7과 같은 연결부(140) 실시예를 제시하고 있는 것이다.In order to adjust the connection angle can be considered a combination by a hinge applied to a general swing door, in addition to adjusting the connection angle in consideration of the fixing in the state in which the connection angle is adjusted, the embodiment of the connection portion 140 as shown in FIG. It is presenting.

도7에 도시된 연결부(140)는, 경첩볼트(141)가 인접하는 2개의 수직앵글(113)에 걸쳐 설치되어, 연결된 유닛패널(110a)간의 연결각도가 조절되도록 구성된 것이다.The connecting portion 140 shown in FIG. 7 is provided so that the hinge bolts 141 are installed over two vertical angles 113 adjacent to each other, and the connection angle between the connected unit panels 110a is adjusted.

상기 경첩볼트(141)는 볼트의 일단에 통공이 형성된 것으로서, 통공 형성부는 일측의 수직앵글(113)에 설치된 브래킷상(142)에 배치, 고정되되, 상기 브래킷(142)과 경첩볼트(141)의 통공을 관통한 상태로 고정너트(145a)와 결합되는 핀볼 트(143)를 축으로 회동가능하도록 설치되고, 수나사산이 형성된 볼트부는 타측의 수직앵글(110)에 세로축 방향으로 회동가능하도록 설치된 힌지블럭(144)에 거치된 상태에서, 상기 힌지블럭(144)의 양측면에서 결합되는 고정너트(145b, 145c)에 의해 고정된다.The hinge bolt 141 is formed with a hole in one end of the bolt, the hole forming portion is arranged and fixed on the bracket 142 installed on the vertical angle 113 of one side, the bracket 142 and the hinge bolt 141 The pin bolt 143 coupled to the fixing nut 145a in a state penetrating the through hole of the shaft is installed to be rotatable, and the bolt portion having the male thread is installed to be rotatable in the vertical axis direction to the vertical angle 110 on the other side. In a state in which the hinge block 144 is mounted, it is fixed by fixing nuts 145b and 145c coupled at both sides of the hinge block 144.

도8은 폭이 조절되도록 구성된 수직면 패널을 도시한 것이다. 폭이 조절되도록 구성된 수직면 패널은 메인패널(110b-1)과 서브패널(110b-2)의 중첩적으로 구성된 유닛패널(100b)되는 것으로 상기 서브패널(110b-2)이 상기 메인패널(110b-2)의 프레임부를 따라 횡으로 슬라이딩 운동을 함으로서 거푸집의 폭을 늘릴 수 있다.Figure 8 shows a vertical face panel configured to be adjusted in width. The vertical surface panel configured to adjust the width is a unit panel 100b configured to overlap the main panel 110b-1 and the subpanel 110b-2. The subpanel 110b-2 is the main panel 110b-. The width of the formwork can be increased by sliding sideways along the frame part of 2).

위에서 설명한 바와 같이 각도조절이 가능한 연결부(140)와 폭이 조절되도록 구성된 수직면 패널(110)을 구비한 시스템 거푸집을 활용하여, 도로 상황에 따라 다양한 각도로 경계석(20)을 설치할 수 있다. As described above, by utilizing the system formwork having an adjustable angle connecting portion 140 and the vertical panel 110 configured to adjust the width, the boundary stone 20 can be installed at various angles according to the road situation.

도1은 경계석 설치 구조를 도시한 것이다.Figure 1 shows the boundary stone installation structure.

도2는 종래의 경계석 설치과정을 시공순서별로 도시한 것이다.Figure 2 shows a conventional boundary stone installation process by construction order.

도3은 본 발명에 따른 도로 경계석 시공방법을 시공순서별로 도시한 것이다.Figure 3 shows the road boundary stone construction method according to the construction order according to the present invention.

도4는 본 발명에 적용되는 시스템 거푸집의 일 실시예를 도시한 것이다.Figure 4 illustrates one embodiment of a system formwork applied to the present invention.

도5는 스테이바를 도시한 것이다.5 shows a stay bar.

도6은 콘트롤바를 도시한 것이다.6 shows a control bar.

도7은 연결부를 도시한 것이다.Figure 7 shows the connection.

도8은 폭이 조절되도록 구성된 수직면 패널을 도시한 것이다.Figure 8 shows a vertical face panel configured to be adjusted in width.

<도면의 주요부호에 대한 설명><Description of Major Symbols in Drawing>

10 : 받침부재 20 : 경계석10: support member 20: boundary stone

30 : 기초부30: foundation

100 : 시스템 거푸집 110 : 수직면 패널100 system formwork 110 vertical panel

120 : 스테이바 130 : 콘트롤바120: stay bar 130: control bar

140 : 연결부 140: connection

200 : 파이프200: pipe

Claims (3)

상호 대향하는 양측 수직면 패널(110)과 상기 양측 수직면 패널(110) 사이를 연결, 고정시키는 스테이바(120)를 포함하여 구성되는 시스템 거푸집(100) 다수개를 경계석(20) 배치라인을 따라 연속적으로 연결, 설치하는 제1단계;A plurality of system formwork 100, including a stay bar 120 for connecting and fixing the two vertical panels 110 and the two vertical panels 110 opposite to each other continuously along the boundary line 20 arrangement line Connecting, installing the first step; 인접한 2개의 스테이바(120) 위에 경계석(20)을 거치시키는 제2단계;A second step of placing the boundary stone 20 on two adjacent stay bars 120; 양측 수직면 패널(110) 사이에 콘크리트를 타설, 양생하여 상기 경계석(20)을 고정시키는 기초부(30)를 형성하는 제3단계; 및A third step of forming and curing concrete between both vertical surface panels 110 to form a foundation portion 30 to fix the boundary stone 20; And 상기 시스템 거푸집(100)을 탈형하는 제4단계;로 이루어지되,A fourth step of demolding the system formwork 100; 상기 제1단계는 상기 스테이바(120)가 양측 수직면 패널(110)의 이격거리에 대응하는 길이를 갖는 파이프(200)를 관통하도록 설치하고,The first step is installed so that the stay bar 120 penetrates the pipe 200 having a length corresponding to the separation distance between the two vertical panels 110, 상기 제4단계는 상기 스테이바(120)를 파이프(200)에서 빼낸 후 양측 수직면 패널(110)을 해체하는 과정으로 이루어지는 것을 특징으로 하는 도로 경계석 시공방법. The fourth step is a road boundary stone construction method comprising the step of disassembling the vertical panel 110 on both sides after removing the stay bar 120 from the pipe (200). 상호 대향하는 양측 수직면 패널(110)과 상기 양측 수직면 패널(110) 사이를 연결, 고정시키는 스테이바(120)를 포함하여 구성되는 시스템 거푸집(100) 다수개를 경계석(20) 배치라인을 따라 연속적으로 연결, 설치하는 제1단계;A plurality of system formwork 100, including a stay bar 120 for connecting and fixing the two vertical panels 110 and the two vertical panels 110 opposite to each other continuously along the boundary line 20 arrangement line Connecting, installing the first step; 인접한 2개의 스테이바(120) 위에 경계석(20)을 거치시키는 제2단계;A second step of placing the boundary stone 20 on two adjacent stay bars 120; 양측 수직면 패널(110) 사이에 콘크리트를 타설, 양생하여 상기 경계석(20)을 고정시키는 기초부(30)를 형성하는 제3단계; 및A third step of forming and curing concrete between both vertical surface panels 110 to form a foundation portion 30 to fix the boundary stone 20; And 상기 시스템 거푸집(100)을 탈형하는 제4단계;로 이루어지되,A fourth step of demolding the system formwork 100; 상기 수직면 패널(110)은, 거푸집널(111) 및 상기 거푸집널(111)의 상하단에 결합하는 프레임부(112)로 구성되며, 길이방향을 따라 일정간격으로 다수개의 끼움홈(114)이 형성된 수직앵글(113)이 상기 거푸집널(111)의 양측에 결합된 유닛패널(110a)이 연결부(120)에 의해 횡방향으로 복수개 연결된 것이고,The vertical panel 110 is composed of a formwork 111 and the frame portion 112 coupled to the upper and lower ends of the formwork 111, a plurality of fitting grooves 114 are formed at a predetermined interval along the longitudinal direction A plurality of vertical panels 113 are coupled to both sides of the formwork 111, the unit panel 110a is connected to the plurality of horizontally by the connecting portion 120, 상기 스테이바(120)는 길이방향을 따라 일정간격으로 끼움홈(121)이 형성된 것으로서,The stay bar 120 has a fitting groove 121 is formed at a predetermined interval along the longitudinal direction, 상기 제1단계에서, 시스템 거푸집(100) 설치작업은 수직부(131)와 수평부(132)를 갖도록 절곡된 콘트롤바(130)를 이용하여 상기 스테이바(120)를 설치하되,In the first step, the system formwork 100 installation work is to install the stay bar 120 using a control bar 130 bent to have a vertical portion 131 and a horizontal portion 132, 상기 수직부(131)는 상기 스테이바(120)의 끼움홈(121)에, 상기 수평부(132)는 인접하는 2개의 수직앵글(113)의 끼움홈(114)에 동시에 끼우며, 스테이바(120)의 설치높이와 수직면 패널(110)의 설치간격을 조절하는 과정을 포함하는 것을 특징으로 하는 도로 경계석 시공방법. The vertical portion 131 is inserted into the fitting groove 121 of the stay bar 120, the horizontal portion 132 is simultaneously inserted into the fitting groove 114 of two adjacent vertical angles 113, the stay bar Road boundary stone construction method comprising the step of adjusting the installation height of the 120 and the installation interval of the vertical surface panel (110). 삭제delete
KR1020070074582A 2007-07-25 2007-07-25 Boundary stone setting method KR100892365B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020070074582A KR100892365B1 (en) 2007-07-25 2007-07-25 Boundary stone setting method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020070074582A KR100892365B1 (en) 2007-07-25 2007-07-25 Boundary stone setting method

Publications (2)

Publication Number Publication Date
KR20090011214A KR20090011214A (en) 2009-02-02
KR100892365B1 true KR100892365B1 (en) 2009-04-10

Family

ID=40682390

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020070074582A KR100892365B1 (en) 2007-07-25 2007-07-25 Boundary stone setting method

Country Status (1)

Country Link
KR (1) KR100892365B1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101071691B1 (en) 2011-04-07 2011-10-11 주식회사 유신 Using the contact type form and the contact type form civil engineering, road construction method of boundary stone gutter

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104005313B (en) * 2014-06-16 2015-12-02 中国葛洲坝集团第二工程有限公司 Asphalt concrete pavement dividing strip road kerb construction method

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS58174560U (en) 1982-05-17 1983-11-22 岡部株式会社 formwork board
KR200209597Y1 (en) 2000-08-03 2001-01-15 안영순 Width adjustable concrete form
KR100654170B1 (en) * 2006-06-08 2006-12-06 이종열 Apparatus for constructing a curbstone

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS58174560U (en) 1982-05-17 1983-11-22 岡部株式会社 formwork board
KR200209597Y1 (en) 2000-08-03 2001-01-15 안영순 Width adjustable concrete form
KR100654170B1 (en) * 2006-06-08 2006-12-06 이종열 Apparatus for constructing a curbstone

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101071691B1 (en) 2011-04-07 2011-10-11 주식회사 유신 Using the contact type form and the contact type form civil engineering, road construction method of boundary stone gutter

Also Published As

Publication number Publication date
KR20090011214A (en) 2009-02-02

Similar Documents

Publication Publication Date Title
KR100837608B1 (en) J.K Bracket Method
KR101588593B1 (en) Temporary bridge construction method
CN106836445B (en) Trapezoidal drainage ditch pouring forming method based on adjustable groove forming die
KR20170072080A (en) Cantilever part for bridge and constructing method thereof
US20140223851A1 (en) Prefabricated reinforced concrete wall panel and installation method
KR100892365B1 (en) Boundary stone setting method
KR100892751B1 (en) Bridge repairng method by upper structure lifting and hinge typeed temporary bridge construction
KR20090070852A (en) Method and apparatus for constructing boader stones between footway and roadway
KR101378967B1 (en) Apparatus for constructing boundary stone
JP4477467B2 (en) Bridge structure and its replacement method
KR101619330B1 (en) Horizontal Beam Supporting Bracket for Temporary Soil Retaining Work
KR100778139B1 (en) Frame for length adjustment in horizontal prop of mold
CN110055903B (en) Support of bridge gate type pier top folding section and installation method thereof
KR100791991B1 (en) Temporary bridge consruction method using composite slab girder
CN210368646U (en) Support of bridge portal pier top closure section
KR200456737Y1 (en) A supporter of a road boundary stone
CN112031495A (en) Prefabricated cabin transformer substation assembled steel structure foundation and construction splicing method thereof
KR100964721B1 (en) Block for road extension
KR20090025748A (en) Closed conduit using corbel slab
WO2005106136A1 (en) Fabricated breast walls in which a pre-stress is induced in steel strands installed in a body and a construction method thereof
KR100556629B1 (en) Fabricated temporary junction bridge with easy construction and dismantlement and building method thereof
KR200419013Y1 (en) Temporary bridge consruction system using composite slab girder
CN219450490U (en) Assembled stone blocking net skeleton and stone blocking net structure
CN218844314U (en) Supporting structure for strongly weathered mudstone tunnel
CN220433734U (en) A template system for construction of underground space concrete structure

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20120402

Year of fee payment: 4

FPAY Annual fee payment

Payment date: 20130401

Year of fee payment: 5

FPAY Annual fee payment

Payment date: 20160425

Year of fee payment: 8

LAPS Lapse due to unpaid annual fee